You are on page 1of 134

Job ref

Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 1: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C1


LEVEL 6

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT, U NBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

777.7 k

.45x(600x400-2161)x25 + 0.95x2161.4x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-2161)x25 + 0.95x2161.4x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-183.6 kN.m, 180.1 kN.m


777.7 kN, 20.0 mm

3620.2 k
OK
3352.7 k

X-X Moments
15.6 kN.m
183.6 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-103.6 kN.m, 217.2 kN.m


217.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(183.6 + 217.2 )
atn(217.2/ 183.6)

284.4 kN.m
49.8 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 2: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.439, 716 mm, 600 mm, 314.66 mm, 80702 mm, 188.1 m
1 x 20, 634.7, -0.356, -437, -276.5, -137.3
1 x 20, 265.1, 0.055, 110, 93.1, 34.7
1 x 12, 514.1, -0.222, -437, -155.9, -49.4
1 x 12, 390.9, -0.085, -170, -32.6, -19.2
1 x 12, 576.7, -0.291, -437, -218.4, -49.4
1 x 12, 515.5, -0.223, -437, -157.3, -49.4
1 x 20, 451.4, -0.152, -304, -93.1, -95.5
1 x 20, 81.7, 0.259, 437, 276.5, 137.3
1 x 12, 325.6, -0.012, -24, 32.6, -2.7
1 x 12, 202.4, 0.125, 250, 155.9, 28.3
1 x 12, 200.9, 0.127, 253, 157.3, 28.6
1 x 12, 139.8, 0.195, 389, 218.4, 44.0
80702 x 0.45 x 25
-137+35-49-19-49-49-96+137-3+28+29+4
+908-777.7

Max Moment/Mu

907.9 x (716 / 2 - 188.1)


154.4 + (38.0+3.2+7.7+0.6+10.8+7.8+8.9+38.0
+ (-0.1+4.4+4.5+9.6)
284.4 / 287.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

236.1 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

279.3 mm, 360 m

OK

38.0
3.2
7.7
0.6
10.8
7.8
8.9
38.0
-0.1
4.4
4.5
9.6
907.9

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
154.4 kN
287.8kN
0.98

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

777.7 k

.45x(600x400-2161)x25 + 0.95x2161.4x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-2161)x25 + 0.95x2161.4x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

3620.2 k
OK
3352.7 k

X-X Moments

-183.6 kN.m, 180.1 kN.m


183.6 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-103.6 kN.m, 217.2 kN.m


777.7, 20.0

15.6 kN.m
217.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(183.6 + 217.2 )
atn(217.2/ 183.6)

284.4 kN.m
49.8 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)

0.439, 716 mm, 600 mm, 314.66 mm, 80702 mm, 188.1 m
1 x 20, 634.7, -0.356, -437, -276.5, -137.3
1 x 20, 265.1, 0.055, 110, 93.1, 34.7
1 x 12, 514.1, -0.222, -437, -155.9, -49.4
1 x 12, 390.9, -0.085, -170, -32.6, -19.2

38.0
3.2
7.7
0.6

kN
kN
kN
kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group5:M5 fn(bars,d,%,,la,F)


Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

1 x 12, 576.7, -0.291, -437, -218.4, -49.4


1 x 12, 515.5, -0.223, -437, -157.3, -49.4
1 x 20, 451.4, -0.152, -304, -93.1, -95.5
1 x 20, 81.7, 0.259, 437, 276.5, 137.3
1 x 12, 325.6, -0.012, -24, 32.6, -2.7
1 x 12, 202.4, 0.125, 250, 155.9, 28.3
1 x 12, 200.9, 0.127, 253, 157.3, 28.6
1 x 12, 139.8, 0.195, 389, 218.4, 44.0
80702 x 0.45 x 25
-137+35-49-19-49-49-96+137-3+28+29+4
+908-777.7

Max Moment/Mu

907.9 x (716 / 2 - 188.1)


154.4 + (38.0+3.2+7.7+0.6+10.8+7.8+8.9+38.0
+ (-0.1+4.4+4.5+9.6)
284.4 / 287.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

236.1 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

279.3 mm, 360 m

OK

: Job Ref
: Sheet Ref / 3: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

10.8
7.8
8.9
38.0
-0.1
4.4
4.5
9.6
907.9

kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
154.4 kN
287.8kN
0.98

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 4: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C1


LEVEL 5

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT, U NBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1934.0 k

.45x(600x400-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5730)x25 + 0.95x5730.3x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

5139.7 k
OK
4876.1 k

X-X Moments

-157.0 kN.m, 134.9 kN.m


1934.0 kN, 20.0 mm

38.7 kN.m
157.0 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

36.4 kN.m, -52.9 kN.m


52.9 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(157.0 + 52.9 )
atn(52.9/ 157.0)

165.7 kN.m
18.6 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar

0.582, 571 mm, 600 mm, 331.88 mm, 128465 mm, 189.7 m

Bar group1:M1 fn(bars,d,%,,la,F)

1 x 32, 489.6, -0.166, -333, -204.2, -267.5

54.6 kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group2:M2 fn(bars,d,%,,la,F)


Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

: Job Ref
: Sheet Ref / 5: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1 x 32, 338.8, -0.007, -15, -53.5, -11.8


1 x 20, 445.0, -0.119, -239, -159.7, -75.0
1 x 20, 394.8, -0.066, -133, -109.4, -41.7
1 x 20, 405.6, -0.078, -155, -120.2, -48.8
1 x 20, 319.6, 0.013, 26, -34.3, 8.1
1 x 32, 231.8, 0.106, 211, 53.5, 169.8
1 x 32, 81.1, 0.264, 437, 204.2, 351.5
1 x 20, 175.9, 0.165, 329, 109.4, 103.4
1 x 20, 125.6, 0.218, 435, 159.7, 136.7
1 x 20, 251.0, 0.085, 171, 34.3, 53.6
1 x 20, 165.1, 0.176, 352, 120.2, 110.5
128465 x 0.45 x 25
-267-12-75-42-49+8+170+351+103+137+5
+111+1445-1934

Max Moment/Mu

1445.2 x (571 / 2 - 189.7)


138.2 + (54.6+0.6+12.0+4.6+5.9+-0.3+9.1
+ (71.8+11.3+21.8+1.8+13.3)
165.7 / 344.7

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

81.2 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

27.4 mm, 360 m

OK

0.6
12.0
4.6
5.9
-0.3
9.1
71.8
11.3
21.8
1.8
13.3
1445.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
138.2 kN
344.7kN
0.48

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1934.0 k

.45x(600x400-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5730)x25 + 0.95x5730.3x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

5139.7 k
OK
4876.1 k

X-X Moments

-157.0 kN.m, 134.9 kN.m


157.0 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

36.4 kN.m, -52.9 kN.m


1934.0, 20.0

38.7 kN.m
52.9 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(157.0 + 52.9 )
atn(52.9/ 157.0)

165.7 kN.m
18.6 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)

0.582, 571 mm, 600 mm, 331.88 mm, 128465 mm, 189.7 m
1 x 32, 489.6, -0.166, -333, -204.2, -267.5
1 x 32, 338.8, -0.007, -15, -53.5, -11.8
1 x 20, 445.0, -0.119, -239, -159.7, -75.0
1 x 20, 394.8, -0.066, -133, -109.4, -41.7

54.6
0.6
12.0
4.6

kN
kN
kN
kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group5:M5 fn(bars,d,%,,la,F)


Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

1 x 20, 405.6, -0.078, -155, -120.2, -48.8


1 x 20, 319.6, 0.013, 26, -34.3, 8.1
1 x 32, 231.8, 0.106, 211, 53.5, 169.8
1 x 32, 81.1, 0.264, 437, 204.2, 351.5
1 x 20, 175.9, 0.165, 329, 109.4, 103.4
1 x 20, 125.6, 0.218, 435, 159.7, 136.7
1 x 20, 251.0, 0.085, 171, 34.3, 53.6
1 x 20, 165.1, 0.176, 352, 120.2, 110.5
128465 x 0.45 x 25
-267-12-75-42-49+8+170+351+103+137+5
+111+1445-1934

Max Moment/Mu

1445.2 x (571 / 2 - 189.7)


138.2 + (54.6+0.6+12.0+4.6+5.9+-0.3+9.1
+ (71.8+11.3+21.8+1.8+13.3)
165.7 / 344.7

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

81.2 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

27.4 mm, 360 m

OK

: Job Ref
: Sheet Ref / 6: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

5.9
-0.3
9.1
71.8
11.3
21.8
1.8
13.3
1445.2

kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
138.2 kN
344.7kN
0.48

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 7: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C1


LEVEL 4

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2986.6 k

.45x(600x400-4477)x25 + 0.95x4476.8x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4477)x25 + 0.95x4476.8x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

4606.0 k
OK
4341.0 k

X-X Moments

-158.7 kN.m, 141.8 kN.m


2986.6 kN, 20.0 mm

59.7 kN.m
158.7 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-14.1 kN.m, -14.1 kN.m


14.1 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(158.7 + 14.1 )
atn(14.1/ 158.7)

159.3 kN.m
5.1 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)

0.789, 452 mm, 600 mm, 356.05 mm, 177032 mm, 173.1 m
1 x 25, 385.9, -0.029, -59, -160.1, -28.8
1 x 25, 343.5, 0.012, 25, -117.8, 12.1
1 x 20, 374.3, -0.018, -36, -148.5, -11.3

4.6 kN
-1.4 kN
1.7 kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group4:M4 fn(bars,d,%,,la,F)


Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

: Job Ref
: Sheet Ref / 8: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1 x 20, 360.1, -0.004, -8, -134.4, -2.5


1 x 20, 293.5, 0.061, 123, -67.7, 38.6
1 x 20, 200.9, 0.153, 305, 24.9, 95.8
1 x 25, 108.0, 0.244, 437, 117.8, 214.5
1 x 25, 65.6, 0.285, 437, 160.1, 214.5
1 x 20, 91.4, 0.260, 437, 134.4, 137.3
1 x 20, 77.3, 0.274, 437, 148.5, 137.3
1 x 20, 250.7, 0.104, 207, -24.9, 65.1
1 x 20, 158.0, 0.195, 389, 67.7, 122.3
177032 x 0.45 x 25
-29+12-11-3+39+96+215+215+137+137+6
+122+1992-2986.6

Max Moment/Mu

1991.6 x (452 / 2 - 173.1)


104.9 + (4.6+-1.4+1.7+0.3+-2.6+2.4+25.3
+ (34.4+18.4+20.4+-1.6+8.3)
159.3 / 215.0

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

53.1 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

4.7 mm, 360 m

OK

0.3
-2.6
2.4
25.3
34.4
18.4
20.4
-1.6
8.3
1991.6

kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
104.9 kN
215.0kN
0.74

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2986.6 k

.45x(600x400-4477)x25 + 0.95x4476.8x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4477)x25 + 0.95x4476.8x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

4606.0 k
OK
4341.0 k

X-X Moments

-158.7 kN.m, 141.8 kN.m


158.7 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-14.1 kN.m, -14.1 kN.m


2986.6, 20.0

59.7 kN.m
59.7 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(158.7 + 59.7 )
atn(59.7/ 158.7)

169.6 kN.m
20.6 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)

0.741, 586 mm, 600 mm, 434.02 mm, 182274 mm, 241.3 m
1 x 25, 507.8, -0.059, -119, -214.9, -58.4
1 x 25, 339.1, 0.077, 153, -46.2, 75.2
1 x 20, 453.9, -0.016, -32, -161.0, -10.1
1 x 20, 397.6, 0.029, 59, -104.8, 18.4
1 x 20, 421.6, 0.010, 20, -128.8, 6.3
1 x 20, 334.6, 0.080, 160, -41.7, 50.4

12.6
-3.5
1.6
-1.9
-0.8
-2.1

kN
kN
kN
kN
kN
kN

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group7:M7 fn(bars,d,%,,la,F)


Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

Job ref
Sheet
Made By
Date
Checked
Approved

1 x 25, 246.7, 0.151, 302, 46.2, 148.3


1 x 25, 77.9, 0.287, 437, 214.9, 214.5
1 x 20, 188.1, 0.198, 397, 104.8, 124.6
1 x 20, 131.8, 0.244, 437, 161.0, 137.3
1 x 20, 251.1, 0.147, 295, 41.7, 92.7
1 x 20, 164.1, 0.218, 435, 128.8, 136.8
182274 x 0.45 x 25
-58+75-10+18+6+50+148+215+125+137+9
+137+2051-2986.6

Max Moment/Mu

2050.6 x (586 / 2 - 241.3)


105.7 + (12.6+-3.5+1.6+-1.9+-0.8+-2.1+6.9
+ (46.1+13.1+22.1+3.9+17.6)
169.6 / 221.2

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

53.1 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

: Job Ref
: Sheet Ref / 9: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

6.9
46.1
13.1
22.1
3.9
17.6
2050.6

kN
kN
kN
kN
kN
kN
k

0.0

k
OK
105.7 kN
221.2kN
0.76

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 10: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Column @ COLUMN TYPE C1


Level 3

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT, U NBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3927.0 k

.45x(600x400-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5730)x25 + 0.95x5730.3x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

5139.7 k
OK
4876.1 k

X-X Moments

-162.7 kN.m, 137.0 kN.m


3927.0 kN, 20.0 mm

78.5 kN.m
162.7 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

70.6 kN.m, -47.0 kN.m


70.6 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(162.7 + 70.6 )
atn(70.6/ 162.7)

177.4 kN.m
23.5 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)

0.859, 606 mm, 600 mm, 520.10 mm, 214039 mm, 277.3 m
1 x 32, 521.6, -0.001, -2, -218.7, -1.6

0.4 kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group2:M2 fn(bars,d,%,,la,F)


Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

: Job Ref
: Sheet Ref / 11: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1 x 32, 333.7, 0.125, 251, -30.8, 201.8


1 x 20, 464.5, 0.037, 75, -161.6, 23.5
1 x 20, 401.8, 0.080, 159, -99.0, 50.0
1 x 20, 440.8, 0.053, 107, -137.9, 33.5
1 x 20, 357.6, 0.109, 219, -54.7, 68.7
1 x 32, 272.1, 0.167, 334, 30.8, 268.5
1 x 32, 84.2, 0.293, 437, 218.7, 351.5
1 x 20, 203.9, 0.213, 426, 99.0, 133.7
1 x 20, 141.3, 0.255, 437, 161.6, 137.3
1 x 20, 248.1, 0.183, 366, 54.7, 115.0
1 x 20, 165.0, 0.239, 437, 137.9, 137.3
214039 x 0.45 x 25
-2+202+24+50+34+69+268+351+134+137+11
+137+2408-3927

Max Moment/Mu

2407.9 x (606 / 2 - 277.3)


61.7 + (0.4+-6.2+-3.8+-4.9+-4.6+-3.8+8.3
+ (76.9+13.2+22.2+6.3+18.9)
177.4 / 184.4

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

41.4 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

18 mm, 360 m

OK

-6.2
-3.8
-4.9
-4.6
-3.8
8.3
76.9
13.2
22.2
6.3
18.9
2407.9

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
61.7 kN
184.4kN
0.96

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3927.0 k

.45x(600x400-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5730)x25 + 0.95x5730.3x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

5139.7 k
OK
4876.1 k

X-X Moments

-162.7 kN.m, 137.0 kN.m


162.7 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

70.6 kN.m, -47.0 kN.m


3927.0, 20.0

78.5 kN.m
78.5 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(162.7 + 78.5 )
atn(78.5/ 162.7)

180.7 kN.m
25.8 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)

0.858, 621 mm, 600 mm, 532.64 mm, 214363 mm, 284.7 m
1 x 32, 535.6, -0.002, -4, -225.1, -3.1
1 x 32, 330.4, 0.133, 266, -19.9, 213.7
1 x 20, 472.6, 0.039, 79, -162.1, 24.8
1 x 20, 404.2, 0.084, 169, -93.7, 53.0
1 x 20, 456.6, 0.050, 100, -146.0, 31.4
1 x 20, 374.9, 0.104, 207, -64.4, 65.1

0.7
-4.2
-4.0
-5.0
-4.6
-4.2

kN
kN
kN
kN
kN
kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group7:M7 fn(bars,d,%,,la,F)


Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

1 x 32, 290.6, 0.159, 318, 19.9, 255.8


1 x 32, 85.5, 0.294, 437, 225.1, 351.5
1 x 20, 216.8, 0.208, 415, 93.7, 130.4
1 x 20, 148.5, 0.252, 437, 162.1, 137.3
1 x 20, 246.2, 0.188, 377, 64.4, 118.3
1 x 20, 164.5, 0.242, 437, 146.0, 137.3
214363 x 0.45 x 25
-3+214+25+53+31+65+256+351+130+137+11
+137+2412-3927

Max Moment/Mu

2411.6 x (621 / 2 - 284.7)


62.3 + (0.7+-4.2+-4.0+-5.0+-4.6+-4.2+5.1
+ (79.1+12.2+22.3+7.6+20.0)
180.7 / 187.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

41.4 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

: Job Ref
: Sheet Ref / 12: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

5.1
79.1
12.2
22.3
7.6
20.0
2411.6

kN
kN
kN
kN
kN
kN
k

0.0

k
OK
62.3 kN
187.3kN
0.96

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 13: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C1


LEVEL 2

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=5000-(700+700)/2
Loy=5000-(600+600)/2

1.20
1.20
4300
4400

LEX=5160.0 MM, LEX/H=12.9, EXX=20.0 MM


LEY=5280.0 MM, LEY/B=8.8, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

5105.0 k

.45x(600x400-12596)x25 + 0.95x12596.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-12596)x25 + 0.95x12596.2x460

OK

8062.8 k
OK
7807.0 k

X-X Moments

Applied Moments (Mx1, Mx2)


-122.6 kN.m, 111.4 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (8063 - 5105)/(8063 - 1296) < 1
au = a K h
0.083, 1.000, 400
Madd= N au
5105 x 33.3
Mi=fn(Mx1, Mx2)
-122.6 kN.m, 111.4 kN.m
M2+Madd, M nom
292.5 kN.m, 102.1 kN.m
M nom=fn(N, exx)
5105.0 kN, 20.0 mm
Design Moment

1.00
33.3 mm
169.9 kN.m
49.0 kN.m
169.9 kN.m
292.5 kN.m

Y-Y Moments
Applied Moments (My1, My2)
138.6 kN.m, -87.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (8063 - 5105)/(8063 - 598) < 1
au = a K h
0.039, 1.000, 400
Madd= N au
5105 x 23.2
Mi=fn(My1, My2)
138.6 kN.m, -87.8 kN.m
M nom=fn(M2+Madd)
257.2
M nom=fn(N, eyy)
5105.0, 20.0
Design Moment

1.00
23.2 mm
118.6 kN.m
55.4 kN.m
0.0 kN.m
118.6 kN.m
257.2 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 14: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(292.5 + 257.2 )
atn(257.2/ 292.5)

389.5 kN.m
41.3 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Bar group17:M17 fn(bars,d,%,,la,F)
Bar group18:M18 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M18)

0.775, 697 mm, 600 mm, 539.74 mm, 195184 mm, 300.6 m
1 x 32, 606.3, -0.043, -86, -258.0, -69.4
1 x 32, 294.6, 0.159, 318, 53.7, 255.7
1 x 32, 543.9, -0.003, -5, -195.6, -4.4
1 x 32, 481.6, 0.038, 75, -133.3, 60.6
1 x 32, 419.3, 0.078, 156, -71.0, 125.7
1 x 32, 356.9, 0.119, 237, -8.6, 190.7
1 x 25, 557.5, -0.012, -23, -209.2, -11.3
1 x 25, 506.4, 0.022, 43, -158.1, 21.2
1 x 25, 455.4, 0.055, 109, -107.1, 53.7
1 x 32, 402.0, 0.089, 179, -53.7, 143.7
1 x 32, 90.3, 0.291, 437, 258.0, 351.5
1 x 32, 339.7, 0.130, 259, 8.6, 208.7
1 x 32, 277.3, 0.170, 340, 71.0, 273.7
1 x 32, 215.0, 0.211, 421, 133.3, 338.7
1 x 32, 152.7, 0.251, 437, 195.6, 351.5
1 x 25, 241.2, 0.194, 387, 107.1, 190.0
1 x 25, 190.1, 0.227, 437, 158.1, 214.5
1 x 25, 139.1, 0.260, 437, 209.2, 214.5
195184 x 0.45 x 25
-69+256-4+61+126+191-11+21+54+144+35
+209+274+339+351+190+215+215+2196-5105

Max Moment/Mu

2195.8 x (697 / 2 - 300.6)


104.7 + (17.9+13.7+0.9+-8.1+-8.9+-1.6+2.4
+ (-3.4+-5.8+-7.7+90.7+1.8+19.4+45.2
+ (68.8+20.4+33.9+44.9)
389.5 / 429.1

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

57.3 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

50.4 mm, 360 m

OK

17.9
13.7
0.9
-8.1
-8.9
-1.6
2.4
-3.4
-5.8
-7.7
90.7
1.8
19.4
45.2
68.8
20.4
33.9
44.9
2195.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
104.7 kN

429.1kN
0.90

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

5105.0 k

.45x(600x400-12596)x25 + 0.95x12596.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-12596)x25 + 0.95x12596.2x460

OK

8062.8 k
OK
7807.0 k

X-X Moments

Applied Moments (Mx1, Mx2)


-122.6 kN.m, 111.4 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (8063 - 5105)/(8063 - 1296) < 1
au = a K h
0.083, 1.000, 400
Madd= N au
5105 x 33.3
Mi=fn(Mx1, Mx2)
-122.6 kN.m, 111.4 kN.m
M2+Madd, M nom
292.5 kN.m, 0.0 kN.m
M nom=fn(N, exx)
5105.0 kN, 20.0 mm
Design Moment

1.00
33.3 mm
169.9 kN.m
49.0 kN.m
169.9 kN.m
292.5 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 15: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Y-Y Moments
Applied Moments (My1, My2)
138.6 kN.m, -87.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (8063 - 5105)/(8063 - 598) < 1
au = a K h
0.039, 1.000, 400
Madd= N au
5105 x 23.2
Mi=fn(My1, My2)
138.6 kN.m, -87.8 kN.m
M nom=fn(M2+Madd)
257.2
M nom=fn(N, eyy)
5105.0, 20.0
Design Moment

1.00
23.2 mm
118.6 kN.m
55.4 kN.m
102.1 kN.m
118.6 kN.m
257.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(292.5 + 257.2 )
atn(257.2/ 292.5)

389.5 kN.m
41.3 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Bar group17:M17 fn(bars,d,%,,la,F)
Bar group18:M18 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M18)

0.775, 697 mm, 600 mm, 539.74 mm, 195184 mm, 300.6 m
1 x 32, 606.3, -0.043, -86, -258.0, -69.4
1 x 32, 294.6, 0.159, 318, 53.7, 255.7
1 x 32, 543.9, -0.003, -5, -195.6, -4.4
1 x 32, 481.6, 0.038, 75, -133.3, 60.6
1 x 32, 419.3, 0.078, 156, -71.0, 125.7
1 x 32, 356.9, 0.119, 237, -8.6, 190.7
1 x 25, 557.5, -0.012, -23, -209.2, -11.3
1 x 25, 506.4, 0.022, 43, -158.1, 21.2
1 x 25, 455.4, 0.055, 109, -107.1, 53.7
1 x 32, 402.0, 0.089, 179, -53.7, 143.7
1 x 32, 90.3, 0.291, 437, 258.0, 351.5
1 x 32, 339.7, 0.130, 259, 8.6, 208.7
1 x 32, 277.3, 0.170, 340, 71.0, 273.7
1 x 32, 215.0, 0.211, 421, 133.3, 338.7
1 x 32, 152.7, 0.251, 437, 195.6, 351.5
1 x 25, 241.2, 0.194, 387, 107.1, 190.0
1 x 25, 190.1, 0.227, 437, 158.1, 214.5
1 x 25, 139.1, 0.260, 437, 209.2, 214.5
195184 x 0.45 x 25
-69+256-4+61+126+191-11+21+54+144+35
+209+274+339+351+190+215+215+2196-5105

Max Moment/Mu

2195.8 x (697 / 2 - 300.6)


104.7 + (17.9+13.7+0.9+-8.1+-8.9+-1.6+2.4
+ (-3.4+-5.8+-7.7+90.7+1.8+19.4+45.2
+ (68.8+20.4+33.9+44.9)
389.5 / 429.1

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

57.3 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

50.4 mm, 360 m

OK

17.9
13.7
0.9
-8.1
-8.9
-1.6
2.4
-3.4
-5.8
-7.7
90.7
1.8
19.4
45.2
68.8
20.4
33.9
44.9
2195.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
104.7 kN

429.1kN
0.90

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 16: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C1


LEVEL 1

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 500 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Deep, Bottom: Shallow


Top: Deep, Bottom: Shallow
Lox=5000-(700+0)/2
Loy=5000-(600+0)/2

1.30
1.30
4650
4700

LEX=6045.0 MM, LEX/H=12.1, EXX=20.0 MM


LEY=6110.0 MM, LEY/B=10.2, EYY=20.0 MM
BI-AXIAL , SLENDER, UNBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

6465.5 k

.45x(600x500-14476)x25 + 0.95x14476.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x500-14476)x25 + 0.95x14476.5x460

OK
Applied Moments (Mx1, Mx2)
-59.4 kN.m, 98.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (9538 - 6466)/(9538 - 846) < 1
au = a K h
0.073, 1.000, 500
Madd= N au
6466 x 36.5
Mi=fn(Mx1, Mx2)
-59.4 kN.m, 98.6 kN.m
M2+Madd, M nom
334.9 kN.m, 129.3 kN.m
M nom=fn(N, exx)
6465.5 kN, 20.0 mm
Design Moment

9538.4 k
OK
9217.1 k

X-X Moments
1.00
36.5 mm
236.3 kN.m
39.4 kN.m
236.3 kN.m
334.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
85.3 kN.m, -140.2 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (9538 - 6466)/(9538 - 872) < 1
au = a K h
0.052, 1.000, 500
Madd= N au
6466 x 31.1
Mi=fn(My1, My2)
85.3 kN.m, -140.2 kN.m
M nom=fn(M2+Madd)
341.3

1.00
31.1 mm
201.1 kN.m
56.1 kN.m
0.0 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 17: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

6465.5, 20.0

201.1 kN.m
341.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(334.9 + 341.3 )
atn(341.3/ 334.9)

478.2 kN.m
45.5 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Bar group17:M17 fn(bars,d,%,,la,F)
Bar group18:M18 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M18)

0.811, 778 mm, 600 mm, 631.45 mm, 255828 mm, 346.2 m
1 x 32, 688.0, -0.031, -63, -298.7, -50.4
1 x 32, 351.0, 0.155, 311, 38.2, 250.0
1 x 32, 620.6, 0.006, 12, -231.3, 9.7
1 x 32, 553.2, 0.043, 87, -163.9, 69.8
1 x 32, 485.8, 0.081, 161, -96.6, 129.9
1 x 32, 418.4, 0.118, 236, -29.2, 189.9
1 x 32, 622.8, 0.005, 10, -233.6, 7.7
1 x 32, 557.7, 0.041, 82, -168.5, 65.8
1 x 32, 492.6, 0.077, 154, -103.3, 123.8
1 x 32, 427.4, 0.113, 226, -38.2, 181.9
1 x 32, 90.5, 0.300, 437, 298.7, 351.5
1 x 32, 360.1, 0.150, 301, 29.2, 242.0
1 x 32, 292.7, 0.188, 376, 96.6, 302.0
1 x 32, 225.3, 0.225, 437, 163.9, 351.5
1 x 32, 157.9, 0.262, 437, 231.3, 351.5
1 x 32, 285.9, 0.192, 383, 103.3, 308.1
1 x 32, 220.8, 0.228, 437, 168.5, 351.5
1 x 32, 155.6, 0.264, 437, 233.6, 351.5
255828 x 0.45 x 25
-50+250+10+70+130+190+8+66+124+182+35
+242+302+351+351+308+351+351+2878-6465.5

Max Moment/Mu

2878.1 x (778 / 2 - 346.2)


123.8 + (15.0+9.6+-2.2+-11.4+-12.5+-5.5
+ (-1.8+-11.1+-12.8+-7.0+105.0+7.1
+ (29.2+57.6+81.3+31.8+59.2+82.1)
478.2 / 537.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

51.8 mm, 300 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

52.8 mm, 360 m

OK

15.0
9.6
-2.2
-11.4
-12.5
-5.5
-1.8
-11.1
-12.8
-7.0
105.0
7.1
29.2
57.6
81.3
31.8
59.2
82.1
2878.1

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
123.8 kN

537.3kN
0.89

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

6465.5 k

.45x(600x500-14476)x25 + 0.95x14476.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x500-14476)x25 + 0.95x14476.5x460

OK
Applied Moments (Mx1, Mx2)
-59.4 kN.m, 98.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (9538 - 6466)/(9538 - 846) < 1
au = a K h
0.073, 1.000, 500
Madd= N au
6466 x 36.5
Mi=fn(Mx1, Mx2)
-59.4 kN.m, 98.6 kN.m

9538.4 k
OK
9217.1 k

X-X Moments
1.00
36.5 mm
236.3 kN.m
39.4 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M2+Madd, M nom
M nom=fn(N, exx)
Design Moment

