Equipment
Valves
GOOAV (48)
GOOAV (30/36)
GOOAV (20/24)
SDV (16/20)
SDV (4/6/8)
BDV (2/4)
Control valve (4/6)
Control valve (2)
Anti Surge Valves(24")
Sub Total
Field Monted Instruments
Panel Monted Instruments
Sub Total
Compressor / Turbine Unit
Buffer Air Consumption
Sub Total
Plant Flushing,RO Plant ,Cleaning etc
Sub Total
Requirement of Air Dryer (venting moist
air)
Sub Total
Operational Margin
Sub Total
TOTAL VOLUME FLOW OF AIR
5.10
3.40
2.55
2.21
1.70
1.02
1.02
0.85
2.55
1.50
1.50
50.00
1.70
Quantity (B)
Nos.
0.00
0.00
0.00
7.00
5.00
8.00
0.00
4.00
4.00
28.00
12.00
12.00
24.00
1.00
1.00
2.00
Consumption (A x B)
SCMH
0.00
0.00
0.00
15.46
8.50
8.16
0.00
3.40
10.19
45.70
18.00
18.00
36.00
50.00
1.70
51.70
33.35
33.35
25.01
25.01
47.94
47.94
239.71
SDV
NUMBER
4
(2" /4")
BDV
(2" /4")
FCV
(2" )
ANTI SURGE
(24")
SDV
(20")
Panel mounted/BDV
Panel mounted/SDV