Professional Documents
Culture Documents
Unidad arquitectnica (codigo) 1 2 54 51 50 9 10 11 12 13 14 18 16 32-33 53 3 4 5 6 30 28 27 26 17 19 20 22 24 25 29 67 65 60 61 62 63 69 135 136 142 137 138 139 156 148, 149, 150, 151, 152 230 228 181, 182, 180 183 78 82 85 87 92 81 190 191 194 195 196 197 208, 209 221 226 227 222 223 213 212 Elem. Arqui 1 (Norte) metros 7.24 16.62 ---5.48 ---8.16 11.9 ---6.05 30.52 7.98 1.85 8.19 13.62 6.37 4.69 4.78 15.66 3.28 18.11 10.98 5.73 11.08 3.47 5.23 2.79 15.53 2.23 6.78 21.1 14.05 11.07 3.35 9.47 3.16 3.36 13.26 7.15 3.58 7.05 4.36 7.75 4.92 5.36 15.19 16.62 5.77 11.55 11.79 7.79 3.2 6.19 4.24 5.69 3.9 2.99 6.81 15.23 7.89 17.18 9.84 9.33 7.49 12.1 4.97 13.86 7.57 14.49 5.52 5.99 7.88 ---8.24 4.27 3.71 5.76 5.48 9.56 6.49 5.67 7.47 7.63 7.87 13.26 8.06 6.97 6.8 8.71 3.3 3.4 4.4 5.29 3.18 5.81 4.67 5.34 7.54 2.43 11.77 5.72 2.22 13.39 4.18 3.58 6.04 3.24 6.17 10.46 8.04 23.81 5 5.64 12.78 5.51 5.25 9.21 14.56 14.74 4.16 3.31 20.84 6.66 17.64 7.38 6.59 6.98 18.07 4.69 8.25 6.73 12.07 6.83 13.63 11.04 8.52 ---4.39 3.51 ---6.56 30.42 8.09 2 7.99 15.37 7.46 5.1 5.8 14.96 4.09 17.54 10.48 6.51 10.59 3.87 5.16 3.15 15.92 3.19 6.99 21.13 13.98 11.15 3.48 9.16 2.89 3.3 13.2 6.6 3.91 7.33 4.57 7.54 5.08 5.61 15.75 17.56 5.65 11.56 12.49 7.58 3.1 6.18 3.97 5.2 4.09 3.34 6.26 15.11 6.85 18.41 9.46 9.39 7.06 12.71 4.75 13.61 9.37 13.53 8.12 6.73 7.11 ---6.15 ---7.54 11.95 ---8.4 4.6 3.71 5.76 5.44 9.93 5.92 5.41 6.58 8.1 8.34 12.22 7.8 8.06 7.58 8.7 3.76 3.07 4.53 5.56 2.41 4.36 4.94 6.15 6.9 3.23 11.98 5.78 2.08 14.05 4.35 4.23 6.38 2.32 6.05 10.65 9.11 22.52 4.87 6.15 10.49 5.42 5.14 9.55 14.67 14.46 4.71 3.41 21.59 5.97 17.65 6.95 6.28 6.59 17.47 5.13 8.56 7.36 13.22 7.85 13.11 10.8 7.99 Elem. Arqui 2 (Este) metros 3.4 6.94 ---5.48 ---4.62 4.35 Elem. Arqui 3 (Sur) metros 6.95 16.74 ---6.15 Elem. Arqui 4 (Oeste) metros 3.55 8.24 Permetro (metros) 21.15 48.55 ---23.28 ---24.72 31.73 ---29.26 69.82 23.51 15.38 27.15 48.5 26.25 20.91 25 46.36 23.6 63.48 37.34 27.28 36.06 24.76 17.46 12.42 40.24 16.3 19.37 52.45 37.66 33.37 21.09 24.3 29.82 18.18 30.78 41.22 16.03 22.21 21.42 20.87 22.5 32.11 48.1 95.5 21.31 34.91 47.45 26.3 16.7 31.17 37.46 40.12 16.88 12.96 55.51 42.98 50.04 49.93 32.19 32.31 50.11 34.65 26.55 41.57 45.58 42.76 40.39 34.58 31.53 Volumen(metros) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 196.185 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 186.06 0 0 0 0 0 0 0 0 0
N 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
Area (metros) 24.65 126.49 20.75 33.67 20.75 35.12 46.93 51.78 52.08 135.16 29.84 11.09 44.33 108.26 42.6 25.01 36.93 122.13 29.39 178.2 130.79 77.76 31.94 18.34 9.59 68.97 15.46 19.14 84.85 68.64 47.66 24.21 26.31 36 19.19 28.5 94.29 15.97 28.09 27.86 24.16 24.7 48.76 132.59 206.66 27.86 68.07 111.55 41.91 16.39 41.88 54.61 79.6 17.69 8.04 138.45 95.49 130.03 126.4 124.04 131.55 60.9 40.89 96.79 107.71 80.04 90.67 70.3 60.21
70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 TOTAL
198 199 200 193 192 201 88 96 94 95 97 202 205 207 215, 216 217 218 219 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 56 73 109 127 128 146 254 255 256 56 73 109 127 128 146
9.05 16.43 16.43 7.66 13.65 15.32 14.14 10.03 7.42 16.62 3.71 6.91 18.31 14.82 7.1 24.56 7.47 17.35 11.92 8.97 4.98 4.92 8.96 8.96 8.96 8.96 4.98 4.98 8.96 8.96 8.97 8.95 4.93 4.93 8.96 8.96 8.96 8.96 4.98 4.98 8.96 8.96 8.96 8.96 8.96 25.54 8.57 6.75 8.96 8.96 8.96 25.54 8.57 6.75 1075.11 Cuadro Resumen
16.83 8.29 8.36 17.49 4.22 6.97 2.48 2.36 15.68 6.88 8.1 20.01 6.87 13.87 4.81 6.28 11.8 6.8 6.62 5.95 8.65 8.65 5.95 5.95 5.89 5.95 8.65 8.65 5.95 5.95 5.96 5.98 8.65 8.65 5.95 5.95 5.89 5.95 8.65 8.65 5.95 5.95 5.95 5.95 5.95 7.08 4.39 4.29 5.95 5.95 5.95 7.08 4.39 4.29 887.1
6.68 16.49 16.49 8.88 14.11 16.07 13.85 9.91 7.7 16.74 3.73 8.09 18.3 15.14 7.13 24.78 8.09 17.42 10.63 9.19 5.69 5.65 9.19 9.19 9.19 9.19 5.69 5.69 9.2 9.19 9.2 9.18 5.69 5.69 9.19 9.19 9.19 9.19 5.69 5.69 9.19 9.19 9.19 9.19 9.19
16.32 7.16 7.04 17.28 6 6.32 3.6 2.92 15.83 8.24 8.55 20.72 7.02 13.34 4.81 7.18 12.09 5.68 9.72 5.85 8.66 8.66 5.85 5.85 5.85 5.86 8.66 8.66 5.85 5.86 5.87 5.89 8.66 8.66 5.85 5.85 5.85 5.85 8.66 8.66 5.85 5.85 5.85 5.85 5.85
129.44 127.55 127.54 142.92 70.43 104.52 42.51 26.36 11.98 126.49 30.96 152.54 127.16 121.61 17.12 166.18 94.7 103.77 74.36 53.6 46.16 46.16 53.6 53.6 53.6 53.62 46.16 46.17 53.61 53.65 53.6 53.65 46.16 46.16 53.6 53.6 53.6 53.6 46.16 46.16 53.6 53.6 53.6 53.6 53.6 180.83 37.64 28.96 53.6 53.6 53.6 180.83 37.64 28.96 8094.68
48.91 48.45 48.52 51.38 37.99 44.75 34.08 25.23 46.64 48.55 24.1 55.75 50.51 77.6 62.82 39.48 47.27 39.04 29.97 27.99 27.99 29.97 29.97 29.97 29.85 27.99 27.89 29.93 29.97 29.99 29.89 27.99 27.99 29.97 29.97 29.97 29.97 27.99 27.99 29.97 29.97 29.97 29.97 29.97 65.39 25.69 22.16 29.97 29.97 29.97 65.39 25.69 22.16 4173.95
Subsector A B C TOTAL
ARBOL DE CA
ARBOL DE EFE
EFECTO DIRECTO 1 Deterioro y peligro de colapso de las unidades arquitectnicas Sector III.
ARBOL CAUSA -
EFECTO DIRECTO 1 Deterioro y peligro de colapso de las unidades arquitectnicas Sector III.
ARBOL DE CAUSAS
PROBLEMA CENTRAL MITADA PUESTA EN VALOR DEL SECTOR III DEL COMPLEJO ARQUEOLGICO DE HUNUCO PAMPA
ARBOL DE EFECTOS
EFECTO FINAL A DE LA IDENTIDAD CULTURAL DE LOS POBLADORES DE LA ZONA LUENCIA DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA.
EFECTO INDIRECTO 2.1 Mnimo inters por visitar el complejo arqueolgico de Huanuco Pampa
EFECTO DIRECTO 2 Desconocimiento de la poblacin del valor cultural del sector III del complejo arqueolgico
PROBLEMA CENTRAL MITADA PUESTA EN VALOR DEL SECTOR III DEL COMPLEJO ARQUEOLGICO DE HUNUCO PAMPA
EFECTO FINAL A DE LA IDENTIDAD CULTURAL DE LOS POBLADORES DE LA ZONA LUENCIA DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA.
EFECTO INDIRECTO 2.1 Mnimo inters por visitar el complejo arqueolgico de Huanuco Pampa
EFECTO DIRECTO 2 Desconocimiento de la poblacin del valor cultural del sector III del complejo arqueolgico
PROBLEMA CENTRAL MITADA PUESTA EN VALOR DEL SECTOR III DEL COMPLEJO ARQUEOLGICO DE HUNUCO PAMPA
FIN CONSERVACIN DE LA IDENTIDAD CULTURAL DE LOS POBLADORES DE LA ZONA DE INFLUENCIA DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA.
FIN DIRECTO 1 Restauracin y adecuada conservacin de las unidades arquitectnicas Sector III.