: Job Ref
: Sheet Ref / 18: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

334.9 kN.m, 0.0 kN.m


6465.5 kN, 20.0 mm

236.3 kN.m
334.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
85.3 kN.m, -140.2 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (9538 - 6466)/(9538 - 872) < 1
au = a K h
0.052, 1.000, 500
Madd= N au
6466 x 31.1
Mi=fn(My1, My2)
85.3 kN.m, -140.2 kN.m
M nom=fn(M2+Madd)
341.3
M nom=fn(N, eyy)
6465.5, 20.0
Design Moment

1.00
31.1 mm
201.1 kN.m
56.1 kN.m
129.3 kN.m
201.1 kN.m
341.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(334.9 + 341.3 )
atn(341.3/ 334.9)

478.2 kN.m
45.5 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Bar group17:M17 fn(bars,d,%,,la,F)
Bar group18:M18 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M18)

0.811, 778 mm, 600 mm, 631.45 mm, 255828 mm, 346.2 m
1 x 32, 688.0, -0.031, -63, -298.7, -50.4
1 x 32, 351.0, 0.155, 311, 38.2, 250.0
1 x 32, 620.6, 0.006, 12, -231.3, 9.7
1 x 32, 553.2, 0.043, 87, -163.9, 69.8
1 x 32, 485.8, 0.081, 161, -96.6, 129.9
1 x 32, 418.4, 0.118, 236, -29.2, 189.9
1 x 32, 622.8, 0.005, 10, -233.6, 7.7
1 x 32, 557.7, 0.041, 82, -168.5, 65.8
1 x 32, 492.6, 0.077, 154, -103.3, 123.8
1 x 32, 427.4, 0.113, 226, -38.2, 181.9
1 x 32, 90.5, 0.300, 437, 298.7, 351.5
1 x 32, 360.1, 0.150, 301, 29.2, 242.0
1 x 32, 292.7, 0.188, 376, 96.6, 302.0
1 x 32, 225.3, 0.225, 437, 163.9, 351.5
1 x 32, 157.9, 0.262, 437, 231.3, 351.5
1 x 32, 285.9, 0.192, 383, 103.3, 308.1
1 x 32, 220.8, 0.228, 437, 168.5, 351.5
1 x 32, 155.6, 0.264, 437, 233.6, 351.5
255828 x 0.45 x 25
-50+250+10+70+130+190+8+66+124+182+35
+242+302+351+351+308+351+351+2878-6465.5

Max Moment/Mu

2878.1 x (778 / 2 - 346.2)


123.8 + (15.0+9.6+-2.2+-11.4+-12.5+-5.5
+ (-1.8+-11.1+-12.8+-7.0+105.0+7.1
+ (29.2+57.6+81.3+31.8+59.2+82.1)
478.2 / 537.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

51.8 mm, 300 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

52.8 mm, 360 m

OK

15.0
9.6
-2.2
-11.4
-12.5
-5.5
-1.8
-11.1
-12.8
-7.0
105.0
7.1
29.2
57.6
81.3
31.8
59.2
82.1
2878.1

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
123.8 kN

537.3kN
0.89

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 19: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C2


LEVEL 6

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

991.7 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

310.0 kN.m, -331.6 kN.m


991.7 kN, 20.0 mm

4572.5 k
OK
4307.5 k

X-X Moments
19.8 kN.m
331.6 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

0.0 kN.m, -8.6 kN.m


8.6 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(331.6 + 8.6 )
atn(8.6/ 331.6)

331.7 kN.m
1.5 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 20: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

0.452, 415 mm, 600 mm, 187.62 mm, 96682 mm, 88.3 m
1 x 20, 355.9, -0.314, -437, -148.2, -137.3
1 x 20, 343.4, -0.291, -437, -135.7, -137.3
1 x 20, 352.8, -0.308, -437, -145.1, -137.3
1 x 20, 349.7, -0.302, -437, -142.0, -137.3
1 x 20, 346.5, -0.296, -437, -138.8, -137.3
1 x 20, 261.3, -0.137, -275, -53.6, -86.4
1 x 20, 166.7, 0.039, 78, 41.0, 24.6
1 x 20, 72.0, 0.216, 431, 135.7, 135.5
1 x 20, 59.5, 0.239, 437, 148.2, 137.3
1 x 20, 68.9, 0.221, 437, 138.8, 137.3
1 x 20, 65.8, 0.227, 437, 142.0, 137.3
1 x 20, 62.6, 0.233, 437, 145.1, 137.3
1 x 20, 248.8, -0.114, -228, -41.0, -71.7
1 x 20, 154.1, 0.062, 125, 53.6, 39.3
96682 x 0.45 x 25
-137-137-137-137-137-86+25+135+137+13
+137+137-72+39+1088-991.7

Max Moment/Mu

1087.7 x (415 / 2 - 88.3)


129.9 + (20.3+18.6+19.9+19.5+19.1+4.6+1.0
+ (18.4+20.3+19.1+19.5+19.9+2.9+2.1)
331.7 / 335.2

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

334.4 mm, 240 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

2.14%, 0.85 N/mm, 0.85 N/mm


0 mm, 225 mm, 3 no 8 mm legs
0 mm, 151 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

8.7 mm, 360 m

OK

20.3
18.6
19.9
19.5
19.1
4.6
1.0
18.4
20.3
19.1
19.5
19.9
2.9
2.1
1087.7

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
129.9 kN
335.2kN
0.98

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

991.7 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

4572.5 k
OK
4307.5 k

X-X Moments

310.0 kN.m, -331.6 kN.m


331.6 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

0.0 kN.m, -8.6 kN.m


991.7, 20.0

19.8 kN.m
19.8 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 21: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(331.6 + 19.8 )
atn(19.8/ 331.6)

332.2 kN.m
3.4 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

0.459, 435 mm, 600 mm, 199.91 mm, 97380 mm, 98.6 m
1 x 20, 373.8, -0.304, -437, -156.2, -137.3
1 x 20, 344.9, -0.254, -437, -127.3, -137.3
1 x 20, 366.5, -0.292, -437, -149.0, -137.3
1 x 20, 359.3, -0.279, -437, -141.7, -137.3
1 x 20, 352.1, -0.266, -437, -134.5, -137.3
1 x 20, 279.3, -0.139, -278, -61.7, -87.3
1 x 20, 184.8, 0.027, 53, 32.8, 16.7
1 x 20, 90.3, 0.192, 384, 127.3, 120.6
1 x 20, 61.4, 0.243, 437, 156.2, 137.3
1 x 20, 83.0, 0.205, 409, 134.5, 128.6
1 x 20, 75.8, 0.217, 435, 141.7, 136.5
1 x 20, 68.6, 0.230, 437, 149.0, 137.3
1 x 20, 250.4, -0.088, -177, -32.8, -55.5
1 x 20, 155.9, 0.077, 154, 61.7, 48.5
97380 x 0.45 x 25
-137-137-137-137-137-87+17+121+137+12
+137+137-55+48+1096-991.7

Max Moment/Mu

1095.5 x (435 / 2 - 98.6)


130.3 + (21.4+17.5+20.5+19.5+18.5+5.4+0.5
+ (15.4+21.4+17.3+19.4+20.5+1.8+3.0)
332.2 / 332.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

334.4 mm, 240 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

2.14%, 0.85 N/mm, 0.85 N/mm


0 mm, 225 mm, 3 no 8 mm legs
0 mm, 151 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

21.4
17.5
20.5
19.5
18.5
5.4
0.5
15.4
21.4
17.3
19.4
20.5
1.8
3.0
1095.5

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
130.3 kN
332.3kN
1.00

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 22: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C2


LEVEL 5

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2014.6 k

.45x(600x400-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

243.4 kN.m, -200.8 kN.m


2014.6 kN, 20.0 mm

4305.0 k
OK
4039.3 k

X-X Moments
40.3 kN.m
243.4 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-7.3 kN.m, 10.0 kN.m


10.0 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(243.4 + 10.0 )
atn(10.0/ 243.4)

243.6 kN.m
2.4 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 23: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.635, 424 mm, 600 mm, 269.40 mm, 138206 mm, 127.3 m
1 x 20, 364.0, -0.123, -246, -151.8, -77.2
1 x 20, 344.1, -0.097, -194, -131.9, -61.0
1 x 20, 357.3, -0.114, -228, -145.2, -71.8
1 x 20, 350.7, -0.106, -211, -138.6, -66.4
1 x 20, 269.4, 0.000, 0, -57.2, 0.0
1 x 20, 174.8, 0.123, 246, 37.4, 77.2
1 x 20, 80.2, 0.246, 437, 131.9, 137.3
1 x 20, 60.3, 0.272, 437, 151.8, 137.3
1 x 20, 73.6, 0.254, 437, 138.6, 137.3
1 x 20, 67.0, 0.263, 437, 145.2, 137.3
1 x 20, 249.5, 0.026, 52, -37.4, 16.2
1 x 20, 154.9, 0.149, 297, 57.2, 93.5
138206 x 0.45 x 25
-77-61-72-66+0+77+137+137+137+137+1
+93+1555-2014.6

Max Moment/Mu

1554.8 x (424 / 2 - 127.3)


132.0 + (11.7+8.0+10.4+9.2+0.0+2.9+18.1
+ (20.8+19.0+19.9+-0.6+5.3)
243.6 / 256.9

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

120.8 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

5 mm, 360 m

OK

11.7
8.0
10.4
9.2
0.0
2.9
18.1
20.8
19.0
19.9
-0.6
5.3
1554.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
132.0 kN
256.9kN
0.94

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

BI-AXIAL , SHORT, UNBRACED, COLUMN DESIGN


Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2014.6 k

.45x(600x400-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

4305.0 k
OK
4039.3 k

X-X Moments

243.4 kN.m, -200.8 kN.m


243.4 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-7.3 kN.m, 10.0 kN.m


2014.6, 20.0

40.3 kN.m
40.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(243.4 + 40.3 )
atn(40.3/ 243.4)

246.7 kN.m
9.4 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)

0.621, 493 mm, 600 mm, 306.10 mm, 137745 mm, 160.5 m
1 x 20, 425.9, -0.137, -274, -179.6, -86.1
1 x 20, 346.9, -0.047, -93, -100.6, -29.3

15.5 kN
2.9 kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group3:M3 fn(bars,d,%,,la,F)


Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

1 x 20, 399.6, -0.107, -214, -153.3, -67.2


1 x 20, 373.2, -0.077, -154, -126.9, -48.2
1 x 20, 332.5, -0.030, -60, -86.2, -19.0
1 x 20, 239.1, 0.077, 153, 7.2, 48.1
1 x 20, 145.7, 0.183, 367, 100.6, 115.2
1 x 20, 66.7, 0.274, 437, 179.6, 137.3
1 x 20, 119.4, 0.213, 427, 126.9, 134.1
1 x 20, 93.0, 0.244, 437, 153.3, 137.3
1 x 20, 253.5, 0.060, 120, -7.2, 37.8
1 x 20, 160.1, 0.167, 334, 86.2, 104.9
137745 x 0.45 x 25
-86-29-67-48-19+48+115+137+134+137+3
+105+1550-2014.6

Max Moment/Mu

1549.6 x (493 / 2 - 160.5)


133.0 + (15.5+2.9+10.3+6.1+1.6+0.3+11.6
+ (24.7+17.0+21.0+-0.3+9.0)
246.7 / 252.9

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

120.8 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

: Job Ref
: Sheet Ref / 24: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

10.3
6.1
1.6
0.3
11.6
24.7
17.0
21.0
-0.3
9.0
1549.6

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
133.0 kN
252.9kN
0.97

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 25: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C2


LEVEL 4

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2928.0 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

257.0 kN.m, -224.5 kN.m


2928.0 kN, 20.0 mm

5207.9 k
OK
4944.5 k

X-X Moments
58.6 kN.m
257.0 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-2.8 kN.m, 0.0 kN.m


2.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(257.0 + 2.8 )
atn(2.8/ 257.0)

257.0 kN.m
0.6 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 26: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

0.742, 407 mm, 600 mm, 301.53 mm, 160874 mm, 137.3 m
1 x 25, 345.4, -0.051, -102, -142.1, -49.9
7.1
1 x 25, 340.1, -0.045, -90, -136.9, -44.0
6.0
1 x 25, 343.6, -0.049, -98, -140.4, -48.0
6.7
1 x 25, 341.9, -0.047, -94, -138.6, -46.0
6.4
1 x 25, 252.4, 0.057, 114, -49.1, 56.0
-2.8
1 x 25, 159.4, 0.165, 330, 43.9, 162.0
7.1
1 x 25, 66.4, 0.273, 437, 136.9, 214.5
29.4
1 x 25, 61.2, 0.279, 437, 142.1, 214.5
30.5
1 x 25, 64.6, 0.275, 437, 138.6, 214.5
29.7
1 x 25, 62.9, 0.277, 437, 140.4, 214.5
30.1
1 x 25, 247.1, 0.063, 126, -43.9, 62.0
-2.7
1 x 25, 154.2, 0.171, 342, 49.1, 167.9
8.2
160874 x 0.45 x 25
1809.8
-50-44-48-46+56+162+215+215+215+21+62+168+1810-2928
-0.1

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)
Max Moment/Mu

1809.8 x (407 / 2 - 137.3)


119.3 + (7.1+6.0+6.7+6.4+-2.8+7.1+29.4+30.5
+ (29.7+30.1+-2.7+8.2)
257.0 / 275.1

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

87.8 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

1 mm, 360 m

OK

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k
k
OK
119.3 kN
275.1kN
0.93

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN


Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2928.0 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

5207.9 k
OK
4944.5 k

X-X Moments

257.0 kN.m, -224.5 kN.m


257.0 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-2.8 kN.m, 0.0 kN.m


2928.0, 20.0

58.6 kN.m
58.6 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(257.0 + 58.6 )
atn(58.6/ 257.0)

263.6 kN.m
12.8 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)

0.702, 523 mm, 600 mm, 367.62 mm, 162588 mm, 196.0 m
1 x 25, 450.9, -0.079, -159, -189.2, -77.8
1 x 25, 344.5, 0.022, 44, -82.8, 21.7
1 x 25, 415.4, -0.045, -91, -153.8, -44.7

14.7 kN
-1.8 kN
6.9 kN

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group4:M4 fn(bars,d,%,,la,F)


Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

Job ref
Sheet
Made By
Date
Checked
Approved

1 x 25, 379.9, -0.012, -23, -118.3, -11.5


1 x 25, 360.2, 0.007, 14, -98.5, 6.9
1 x 25, 269.5, 0.093, 187, -7.9, 91.7
1 x 25, 178.8, 0.180, 359, 82.8, 176.4
1 x 25, 72.4, 0.281, 437, 189.2, 214.5
1 x 25, 143.4, 0.213, 427, 118.3, 209.6
1 x 25, 107.9, 0.247, 437, 153.7, 214.5
1 x 25, 253.8, 0.108, 217, 7.9, 106.4
1 x 25, 163.1, 0.195, 389, 98.5, 191.2
162588 x 0.45 x 25
-78+22-45-12+7+92+176+215+210+215+10
+191+1829-2928

Max Moment/Mu

1829.1 x (523 / 2 - 196.0)


120.2 + (14.7+-1.8+6.9+1.4+-0.7+-0.7+14.6
+ (40.6+24.8+33.0+0.8+18.8)
263.6 / 272.6

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

87.8 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

: Job Ref
: Sheet Ref / 27: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1.4
-0.7
-0.7
14.6
40.6
24.8
33.0
0.8
18.8
1829.1

kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
120.2 kN
272.6kN
0.96

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 28: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C2


LEVEL 3

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.20
1.20
2600
2700

LEX=3120.0 MM, LEX/H=7.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3736.0 k

.45x(600x400-7854)x25 + 0.95x7854.0x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-7854)x25 + 0.95x7854.0x460

OK
M nom
Design Moment

6043.8 k
OK
5782.7 k

X-X Moments

74.7
257.0 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0

0.819, 400 mm, 600 mm, 327.49 mm, 176845 mm, 147.4 m
6 x 25, 60.5, 0.285, 437, 139.5, 1287.1
6 x 25, 339.5, -0.013, -26, -139.5, -75.6
2 x 25, 242.3, 0.091, 182, -42.3, 178.7
2 x 25, 157.7, 0.181, 363, 42.3, 356.4
176845 x 0.45 x 25
1287 - 76 + 179 + 356 + 1990 - 3736.0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

1989.5 x (400 / 2 - 147.4)


104.7 + (179.5+10.5+-7.6+15.1)
257.0 / 302.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

68.8 mm, 240 m

OK

179.5
10.5
-7.6
15.1
1989.5
0.0

kN
kN
kN
kN
k
k
OK
104.7 kN
302.3kN
0.85

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 29: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C2


LEVEL 2

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Deep, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=5000-(700+700)/2
Loy=5000-(600+600)/2

1.30
1.20
4300
4400

LEX=5590.0 MM, LEX/H=14.0, EXX=20.0 MM


LEY=5280.0 MM, LEY/B=8.8, EYY=20.0 MM
SLENDER, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live

U NI-AXIAL ,

Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

4715.3 k

.45x(600x400-14205)x25 + 0.95x14204.7x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-14205)x25 + 0.95x14204.7x460

OK

8747.7 k
OK
8493.6 k

X-X Moments

Applied Moments(M1, M2)


-213.2 kN.m, 300.1 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (8748 - 4715)/(8748 - 1296) < 1
au = a K h
0.098, 1.000, 400
Madd= N au
4715 x 39.1
Initial Moment Mi=fn(M1,M2)
-213.2 kN.m, 300.1 kN.m
M2+Madd, M nom
484.3, 94.3
Design Moment

1.00
39.1 mm
184.2 kN.m
120.0 kN.m
484.3 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)

0.772, 400 mm, 600 mm, 308.80 mm, 166749 mm, 139.0 m
7 x 32, 64.0, 0.277, 437, 136.0, 2460.2
7 x 32, 336.0, -0.031, -62, -136.0, -347.2
2 x 25, 260.0, 0.055, 111, -60.0, 108.6

334.6 kN
47.2 kN
-6.5 kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Bar group4:M4 fn(bars,d,%,,la,F)


Bar group5:M5 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

2 x 25, 200.0, 0.123, 247, 0.0, 242.1


2 x 25, 140.0, 0.191, 383, 60.0, 375.7
166749 x 0.45 x 25
2460 -347 +109 +242 +376 +1876 -4715.3

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M5)
Max Moment/Mu

1875.9 x (400 / 2 - 139.0)


114.5 + (334.6+47.2+-6.5+0.0+22.5)
484.3 / 512.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

102.7 mm, 240 m

OK

: Job Ref
: Sheet Ref / 30: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

0.0 kN
22.5 kN
1875.9 k
0.0 k
OK
114.5 kN
512.3kN
0.94

X-X Shear Checks


OK

Nominal links

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 31: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C2


LEVEL 1

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 500 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Shallow
Lox=5000-(700+0)/2
Loy=5000-(600+0)/2

1.50
1.30
4650
4700

LEX=6975.0 MM, LEX/H=14.0, EXX=20.0 MM


LEY=6110.0 MM, LEY/B=10.2, EYY=20.0 MM
SLENDER, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live

U NI-AXIAL ,

Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

5486.0 k

.45x(600x500-12868)x25 + 0.95x12868.0x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x500-12868)x25 + 0.95x12868.0x460

OK

8853.5 k
OK
8530.5 k

X-X Moments

Applied Moments(M1, M2)


175.9 kN.m, -283.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (8854 - 5486)/(8854 - 846) < 1
au = a K h
0.097, 1.000, 500
Madd= N au
5486 x 48.7
Initial Moment Mi=fn(M1,M2)
175.9 kN.m, -283.7 kN.m
M2+Madd, M nom
550.6, 109.7
Design Moment

1.00
48.7 mm
266.9 kN.m
113.5 kN.m
550.6 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)

0.831, 500 mm, 600 mm, 415.39 mm, 224311 mm, 186.9 m
5 x 32, 64.0, 0.296, 437, 186.0, 1757.3
5 x 32, 436.0, -0.017, -35, -186.0, -139.7
2 x 32, 335.0, 0.068, 135, -85.0, 217.9
2 x 32, 250.0, 0.139, 279, 0.0, 448.3
2 x 32, 165.0, 0.211, 422, 85.0, 678.7
224311 x 0.45 x 25

326.9
26.0
-18.5
0.0
57.7
2523.5

kN
kN
kN
kN
kN
k

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

F Equlibrum (Ft) + FC - Fapp = 0

1757 -140 + 218 + 448 + 679 + 2523 -5486

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M5)
Max Moment/Mu

2523.5 x (500 / 2 - 186.9)


159.2 + (326.9+26.0+-18.5+0.0+57.7)
550.6 / 551.2

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

100.4 mm, 300 m

OK

: Job Ref
: Sheet Ref / 32: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

0.0

k
OK
159.2 kN
551.2kN
0.99

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 33: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C3


LEVEL 6

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

598.9 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-165.2 kN.m, 191.9 kN.m


598.9 kN, 20.0 mm

4572.5 k
OK
4307.5 k

X-X Moments
12.0 kN.m
191.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-129.1 kN.m, 153.5 kN.m


153.5 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(191.9 + 153.5 )
atn(153.5/ 191.9)

245.7 kN.m
38.7 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 34: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Max Moment/Mu

0.445, 687 mm, 600 mm, 305.98 mm, 77731 mm, 183.6 m
1 x 20, 605.6, -0.343, -437, -262.1, -137.3
1 x 20, 303.3, 0.003, 6, 40.3, 1.9
1 x 20, 530.0, -0.256, -437, -186.5, -137.3
1 x 20, 454.5, -0.170, -340, -110.9, -106.7
1 x 20, 378.9, -0.083, -167, -35.3, -52.4
1 x 20, 531.7, -0.258, -437, -188.1, -137.3
1 x 20, 457.8, -0.174, -347, -114.2, -109.1
1 x 20, 383.9, -0.089, -178, -40.3, -56.0
1 x 20, 81.5, 0.257, 437, 262.1, 137.3
1 x 20, 308.3, -0.003, -5, 35.3, -1.6
1 x 20, 232.7, 0.084, 168, 110.9, 52.7
1 x 20, 157.1, 0.170, 341, 186.5, 107.0
1 x 20, 229.4, 0.088, 175, 114.2, 55.1
1 x 20, 155.4, 0.172, 344, 188.1, 108.2
77731 x 0.45 x 25
-137+2-137-107-52-137-109-56+137-2+5
+107+55+108+874-598.9
874.5 x (687 / 2 - 183.6)
139.9 + (36.0+0.1+25.6+11.8+1.9+25.8+12.5
+ (2.3+36.0+-0.1+5.8+20.0+6.3+20.4)
245.7 / 344.1

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

320.4 mm, 240 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

2.14%, 0.85 N/mm, 0.85 N/mm


0 mm, 225 mm, 3 no 8 mm legs
0 mm, 151 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

256.3 mm, 360 m

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

OK

36.0
0.1
25.6
11.8
1.9
25.8
12.5
2.3
36.0
-0.1
5.8
20.0
6.3
20.4
874.5

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0 k
139.9 kN
344.1kN
0.71

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

NOMINAL LINKS BI-AXIAL , SHORT,


UNBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

598.9 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

4572.5 k
OK
4307.5 k

X-X Moments

-165.2 kN.m, 191.9 kN.m


191.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-129.1 kN.m, 153.5 kN.m


598.9, 20.0

12.0 kN.m
153.5 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(191.9 + 153.5 )
atn(153.5/ 191.9)

245.7 kN.m
38.7 deg

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 35: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Max Moment/Mu

0.445, 687 mm, 600 mm, 305.98 mm, 77731 mm, 183.6 m
1 x 20, 605.6, -0.343, -437, -262.1, -137.3
1 x 20, 303.3, 0.003, 6, 40.3, 1.9
1 x 20, 530.0, -0.256, -437, -186.5, -137.3
1 x 20, 454.5, -0.170, -340, -110.9, -106.7
1 x 20, 378.9, -0.083, -167, -35.3, -52.4
1 x 20, 531.7, -0.258, -437, -188.1, -137.3
1 x 20, 457.8, -0.174, -347, -114.2, -109.1
1 x 20, 383.9, -0.089, -178, -40.3, -56.0
1 x 20, 81.5, 0.257, 437, 262.1, 137.3
1 x 20, 308.3, -0.003, -5, 35.3, -1.6
1 x 20, 232.7, 0.084, 168, 110.9, 52.7
1 x 20, 157.1, 0.170, 341, 186.5, 107.0
1 x 20, 229.4, 0.088, 175, 114.2, 55.1
1 x 20, 155.4, 0.172, 344, 188.1, 108.2
77731 x 0.45 x 25
-137+2-137-107-52-137-109-56+137-2+5
+107+55+108+874-598.9
874.5 x (687 / 2 - 183.6)
139.9 + (36.0+0.1+25.6+11.8+1.9+25.8+12.5
+ (2.3+36.0+-0.1+5.8+20.0+6.3+20.4)
245.7 / 344.1

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

320.4 mm, 240 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

2.14%, 0.85 N/mm, 0.85 N/mm


0 mm, 225 mm, 3 no 8 mm legs
0 mm, 151 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

256.3 mm, 360 m

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

OK

36.0
0.1
25.6
11.8
1.9
25.8
12.5
2.3
36.0
-0.1
5.8
20.0
6.3
20.4
874.5

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0 k
139.9 kN
344.1kN
0.71

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 36: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C3


LEVEL 5

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1250.3 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-101.1 kN.m, 83.3 kN.m


1250.3 kN, 20.0 mm

4572.5 k
OK
4307.5 k

X-X Moments
25.0 kN.m
101.1 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-78.8 kN.m, 61.8 kN.m


78.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(101.1 + 78.8 )
atn(78.8/ 101.1)

128.2 kN.m
37.9 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 37: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

0.516, 684 mm, 600 mm, 352.89 mm, 104016 mm, 211.7 m
1 x 20, 602.9, -0.248, -437, -260.8, -137.3
1 x 20, 305.4, 0.047, 94, 36.8, 29.6
1 x 20, 528.6, -0.174, -348, -186.4, -109.5
1 x 20, 454.2, -0.100, -201, -112.0, -63.1
1 x 20, 379.8, -0.027, -53, -37.6, -16.8
1 x 20, 528.3, -0.174, -348, -186.1, -109.3
1 x 20, 453.6, -0.100, -200, -111.4, -62.8
1 x 20, 378.9, -0.026, -52, -36.8, -16.2
1 x 20, 81.4, 0.269, 437, 260.8, 137.3
1 x 20, 304.6, 0.048, 96, 37.6, 30.1
1 x 20, 230.2, 0.122, 243, 112.0, 76.5
1 x 20, 155.8, 0.195, 391, 186.4, 122.8
1 x 20, 230.7, 0.121, 242, 111.4, 76.1
1 x 20, 156.1, 0.195, 390, 186.1, 122.7
104016 x 0.45 x 25
-137+30-109-63-17-109-63-16+137+30+7
+123+76+123+1170-1250.3

Max Moment/Mu

1170.2 x (684 / 2 - 211.7)


152.6 + (35.8+1.1+20.4+7.1+0.6+20.3+7.0
+ (0.6+35.8+1.1+8.6+22.9+8.5+22.8)
128.2 / 345.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

80.9 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

63 mm, 360 m

OK

35.8
1.1
20.4
7.1
0.6
20.3
7.0
0.6
35.8
1.1
8.6
22.9
8.5
22.8
1170.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
152.6 kN
345.3kN
0.37

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1250.3 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

4572.5 k
OK
4307.5 k

X-X Moments

-101.1 kN.m, 83.3 kN.m


101.1 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-78.8 kN.m, 61.8 kN.m


1250.3, 20.0

25.0 kN.m
78.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(101.1 + 78.8 )
atn(78.8/ 101.1)

128.2 kN.m
37.9 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)

0.516, 684 mm, 600 mm, 352.89 mm, 104016 mm, 211.7 m
1 x 20, 602.9, -0.248, -437, -260.8, -137.3
1 x 20, 305.4, 0.047, 94, 36.8, 29.6

35.8 kN
1.1 kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

1 x 20, 528.6, -0.174, -348, -186.4, -109.5


1 x 20, 454.2, -0.100, -201, -112.0, -63.1
1 x 20, 379.8, -0.027, -53, -37.6, -16.8
1 x 20, 528.3, -0.174, -348, -186.1, -109.3
1 x 20, 453.6, -0.100, -200, -111.4, -62.8
1 x 20, 378.9, -0.026, -52, -36.8, -16.2
1 x 20, 81.4, 0.269, 437, 260.8, 137.3
1 x 20, 304.6, 0.048, 96, 37.6, 30.1
1 x 20, 230.2, 0.122, 243, 112.0, 76.5
1 x 20, 155.8, 0.195, 391, 186.4, 122.8
1 x 20, 230.7, 0.121, 242, 111.4, 76.1
1 x 20, 156.1, 0.195, 390, 186.1, 122.7
104016 x 0.45 x 25
-137+30-109-63-17-109-63-16+137+30+7
+123+76+123+1170-1250.3

Max Moment/Mu

1170.2 x (684 / 2 - 211.7)


152.6 + (35.8+1.1+20.4+7.1+0.6+20.3+7.0
+ (0.6+35.8+1.1+8.6+22.9+8.5+22.8)
128.2 / 345.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

80.9 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

63 mm, 360 m

OK

: Job Ref
: Sheet Ref / 38: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

20.4
7.1
0.6
20.3
7.0
0.6
35.8
1.1
8.6
22.9
8.5
22.8
1170.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
152.6 kN
345.3kN
0.37

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 39: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C3


LEVEL 4

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1830.3 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

