REVISION :
DESCRIPTION INSPECTION TEST PLAN FOR THE FABRICATION OF FISH PASSING FACILITIES
PACKAGE 2 - HYDROMECHANICAL EQUIPMENT XAYABURI HYDROELECTRIC POWER PLANT PROJECT, LAO PDR. CH KARNCHANG (LAO) COMPANY LIMITED
PREPARED BY:
APPROVED BY:
DATE:
DATE:
LEGEND:
A1 = A2 = W1 = W2 = R1 = R2 = S = H = AP = IN =
APPROVAL STAMPS: 100% ACTUAL INSPECTION / TEST SAMPLE INSPECTION / TEST 100% WITNESS INSPECTION / TEST SAMPLE WITNESS INSPECTION / TEST 100% REVIEW OF DOCUMENTS SAMPLE REVIEW OF DOCUMENTS OPERATION SURVIELLANCE MANDATORY HOLD POINT SUBMIT FOR APPROVAL SUBMIT FOR INFORMATION Flux Cored Arc Welding Sheilded Metal Arc Welding Submerged Arc Welding Radiogarphic Test Magnetic Particle Inspection Dye Penetrent Inspection Non Destructive Test Dry Film Thickness
FCAW =
SMAW = SAW = RT = MPI = DPI = NDT =
DFT =
Page 2 of 4
DOCUMENTS
Issue Design Calculation & Detail Dwgs To Review & Approve Client Submission of Technical Documents for approval Review & Approve Client spec Approved Design Calculation & Drawings. Approved Control Procedures & Method Statement AP R1/AP
A2
Client Spec
AP
R1/AP
A3
Qualify WPS / PQR for Selected material/welding process. Welder Qualification Test (WQT)
ASME IX / Client Spec(GTS Approved WPS Sub-Clause 2.1.1) ASME IX / Client Spec(GTS WQT certificates Sub-Clause 2.1.1)
W1 / AP
W1 /AP
A4
W1 / R1
W1 / AP
B B1
MATERIAL
Material Receiving inspection & Storage Visual check for defects, Qty check Check plate marking / Heat no. EN 10204/DIN 50049 : Cert Categories (EN10024:3.1) PTS- Section 4.1.1, American Welding Society (AWS) Material receiving report. Material Deficiency report . Mill certificates. Material receiving report. Material Deficiency report . Electrode batch certificates. A1 / R1 A2 / R1
B2
Welding consumables receiving inspection Visual check for damages, & storage Qty check Check batch no.
A1 / R1
A2 / R1
C C1
FABRICATION (Pump)
Design of Pump follow required parameter Check the pump Specification Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.2 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.3 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.4 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.5 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.6
R1
-
R2
C2
A1 / R1
A2 / R2
C3
A1 / R1
A2 / R2
C4
A1 / R1
A2 / R2
C5
Motor charateristic
A1 / R1
A2 / R2
C6
check the speed & pressure variation Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.7 Check to ensure system is stable under load condition Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.8 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.9 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.10 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.11 Client spec: PTS- Section 4.1.1, Sub-Clause 1.3.12 Client spec: PTS- Section 4.1.1, Sub-Clause 1.8
A1 / R1
A2 / R2
C7
Stability of system
A1 / R1
A2 / R2
C8
A1 / R1
A2 / R2
C9
A1 / R1
A2 / R2
C10
A1 / R1
A2 / R2
C11
A1 / R1
A2 / R2
C12
Check the pressure test, roughness of bearing and runout measurement of shaft
A1 / R1
A2 / R2
C13
Verified the allignment, pre-stressing, Client spec: NDT & corrosion potection PTS- Section 4.1.1, Sub-Clause 1.9 Check completeness of each reports. / Client spec.
A1 / R1
A2 / R2
C14
Compile all reports and inspection data into Review all documents document package for each section.