OBJETIVO CENTRAL PUESTA EN VALOR DEL PATRIMONIO HISTORICO - CULTURAL DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA SECTOR III
OS
FIN INDIRECTO 2.1 Mnimo inters por visitar el complejo arqueolgico de Huanuco Pampa
FIN DIRECTO 2 Conocimiento por parte de la poblacin del valor cultural del sector III del complejo arqueolgico
MEDIO FUNDAMENTAL
IMPRESCINDIBLE MEDIO FUNDAMENTAL 1.1 Existen labores de restauracin en el Sector III IMPRESCINDIBLE
FUNDAMENTAL NICO
IMPRESCINDIBLE IMPRESCINDIBLE MEDIO FUNDAMENTAL 3.1 Existencia de programas educativos y de sensibilizacin
MEDIO FUNDAM
IMPRESCINDIBLE MEDIO FUNDAMENTAL 1.1 Existen labores de restauracin en el Sector III
IMPRESCINDIBLE
IMPRESCINDIBLE
MEDIO FUNDAMENTAL 1.1 Existen labores de restauracin en el Sector III
IMPRESCINDIBLE
MEDIO FUNDAMENTAL 2.1 Implementacin de un circuito en el Sector III
MPRESCINDIBLE
IMPRESCINDIBLE
MEDIO FUNDAMENTAL 3.1 Existencia de programas educativos y de sensibilizacin
Apr-11
Evaluacin Perfil
1 Aug-11
1 Sep-11
1 Dec-11
4 2014 OyM
5 2015 OyM
6 2016 OyM
8 2018 OyM
9 2019 OyM
11.73 12.49 13.80 10.66 8.50 7.27 6.25 5.84 5.25 4.48 3.49 2.77 2.27 1.80 1.38 1.06 0.53 0.28 0.08 0.07
100.00
11.37 12.30 13.20 10.27 8.71 7.44 6.56 6.29 5.30 4.45 3.52 2.76 2.28 1.93 1.42 1.05 0.58 0.33 0.11 0.12
100.00
762223
Tipo de rea Urbano Rural Total
50.43
Sexo Hombre 158,977 225,447 384,424
49.57
Mujer 164,958 212,841 377,799 Total
100
%
42.50 57.50
100.00
Categoria
PEA Ocupada PEA Desocupada No PEA Total NSA :
Total 237,893 13,977 404,549 656,419 105,804 Total 94.45 5.55 100.00
Categoria
PEA Ocupada PEA Desocupada Total PEA
Categoria
Total 540 18325 5941 5145 24602 75695 10361 15012 76404 5868 237,893 524,330
0.23 7.70 2.50 2.16 10.34 31.82 4.36 6.31 32.12 2.47 100.00
6 6
0 0 0 0 0 0 1 1 1 1 1 1 2 2 2 2 3 3
6 7
10
13 12 11 15 20
15.00
10
Column E
187138
178127
365265
47.92%
38.37 762,223
251,870
94.45 5.55
20
Fuente: Departamento: Provincia Edades 0-4 5-9 10 - 14 15 - 19 20 - 24 25 - 29 30 - 34 35 - 39 40 - 44 45 - 49 50 - 54 55 - 59 60 - 64 65 - 69 70 - 74 75 - 79 80 - 84 85 - 89 90 - 94 95 - 99 Total Tipo de rea Urbano Rural Total rea Urbano Rural Total
Censo 2007, INEI Huanuco Dos De Mayo HOMBRES 3021 3181 3610 2577 1763 1395 1247 1162 1112 995 696 651 534 469 370 281 129 70 25 25 23313 47008 Poblacin 16,433 30,575 47,008 Hombre 8,088 15,225 23,313 49.5936861811 MUJERES 2890 3165 3445 2490 1849 1481 1364 1358 1146 1007 768 633 561 546 399 304 122 99 21 47 23695 % 34.96 65.04 100 Mujer 8,345 15,350 23,695 50.4063138189 Total 16,433 30,575 47,008 100 % 34.96 65.04 100.00 Var (%) H Var(%) M
12.96 13.64 15.48 11.05 7.56 5.98 5.35 4.98 4.77 4.27 2.99 2.79 2.29 2.01 1.59 1.21 0.55 0.30 0.11 0.11
100.00
12.20 13.36 14.54 10.51 7.80 6.25 5.76 5.73 4.84 4.25 3.24 2.67 2.37 2.30 1.68 1.28 0.51 0.42 0.09 0.20
100.00 12389
AREA # 1003
P: Segn Sexo
Nivel de Estudio Sin Nivel Educacin Inicial Primaria Secundaria Superior No Univ. incompleta Superior No Univ. completa Superior Univ. incompleta Superior Univ. completa Total NSA :
Hombre 2,870 616 10,929 5,461 508 706 181 353 21,624
Total 7,857 1,232 21,813 9,497 944 1,437 279 575 43,634 3,374
# 1003
P6a+: Actividad Econmica de la Poblacin (PEA) PEA PEA Ocupada PEA Desocupada No PEA Total NSA :
Total 12,132 714 27,114 39,960 7,048 Total 43.60 2.57 46.16
Categoria
PEA Ocupada PEA Desocupada Total PEA
AREA # 1003
Mujer
Total
Miembros poder ejec.y leg. direct. adm. pub y emp. Profes. cientificos e intelectuales
30 496
3 425
33 921
0.27 7.59
Tcnicos de nivel medio y trabajador asimilados Jefes y empleados de oficina Trabj. de serv.pers. y vend.del comerc. y mcdo. Agricult.trabajador calific.agrop.y pesqueros Obrero y oper. de minas,cant.,ind.,manuf.y otros Obreros construcc.,conf., papel, fab., instr. Trabaj.no calif.serv.,peon,vend.,a mb., y afines Otras ocupaciones Total NSA :
125
65
190
1.57
77
65
142
1.17
294
466
760
6.26
3,421
498
3,919
32.30
319
42
361
2.98
353
353
2.91
15.00
10.00
5.00
Column E
32.15
12,846
o: Estructura - Poblacional
5.00
5
Column D
10
15
20
Column E
11.82 13.36 13.39 11.01 7.97 6.88 6.27 6.47 5.42 4.43 3.27 2.66 2.01 1.57 1.47 1.12 0.58 0.17 0.03 0.10
100.00
10.6 11.8 13.7 10.1 8.1 7.2 6.8 7.5 5.5 4.1 3.5 2.8 2.0 2.2 1.5 1.0 0.4 0.6 0.1 0.2
100.0
6114
Tipo de rea Urbano Rural Total
% 48.00
Sexo Hombre 2,324 611 2,935
% 52.00
% 100.00
Total 4,836 1,278 6,114 %
Rural Total
20.82 100.00
20.98 100.00
6,114 Categoria
PEA Ocupada PEA Desocupada No PEA Total NSA : Hombre 1,107 109 1,314 2,530 Mujer 724 32 2,008 2,764 Total 1,831 141 3,322 5,294 820 Total 92.85 7.15 100.00 %
Categoria
PEA Ocupada PEA Desocupada Total PEA
Agricult.trabajador calific.agrop.y pesqueros Obrero y oper. de minas,cant.,ind.,manuf.y otros Obreros construcc.,conf., papel, fab., instr. Trabaj.no calif.serv.,peon,vend.,am b., y afines Otras ocupaciones Total NSA :
128
28
156
91
27
118
138
138
287 24 1,107
166 7 724
8 7 7
10 11 12
14 15 20
5.00
10
HOMBRES
MUJERES
2927 47.87
37.25 1,972
10 11 12
14 15 20
N 1 2 3 4 5 6 7 8 9 10 11
PROVINCIA
POB. 1993
POB. 2007
HUANUCO 223,339 270233 AMBO 55,942 55483 DOS DE MAYO 104,766 47,008 HUACAYBAMBA 17,719 20408 HUAMALIES 56,119 66450 LEONCIO PRADO 97,931 116965 MARAON 20,106 26620 PACHITEA 46,162 60321 PUERTO INCA 32,405 31032 Lauricocha (*)/1 N.A 35323 Yarowilca (*)/2 N.A 32380 TOTAL 654,489 762,223 (*) Estas provincias no existian en el ao 1993. /1: Se uso Tasa Intercensal Promedio de la provincia n 1 a la n 9 /2: Se uso Tasa Intercensal Promedio de la provincia n 1 a la n 10 Fuente: CENSO 1993 y 2007 - INEI Poblacin de Referencia A sin Proyecto
Qu porcentaje de la poblacin esta interesada en conocer Huanuco Pampa? Supuesto 1: provincias cercanas a la de Dos de May, 15% de la poblacin estainteresada Supuesto 2: provincias alejadas a la de Dos de May, 0% de la poblacin estainteresada N PROVINCIA PARTICIPACIN 2011 1 HUANUCO 15% 42,804 2 AMBO 0% 0 3 DOS DE MAYO 10% 3,739 4 HUACAYBAMBA 0% 0 5 HUAMALIES 15% 10,461 6 LEONCIO PRADO 0% 0 7 MARAON 0% 0 8 PACHITEA 0% 0 9 PUERTO INCA 0% 0 10 Lauricocha 15% 5,367 11 Yarowilca 15% 4,920 TOTAL HUANUCO 67,290 AOS
Qu porcentaje de la poblacin esta interesada en conocer Huanuco Pampa, una vez q Supuesto 3: Una vez que el proyecto inicie su operacin, atencin al pblico, el inters Supuesto 4: Una vez que el proyecto inicie su operacin, atencin al pblico, el inters N PROVINCIA PARTICIPACIN 2014 1 HUANUCO 60% 178,351 2 AMBO 30% 16,576 3 DOS DE MAYO 100% 31,488 4 HUACAYBAMBA 30% 6,571 5 HUAMALIES 60% 43,385 6 LEONCIO PRADO 30% 38,348 7 MARAON 30% 9,189 8 PACHITEA 30% 20,686 9 PUERTO INCA 30% 9,110 10 Lauricocha 60% 21,676 11 Yarowilca 60% 19,870 TOTAL HUANUCO 395,252 Poblacin de Referencia B sin Proyecto
Supuesto 5: Se considera que a partir del 2013, la tasa de crecimiento de turistas nacio
Supuesto 6: Se considera que a partir del 2013, la tasa de crecimiento de turistas extra
AO Nacionales 496,614 541,598 590,667 644,181 702,544 766,194 835,612 911,318 993,883 1,083,929 % 9.06% 9.06% 9.06% = = = = = = = FASE DE POST INVRSIN
1 2 3 4 5 6 7 8 9 10
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
FASE DE INVERSIN
1 2 3 4 5 6 7 8 9 10
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
67,290 67,829 68,389 395,252 397,709 403,087 412,251 426,368 446,819 475,176
496,614 541,598 590,667 644,181 702,544 766,194 835,612 911,318 993,883 1,083,929
57.50%
Rural (57.50%)
1 2 3 4 5 6 7 8 9
10
2020
201,950
273,226
30%
1 2 3 4 5 6 7 8 9 10
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
14,299 14,414 14,533 83,991 84,513 85,656 87,603 90,603 94,949 100,975
11,607 11,700 11,797 68,181 68,605 69,533 71,113 73,548 77,076 81,968
Tabla Resumen
Ao 1 2 3 4 5 6 7 8 9 10
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Total Poblacin de Referencia 566,233 612,048 661,914 1,042,651 1,103,875 1,173,358 1,252,451 1,342,851 1,446,517 1,565,650
Total Demanda Potencial 168,709 178,507 189,095 526,984 541,477 559,995 583,503 613,280 650,829 697,852
Tasa Intercensal
1.37% -0.06% -5.56% 1.01% 1.21% 1.28% 2.02% 1.93% -0.31% 0.32% 0.32%
POB. PROYECTADA 2011 285,357 55,353 37,388 21,249 69,737 123,054 28,842 65,112 30,651 35,780 32,799 785,321
1 a la n 9 1 a la n 10
cer Huanuco Pampa? % de la poblacin estainteresada de la poblacin estainteresada 2012 2013 43,390 43,985 0 0 3,531 3,334 0 0 10,588 10,716 0 0 0 0 0 0 0 0 5,384 5,402 4,936 4,952 67,829 68,389 1 2 3 4
cer Huanuco Pampa, una vez que inicie la operacin del proyecto? atencin al pblico, el inters por conocer Huanuco Pampa se duplicaria en las Provincias cercanas atencin al pblico, el inters por conocer Huanuco Pampa en Provincias alejadas se incrementar 2015 2016 2017 2018 180,796 185,786 193,531 204,362 16,567 16,547 16,518 16,479 29,736 26,520 22,335 17,764 6,637 6,773 6,981 7,268 43,912 44,985 46,643 48,950 38,838 39,836 41,381 43,535 9,375 9,759 10,363 11,229 21,085 21,907 23,199 25,042 9,082 9,026 8,943 8,833 21,746 21,886 22,099 22,385 19,934 20,063 20,257 20,520 397,709 403,087 412,251 426,368