5207.9 k
OK
4944.5 k

X-X Moments

-105.8 kN.m, 96.2 kN.m


1830.3 kN, 20.0 mm

36.6 kN.m
105.8 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-77.8 kN.m, 73.9 kN.m


77.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(105.8 + 77.8 )
atn(77.8/ 105.8)

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar

0.566, 678 mm, 600 mm, 383.85 mm, 124462 mm, 229.8 m

131.3 kN.m
36.3 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

: Job Ref
: Sheet Ref / 40: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1 x 25, 593.1, -0.191, -382, -254.3, -187.3


1 x 25, 309.4, 0.068, 136, 29.5, 66.7
1 x 25, 498.5, -0.105, -209, -159.7, -102.7
1 x 25, 403.9, -0.018, -37, -65.1, -18.0
1 x 25, 518.2, -0.123, -245, -179.3, -120.3
1 x 25, 443.3, -0.054, -108, -104.4, -53.2
1 x 25, 368.4, 0.014, 28, -29.5, 13.9
1 x 25, 84.6, 0.273, 437, 254.3, 214.5
1 x 25, 273.8, 0.100, 201, 65.1, 98.5
1 x 25, 179.2, 0.187, 373, 159.7, 183.2
1 x 25, 234.4, 0.136, 272, 104.4, 133.8
1 x 25, 159.5, 0.205, 409, 179.3, 200.8
124462 x 0.45 x 25
-187+67-103-18-120-53+14+215+99+18
+134+201+1400-1830.3

Max Moment/Mu

1400.2 x (678 / 2 - 229.8)


152.7 + (47.6+2.0+16.4+1.2+21.6+5.6+-0.4
+ (54.5+6.4+29.3+14.0+36.0)
131.3 / 386.7

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

57.8 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

42.5 mm, 360 m

OK

47.6
2.0
16.4
1.2
21.6
5.6
-0.4
54.5
6.4
29.3
14.0
36.0
1400.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.2

k
OK
152.7 kN
386.7kN
0.34

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1830.3 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

5207.9 k
OK
4944.5 k

X-X Moments

-105.8 kN.m, 96.2 kN.m


105.8 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-77.8 kN.m, 73.9 kN.m


1830.3, 20.0

36.6 kN.m
77.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(105.8 + 77.8 )
atn(77.8/ 105.8)

131.3 kN.m
36.3 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)

0.566, 678 mm, 600 mm, 383.85 mm, 124462 mm, 229.8 m
1 x 25, 593.1, -0.191, -382, -254.3, -187.3
1 x 25, 309.4, 0.068, 136, 29.5, 66.7
1 x 25, 498.5, -0.105, -209, -159.7, -102.7
1 x 25, 403.9, -0.018, -37, -65.1, -18.0
1 x 25, 518.2, -0.123, -245, -179.3, -120.3

47.6
2.0
16.4
1.2
21.6

kN
kN
kN
kN
kN

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 41: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Bar group6:M6 fn(bars,d,%,,la,F)


Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

1 x 25, 443.3, -0.054, -108, -104.4, -53.2


5.6
1 x 25, 368.4, 0.014, 28, -29.5, 13.9
-0.4
1 x 25, 84.6, 0.273, 437, 254.3, 214.5
54.5
1 x 25, 273.8, 0.100, 201, 65.1, 98.5
6.4
1 x 25, 179.2, 0.187, 373, 159.7, 183.2
29.3
1 x 25, 234.4, 0.136, 272, 104.4, 133.8
14.0
1 x 25, 159.5, 0.205, 409, 179.3, 200.8
36.0
124462 x 0.45 x 25
1400.2
-187+67-103-18-120-53+14+215+99+18+134+201+1400-1830.3 -0.2

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

1400.2 x (678 / 2 - 229.8)


152.7 + (47.6+2.0+16.4+1.2+21.6+5.6+-0.4

+ (54.5+6.4+29.3+14.0+36.0)

Max Moment/Mu

kN
kN
kN
kN
kN
kN
kN
k
k
OK
152.7 kN

386.7kN

131.3 / 386.7

0.34

OK
App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

57.8 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

42.5 mm, 360 m

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 42: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C3


LEVEL 3

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2351.0 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

5207.9 k
OK
4944.5 k

X-X Moments

-88.2 kN.m, 83.6 kN.m


2351.0 kN, 20.0 mm

47.0 kN.m
88.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-66.3 kN.m, 59.3 kN.m


66.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(88.2 + 66.3 )
atn(66.3/ 88.2)

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar

0.617, 680 mm, 600 mm, 419.75 mm, 144753 mm, 249.0 m

110.3 kN.m
36.9 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

Max Moment/Mu

: Job Ref
: Sheet Ref / 43: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1 x 25, 595.5, -0.147, -293, -255.4, -143.9


1 x 25, 307.7, 0.093, 187, 32.4, 91.7
1 x 25, 499.6, -0.067, -133, -159.5, -65.4
1 x 25, 403.7, 0.013, 27, -63.5, 13.2
1 x 25, 521.2, -0.085, -169, -181.1, -83.0
1 x 25, 446.9, -0.023, -45, -106.7, -22.2
1 x 25, 372.5, 0.039, 79, -32.4, 38.7
1 x 25, 84.7, 0.279, 437, 255.4, 214.5
1 x 25, 276.6, 0.119, 239, 63.5, 117.2
1 x 25, 180.7, 0.199, 399, 159.5, 195.7
1 x 25, 233.4, 0.155, 311, 106.7, 152.6
1 x 25, 159.1, 0.217, 435, 181.1, 213.4
144753 x 0.45 x 25
-144+92-65+13-83-22+39+215+117+196+15
+213+1628-2351

36.8
3.0
10.4
-0.8
15.0
2.4
-1.3
54.8
7.4
31.2
16.3
38.6
1628.5
-0.1

k
OK
148.4 kN

1628.5 x (680 / 2 - 249.0)


148.4 + (36.8+3.0+10.4+-0.8+15.0+2.4+-1.3
+ (54.8+7.4+31.2+16.3+38.6)

362.2kN

110.3 / 362.2

0.30

OK
App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

37.5 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

28.2 mm, 360 m

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2351.0 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

5207.9 k
OK
4944.5 k

X-X Moments

-88.2 kN.m, 83.6 kN.m


88.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-66.3 kN.m, 59.3 kN.m


2351.0, 20.0

47.0 kN.m
66.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(88.2 + 66.3 )
atn(66.3/ 88.2)

110.3 kN.m
36.9 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)

0.617, 680 mm, 600 mm, 419.75 mm, 144753 mm, 249.0 m
1 x 25, 595.5, -0.147, -293, -255.4, -143.9
1 x 25, 307.7, 0.093, 187, 32.4, 91.7
1 x 25, 499.6, -0.067, -133, -159.5, -65.4
1 x 25, 403.7, 0.013, 27, -63.5, 13.2
1 x 25, 521.2, -0.085, -169, -181.1, -83.0

36.8
3.0
10.4
-0.8
15.0

kN
kN
kN
kN
kN

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

Job ref
Sheet
Made By
Date
Checked
Approved

1 x 25, 446.9, -0.023, -45, -106.7, -22.2


1 x 25, 372.5, 0.039, 79, -32.4, 38.7
1 x 25, 84.7, 0.279, 437, 255.4, 214.5
1 x 25, 276.6, 0.119, 239, 63.5, 117.2
1 x 25, 180.7, 0.199, 399, 159.5, 195.7
1 x 25, 233.4, 0.155, 311, 106.7, 152.6
1 x 25, 159.1, 0.217, 435, 181.1, 213.4
144753 x 0.45 x 25
-144+92-65+13-83-22+39+215+117+196+15
+213+1628-2351

Max Moment/Mu

1628.5 x (680 / 2 - 249.0)


148.4 + (36.8+3.0+10.4+-0.8+15.0+2.4+-1.3
+ (54.8+7.4+31.2+16.3+38.6)
110.3 / 362.2

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

37.5 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

28.2 mm, 360 m

OK

: Job Ref
: Sheet Ref / 44: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

2.4
-1.3
54.8
7.4
31.2
16.3
38.6
1628.5

kN
kN
kN
kN
kN
kN
kN
k

-0.1

k
OK
148.4 kN
362.2kN
0.30

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 45: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C3


LEVEL 2

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=5000-(700+700)/2
Loy=5000-(600+600)/2

1.50
1.20
4300
4400

LEX=6450.0 MM, LEX/H=16.1, EXX=20.0 MM


LEY=5280.0 MM, LEY/B=8.8, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2966.6 k

.45x(600x400-7144)x25 + 0.95x7144.0x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-7144)x25 + 0.95x7144.0x460

OK

5741.6 k
OK
5479.6 k

X-X Moments

Applied Moments (Mx1, Mx2)


-70.2 kN.m, 59.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5742 - 2967)/(5742 - 1303) < 1
au = a K h
0.130, 1.000, 400
Madd= N au
2967 x 52.0
Mi=fn(Mx1, Mx2)
-70.2 kN.m, 59.9 kN.m
M2+Madd, M nom
224.5 kN.m, 59.3 kN.m
M nom=fn(N, exx)
2966.6 kN, 20.0 mm
Design Moment

1.00
52.0 mm
154.3 kN.m
28.1 kN.m
154.3 kN.m
224.5 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-28.2 kN.m, 36.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5742 - 2967)/(5742 - 1372) < 1
au = a K h
0.039, 1.000, 400
Madd= N au
2967 x 23.2
Mi=fn(My1, My2)
-28.2 kN.m, 36.9 kN.m

1.00
23.2 mm
68.9 kN.m
14.8 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(M2+Madd)
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 46: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

105.8
2966.6, 20.0

0.0 kN.m
68.9 kN.m
105.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(224.5 + 105.8 )
atn(105.8/ 224.5)

248.2 kN.m
25.2 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.667, 618 mm, 600 mm, 412.19 mm, 161112 mm, 238.1 m
1 x 32, 532.5, -0.102, -204, -223.6, -164.3
1 x 32, 331.2, 0.069, 138, -22.4, 110.6
1 x 25, 468.6, -0.048, -96, -159.7, -47.0
1 x 25, 401.5, 0.009, 18, -92.6, 8.9
1 x 25, 452.0, -0.034, -68, -143.1, -33.2
1 x 25, 369.9, 0.036, 72, -61.1, 35.2
1 x 32, 286.4, 0.107, 214, 22.4, 171.7
1 x 32, 85.2, 0.278, 437, 223.6, 351.5
1 x 25, 216.2, 0.166, 333, 92.6, 163.4
1 x 25, 149.1, 0.223, 437, 159.7, 214.5
1 x 25, 247.7, 0.140, 279, 61.1, 137.1
1 x 25, 165.7, 0.209, 419, 143.1, 205.5
161112 x 0.45 x 25
-164+111-47+9-33+35+172+351+163+21
+137+205+1813-2966.6

Max Moment/Mu

1812.5 x (618 / 2 - 238.1)


128.1 + (36.7+-2.5+7.5+-0.8+4.7+-2.2+3.8
+ (78.6+15.1+34.3+8.4+29.4)
248.2 / 341.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

75.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

35.7 mm, 360 m

OK

36.7
-2.5
7.5
-0.8
4.7
-2.2
3.8
78.6
15.1
34.3
8.4
29.4
1812.5

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.1

k
OK
128.1 kN
341.3kN
0.72

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2966.6 k

.45x(600x400-7144)x25 + 0.95x7144.0x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-7144)x25 + 0.95x7144.0x460

OK

5741.6 k
OK
5479.6 k

X-X Moments

Applied Moments (Mx1, Mx2)


-70.2 kN.m, 59.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5742 - 2967)/(5742 - 1303) < 1
au = a K h
0.130, 1.000, 400
Madd= N au
2967 x 52.0
Mi=fn(Mx1, Mx2)
-70.2 kN.m, 59.9 kN.m
M2+Madd, M nom
224.5 kN.m, 0.0 kN.m
M nom=fn(N, exx)
2966.6 kN, 20.0 mm
Design Moment

1.00
52.0 mm
154.3 kN.m
28.1 kN.m
154.3 kN.m
224.5 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 47: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Y-Y Moments
Applied Moments (My1, My2)
-28.2 kN.m, 36.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5742 - 2967)/(5742 - 1372) < 1
au = a K h
0.039, 1.000, 400
Madd= N au
2967 x 23.2
Mi=fn(My1, My2)
-28.2 kN.m, 36.9 kN.m
M nom=fn(M2+Madd)
105.8
M nom=fn(N, eyy)
2966.6, 20.0
Design Moment

1.00
23.2 mm
68.9 kN.m
14.8 kN.m
59.3 kN.m
68.9 kN.m
105.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(224.5 + 105.8 )
atn(105.8/ 224.5)

248.2 kN.m
25.2 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.667, 618 mm, 600 mm, 412.19 mm, 161112 mm, 238.1 m
1 x 32, 532.5, -0.102, -204, -223.6, -164.3
1 x 32, 331.2, 0.069, 138, -22.4, 110.6
1 x 25, 468.6, -0.048, -96, -159.7, -47.0
1 x 25, 401.5, 0.009, 18, -92.6, 8.9
1 x 25, 452.0, -0.034, -68, -143.1, -33.2
1 x 25, 369.9, 0.036, 72, -61.1, 35.2
1 x 32, 286.4, 0.107, 214, 22.4, 171.7
1 x 32, 85.2, 0.278, 437, 223.6, 351.5
1 x 25, 216.2, 0.166, 333, 92.6, 163.4
1 x 25, 149.1, 0.223, 437, 159.7, 214.5
1 x 25, 247.7, 0.140, 279, 61.1, 137.1
1 x 25, 165.7, 0.209, 419, 143.1, 205.5
161112 x 0.45 x 25
-164+111-47+9-33+35+172+351+163+21
+137+205+1813-2966.6

Max Moment/Mu

1812.5 x (618 / 2 - 238.1)


128.1 + (36.7+-2.5+7.5+-0.8+4.7+-2.2+3.8
+ (78.6+15.1+34.3+8.4+29.4)
248.2 / 341.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

75.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

35.7 mm, 360 m

OK

36.7
-2.5
7.5
-0.8
4.7
-2.2
3.8
78.6
15.1
34.3
8.4
29.4
1812.5

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.1

k
OK
128.1 kN
341.3kN
0.72

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 48: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C3


LEVEL 1

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Shallow
Lox=5000-(700+0)/2
Loy=5000-(600+0)/2

1.50
1.30
4650
4700

LEX=6975.0 MM, LEX/H=17.4, EXX=20.0 MM


LEY=6110.0 MM, LEY/B=10.2, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3523.6 k

.45x(600x400-9651)x25 + 0.95x9651.0x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-9651)x25 + 0.95x9651.0x460

OK

6808.9 k
OK
6549.8 k

X-X Moments

Applied Moments (Mx1, Mx2)


-37.2 kN.m, 62.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (6809 - 3524)/(6809 - 1321) < 1
au = a K h
0.152, 1.000, 400
Madd= N au
3524 x 60.8
Mi=fn(Mx1, Mx2)
-37.2 kN.m, 62.6 kN.m
M2+Madd, M nom
276.9 kN.m, 70.5 kN.m
M nom=fn(N, exx)
3523.6 kN, 20.0 mm
Design Moment

1.00
60.8 mm
214.3 kN.m
25.0 kN.m
214.3 kN.m
276.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-8.8 kN.m, 15.1 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (6809 - 3524)/(6809 - 1258) < 1

1.00

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
au = a K h
Madd= N au
Mi=fn(My1, My2)
M nom=fn(M2+Madd)
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 49: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

0.052, 1.000, 400


3524 x 31.1
-8.8 kN.m, 15.1 kN.m
124.7
3523.6, 20.0

31.1 mm
109.6 kN.m
6.0 kN.m
0.0 kN.m
109.6 kN.m
124.7 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(276.9 + 124.7 )
atn(124.7/ 276.9)

303.7 kN.m
24.2 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.679, 611 mm, 600 mm, 414.78 mm, 164477 mm, 238.1 m
1 x 32, 526.5, -0.094, -189, -220.9, -151.6
1 x 32, 332.6, 0.069, 139, -27.1, 111.5
1 x 32, 461.9, -0.040, -79, -156.3, -63.9
1 x 32, 397.3, 0.015, 30, -91.7, 23.8
1 x 32, 443.8, -0.025, -49, -138.3, -39.4
1 x 32, 361.2, 0.045, 90, -55.6, 72.8
1 x 32, 278.5, 0.115, 230, 27.1, 185.0
1 x 32, 84.6, 0.279, 437, 220.9, 351.5
1 x 32, 213.9, 0.170, 339, 91.7, 272.7
1 x 32, 149.3, 0.224, 437, 156.3, 351.5
1 x 32, 250.0, 0.139, 278, 55.6, 223.7
1 x 32, 167.3, 0.209, 418, 138.3, 335.9
164477 x 0.45 x 25
-152+111-64+24-39+73+185+351+273+35
+224+336+1850-3523.6

Max Moment/Mu

1850.4 x (611 / 2 - 238.1)


124.9 + (33.5+-3.0+10.0+-2.2+5.5+-4.0+5.0
+ (77.6+25.0+54.9+12.4+46.4)
303.7 / 386.1

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

78.6 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

35.4 mm, 360 m

OK

33.5
-3.0
10.0
-2.2
5.5
-4.0
5.0
77.6
25.0
54.9
12.4
46.4
1850.4

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
124.9 kN
386.1kN
0.78

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3523.6 k

.45x(600x400-9651)x25 + 0.95x9651.0x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-9651)x25 + 0.95x9651.0x460

OK

6808.9 k
OK
6549.8 k

X-X Moments

Applied Moments (Mx1, Mx2)


-37.2 kN.m, 62.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (6809 - 3524)/(6809 - 1321) < 1
au = a K h
0.152, 1.000, 400
Madd= N au
3524 x 60.8
Mi=fn(Mx1, Mx2)
-37.2 kN.m, 62.6 kN.m
M2+Madd, M nom
276.9 kN.m, 0.0 kN.m
M nom=fn(N, exx)
3523.6 kN, 20.0 mm

1.00
60.8 mm
214.3 kN.m
25.0 kN.m
214.3 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 50: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Design Moment

276.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-8.8 kN.m, 15.1 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (6809 - 3524)/(6809 - 1258) < 1
au = a K h
0.052, 1.000, 400
Madd= N au
3524 x 31.1
Mi=fn(My1, My2)
-8.8 kN.m, 15.1 kN.m
M nom=fn(M2+Madd)
124.7
M nom=fn(N, eyy)
3523.6, 20.0
Design Moment

1.00
31.1 mm
109.6 kN.m
6.0 kN.m
70.5 kN.m
109.6 kN.m
124.7 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(276.9 + 124.7 )
atn(124.7/ 276.9)

303.7 kN.m
24.2 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

Max Moment/Mu

0.679, 611 mm, 600 mm, 414.78 mm, 164477 mm, 238.1 m
1 x 32, 526.5, -0.094, -189, -220.9, -151.6
1 x 32, 332.6, 0.069, 139, -27.1, 111.5
1 x 32, 461.9, -0.040, -79, -156.3, -63.9
1 x 32, 397.3, 0.015, 30, -91.7, 23.8
1 x 32, 443.8, -0.025, -49, -138.3, -39.4
1 x 32, 361.2, 0.045, 90, -55.6, 72.8
1 x 32, 278.5, 0.115, 230, 27.1, 185.0
1 x 32, 84.6, 0.279, 437, 220.9, 351.5
1 x 32, 213.9, 0.170, 339, 91.7, 272.7
1 x 32, 149.3, 0.224, 437, 156.3, 351.5
1 x 32, 250.0, 0.139, 278, 55.6, 223.7
1 x 32, 167.3, 0.209, 418, 138.3, 335.9
164477 x 0.45 x 25
-152+111-64+24-39+73+185+351+273+35
+224+336+1850-3523.6
1850.4 x (611 / 2 - 238.1)
124.9 + (33.5+-3.0+10.0+-2.2+5.5+-4.0+5.0
+ (77.6+25.0+54.9+12.4+46.4)

33.5
-3.0
10.0
-2.2
5.5
-4.0
5.0
77.6
25.0
54.9
12.4
46.4
1850.4
0.0

k
OK
124.9 kN
386.1kN

303.7 / 386.1

0.78

OK
App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

78.6 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

35.4 mm, 360 m

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 51: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C4


LEVEL 6

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

777.9 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-69.7 kN.m, 101.1 kN.m


777.9 kN, 20.0 mm

4572.5 k
OK
4307.5 k

X-X Moments
15.6 kN.m
101.1 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

1.8 kN.m, -7.6 kN.m


7.6 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(101.1 + 7.6 )
atn(7.6/ 101.1)

101.4 kN.m
4.3 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 52: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

Max Moment/Mu

0.425, 444 mm, 600 mm, 188.73 mm, 88672 mm, 95.6 m
1 x 20, 381.7, -0.358, -437, -159.7, -137.3
1 x 20, 345.4, -0.291, -437, -123.5, -137.3
1 x 20, 372.6, -0.341, -437, -150.7, -137.3
1 x 20, 363.5, -0.324, -437, -141.6, -137.3
1 x 20, 354.5, -0.307, -437, -132.5, -137.3
1 x 20, 287.3, -0.183, -365, -65.3, -114.8
1 x 20, 192.9, -0.008, -15, 29.1, -4.8
1 x 20, 98.5, 0.167, 335, 123.5, 105.2
1 x 20, 62.2, 0.235, 437, 159.7, 137.3
1 x 20, 89.4, 0.184, 368, 132.5, 115.7
1 x 20, 80.3, 0.201, 402, 141.6, 126.3
1 x 20, 71.3, 0.218, 436, 150.7, 136.9
1 x 20, 251.0, -0.115, -231, -29.1, -72.5
1 x 20, 156.6, 0.060, 119, 65.3, 37.5
88672 x 0.45 x 25
-137-137-137-137-137-115-5+105+137+11
+126+137-73+37+998-777.9

21.9
16.9
20.7
19.4
18.2
7.5
-0.1
13.0
21.9
15.3
17.9
20.6
2.1
2.4
997.6
-0.1

k
OK
126.0 kN

997.6 x (444 / 2 - 95.6)


126.0 + (21.9+16.9+20.7+19.4+18.2+7.5+-0.1
+ (13.0+21.9+15.3+17.9+20.6+2.1+2.4)

323.9kN

101.4 / 323.9

0.31

OK
App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

130 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

9.8 mm, 360 m

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

777.9 k

.45x(600x400-4398)x25 + 0.95x4398.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-4398)x25 + 0.95x4398.2x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

4572.5 k
OK
4307.5 k

X-X Moments

-69.7 kN.m, 101.1 kN.m


101.1 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

1.8 kN.m, -7.6 kN.m


777.9, 20.0

15.6 kN.m
15.6 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(101.1 + 15.6 )
atn(15.6/ 101.1)

102.3 kN.m
8.7 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)

0.443, 487 mm, 600 mm, 215.67 mm, 90135 mm, 117.5 m
1 x 20, 420.5, -0.332, -437, -177.2, -137.3

24.3 kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

1 x 20, 346.8, -0.213, -426, -103.5, -133.7


1 x 20, 402.1, -0.302, -437, -158.8, -137.3
1 x 20, 383.7, -0.273, -437, -140.3, -137.3
1 x 20, 365.2, -0.243, -437, -121.9, -137.3
1 x 20, 326.9, -0.180, -361, -83.6, -113.4
1 x 20, 233.3, -0.029, -57, 10.0, -18.0
1 x 20, 139.8, 0.123, 246, 103.5, 77.4
1 x 20, 66.1, 0.243, 437, 177.2, 137.3
1 x 20, 121.4, 0.153, 306, 121.9, 96.2
1 x 20, 103.0, 0.183, 366, 140.3, 114.9
1 x 20, 84.6, 0.213, 426, 158.8, 133.7
1 x 20, 253.3, -0.061, -122, -10.0, -38.3
1 x 20, 159.7, 0.091, 182, 83.6, 57.1
90135 x 0.45 x 25
-137-134-137-137-137-113-18+77+137+9
+115+134-38+57+1014-777.9

Max Moment/Mu

1014.0 x (487 / 2 - 117.5)


127.5 + (24.3+13.8+21.8+19.3+16.7+9.5+-0.2
+ (8.0+24.3+11.7+16.1+21.2+0.4+4.8)
102.3 / 319.4

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

130 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

: Job Ref
: Sheet Ref / 53: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

13.8
21.8
19.3
16.7
9.5
-0.2
8.0
24.3
11.7
16.1
21.2
0.4
4.8
1014.0

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
127.5 kN
319.4kN
0.32

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 54: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C4


LEVEL 5

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1580.7 k

.45x(600x400-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-14.5 kN.m, 7.7 kN.m


1580.7 kN, 20.0 mm

4305.0 k
OK
4039.3 k

X-X Moments
31.6 kN.m
31.6 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

2.3 kN.m, 0.0 kN.m


2.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(31.6 + 2.3 )
atn(2.3/ 31.6)

31.7 kN.m
4.2 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 55: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.558, 442 mm, 600 mm, 246.94 mm, 120607 mm, 121.6 m
1 x 20, 380.4, -0.189, -378, -159.2, -118.9
1 x 20, 345.3, -0.139, -279, -124.1, -87.6
1 x 20, 368.7, -0.173, -345, -147.5, -108.4
1 x 20, 357.0, -0.156, -312, -135.8, -98.0
1 x 20, 286.0, -0.055, -111, -64.8, -34.8
1 x 20, 191.6, 0.078, 157, 29.6, 49.3
1 x 20, 97.2, 0.212, 425, 124.1, 133.4
1 x 20, 62.1, 0.262, 437, 159.2, 137.3
1 x 20, 85.5, 0.229, 437, 135.8, 137.3
1 x 20, 73.8, 0.245, 437, 147.5, 137.3
1 x 20, 250.9, -0.006, -11, -29.6, -3.5
1 x 20, 156.5, 0.128, 256, 64.8, 80.6
120607 x 0.45 x 25
-119-88-108-98-35+49+133+137+137+13
-4+81+1357-1580.7

Max Moment/Mu

1356.8 x (442 / 2 - 121.6)


135.2 + (18.9+10.9+16.0+13.3+2.3+1.5+16.5
+ (21.9+18.6+20.2+0.1+5.2)
31.7 / 280.6

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

20 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

1.5 mm, 360 m

OK

18.9
10.9
16.0
13.3
2.3
1.5
16.5
21.9
18.6
20.2
0.1
5.2
1356.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
135.2 kN
280.6kN
0.11

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1580.7 k

.45x(600x400-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

4305.0 k
OK
4039.3 k

X-X Moments

-14.5 kN.m, 7.7 kN.m


14.5 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

2.3 kN.m, 0.0 kN.m


1580.7, 20.0

31.6 kN.m
31.6 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(14.5 + 31.6 )
atn(31.6/ 14.5)

34.8 kN.m
65.4 deg

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 56: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Max Moment/Mu

0.559, 712 mm, 600 mm, 398.05 mm, 120960 mm, 216.6 m
1 x 20, 635.2, -0.209, -417, -279.2, -131.0
1 x 20, 195.3, 0.178, 357, 160.8, 112.0
1 x 20, 488.6, -0.080, -159, -132.5, -50.0
1 x 20, 341.9, 0.049, 99, 14.1, 31.0
1 x 20, 595.8, -0.174, -348, -239.7, -109.2
1 x 20, 556.3, -0.139, -278, -200.2, -87.4
1 x 20, 516.8, -0.104, -209, -160.8, -65.6
1 x 20, 76.9, 0.282, 437, 279.2, 137.3
1 x 20, 370.2, 0.025, 49, -14.1, 15.4
1 x 20, 223.5, 0.153, 307, 132.5, 96.4
1 x 20, 155.8, 0.213, 426, 200.2, 133.8
1 x 20, 116.4, 0.248, 437, 239.7, 137.3
120960 x 0.45 x 25
-131+112-50+31-109-87-66+137+15+96+13
+137+1361-1580.7
1360.8 x (712 / 2 - 216.6)
189.8 + (36.6+18.0+6.6+0.4+26.2+17.5+10.5
+ (38.3+-0.2+12.8+26.8+32.9)
34.8 / 416.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

9.2 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

OK

36.6
18.0
6.6
0.4
26.2
17.5
10.5
38.3
-0.2
12.8
26.8
32.9
1360.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0 k
189.8 kN
416.3kN
0.08

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 57: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C4


LEVEL 4

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2298.0 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-22.3 kN.m, 21.9 kN.m


2298.0 kN, 20.0 mm

5207.9 k
OK
4944.5 k

X-X Moments
46.0 kN.m
46.0 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

3.9 kN.m, -3.1 kN.m


3.9 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(46.0 + 3.9 )
atn(3.9/ 46.0)

46.1 kN.m
4.9 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 58: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.629, 449 mm, 600 mm, 282.67 mm, 137916 mm, 139.4 m
1 x 25, 383.9, -0.125, -251, -159.3, -123.1
1 x 25, 343.4, -0.075, -150, -118.8, -73.8
1 x 25, 370.4, -0.109, -217, -145.8, -106.6
1 x 25, 356.9, -0.092, -184, -132.3, -90.2
1 x 25, 291.2, -0.011, -21, -66.6, -10.4
1 x 25, 198.6, 0.104, 208, 26.1, 102.2
1 x 25, 105.9, 0.219, 437, 118.8, 214.5
1 x 25, 65.4, 0.269, 437, 159.3, 214.5
1 x 25, 92.4, 0.236, 437, 132.3, 214.5
1 x 25, 78.9, 0.252, 437, 145.8, 214.5
1 x 25, 250.7, 0.040, 79, -26.1, 38.8
1 x 25, 158.1, 0.154, 309, 66.6, 151.5
137916 x 0.45 x 25
-123-74-107-90-10+102+215+215+215+21
+39+151+1552-2298

