You are on page 1of 6

MSC Audit Gudline and test senarios

MSC Name Location MSC_LUK_MSS01 Lucknow Engineer Period

MSC Audit Test case and Remarks Test Case # Test Description-Functionality check
The supplier shall provide the listing of all the Office Dependent Data (e.g. Timers, License, MAP, SPF, VLR, and Authentication parameters etc.), which are to be configured uniformly in the entire Network. (Software Conformity) Test the effects on calls during command-initiated changeover for duplicated/ load-sharing sub-systems (call in set-up phase, call in conversation phase). Call restriction of subscriber services by operator Verify CRBT service. Verify Multiparty Calling Tests Verify Call Forwarding Tests (Unconditional/ Busy/ NotReachable / No Answer) Verify CLIP Verify CLIR Verify Call-Waiting By making calls check various tones and announcements. Call Details: Total/ Successful / Failed with category Mobile-to-Mobile Call setup (Inter and Intra MSC): To verify Mobile to Mobile Voice call setup capability of MSC Mobile-to-Land Call setup Test: To verify Mobile to Landline Voice call setup capability of MSC To verify the calling Mobile Subscriber gets busy tone, While called landline subscriber is busy in other conversation Busy Mobile Subscriber Calling Test: To verify the calling parry gets busy tone. While called Mobile subscriber is busy in other conversation Mobile movement test out of system area during a call: To verify the recovery function of subscribers when the mobile subscriber is moved out of system area during a call (Call Page 1 of 6 8/13/2013 MSC Acceptance Check List Page 1 of 6

Passed / Failed

Comments

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.


MSC Audit Check List

MSC Audit Test case and Remarks Test Case # Test Description-Functionality check
disconnected with all radio resources and trunk line released and subscriber status back to idle state) Call termination to 1. Roaming subscriber (MSRN to be assigned). 2. Switched off mobile. 3. Not reachable subscriber (No page response) For cases 2 & 3 system resource release is to be verified. Call setup Test to Non-existing Land Subscriber: To verify the call processing function when any Mobile subscriber calls to Non- existing Land subscriber number Call setup Test to Non-existing Mobile Subscriber: To verify the call processing function when any Mobile subscriber calls to Non- existing Mobile subscriber number Answer Time out Treatment (Mobile to Mobile Call and Land to Mobile call): To verify Answer Time out Treatment for called mobile subscriber is properly generated in which the called party does not answer (Call disconnected and call processing resources released) Originating Call barring (Through HLR ) To verify call origination is denied for Mobile subscriber who has configured for Origination Barred Incoming Call Barring through HLR: To verify call Termination is denied for Mobile subscriber who has configured for Incoming call barred. Outgoing Long distance call barring (Through HLR as well as Feature code): To verify Long distance call origination is denied for Mobile subscriber who has configured for Long Distance call Origination denied. Outgoing international call barring (Through HLR as well as Feature code): To verify International call origination is denied for Mobile subscriber who has been configured for International call Origination denied. Partial dial out treatment: To verify whether the Partial dial out treatment is presented to Mobile subscriber when proper digits have not been entered Emergency Call Dialling: To verify Emergency call can be originated by Registered subscribers or subscriber with Call Barring or delinquent account Page Retry function: The objective of this test is to verify that the Base Station re-tries to send a page to the mobile if it does not receive a Page Response Message from the mobile station for the previous page sent Global paging function: The objective of this test is to verify that if the network is not configured in zones then the pages are sent over the whole network Verify pre-paging functionality. Power up location registration/Power down Deregistration: To verify Power up location registration/Power down deregistration functionality is performed by VLR for NonPage 2 of 6 8/13/2013 MSC Acceptance Check List Page 2 of 6

Passed / Failed

Comments

17. 18. 19.

20. 21. 22.

23.

24. 25. 26.

27. 28. 29. 30.

MSC Audit Check List

MSC Audit Test case and Remarks Test Case # Test Description-Functionality check
registered Mobile subscriber with confirmation from HLR.