191,202 197,153 198,568 170,857 247,078 274,654 293,724 335,275 352,370 416,387 436,334 457,436
Hunuco:
500,000 400,000 300,000 200,000 100,000 0
erencia Total
Turista Extranjero Total Poblacin de Referencia
2,329 2,621 2,859 3,218 3,622 4,077 4,589 5,165 5,814 6,544
566,233 612,048 661,914 1,042,651 1,103,875 1,173,358 1,252,451 1,342,851 1,446,517 1,565,650
20%
Turista Nacional (20%)
90%
Turista Extranjero (90%) Total Demanda Potencial
216,786
5,890
697,852
15%
Turista Nacional (15%)
80%
Turista Extranjero (80%) Total Demanda Efectiva
14,898 16,248 17,720 19,325 21,076 22,986 25,068 27,340 29,817 32,518
1,677 1,887 2,058 2,317 2,608 2,935 3,304 3,719 4,186 4,712
42,482 44,249 46,108 173,814 176,802 181,110 187,089 195,210 206,028 220,173
sumen
Total Demanda Efectiva 42,482 44,249 46,108 173,814 176,802 181,110 187,089 195,210 206,028 220,173 Horizonte de Evaluacin FASE DE INVERSIN (Sin Proyecto)
aria en las Provincias cercanas ncias alejadas se incrementar a 30% 2019 2020 218,757 237,376 16,431 16,373 13,343 9,464 7,644 8,122 51,995 55,901 46,386 50,055 12,412 13,999 27,553 30,900 8,697 8,537 22,748 23,191 20,852 21,259 446,819 475,176
Poblacin de Hunuc
520,000 420,000 320,000 220,000 120,000 20,000
500,000
400,000
300,000
200,000
100,000 0 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 Column H
10
Anlisis de Recursos Disponibles Recurso Disponibilidad Personal No existen Equipos y/o Herramientas No existen Materiales diversos No existen Ao 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Oferta Actual 0 0 0 0 0 0 0 0 0 0
Oferta Optimizada 0 0 0 0 0 0 0 0 0 0
Ao 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Promedio: Ao 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Promedio:
Demanda Oferta Efectiva Optimizada 42,482 0 44,249 0 46,108 0 173,814 0 176,802 0 181,110 0 187,089 0 195,210 0 206,028 0 220,173 0 147,306 0 Dficit 42,482 44,249 46,108 173,814 176,802 181,110 187,089 195,210 206,028 220,173 147,306 Oferta con PIP 0 0 0 173814 176802 181110 187089 195210 206028 220173 134,023
Balance Oferta Demanda 42,482 44,249 46,108 173,814 176,802 181,110 187,089 195,210 206,028 220,173 147,306
Balance Oferta - De
250000 200000 150000 100000 50000 0 2011 2012 2013 2014 Dficit 2015 2016
Oferta co
2013
2014 Dficit
2015
2016
2017
2018
2019
2020
Puesta en Valor del Sector III del Complejo Arqueolgico Huanuco Pampa Huanuco
PARTIDAS
01.01.01
CAMPAMENTO: OFICINA, CASETA DE GUARDIANIA, ALMACEN, TALLER PREPARACIN MORTEROS, PARARAYOS, ESTACIN METEROLGICA DESCRIPCION TOTAL EN OBRA VECES 1.00
UNIDAD
METRADO TOTAL
1.00
01.01.02
UNIDAD
METRADO TOTAL 01.02.00 01.02.01 TRABAJOS PRELIMINARES DESHIERBADO DEL TERRENO MANUAL DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 855.51 ANCHO PROM 221.75 UNIDAD ALTURA 1.50 METRADO TOTAL
1.00
01.02.02
ELIMINACION DE DESMONTE DP = 10KM DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 855.51 ANCHO PROM 221.75
01.03.00 01.03.01
EXCAVACIN CON FINES DE CONSERVACION LIMPIEZA Y DESHIERBADO DEL MURO ARQUEOLGICO DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 94.00 ANCHO PROM 57.28 METRADO TOTAL UNIDAD M2 METRADO PARCIAL 5384.32 5,384.32
01.03.02
CUADRICULACIN DESCRIPCION TOTAL EN OBRA VECES 210.00 LONG 4.00 ANCHO PROM 4.00
UNIDAD
METRADO TOTAL
3,360.00
01.03.03
EXCAVACIN ARQUEOLGICA EN AREA CON FINES DE RESTAURACIN DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 40.00 ANCHO PROM 40.00
01.04.00 01.04.01
REGISTRO CON FINES DE CONSERVACION REGISTRO ARQUEOLGICO DE UNIDADES DESCRIPCION VECES LONG ANCHO PROM UNIDAD M2 METRADO PARCIAL
TOTAL EN OBRA
1.00
139.58
16,152.20 16,152.20
01.04.02
REGISTRO ARQUEOLGICO DE ELEMENTOS DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 139.58 ANCHO PROM 115.72
UNIDAD
METRADO TOTAL
16,152.20
01.04.03
REGISTRO GRFICO DE PARAMETROS ARQUEOLOGICOS CON ESTACION TOTAL CON ESCANER DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 139.58 ANCHO PROM 115.72
UNIDAD
METRADO TOTAL
16,152.20
01.04.04
REGISTRO FOTOGRFICO DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 139.58 ANCHO PROM 115.72
UNIDAD
METRADO TOTAL
16,152.20
01.04.05
REGISTRO DE LESIONES Y DAOS ESTRUCTURALES DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 139.58 ANCHO PROM 115.72
UNIDAD
METRADO TOTAL
16,152.20
01.04.06
REGISTRO DE PATOLOGIAS EN UNIDADES LITICAS DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 139.58 ANCHO PROM 115.72
UNIDAD
METRADO TOTAL
16,152.20
01.05.00 01.05.01
RESTAURACIN DESMONTAJE Y REARMADO DE MURO DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 93.88 ANCHO PROM 57.35 UNIDAD ALTURA 1.50 METRADO TOTAL M3 METRADO PARCIAL 8076.38 8,076.38
01.05.02
EMBOQUILLADO DE MURO ARQUEOLOGICO DESCRIPCION TOTAL EN OBRA VECES 1.00 LONG 98.00 ANCHO PROM 54.94
UNIDAD
METRADO TOTAL
5,384.12
01.05.03
UNIDAD
METRADO TOTAL
7,488.31
01.05.04
COBERTURA DE MADERA PARA PROTECCIN DE ESTRUCTURAS DESCRIPCION TOTAL EN OBRA VECES 35.00
UNIDAD
METRADO TOTAL
35.00
01.05.05
REINTEGRACION DE MUROS COLAPSADOS DESCRIPCION TOTAL EN OBRA VECES 1.00 163.00 66.06
UNIDAD
M3 METRADO PARCIAL
16151.67 16,151.67
01.06.00 01.06.01
OTROS SEGURIDAD EN LA OBRA DESCRIPCION TOTAL EN OBRA VECES 1.00 METRADO TOTAL UNIDAD GLB METRADO PARCIAL 1.00 1.00
01.06.02
UNIDAD
METRADO TOTAL
1.00
01.06.03
UNIDAD
METRADO TOTAL
1.00
02.00.00 02.01.00
INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM DESCRIPCION TOTAL EN OBRA VECES 1.00 METRADO TOTAL UNIDAD GLB METRADO PARCIAL 1.00 1.00
02.02.00
UNIDAD
METRADO TOTAL
1.00
02.03.00
UNIDAD
METRADO TOTAL
1.00
03.00.00 03.01.00
03.02.00
UNIDAD
METRADO TOTAL
1.00
IGV
0.18
Componente / Partidas / Subpartida RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES CAMPAMENTO: OFICINA, CASETA DE GUARDIANIA, ALMACEN, TALLER PREPARACIN MORTEROS, PARARAYOS, ESTACIN METEROLGICA CARTEL DE IDENTIFICACIN DE 3.6m X 7.2m TRABAJOS PRELIMINARES DESHIERBADO DEL TERRENO MANUAL ELIMINACION DE DESMONTE DP = 10KM EXCAVACIN CON FINES DE CONSERVACION LIMPIEZA Y DESHIERBADO DEL MURO ARQUEOLGICO CUADRICULACIN EXCAVACIN ARQUEOLGICA EN AREA CON FINES DE RESTAURACIN REGISTRO CON FINES DE CONSERVACION REGISTRO ARQUEOLGICO DE UNIDADES REGISTRO ARQUEOLGICO DE ELEMENTOS REGISTRO GRFICO DE PARAMETROS ARQUEOLOGICOS CON ESTACION TOTAL CON ESCANER REGISTRO FOTOGRFICO REGISTRO DE LESIONES Y DAOS ESTRUCTURALES REGISTRO DE PATOLOGIAS EN UNIDADES LITICAS RESTAURACIN DESMONTAJE Y REARMADO DE MURO EMBOQUILLADO DE MURO ARQUEOLOGICO PROTECCIN DE CABECERAS COBERTURA DE MADERA PARA PROTECCIN DE ESTRUCTURAS REINTEGRACION DE MUROS COLAPSADOS OTROS SEGURIDAD EN LA OBRA ENSAYO DE LABORATORIO GUADIANIA EN OBRA DIA Y NOCHE INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS
COSTO DIRECTO (CD) GASTOS GENERALES (10%*CD) ESTUDIO DEFINITIVO (3%*CD) SUPERVISIN (3%*CD) IMPREVISTOS (2%*CD) IMPUESTO (IGV = 18%*(CD+C4+C5+C6+C7)) COSTO INDIRECTO (CI) MONTO DE LA INVERSIN
Parcial
GLB GLB M3 M3 M2 M2 M3 M2 M2 M2 M2 M2 M2 M3 M2 ML GLB M3 GLB GLB GLB GLB GLB GLB GLB GLB
1.00 1.00 284,564.01 284,564.01 5,384.32 3,360.00 3,200.00 16,152.20 16,152.20 16,152.20 16,152.20 16,152.20 16,152.20 8,076.38 5,384.12 7,488.31 35.00 16,151.67 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
260,000.00 2,110.72 0.02 0.02 0.71 11.30 2.44 2.55 1.92 2.49 2.96 2.30 2.82 7.29 7.32 5.87 868.92 5.35 108,000.00 52,856.70 96,000.00 2,393,354.18 50,000.00 70,000.00 20,000.00 50,000.00
260,000.00 2,110.72 11,661.98 4,667.67 6,994.31 49,597.05 3,827.78 37,973.12 7,796.15 242,749.25 41,126.62 30,969.18 40,191.70 47,780.27 37,094.04 45,587.45 258,985.00 58,852.53 39,385.51 43,948.12 30,412.03 86,386.80 256,856.70 108,000.00 52,856.70 96,000.00
2,513,354.18
2,393,354.18 50,000.00 70,000.00
2,965,757.93
70,000.00
20,000.00 50,000.00 3,665,314.89 10% 3% 3% 2% 18% 366,531.49 109,959.45 109,959.45 73,306.30 778,512.88 1,438,269.56 5,103,584.46 10% 20% 30%
82,600.00
4,325,071.57 432,507.16 129,752.15 129,752.15 86,501.43 N.A 778,512.88 5,103,584.46 5,613,942.90 6,124,301.35 6,634,659.79
ANLISIS DE PRECIO UNITARIOS Puesta en Valor del Sector III del Complejo Arqueolgico Huanuco Pampa ITEM 01.01.01 Rendimiento SUBPARTIDA CAMPAMENTO: OFICINA, CASETA DE GUARDIANIA, ALMACEN, TALLER PREPARACIN MORTEROS, PARARAYOS, ESTACIN METEROLGICA MO. EQ. Costo unitario directo por : Unidad 260,000.00 Anlisis de Recursos Unidad Cuadrilla Cantidad Precio S/. Parcial S/. RECURSOS DE TRABAJO: 0 MANO DE OBRA 0
EQUIPOS
RECURSOS MATERIALES: OFICINA CASETA DE GUARDIANIA ALMACEN TALLER PARA RAYOS ESTACIN METEROLOGICA GLB GLB GLB GLB GLB GLB 1.0000 1.0000 1.0000 1.0000 4.0000 1.0000 100000 10000 25000 50000 15000 15000
SUBPARTIDA CARTEL DE IDENTIFICACIN DE 3.6m X 7.2m EQ. Costo unitario directo por : m2 Unidad Cuadrilla Cantidad Precio S/.