Max Moment/Mu

1551.6 x (449 / 2 - 139.4)


132.2 + (19.6+8.8+15.5+11.9+0.7+2.7+25.5
+ (34.2+28.4+31.3+-1.0+10.1)
46.1 / 319.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

20 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

1.7 mm, 360 m

OK

19.6
8.8
15.5
11.9
0.7
2.7
25.5
34.2
28.4
31.3
-1.0
10.1
1551.6

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
132.2 kN
319.8kN
0.14

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2298.0 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

5207.9 k
OK
4944.5 k

X-X Moments

-22.3 kN.m, 21.9 kN.m


22.3 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

3.9 kN.m, -3.1 kN.m


2298.0, 20.0

46.0 kN.m
46.0 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(22.3 + 46.0 )
atn(46.0/ 22.3)

51.1 kN.m
64.1 deg

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 59: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.626, 714 mm, 600 mm, 447.14 mm, 140101 mm, 240.8 m
1 x 25, 633.6, -0.146, -292, -276.4, -143.3
1 x 25, 202.6, 0.191, 383, 154.6, 187.9
1 x 25, 489.9, -0.033, -67, -132.7, -32.9
1 x 25, 346.3, 0.079, 158, 10.9, 77.5
1 x 25, 593.0, -0.114, -228, -235.8, -112.1
1 x 25, 552.4, -0.082, -165, -195.2, -80.9
1 x 25, 511.8, -0.051, -101, -154.6, -49.7
1 x 25, 80.8, 0.287, 437, 276.4, 214.5
1 x 25, 368.1, 0.062, 124, -10.9, 60.7
1 x 25, 224.5, 0.174, 349, 132.7, 171.1
1 x 25, 162.0, 0.223, 437, 195.2, 214.5
1 x 25, 121.4, 0.255, 437, 235.8, 214.5
140101 x 0.45 x 25
-143+188-33+78-112-81-50+215+61+17
+215+215+1576-2298

Max Moment/Mu

1576.1 x (714 / 2 - 240.8)


183.4 + (39.6+29.0+4.4+0.8+26.4+15.8+7.7
+ (59.3+-0.7+22.7+41.9+50.6)
51.1 / 481.0

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

9.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

39.6
29.0
4.4
0.8
26.4
15.8
7.7
59.3
-0.7
22.7
41.9
50.6
1576.1

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
183.4 kN
481.0kN
0.10

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 60: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C4


LEVEL 3

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.20
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=3240.0 MM, LEY/B=5.4, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3709.9 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-43.4 kN.m, 13.8 kN.m


3709.9 kN, 20.0 mm

5207.9 k
OK
4944.5 k

X-X Moments
74.2 kN.m
74.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

4.0 kN.m, 0.0 kN.m


4.0 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(74.2 + 4.0 )
atn(4.0/ 74.2)

74.3 kN.m
3.1 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 61: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.873, 432 mm, 600 mm, 377.03 mm, 194188 mm, 177.6 m
1 x 25, 368.0, 0.008, 17, -152.2, 8.2
1 x 25, 342.3, 0.032, 65, -126.4, 31.7
1 x 25, 359.5, 0.016, 33, -143.6, 16.0
1 x 25, 350.9, 0.024, 49, -135.0, 23.9
1 x 25, 275.2, 0.095, 189, -59.3, 92.8
1 x 25, 182.3, 0.181, 362, 33.5, 177.5
1 x 25, 89.5, 0.267, 437, 126.4, 214.5
1 x 25, 63.7, 0.291, 437, 152.2, 214.5
1 x 25, 80.9, 0.275, 437, 135.0, 214.5
1 x 25, 72.3, 0.283, 437, 143.6, 214.5
1 x 25, 249.4, 0.118, 237, -33.5, 116.3
1 x 25, 156.5, 0.205, 409, 59.3, 201.0
194188 x 0.45 x 25
8+32+16+24+93+177+215+215+215+215+11
+201+2185-3709.9

Max Moment/Mu

2184.6 x (432 / 2 - 177.6)


83.6 + (-1.2+-4.0+-2.3+-3.2+-5.5+6.0+27.1
+ (32.6+29.0+30.8+-3.9+11.9)
74.3 / 200.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

20 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

1.1 mm, 360 m

OK

-1.2
-4.0
-2.3
-3.2
-5.5
6.0
27.1
32.6
29.0
30.8
-3.9
11.9
2184.6

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
83.6 kN
200.8kN
0.37

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3709.9 k

.45x(600x400-5890)x25 + 0.95x5890.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5890)x25 + 0.95x5890.5x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

5207.9 k
OK
4944.5 k

X-X Moments

-43.4 kN.m, 13.8 kN.m


43.4 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

4.0 kN.m, 0.0 kN.m


3709.9, 20.0

74.2 kN.m
74.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(43.4 + 74.2 )
atn(74.2/ 43.4)

86.0 kN.m
59.7 deg

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 62: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.824, 720 mm, 600 mm, 592.96 mm, 200224 mm, 313.1 m
1 x 25, 637.1, -0.026, -52, -277.2, -25.6
1 x 25, 223.6, 0.218, 436, 136.3, 214.0
1 x 25, 499.3, 0.055, 111, -139.3, 54.3
1 x 25, 361.5, 0.137, 273, -1.5, 134.2
1 x 25, 590.1, 0.002, 3, -230.2, 1.6
1 x 25, 543.2, 0.029, 59, -183.3, 28.8
1 x 25, 496.2, 0.057, 114, -136.3, 56.1
1 x 25, 82.8, 0.301, 437, 277.2, 214.5
1 x 25, 358.4, 0.138, 277, 1.5, 135.9
1 x 25, 220.6, 0.220, 437, 139.3, 214.5
1 x 25, 176.7, 0.246, 437, 183.3, 214.5
1 x 25, 129.7, 0.273, 437, 230.2, 214.5
200224 x 0.45 x 25
-26+214+54+134+2+29+56+215+136+215+21
+215+2253-3709.9

Max Moment/Mu

2252.5 x (720 / 2 - 313.1)


105.5 + (7.1+29.2+-7.6+-0.2+-0.4+-5.3+-7.6
+ (59.5+0.2+29.9+39.3+49.4)
86.0 / 298.9

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

11.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

7.1
29.2
-7.6
-0.2
-0.4
-5.3
-7.6
59.5
0.2
29.9
39.3
49.4
2252.5

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
105.5 kN
298.9kN
0.28

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 63: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C4


LEVEL 2

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Deep
Lox=5000-(700+700)/2
Loy=5000-(600+600)/2

1.50
1.20
4300
4400

LEX=6450.0 MM, LEX/H=16.1, EXX=20.0 MM


LEY=5280.0 MM, LEY/B=8.8, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3709.9 k

.45x(600x400-6872)x25 + 0.95x6872.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-6872)x25 + 0.95x6872.2x460

OK

5625.9 k
OK
5363.6 k

X-X Moments

Applied Moments (Mx1, Mx2)


-43.4 kN.m, 13.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5626 - 3710)/(5626 - 1326) < 1
au = a K h
0.130, 1.000, 400
Madd= N au
3710 x 52.0
Mi=fn(Mx1, Mx2)
-43.4 kN.m, 13.8 kN.m
M2+Madd, M nom
236.3 kN.m, 74.2 kN.m
M nom=fn(N, exx)
3709.9 kN, 20.0 mm
Design Moment

1.00
52.0 mm
192.9 kN.m
20.5 kN.m
192.9 kN.m
236.3 kN.m

Y-Y Moments
Applied Moments (My1, My2)
4.0 kN.m, 0.0 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5626 - 3710)/(5626 - 864) < 1
au = a K h
0.039, 1.000, 400
Madd= N au
3710 x 23.2
Mi=fn(My1, My2)
4.0 kN.m, 0.0 kN.m
M nom=fn(M2+Madd)
90.2

1.00
23.2 mm
86.2 kN.m
2.4 kN.m
0.0 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 64: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

3709.9, 20.0

86.2 kN.m
90.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(236.3 + 90.2 )
atn(90.2/ 236.3)

253.0 kN.m
20.9 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

Max Moment/Mu

0.768, 588 mm, 600 mm, 451.49 mm, 190664 mm, 249.1 m
1 x 25, 509.5, -0.045, -90, -215.7, -44.2
1 x 25, 338.8, 0.087, 175, -44.9, 85.8
1 x 25, 466.8, -0.012, -24, -173.0, -11.7
1 x 25, 424.2, 0.021, 42, -130.3, 20.8
1 x 25, 381.5, 0.054, 109, -87.6, 53.3
1 x 25, 422.7, 0.022, 45, -128.8, 21.9
1 x 25, 335.8, 0.090, 179, -41.9, 88.1
1 x 25, 248.9, 0.157, 314, 44.9, 154.2
1 x 25, 78.1, 0.289, 437, 215.7, 214.5
1 x 25, 206.2, 0.190, 380, 87.6, 186.7
1 x 25, 163.5, 0.223, 437, 130.3, 214.5
1 x 25, 120.8, 0.256, 437, 173.0, 214.5
1 x 25, 251.9, 0.155, 309, 41.9, 151.9
1 x 25, 165.0, 0.222, 437, 128.8, 214.5
190664 x 0.45 x 25
-44+86-12+21+53+22+88+154+215+187+21
+215+152+215+2145-3709.9
2145.0 x (588 / 2 - 249.1)
96.0 + (9.5+-3.9+2.0+-2.7+-4.7+-2.8+-3.7
+ (6.9+46.3+16.4+28.0+37.1+6.4+27.6)

9.5
-3.9
2.0
-2.7
-4.7
-2.8
-3.7
6.9
46.3
16.4
28.0
37.1
6.4
27.6
2145.0
0.0

k
OK
96.0 kN
258.4kN

253.0 / 258.4

0.97

OK
App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

63.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

24.3 mm, 360 m

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

3709.9 k

.45x(600x400-6872)x25 + 0.95x6872.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-6872)x25 + 0.95x6872.2x460

OK

5625.9 k
OK
5363.6 k

X-X Moments

Applied Moments (Mx1, Mx2)


-43.4 kN.m, 13.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5626 - 3710)/(5626 - 1326) < 1
au = a K h
0.130, 1.000, 400
Madd= N au
3710 x 52.0
Mi=fn(Mx1, Mx2)
-43.4 kN.m, 13.8 kN.m
M2+Madd, M nom
236.3 kN.m, 0.0 kN.m
M nom=fn(N, exx)
3709.9 kN, 20.0 mm

1.00
52.0 mm
192.9 kN.m
20.5 kN.m
192.9 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 65: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Design Moment

236.3 kN.m

Y-Y Moments
Applied Moments (My1, My2)
4.0 kN.m, 0.0 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5626 - 3710)/(5626 - 864) < 1
au = a K h
0.039, 1.000, 400
Madd= N au
3710 x 23.2
Mi=fn(My1, My2)
4.0 kN.m, 0.0 kN.m
M nom=fn(M2+Madd)
90.2
M nom=fn(N, eyy)
3709.9, 20.0
Design Moment

1.00
23.2 mm
86.2 kN.m
2.4 kN.m
74.2 kN.m
86.2 kN.m
90.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(236.3 + 90.2 )
atn(90.2/ 236.3)

253.0 kN.m
20.9 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M14)

0.768, 588 mm, 600 mm, 451.49 mm, 190664 mm, 249.1 m
1 x 25, 509.5, -0.045, -90, -215.7, -44.2
1 x 25, 338.8, 0.087, 175, -44.9, 85.8
1 x 25, 466.8, -0.012, -24, -173.0, -11.7
1 x 25, 424.2, 0.021, 42, -130.3, 20.8
1 x 25, 381.5, 0.054, 109, -87.6, 53.3
1 x 25, 422.7, 0.022, 45, -128.8, 21.9
1 x 25, 335.8, 0.090, 179, -41.9, 88.1
1 x 25, 248.9, 0.157, 314, 44.9, 154.2
1 x 25, 78.1, 0.289, 437, 215.7, 214.5
1 x 25, 206.2, 0.190, 380, 87.6, 186.7
1 x 25, 163.5, 0.223, 437, 130.3, 214.5
1 x 25, 120.8, 0.256, 437, 173.0, 214.5
1 x 25, 251.9, 0.155, 309, 41.9, 151.9
1 x 25, 165.0, 0.222, 437, 128.8, 214.5
190664 x 0.45 x 25
-44+86-12+21+53+22+88+154+215+187+21
+215+152+215+2145-3709.9

Max Moment/Mu

2145.0 x (588 / 2 - 249.1)


96.0 + (9.5+-3.9+2.0+-2.7+-4.7+-2.8+-3.7
+ (6.9+46.3+16.4+28.0+37.1+6.4+27.6)
253.0 / 258.4

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

63.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

24.3 mm, 360 m

OK

9.5
-3.9
2.0
-2.7
-4.7
-2.8
-3.7
6.9
46.3
16.4
28.0
37.1
6.4
27.6
2145.0

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
96.0 kN
258.4kN
0.97

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 66: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C4


LEVEL 1

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Shallow
Lox=5000-(700+0)/2
Loy=5000-(600+0)/2

1.50
1.30
4650
4700

LEX=6975.0 MM, LEX/H=17.4, EXX=20.0 MM


LEY=6110.0 MM, LEY/B=10.2, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

4253.7 k

.45x(600x400-10988)x25 + 0.95x10987.7x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-10988)x25 + 0.95x10987.7x460

OK
Applied Moments (Mx1, Mx2)
-39.0 kN.m, 65.2 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (7378 - 4254)/(7378 - 718) < 1
au = a K h
0.152, 1.000, 400
Madd= N au
4254 x 60.8
Mi=fn(Mx1, Mx2)
-39.0 kN.m, 65.2 kN.m
M2+Madd, M nom
323.9 kN.m, 85.1 kN.m
M nom=fn(N, exx)
4253.7 kN, 20.0 mm
Design Moment

7378.0 k
OK
7120.4 k

X-X Moments
1.00
60.8 mm
258.7 kN.m
26.1 kN.m
258.7 kN.m
323.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
1.2 kN.m, -1.5 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (7378 - 4254)/(7378 - 957) < 1
au = a K h
0.052, 1.000, 400
Madd= N au
4254 x 31.1
Mi=fn(My1, My2)
1.2 kN.m, -1.5 kN.m
M nom=fn(M2+Madd)
133.8

1.00
31.1 mm
132.3 kN.m
0.6 kN.m
0.0 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 67: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

4253.7, 20.0

132.3 kN.m
133.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(323.9 + 133.8 )
atn(133.8/ 323.9)

350.4 kN.m
22.5 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M16)

0.726, 599 mm, 600 mm, 434.81 mm, 179009 mm, 244.5 m
1 x 32, 515.2, -0.065, -129, -215.8, -104.1
1 x 32, 335.0, 0.080, 161, -35.6, 129.3
1 x 25, 473.4, -0.031, -62, -174.0, -30.5
1 x 25, 428.3, 0.005, 10, -128.9, 5.1
1 x 25, 383.3, 0.041, 83, -83.9, 40.7
1 x 32, 452.4, -0.014, -28, -153.0, -22.8
1 x 32, 389.5, 0.036, 73, -90.1, 58.6
1 x 32, 326.7, 0.087, 174, -27.3, 140.0
1 x 32, 263.8, 0.138, 275, 35.6, 221.4
1 x 32, 83.6, 0.283, 437, 215.8, 351.5
1 x 25, 215.5, 0.176, 353, 83.9, 173.3
1 x 25, 170.5, 0.213, 426, 128.9, 208.9
1 x 25, 125.4, 0.249, 437, 174.0, 214.5
1 x 32, 272.1, 0.131, 262, 27.3, 210.6
1 x 32, 209.3, 0.182, 363, 90.1, 292.0
1 x 32, 146.4, 0.232, 437, 153.0, 351.5
179009 x 0.45 x 25
-104+129-30+5+41-23+59+140+221+351+17
+209+215+211+292+351+2014-4253.7

Max Moment/Mu

2013.8 x (599 / 2 - 244.5)


110.5 + (22.5+-4.6+5.3+-0.7+-3.4+3.5+-5.3
+ (-3.8+7.9+75.9+14.5+26.9+37.3+5.7
+ (26.3+53.8)
350.4 / 372.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

76.1 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

31.5 mm, 360 m

OK

22.5
-4.6
5.3
-0.7
-3.4
3.5
-5.3
-3.8
7.9
75.9
14.5
26.9
37.3
5.7
26.3
53.8
2013.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
110.5 kN

372.3kN
0.94

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-10988)x25 + 0.95x10987.7x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-10988)x25 + 0.95x10987.7x460

OK
Applied Moments (Mx1, Mx2)
-39.0 kN.m, 65.2 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (7378 - 4254)/(7378 - 718) < 1
au = a K h
0.152, 1.000, 400
Madd= N au
4254 x 60.8
Mi=fn(Mx1, Mx2)
-39.0 kN.m, 65.2 kN.m
M2+Madd, M nom
323.9 kN.m, 0.0 kN.m
M nom=fn(N, exx)
4253.7 kN, 20.0 mm
Design Moment

4253.7 k
7378.0 k
OK
7120.4 k

X-X Moments
1.00
60.8 mm
258.7 kN.m
26.1 kN.m
258.7 kN.m
323.9 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 68: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Y-Y Moments
Applied Moments (My1, My2)
1.2 kN.m, -1.5 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (7378 - 4254)/(7378 - 957) < 1
au = a K h
0.052, 1.000, 400
Madd= N au
4254 x 31.1
Mi=fn(My1, My2)
1.2 kN.m, -1.5 kN.m
M nom=fn(M2+Madd)
133.8
M nom=fn(N, eyy)
4253.7, 20.0
Design Moment

1.00
31.1 mm
132.3 kN.m
0.6 kN.m
85.1 kN.m
132.3 kN.m
133.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(323.9 + 133.8 )
atn(133.8/ 323.9)

350.4 kN.m
22.5 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M16)

0.726, 599 mm, 600 mm, 434.81 mm, 179009 mm, 244.5 m
1 x 32, 515.2, -0.065, -129, -215.8, -104.1
1 x 32, 335.0, 0.080, 161, -35.6, 129.3
1 x 25, 473.4, -0.031, -62, -174.0, -30.5
1 x 25, 428.3, 0.005, 10, -128.9, 5.1
1 x 25, 383.3, 0.041, 83, -83.9, 40.7
1 x 32, 452.4, -0.014, -28, -153.0, -22.8
1 x 32, 389.5, 0.036, 73, -90.1, 58.6
1 x 32, 326.7, 0.087, 174, -27.3, 140.0
1 x 32, 263.8, 0.138, 275, 35.6, 221.4
1 x 32, 83.6, 0.283, 437, 215.8, 351.5
1 x 25, 215.5, 0.176, 353, 83.9, 173.3
1 x 25, 170.5, 0.213, 426, 128.9, 208.9
1 x 25, 125.4, 0.249, 437, 174.0, 214.5
1 x 32, 272.1, 0.131, 262, 27.3, 210.6
1 x 32, 209.3, 0.182, 363, 90.1, 292.0
1 x 32, 146.4, 0.232, 437, 153.0, 351.5
179009 x 0.45 x 25
-104+129-30+5+41-23+59+140+221+351+17
+209+215+211+292+351+2014-4253.7

Max Moment/Mu

2013.8 x (599 / 2 - 244.5)


110.5 + (22.5+-4.6+5.3+-0.7+-3.4+3.5+-5.3
+ (-3.8+7.9+75.9+14.5+26.9+37.3+5.7
+ (26.3+53.8)
350.4 / 372.3

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

76.1 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

31.5 mm, 360 m

OK

22.5
-4.6
5.3
-0.7
-3.4
3.5
-5.3
-3.8
7.9
75.9
14.5
26.9
37.3
5.7
26.3
53.8
2013.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
110.5 kN

372.3kN
0.94

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 69: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C5


LEVEL 6

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 300 mm deep column
y : for 400 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Shallow, Bottom: Shallow
Lox=3300-(600+600)/2
Loy=3300-(600+600)/2

1.20
1.50
2700
2700

LEX=3240.0 MM, LEX/H=10.8, EXX=15.0 MM


LEY=4050.0 MM, LEY/B=10.1, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

314.2 k

.45x(400x300-2513)x25 + 0.95x2513.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-2513)x25 + 0.95x2513.3x460

OK
Applied Moments (Mx1, Mx2)
-78.6 kN.m, 59.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2420 - 314)/(2420 - 608) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
314 x 17.5
Mi=fn(Mx1, Mx2)
-78.6 kN.m, 59.7 kN.m
M2+Madd, M nom
84.1 kN.m, 4.7 kN.m
M nom=fn(N, exx)
314.2 kN, 15.0 mm
Design Moment

2420.0 k
OK
2287.9 k

X-X Moments
1.00
17.5 mm
5.5 kN.m
31.4 kN.m
5.5 kN.m
84.1 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-22.7 kN.m, 14.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2420 - 314)/(2420 - 660) < 1
au = a K h
0.051, 1.000, 300
Madd= N au
314 x 20.5
Mi=fn(My1, My2)
-22.7 kN.m, 14.7 kN.m
M nom=fn(M2+Madd)
29.1

1.00
20.5 mm
6.4 kN.m
9.1 kN.m
0.0 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 70: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

314.2, 20.0

6.4 kN.m
29.1 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(84.1 + 29.1 )
atn(29.1/ 84.1)

89.0 kN.m
19.1 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

0.446, 414 mm, 400 mm, 184.74 mm, 42662 mm, 108.8 m
1 x 20, 340.6, -0.295, -437, -133.4, -137.3
1 x 20, 247.7, -0.119, -238, -40.4, -74.9
1 x 20, 294.1, -0.207, -415, -86.9, -130.2
1 x 20, 253.7, -0.131, -261, -46.5, -82.1
1 x 20, 166.8, 0.034, 68, 40.4, 21.4
1 x 20, 73.8, 0.210, 420, 133.4, 132.1
1 x 20, 120.3, 0.122, 244, 86.9, 76.7
1 x 20, 160.7, 0.045, 91, 46.5, 28.6
42662 x 0.45 x 25
-137-75-130-82+21+132+77+29+480-314.2

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M8)
Max Moment/Mu

480.0 x (414 / 2 - 108.8)


47.2 + (18.3+3.0+11.3+3.8+0.9+17.6+6.7
+ (1.3)
89.0 / 110.2

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

267.7 mm, 180 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

2.60%, 0.98 N/mm, 0.98 N/mm


0 mm, 225 mm, 3 no 8 mm legs
0 mm, 151 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

92.8 mm, 240 m

OK

18.3
3.0
11.3
3.8
0.9
17.6
6.7
1.3
480.0
0.0

kN
kN
kN
kN
kN
kN
kN
kN
k
k
OK
47.2 kN

110.2kN
0.80

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

314.2 k

.45x(400x300-2513)x25 + 0.95x2513.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-2513)x25 + 0.95x2513.3x460

OK
Applied Moments (Mx1, Mx2)
-78.6 kN.m, 59.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2420 - 314)/(2420 - 608) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
314 x 17.5
Mi=fn(Mx1, Mx2)
-78.6 kN.m, 59.7 kN.m
M2+Madd, M nom
84.1 kN.m, 0.0 kN.m
M nom=fn(N, exx)
314.2 kN, 15.0 mm
Design Moment

2420.0 k
OK
2287.9 k

X-X Moments
1.00
17.5 mm
5.5 kN.m
31.4 kN.m
5.5 kN.m
84.1 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-22.7 kN.m, 14.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2420 - 314)/(2420 - 660) < 1

1.00

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
au = a K h
Madd= N au
Mi=fn(My1, My2)
M nom=fn(M2+Madd)
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 71: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

0.051, 1.000, 300


314 x 20.5
-22.7 kN.m, 14.7 kN.m
29.1
314.2, 20.0

20.5 mm
6.4 kN.m
9.1 kN.m
6.3 kN.m
6.4 kN.m
29.1 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(84.1 + 29.1 )
atn(29.1/ 84.1)

89.0 kN.m
19.1 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

0.446, 414 mm, 400 mm, 184.74 mm, 42662 mm, 108.8 m
1 x 20, 340.6, -0.295, -437, -133.4, -137.3
1 x 20, 247.7, -0.119, -238, -40.4, -74.9
1 x 20, 294.1, -0.207, -415, -86.9, -130.2
1 x 20, 253.7, -0.131, -261, -46.5, -82.1
1 x 20, 166.8, 0.034, 68, 40.4, 21.4
1 x 20, 73.8, 0.210, 420, 133.4, 132.1
1 x 20, 120.3, 0.122, 244, 86.9, 76.7
1 x 20, 160.7, 0.045, 91, 46.5, 28.6
42662 x 0.45 x 25
-137-75-130-82+21+132+77+29+480-314.2

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M8)
Max Moment/Mu

480.0 x (414 / 2 - 108.8)


47.2 + (18.3+3.0+11.3+3.8+0.9+17.6+6.7
+ (1.3)
89.0 / 110.2

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

267.7 mm, 180 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

2.60%, 0.98 N/mm, 0.98 N/mm


0 mm, 225 mm, 3 no 8 mm legs
0 mm, 151 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

92.8 mm, 240 m

OK

18.3
3.0
11.3
3.8
0.9
17.6
6.7
1.3
480.0
0.0

kN
kN
kN
kN
kN
kN
kN
kN
k
k
OK
47.2 kN

110.2kN
0.80

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 72: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C5


LEVEL 5

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 300 mm deep column
y : for 400 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Shallow, Bottom: Shallow
Lox=3300-(600+600)/2
Loy=3300-(600+600)/2

1.20
1.50
2700
2700

LEX=3240.0 MM, LEX/H=10.8, EXX=15.0 MM


LEY=4050.0 MM, LEY/B=10.1, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

826.7 k

.45x(400x300-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
-94.0 kN.m, 87.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2955 - 827)/(2955 - 608) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
827 x 17.5
Mi=fn(Mx1, Mx2)
-94.0 kN.m, 87.7 kN.m
M2+Madd, M nom
108.5 kN.m, 12.4 kN.m
M nom=fn(N, exx)
826.7 kN, 15.0 mm
Design Moment

2955.0 k
OK
2824.3 k

X-X Moments
1.00
17.5 mm
14.5 kN.m
37.6 kN.m
14.5 kN.m
108.5 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-46.3 kN.m, 39.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2955 - 827)/(2955 - 682) < 1
au = a K h
0.051, 1.000, 300
Madd= N au
827 x 20.5
Mi=fn(My1, My2)
-46.3 kN.m, 39.9 kN.m
M nom=fn(M2+Madd)
63.2

1.00
20.5 mm
16.9 kN.m
18.5 kN.m
0.0 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 73: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

826.7, 20.0

16.9 kN.m
63.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(108.5 + 63.2 )
atn(63.2/ 108.5)

125.6 kN.m
30.2 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.540, 461 mm, 400 mm, 248.92 mm, 57083 mm, 148.7 m
1 x 20, 381.3, -0.186, -372, -151.0, -117.0
1 x 20, 238.3, 0.015, 30, -7.9, 9.4
1 x 20, 333.6, -0.119, -238, -103.3, -74.9
1 x 20, 286.0, -0.052, -104, -55.6, -32.7
1 x 20, 328.4, -0.112, -223, -98.0, -70.2
1 x 20, 275.4, -0.037, -74, -45.0, -23.4
1 x 20, 222.4, 0.037, 75, 7.9, 23.4
1 x 20, 79.3, 0.238, 437, 151.0, 137.3
1 x 20, 174.7, 0.104, 209, 55.6, 65.6
1 x 20, 127.0, 0.171, 343, 103.3, 107.7
1 x 20, 185.3, 0.089, 179, 45.0, 56.2
1 x 20, 132.3, 0.164, 328, 98.0, 103.0
57083 x 0.45 x 25
-117+9-75-33-70-23+23+137+66+108+5
+103+642-826.7

Max Moment/Mu

642.2 x (461 / 2 - 148.7)


52.4 + (17.7+-0.1+7.7+1.8+6.9+1.1+0.2+20.7
+ (3.6+11.1+2.5+10.1)
125.6 / 135.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

131.2 mm, 180 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

76.5 mm, 240 m

OK

17.7
-0.1
7.7
1.8
6.9
1.1
0.2
20.7
3.6
11.1
2.5
10.1
642.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
52.4 kN
135.8kN
0.92

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

826.7 k

.45x(400x300-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
-94.0 kN.m, 87.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2955 - 827)/(2955 - 608) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
827 x 17.5
Mi=fn(Mx1, Mx2)
-94.0 kN.m, 87.7 kN.m
M2+Madd, M nom
108.5 kN.m, 0.0 kN.m
M nom=fn(N, exx)
826.7 kN, 15.0 mm
Design Moment

2955.0 k
OK
2824.3 k

X-X Moments
1.00
17.5 mm
14.5 kN.m
37.6 kN.m
14.5 kN.m
108.5 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-46.3 kN.m, 39.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2955 - 827)/(2955 - 682) < 1

1.00

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
au = a K h
Madd= N au
Mi=fn(My1, My2)
M nom=fn(M2+Madd)
M nom=fn(N, eyy)
Design Moment

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 74: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

