You are on page 1of 14

11:24:19AM

Category Overview

March 10, 2010

Reduction in lead time of rotor blades of Orpheus engine using VSM


Replications:

Time Units:

Days

Key Performance Indicators


System
Number Out
Average

105

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Reduction in lead time of rotor blades of Orpheus engine using VSM


Replications:

Time Units:

Days

Entity Time
VA Time part NVA Time part Wait Time part Transfer Time part Other Time part Total Time part
Average Half Width Minimum Value Maximum Value

2.8930
Average

(Insufficient)
Half Width

0.00
Minimum Value

49.8300
Maximum Value

0.8685
Average

(Insufficient)
Half Width

0.1300
Minimum Value

10.8340
Maximum Value

19.3165
Average

(Insufficient)
Half Width

0.00
Minimum Value

200.00
Maximum Value

0.00
Average

(Insufficient)
Half Width

0.00
Minimum Value

0.00
Maximum Value

0.00
Average

(Insufficient)
Half Width

0.00
Minimum Value

0.00
Maximum Value

23.0779

(Insufficient)

0.1300

219.38

Other
Number In part Number Out part WIP part
Value

301.00
Value

105.00
Average Half Width Minimum Value Maximum Value

97.0206

(Correlated)

0.00

196.00

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Reduction in lead time of rotor blades of Orpheus engine using VSM


Replications:

Time Units:

Days

Queue Time
Waiting Time Bench marking and flash removal.Queue bench work 2.Queue bench work.Queue blohm surface grinding and deburring.Queue Bristol root grinding.Queue correct twist and droop.Queue engraving.Queue glass beed peening.Queue Horizontal milling 1.Queue osmond cut off.Queue parawash.Queue plano milling and deburring.Queue Polishing.Queue preperation of cd test.Queue Remove corners.Queue stripping.Queue vibroetch cd test.Queue
Average Half Width Minimum Value Maximum Value

50.6919 82.0100 44.1017 3.4980 1.9983 19.8223 0.03416667 0.00 20.4524 0.00 42.9503 21.2469 32.6900 50.9785 47.7395 45.3670 0.00

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)

0.00 81.6200 0.00 1.5780 0.00 0.00 0.00 0.00 0.00 0.00 10.4820 0.8400 0.00 29.9600 0.1000 0.00 0.00

100.76 82.4000 107.76 6.6780 7.7300 51.5900 1.2300 0.00 39.7500 0.00 82.9620 40.3480 82.2500 107.49 98.8300 94.8900 0.00

Other

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Reduction in lead time of rotor blades of Orpheus engine using VSM


Replications:

Time Units:

Days

Queue Other
Number Waiting Bench marking and flash removal.Queue bench work 2.Queue bench work.Queue blohm surface grinding and deburring.Queue Bristol root grinding.Queue correct twist and droop.Queue engraving.Queue glass beed peening.Queue Horizontal milling 1.Queue osmond cut off.Queue packing.Queue painting.Queue parawash.Queue plano milling and deburring.Queue plating.Queue Polishing.Queue preperation of cd test.Queue Remove corners.Queue stripping.Queue vibroetch cd test.Queue
Average Half Width Minimum Value Maximum Value

35.7395 0.6255 10.6010 0.0933 0.5196 5.0470 0.00410000 0.00 9.6143 0.00 0.00 0.00 1.0437 3.1721 0.1727 1.8233 1.1350 19.0701 3.1694 0.00

(Correlated) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

71.0000 2.0000 29.0000 1.0000 2.0000 22.0000 1.0000 0.00 23.0000 0.00 0.00 0.00 3.0000 10.0000 1.0000 8.0000 4.0000 42.0000 11.0000 0.00

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Reduction in lead time of rotor blades of Orpheus engine using VSM


Replications:

Time Units:

Days

Resource Usage
Instantaneous Utilization cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays Number Busy cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays Number Scheduled cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays
Average Half Width Minimum Value Maximum Value

0.01946667 0.3780 0.03200000 0.9988 0.9143 0.9275 0.9912 0.6829 0.03000000 0.00
Average

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)
Half Width

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minimum Value

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 0.00
Maximum Value

0.01946667 0.3780 0.03200000 0.9988 0.9143 0.9275 0.9912 0.6829 0.03000000 0.00
Average

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)
Half Width

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minimum Value

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 0.00
Maximum Value

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Reduction in lead time of rotor blades of Orpheus engine using VSM


Replications:

Time Units:

Days

Resource Usage
Scheduled Utilization cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays
1.000 0.800 0.600 0.400 0.200 0.000
cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays

Value

0.01946667 0.3780 0.03200000 0.9988 0.9143 0.9275 0.9912 0.6829 0.03000000 0.00

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Reduction in lead time of rotor blades of Orpheus engine using VSM


Replications:

Time Units:

Days

Resource Usage
Total Number Seized cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays
240.000 200.000 160.000 120.000 80.000 40.000 0.000
cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays

Value

8.0000 36.0000 3.0000 221.00 86.0000 104.00 157.00 47.0000 3.0000 0.00

Unnamed Project
Replications:

Time Units:

Days

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Unnamed Project
Replications:

Time Units:

Days

Key Performance Indicators


System
Number Out
Average

105

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Unnamed Project
Replications:

Time Units:

Days

Entity Time
VA Time part NVA Time part Wait Time part Transfer Time part Other Time part Total Time part
Average Half Width Minimum Value Maximum Value

2.8930
Average

(Insufficient)
Half Width

0.00
Minimum Value

49.8300
Maximum Value

0.8685
Average

(Insufficient)
Half Width

0.1300
Minimum Value

10.8340
Maximum Value

19.3165
Average

(Insufficient)
Half Width

0.00
Minimum Value

200.00
Maximum Value

0.00
Average

(Insufficient)
Half Width

0.00
Minimum Value

0.00
Maximum Value

0.00
Average

(Insufficient)
Half Width

0.00
Minimum Value

0.00
Maximum Value

23.0779

(Insufficient)

0.1300

219.38

Other
Number In part Number Out part WIP part
Value

301.00
Value

105.00
Average Half Width Minimum Value Maximum Value

97.0206

(Correlated)

0.00

196.00

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

of

14

11:24:19AM

Category Overview

March 10, 2010

Unnamed Project
Replications:

Time Units:

Days

Queue Time
Waiting Time Bench marking and flash removal.Queue bench work 2.Queue bench work.Queue blohm surface grinding and deburring.Queue Bristol root grinding.Queue correct twist and droop.Queue engraving.Queue glass beed peening.Queue Horizontal milling 1.Queue osmond cut off.Queue parawash.Queue plano milling and deburring.Queue Polishing.Queue preperation of cd test.Queue Remove corners.Queue stripping.Queue vibroetch cd test.Queue
Average Half Width Minimum Value Maximum Value

50.6919 82.0100 44.1017 3.4980 1.9983 19.8223 0.03416667 0.00 20.4524 0.00 42.9503 21.2469 32.6900 50.9785 47.7395 45.3670 0.00

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)

0.00 81.6200 0.00 1.5780 0.00 0.00 0.00 0.00 0.00 0.00 10.4820 0.8400 0.00 29.9600 0.1000 0.00 0.00

100.76 82.4000 107.76 6.6780 7.7300 51.5900 1.2300 0.00 39.7500 0.00 82.9620 40.3480 82.2500 107.49 98.8300 94.8900 0.00

Other

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

10

of

14

11:24:19AM

Category Overview

March 10, 2010

Unnamed Project
Replications:

Time Units:

Days

Queue Other
Number Waiting Bench marking and flash removal.Queue bench work 2.Queue bench work.Queue blohm surface grinding and deburring.Queue Bristol root grinding.Queue correct twist and droop.Queue engraving.Queue glass beed peening.Queue Horizontal milling 1.Queue osmond cut off.Queue packing.Queue painting.Queue parawash.Queue plano milling and deburring.Queue plating.Queue Polishing.Queue preperation of cd test.Queue Remove corners.Queue stripping.Queue vibroetch cd test.Queue
Average Half Width Minimum Value Maximum Value

35.7395 0.6255 10.6010 0.0933 0.5196 5.0470 0.00410000 0.00 9.6143 0.00 0.00 0.00 1.0437 3.1721 0.1727 1.8233 1.1350 19.0701 3.1694 0.00

(Correlated) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

71.0000 2.0000 29.0000 1.0000 2.0000 22.0000 1.0000 0.00 23.0000 0.00 0.00 0.00 3.0000 10.0000 1.0000 8.0000 4.0000 42.0000 11.0000 0.00

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

11

of

14

11:24:19AM

Category Overview

March 10, 2010

Unnamed Project
Replications:

Time Units:

Days

Resource Usage
Instantaneous Utilization cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays Number Busy cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays Number Scheduled cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays
Average Half Width Minimum Value Maximum Value

0.01946667 0.3780 0.03200000 0.9988 0.9143 0.9275 0.9912 0.6829 0.03000000 0.00
Average

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)
Half Width

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minimum Value

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 0.00
Maximum Value

0.01946667 0.3780 0.03200000 0.9988 0.9143 0.9275 0.9912 0.6829 0.03000000 0.00
Average

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)
Half Width

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minimum Value

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 0.00
Maximum Value

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

(Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient) (Insufficient)

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

12

of

14

11:24:19AM

Category Overview

March 10, 2010

Unnamed Project
Replications:

Time Units:

Days

Resource Usage
Scheduled Utilization cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays
1.000 0.800 0.600 0.400 0.200 0.000
cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays

Value

0.01946667 0.3780 0.03200000 0.9988 0.9143 0.9275 0.9912 0.6829 0.03000000 0.00

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future

Page

13

of

14

11:24:19AM

Category Overview

March 10, 2010

Unnamed Project
Replications:

Time Units:

Days

Resource Usage
Total Number Seized cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays
240.000 200.000 160.000 120.000 80.000 40.000 0.000
cutting machine engraving machine equipments gauging machine grinding machine man milling machine OMT projector peening machine sprays

Value

8.0000 36.0000 3.0000 221.00 86.0000 104.00 157.00 47.0000 3.0000 0.00

Model Filename: F:\project\PPT\SIMULATION\SELECTED\MODEL R3D future