hh hh
1.0000 1.0000
18.0000 15.0000
3.00 2.50
RECURSOS MATERIALES: CLAVOS PARA MADERA CON CABEZA DE 3" PERNO HEXAGONAL DE 3/4" X 3 1/2" CEMENTO PORTLAND TIPO I (42.5 kg) HORMIGON (PUESTO EN OBRA) MADERA TORNILLO TRIPLAY DE 8 mm PINTURA ESMALTE SINTETICO
25.0000
SUBPARTIDA DESHIERBADO DEL TERRENO MANUAL EQ. Costo unitario directo por : m3 25.0000 Unidad Cuadrilla Cantidad Precio S/.
hh hh
1.0000 1.0000
0.0104166667 0.0104166667
0.7812500 0.7812500
%MO
0.0333
0.0038
RECURSOS MATERIALES:
10.0000
SUBPARTIDA ELIMINACION DE DESMONTE DP = 10KM EQ. Costo unitario directo por : m3 10.0000 Unidad Cuadrilla Cantidad Precio S/.
hh hh
1.0000 1.0000
0.0125 0.0125
0.9375000 0.9375000
%MO
0.1000
0.0114
RECURSOS MATERIALES:
ITEM
SUBPARTIDA
01.03.01 Rendimiento
25.0000
LIMPIEZA Y DESHIERBADO DEL MURO ARQUEOLGICO EQ. Costo unitario directo por : m2 25.0000 Unidad Cuadrilla Cantidad Precio S/.
hh hh
3.0000 11.0000
0.0125 0.0125
0.9375000 0.9375000
%MO
0.6000
0.9114
RECURSOS MATERIALES:
SUBPARTIDA CUADRICULACIN MO. m2/DIA Anlisis de Recursos RECURSOS DE TRABAJO: MANO DE OBRA EQ. Unidad Costo unitario directo por : M2 Cuadrilla Cantidad Precio S/. 11.30 Parcial S/. 0.0015233569
TOPOGRAFO ASISTENTE TOPOGRAFICO OBREROS EQUIPOS HERRAMIENTAS MANUALES ESTACION TOTAL: JALONES, PRISMAS Y PORTAPRIMAS RECURSOS MATERIALES: CORDEL (PAVILO) ESTACAS DE MEDERA glb glb %MO
0.0003815 0.7500 0.00025 0.3100 0.0001033333 0.0845 2.81666666667E-005 0.0011418569 0.0011415525 0.0114 0.0009 3.04414003044E-007 11.3 4.5 6.8
3.0000 4.0000
1.5000 1.7000
SUBPARTIDA EXCAVACIN ARQUEOLGICA EN AREA CON FINES DE RESTAURACIN EQ. Costo unitario directo por : m3 0.6000 0.6000 Unidad Cuadrilla Cantidad Precio S/.
hh hh hh %MO
RECURSOS MATERIALES:
133.0000
SUBPARTIDA REGISTRO ARQUEOLGICO DE UNIDADES EQ. Costo unitario directo por : m2 133.0000 Unidad Cuadrilla Cantidad Precio S/.
hh hh hh
1.92 1.92
26.0000
SUBPARTIDA REGISTRO ARQUEOLGICO DE ELEMENTOS EQ. Costo unitario directo por : m2 26.0000 Unidad Cuadrilla Cantidad Precio S/.
1.92 Parcial S/. 0.63 0.63 0.61 0.01 0.01 0.00 0.00
MANO DE OBRA ARQUEOLOGO ASISTENTE PARA PROCESAMIENTO DE DATOS COMUNERO EQUIPOS HERRAMIENTAS MANUALES
hh hh hh %MO
1.29 1.29
SUBPARTIDA REGISTRO GRFICO DE PARAMETROS ARQUEOLOGICOS CON ESTACION TOTAL CON ESCANER MO. EQ. Costo unitario directo por : m2 m2/DIA 6.5000 6.5000 Anlisis de Recursos Unidad Cuadrilla Cantidad Precio S/. RECURSOS DE TRABAJO: MANO DE OBRA
2.49 Parcial S/. 0.63 0.63 0.01 0.61 0.01 0.00 0.00
hh hh hh %MO
1.86 1.86
1,000.0000
EQ.
SUBPARTIDA REGISTRO FOTOGRFICO Costo unitario directo por : m2 1,000.0000 Unidad Cuadrilla Cantidad Precio S/.
2.96 Parcial S/. 0.6281278737 0.6261935764 0.6076388889 0.01 0.01 0.00 0.00 0.0007927448 2.33 2.33
MANO DE OBRA ARQUEOLOGO ASISTENTE PARA PROCESAMIENTO DE DATOS COMUNERO EQUIPOS HERRAMIENTAS MANUALES CAMARA FOTOGRFICA RECURSOS MATERIALES: ARTICULOS DE OFICINA
hh hh hh %MO hm
glb
1.0000
2.33
30.0000
SUBPARTIDA REGISTRO DE LESIONES Y DAOS ESTRUCTURALES EQ. Costo unitario directo por : m2 30.0000 Unidad Cuadrilla Cantidad
2.30 Precio S/. Parcial S/. 0.03 0.03 0.01 0.01 0.01 0.00 0.00
MANO DE OBRA DIBUJANTE DE CAD ASISTENTE CALIFICADO PARA REGISTRO DE LESIONES COMUNERO EQUIPOS HERRAMIENTAS MANUALES
hh hh hh %MO
2.27 2.27
40.0000
SUBPARTIDA REGISTRO DE PATOLOGIAS EN UNIDADES LITICAS EQ. Costo unitario directo por : m2 40.0000 Unidad Cuadrilla Cantidad
Precio S/.
2.82 Parcial S/. 0.03 0.03 0.01 0.01 0.01 0.01 0.00 0.00
DIBUJANTE DE CAD ASISTENTE CALIFICADO PARA REGISTRO DE LESIONES ASISTENTE PARA PROCESAMIENTO DE DATOS COMUNERO EQUIPOS HERRAMIENTAS MANUALES
hh hh hh hh %MO
2.789 2.789
ITEM 01.05.01
Rendimiento
0.5000
EQ.
0.5000 Unidad
7.29 Parcial S/. 3.7027 3.7016 2.4000 0.4750 0.3125 0.3500 0.0352 0.1289 0.0011 0.0011
hh hh hh hh hh hh %MO
RECURSOS MATERIALES: PULPA DE CACTUS GRAVA AGUA INC. TRASLADO MORTERO DE BARRO - INC. PREPARACIN
kg m3 m3 m3
6.0000
SUBPARTIDA EMBOQUILLADO DE MURO ARQUEOLOGICO EQ. Costo unitario directo por : m2 6.0000 Unidad Cuadrilla Cantidad Precio S/.
7.32 Parcial S/. 2.96 2.88 2.400 0.313 0.035 0.129 0.079 0.079
hh hh hh hh %MO
m3 m3
0.2000 0.5000
2.15 7.86
24.0000
SUBPARTIDA PROTECCIN DE CABECERAS EQ. Costo unitario directo por : m2 24.0000 Unidad Cuadrilla Cantidad
Precio S/.
5.87 Parcial S/. 2.88 2.88 2.40 0.31 0.04 0.13 0.0011415525 0.0011415525
hh hh hh hh %MO
RECURSOS MATERIALES: ICHU MORTERO DE BARRO - INC. PREPARACIN AGUA INC. TRASLADO
sac m3 m3
SUBPARTIDA COBERTURA DE MADERA PARA PROTECCIN DE ESTRUCTURAS EQ. Costo unitario directo por : m2 0.3000 0.3000 Unidad Cuadrilla Cantidad
Precio S/.
hh hh
3.0000 11.0000
0.0125 0.0125
0.9375000 0.9375000
%MO
0.1000
0.0114
GLB
1.0000
868.75
868.75 868.75
SUBPARTIDA REINTEGRACION DE MUROS COLAPSADOS EQ. Costo unitario directo por : GLB Unidad Cuadrilla Cantidad Precio S/.
Restaurador asistente de restaurador arquelogo capataz comunero EQUIPOS TECHO DE POSTES Y VIGAS DE MADERA
hh hh hh hh hh %MO
GLB
1.0000
3.76
3.758 3.758
EQ.
SUBPARTIDA SEGURIDAD EN LA OBRA Costo unitario directo por : m2 Unidad Cuadrilla Cantidad
Precio S/.