0.051, 1.000, 300


827 x 20.5
-46.3 kN.m, 39.9 kN.m
63.2
826.7, 20.0

20.5 mm
16.9 kN.m
18.5 kN.m
16.5 kN.m
16.9 kN.m
63.2 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(108.5 + 63.2 )
atn(63.2/ 108.5)

125.6 kN.m
30.2 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.540, 461 mm, 400 mm, 248.92 mm, 57083 mm, 148.7 m
1 x 20, 381.3, -0.186, -372, -151.0, -117.0
1 x 20, 238.3, 0.015, 30, -7.9, 9.4
1 x 20, 333.6, -0.119, -238, -103.3, -74.9
1 x 20, 286.0, -0.052, -104, -55.6, -32.7
1 x 20, 328.4, -0.112, -223, -98.0, -70.2
1 x 20, 275.4, -0.037, -74, -45.0, -23.4
1 x 20, 222.4, 0.037, 75, 7.9, 23.4
1 x 20, 79.3, 0.238, 437, 151.0, 137.3
1 x 20, 174.7, 0.104, 209, 55.6, 65.6
1 x 20, 127.0, 0.171, 343, 103.3, 107.7
1 x 20, 185.3, 0.089, 179, 45.0, 56.2
1 x 20, 132.3, 0.164, 328, 98.0, 103.0
57083 x 0.45 x 25
-117+9-75-33-70-23+23+137+66+108+5
+103+642-826.7

Max Moment/Mu

642.2 x (461 / 2 - 148.7)


52.4 + (17.7+-0.1+7.7+1.8+6.9+1.1+0.2+20.7
+ (3.6+11.1+2.5+10.1)
125.6 / 135.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

131.2 mm, 180 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

76.5 mm, 240 m

OK

17.7
-0.1
7.7
1.8
6.9
1.1
0.2
20.7
3.6
11.1
2.5
10.1
642.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
52.4 kN
135.8kN
0.92

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 75: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C5


LEVEL 4

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 300 mm deep column
y : for 400 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Shallow, Bottom: Shallow
Lox=3300-(600+600)/2
Loy=3300-(600+600)/2

1.20
1.50
2700
2700

LEX=3240.0 MM, LEX/H=10.8, EXX=15.0 MM


LEY=4050.0 MM, LEY/B=10.1, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1188.4 k

.45x(400x300-3848)x25 + 0.95x3848.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-3848)x25 + 0.95x3848.5x460

OK
Applied Moments (Mx1, Mx2)
-90.4 kN.m, 80.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2988 - 1188)/(2988 - 608) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
1188 x 17.5
Mi=fn(Mx1, Mx2)
-90.4 kN.m, 80.8 kN.m
M2+Madd, M nom
111.2 kN.m, 17.8 kN.m
M nom=fn(N, exx)
1188.4 kN, 15.0 mm
Design Moment

2988.5 k
OK
2857.8 k

X-X Moments
1.00
17.5 mm
20.8 kN.m
36.2 kN.m
20.8 kN.m
111.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-44.5 kN.m, 41.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2988 - 1188)/(2988 - 654) < 1
au = a K h
0.051, 1.000, 300
Madd= N au
1188 x 20.5
Mi=fn(My1, My2)
-44.5 kN.m, 41.7 kN.m
M nom=fn(M2+Madd)
68.9

1.00
20.5 mm
24.4 kN.m
17.8 kN.m
0.0 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 76: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1188.4, 20.0

24.4 kN.m
68.9 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(111.2 + 68.9 )
atn(68.9/ 111.2)

130.8 kN.m
31.8 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M10)

0.599, 466 mm, 400 mm, 278.79 mm, 68509 mm, 165.4 m
1 x 25, 382.4, -0.130, -260, -149.5, -127.7
1 x 25, 235.5, 0.054, 109, -2.6, 53.4
1 x 20, 311.0, -0.040, -81, -78.2, -25.4
1 x 20, 333.0, -0.068, -136, -100.1, -42.7
1 x 20, 282.2, -0.004, -9, -49.4, -2.7
1 x 25, 230.2, 0.061, 122, 2.6, 59.9
1 x 25, 83.3, 0.245, 437, 149.5, 214.5
1 x 20, 154.6, 0.156, 312, 78.2, 98.0
1 x 20, 183.4, 0.120, 239, 49.4, 75.2
1 x 20, 132.7, 0.183, 367, 100.1, 115.2
68509 x 0.45 x 25
-128+53-25-43-3+60+215+98+75+115+77
-1188.4

Max Moment/Mu

770.7 x (466 / 2 - 165.4)


52.0 + (19.1+-0.1+2.0+4.3+0.1+0.2+32.1
+ (7.7+3.7+11.5)
130.8 / 132.5

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

93.6 mm, 180 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

57.9 mm, 240 m

OK

19.1
-0.1
2.0
4.3
0.1
0.2
32.1
7.7
3.7
11.5
770.7

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
52.0 kN
132.5kN
0.98

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1188.4 k

.45x(400x300-3848)x25 + 0.95x3848.5x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-3848)x25 + 0.95x3848.5x460

OK
Applied Moments (Mx1, Mx2)
-90.4 kN.m, 80.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2988 - 1188)/(2988 - 608) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
1188 x 17.5
Mi=fn(Mx1, Mx2)
-90.4 kN.m, 80.8 kN.m
M2+Madd, M nom
111.2 kN.m, 0.0 kN.m
M nom=fn(N, exx)
1188.4 kN, 15.0 mm
Design Moment

2988.5 k
OK
2857.8 k

X-X Moments
1.00
17.5 mm
20.8 kN.m
36.2 kN.m
20.8 kN.m
111.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-44.5 kN.m, 41.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (2988 - 1188)/(2988 - 654) < 1
au = a K h
0.051, 1.000, 300
Madd= N au
1188 x 20.5

1.00
20.5 mm
24.4 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
Mi=fn(My1, My2)
M nom=fn(M2+Madd)
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 77: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

-44.5 kN.m, 41.7 kN.m


68.9
1188.4, 20.0

17.8
23.8
24.4
68.9

kN.m
kN.m
kN.m
kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(111.2 + 68.9 )
atn(68.9/ 111.2)

130.8 kN.m
31.8 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M10)

0.599, 466 mm, 400 mm, 278.79 mm, 68509 mm, 165.4 m
1 x 25, 382.4, -0.130, -260, -149.5, -127.7
1 x 25, 235.5, 0.054, 109, -2.6, 53.4
1 x 20, 311.0, -0.040, -81, -78.2, -25.4
1 x 20, 333.0, -0.068, -136, -100.1, -42.7
1 x 20, 282.2, -0.004, -9, -49.4, -2.7
1 x 25, 230.2, 0.061, 122, 2.6, 59.9
1 x 25, 83.3, 0.245, 437, 149.5, 214.5
1 x 20, 154.6, 0.156, 312, 78.2, 98.0
1 x 20, 183.4, 0.120, 239, 49.4, 75.2
1 x 20, 132.7, 0.183, 367, 100.1, 115.2
68509 x 0.45 x 25
-128+53-25-43-3+60+215+98+75+115+77
-1188.4

Max Moment/Mu

770.7 x (466 / 2 - 165.4)


52.0 + (19.1+-0.1+2.0+4.3+0.1+0.2+32.1
+ (7.7+3.7+11.5)
130.8 / 132.5

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

93.6 mm, 180 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

57.9 mm, 240 m

OK

19.1
-0.1
2.0
4.3
0.1
0.2
32.1
7.7
3.7
11.5
770.7

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
52.0 kN
132.5kN
0.98

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 78: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C5


LEVEL 3

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 300 mm deep column
y : for 400 mm wide column
Lc=3300

Top: Deep, Bottom: Deep


Top: Shallow, Bottom: Shallow
Lox=3300-(600+600)/2
Loy=3300-(600+600)/2

1.20
1.50
2700
2700

LEX=3240.0 MM, LEX/H=10.8, EXX=15.0 MM


LEY=4050.0 MM, LEY/B=10.1, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1523.6 k

.45x(400x300-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-5730)x25 + 0.95x5730.3x460

OK
Applied Moments (Mx1, Mx2)
-104.6 kN.m, 85.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3790 - 1524)/(3790 - 504) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
1524 x 17.5
Mi=fn(Mx1, Mx2)
-104.6 kN.m, 85.6 kN.m
M2+Madd, M nom
131.3 kN.m, 22.9 kN.m
M nom=fn(N, exx)
1523.6 kN, 15.0 mm
Design Moment

3789.7 k
OK
3661.1 k

X-X Moments
1.00
17.5 mm
26.7 kN.m
41.8 kN.m
26.7 kN.m
131.3 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-79.2 kN.m, 51.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3790 - 1524)/(3790 - 653) < 1
au = a K h
0.051, 1.000, 300
Madd= N au
1524 x 20.5
Mi=fn(My1, My2)
-79.2 kN.m, 51.6 kN.m
M nom=fn(M2+Madd)
110.4

1.00
20.5 mm
31.2 kN.m
31.7 kN.m
0.0 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 79: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1523.6, 20.0

31.2 kN.m
110.4 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(131.3 + 110.4 )
atn(110.4/ 131.3)

171.5 kN.m
40.1 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.616, 487 mm, 400 mm, 299.94 mm, 72146 mm, 178.0 m
1 x 32, 396.9, -0.113, -226, -153.4, -182.0
1 x 32, 221.8, 0.091, 182, 21.8, 146.7
1 x 20, 343.1, -0.050, -101, -99.6, -31.7
1 x 20, 284.8, 0.018, 35, -41.2, 11.1
1 x 20, 356.9, -0.066, -133, -113.4, -41.8
1 x 20, 313.0, -0.015, -31, -69.5, -9.6
1 x 32, 265.3, 0.040, 81, -21.8, 65.0
1 x 32, 90.2, 0.245, 437, 153.4, 351.5
1 x 20, 202.3, 0.114, 228, 41.2, 71.6
1 x 20, 144.0, 0.182, 364, 99.6, 114.4
1 x 20, 174.1, 0.147, 294, 69.5, 92.3
1 x 20, 130.2, 0.198, 396, 113.4, 124.5
72146 x 0.45 x 25
-182+147-32+11-42-10+65+351+72+114+9
+124+812-1523.6

Max Moment/Mu

811.6 x (487 / 2 - 178.0)


53.2 + (27.9+3.2+3.2+-0.5+4.7+0.7+-1.4
+ (53.9+2.9+11.4+6.4+14.1)
171.5 / 179.7

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

86.1 mm, 180 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

72.5 mm, 240 m

OK

27.9
3.2
3.2
-0.5
4.7
0.7
-1.4
53.9
2.9
11.4
6.4
14.1
811.6

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
53.2 kN
179.7kN
0.95

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1523.6 k

.45x(400x300-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(400x300-5730)x25 + 0.95x5730.3x460

OK
Applied Moments (Mx1, Mx2)
-104.6 kN.m, 85.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3790 - 1524)/(3790 - 504) < 1
au = a K h
0.058, 1.000, 300
Madd= N au
1524 x 17.5
Mi=fn(Mx1, Mx2)
-104.6 kN.m, 85.6 kN.m
M2+Madd, M nom
131.3 kN.m, 0.0 kN.m
M nom=fn(N, exx)
1523.6 kN, 15.0 mm
Design Moment

3789.7 k
OK
3661.1 k

X-X Moments
1.00
17.5 mm
26.7 kN.m
41.8 kN.m
26.7 kN.m
131.3 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-79.2 kN.m, 51.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3790 - 1524)/(3790 - 653) < 1

1.00

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
au = a K h
Madd= N au
Mi=fn(My1, My2)
M nom=fn(M2+Madd)
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 80: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

0.051, 1.000, 300


1524 x 20.5
-79.2 kN.m, 51.6 kN.m
110.4
1523.6, 20.0

20.5 mm
31.2 kN.m
31.7 kN.m
30.5 kN.m
31.2 kN.m
110.4 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(131.3 + 110.4 )
atn(110.4/ 131.3)

171.5 kN.m
40.1 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0

0.616, 487 mm, 400 mm, 299.94 mm, 72146 mm, 178.0 m
1 x 32, 396.9, -0.113, -226, -153.4, -182.0
1 x 32, 221.8, 0.091, 182, 21.8, 146.7
1 x 20, 343.1, -0.050, -101, -99.6, -31.7
1 x 20, 284.8, 0.018, 35, -41.2, 11.1
1 x 20, 356.9, -0.066, -133, -113.4, -41.8
1 x 20, 313.0, -0.015, -31, -69.5, -9.6
1 x 32, 265.3, 0.040, 81, -21.8, 65.0
1 x 32, 90.2, 0.245, 437, 153.4, 351.5
1 x 20, 202.3, 0.114, 228, 41.2, 71.6
1 x 20, 144.0, 0.182, 364, 99.6, 114.4
1 x 20, 174.1, 0.147, 294, 69.5, 92.3
1 x 20, 130.2, 0.198, 396, 113.4, 124.5
72146 x 0.45 x 25
-182+147-32+11-42-10+65+351+72+114+9+124+812-1523.6

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

811.6 x (487 / 2 - 178.0)


53.2 + (27.9+3.2+3.2+-0.5+4.7+0.7+-1.4
+ (53.9+2.9+11.4+6.4+14.1)

Max Moment/Mu

171.5 / 179.7

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

86.1 mm, 180 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

72.5 mm, 240 m

27.9
3.2
3.2
-0.5
4.7
0.7
-1.4
53.9
2.9
11.4
6.4
14.1
811.6
0.0

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k
k
OK
53.2 kN

179.7kN

0.95

OK

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

COLUMN @ COLUMN TYPE C5


LEVEL 2

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 81: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 500 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Deep
Lox=5000-(600+600)/2
Loy=5000-(600+600)/2

1.50
1.30
4400
4400

LEX=6600.0 MM, LEX/H=16.5, EXX=20.0 MM


LEY=5720.0 MM, LEY/B=11.4, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1907.9 k

.45x(500x400-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(500x400-5730)x25 + 0.95x5730.3x460

OK

4689.7 k
OK
4471.1 k

X-X Moments

Applied Moments (Mx1, Mx2)


-54.6 kN.m, 63.3 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4690 - 1908)/(4690 - 1077) < 1
au = a K h
0.136, 1.000, 400
Madd= N au
1908 x 54.5
Mi=fn(Mx1, Mx2)
-54.6 kN.m, 63.3 kN.m
M2+Madd, M nom
167.2 kN.m, 38.2 kN.m
M nom=fn(N, exx)
1907.9 kN, 20.0 mm
Design Moment

1.00
54.5 mm
103.9 kN.m
25.3 kN.m
103.9 kN.m
167.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
62.1 kN.m, 7.5 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4690 - 1908)/(4690 - 1128) < 1
au = a K h
0.065, 1.000, 400
Madd= N au
1908 x 32.7
Mi=fn(My1, My2)
62.1 kN.m, 7.5 kN.m
M nom=fn(M2+Madd)
124.5
M nom=fn(N, eyy)
1907.9, 20.0
Design Moment

1.00
32.7 mm
62.4 kN.m
40.3 kN.m
0.0 kN.m
62.4 kN.m
124.5 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(167.2 + 124.5 )
atn(124.5/ 167.2)

208.5 kN.m
36.7 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)

0.602, 619 mm, 500 mm, 372.96 mm, 115936 mm, 222.3 m
1 x 32, 529.9, -0.147, -295, -220.2, -236.9
1 x 32, 307.7, 0.061, 122, 2.0, 98.5
1 x 20, 460.7, -0.082, -165, -150.9, -51.7
1 x 20, 386.6, -0.013, -26, -76.8, -8.0
1 x 20, 460.8, -0.082, -165, -151.0, -51.8
1 x 20, 388.1, -0.014, -28, -78.3, -8.9
1 x 32, 311.8, 0.057, 115, -2.0, 92.4
1 x 32, 89.6, 0.266, 437, 220.2, 351.5
1 x 20, 232.9, 0.131, 263, 76.8, 82.6
1 x 20, 158.8, 0.201, 402, 150.9, 126.3
1 x 20, 231.4, 0.133, 266, 78.3, 83.5
1 x 20, 158.7, 0.201, 402, 151.0, 126.3
115936 x 0.45 x 25

52.2
0.2
7.8
0.6
7.8
0.7
-0.2
77.4
6.3
19.1
6.5
19.1
1304.3

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

: Job Ref
: Sheet Ref / 82: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

-237+99-52-8-52-9+92+351+83+126+83+12
+1304-1907.9

0.0

Max Moment/Mu

1304.3 x (619 / 2 - 222.3)


114.0 + (52.2+0.2+7.8+0.6+7.8+0.7+-0.2+77.4
+ (6.3+19.1+6.5+19.1)
208.5 / 311.5

App. Shear Vx, v, v max


M/N, 0.6h

0 kN, 0 N/mm, 4 N/mm


87.6 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

65.3 mm, 300 m

OK

k
OK
114.0 kN
311.5kN
0.66

X-X Shear Checks

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1907.9 k

.45x(500x400-5730)x25 + 0.95x5730.3x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(500x400-5730)x25 + 0.95x5730.3x460

OK

4689.7 k
OK
4471.1 k

X-X Moments

Applied Moments (Mx1, Mx2)


-54.6 kN.m, 63.3 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4690 - 1908)/(4690 - 1077) < 1
au = a K h
0.136, 1.000, 400
Madd= N au
1908 x 54.5
Mi=fn(Mx1, Mx2)
-54.6 kN.m, 63.3 kN.m
M2+Madd, M nom
167.2 kN.m, 0.0 kN.m
M nom=fn(N, exx)
1907.9 kN, 20.0 mm
Design Moment

1.00
54.5 mm
103.9 kN.m
25.3 kN.m
103.9 kN.m
167.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
62.1 kN.m, 7.5 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4690 - 1908)/(4690 - 1128) < 1
au = a K h
0.065, 1.000, 400
Madd= N au
1908 x 32.7
Mi=fn(My1, My2)
62.1 kN.m, 7.5 kN.m
M nom=fn(M2+Madd)
124.5
M nom=fn(N, eyy)
1907.9, 20.0
Design Moment

1.00
32.7 mm
62.4 kN.m
40.3 kN.m
38.2 kN.m
62.4 kN.m
124.5 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(167.2 + 124.5 )
atn(124.5/ 167.2)

208.5 kN.m
36.7 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)

0.602, 619 mm, 500 mm, 372.96 mm, 115936 mm, 222.3 m
1 x 32, 529.9, -0.147, -295, -220.2, -236.9
1 x 32, 307.7, 0.061, 122, 2.0, 98.5
1 x 20, 460.7, -0.082, -165, -150.9, -51.7
1 x 20, 386.6, -0.013, -26, -76.8, -8.0
1 x 20, 460.8, -0.082, -165, -151.0, -51.8
1 x 20, 388.1, -0.014, -28, -78.3, -8.9
1 x 32, 311.8, 0.057, 115, -2.0, 92.4
1 x 32, 89.6, 0.266, 437, 220.2, 351.5
1 x 20, 232.9, 0.131, 263, 76.8, 82.6
1 x 20, 158.8, 0.201, 402, 150.9, 126.3
1 x 20, 231.4, 0.133, 266, 78.3, 83.5
1 x 20, 158.7, 0.201, 402, 151.0, 126.3

52.2
0.2
7.8
0.6
7.8
0.7
-0.2
77.4
6.3
19.1
6.5
19.1

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

Job ref
Sheet
Made By
Date
Checked
Approved

115936 x 0.45 x 25
-237+99-52-8-52-9+92+351+83+126+83+12
+1304-1907.9

Max Moment/Mu

1304.3 x (619 / 2 - 222.3)


114.0 + (52.2+0.2+7.8+0.6+7.8+0.7+-0.2+77.4
+ (6.3+19.1+6.5+19.1)
208.5 / 311.5

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

87.6 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

65.3 mm, 300 m

OK

: Job Ref
: Sheet Ref / 83: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

1304.3

0.0

k
OK
114.0 kN
311.5kN
0.66

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 84: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ COLUMN TYPE C5


LEVEL 1

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 500 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Deep, Bottom: Shallow
Lox=5000-(600+0)/2
Loy=5000-(600+0)/2

1.50
1.30
4700
4700

LEX=7050.0 MM, LEX/H=17.6, EXX=20.0 MM


LEY=6110.0 MM, LEY/B=12.2, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2784.3 k

.45x(500x400-6987)x25 + 0.95x6986.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(500x400-6987)x25 + 0.95x6986.9x460

OK

5224.7 k
OK
5007.5 k

X-X Moments

Applied Moments (Mx1, Mx2)


-18.2 kN.m, 30.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5225 - 2784)/(5225 - 1084) < 1
au = a K h
0.155, 1.000, 400
Madd= N au
2784 x 62.1
Mi=fn(Mx1, Mx2)
-18.2 kN.m, 30.7 kN.m
M2+Madd, M nom
203.7 kN.m, 55.7 kN.m
M nom=fn(N, exx)
2784.3 kN, 20.0 mm
Design Moment

1.00
62.1 mm
173.0 kN.m
12.3 kN.m
173.0 kN.m
203.7 kN.m

Y-Y Moments
Applied Moments (My1, My2)
65.7 kN.m, -109.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5225 - 2784)/(5225 - 1070) < 1
au = a K h
0.075, 1.000, 400
Madd= N au
2784 x 37.3
Mi=fn(My1, My2)
65.7 kN.m, -109.9 kN.m
M nom=fn(M2+Madd)
213.8

1.00
37.3 mm
103.9 kN.m
44.0 kN.m
0.0 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 85: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

2784.3, 20.0

103.9 kN.m
213.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(203.7 + 213.8 )
atn(213.8/ 203.7)

295.3 kN.m
46.4 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M16)

0.685, 638 mm, 500 mm, 437.26 mm, 140201 mm, 252.4 m
1 x 32, 547.4, -0.088, -176, -228.5, -141.9
1 x 32, 278.1, 0.127, 255, 40.9, 204.9
1 x 20, 484.2, -0.038, -75, -165.3, -23.6
1 x 20, 416.9, 0.016, 33, -97.9, 10.2
1 x 20, 349.6, 0.070, 140, -30.6, 44.1
1 x 20, 504.9, -0.054, -108, -185.9, -34.0
1 x 20, 458.0, -0.017, -33, -139.0, -10.4
1 x 20, 411.1, 0.021, 42, -92.1, 13.2
1 x 32, 359.8, 0.062, 124, -40.9, 99.7
1 x 32, 90.5, 0.278, 437, 228.5, 351.5
1 x 20, 288.4, 0.119, 238, 30.6, 74.9
1 x 20, 221.0, 0.173, 346, 97.9, 108.8
1 x 20, 153.7, 0.227, 437, 165.3, 137.3
1 x 20, 226.8, 0.168, 337, 92.1, 105.8
1 x 20, 179.9, 0.206, 412, 139.0, 129.4
1 x 20, 133.0, 0.244, 437, 185.9, 137.3
140201 x 0.45 x 25
-142+205-24+10+44-34-10+13+100+351+7
+109+137+106+129+137+1577-2784.3

Max Moment/Mu

1577.3 x (638 / 2 - 252.4)


105.0 + (32.4+8.4+3.9+-1.0+-1.3+6.3+1.4
+ (-1.2+-4.1+80.3+2.3+10.7+22.7+9.7
+ (18.0+25.5)
295.3 / 319.0

App. Shear Vx, v, v max


M/N, 0.6h

0 kN, 0 N/mm, 4 N/mm


73.2 mm, 240 m

App. Shear Vy, v, v max


M/N, 0.6b

0 kN, 0 N/mm, 4 N/mm


76.8 mm, 300 m

OK

32.4
8.4
3.9
-1.0
-1.3
6.3
1.4
-1.2
-4.1
80.3
2.3
10.7
22.7
9.7
18.0
25.5
1577.3

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
105.0 kN

319.0kN
0.92

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

2784.3 k

.45x(500x400-6987)x25 + 0.95x6986.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(500x400-6987)x25 + 0.95x6986.9x460

OK

5224.7 k
OK
5007.5 k

X-X Moments

Applied Moments (Mx1, Mx2)


-18.2 kN.m, 30.7 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5225 - 2784)/(5225 - 1084) < 1
au = a K h
0.155, 1.000, 400
Madd= N au
2784 x 62.1
Mi=fn(Mx1, Mx2)
-18.2 kN.m, 30.7 kN.m
M2+Madd, M nom
203.7 kN.m, 0.0 kN.m
M nom=fn(N, exx)
2784.3 kN, 20.0 mm
Design Moment

1.00
62.1 mm
173.0 kN.m
12.3 kN.m
173.0 kN.m
203.7 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 86: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Y-Y Moments
Applied Moments (My1, My2)
65.7 kN.m, -109.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (5225 - 2784)/(5225 - 1070) < 1
au = a K h
0.075, 1.000, 400
Madd= N au
2784 x 37.3
Mi=fn(My1, My2)
65.7 kN.m, -109.9 kN.m
M nom=fn(M2+Madd)
213.8
M nom=fn(N, eyy)
2784.3, 20.0
Design Moment

1.00
37.3 mm
103.9 kN.m
44.0 kN.m
55.7 kN.m
103.9 kN.m
213.8 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(203.7 + 213.8 )
atn(213.8/ 203.7)

295.3 kN.m
46.4 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Bar group13:M13 fn(bars,d,%,,la,F)
Bar group14:M14 fn(bars,d,%,,la,F)
Bar group15:M15 fn(bars,d,%,,la,F)
Bar group16:M16 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M16)

0.685, 638 mm, 500 mm, 437.26 mm, 140201 mm, 252.4 m
1 x 32, 547.4, -0.088, -176, -228.5, -141.9
1 x 32, 278.1, 0.127, 255, 40.9, 204.9
1 x 20, 484.2, -0.038, -75, -165.3, -23.6
1 x 20, 416.9, 0.016, 33, -97.9, 10.2
1 x 20, 349.6, 0.070, 140, -30.6, 44.1
1 x 20, 504.9, -0.054, -108, -185.9, -34.0
1 x 20, 458.0, -0.017, -33, -139.0, -10.4
1 x 20, 411.1, 0.021, 42, -92.1, 13.2
1 x 32, 359.8, 0.062, 124, -40.9, 99.7
1 x 32, 90.5, 0.278, 437, 228.5, 351.5
1 x 20, 288.4, 0.119, 238, 30.6, 74.9
1 x 20, 221.0, 0.173, 346, 97.9, 108.8
1 x 20, 153.7, 0.227, 437, 165.3, 137.3
1 x 20, 226.8, 0.168, 337, 92.1, 105.8
1 x 20, 179.9, 0.206, 412, 139.0, 129.4
1 x 20, 133.0, 0.244, 437, 185.9, 137.3
140201 x 0.45 x 25
-142+205-24+10+44-34-10+13+100+351+7
+109+137+106+129+137+1577-2784.3

Max Moment/Mu

1577.3 x (638 / 2 - 252.4)


105.0 + (32.4+8.4+3.9+-1.0+-1.3+6.3+1.4
+ (-1.2+-4.1+80.3+2.3+10.7+22.7+9.7
+ (18.0+25.5)
295.3 / 319.0

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

73.2 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

76.8 mm, 300 m

OK

32.4
8.4
3.9
-1.0
-1.3
6.3
1.4
-1.2
-4.1
80.3
2.3
10.7
22.7
9.7
18.0
25.5
1577.3

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.1

k
OK
105.0 kN

319.0kN
0.92

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 87: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 8

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

233.1 k

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

-99.9 kN.m, 92.2 kN.m


233.1 kN, 20.0 mm

3277.8 k
OK
3009.3 k

X-X Moments
4.7 kN.m
99.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-1.3 kN.m, 0.0 kN.m


1.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(99.9 + 1.3 )
atn(1.3/ 99.9)

99.9 kN.m
0.7 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 88: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.219, 408 mm, 600 mm, 89.42 mm, 45948 mm, 42.2 m
1 x 12, 353.1, -1.032, -437, -149.2, -49.4
1 x 12, 346.7, -1.007, -437, -142.8, -49.4
1 x 12, 350.9, -1.024, -437, -147.1, -49.4
1 x 12, 348.8, -1.015, -437, -144.9, -49.4
1 x 12, 255.8, -0.651, -437, -51.9, -49.4
1 x 12, 158.4, -0.270, -437, 45.5, -49.4
1 x 12, 61.1, 0.111, 222, 142.8, 25.1
1 x 12, 54.7, 0.136, 272, 149.2, 30.7
1 x 12, 59.0, 0.119, 238, 144.9, 27.0
1 x 12, 56.8, 0.128, 255, 147.1, 28.9
1 x 12, 249.3, -0.626, -437, -45.5, -49.4
1 x 12, 152.0, -0.245, -437, 51.9, -49.4
45948 x 0.45 x 25
-49-49-49-49-49-49+25+31+27+29-49-4
+517-233.1

Max Moment/Mu

516.9 x (408 / 2 - 42.2)


83.6 + (7.4+7.1+7.3+7.2+2.6+-2.2+3.6+4.6
+ (3.9+4.2+2.2+-2.6)
99.9 / 128.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

428.6 mm, 240 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

0.65%, 0.57 N/mm, 0.57 N/mm


0 mm, 125 mm, 4 no 8 mm legs
0 mm, 201 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

5.6 mm, 360 m

OK

7.4
7.1
7.3
7.2
2.6
-2.2
3.6
4.6
3.9
4.2
2.2
-2.6
516.9

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
83.6 kN
128.8kN
0.77

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

233.1 k

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

3277.8 k
OK
3009.3 k

X-X Moments

-99.9 kN.m, 92.2 kN.m


99.9 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-1.3 kN.m, 0.0 kN.m


233.1, 20.0

4.7 kN.m
4.7 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(99.9 + 4.7 )
atn(4.7/ 99.9)

