You are on page 1of 4

Accenture Green Technology Suite—

Data Center Estimator


Create and execute a strategy cooling—and cooling increases energy How it works
for a green data center to reap consumption by 50 to 100 percent. The The Data Center Estimator is a decision-
environmental and bottom-line problem here is that power grids are support tool for planning a strategy to
benefits on the road to high often overloaded and energy costs are achieve an energy-efficient data cen-
performance rising. “Energy costs, now about 10 ter. It assists Accenture consultants in
With environmental issues moving to percent of the average IT budget, could providing clients with a rapid assess-
the top of the international agenda, rise to 50 percent in a matter of years,” ment of the environmental and financial
businesses face the challenge of ensur- says Rakesh Kumar, vice president- impact of their data center strategies
ing their IT infrastructures contribute Research, Gartner. based on energy savings.
as little as possible to the emission of
greenhouse gases. With these require- Businesses also have an obligation— Step 1: The process begins when the
ments becoming mandatory, being which may be law in some jurisdictions— user creates an initial assessment of
able to reduce its carbon footprint to reduce their carbon footprints. the “as-is” situation documenting the
will become a prerequisite for high current IT and facilities landscape. Both
performance. Data centers are one of In this context, the value proposition high-level and detailed assessments
the largest consumers of energy within of a green data center becomes very are supported.
an organization’s IT systems, and in total, attractive:
account for some 1.2 percent of the Step 2: Thereafter, the user can create
total electricity consumed in the United ™To reduce operational costs by a number of “what-if” scenarios. For
States (0.8 percent worldwide). Because reducing energy costs. example, these scenarios can show the
of their concentration of equipment, ™To prolong the life of existing data effects of a rise in the energy price of
data centers consume on average 10 to centers by intelligently refreshing varying percentages, of a cleaner source
15 times more electricity than an office equipment, taking advantage of of power becoming available, or of a
building per square foot of floor space. energy efficiencies. change in capacity demand for servers
Some data centers with particularly ™To prepare the organization for or storage. Each of these scenarios can
concentrated layouts can consume up compliance with future regulations be used to evaluate the robustness of
to 100 times more electricity per square and certifications. the strategy planned.
foot than normal office buildings. ™To take advantage of pricing incen-
tives, tax breaks and rebates offered Step 3: The Data Center Estimator then
But greening your data center is more by utilities, insurance companies and helps plan a data center strategy road
than an environmental imperative: It governments. map, thus offering more than a before-
also makes sound business sense. In ™To reduce the carbon footprint. and-after snapshot. The estimator helps
fact, it should be seen as a business ™To reduce the strain on the electricity users to craft a road map by helping to
decision that has environmental grid. decide which initiatives would generate
ramifications. the most value—and to decide between
Accenture Technology Labs has solutions offered by vendors to accom-
Put simply, businesses in search of more developed the Data Center Estimator, plish them. The key here is to understand
computing power cannot simply con- which is part of the Accenture Green what initiatives make most sense for
tinue to add more servers to their data Technology Suite to help organizations the particular data center. The process
centers. At present, the availability of undertake the detailed planning and is analogous to deciding which actions
cheap commodity servers has caused strategic analysis necessary to decide (buying new tires, using premium fuel
the installed server base to grow hugely how to green their data centers. or having a tune-up) would improve a
(it nearly doubled in the United States vehicle’s fuel consumption. The answer
during 2000 to 2005). However, adding depends on the type of vehicle under
new servers requires more power and consideration: minivan or sports car?
By drawing on a database of real-life
case studies, the Data Center Estimator
can help users to craft the right solu-
tion for their particular data center.

2
Step 4: The Data Center Estimator ™Better planning. The ability to com-
finally allows users to visualize the pare the as-is state with an achievable
expected outcomes with respect to end state—and the effects of initiatives
carbon output, cost reduction and depending on their timing—means that
electricity consumption across sce- planning becomes dynamic. Users
narios. This estimation is based on establish not only where they want
the database of actual figures from to go, but how to get there, including
real implementations, and so provides the effects of scheduling individual
a realistic picture of what the benefits initiatives over time. In this way, sav-
are likely to be. The tool also recom- ings from each phase of the project
mends a set of further options to reduce can help to fund the next phase.
carbon dioxide emissions further. ™Better decision making. By creating a
detailed cost/benefit analysis for sce-
Estimating cost and benefits narios based on real-life information,
The Data Center Estimator thus helps users can make decisions based on
organizations of all sizes to create a probability. In this way, too, the com-
detailed strategy for optimizing their peting claims of energy-efficiency
data centers over time. The benefits vendors can be assessed.
of using this tool are:
The Data Center Estimator was devel-
™Reduced risk. The ability to compare oped by Accenture Technology Labs to
different scenarios helps reduce risk give clients a tool to help them reap
and maximizes benefits in the light of maximum rewards from initiatives to
expected business and other conditions. reduce their carbon footprint.

3
About Accenture About Accenture To find out more, please contact:
Technology Labs Accenture is a global management
Accenture Technology Labs, the dedicated consulting, technology services and Teresa Tung
technology research and development outsourcing company. Combining +1 408 817 2106
(R&D) organization within Accenture, has unparalleled experience, comprehen- teresa.tung@accenture.com
been turning technology innovation into sive capabilities across all industries
business results for 20 years. The Labs and business functions, and extensive Joseph Tobolski
create a vision of how technology will research on the world’s most success- +1 312 693 6481
shape the future and invent the next ful companies, Accenture collaborates joseph.f.tobolski@accenture.com
wave of cutting-edge business solutions. with clients to help them become
Working closely with Accenture’s global high-performance businesses and Serena Cheng
network of specialists, Accenture Tech- governments. With 178,000 people in +1 408 817 2398
nology Labs helps clients innovate to 49 countries, the company generated serena.t.cheng@accenture.com
achieve high business performance. The net revenues of US $19.70 billion for
Labs are located in San Jose, California; the fiscal year ended August 31, 2007.
Chicago, Illinois; Sophia Antipolis, France; Its home page is www.accenture.com.
and Bangalore, India. For more infor-
mation, please visit our website at
www.accenture.com/accenturetechlabs.

Copyright © 2008 Accenture


All rights reserved.

Accenture, its logo, and


High Performance Delivered
are trademarks of Accenture.

Barcode Placement

You might also like