SUPERVISOR DE SEGURIDAD
GLB
1.0000
24.0000
3500.00
24000 24000.00
RECURSOS MATERIALES:
SUBPARTIDA ENSAYO DE LABORATORIO MO. Anlisis de Recursos RECURSOS DE TRABAJO: MANO DE OBRA EQ. Unidad Costo unitario directo por : GLB Cuadrilla Cantidad Precio S/. 52,856.70 Parcial S/. 0 0 0.00
EQUIPOS
0 0
52856.7 52856.7
SUBPARTIDA GUADIANIA EN OBRA DIA Y NOCHE EQ. Costo unitario directo por : GLB Unidad Cuadrilla Cantidad Precio S/.
VIGILANTES
GLB
2.0000
24.0000
2000.00
EQUIPOS
RECURSOS MATERIALES:
SUBPARTIDA INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM EQ. Costo unitario directo por : GLB Unidad Cuadrilla Cantidad Precio S/.
EQUIPOS
RECURSOS MATERIALES:
2393354.1806
CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM, COLOR VERDE, RERA 21748.6
GLB
2,393,354.18
2393354.18
2.78 SUBPARTIDA BARANDAS LATERALES MO. Anlisis de Recursos RECURSOS DE TRABAJO: MANO DE OBRA EQ. Unidad Costo unitario directo por : GLB Cuadrilla Cantidad Precio S/. 50,000.00 Parcial S/. 0.00 0.00 0.00
EQUIPOS
50,000
50000 50,000
SUBPARTIDA SEALES Y PANELES INFORMATIVOS EQ. Costo unitario directo por : GLB Unidad Cuadrilla Cantidad Precio S/.
EQUIPOS
1 1
25000 45000
SUBPARTIDA MATERIAL EDUCATIVO MO. Anlisis de Recursos RECURSOS DE TRABAJO: MANO DE OBRA EQ. Unidad Costo unitario directo por : GLB Cuadrilla Cantidad Precio S/. 20,000.00 Parcial S/. 0.00 0.00 0.00
EQUIPOS
20000
20000 20000
SUBPARTIDA EVENTOS INFORMATIVOS MO. Anlisis de Recursos RECURSOS DE TRABAJO: MANO DE OBRA EQ. Unidad Costo unitario directo por : GLB Cuadrilla Cantidad Precio S/. 50,000.00 Parcial S/. 0.00 0.00 0.00
EQUIPOS
50000
50000 50000
Mano de Obra Unidad Horas Jornada Rendimiento x Hora Rendimiento Jornada 1 m2; m3, otros Coto Jornada 8 4.6875 m2, m3, otros 37.5 0.0266666667 jornada 0.032000 x m2, m3, otros.
Equipos y Maquinarias Rendimiento Hora 1 m2; m3, otros 1250 m2, m3, otros 0.0008 hora
Coto
0.000001
Materiales Materail STACAS CORDEL CEMENTO PORTLAND TIPO I (42.5 kg) HORMIGON (PUESTO EN OBRA) MADERA TORNILLO TRIPLAY DE 8 mm PINTURA ESMALTE SINTETICO Unidad Comercial UND CONO bls 110 m3 p2 m2 gal 223 5 Precio 2.5 12
UND CONO
1 m2, m3, otros 1 m2, m3, otros 1 m2, m3, otros 1 m2, m3, otros 1 m2, m3, otros 1 m2, m3, otros 1 m2, m3, otros
bls m3 p2 m2 gal 0 0
Mano de Obra Salario Mes Dias utiles Costo dia Costo Hora Precio S/. 0.025 1200 Equipos y Maquinarias Inversin Vida til Horas Disponibles Costo Eq / h Combustible / hora Operario Otros Costo Horario Precio S/. 50000 5 43800 1.1416 S/ aos horas S/ S/ S/ S/ S/ 900 20 45 5.625 1.200000
10
120
1.1416 0.000913242
Materiales Rendimiento 4 100 Unidad Rendimiento x m2, m3, otros. x m2, m3, otros.
x m2, m3, otros. x m2, m3, otros. x m2, m3, otros. x m2, m3, otros. x m2, m3, otros. x m2, m3, otros. x m2, m3, otros. Precio S/. 0.63 0.12 Costo 0.16 0.00
Total
#DIV/0!
Actividades FASE DE INVERSIN A. Estudio Definitivo Gestiones Administrativas y Presupuestales Elaboracin del Estudio Definitivo Aprobacin del Estudio Definitivo B. Ejecucin del PIP RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION RESTAURACIN OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS FASE DE POST INVERSIN C. Operacin y Mantenimiento Operacin y Mantenimiento del Centro Arqueolgico Hunuco Pampa Sector III D. Evaluacin Expost Evaluacin expost de la inversin
Duracin en Meses
A1 A2 A3 01.00.00 01.01.00 01.02.00 01.03.00 01.04.00 01.05.00 01.06.00 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 03.02.00
1 3 2
2 1 8 8 10 24
2 2 4 4 4
D E
84 6
CRONOGRAMA DE EJECUCIN DEL PROYECTO A1 A2 A3 01.00.00 01.01.00 01.02.00 01.03.00 01.04.00 01.05.00 01.06.00 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 03.02.00 FASE DE INVERSIN Gestiones Administrativas y Presupuestales Elaboracin del Estudio Definitivo Aprobacin del Estudio Definitivo RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION RESTAURACIN OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS
Jul-11
D E
FASE DE POST INVERSIN Operacin y Mantenimiento del Centro Arqueolgico Hunuco Pampa Sector III Evaluacin expost de la inversin
CRONOGRAMA DE EJECUCIN DEL PROYECTO A1 A2 A3 01.00.00 01.01.00 01.02.00 01.03.00 01.04.00 01.05.00 01.06.00 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 03.02.00 D E FASE DE INVERSIN Gestiones Administrativas y Presupuestales Elaboracin del Estudio Definitivo Aprobacin del Estudio Definitivo RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION RESTAURACIN OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS FASE DE POST INVERSIN Operacin y Mantenimiento del Centro Arqueolgico Hunuco Pampa Sector III Evaluacin expost de la inversin
Jan-12
CRONOGRAMA DE EJECUCIN DEL PROYECTO A1 A2 A3 01.00.00 01.01.00 01.02.00 01.03.00 01.04.00 01.05.00 01.06.00 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 FASE DE INVERSIN Gestiones Administrativas y Presupuestales Elaboracin del Estudio Definitivo Aprobacin del Estudio Definitivo RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION RESTAURACIN OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO
Jan-13
03.02.00 D E
EVENTOS INFORMATIVOS FASE DE POST INVERSIN Operacin y Mantenimiento del Centro Arqueolgico Hunuco Pampa Sector III Evaluacin expost de la inversin
2014 A1 A2 A3 01.00.00 01.01.00 01.02.00 01.03.00 01.04.00 01.05.00 01.06.00 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 03.02.00 D E FASE DE INVERSIN Gestiones Administrativas y Presupuestales Elaboracin del Estudio Definitivo Aprobacin del Estudio Definitivo RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION RESTAURACIN OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS FASE DE POST INVERSIN Operacin y Mantenimiento del Centro Arqueolgico Hunuco Pampa Sector III Evaluacin expost de la inversin
Aug-11
Feb-12
Mar-12
Apr-12
May-12
Aug-12
Sep-12
Oct-12
Nov-12
Feb-13
Mar-13
Apr-13
May-13
Aug-13
Sep-13
Oct-13
Nov-13
2015
2016
2017
2018
2019
2020
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
Mar-13
Dec-12
Jan-13
Feb-13
Mar-13
Apr-13
May-13
Aug-13
Sep-13
Dec-13
Apr-13
May-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Oct-13
Nov-13
Dec-13
2014
2015
2016
2017
2018
2019
2020
PRESUPUESTO ANALTICO - PRECIOS PRIVADOS Puesta en Valor del Sector III del Complejo Arqueolgico Huanuco Pampa Componentes RECUPERACIN DEL PATRIMONIO CULTURAL INPLEMENTACIN DE CIRCUITO DIFUSIN Y SENSIBILIZACIN COSTO DIRECTO (CD) GASTOS GENERALES (10%*CD) ESTUDIO DEFINITIVO (3%*CD) SUPERVISIN (3%*CD) IMPREVISTOS (2%*CD) IMPUESTO (IGV = 18%*(CD+C4+C5+C6+C7)) COSTO INDIRECTO (CI) MONTO DE LA INVERSIN 10% 3% 3% 2% 18%
anuco Pampa Costo Sin IGV 1,081,961 2,513,354 70,000 3,665,315 366,531 0 109,959 0 109,959 0 73,306 778,513 1,438,270 5,103,584 Costo Con IGV 1,276,714 2,965,758 82,600 4,325,072 432,507 129,752 129,752 86,501 N.A 778,513 5,103,584 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2DO SEMESTRE 2011 0 0 0 0 0 0 109959 0 0 0 0 0 19793 129,752 129,752 1ro SEMESTRE 2012 482805 0 0 482,805 48280 0 0 0 14484 0 9656 0 99941 172,361 655,166
2DO SEMESTRE 2012 263540 0 0 263,540 26354 0 0 0 7906 0 5271 0 54553 94,084 357,623
1ER SEMESTRE 2013 219605 2513354 10000 2,742,959 274296 0 0 0 82289 0 54859 0 567793 979,236 3,722,196
2DO SEMESTRE 2013 116011 0 60000 176,011 17601 0 0 0 5280 0 3520 0 36434 62,836 238,847
Gastos de Operacin Personal Arquelogo Asistente Comunero Vigilante Servicios Agua Comunicaciones Medicamentos Transporte Combustible Alimentos Otros TOTAL OPERACIN Gastos de Mantenimiento Herramientas Palas Brochas Escobas Otros Materiales Arqticulos de limpieza Articulos de Oficina Cordel Madera Otros TOTAL MANTENIMIENTO
Und Personal Personal Personal Personal litros Minuto GLB Pasaje Galon Platos GLB
Und Und. Und. Und. GLB GLB GLB Und. GLB GLB
Precio Mes Costo Mes Costo Ao 24,100 289,200 5,000 5,000 60,000 3,500 10,500 126,000 1,200 3,600 43,200 2,500 5,000 60,000 21,971 263,655 2 5,400 64,800 1 675 8,100 900 900 10,800 150 5,400 64,800 15 450 5,400 10 8,100 97,200 1 1,046 12,555 46,071 552855 Precio Mes Costo Mes Costo Ao 2,000 13,200 200 1,200 4,800 10 100 1,200 20 200 1,200 1 500 6,000 3,600 43,200 500 500 6,000 500 500 6,000 30 600 7,200 1,000 1,000 12,000 1 1,000 12,000 5,600 56400 Total OyM 609,255