100.0 kN.m
2.7 deg

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 89: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.235, 428 mm, 600 mm, 100.67 mm, 46019 mm, 51.9 m
1 x 12, 371.1, -0.940, -437, -157.3, -49.4
1 x 12, 348.1, -0.860, -437, -134.4, -49.4
1 x 12, 363.4, -0.914, -437, -149.7, -49.4
1 x 12, 355.8, -0.887, -437, -142.0, -49.4
1 x 12, 273.8, -0.602, -437, -60.1, -49.4
1 x 12, 176.6, -0.264, -437, 37.1, -49.4
1 x 12, 79.4, 0.074, 148, 134.4, 16.7
1 x 12, 56.5, 0.154, 307, 157.3, 34.8
1 x 12, 71.7, 0.101, 201, 142.0, 22.7
1 x 12, 64.1, 0.127, 254, 149.7, 28.8
1 x 12, 250.9, -0.522, -437, -37.1, -49.4
1 x 12, 153.7, -0.184, -369, 60.1, -41.7
46019 x 0.45 x 25
-49-49-49-49-49-49+17+35+23+29-49-4
+518-233.1

Max Moment/Mu

517.7 x (428 / 2 - 51.9)


83.8 + (7.8+6.6+7.4+7.0+3.0+-1.8+2.2+5.5
+ (3.2+4.3+1.8+-2.5)
100.0 / 128.4

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

428.6 mm, 240 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

0.65%, 0.57 N/mm, 0.57 N/mm


0 mm, 125 mm, 4 no 8 mm legs
0 mm, 201 mm

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

20 mm, 360 m

OK

7.8
6.6
7.4
7.0
3.0
-1.8
2.2
5.5
3.2
4.3
1.8
-2.5
517.7

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.1

k
OK
83.8 kN

128.4kN
0.77

X-X Shear Checks


OK

links reqd. Link check

Nominal OK Y-Y Shear Checks


OK

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 90: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 7

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

560.0 k

.45x(600x400-2061)x25 + 0.95x2060.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-2061)x25 + 0.95x2060.9x460

OK
M nom
Design Moment

3577.4 k
OK
3309.7 k

X-X Moments

11.2
122.2 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M6)
Max Moment/Mu

0.334, 400 mm, 600 mm, 133.44 mm, 72058 mm, 60.0 m
2 x 12, 58.0, 0.198, 396, 142.0, 89.5
2 x 16, 340.0, -0.542, -437, -140.0, -175.7
2 x 12, 342.0, -0.547, -437, -142.0, -98.8
2 x 16, 60.0, 0.193, 385, 140.0, 154.9
2 x 16, 245.3, -0.293, -437, -45.3, -175.7
2 x 16, 154.7, -0.056, -111, 45.3, -44.8
72058 x 0.45 x 25
90 -176 -99 + 155 -176 -45 + 811 -560
810.7 x (400 / 2 - 60.0)
113.5 + (12.7+24.6+14.0+21.7+8.0+-2.0)
122.2 / 192.4

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

218.2 mm, 240 m

OK

12.7 kN
24.6 kN
14.0 kN
21.7 kN
8.0 kN
-2.0 kN
810.7 k
0.0 k
113.5 kN
192.4kN
0.63

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 91: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 6

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

946.9 k

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

3277.8 k
OK
3009.3 k

X-X Moments

18.9
129.3 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

0.416, 400 mm, 600 mm, 166.40 mm, 89856 mm, 74.9 m
4 x 12, 58.0, 0.228, 437, 142.0, 197.7
4 x 12, 342.0, -0.369, -437, -142.0, -197.7
2 x 12, 245.3, -0.166, -332, -45.3, -75.1
2 x 12, 154.7, 0.025, 49, 45.3, 11.2
89856 x 0.45 x 25
198 - 198 - 75 + 11 + 1011 - 946.9
1010.9 x (400 / 2 - 74.9)
126.5 + (28.1+28.1+3.4+0.5)
129.3 / 186.5

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

136.6 mm, 240 m

OK

28.1 kN
28.1 kN
3.4 kN
0.5 kN
1010.9 k
0.0 k
126.5 kN
186.5kN
0.69

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 92: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 5

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

1309.9 k

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

3277.8 k
OK
3009.3 k

X-X Moments

26.2
98.3 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0

0.531, 400 mm, 600 mm, 212.54 mm, 114773 mm, 95.6 m
4 x 12, 54.0, 0.261, 437, 146.0, 197.7
4 x 12, 346.0, -0.220, -437, -146.0, -197.7
2 x 12, 246.7, -0.056, -112, -46.7, -25.4
2 x 12, 153.3, 0.098, 195, 46.7, 44.1
114773 x 0.45 x 25
198 - 198 - 25 + 44 + 1291 - 1309.9

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

1291.2 x (400 / 2 - 95.6)


134.7 + (28.9+28.9+1.2+2.1)
98.3 / 195.7

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

75 mm, 240 m

OK

28.9
28.9
1.2
2.1
1291.2
0.0

kN
kN
kN
kN
k
k
OK
134.7 kN
195.7kN
0.50

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 93: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 4

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

1652.8 k
3277.8 k
OK
3009.3 k

X-X Moments

33.1
93.4 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

0.623, 400 mm, 600 mm, 249.40 mm, 134674 mm, 112.2 m
4 x 12, 54.0, 0.274, 437, 146.0, 197.7
4 x 12, 346.0, -0.136, -271, -146.0, -122.7
2 x 12, 246.7, 0.004, 8, -46.7, 1.7
2 x 12, 153.3, 0.135, 270, 46.7, 61.0
134674 x 0.45 x 25
198 - 123 + 2 + 61 + 1515 - 1652.8
1515.1 x (400 / 2 - 112.2)
133.0 + (28.9+17.9+-0.1+2.8)
93.4 / 182.5

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

56.5 mm, 240 m

OK

28.9 kN
17.9 kN
-0.1 kN
2.8 kN
1515.1 k
0.0 k
133.0 kN
182.5kN
0.51

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 94: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 3

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3500

Top: Shallow, Bottom: Deep


Top: Shallow, Bottom: Shallow
Lox=3500-(700+950)/2
Loy=3500-(600+950)/2

1.30
1.50
2675
2725

LEX=3477.5 MM, LEX/H=8.7, EXX=20.0 MM


LEY=4087.5 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

1978.6 k
.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

3277.8 k
OK
3009.3 k

X-X Moments

39.6
90.9 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

0.719, 400 mm, 600 mm, 287.79 mm, 155408 mm, 129.5 m
4 x 12, 54.0, 0.284, 437, 146.0, 197.7
4 x 12, 346.0, -0.071, -142, -146.0, -64.0
2 x 12, 246.7, 0.050, 100, -46.7, 22.6
2 x 12, 153.3, 0.164, 327, 46.7, 74.0
155408 x 0.45 x 25
198 - 64 + 23 + 74 + 1748 - 1978.6
1748.3 x (400 / 2 - 129.5)
123.2 + (28.9+9.4+-1.1+3.5)
90.9 / 163.9

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

45.9 mm, 240 m

OK

28.9 kN
9.4 kN
-1.1 kN
3.5 kN
1748.3 k
0.0 k
123.2 kN
163.9kN
0.55

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 95: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 2

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Deep, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=5000-(950+700)/2
Loy=5000-(950+600)/2

1.30
1.50
4175
4225

LEX=5427.5 MM, LEX/H=13.6, EXX=20.0 MM


LEY=6337.5 MM, LEY/B=10.6, EYY=20.0 MM
UNI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-2865)x25 + 0.95x2865.1x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-2865)x25 + 0.95x2865.1x460

OK

2400.0 k
3919.8 k
OK
3653.1 k

X-X Moments

Applied Moments(M1, M2)


62.0 kN.m, -90.9 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3920 - 2400)/(3920 - 1308) < 1
au = a K h
0.092, 1.000, 400
Madd= N au
2400 x 36.8
Initial Moment Mi=fn(M1,M2)
62.0 kN.m, -90.9 kN.m
M2+Madd, M nom
179.3, 48.0
Design Moment

1.00
36.8 mm
88.4 kN.m
36.4 kN.m
179.3 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M6)
Max Moment/Mu

0.761, 400 mm, 600 mm, 304.23 mm, 164284 mm, 136.9 m
2 x 20, 58.0, 0.283, 437, 142.0, 274.6
2 x 16, 344.0, -0.046, -92, -144.0, -36.8
2 x 20, 342.0, -0.043, -87, -142.0, -54.6
2 x 16, 56.0, 0.286, 437, 144.0, 175.7
2 x 16, 244.0, 0.069, 139, -44.0, 55.7
2 x 16, 156.0, 0.171, 341, 44.0, 137.1
164284 x 0.45 x 25
275 -37 -55 +176 +56 +137 +1848 -2400
1848.2 x (400 / 2 - 136.9)
116.6 + (39.0+5.3+7.8+25.3+-2.5+6.0)
179.3 / 197.5

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

74.7 mm, 240 m

OK

39.0 kN
5.3 kN
7.8 kN
25.3 kN
-2.5 kN
6.0 kN
1848.2 k
0.0 k
116.6 kN
197.5kN
0.90

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 96: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C7
LEVEL 1

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=5000-(700+0)/2
Loy=5000-(600+0)/2

1.50
1.50
4650
4700

LEX=6975.0 MM, LEX/H=17.4, EXX=20.0 MM


LEY=7050.0 MM, LEY/B=11.8, EYY=20.0 MM
SLENDER, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live

U NI-AXIAL ,

Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-5105)x25 + 0.95x5105.1x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-5105)x25 + 0.95x5105.1x460

OK

2927.7 k
4873.5 k
OK
4609.2 k

X-X Moments

Applied Moments(M1, M2)


-34.3 kN.m, 58.6 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4873 - 2928)/(4873 - 1308) < 1
au = a K h
0.152, 1.000, 400
Madd= N au
2928 x 60.8
Initial Moment Mi=fn(M1,M2)
-34.3 kN.m, 58.6 kN.m
M2+Madd, M nom
236.6, 58.6
Design Moment

1.00
60.8 mm
178.0 kN.m
23.4 kN.m
236.6 kN.m

Moment Capacity Mu X-X


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M6)
Max Moment/Mu

0.780, 400 mm, 600 mm, 311.97 mm, 168463 mm, 140.4 m
2 x 25, 60.5, 0.282, 437, 139.5, 429.0
3 x 20, 342.0, -0.034, -67, -142.0, -63.5
2 x 25, 339.5, -0.031, -62, -139.5, -60.6
3 x 20, 58.0, 0.285, 437, 142.0, 411.9
2 x 20, 242.3, 0.078, 156, -42.3, 98.2
2 x 20, 157.7, 0.173, 346, 42.3, 217.5
168463 x 0.45 x 25
429 -64 -61 +412 +98 +218 +1895 -2927.7
1895.2 x (400 / 2 - 140.4)
113.0 + (59.8+9.0+8.5+58.5+-4.2+9.2)
236.6 / 253.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

80.8 mm, 240 m

OK

59.8 kN
9.0 kN
8.5 kN
58.5 kN
-4.2 kN
9.2 kN
1895.2 k
0.0 k
113.0 kN
253.8kN
0.93

X-X Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 97: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8
LEVEL 8

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

55.7 k
3277.8 k
OK
3009.3 k

Y-Y Moments

1.1
150.4 kN.m

Moment Capacity Mu Y-Y


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0

0.139, 600 mm, 400 mm, 83.65 mm, 30115 mm, 37.6 m
4 x 12, 54.0, 0.124, 248, 246.0, 112.2
4 x 12, 546.0, -1.934, -437, -246.0, -197.7
2 x 12, 380.0, -1.240, -437, -80.0, -98.8
2 x 12, 220.0, -0.570, -437, 80.0, -98.8
30115 x 0.45 x 25
112 - 198 - 99 - 99 + 339 - 55.7

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

338.8 x (600 / 2 - 37.6)


88.9 + (27.6+48.6+7.9+-7.9)
150.4 / 165.1

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

2700.2 mm, 360 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd
OK

0.62%, 0.54 N/mm, 0.54 N/mm


0 mm, 125 mm, 4 no 8 mm legs
0 mm, 201 mm

OK

27.6
48.6
7.9
-7.9
338.8
0.0

kN
kN
kN
kN
k
k
OK
88.9 kN
165.1kN
0.91

Y-Y Shear Checks


OK

links reqd. Link check


0.00

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 98: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8
LEVEL 7

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

131.2 k
3277.8 k
OK
3009.3 k

Y-Y Moments

2.6
88.6 kN.m

Moment Capacity Mu Y-Y


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

0.163, 600 mm, 400 mm, 98.08 mm, 35309 mm, 44.1 m
4 x 12, 58.0, 0.143, 286, 242.0, 129.4
4 x 12, 542.0, -1.584, -437, -242.0, -197.7
2 x 12, 378.7, -1.001, -437, -78.7, -98.8
2 x 12, 221.3, -0.440, -437, 78.7, -98.8
35309 x 0.45 x 25
129 - 198 - 99 - 99 + 397 - 131.2
397.2 x (600 / 2 - 44.1)
101.6 + (31.3+47.8+7.8+-7.8)
88.6 / 180.8

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

675.3 mm, 360 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

0.63%, 0.54 N/mm, 0.54 N/mm


0 mm, 125 mm, 4 no 12 mm legs
0 mm, 452 mm

OK

31.3 kN
47.8 kN
7.8 kN
-7.8 kN
397.2 k
0.0 k
101.6 kN
180.8kN
0.49

Y-Y Shear Checks


OK

links reqd. Link check


0.00
OK

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 99: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8
LEVEL 6

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

259.3 k
3277.8 k
OK
3009.3 k

Y-Y Moments

5.2
132.4 kN.m

Moment Capacity Mu Y-Y


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu

0.202, 600 mm, 400 mm, 120.95 mm, 43542 mm, 54.4 m
4 x 12, 58.0, 0.182, 364, 242.0, 164.8
4 x 12, 542.0, -1.218, -437, -242.0, -197.7
2 x 12, 378.7, -0.746, -437, -78.7, -98.8
2 x 12, 221.3, -0.290, -437, 78.7, -98.8
43542 x 0.45 x 25
165 - 198 - 99 - 99 + 490 - 259.3
489.8 x (600 / 2 - 54.4)
120.3 + (39.9+47.8+7.8+-7.8)
132.4 / 208.0

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

510.6 mm, 360 m

100 As/bd, vc, vc'


As/Svreq, Sv, Links
Asvreq, Asvpvd

0.63%, 0.54 N/mm, 0.54 N/mm


0 mm, 125 mm, 4 no 12 mm legs
0 mm, 452 mm

OK

39.9 kN
47.8 kN
7.8 kN
-7.8 kN
489.8 k
0.0 k
120.3 kN
208.0kN
0.63

Y-Y Shear Checks


OK

links reqd. Link check


0.00
OK

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 100: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8
LEVEL 5

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

402.8 k
3277.8 k
OK
3009.3 k

X-X Moments

1.5 kN.m, 0.0 kN.m


402.8 kN, 20.0 mm

8.1 kN.m
8.1 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-136.4 kN.m, 126.6 kN.m


136.4 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(8.1 + 136.4 )
atn(136.4/ 8.1)

136.6 kN.m
86.6 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)

0.254, 623 mm, 600 mm, 157.87 mm, 52206 mm, 76.8 m
1 x 12, 565.5, -0.904, -437, -254.2, -49.4
1 x 12, 74.3, 0.185, 371, 237.0, 41.9
1 x 12, 401.7, -0.541, -437, -90.5, -49.4
1 x 12, 238.0, -0.178, -355, 73.2, -40.2
1 x 12, 559.7, -0.891, -437, -248.4, -49.4
1 x 12, 554.0, -0.878, -437, -242.7, -49.4
1 x 12, 548.2, -0.865, -437, -237.0, -49.4
1 x 12, 57.1, 0.223, 437, 254.2, 49.4
1 x 12, 384.5, -0.502, -437, -73.2, -49.4
1 x 12, 220.8, -0.140, -279, 90.5, -31.6
1 x 12, 68.6, 0.198, 396, 242.7, 44.8

12.6
9.9
4.5
-2.9
12.3
12.0
11.7
12.6
3.6
-2.9
10.9

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 101: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Bar group12:M12 fn(bars,d,%,,la,F) 1 x 12, 62.8, 0.211, 421, 248.4, 47.7


Concrete Fc=(Ac.45fcu)
52206 x 0.45 x 25
F Equlibrum (Ft) + FC - Fapp = 0
-49+42-49-40-49-49-49+49-49-32+45+4
+587-402.8
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)
Max Moment/Mu

587.3 x (623 / 2 - 76.8)


137.7 + (12.6+9.9+4.5+-2.9+12.3+12.0+11.7
+ (12.6+3.6+-2.9+10.9+11.8)
136.6 / 233.8

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

20 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

338.6 mm, 360 m

OK

11.8 kN
587.3 k
0.0

k
OK
137.7 kN
233.8kN
0.58

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

402.8 k
3277.8 k
OK
3009.3 k

X-X Moments

1.5 kN.m, 0.0 kN.m


1.5 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-136.4 kN.m, 126.6 kN.m


402.8, 20.0

8.1 kN.m
136.4 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(1.5 + 136.4 )
atn(136.4/ 1.5)

136.4 kN.m
89.4 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.243, 604 mm, 600 mm, 146.58 mm, 51893 mm, 67.1 m
1 x 12, 549.8, -0.963, -437, -247.6, -49.4
1 x 12, 57.8, 0.212, 424, 244.4, 47.9
1 x 12, 385.8, -0.571, -437, -83.6, -49.4
1 x 12, 221.8, -0.180, -359, 80.4, -40.6
1 x 12, 548.7, -0.960, -437, -246.5, -49.4
1 x 12, 547.6, -0.958, -437, -245.5, -49.4
1 x 12, 546.6, -0.955, -437, -244.4, -49.4
1 x 12, 54.6, 0.220, 437, 247.6, 49.4
1 x 12, 382.6, -0.563, -437, -80.4, -49.4
1 x 12, 218.6, -0.172, -344, 83.6, -38.9
1 x 12, 56.7, 0.215, 429, 245.5, 48.5
1 x 12, 55.7, 0.217, 434, 246.5, 49.1
51893 x 0.45 x 25
-49+48-49-41-49-49-49+49-49-39+49+4
+584-402.8

583.8 x (604 / 2 - 67.1)


137.3 + (12.2+11.7+4.1+-3.3+12.2+12.1+12.1

12.2
11.7
4.1
-3.3
12.2
12.1
12.1
12.2
4.0
-3.3
11.9
12.1
583.8

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

OK
137.3 kN

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Max Moment/Mu

Job ref
Sheet
Made By
Date
Checked
Approved

+ (12.2+4.0+-3.3+11.9+12.1)
136.4 / 235.5

OK
App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

3.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

338.6 mm, 360 m

: Job Ref
: Sheet Ref / 102: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

235.5kN
0.57

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 103: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8 LEVEL 4

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3300

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=3300-(700+700)/2
Loy=3300-(600+600)/2

1.50
1.50
2600
2700

LEX=3900.0 MM, LEX/H=9.8, EXX=20.0 MM


LEY=4050.0 MM, LEY/B=6.8, EYY=20.0 MM
BI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

531.3 k

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
Applied Moments (Mx1, Mx2)
M nom=fn(N, exx)
Design Moment

1.3 kN.m, 0.0 kN.m


531.3 kN, 20.0 mm

3277.8 k
OK
3009.3 k

X-X Moments
10.6 kN.m
10.6 kN.m

Y-Y Moments
Applied Moments (My1, My2)
Design Moment

-125.9 kN.m, 114.0 kN.m


125.9 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(10.6 + 125.9 )
atn(125.9/ 10.6)

126.3 kN.m
85.2 deg

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 104: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.294, 632 mm, 600 mm, 185.76 mm, 60358 mm, 91.7 m
1 x 12, 573.2, -0.730, -437, -257.4, -49.4
1 x 12, 82.9, 0.194, 388, 232.8, 43.8
1 x 12, 409.7, -0.422, -437, -94.0, -49.4
1 x 12, 246.3, -0.114, -228, 69.4, -25.8
1 x 12, 565.0, -0.715, -437, -249.2, -49.4
1 x 12, 556.8, -0.699, -437, -241.0, -49.4
1 x 12, 548.6, -0.684, -437, -232.8, -49.4
1 x 12, 58.4, 0.240, 437, 257.4, 49.4
1 x 12, 385.2, -0.376, -437, -69.4, -49.4
1 x 12, 221.8, -0.068, -136, 94.0, -15.3
1 x 12, 74.7, 0.209, 418, 241.0, 47.3
1 x 12, 66.5, 0.225, 437, 249.2, 49.4
60358 x 0.45 x 25
-49+44-49-26-49-49-49+49-49-15+47+4
+679-531.3

Max Moment/Mu

679.0 x (632 / 2 - 91.7)


152.1 + (12.7+10.2+4.6+-1.8+12.3+11.9+11.5
+ (12.7+3.4+-1.4+11.4+12.3)
126.3 / 252.1

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

20 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

237 mm, 360 m

OK

12.7
10.2
4.6
-1.8
12.3
11.9
11.5
12.7
3.4
-1.4
11.4
12.3
679.0

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
152.1 kN
252.1kN
0.50

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SHORT, UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

531.3 k

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
Applied Moments (Mx1, Mx2)
Design Moment

3277.8 k
OK
3009.3 k

X-X Moments

1.3 kN.m, 0.0 kN.m


1.3 kN.m

Y-Y Moments
Applied Moments (My1, My2)
M nom=fn(N, eyy)
Design Moment

-125.9 kN.m, 114.0 kN.m


531.3, 20.0

10.6 kN.m
125.9 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(1.3 + 125.9 )
atn(125.9/ 1.3)

125.9 kN.m
89.4 deg

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 105: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.281, 604 mm, 600 mm, 169.52 mm, 60206 mm, 77.3 m
1 x 12, 549.5, -0.785, -437, -247.5, -49.4
1 x 12, 57.6, 0.231, 437, 244.5, 49.4
1 x 12, 385.6, -0.446, -437, -83.5, -49.4
1 x 12, 221.6, -0.107, -215, 80.5, -24.3
1 x 12, 548.5, -0.783, -437, -246.5, -49.4
1 x 12, 547.5, -0.780, -437, -245.5, -49.4
1 x 12, 546.5, -0.778, -437, -244.5, -49.4
1 x 12, 54.6, 0.237, 437, 247.5, 49.4
1 x 12, 382.5, -0.440, -437, -80.5, -49.4
1 x 12, 218.5, -0.101, -202, 83.5, -22.9
1 x 12, 56.6, 0.233, 437, 245.5, 49.4
1 x 12, 55.6, 0.235, 437, 246.5, 49.4
60206 x 0.45 x 25
-49+49-49-24-49-49-49+49-49-23+49+4
+677-531.3

Max Moment/Mu

677.3 x (604 / 2 - 77.3)


152.2 + (12.2+12.1+4.1+-2.0+12.2+12.1+12.1
+ (12.2+4.0+-1.9+12.1+12.2)
125.9 / 253.7

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

2.4 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

237 mm, 360 m

OK

12.2
12.1
4.1
-2.0
12.2
12.1
12.1
12.2
4.0
-1.9
12.1
12.2
677.3

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

0.0

k
OK
152.2 kN
253.7kN
0.49

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 106: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8 LEVEL 3

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=3500

Top: Shallow, Bottom: Deep


Top: Shallow, Bottom: Shallow
Lox=3500-(700+950)/2
Loy=3500-(600+950)/2

1.30
1.50
2675
2725

LEX=3477.5 MM, LEX/H=8.7, EXX=20.0 MM


LEY=4087.5 MM, LEY/B=6.8, EYY=20.0 MM
U NI-AXIAL , SHORT,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-1357)x25 + 0.95x1357.2x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-1357)x25 + 0.95x1357.2x460

OK
M nom
Design Moment

644.1 k
3277.8 k
OK
3009.3 k

Y-Y Moments

12.9
125.4 kN.m

Moment Capacity Mu Y-Y


Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp= 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M4)
Max Moment/Mu
App. Shear Vy, v, v max

0.316, 600 mm, 400 mm, 189.69 mm, 68288 mm, 85.4 m
4 x 12, 54.0, 0.250, 437, 246.0, 197.7
4 x 12, 546.0, -0.657, -437, -246.0, -197.7
2 x 12, 380.0, -0.351, -437, -80.0, -98.8
2 x 12, 220.0, -0.056, -112, 80.0, -25.3
68288 x 0.45 x 25
198 - 198 - 99 - 25 + 768 - 644.1
768.2 x (600 / 2 - 85.4)
164.9 + (48.6+48.6+7.9+-2.0)
125.4 / 268.0
0 kN, 0 N/mm, 4 N/mm

48.6 kN
48.6 kN
7.9 kN
-2.0 kN
768.2 k
0.0 k
164.9 kN
268.0kN
0.46

OK
M/N, 0.6b

194.7 mm, 360 m


Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 107: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8 LEVEL 2

Basic Data
Design to
Grades Fy, Fyv, Fcu

BS 8110: 199
460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Deep, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=5000-(950+700)/2
Loy=5000-(950+600)/2

1.30
1.50
4175
4225

LEX=5427.5 MM, LEX/H=13.6, EXX=20.0 MM


LEY=6337.5 MM, LEY/B=10.6, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-2413)x25 + 0.95x2412.7x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-2413)x25 + 0.95x2412.7x460

OK
Applied Moments (Mx1, Mx2)
0.0 kN.m, 1.5 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3727 - 779)/(3727 - 1316) < 1
au = a K h
0.092, 1.000, 400
Madd= N au
779 x 36.8
Mi=fn(Mx1, Mx2)
0.0 kN.m, 1.5 kN.m
M2+Madd, M nom
30.2 kN.m, 15.6 kN.m
M nom=fn(N, exx)
779.2 kN, 20.0 mm
Design Moment

779.2 k
3727.2 k
OK
3459.9 k

X-X Moments
1.00
36.8 mm
28.7 kN.m
0.9 kN.m
28.7 kN.m
30.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-86.4 kN.m, 81.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3727 - 779)/(3727 - 1393) < 1
au = a K h
0.056, 1.000, 400
Madd= N au
779 x 33.5
Mi=fn(My1, My2)
-86.4 kN.m, 81.8 kN.m
M nom=fn(M2+Madd)
112.5
M nom=fn(N, eyy)
779.2, 20.0
Design Moment

1.00
33.5 mm
26.1 kN.m
34.6 kN.m
0.0 kN.m
26.1 kN.m
112.5 kN.m

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 108: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(30.2 + 112.5 )
atn(112.5/ 30.2)

116.5 kN.m
75.0 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
Equlibrum (Ft) + FC - Fapp= 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.409, 683 mm, 600 mm, 279.18 mm, 82589 mm, 149.3 m
1 x 16, 614.6, -0.420, -437, -273.0, -87.9
1 x 16, 143.3, 0.170, 341, 198.3, 68.5
1 x 16, 457.5, -0.224, -437, -115.9, -87.9
1 x 16, 300.4, -0.027, -53, 41.2, -10.7
1 x 16, 589.7, -0.389, -437, -248.1, -87.9
1 x 16, 564.8, -0.358, -437, -223.2, -87.9
1 x 16, 539.9, -0.327, -437, -198.3, -87.9
1 x 16, 68.6, 0.264, 437, 273.0, 87.9
1 x 16, 382.8, -0.130, -260, -41.2, -52.2
1 x 16, 225.7, 0.067, 134, 115.9, 27.0
1 x 16, 118.4, 0.202, 403, 223.2, 81.1
1 x 16, 93.5, 0.233, 437, 248.1, 87.9
82589 x 0.45 x 25
-88+69-88-11-88-88-88+88-52+27+81+8
+929-779.2

Max Moment/Mu

929.1 x (683 / 2 - 149.3)


178.7 + (24.0+13.6+10.2+-0.4+21.8+19.6+17.4
+ (24.0+2.2+3.1+18.1+21.8)
116.5 / 354.0

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

38.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

144.4 mm, 360 m

OK

24.0
13.6
10.2
-0.4
21.8
19.6
17.4
24.0
2.2
3.1
18.1
21.8
929.1

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.1

k
OK
178.7 kN
354.0kN
0.32

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-2413)x25 + 0.95x2412.7x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-2413)x25 + 0.95x2412.7x460

OK
Applied Moments (Mx1, Mx2)
0.0 kN.m, 1.5 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3727 - 779)/(3727 - 1316) < 1
au = a K h
0.092, 1.000, 400
Madd= N au
779 x 36.8
Mi=fn(Mx1, Mx2)
0.0 kN.m, 1.5 kN.m
M2+Madd, M nom
30.2 kN.m, 0.0 kN.m
M nom=fn(N, exx)
779.2 kN, 20.0 mm
Design Moment

779.2 k
3727.2 k
OK
3459.9 k

X-X Moments
1.00
36.8 mm
28.7 kN.m
0.9 kN.m
28.7 kN.m
30.2 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-86.4 kN.m, 81.8 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (3727 - 779)/(3727 - 1393) < 1
au = a K h
0.056, 1.000, 400
Madd= N au
779 x 33.5
Mi=fn(My1, My2)
-86.4 kN.m, 81.8 kN.m
M nom=fn(M2+Madd)
112.5

1.00
33.5 mm
26.1 kN.m
34.6 kN.m
15.6 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
M nom=fn(N, eyy)
Design Moment

