Aspahltic Wearing Course(7cm Tack Coat Asphaltic Base Course(12cm) Prime Coat Water Bound Macadam(30cm) Base Course(20cm)

Sub Base Course(30cm) Subgrade(By Three Methods)

NSL

Cross-section of Flexible Pavement/Highway

Asphaltic Wearing Co Tack Coat Prime Coat Base Course + Sand Sub Base Course Subgrade NSL Reinforced Concrete Slab (25cm) with Expansion Joints

Cross-section of Rigid Pavement/Highway

Plan of Pavement/Highway - Flexible


L A N E 3 L A N E 2 L A N E 1 L A N E 1 L A N E 2 L A N E 3

Fence
SHOULDERS SHOULDERS

Kerb Stone Median Road Marking Road Lighting

Plan of Pavement/Highway - Rigid


L A N E 3 L A N E 2 L A N E 1 L A N E 1 L A N E 2 L A N E 3

Fence
SHOULDERS

Road Marking

SHOULDERS

Kerb Stone Median Expension Joint

Road Lighting

Tripple Surface Treatment(TST)

Prime Coat Base Course (9") Sub Base Course(12") Subgrade (By Three Methods)

NSL

Cross Section of Shoulder - Flexible/Rigid Pavement

Dsn Problem 1

Course(7cm)

rse(12cm)

dam(30cm)

A flexible pavement is proposed between Lahore-Sahiwal The length of the section is 150 Km. The road is 3 lane ea If the all components of flexible plavement are provided ex the quantity of works? Width of Each Lane = 4.5m, Width of Shoulder on each Si Sr. No. Description
Length

Qty
Width m m

Methods) Main Road


1 AWC 2 Tack Coat 3 ABC 4 5 6 7 8 9 10 11 12 a Prime Coat WBM Base Course Sub Base Course Fence Road Lighting Poles Median Kerb Stones Road Marking B/w Lanes

Wearing Course

b Along Shoulder and Median

Shoulders
1 TST 2 Prime Coat 3 Base Course 4 Sub Base Course

se + Sand Course

If pavement is replaced with Rigid Pavement, describe


1 RCC Slab 2 Expansion Joints a Transverse b Longitudinal -

on Joints

Dsn Problem 2 A flexible pavement is proposed between Lahore-Sialkot s The length of the section is 300 km. The road is 4 lanes ea If the all components of flexible plavement is provided exc the quantity of works? Width of Each Lane = 4.5m, Width of Shoulder on each Si

If Pavement is replaced with Rigid Pavement, Describe

Draw the neat Plans and Cross sections of main road (flexible and Road Lighting: 10 Poles in 1Km on both sides of the road Road Marking: 5mx0.15m @ 5m

Longitudinal Joints: Along the median, Transverse Joints: after 2

erb Stone

erb Stone

Methods)

oposed between Lahore-Sahiwal section of GT Road. is 150 Km. The road is 3 lane each side. exible plavement are provided except subgrade. Estimate

5m, Width of Shoulder on each Side = 4.0m Qty


Height m m3 m2 m3 m2 m3 m3 m3 Rm No Rm Rm m2 Rm m2 m2 m3 m3 6 lanes @ 4.5m

Qty

Unit

Remarks

10 Poles in 1 Km

5m x 0.15m @ 5m

with Rigid Pavement, describe the quantities of new items.


m3 No Rm after 20m Along median 0.5-0.75% Steel

oposed between Lahore-Sialkot section of Motorway by National Highway Authority is 300 km. The road is 4 lanes each side. exible plavement is provided except subgrade. Estimate

5m, Width of Shoulder on each Side = 4m. with Rigid Pavement, Describe the Quantities of New Items.

oss sections of main road (flexible and rigid), shoulders and miscellaneous items.

he median, Transverse Joints: after 20m on both sides

Dsn Problem 1 A flexible pavement is proposed between Lahore-Sahiwal section of GT Road. The length of the section is 150 Km. The road is 3 lane each side. If the all components of flexible plavement are provided except subgrade. Estimate the quantity of works? Width of Each Lane = 4.5m, Width of Shoulder on each Side = 4.0m