Item 01.00.00 01.01.00 01.01.01 01.01.02 01.02.00 01.02.01 01.02.02 01.03.00 01.03.01 01.03.02 01.03.03 01.04.00 01.04.01 01.04.02 01.04.03 01.04.04 01.04.05 01.04.06 01.05.00 01.05.01 01.05.02 01.05.03 01.05.04 01.05.05 01.06.00 01.06.01 01.06.02 01.06.03 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 03.02.00
CRONOGRAMA DE GASTO DEL PIP Componente / Partidas / Subpartida RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES CAMPAMENTO: OFICINA, CASETA DE GUARDIANIA, ALMACEN, TALLER PREPARACIN MORTEROS, PARARAYOS, ESTACIN METEROLGICA CARTEL DE IDENTIFICACIN DE 3.6m X 7.2m TRABAJOS PRELIMINARES DESHIERBADO DEL TERRENO MANUAL ELIMINACION DE DESMONTE DP = 10KM EXCAVACIN CON FINES DE CONSERVACION LIMPIEZA Y DESHIERBADO DEL MURO ARQUEOLGICO CUADRICULACIN EXCAVACIN ARQUEOLGICA EN AREA CON FINES DE RESTAURACIN REGISTRO CON FINES DE CONSERVACION REGISTRO ARQUEOLGICO DE UNIDADES REGISTRO ARQUEOLGICO DE ELEMENTOS REGISTRO GRFICO DE PARAMETROS ARQUEOLOGICOS CON ESTACION TOTAL CON ESCANER REGISTRO FOTOGRFICO REGISTRO DE LESIONES Y DAOS ESTRUCTURALES REGISTRO DE PATOLOGIAS EN UNIDADES LITICAS RESTAURACIN DESMONTAJE Y REARMADO DE MURO EMBOQUILLADO DE MURO ARQUEOLOGICO PROTECCIN DE CABECERAS COBERTURA DE MADERA PARA PROTECCIN DE ESTRUCTURAS REINTEGRACION DE MUROS COLAPSADOS OTROS SEGURIDAD EN LA OBRA ENSAYO DE LABORATORIO GUADIANIA EN OBRA DIA Y NOCHE INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS
2011
Presupuesto
1,081,960.71 262,110.72 260,000.00 2,110.72 11,661.98 4,667.67 6,994.31 49,597.05 3,827.78 37,973.12 7,796.15 242,749.25 41,126.62 30,969.18 40,191.70 47,780.27 37,094.04 45,587.45 258,985.00 58,852.53 39,385.51 43,948.12 30,412.03 86,386.80 256,856.70 108,000.00 52,856.70 96,000.00 2,513,354.18 2,393,354.18 50,000.00 70,000.00 70,000.00 20,000.00 50,000.00 3,665,314.89
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
130,000
3,828 5,425 1,114 5,141 3,871 5,024 5,973 4,637 5,698 5,141 3,871 5,024 5,973 4,637 5,698
COSTO DIRECTO (CD) GASTOS GENERALES (10%*CD) ESTUDIO DEFINITIVO (3%*CD) SUPERVISIN (3%*CD) IMPREVISTOS (2%*CD) IMPUESTO (IGV = 18%*(CD+C4+C5+C6+C7)) COSTO INDIRECTO (CI) MONTO DE LA INVERSIN 10% 3% 3% 2% 18%
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
154,475 15,448
140,702 14,070
44,874 4,487
47,584 4,758
126 de 161
Item 01.00.00 01.01.00 01.01.01 01.01.02 01.02.00 01.02.01 01.02.02 01.03.00 01.03.01 01.03.02 01.03.03 01.04.00 01.04.01 01.04.02 01.04.03 01.04.04 01.04.05 01.04.06 01.05.00 01.05.01 01.05.02 01.05.03 01.05.04 01.05.05 01.06.00 01.06.01 01.06.02 01.06.03 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 03.02.00
CRONOGRAMA DE GASTO DEL PIP Componente / Partidas / Subpartida RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES CAMPAMENTO: OFICINA, CASETA DE GUARDIANIA, ALMACEN, TALLER PREPARACIN MORTEROS, PARARAYOS, ESTACIN METEROLGICA CARTEL DE IDENTIFICACIN DE 3.6m X 7.2m TRABAJOS PRELIMINARES DESHIERBADO DEL TERRENO MANUAL ELIMINACION DE DESMONTE DP = 10KM EXCAVACIN CON FINES DE CONSERVACION LIMPIEZA Y DESHIERBADO DEL MURO ARQUEOLGICO CUADRICULACIN EXCAVACIN ARQUEOLGICA EN AREA CON FINES DE RESTAURACIN REGISTRO CON FINES DE CONSERVACION REGISTRO ARQUEOLGICO DE UNIDADES REGISTRO ARQUEOLGICO DE ELEMENTOS REGISTRO GRFICO DE PARAMETROS ARQUEOLOGICOS CON ESTACION TOTAL CON ESCANER REGISTRO FOTOGRFICO REGISTRO DE LESIONES Y DAOS ESTRUCTURALES REGISTRO DE PATOLOGIAS EN UNIDADES LITICAS RESTAURACIN DESMONTAJE Y REARMADO DE MURO EMBOQUILLADO DE MURO ARQUEOLOGICO PROTECCIN DE CABECERAS COBERTURA DE MADERA PARA PROTECCIN DE ESTRUCTURAS REINTEGRACION DE MUROS COLAPSADOS OTROS SEGURIDAD EN LA OBRA ENSAYO DE LABORATORIO GUADIANIA EN OBRA DIA Y NOCHE INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS
2012
Presupuesto
1,081,960.71 262,110.72 260,000.00 2,110.72 11,661.98 4,667.67 6,994.31 49,597.05 3,827.78 37,973.12 7,796.15 242,749.25 41,126.62 30,969.18 40,191.70 47,780.27 37,094.04 45,587.45 258,985.00 58,852.53 39,385.51 43,948.12 30,412.03 86,386.80 256,856.70 108,000.00 52,856.70 96,000.00 2,513,354.18 2,393,354.18 50,000.00 70,000.00 70,000.00 20,000.00 50,000.00 3,665,314.89
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13
Feb-13
5,425 1,114 5,141 3,871 5,024 5,973 4,637 5,698 5,885 3,939 4,395 3,041 8,639 5,885 3,939 4,395 3,041 8,639 4,500 2,202 4,000 5,885 3,939 4,395 3,041 8,639 4,500 2,202 4,000 5,885 3,939 4,395 3,041 8,639 4,500 2,202 4,000
COSTO DIRECTO (CD) GASTOS GENERALES (10%*CD) ESTUDIO DEFINITIVO (3%*CD) SUPERVISIN (3%*CD) IMPREVISTOS (2%*CD) IMPUESTO (IGV = 18%*(CD+C4+C5+C6+C7)) COSTO INDIRECTO (CI) MONTO DE LA INVERSIN 10% 3% 3% 2% 18%
47,584 4,758
47,584 4,758
47,584 4,758
47,584 4,758
47,584 4,758
47,584 4,758
36,601 3,660
36,601 3,660
36,601 3,660
36,601 3,660
127 de 161
Item 01.00.00 01.01.00 01.01.01 01.01.02 01.02.00 01.02.01 01.02.02 01.03.00 01.03.01 01.03.02 01.03.03 01.04.00 01.04.01 01.04.02 01.04.03 01.04.04 01.04.05 01.04.06 01.05.00 01.05.01 01.05.02 01.05.03 01.05.04 01.05.05 01.06.00 01.06.01 01.06.02 01.06.03 02.00.00 02.01.00 02.02.00 02.03.00 03.00.00 03.01.00 03.02.00
CRONOGRAMA DE GASTO DEL PIP Componente / Partidas / Subpartida RECUPERACIN DEL PATRIMONIO CULTURAL OBRAS PROVISIONALES CAMPAMENTO: OFICINA, CASETA DE GUARDIANIA, ALMACEN, TALLER PREPARACIN MORTEROS, PARARAYOS, ESTACIN METEROLGICA CARTEL DE IDENTIFICACIN DE 3.6m X 7.2m TRABAJOS PRELIMINARES DESHIERBADO DEL TERRENO MANUAL ELIMINACION DE DESMONTE DP = 10KM EXCAVACIN CON FINES DE CONSERVACION LIMPIEZA Y DESHIERBADO DEL MURO ARQUEOLGICO CUADRICULACIN EXCAVACIN ARQUEOLGICA EN AREA CON FINES DE RESTAURACIN REGISTRO CON FINES DE CONSERVACION REGISTRO ARQUEOLGICO DE UNIDADES REGISTRO ARQUEOLGICO DE ELEMENTOS REGISTRO GRFICO DE PARAMETROS ARQUEOLOGICOS CON ESTACION TOTAL CON ESCANER REGISTRO FOTOGRFICO REGISTRO DE LESIONES Y DAOS ESTRUCTURALES REGISTRO DE PATOLOGIAS EN UNIDADES LITICAS RESTAURACIN DESMONTAJE Y REARMADO DE MURO EMBOQUILLADO DE MURO ARQUEOLOGICO PROTECCIN DE CABECERAS COBERTURA DE MADERA PARA PROTECCIN DE ESTRUCTURAS REINTEGRACION DE MUROS COLAPSADOS OTROS SEGURIDAD EN LA OBRA ENSAYO DE LABORATORIO GUADIANIA EN OBRA DIA Y NOCHE INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM BARANDAS LATERALES SEALES Y PANELES INFORMATIVOS DIFUSIN Y SENSIBILIZACIN MATERIAL EDUCATIVO EVENTOS INFORMATIVOS
2013
Presupuesto
1,081,960.71 262,110.72 260,000.00 2,110.72 11,661.98 4,667.67 6,994.31 49,597.05 3,827.78 37,973.12 7,796.15 242,749.25 41,126.62 30,969.18 40,191.70 47,780.27 37,094.04 45,587.45 258,985.00 58,852.53 39,385.51 43,948.12 30,412.03 86,386.80 256,856.70 108,000.00 52,856.70 96,000.00 2,513,354.18 2,393,354.18 50,000.00 70,000.00 70,000.00 20,000.00 50,000.00 3,665,314.89
Mar-13
Apr-13
May-13
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
5,885 3,939 4,395 3,041 8,639 4,500 2,202 4,000 1,196,677 25,000 17,500
5,885 3,939 4,395 3,041 8,639 4,500 2,202 4,000 1,196,677 25,000 17,500
5,885 3,939 4,395 3,041 8,639 4,500 2,202 4,000 4,500 2,202 4,000 4,500 2,202 4,000 4,500 2,202 4,000 4,500 2,202 4,000
17,500 5,000
17,500 5,000 5,000 5,000 12,500 12,500 23,202 2,320 12,500 23,202 2,320 12,500 23,202 2,320
COSTO DIRECTO (CD) GASTOS GENERALES (10%*CD) ESTUDIO DEFINITIVO (3%*CD) SUPERVISIN (3%*CD) IMPREVISTOS (2%*CD) IMPUESTO (IGV = 18%*(CD+C4+C5+C6+C7)) COSTO INDIRECTO (CI) MONTO DE LA INVERSIN 10% 3% 3% 2% 18%
1,275,778 127,578
1,275,778 127,578
59,101 5,910
59,101 5,910
41,601 4,160
41,601 4,160
23,202 2,320
128 de 161
N
1 2 3 4 5 6 7 8 9 10
DESAGREGADO DE LOS COSTOS DEL PIP POR COMPONENTES DIRECTOS Precio Privados - Alternativa nica (en nuevos soles) RECUPERACIN DEL PATRIMONIO CULTURAL * 1,081,960.71 194,752.93 1,276,713.64 INPLEMENTACIN DE CIRCUITO 2,513,354.18 452,403.75 2,965,757.93
DESAGREGADO DE LOS COSTOS DEL PIP POR TIPO DE BIEN O SERVICIO Precio Privados - Alternativa nica (en nuevos soles) Bienes Nacionales 70% RECUPERACIN DEL PATRIMONIO CULTURAL * INPLEMENTACIN DE CIRCUITO DIFUSIN Y SENSIBILIZACIN TOTAL COSTO DIRECTO 893,699.55 2,076,030.55 57,820.00 Mano de Obra Calificada 10% 127,671.36 296,575.79 8,260.00
Componentes
DESAGREGADO DE LOS COSTOS DEL PIP POR TIPO DE BIEN O SERVICIO Precio Sociales - Alternativa nica (en nuevos soles) Bienes Nacionales 0.85 RECUPERACIN DEL PATRIMONIO CULTURAL * INPLEMENTACIN DE CIRCUITO DIFUSIN Y SENSIBILIZACIN 757,372.50 1,759,347.93 Mano de Obra Calificada 0.91 116,064.88 269,614.36 7,509.09