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 109: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

779.2, 20.0

26.1 kN.m
112.5 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(30.2 + 112.5 )
atn(112.5/ 30.2)

116.5 kN.m
75.0 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.409, 683 mm, 600 mm, 279.18 mm, 82589 mm, 149.3 m
1 x 16, 614.6, -0.420, -437, -273.0, -87.9
1 x 16, 143.3, 0.170, 341, 198.3, 68.5
1 x 16, 457.5, -0.224, -437, -115.9, -87.9
1 x 16, 300.4, -0.027, -53, 41.2, -10.7
1 x 16, 589.7, -0.389, -437, -248.1, -87.9
1 x 16, 564.8, -0.358, -437, -223.2, -87.9
1 x 16, 539.9, -0.327, -437, -198.3, -87.9
1 x 16, 68.6, 0.264, 437, 273.0, 87.9
1 x 16, 382.8, -0.130, -260, -41.2, -52.2
1 x 16, 225.7, 0.067, 134, 115.9, 27.0
1 x 16, 118.4, 0.202, 403, 223.2, 81.1
1 x 16, 93.5, 0.233, 437, 248.1, 87.9
82589 x 0.45 x 25
-88+69-88-11-88-88-88+88-52+27+81+8
+929-779.2

Max Moment/Mu

929.1 x (683 / 2 - 149.3)


178.7 + (24.0+13.6+10.2+-0.4+21.8+19.6+17.4
+ (24.0+2.2+3.1+18.1+21.8)
116.5 / 354.0

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

38.7 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

144.4 mm, 360 m

OK

24.0
13.6
10.2
-0.4
21.8
19.6
17.4
24.0
2.2
3.1
18.1
21.8
929.1

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.1

k
OK
178.7 kN
354.0kN
0.32

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

: Job Ref
: Sheet Ref / 110: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

COLUMN @ TYPE C8 LEVEL 1

Basic Data
Design to

BS 8110: 199

Grades Fy, Fyv, Fcu

460 N/mm, 460 N/mm, 25 N/mm

Restraint Conditions and


Effective Lengths
x : for 400 mm deep column
y : for 600 mm wide column
Lc=5000

Top: Shallow, Bottom: Shallow


Top: Shallow, Bottom: Shallow
Lox=5000-(700+0)/2
Loy=5000-(600+0)/2

1.50
1.50
4650
4700

LEX=6975.0 MM, LEX/H=17.4, EXX=20.0 MM


LEY=7050.0 MM, LEY/B=11.8, EYY=20.0 MM
BI-AXIAL , SLENDER,
UNBRACED, COLUMN D ESIGN
Critical Case : 1 : Dead plus Live
Part 1 of 2 with Mxx Nominal considered
Axial Capacity
Applied Axial N

Nuz=.45(BH-acs)fcu + .95ascfy

963.8 k

.45x(600x400-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
0.0 kN.m, 2.0 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4305 - 964)/(4305 - 1321) < 1
au = a K h
0.152, 1.000, 400
Madd= N au
964 x 60.8
Mi=fn(Mx1, Mx2)
0.0 kN.m, 2.0 kN.m
M2+Madd, M nom
60.6 kN.m, 19.3 kN.m
M nom=fn(N, exx)
963.8 kN, 20.0 mm
Design Moment

4305.0 k
OK
4039.3 k

X-X Moments
1.00
60.8 mm
58.6 kN.m
1.2 kN.m
58.6 kN.m
60.6 kN.m

Y-Y Moments
Applied Moments (My1, My2)
-36.2 kN.m, 64.4 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4305 - 964)/(4305 - 1367) < 1

1.00

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
au = a K h
Madd= N au
Mi=fn(My1, My2)
M nom=fn(M2+Madd)
M nom=fn(N, eyy)
Design Moment

: Job Ref
: Sheet Ref / 111: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

0.069, 1.000, 400


964 x 41.4
-36.2 kN.m, 64.4 kN.m
104.3
963.8, 20.0

41.4 mm
39.9 kN.m
25.8 kN.m
0.0 kN.m
39.9 kN.m
104.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(60.6 + 104.3 )
atn(104.3/ 60.6)

120.6 kN.m
59.8 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0

Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)

0.472, 720 mm, 600 mm, 339.70 mm, 94952 mm, 194.9 m
1 x 20, 640.5, -0.310, -437, -280.6, -137.3
1 x 20, 222.0, 0.121, 243, 137.9, 76.2
1 x 20, 501.0, -0.166, -332, -141.1, -104.4
1 x 20, 361.5, -0.022, -45, -1.6, -14.1
1 x 20, 592.9, -0.261, -437, -233.0, -137.3
1 x 20, 545.3, -0.212, -424, -185.5, -133.1
1 x 20, 497.8, -0.163, -326, -137.9, -102.3
1 x 20, 79.3, 0.268, 437, 280.6, 137.3
1 x 20, 358.3, -0.019, -38, 1.6, -12.0
1 x 20, 218.8, 0.125, 249, 141.1, 78.3
1 x 20, 174.4, 0.170, 341, 185.5, 107.0
1 x 20, 126.8, 0.219, 437, 233.0, 137.3
94952 x 0.45 x 25
-137+76-104-14-137-133-102+137-12+7
+107+137+1068-963.8

Max Moment/Mu

1068.2 x (720 / 2 - 194.9)


176.2 + (38.5+10.5+14.7+0.0+32.0+24.7+14.1
+ (38.5+0.0+11.0+19.8+32.0)
120.6 / 412.2

App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

62.9 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

108.2 mm, 360 m

OK

38.5
10.5
14.7
0.0
32.0
24.7
14.1
38.5
0.0
11.0
19.8
32.0
1068.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.1

k
OK
176.2 kN
412.2kN
0.29

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

NOMINAL LINKS
BI-AXIAL , SLENDER, U NBRACED, COLUMN DESIGN
Critical Case : 1 : Dead plus Live
Part 2 of 2: with Myy Nominal considered
Axial Capacity
Applied Axial N
Nuz=.45(BH-acs)fcu + .95ascfy

.45x(600x400-3770)x25 + 0.95x3769.9x460

Ncap=.9.45(BH-acs)fcu + .95ascfy.9x.45x(600x400-3770)x25 + 0.95x3769.9x460

OK
Applied Moments (Mx1, Mx2)
0.0 kN.m, 2.0 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4305 - 964)/(4305 - 1321) < 1
au = a K h
0.152, 1.000, 400
Madd= N au
964 x 60.8
Mi=fn(Mx1, Mx2)
0.0 kN.m, 2.0 kN.m
M2+Madd, M nom
60.6 kN.m, 0.0 kN.m
M nom=fn(N, exx)
963.8 kN, 20.0 mm
Design Moment

963.8 k
4305.0 k
OK
4039.3 k

X-X Moments
1.00
60.8 mm
58.6 kN.m
1.2 kN.m
58.6 kN.m
60.6 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 112: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Y-Y Moments
Applied Moments (My1, My2)
-36.2 kN.m, 64.4 kN.m
K = Kmin > (Nuz - N)/(Nuz - Nbal) < 1 1.00 > (4305 - 964)/(4305 - 1367) < 1
au = a K h
0.069, 1.000, 400
Madd= N au
964 x 41.4
Mi=fn(My1, My2)
-36.2 kN.m, 64.4 kN.m
M nom=fn(M2+Madd)
104.3
M nom=fn(N, eyy)
963.8, 20.0
Design Moment

1.00
41.4 mm
39.9 kN.m
25.8 kN.m
19.3 kN.m
39.9 kN.m
104.3 kN.m

Resultant Design Moment


M=sqr(Mx + My)
= atn(My / Mx)

sqr(60.6 + 104.3 )
atn(104.3/ 60.6)

120.6 kN.m
59.8 deg

Moment Capacity
Design Data X/h, h, b, X, Ac, Ybar
Bar group1:M1 fn(bars,d,%,,la,F)
Bar group2:M2 fn(bars,d,%,,la,F)
Bar group3:M3 fn(bars,d,%,,la,F)
Bar group4:M4 fn(bars,d,%,,la,F)
Bar group5:M5 fn(bars,d,%,,la,F)
Bar group6:M6 fn(bars,d,%,,la,F)
Bar group7:M7 fn(bars,d,%,,la,F)
Bar group8:M8 fn(bars,d,%,,la,F)
Bar group9:M9 fn(bars,d,%,,la,F)
Bar group10:M10 fn(bars,d,%,,la,F)
Bar group11:M11 fn(bars,d,%,,la,F)
Bar group12:M12 fn(bars,d,%,,la,F)
Concrete Fc=(Ac.45fcu)
F Equlibrum (Ft) + FC - Fapp = 0
Concrete Mc=Fc(H/2-Ybar)
Mu =Mc + (M1+...+M12)
Max Moment/Mu

0.472, 720 mm, 600 mm, 339.70 mm, 94952 mm, 194.9 m
1 x 20, 640.5, -0.310, -437, -280.6, -137.3
1 x 20, 222.0, 0.121, 243, 137.9, 76.2
1 x 20, 501.0, -0.166, -332, -141.1, -104.4
1 x 20, 361.5, -0.022, -45, -1.6, -14.1
1 x 20, 592.9, -0.261, -437, -233.0, -137.3
1 x 20, 545.3, -0.212, -424, -185.5, -133.1
1 x 20, 497.8, -0.163, -326, -137.9, -102.3
1 x 20, 79.3, 0.268, 437, 280.6, 137.3
1 x 20, 358.3, -0.019, -38, 1.6, -12.0
1 x 20, 218.8, 0.125, 249, 141.1, 78.3
1 x 20, 174.4, 0.170, 341, 185.5, 107.0
1 x 20, 126.8, 0.219, 437, 233.0, 137.3
94952 x 0.45 x 25
-137+76-104-14-137-133-102+137-12+7
+107+137+1068-963.8
1068.2 x (720 / 2 - 194.9)
176.2 + (38.5+10.5+14.7+0.0+32.0+24.7+14.1
+ (38.5+0.0+11.0+19.8+32.0)
120.6 / 412.2

OK
App. Shear Vx, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6h

62.9 mm, 240 m

App. Shear Vy, v, v max

0 kN, 0 N/mm, 4 N/mm

M/N, 0.6b

108.2 mm, 360 m

38.5
10.5
14.7
0.0
32.0
24.7
14.1
38.5
0.0
11.0
19.8
32.0
1068.2

kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
kN
k

-0.1 k
176.2 kN
412.2kN
0.29

X-X Shear Checks


OK

Nominal links

Y-Y Shear Checks


OK

Nominal links

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 113: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

PAD FOOTING DESIGN RESULTS


BASE TYPE E GRID F/10
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C3
1
-3191.9
-34.8
-99.2 G+Q *F
2
-3109.9
-32.3
-96.6 (G+Q)P11 *F
3
-3015.1
-32.7
-95.9 (G+Q)P12 *F
4
-2571.6
-22.5
-87.4 (G+Q)P21 *F
5
-2245.6
-38.6
-57.3 (G+Q)P22 *F
6
-3173.2
-33.4
-99.3 (G+Q)P31 *F
7
-3113.8
-34.3
-95.8 (G+Q)P32 *F
8
-2577.0
-22.9
-87.2 (G+Q)P41 *F
9
-2246.5
-38.6
-57.0 (G+Q)P42 *F
10
-3104.0
-31.9
-96.5 (G+Q)P51 *F
11
-3015.4
-32.6
-96.3 (G+Q)P52 *F
12
-2657.4
-10.4
-92.8 G+Q+Nx
13
-2688.1
-48.8
-72.8 G+Q-Nx
14
-2658.9
-32.0
-75.6 G+Q+Ny
15
-2686.6
-27.1
-89.9 G+Q-Ny
Column:
1C1
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-3191.9 kN
Mx =
34.8 kN.m
My =
99.2 kN.m
Footing Dimensions:
Lx =
3000.0 mm
Ly =
3000.0 mm
h =
800.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 403.620 kN/m2
S-min = 344.086 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1600.00 mm2/m
X Dir:
Footing Design:
M =
339.2 kN.m/m
K/K' =
0.15 < 1.0
As = 1600.00 mm2/m
T20-175
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.70 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.30 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
3275.0 kN
V-eff =
3331.7 kN
v =
2.25 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
602.5 kN
V-eff =
621.0 kN
v =
0.08 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
286.4 kN.m/m
K/K' =
0.14 < 1.0
As = 1600.00 mm2/m
T20-175
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.66 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.26 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
3275.0 kN
V-eff =
3331.7 kN
v =
2.25 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
602.5 kN
V-eff =
659.3 kN
v =
0.08 N/mm2
<
vc =
0.40 N/mm2

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 114: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

BASE TYPE F GRID G/10


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C4
1
-4173.0
-0.9
-120.2 G+Q *F
2
-3270.5
15.3
-119.7 (G+Q)P11 *F
3
-3453.4
1.1
-126.6 (G+Q)P12 *F
4
-2923.8
-14.5
-83.8 (G+Q)P21 *F
5
-3590.4
6.4
-36.7 (G+Q)P22 *F
6
-3674.3
0.5
-120.9 (G+Q)P31 *F
7
-4021.7
1.1
-106.9 (G+Q)P32 *F
8
-3014.2
-15.5
-86.6 (G+Q)P41 *F
9
-3607.9
6.0
-42.0 (G+Q)P42 *F
10
-3269.0
15.9
-119.4 (G+Q)P51 *F
11
-3456.0
1.3
-126.5 (G+Q)P52 *F
12
-3454.2
24.3
-97.9 G+Q+Nx
13
-3479.2
-25.1
-98.4 G+Q-Nx
14
-3445.6
-3.8
-92.1 G+Q+Ny
15
-3487.8
3.1
-104.1 G+Q-Ny
Column:
1C2
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-4173.0 kN
Mx =
0.9 kN.m
My =
120.2 kN.m
Footing Dimensions:
Lx =
3400.0 mm
Ly =
3400.0 mm
h =
900.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 413.416 kN/m2
S-min = 376.440 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1800.00 mm2/m
X Dir:
Footing Design:
M =
465.0 kN.m/m
K/K' =
0.17 < 1.0
As = 1800.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.73 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.32 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
4470.6 kN
V-eff =
4532.4 kN
v =
2.70 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
967.4 kN
V-eff =
967.8 kN
v =
0.10 N/mm2
<
vc =
0.40 N/mm2
Y Dir:
Footing Design:
M =
400.2 kN.m/m
K/K' =
0.15 < 1.0
As = 1800.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.70 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.28 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
4470.6 kN
V-eff =
4532.4 kN
v =
2.70 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
967.4 kN
V-eff =
1029.2 kN
v =
0.10 N/mm2
<
vc =
0.40 N/mm2

BASE TYPE G GRID H/10


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C3
1
-2266.6
35.3
-97.3 G+Q *F
2
-1772.3
21.1
-95.9 (G+Q)P11 *F
3
-2124.0
33.1
-94.3 (G+Q)P12 *F

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
4
5
6
7
8
9
10
11
12
13
14
15

-2101.4
-1779.1
-2149.6
-2203.0
-2139.8
-1777.4
-1798.9
-2132.0
-1924.2
-1848.7
-1865.4
-1907.5

28.3
35.4
33.5
35.6
28.2
35.4
21.5
33.2
50.0
8.1
26.3
31.9

-61.7
-45.4
-94.6
-94.1
-63.3
-45.1
-96.2
-94.9
-72.8
-87.4
-75.6
-84.6

: Job Ref
: Sheet Ref / 115: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny

*F
*F
*F
*F
*F
*F
*F
*F

Column:

1C3
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-2266.6 kN
Mx =
35.3 kN.m
My =
97.3 kN.m
Footing Dimensions:
Lx =
2600.0 mm
Ly =
2600.0 mm
h =
700.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 409.527 kN/m2
S-min = 318.975 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1400.00 mm2/m
X Dir:
Footing Design:
M =
245.7 kN.m/m
K/K' =
0.15 < 1.0
As = 1400.00 mm2/m
T20-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.69 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.28 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
2374.9 kN
V-eff =
2437.8 kN
v =
1.90 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
332.8 kN
V-eff =
353.8 kN
v =
0.06 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
200.5 kN.m/m
K/K' =
0.13 < 1.0
As = 1400.00 mm2/m
T20-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.65 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.24 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
2374.9 kN
V-eff =
2437.8 kN
v =
1.90 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
332.8 kN
V-eff =
395.7 kN
v =
0.06 N/mm2
<
vc =
0.40 N/mm2

BASE TYPE D GRID F/9


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C2
1
-5097.5
-111.9
31.6 G+Q *F
2
-4122.6
-129.3
35.4 (G+Q)P11 *F
3
-3664.6
-122.2
63.5 (G+Q)P12 *F
4
-4475.5
-13.6
19.4 (G+Q)P21 *F
5
-3308.5
-121.3
-3.7 (G+Q)P22 *F
6
-5056.4
-105.2
32.1 (G+Q)P31 *F
7
-4131.4
-121.7
35.7 (G+Q)P32 *F
8
-4480.6
-17.5
19.4 (G+Q)P41 *F
9
-3346.3
-122.8
-2.4 (G+Q)P42 *F
10
-4115.8
-128.7
35.5 (G+Q)P51 *F
11
-3663.6
-122.1
62.4 (G+Q)P52 *F

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
12
13
14
15

-4187.3
-4232.3
-4213.7
-4205.8

-73.9
-104.7
-91.3
-87.3

Job ref
Sheet
Made By
Date
Checked
Approved

15.2
40.2
36.2
19.2

: Job Ref
: Sheet Ref / 116: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny

Column:

1C4
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-5097.5 kN
Mx =
111.9 kN.m
My =
31.6 kN.m
Footing Dimensions:
Lx =
3800.0 mm
Ly =
3800.0 mm
h =
1000.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 405.093 kN/m2
S-min = 373.711 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
2000.00 mm2/m
X Dir:
Footing Design:
M =
580.1 kN.m/m
K/K' =
0.16 < 1.0
As = 2000.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.72 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.32 N/mm2
< vc =
0.38 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5529.5 kN
V-eff =
5578.6 kN
v =
2.97 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1334.7 kN
V-eff =
1383.8 kN
v =
0.11 N/mm2
<
vc =
0.38 N/mm2
Y Dir:
Footing Design:
M =
517.3 kN.m/m
K/K' =
0.15 < 1.0
As = 2000.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.70 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.29 N/mm2
< vc =
0.38 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5529.5 kN
V-eff =
5578.6 kN
v =
2.97 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1334.7 kN
V-eff =
1349.5 kN
v =
0.11 N/mm2
<
vc =
0.38 N/mm2

BASE TYPE D GRID F/8


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C2
1
-5486.0
-175.9
-1.9 G+Q *F
2
-4269.7
-197.4
-3.4 (G+Q)P11 *F
3
-3916.9
-188.9
-32.9 (G+Q)P12 *F
4
-4710.7
-29.1
0.2 (G+Q)P21 *F
5
-3447.1
-186.4
24.8 (G+Q)P22 *F
6
-5437.2
-168.9
-2.0 (G+Q)P31 *F
7
-3929.4
-189.3
24.5 (G+Q)P32 *F
8
-4716.1
-33.4
0.4 (G+Q)P41 *F
9
-3905.3
-185.7
-5.4 (G+Q)P42 *F
10
-4263.5
-196.6
-3.3 (G+Q)P51 *F
11
-3943.2
-190.1
-29.8 (G+Q)P52 *F
12
-4494.6
-128.7
-13.8 G+Q+Nx
13
-4527.6
-151.8
10.6 G+Q-Nx
14
-4513.7
-141.7
6.8 G+Q+Ny
15
-4508.5
-138.8
-10.0 G+Q-Ny
Column:
1C5
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-5486.0 kN
Mx =
175.9 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 117: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

My =
1.9 kN.m
Footing Dimensions:
Lx =
3900.0 mm
Ly =
3900.0 mm
h =
1000.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 415.061 kN/m2
S-min = 379.103 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
2000.00 mm2/m
X Dir:
Footing Design:
M =
627.4 kN.m/m
K/K' =
0.18 < 1.0
As = 2000.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.76 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.35 N/mm2
< vc =
0.38 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5944.3 kN
V-eff =
6021.4 kN
v =
3.20 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1666.8 kN
V-eff =
1743.9 kN
v =
0.14 N/mm2
<
vc =
0.38 N/mm2
Y Dir:
Footing Design:
M =
564.9 kN.m/m
K/K' =
0.17 < 1.0
As = 2000.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.74 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.32 N/mm2
< vc =
0.38 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5944.3 kN
V-eff =
6021.4 kN
v =
3.20 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1666.8 kN
V-eff =
1667.7 kN
v =
0.13 N/mm2
<
vc =
0.38 N/mm2

BASE TYPE D GRID F/7


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C2
1
-4841.8
-132.4
-26.7 G+Q *F
2
-3912.3
-147.7
-34.4 (G+Q)P11 *F
3
-3593.9
-140.3
21.9 (G+Q)P12 *F
4
-3986.4
-23.6
7.4 (G+Q)P21 *F
5
-3337.4
-141.2
-61.7 (G+Q)P22 *F
6
-4802.4
-127.1
-26.7 (G+Q)P31 *F
7
-3515.6
-143.3
-58.3 (G+Q)P32 *F
8
-3991.6
-26.8
7.4 (G+Q)P41 *F
9
-3443.0
-139.5
19.2 (G+Q)P42 *F
10
-3906.8
-147.3
-34.3 (G+Q)P51 *F
11
-3959.5
-141.2
-31.5 (G+Q)P52 *F
12
-3974.0
-97.9
-33.9 G+Q+Nx
13
-4010.9
-113.4
-10.1 G+Q-Nx
14
-3988.8
-106.5
-13.4 G+Q+Ny
15
-3996.1
-104.8
-30.6 G+Q-Ny
Column:
1C6
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-4841.8 kN
Mx =
132.4 kN.m
My =
26.7 kN.m
Footing Dimensions:
Lx =
3700.0 mm
Ly =
3700.0 mm
h =
900.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 406.490 kN/m2
S-min = 368.817 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

X Dir:

Y Dir:

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 118: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

As-min (Both Dir's) =


1800.00 mm2/m
Footing Design:
M =
547.0 kN.m/m
K/K' =
0.19 < 1.0
As = 1800.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.79 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.38 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5213.9 kN
V-eff =
5277.6 kN
v =
3.14 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1775.3 kN
V-eff =
1838.9 kN
v =
0.18 N/mm2
<
vc =
0.40 N/mm2
Footing Design:
M =
487.2 kN.m/m
K/K' =
0.18 < 1.0
As = 1800.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.76 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.35 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5213.9 kN
V-eff =
5277.6 kN
v =
3.14 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1775.3 kN
V-eff =
1789.0 kN
v =
0.18 N/mm2
<
vc =
0.40 N/mm2

BASE TYPE C GRID G/9


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C1
1
-5757.7
43.2
24.8 G+Q *F
2
-3864.4
82.9
34.7 (G+Q)P11 *F
3
-3718.3
47.0
86.6 (G+Q)P12 *F
4
-4038.1
-27.8
1.9 (G+Q)P21 *F
5
-3667.9
47.4
-28.6 (G+Q)P22 *F
6
-4389.9
39.7
31.9 (G+Q)P31 *F
7
-3921.5
45.9
26.5 (G+Q)P32 *F
8
-4582.8
-24.5
-1.2 (G+Q)P41 *F
9
-4075.6
47.9
-14.7 (G+Q)P42 *F
10
-3870.1
82.3
35.0 (G+Q)P51 *F
11
-3743.5
47.3
80.5 (G+Q)P52 *F
12
-4694.6
54.1
22.2 G+Q+Nx
13
-4724.7
14.8
21.8 G+Q-Nx
14
-4712.8
31.9
29.4 G+Q+Ny
15
-4706.5
37.0
14.6 G+Q-Ny
Column:
1C9
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-5757.7 kN
Mx =
43.2 kN.m
My =
24.8 kN.m
Footing Dimensions:
Lx =
4000.0 mm
Ly =
4000.0 mm
h =
1000.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 402.640 kN/m2
S-min = 389.890 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
2000.00 mm2/m
X Dir:
Footing Design:
M =
650.3 kN.m/m
K/K' =
0.18 < 1.0
As = 2000.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.76 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.36 N/mm2
< vc =
0.38 N/mm2

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Y Dir:

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 119: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)


Vt =
6245.1 kN
V-eff =
6264.1 kN
v =
3.33 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1976.4 kN
V-eff =
1995.4 kN
v =
0.16 N/mm2
<
vc =
0.38 N/mm2
Footing Design:
M =
580.9 kN.m/m
K/K' =
0.17 < 1.0
As = 2000.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.74 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.33 N/mm2
< vc =
0.38 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
6245.1 kN
V-eff =
6264.1 kN
v =
3.33 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1976.4 kN
V-eff =
1987.9 kN
v =
0.16 N/mm2
<
vc =
0.38 N/mm2

BASE TYPE C GRID G/8


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C1
1
-6085.6
79.2
2.1 G+Q *F
2
-3923.5
123.2
-0.3 (G+Q)P11 *F
3
-3798.8
83.3
-59.9 (G+Q)P12 *F
4
-4294.2
-22.7
1.1 (G+Q)P21 *F
5
-3789.8
85.0
55.6 (G+Q)P22 *F
6
-4592.1
75.5
0.4 (G+Q)P31 *F
7
-3815.8
82.8
48.8 (G+Q)P32 *F
8
-4880.3
-17.9
1.6 (G+Q)P41 *F
9
-4000.1
84.3
-7.6 (G+Q)P42 *F
10
-3928.9
121.0
0.0 (G+Q)P51 *F
11
-4208.4
84.3
-43.9 (G+Q)P52 *F
12
-4948.9
77.7
1.8 G+Q+Nx
13
-4973.8
48.1
1.5 G+Q-Nx
14
-4963.4
61.0
8.9 G+Q+Ny
15
-4959.3
64.8
-5.6 G+Q-Ny
Column:
1C10
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-6085.6 kN
Mx =
79.2 kN.m
My =
2.1 kN.m
Footing Dimensions:
Lx =
4100.0 mm
Ly =
4100.0 mm
h =
1100.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 407.920 kN/m2
S-min = 393.765 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
2200.00 mm2/m
X Dir:
Footing Design:
M =
694.5 kN.m/m
K/K' =
0.16 < 1.0
As = 2200.00 mm2/m
T20-125
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.72 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.31 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
6642.0 kN
V-eff =
6673.9 kN
v =
3.21 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1489.4 kN
V-eff =
1521.3 kN
v =
0.10 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
624.5 kN.m/m
K/K' =
0.15 < 1.0

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 120: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

As = 2200.00 mm2/m
T20-125
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.69 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.29 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
6642.0 kN
V-eff =
6673.9 kN
v =
3.21 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1489.4 kN
V-eff =
1490.3 kN
v =
0.10 N/mm2
<
vc =
0.39 N/mm2

BASE TYPE C GRID G/7


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C1
1
-6465.5
59.4
-85.3 G+Q *F
2
-4542.7
93.0
-68.3 (G+Q)P11 *F
3
-4447.5
61.3
21.3 (G+Q)P12 *F
4
-4531.3
-17.0
-42.4 (G+Q)P21 *F
5
-4773.7
63.7
-144.6 (G+Q)P22 *F
6
-5339.2
56.7
-90.7 (G+Q)P31 *F
7
-4996.8
62.6
-141.0 (G+Q)P32 *F
8
-4990.4
-14.2
-39.6 (G+Q)P41 *F
9
-4438.3
62.0
15.4 (G+Q)P42 *F
10
-4547.4
92.2
-67.8 (G+Q)P51 *F
11
-4995.6
62.5
-90.9 (G+Q)P52 *F
12
-5278.9
57.2
-69.8 G+Q+Nx
13
-5309.9
37.4
-71.1 G+Q-Nx
14
-5286.7
46.1
-62.7 G+Q+Ny
15
-5302.1
48.4
-78.1 G+Q-Ny
Column:
1C11
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-6465.5 kN
Mx =
59.4 kN.m
My =
85.3 kN.m
Footing Dimensions:
Lx =
4200.0 mm
Ly =
4200.0 mm
h =
1100.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 417.069 kN/m2
S-min = 393.643 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
2200.00 mm2/m
X Dir:
Footing Design:
M =
750.2 kN.m/m
K/K' =
0.17 < 1.0
As = 2200.00 mm2/m
T20-125
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.75 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.34 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
7053.2 kN
V-eff =
7089.5 kN
v =
3.41 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1842.6 kN
V-eff =
1866.5 kN
v =
0.12 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
672.5 kN.m/m
K/K' =
0.16 < 1.0
As = 2200.00 mm2/m
T20-125
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.73 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.31 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
7053.2 kN
V-eff =
7089.5 kN
v =
3.41 N/mm2
<
v-max =
4.00 N/mm2

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 121: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)


Vt =
1842.6 kN
V-eff =
1878.9 kN
v =
0.12 N/mm2
<
vc =
0.39 N/mm2

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 122: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

