You are on page 1of 4

S. No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Equipment
Valves
GOOAV (48)
GOOAV (30/36)
GOOAV (20/24)
SDV (16/20)
SDV (4/6/8)
BDV (2/4)
Control valve (4/6)
Control valve (2)
Anti Surge Valves(24")
Sub Total
Field Monted Instruments
Panel Monted Instruments
Sub Total
Compressor / Turbine Unit
Buffer Air Consumption
Sub Total
Plant Flushing,RO Plant ,Cleaning etc
Sub Total
Requirement of Air Dryer (venting moist
air)
Sub Total
Operational Margin
Sub Total
TOTAL VOLUME FLOW OF AIR

Air consumption per unit (A)


SCFM
SCMH
3
2
1.5
1.3
1
0.6
0.6
0.5
1.5

5.10
3.40
2.55
2.21
1.70
1.02
1.02
0.85
2.55
1.50
1.50
50.00
1.70

Quantity (B)
Nos.
0.00
0.00
0.00
7.00
5.00
8.00
0.00
4.00
4.00
28.00
12.00
12.00
24.00
1.00
1.00
2.00

Consumption (A x B)
SCMH
0.00
0.00
0.00
15.46
8.50
8.16
0.00
3.40
10.19
45.70
18.00
18.00
36.00
50.00
1.70
51.70
33.35
33.35
25.01
25.01
47.94
47.94

239.71

SDV

NUMBER
4

(2" /4")

BDV

(2" /4")

FCV

(2" )

ANTI SURGE

(24")

SDV

(20")

Panel mounted/BDV

Panel mounted/SDV

(REQUIREMENT SHALL BE CONGURRENT WITH GOOV)

URRENT WITH GOOV)

You might also like