R1
R1
D D1
FABRICATION (Motor)
Design of motor follow a parameter Check the pump Specification Client spec: PTS- Section 4.1.2, Sub-Clause 1.2 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.2
R1
Manual for Motor system
R2
D2
A1 / R1
A2 / R2
Page 3 of 4
DOCUMENTS
Check the material of rotor(magnetic Client spec: steel-copper/alluminium) PTS- Section 4.1.2, Sub-Clause 3.2.3 Check the life cycle of motor for minimum duration (40 years) Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.4 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.5 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.6 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.7 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.8 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.9 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.10
A1 / R1
A2 / R2
D4
A1 / R1
A2 / R2
D5
Motor protection
A1 / R1
A2 / R2
D6
A1 / R1
A2 / R2
D7
A1 / R1
A2 / R2
D8
A1 / R1
A2 / R2
D9
Check the noise level ,<80 dB Check the vibration level, > zone condition Ensure the ingress protection of motor
A1 / R1
A2 / R2
D10
Enclosure of motor
A1 / R1
A2 / R2
D11
Check the constituted of transformer Client spec: and on-load switches PTS- Section 4.1.2, Sub-Clause 3.2.11 Check the limitation of motor under frequency converter Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.12 Client spec: PTS- Section 4.1.2, Sub-Clause 3.2.13 Client spec: PTS- Section 4.1.2, Sub-Clause 4.2 Client spec: PTS- Section 4.1.2, Sub-Clause 4.4 Check completeness of each reports. / Client spec.
A1 / R1
A2 / R2
D12
A1 / R1
A2 / R2
D13
Check to conform no oil leakage & follow requirement of the pump and motor Check the temperature rise, short circuit withstand, noise level & load test Verified the erection, connection, cabling & bolted connection
A1 / R1
A2 / R2
D13
A1 / R1
A2 / R2
D14
A1 / R1
A2 / R2
D15
Compile all reports and inspection data into Review all documents document package for each section.
R1
R1
C C1
A1
A2
C2
Approved Drawings
Pre-cutting record
A1
A2
C3
Fit-up all main part crane structure & attachment Welding all main part crane structure & attachment
A1 / R1
A2 / R2
C4
A1 / R1
A2 / R2
C5
Major Butt Weld (Catagories A) =100% UT + 10% MT Secondary Part GTS-Volume 2 SubClause 1.7.1 Final Dimensional Inspection
UT & MT Reports
A1 / R1
A2 / R2
C6
Approved Drawing & Dimensional Report PTS- Volume 2,Sub-Clause 1.7 Approved Drawings OSHA & ASME PTS- Section 4.1.3.1,SubClause 5.2.7 Load Test Certificate
A1 / R1
A2 / R2
C7
A1/R1
A2/R2
Page 4 of 4
Check profile, DFT,Cleanliness of the Client spec: surface & Quality Of Coating. PTS- Section 1.3.2,SubPaint System: Clause 8.2.2 A=Steel above water,contact with oil B=All Steel under water C=Control,panel board & cubicles Test the ability of Crane to operate Client spec: PTS- Section 4.1.3.2,SubClause 7.3 Check completeness of each reports. / Client spec.
A1 / R1
A2 / R2
C9
A1
A2
C10
Compile all reports and inspection data into Review all documents document package for each section.
R1
R1
D D1
A1
A2
D2
Approved Drawings
Pre-cutting record
A1
A2
D3
A1 / R1
A2 / R2
D4
Welding all main part and Stiffener Segment to main part. Carry out NDT activity of the completed Structure.
Visual Inspection PTS- Section 3.2, Sub-Clause 6.2.2 (d) Major Butt Weld (Catagories A) =100% UT + 10% MT Secondary part PTS-Section 4.2 SubClause 6.2.2 (c) Final Dimensional Inspection Tolerance as per: (PTS- Section 4.2, Sub-Clause 4.5)
A1 / R1
A2 / R2
D5
UT & MT Reports
A1 / R1
A2 / R2
D6
Approved Drawings
Dimensional Report
A1 / R1
A2 / R2
D7
All working surfaces shall be Approved Drawings machined and free of twists or warps. PTS-Section 4.2 Sub-Clause 4.6.1 Correctness Of Gap & Operation Inspection Approved Drawings & Client spec: PTS- Section 3.2,SubClause 6.3.1
Dimensional Reports
A1 / R1
A2 / R2
D8
A1 / R1
A1 / R1
D9
Check profile, DFT & weather checks Client spec: during painting activity. PTS- Section 3.2,SubPaint System Clause 4.4 Check completeness of each reports. / Client spec.
A1 / R1
A2 / R2
D10
Compile all reports and inspection data into Review all documents document package for each section.
R1
R1