Componentes
Total
Puesta en Valor del Sector III del Complejo Arqueolgico Huanuco Pampa Componentes RECUPERACIN DEL PATRIMONIO CULTURAL INPLEMENTACIN DE CIRCUITO DIFUSIN Y SENSIBILIZACIN COSTO DIRECTO (CD) GASTOS GENERALES (10%*CD) ESTUDIO DEFINITIVO (3%*CD) SUPERVISIN (3%*CD) IMPREVISTOS (2%*CD) IMPUESTO (IGV = 18%*(CD+C4+C5+C6+C7)) COSTO INDIRECTO (CI) MONTO DE LA INVERSIN
ES
gico Huanuco Pampa Costo Con IGV 1,034,303 2,402,648 66,917 3,503,868 10% 3% 3% 2% 18% 350,387 105,116 105,116 70,077 N.A 630,696 4,134,564
DESAGREGADO DE LOS COSTOS DE OyM DEL PIP POR TIPO DE Precio Privados - Alternativa nica (en nuevos soles) Bienes Nacionales 48% OPERACIN OyM MANTENIMIENTO TOTAL COSTO DIRECTO Factores de Correccin - Anexo SNIP 09 263,655 Bienes Nacionales 100% 56,400
OyM
DESAGREGADO DE LOS COSTOS DE OyM DEL PIP POR TIPO DE BIE Precio Sociales - Alternativa nica (en nuevos soles) Bienes Nacionales 0.85 OPERACIN MANTENIMIENTO 223,436.44 47,796.61 TOTAL COSTO DIRECTO Factores de Correccin - Anexo SNIP 09
Componentes
O DE LOS COSTOS DE OyM DEL PIP POR TIPO DE SERVICIO Precio Privados - Alternativa nica (en nuevos soles) Mano de Obra Calificada 34% 186,000 Mano de Obra Calificada 0% 0 Mano de Obra no calificada 19% 103,200 Mano de Obra no calificada 0% 0 56,400 609,255 Total 552,855
Total
552,855
LOS COSTOS DE OyM DEL PIP POR TIPO DE BIEN O SERVICIO Precio Sociales - Alternativa nica (en nuevos soles) Mano de Obra Calificada 0.91 169,090.91 0.00 Mano de Obra no calificada 0.63 65,016.00 0.00 457,543.35 47,796.61 505,339.96
Total
ECTO
N
1 2 3 4 5 6 7 8 9 10
Total
89,081 695,331 2,719,456 505,340 505,340 505,340 505,340 505,340 505,340 505,340
10% 5,001,913 147,306 33.96
Aos
Fase de Inversin del PIP (S/.) Fase de Inversin del PIP (%)
2011
105,116
2012
820,490
3%
20%
5103584 5103584
0.00
2013
3,208,958
Total
4,134,564 0
78%
100%
% de Variacin del VACS 10% 9% 8% 7% 6% 5% 0% -5% -6% -7% -8% -9% -10%
VAC 5,502,104 5,452,085 5,402,066 5,352,047 5,302,028 5,252,008 5,001,913 4,751,817 4,701,798 4,651,779 4,601,760 4,551,741 4,501,722
ICE S/. x Beneficiario 37.35 37.01 36.67 36.33 35.99 35.65 33.96 32.26 31.92 31.58 31.24 30.90 30.56
Indice (S/
37.35 37.01 38.00 36.67 36.33 37.00 35 36.00 35.00 34.00 33.00 32.00 31.00 30.00 29.00 10% 9% 8% 7% 6
33.96
32.26 31.92 31.58 31.24 30.90 30.56 0% -5% -6% -7% -8% -9% -10%
2010
TOTAL Nivel de Gobierno E: GOBIERNO NACIONAL Sector 03: CULTURA Pliego 003: M. DE CULTURA Fuente de Financiamiento 2: RECURSOS DIRECTAMENTE RECAUDADOS
2011
TOTAL Nivel de Gobierno E: GOBIERNO NACIONAL Sector 03: CULTURA Pliego 003: M. DE CULTURA Fuente de Financiamiento 2: RECURSOS DIRECTAMENTE RECAUDADOS
65,262,896,719 45,996,016,539 33,521,140 33,521,140 22,811,959 Ejecucin Devengado 5,433,332 6,762,686 10,615,941
13,580,045,980 10,085,525,160 36,348,633 23,021,843 11,205,130 Ejecucin Devengado 3,423,399 4,307,551 3,474,179
PIA
PIM
Compromiso
Ejecucin Devengado
124,621,364
PIA
PIM
Compromiso
84,079,584.00
111,509,679
n Girado Avance %
18.31
10.05
EVALUACIN DE IMPACTO AMBIENTAL Efecto Temporabilidad Permanente negativo Disminuciones / Caractersticas de los impactos Ninguno Positivo Transitorio Median o Largo Corto Local
mbito
Medio Fsico Natural Agua Suelo Aire Paisaje Medio Biolgico Flora Fauna Medio Social Bienestar Saludo de la Poblacion
x x x x x x x x x
NTAL
mbito
Regional
Todos
Organizacin de los equipos multidisciplinarios Trabajos Excavacin con fines de conservacin Registro con fines de conservacin Restauracin Otros.
Obras provisionales Trabajo preliminares Excavacin con fines de conservacin Registro con fines de conservacin Restauracin Otros. Obras provisionales Trabajo preliminares Excavacin con fines de conservacin Registro con fines de conservacin Restauracin Otros.
Asistente de Arqueologa
Asistente de restauracin
Obras provisionales Trabajo preliminares Excavacin con fines de conservacin Registro con fines de conservacin Restauracin Otros.
Topgrafo
Obras provisionales Trabajo preliminares Excavacin con fines de conservacin Registro con fines de conservacin Restauracin Otros.
Asistente de Topografa
Obras provisionales Trabajo preliminares Excavacin con fines de conservacin Registro con fines de conservacin Restauracin Otros.
Capataz
Comunero
Obras provisionales Trabajo preliminares Apoyo en excavacin con fines de conservacin Registro con fines de conservacin Restauracin Otros.
Asistente de Conservacin
Obras provisionales Trabajo preliminares Registro de conseracin Otros. Componente 2: INPLEMENTACIN DE CIRCUITO
Cargo
Participacin en Actividades
Capataz
Comunero
Trazo de ruta del recorrido Barandas Laterales Seales y Paneles Informativos Componente 3: DIFUSIN Y SENSIBILIZACIN Cargo Participacin en Actividades
Comunicador
Educador
Diseador Grfico
E FUNCIONES Funcin Elabora y coordina el diseo del proyecto de investigacin del proyecto arqueolgico; coordina la ejecucin del proyecto y/o proyectos; procesa la informacin procedente de los trabajos de campo y gabinete; elabora y coordina la formulacin del informe final; tiene la funcin de gestionar los recursos del Proyecto y conseguir los objetivos del mismo, dando cuenta del proceso de ejecucin de manera formal.ante el Ministerio de Cultura.
N DEL PROYECTO
Se encarga de los trabajos en el complejo arqueolgico de Hunuco Pampa; coordina las funciones con el equipo tcnico y realiza los informes parciales y final del proyecto de investigacin arqueolgica el cual contiene los trabajos de arqueologa y conservacin de los sectores y subsectores; coordina los trabajos de gabinete; supervisa el cumplimiento de las metodologas y estrategias de campo.
Responsable del registro escrito y digital de las evidencias arqueolgicas; del registro fotogrfico de los contextos, hallazgos y evidencias arqueolgicas; responsable de las metodologas y estrategias del trabajo de campo; responsable de los informes parciales de campo concernientes a las excavaciones y anexos. Otras funciones inherentes a su cargo.
Descripcin de las evidencias arqueolgicas; registro escrito y en digital de las evidencias arqueolgicas; dibujo de las mismas; asistencia en las labores de excavacin arqueolgica; otras funciones que conlleven a su responsabilidad.
Responsable del registro escrito y en digital del proyecto arqueolgico; registro grfico de los sectores y subsectores del complejo arqueolgico; presentar informes parciales de los avances al equipo tcnico; trabajos de gabinete; otras funciones que conlleven a sus funciones.
Coordina los trabajos de gabinete; supervisa el desarrollo de las actividades del personal de gabinete; supervisa el cumplimiento de las metodologas y estratgias del trabajo de gabinete; compila y ordena el material y la informacin procedente de los trabajos de campo en formatos digitales; responsable de los materiales en gabinete; responsable de los informes parciales de los trabajos asiganados en gabinete; otras funciones inherentes a su cargo.
Levantamiento planimtrico y topogrfico de las zonas arqueolgicas; responsable del plano planimtrico y topogrfico de las zonas arqueolgicas y adyacentes; digitalizacin de la informacin levantada en campo; levantamiento de cortes y elevaciones de las edificaciones de la zona arqueolgica; apoyo en otras actividades afines a su cargo.
Asistencia en las actividades de levantamiento planimtrico y topogrfico de las zonas arqueolgicas y anexas; dibujo de estructuras arquitectnicas; digitalizacin de la informacin grfica levantada en campo; registro topogrfico de las arquitecturas arqueolgicas; registro fotogrfico de la arquitectura arqueolgica; otras funciones asiganadas a su cargo.
Persona encargada de coordinar con el equipo tcnico del proyecto y de organizar las cuadrillas de obreros (comuneros); encargado de realizar informes semanales con resultados de la obra; asistir al equipo tcnico en funciones de excavacin y de dirigir las obras de rigor; otras funciones de apoyo inherentes a su cargo.
Persona encargada de los trabajos de rigor tanto en campo como en gabinete; debe asistir y coordinar con el capataz as como con el equipo tcnico sobre los trabajos en campo; otras funciones inherentes a su cargo.