Passed / Failed

Comments

31. 32. 33. 34. 35. 36. 37. 38.

Check Aircel (Post paid/Pre) paid Subscriber roaming in Other Operator successfully. Location deregistration: Verify if VLR purges a Mobile when No activity timer expires for a Mobile. Verify Rejection Function in case of Registration as a Illegal IMSI Check the VLR entries at the border of two BSCs of the same MSC as well as of different MSCs Verify Periodic registration function. Verify Mobile to Other Operator Local/Inter Circle GSM mobile Registration failure: Roaming not allowed Intra-BSC handover. Origination Land Call prior Release Test: To verify the recovery function of subscribers when the call attempt is interrupted by the Landline (All call processing resources released and subscriber status back to idle) Prepaid MS-A Calls prepaid MS-B (verify call is charged) For a prepaid subscriber verify recharging of balance using recharge voucher. (USSD) Successful Multiparty Call - Calling Mobile Disconnect after Mid-Call Warning: To verify that 3-Way call is established and call is torn down after Calling mobile disconnect Authentication / TMSI Reallocation Successful. Mobile to Land Call Local BSNL call (Dial local number of BSNL of that City without 0 and area code) Mobile to Land Call STD (Dial any BSNL STD number of different Circle) Failure Statistics (Processor/Subscriber circuit/trunk/CC7/system failure) TFO functionality test (Different Codecs to be Checked). DTMF function test: to verify that digits may be sent while call is in progress. Verify that Static Route with metric-based routing is provided. Verify that Path redundancy support in the system is provided. Page 3 of 6 8/13/2013 MSC Acceptance Check List Page 3 of 6

39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50.
MSC Audit Check List

MSC Audit Test case and Remarks Test Case # Test Description-Functionality check
Verify the synchronization of the switch clock with the External clock and verify the redundancy of clocks by blocking one of them at a time Verification of Legal Intercept concurrent monitoring of one target by 7 agencies To verify SMS delivery and receipt can be processed by the MSC To verify USSD functionality: (Balance Enquiry)

Passed / Failed

Comments

51. 52. 53. 54.

Definitions Check
55. 56. 57. 58. 59. 60. 61. 62. 63. 64. 65. 66. 67. 68. 69. 70.
MSC Audit Check List 8/13/2013 MSC Acceptance Check List Page 4 of 6 Verify that alarms of various functional sub-systems are displayed on the System Panel as per the documentation Run the diagnostic tests using the documented procedures on the all sub-systems. Page 4 of 6 Check MCA functionality. B-table Audit MSRN definition Audit Roaming Tie ups definition as per marketing feedback Trunk Group definition as per the guidelines GT definition and LRN definition SRI and IDP definitions ICR related definitions Customer complain Analysis and monthly trends Critical alarms analysis and RCA Preventive maintenance activity tracker and impact analysis VAS services testing including all short codes and ussd Power verifications: Check voltages of various Power Supply Modules by varying input voltage and load. Check Fan alarms

MSC Audit Test case and Remarks Test Case #


71. 72. 73. 74. 75.

Test Description-Functionality check

Passed / Failed

Comments

MSC Audit Testing Punch List


Sr.# Item Date Closed Name / Signature of closing authority

All test completed without any items on punch list


MSC Audit Check List 8/13/2013 MSC Acceptance Check List Page 5 of 6 Page 5 of 6

Yes Aircel Representative Signature

No Date -----------------------Date -----------------------Date -----------------------Date -----------------------Date -----------------------Date

------------------------------------------------ -------------------------------------ZTE Representative Signature ------------------------------------------------ -------------------------------------Aircel Switch Manager Signature ------------------------------------------------ -------------------------------------ZTE Switch Head Signature ------------------------------------------------ -------------------------------------Aircel Circle Head Signature ------------------------------------------------ -------------------------------------ZTE Circle Head Signature

MSC Audit Check List 8/13/2013 MSC Acceptance Check List Page 6 of 6

Page 6 of 6