BASE TYPE F GRID H/9


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C4
1
-3741.6
42.6
15.5 G+Q *F
2
-3299.1
-8.9
18.3 (G+Q)P11 *F
3
-2684.5
38.9
46.5 (G+Q)P12 *F
4
-3075.1
57.9
-3.5 (G+Q)P21 *F
5
-2585.5
39.0
-16.2 (G+Q)P22 *F
6
-3077.4
44.1
18.3 (G+Q)P31 *F
7
-3135.2
36.9
17.9 (G+Q)P32 *F
8
-3429.4
52.3
-4.4 (G+Q)P41 *F
9
-2638.1
40.9
-14.6 (G+Q)P42 *F
10
-3519.2
-8.5
17.3 (G+Q)P51 *F
11
-2695.2
39.1
45.3 (G+Q)P52 *F
12
-3127.0
50.6
21.7 G+Q+Nx
13
-3054.5
17.2
4.5 G+Q-Nx
14
-3084.8
31.7
18.5 G+Q+Ny
15
-3096.7
36.1
7.7 G+Q-Ny
Column:
1C13
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-3741.6 kN
Mx =
42.6 kN.m
My =
15.5 kN.m
Footing Dimensions:
Lx =
3200.0 mm
Ly =
3200.0 mm
h =
800.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 407.549 kN/m2
S-min = 386.251 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1600.00 mm2/m
X Dir:
Footing Design:
M =
397.2 kN.m/m
K/K' =
0.18 < 1.0
As = 1600.00 mm2/m
T20-175
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.76 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.35 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
3969.0 kN
V-eff =
3991.7 kN
v =
2.70 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1131.8 kN
V-eff =
1154.5 kN
v =
0.14 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
343.7 kN.m/m
K/K' =
0.17 < 1.0
As = 1600.00 mm2/m
T20-175
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.73 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.32 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
3969.0 kN
V-eff =
3991.7 kN
v =
2.70 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1131.8 kN
V-eff =
1140.7 kN
v =
0.14 N/mm2
<
vc =
0.40 N/mm2

BASE TYPE F GRID H/8


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C4
1
-4253.7
39.0
-1.2 G+Q *F
2
-3572.8
-19.8
-0.2 (G+Q)P11 *F
3
-3211.4
32.9
-28.4 (G+Q)P12 *F

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
4
5
6
7
8
9
10
11
12
13
14
15

-3559.4
-2777.4
-3512.6
-3224.0
-3743.9
-3206.1
-4029.9
-3270.4
-3537.0
-3479.0
-3503.4
-3512.6

63.9
33.4
40.1
32.5
57.6
31.9
-19.0
35.2
43.7
18.5
29.5
32.7

Job ref
Sheet
Made By
Date
Checked
Approved

-0.9
27.4
-1.2
26.1
-0.8
0.1
0.3
-28.0
7.4
-9.5
4.3
-6.4

: Job Ref
: Sheet Ref / 123: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny

*F
*F
*F
*F
*F
*F
*F
*F

Column:

1C14
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-4253.7 kN
Mx =
39.0 kN.m
My =
1.2 kN.m
Footing Dimensions:
Lx =
3400.0 mm
Ly =
3400.0 mm
h =
900.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 408.049 kN/m2
S-min = 395.761 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1800.00 mm2/m
X Dir:
Footing Design:
M =
457.1 kN.m/m
K/K' =
0.16 < 1.0
As = 1800.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.72 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.31 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
4549.6 kN
V-eff =
4568.3 kN
v =
2.72 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
984.5 kN
V-eff =
1003.3 kN
v =
0.10 N/mm2
<
vc =
0.40 N/mm2
Y Dir:
Footing Design:
M =
399.8 kN.m/m
K/K' =
0.15 < 1.0
As = 1800.00 mm2/m
T20-150
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.69 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.28 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
4549.6 kN
V-eff =
4568.3 kN
v =
2.72 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
984.5 kN
V-eff =
985.1 kN
v =
0.10 N/mm2
<
vc =
0.40 N/mm2

BASE TYPE E GRID H/7


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C3
1
-3523.6
37.2
8.8 G+Q *F
2
-2889.1
-8.7
29.1 (G+Q)P11 *F
3
-2717.4
30.9
34.3 (G+Q)P12 *F
4
-3031.2
52.7
-5.3 (G+Q)P21 *F
5
-2441.8
34.5
-22.2 (G+Q)P22 *F
6
-2927.8
38.5
6.3 (G+Q)P31 *F
7
-2607.8
34.6
-19.9 (G+Q)P32 *F
8
-3342.3
48.1
-4.7 (G+Q)P41 *F
9
-2583.6
31.2
31.5 (G+Q)P42 *F
10
-3098.4
-8.4
31.3 (G+Q)P51 *F
11
-3025.9
32.9
8.1 (G+Q)P52 *F

Job ref
Sheet
Made By
Date
Checked
Approved

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
12
13
14
15

-2941.7
-2888.8
-2903.4
-2927.0

38.1
21.4
28.8
30.7

14.9
-1.3
12.5
1.1

: Job Ref
: Sheet Ref / 124: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny

Column:

1C15
bx =
400.0 mm
by =
600.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-3523.6 kN
Mx =
37.2 kN.m
My =
8.8 kN.m
Footing Dimensions:
Lx =
3100.0 mm
Ly =
3100.0 mm
h =
800.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 407.415 kN/m2
S-min = 388.876 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1600.00 mm2/m
X Dir:
Footing Design:
M =
369.3 kN.m/m
K/K' =
0.17 < 1.0
As = 1600.00 mm2/m
T20-175
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.73 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.33 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
3730.6 kN
V-eff =
3750.4 kN
v =
2.53 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
884.5 kN
V-eff =
904.3 kN
v =
0.11 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
317.9 kN.m/m
K/K' =
0.15 < 1.0
As = 1600.00 mm2/m
T20-175
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.70 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.29 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
3730.6 kN
V-eff =
3750.4 kN
v =
2.53 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
884.5 kN
V-eff =
889.6 kN
v =
0.11 N/mm2
<
vc =
0.40 N/mm2

BASE TYPE G GRID F5/9b


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1C5
1
-2784.3
18.2
-65.7 G+Q *F
2
-2642.1
18.9
-63.8 (G+Q)P11 *F
3
-2403.6
19.1
-62.8 (G+Q)P12 *F
4
-1695.5
15.5
-35.2 (G+Q)P21 *F
5
-2025.5
13.8
-26.9 (G+Q)P22 *F
6
-2717.2
18.6
-65.6 (G+Q)P31 *F
7
-2733.3
18.2
-63.3 (G+Q)P32 *F
8
-1704.3
15.4
-35.5 (G+Q)P41 *F
9
-2035.5
13.7
-27.3 (G+Q)P42 *F
10
-2641.4
19.1
-63.8 (G+Q)P51 *F
11
-2401.8
19.1
-62.9 (G+Q)P52 *F
12
-2318.2
21.1
-55.1 G+Q+Nx
13
-2320.3
10.4
-53.2 G+Q-Nx
14
-2324.9
15.1
-52.3 G+Q+Ny
15
-2313.7
16.5
-56.0 G+Q-Ny
Column:
1C19
bx =
300.0 mm
by =
400.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-2784.3 kN
Mx =
18.2 kN.m

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 125: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

My =
65.7 kN.m
Footing Dimensions:
Lx =
2800.0 mm
Ly =
2800.0 mm
h =
700.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 407.303 kN/m2
S-min = 361.396 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1400.00 mm2/m
X Dir:
Footing Design:
M =
317.0 kN.m/m
K/K' =
0.19 < 1.0
As = 1400.00 mm2/m
T20-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.78 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.38 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
2967.2 kN
V-eff =
3011.6 kN
v =
3.36 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1033.7 kN
V-eff =
1045.5 kN
v =
0.18 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
289.6 kN.m/m
K/K' =
0.19 < 1.0
As = 1400.00 mm2/m
T20-200
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.78 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.37 N/mm2
< vc =
0.40 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
2967.2 kN
V-eff =
3011.6 kN
v =
3.36 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
1033.7 kN
V-eff =
1078.2 kN
v =
0.19 N/mm2
<
vc =
0.40 N/mm2

BASE TYPE A GRID F/5-6


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1W1
1
-1496.8
-149.4
-0.2 G+Q *F
2
-1448.6
-145.4
-0.4 (G+Q)P11 *F
3
-1317.1
-124.7
-0.2 (G+Q)P12 *F
4
-1205.3
-68.9
0.1 (G+Q)P21 *F
5
-1038.4
-90.9
-0.4 (G+Q)P22 *F
6
-1412.8
-129.7
-0.2 (G+Q)P31 *F
7
-1286.6
-133.7
-0.3 (G+Q)P32 *F
8
-1304.6
-78.9
0.1 (G+Q)P41 *F
9
-1173.3
-104.5
-0.3 (G+Q)P42 *F
10
-1454.2
-143.2
-0.4 (G+Q)P51 *F
11
-1194.6
-107.7
-0.3 (G+Q)P52 *F
12
-1035.3
-85.9
-1.7 G+Q+Nx
13
-1466.3
-156.1
1.3 G+Q-Nx
14
-1600.2
-110.0
1.5 G+Q+Ny
15
-901.3
-131.9
-1.9 G+Q-Ny
1W5
1
-3890.3
-1256.9
-0.5 G+Q *F
2
-3597.7
-1140.6
-1.0 (G+Q)P11 *F
3
-3084.6
-1058.2
-0.6 (G+Q)P12 *F
4
-3189.7
-696.7
0.4 (G+Q)P21 *F
5
-2894.8
-756.4
-0.9 (G+Q)P22 *F
6
-3766.6
-1090.0
-0.5 (G+Q)P31 *F
7
-3326.3
-1196.4
-0.7 (G+Q)P32 *F
8
-3265.3
-797.7
0.3 (G+Q)P41 *F
9
-2866.3
-895.6
-0.8 (G+Q)P42 *F
10
-3580.2
-1064.8
-0.9 (G+Q)P51 *F
11
-3099.1
-898.6
-0.6 (G+Q)P52 *F
12
-3417.8
329.5
-4.4 G+Q+Nx

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

1W7

1W8

1W3

1C7

1C8

13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4

-3069.5
-2761.3
-3726.0
-3301.4
-3123.1
-2789.9
-2623.0
-2373.1
-3170.1
-2878.0
-2738.7
-2545.4
-3108.7
-2618.6
-2489.6
-3019.3
-2872.7
-2636.2
-2465.0
-2298.6
-1983.6
-2138.2
-1786.9
-2366.0
-2017.6
-2246.2
-1808.6
-2324.0
-1975.2
-2309.8
-1807.7
-2100.8
-2016.7
-1601.7
-1506.0
-1325.9
-1322.5
-1155.5
-1537.7
-1359.8
-1384.6
-1209.4
-1509.0
-1276.0
-1333.1
-1340.8
-1381.5
-1292.4
-963.8
-909.3
-786.5
-741.9
-714.1
-920.8
-855.7
-770.5
-724.5
-895.1
-770.7
-688.6
-918.1
-742.1
-864.6
-2604.1
-2594.4
-2599.5
-1840.5

-2387.6
-1204.1
-854.0
-259.7
-235.9
-69.3
-157.5
-334.3
-279.9
-217.0
-108.0
-156.8
-218.7
-224.7
-1082.4
666.9
710.5
-1126.0
-215.6
-152.9
-42.0
-153.0
-270.8
-248.6
-178.1
-92.4
-129.5
-124.7
-162.3
-764.6
420.3
727.1
-1071.4
-138.0
-116.7
-109.4
-75.8
-69.9
-116.6
-118.5
-87.3
-87.4
-111.1
-88.6
37.2
-261.0
-116.0
-107.7
-0.3
0.5
0.1
-0.5
0.5
-0.1
0.1
-0.6
0.3
0.5
0.3
3.7
-4.1
-0.3
-0.1
-82.1
-83.7
-82.0
-40.0

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 126: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

3.6 G+Q-Nx
3.2 G+Q+Ny
-4.0 G+Q-Ny
-1.0 G+Q *F
-0.7 (G+Q)P11
-0.6 (G+Q)P12
-0.7 (G+Q)P21
-0.3 (G+Q)P22
-0.7 (G+Q)P31
-0.6 (G+Q)P32
-0.9 (G+Q)P41
-0.3 (G+Q)P42
-0.7 (G+Q)P51
-0.5 (G+Q)P52
1.1 G+Q+Nx
-2.8 G+Q-Nx
-0.8 G+Q+Ny
-0.9 G+Q-Ny
-1.0 G+Q *F
-0.7 (G+Q)P11
-0.6 (G+Q)P12
-0.7 (G+Q)P21
-0.3 (G+Q)P22
-0.7 (G+Q)P31
-0.6 (G+Q)P32
-0.9 (G+Q)P41
-0.3 (G+Q)P42
-0.7 (G+Q)P51
-0.5 (G+Q)P52
1.1 G+Q+Nx
-2.8 G+Q-Nx
-0.8 G+Q+Ny
-0.9 G+Q-Ny
-0.2 G+Q *F
-0.4 (G+Q)P11
-0.2 (G+Q)P12
0.1 (G+Q)P21
-0.4 (G+Q)P22
-0.2 (G+Q)P31
-0.3 (G+Q)P32
0.1 (G+Q)P41
-0.3 (G+Q)P42
-0.4 (G+Q)P51
-0.2 (G+Q)P52
-1.7 G+Q+Nx
1.3 G+Q-Nx
1.5 G+Q+Ny
-1.9 G+Q-Ny
36.2 G+Q *F
32.6 (G+Q)P11
-6.7 (G+Q)P12
19.8 (G+Q)P21
46.6 (G+Q)P22
36.0 (G+Q)P31
33.1 (G+Q)P32
19.8 (G+Q)P41
-7.4 (G+Q)P42
32.7 (G+Q)P51
47.1 (G+Q)P52
17.1 G+Q+Nx
40.5 G+Q-Nx
36.9 G+Q+Ny
20.8 G+Q-Ny
42.0 G+Q *F
40.7 (G+Q)P11
44.7 (G+Q)P12
38.4 (G+Q)P21

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 127: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

5
-2183.3
-82.5
17.7 (G+Q)P22 *F
6
-2595.6
-82.0
41.9 (G+Q)P31 *F
7
-2591.2
-82.1
41.3 (G+Q)P32 *F
8
-1848.8
-40.0
38.6 (G+Q)P41 *F
9
-2501.0
-82.0
44.3 (G+Q)P42 *F
10
-2592.6
-83.7
40.7 (G+Q)P51 *F
11
-2281.0
-82.4
18.2 (G+Q)P52 *F
12
-2150.5
-68.8
24.5 G+Q+Nx
13
-2213.3
-67.0
46.1 G+Q-Nx
14
-2209.7
-67.5
42.3 G+Q+Ny
15
-2154.1
-68.3
28.2 G+Q-Ny
Columns:
1W9, 1W7, 1W8, 1W10, 1W11, 1C7, 1C8
bx =
6300.0 mm
by =
8100.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-16323.1 kN
Mx =
3822.5 kN.m
My =
15138.9 kN.m
Footing Dimensions:
Lx =
7500.0 mm
Ly =
9700.0 mm
h =
500.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 414.254 kN/m2
S-min =
72.750 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1000.00 mm2/m
X Dir:
Footing Design:
M =
74.2 kN.m/m
K/K' =
0.10 < 1.0
As = 1000.00 mm2/m
T20-250
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.58 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.16 N/mm2
< vc =
0.42 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5288.9 kN
V-eff =
8316.6 kN
v =
0.66 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
511.4 kN
V-eff =
1120.0 kN
v =
0.08 N/mm2
<
vc =
0.42 N/mm2
Y Dir:
Footing Design:
M =
130.3 kN.m/m
K/K' =
0.16 < 1.0
As = 1000.00 mm2/m
T20-250
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.74 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.32 N/mm2
< vc =
0.41 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
5288.9 kN
V-eff =
8316.6 kN
v =
0.66 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
511.4 kN
V-eff =
3539.1 kN
v =
0.24 N/mm2
<
vc =
0.41 N/mm2

BASE TYPE B GRID G-H/5-6


-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
1W2
1
-2111.5
-882.1
0.5 G+Q *F
2
-1887.5
-839.9
1.0 (G+Q)P11 *F
3
-1850.6
-764.4
0.9 (G+Q)P12 *F
4
-1935.1
-407.5
-0.3 (G+Q)P21 *F
5
-1689.2
-498.1
0.5 (G+Q)P22 *F
6
-1940.5
-762.4
0.5 (G+Q)P31 *F
7
-1779.8
-800.8
0.7 (G+Q)P32 *F
8
-1978.0
-471.4
-0.2 (G+Q)P41 *F
9
-1793.8
-634.4
0.6 (G+Q)P42 *F
10
-2041.6
-814.6
1.1 (G+Q)P51 *F
11
-1795.5
-604.7
0.7 (G+Q)P52 *F
12
-1958.9
-405.3
2.9 G+Q+Nx

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

1W6

1W11

1W9

1W4

1W10

13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4

-1584.1
-2215.2
-1327.8
-3241.8
-2782.2
-2538.7
-2744.9
-2668.2
-2885.1
-2852.6
-2939.4
-2458.2
-2778.5
-2755.9
-2537.9
-2869.2
-2235.3
-3171.8
-1627.3
-1376.5
-1305.2
-1697.3
-1496.5
-1491.6
-1371.4
-1737.8
-1355.2
-1483.4
-1493.2
-1798.4
-946.5
-1339.5
-1405.4
-3161.1
-2801.9
-2630.8
-2532.8
-2417.1
-2829.4
-2761.8
-2697.7
-2467.5
-2847.2
-2590.3
-2294.3
-2970.9
-2686.8
-2578.3
-2437.4
-2127.0
-2003.8
-2153.4
-1992.3
-2199.5
-2104.0
-2257.9
-1946.2
-2204.4
-2078.7
-2082.9
-1994.5
-2049.1
-2028.3
-1165.2
-1028.7
-987.4
-1044.6

-1025.1
-706.1
-724.3
-1276.9
-1068.5
-1028.6
-695.6
-685.3
-1102.0
-1132.8
-786.7
-843.6
-1001.7
-847.1
160.1
-2231.8
-1149.5
-922.2
-190.1
-5.4
45.1
-210.2
-147.8
-99.6
-145.7
-288.4
15.3
100.4
-97.7
620.5
-928.1
508.9
-816.5
-268.8
-129.8
-43.2
-209.5
-275.0
-220.1
-240.2
-242.0
-98.7
-45.7
-200.8
-74.5
-357.3
546.6
-978.5
-880.0
-794.5
-742.7
-444.0
-493.6
-764.3
-800.4
-505.9
-616.6
-755.8
-600.5
-96.0
-1333.4
-755.2
-674.2
-2.0
29.8
32.9
-26.9

Job ref
Sheet
Made By
Date
Checked
Approved

-2.1
3.1
-2.3
0.2
0.6
0.6
-0.4
0.2
0.2
0.4
-0.3
0.4
0.7
0.4
2.0
-1.8
2.6
-2.3
-1.0
-0.9
-0.9
-0.7
-0.7
-1.0
-1.0
-0.6
-0.8
-0.8
-0.7
1.4
-3.0
-0.9
-0.8
-1.0
-0.8
-0.8
-0.7
-0.6
-0.9
-1.0
-0.7
-0.7
-0.7
-0.6
1.4
-3.0
-0.8
-0.8
0.5
1.0
0.9
-0.2
0.4
0.5
0.7
-0.1
0.6
1.0
0.7
2.8
-2.0
3.1
-2.3
-0.6
-0.6
-0.5
-0.3

: Job Ref
: Sheet Ref / 128: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

1C6

1C6

1C7

1C7

5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11

-941.3
-1060.1
-995.2
-1082.8
-957.2
-1087.4
-991.3
-1031.0
-920.7
-1091.8
-859.9
-831.7
-723.6
-665.4
-645.2
-645.8
-741.8
-738.6
-694.2
-625.7
-714.5
-683.7
-565.7
-816.4
-611.5
-770.5
-424.1
-354.1
-317.7
-418.3
-387.9
-375.9
-366.5
-444.5
-326.2
-361.7
-384.0
-417.0
-295.4
-254.2
-458.3
-2927.7
-2485.7
-2918.7
-2210.3
-2893.0
-2925.5
-2916.1
-2209.6
-2914.2
-2490.8
-2902.2
-2447.8
-2446.7
-2460.9
-2433.6
-783.7
-581.1
-733.1
-818.8
-775.6
-782.1
-713.8
-809.7
-783.0
-613.5
-772.6

-1.9
3.0
9.8
-28.3
19.4
40.5
13.9
125.7
-128.7
161.4
-164.4
-0.1
0.2
0.0
-0.5
0.3
0.0
-0.1
-0.6
0.1
0.3
0.2
4.6
-4.8
-0.5
0.2
-0.2
0.1
-0.1
-0.6
0.2
-0.1
-0.2
-0.7
0.0
0.2
0.1
4.4
-4.8
-0.6
0.1
34.3
47.4
34.7
4.9
34.6
34.6
34.7
4.9
34.7
47.2
34.5
27.2
29.7
28.7
28.1
25.0
7.3
25.4
30.3
25.9
25.2
25.4
30.2
25.5
7.2
25.7

Job ref
Sheet
Made By
Date
Checked
Approved

-0.4
-0.6
-0.6
-0.3
-0.5
-0.5
-0.4
0.1
-1.0
-0.4
-0.5
145.2
120.3
48.2
102.6
146.5
142.0
144.4
104.8
48.7
120.6
141.2
118.2
117.2
124.2
111.1
1.7
3.7
2.8
-0.9
1.8
1.6
2.4
-0.6
2.2
3.9
2.4
12.2
-9.5
6.6
-3.9
-0.2
0.1
0.4
-0.3
-0.4
-0.2
-0.1
-0.3
0.0
0.2
0.0
0.0
-0.4
3.9
-4.3
-6.3
-0.2
-6.0
-7.9
-6.4
-6.2
-7.3
-8.2
-5.5
0.6
-5.6

: Job Ref
: Sheet Ref / 129: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
(G+Q)P11
(G+Q)P12
(G+Q)P21
(G+Q)P22
(G+Q)P31
(G+Q)P32
(G+Q)P41
(G+Q)P42
(G+Q)P51
(G+Q)P52

*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

*F
*F
*F
*F
*F
*F
*F
*F
*F
*F

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 130: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

12
-720.8
19.6
4.7 G+Q+Nx
13
-600.2
21.9
-15.2 G+Q-Nx
14
-739.1
20.9
0.8 G+Q+Ny
15
-581.9
20.6
-11.3 G+Q-Ny
Columns:
1W3, 1W1, 1W2, 1W4, 1W5, 1W6, 1C12, 1C16, 1C18, 1C17
bx =
6400.0 mm
by =
8100.0 mm
Effects:
Critical Combination = 1 (G+Q *F)
N =
-18711.5 kN
Mx =
10921.8 kN.m
My =
8340.7 kN.m
Footing Dimensions:
Lx =
8000.0 mm
Ly =
10200.0 mm
h =
600.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 410.337 kN/m2
S-min =
89.318 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.4) =
420.000 kN/m2
As-min (Both Dir's) =
1200.00 mm2/m
X Dir:
Footing Design:
M =
129.2 kN.m/m
K/K' =
0.12 < 1.0
As = 1200.00 mm2/m
T20-250
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.62 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.21 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
7434.9 kN
V-eff =
9120.3 kN
v =
0.58 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
959.3 kN
V-eff =
2644.8 kN
v =
0.14 N/mm2
<
vc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
223.9 kN.m/m
K/K' =
0.19 < 1.0
As = 1200.00 mm2/m
T20-250
Shear Check (At Column Face): (BS8110-Cl.3.4.5.2)
v =
0.78 N/mm2
< v-max =
4.00 N/mm2
Shear Check (At 'd' from Column): (BS8110-Cl.3.4.5.2)
v =
0.37 N/mm2
< vc =
0.39 N/mm2
Punching Check (At Column Face): (BS8110-Cl.3.7.6.4)
Vt =
7434.9 kN
V-eff =
9120.3 kN
v =
0.58 N/mm2
<
v-max =
4.00 N/mm2
Punching Check (At '1.5d'): (BS8110-Cl.3.7.6.4)
Vt =
959.3 kN
V-eff =
2523.2 kN
v =
0.13 N/mm2
<
vc =
0.39 N/mm2

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 131: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

STRUT AND TIE (MEMBER)


Member 1 (N.10-N.11) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

(Axial: Non-Slender)

Plastic

113.7
58.696 kN
0.375

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

104.87
66.56 kN
0.543

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

100.13
71.183 kN
0.620

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

97.88
73.461 kN
0.632

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

115.14
64.241 kN

OK
Table 24 a

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.819,1.819,1.6,1.6
4.53x129.57/10 =
21.992 / 58.696

STRUT AND TIE (MEMBER)


Member 3 (N.11-N.12) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.678,1.678,1.6,1.6
4.53x146.93/10 =
36.147 / 66.56

STRUT AND TIE (MEMBER)


Member 5 (N.12-N.13) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.602,1.602,1.6,1.6
4.53x157.14/10 =
44.142 / 71.183

STRUT AND TIE (MEMBER)


Member 7 (N.13-N.14) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.566,1.566,1.6,1.6
4.53x162.17/10 =
46.435 / 73.461

STRUT AND TIE (MEMBER)


Member 9 (N.1-N.2) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.97 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.6 CHS 3.97 [Grade 43]


13.42, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc

1.819,1.819,1.58,1.58
5.06x126.96/10 =

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,
F (Strut)/Pc

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 132: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

62.227 / 64.241

0.969

OK

(Axial: Non-Slender)

Plastic

104.87
66.56 kN
0.570

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

100.13
71.183 kN
0.296

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

97.88
73.461 kN
0.152

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

3.94 cm
108.35 kN
0.181

OK

(Axial: Non-Slender)

Plastic

STRUT AND TIE (MEMBER)


Member 11 (N.2-N.3) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.678,1.678,1.6,1.6
4.53x146.93/10 =
37.917 / 66.56

STRUT AND TIE (MEMBER)


Member 13 (N.3-N.4) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.602,1.602,1.6,1.6
4.53x157.14/10 =
21.056 / 71.183

STRUT AND TIE (MEMBER)


Member 15 (N.4-N.5) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.566,1.566,1.6,1.6
4.53x162.17/10 =
11.156 / 73.461

STRUT AND TIE (MEMBER)


Member 17 (N.2-N.10) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

Axially Loaded Member in Tension : 3.4.3 (Case 1)


Ae = Fn(Ag,A.net,py,Us)
Tc = Ae.py
F (Tie)/Tc

3.94,3.94,275,410
3.94x275/10 =
19.594 / 108.35

STRUT AND TIE (MEMBER)


Member 19 (N.3-N.11) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 133: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Axially Loaded Member in Tension : 3.4.3 (Case 1)


Ae = Fn(Ag,A.net,py,Us)
Tc = Ae.py
F (Tie)/Tc

3.94,3.94,275,410
3.94x275/10 =
17.27 / 108.35

3.94 cm
108.35 kN
0.159

OK

(Axial: Non-Slender)

Plastic

3.94 cm
108.35 kN
0.110

OK

(Axial: Non-Slender)

Plastic

3.94 cm
108.35 kN
0.041

OK

(Axial: Non-Slender)

Plastic

STRUT AND TIE (MEMBER)


Member 21 (N.4-N.12) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

Axially Loaded Member in Tension : 3.4.3 (Case 1)


Ae = Fn(Ag,A.net,py,Us)
Tc = Ae.py
F (Tie)/Tc

3.94,3.94,275,410
3.94x275/10 =
11.91 / 108.35

STRUT AND TIE (MEMBER)


Member 23 (N.5-N.13) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

Axially Loaded Member in Tension : 3.4.3 (Case 1)


Ae = Fn(Ag,A.net,py,Us)
Tc = Ae.py
F (Tie)/Tc

3.94,3.94,275,410
3.94x275/10 =
4.432 / 108.35

STRUT AND TIE (MEMBER)


Member 25 (N.1-N.10) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.56 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

48.3x3.2 CHS 3.56 [Grade 43]


15.09, 275
1

STRUT AND TIE (MEMBER)


Member 27 (N.2-N.11) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

(Axial: Non-Slender)

Plastic

112.45
51.971 kN
0.488

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.563,1.563,1.39,1.39
3.94x131.91/10 =
25.338 / 51.971

STRUT AND TIE (MEMBER)


Member 29 (N.3-N.12) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

Kiri Consult Ltd


Civil, Structural, Project Management, Surveying &
Environmental Consultants
Lenana Close, Off Lenana Road, Hurlingham NAIROBI
Tel: 020-2714897
P.O Box: 4125-00506 Nbr.
Fax: 020- 2714896
Email: info@kiriconsult.co.ke,

Job ref
Sheet
Made By
Date
Checked
Approved

: Job Ref
: Sheet Ref / 134: D.O.C.K
: OCT 2012
: F.O.O
: K.M.M

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.563,1.563,1.39,1.39
3.94x131.91/10 =
18.2 / 51.971

112.45
51.971 kN
0.350

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

112.45
51.971 kN
0.214

OK
Table 24 a
OK

(Axial: Non-Slender)

Plastic

112.45
51.971 kN
0.147

OK
Table 24 a
OK

STRUT AND TIE (MEMBER)


Member 31 (N.4-N.13) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.563,1.563,1.39,1.39
3.94x131.91/10 =
11.108 / 51.971

STRUT AND TIE (MEMBER)


Member 33 (N.5-N.14) @ Level 1
Classification and Properties (BS 5950: 2000)
Section (3.09 kg/m)
Class = Fn(D/t,py)
Auto Design Load Cases

42.4x3.2 CHS 3.09 [Grade 43]


13.25, 275
1

Strut by One Row of Bolts or Equivalent Weld (Case 1)


= Fn(Lx,Ly,rx,ry)
Pc = Area.pc
F (Strut)/Pc

1.563,1.563,1.39,1.39
3.94x131.91/10 =
7.625 / 51.971

You might also like