Coordina los trabajos de diagnstico de conservacin del sitio; identifica y registra los datos del estado de conservacin del sitio; evala y plantea propuestas de conservacin para la zona arqueolgica; responsable del informes parciales del diagnstico de conservacin y de la informacin asociada; responsable del informe de diagnstico de las condiciones de conservacin de la zona arqueolgica con sus respectivas propuestas de intervencin; otras funciones a su cargo.
Apoyo en la labores de identificacin y registro de los datos del estado de conservacin del sitio; registro escrito, grfico y digital del estado de conservacin del sitio; otras funciones inherentes a su cargo.
Persona encargada de coordinar con el equipo tcnico del proyecto y de organizar las cuadrillas de obreros (comuneros); encargado de realizar informes semanales con resultados de la obra; asistir al equipo tcnico en funciones de excavacin y de dirigir las obras de rigor; otras funciones de apoyo inherentes a su cargo. Persona encargada de los trabajos de rigor tanto en campo como en gabinete; debe asistir y coordinar con el capataz as como con el equipo tcnico sobre los trabajos en campo; otras funciones inherentes a su cargo.
IN Y SENSIBILIZACIN Funcin Encargado de los trabajos informativos en los medios de comunicacin de la zona de La Unin - Hunuco; concertar con las instituciones educativas y pedaggicas sobre la difusin del patrimonio arqueolgico; otras funciones a su cargo.
Coordinar con el equipo tcnico del proyecto; realizar talleres informativos; concertar con las instituciones educativas y pedaggicas sobre la difusin del patrimonio cultural; presentar informes parciales; elaborar actividades cosntumbristas de integracin e identidad cultural: danzas, msica, platos tpicos, educacin laboral (tejidos en oveja y otros), etc; otras funciones de apoyo asignadas a su cargo.
Encargado de realizar la difusin del proyecto de Investigacin de Hunuco Pampa en digital e impreso para las campaas de promocin; adems de los trabajos de gabinete para el complejo arqueolgico; presentar informes parciales y final de los trabajos de promocin y difusin.
Jul-11
Aug-11
A2
A3
01.00.00
01.01.00
OBRAS PROVISIONALES
01.02.00 01.03.00
TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION
01.04.00
01.05.00
RESTAURACIN
01.06.00 02.00.00
OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM
02.01.00
02.02.00
BARANDAS LATERALES
03.02.00
EVENTOS INFORMATIVOS
151 de 161
2012 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13
2013 Jun-13
A2
A3
01.00.00
01.01.00
OBRAS PROVISIONALES
01.02.00 01.03.00
TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION
01.04.00
01.05.00
RESTAURACIN
01.06.00 02.00.00
OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM
02.01.00
02.02.00
BARANDAS LATERALES
03.02.00
EVENTOS INFORMATIVOS
152 de 161
Metas Estudio Definitivo Contratado Estudio definitivo entregado Estudio definitivo aprobado
Recurso
1 coordinador 1 coordinador
A2
1 coordinador
A3
01.00.00
01.01.00
OBRAS PROVISIONALES
Obras entregadas trabajos terminados Excabacin concluida Registro concluido Restauracin concluida
Jefe de Campo (Arquelogo) Jefe de Campo (Arquelogo) Jefe de Campo (Arquelogo) Jefe de Campo (Arquelogo) Jefe de Campo (Arquelogo)
Nmero de personal = 2 Nmero de personal = 2 Nmero de personal = 10 Nmero de personal = 10 Nmero de personal = 10 Nmero de personal = 5
01.02.00 01.03.00
TRABAJOS PRELIMINARES EXCAVACIN CON FINES DE CONSERVACION REGISTRO CON FINES DE CONSERVACION
01.04.00
01.05.00
RESTAURACIN
01.06.00 02.00.00
OTROS INPLEMENTACIN DE CIRCUITO INSTALACIN DE CELDA DRENANTE ANDEX 52CD ESPESOR: 52MM
02.01.00
Jefe de Campo Celda Drenante (Arquelogo) Instalada Barras Laterales Instaladas Sealitica Instalada Jefe de Campo (Arquelogo) Jefe de Campo (Arquelogo)
02.02.00
BARANDAS LATERALES
03.02.00
EVENTOS INFORMATIVOS
153 de 161
0 Inicio 0
0 0
1 A1 = 2 1
1 1
2 A2 = 3 2
4 4
5 A3 = 2 5
6 6
19 22 03.01.00 = 4 23 26
23 26 03.02.00 = 4 27 30
31 FIN 31
31 31
7 30 01.06.00 = 24 7 30
Objetivos Jerarquias
Fin(es)
Indicadores Costos
Nombre Formula de clculo Unidad de medida Mtodo de recopilacin Basal Meta Tiempo Fuentes de Informacin Cmo recopilo? Qu nivel de desagregaci? Qe unidad de medida?
Narrativo
Resumen narrativo
Responsable
Frecuencia
Aplicacin
Formato
Circulacin
Redaccin
Cantidad
OE y/o OD
FIN CONSERVACIN DE LA IDENTIDAD CULTURAL DE LOS POBLADORES DE LA ZONA DE INFLUENCIA DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA.
0%
100%
20 aos
Encuesta
A nivel de Provincia
Individuo
Programa Qhapaq an
Muestreo
Cada 2 aos
Lo usara la Alta direccin del Ministerio de Cultura como fuente de referencia para el Diseo de la Poltica Cultural del pas.
Se distribuira por El 80% de los pobladores de la Informe Fsico + versin digital medio del Sistema de Regin permaneceran en la del mismo (pdf) Trmite Documentario misma en los proximos 20 Institucional aos
80%
20 aos
Proposito(s)
Narativo
Costo Total
PU.
OBJETIVO CENTRAL PUESTA EN VALOR DEL PATRIMONIO HISTORICO - CULTURAL DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA SECTOR III
S/. 5,103,584.46
Cuenta de Visitantes
Num
220,173
10 aos
Fuente Primaria Sistema de control de visitas del Centro Arqueolgico Huanuco Pampa
Visitante
Programa Qhapaq an
Conteo
El conteo de las visitas debera ser una El Centro Arqueolgico se Lo usara el responsable de la UE Se distribuira por actividad Informe Fsico + versin digital integrara al 100% con los Programa Qhapaq an, para medio del Sistema de rutinaria(diaria), pero del mismo (Mas Word + Ms servicios que brindan los medir el impacto de su inversin, Trmite Documentario el informe ser Excel) operadores tursticos en la evaluacin expost. Institucional remitido Regin al ao 5 de operacin mensualmente
100%
habra integracin con los servicios que brindan los operadores tursticos en la Regin
5 aos
Componentes
Narativo
Costos
C1
S/. 1,081,960.71
Ejecucin Fisica
Ejecutado / Planeado
0%
100%
2 aos
Inspeccin de campo
Componente 1
Programa Qhapaq an
Mensual
Lo usara el Director del Proyecto La integracin de las para gestionar la Ejecucin del Informe Fsico firmado por el Se distribuira por actividades a su respectivo Mismo, asi como para poder supervisor responsable y medio del Sistema de componente ser al 100%, es responder los diversos ratificado por el jefe de proyecto Trmite Documentario decir, de acuerdo a lo requerimientos informacin de la + Informe digital (pdf) Institucional planeado al ao 2 de la fase de UE a quien reporta inversin
100%
2 aos
C2
INPLEMENTACIN DE CIRCUITO
S/. 2,513,354.18
Ejecucin Fisica
Ejecutado / Planeado
0%
100%
2 aos
Inspeccin de campo
Componente 2
Programa Qhapaq an
Mensual
Lo usara el Director del Proyecto La integracin de las para gestionar la Ejecucin del Informe Fsico firmado por el Se distribuira por actividades a su respectivo Mismo, asi como para poder supervisor responsable y medio del Sistema de componente ser al 100%, es responder los diversos ratificado por el jefe de proyecto Trmite Documentario decir, de acuerdo a lo requerimientos informacin de la + Informe digital (pdf) Institucional planeado al ao 2 de la fase de UE a quien reporta inversin
100%
2 aos
C3
DIFUSIN Y SENSIBILIZACIN
S/. 70,000.00
Ejecucin Fisica
Ejecutado / Planeado
0%
100%
2 aos
Inspeccin de campo
Componente 3
Programa Qhapaq an
Mensual
Lo usara el Director del Proyecto La integracin de las para gestionar la Ejecucin del Informe Fsico firmado por el Se distribuira por actividades a su respectivo Mismo, asi como para poder supervisor responsable y medio del Sistema de componente ser al 100%, es responder los diversos ratificado por el jefe de proyecto Trmite Documentario decir, de acuerdo a lo requerimientos informacin de la + Informe digital (pdf) Institucional planeado al ao 2 de la fase de UE a quien reporta inversin
100%
2 aos
CD CI Actividades
A 1.1
OBRAS PROVISIONALES
S/. 262,110.72
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 1.2
TRABAJOS PRELIMINARES
S/. 11,661.98
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 1.3
S/. 49,597.05
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A.1.4
S/. 242,749.25
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 1.5
RESTAURACIN
S/. 258,985.00
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 1.6
OTROS
S/. 256,856.70
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 2.1
S/. 2,393,354.18
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 2.2
BARANDAS LATERALES
S/. 50,000.00
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 2.3
S/. 70,000.00
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 3.1
MATERIAL EDUCATIVO
S/. 20,000.00
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
A 3.2
EVENTOS INFORMATIVOS
S/. 50,000.00
Ejecucin Presupuestal
0%
100%
Fuente Primaria Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
Actividad
S/.
Programa Qhapaq an
Semanal
Lo usara el Director del Proyecto para gestionar el adecuado Informe Fsico firmado por el Se distribuira por Se tendr los recursos cumplimiento de los componentes responsable de llevar las medio del Sistema de disponibles al 100% la primera del proyecto asi como para poder finanzas del PIP y ratificado por Trmite Documentario semana de cada mes, segn lo responder los diversos el jefe de proyecto + Informe Institucional planeado. requerimientos informacin de la digital (pdf) UE a quien reporta
100%
GASTOS GENERALES (10%*CD) ESTUDIO DEFINITIVO (3%*CD) SUPERVISIN (3%*CD) IMPREVISTOS (2%*CD) IMPUESTO (IGV = 18%*(CD+C4+C5+C6+C7))
10% 3% 3% 2% 18%
S/. 366,531.49 S/. 109,959.45 S/. 109,959.45 S/. 73,306.30 S/. 778,512.88
MATRIZ DE MARCO LGICO TRADICIONAL Objetivo FIN CONSERVACIN DE LA IDENTIDAD CULTURAL DE LOS POBLADORES DE LA ZONA DE INFLUENCIA DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA.
Proposito:
Fin:
OBJETIVO CENTRAL PUESTA EN VALOR DEL PATRIMONIO HISTORICO CULTURAL DEL COMPLEJO ARQUEOLOGICO DE HUNUCO PAMPA SECTOR III
Actividad Actividad Actividad Actividad Componentes Componentes Componentes 1.4: 1.3: 1.2: 1.1: 3: 2: 1:
INPLEMENTACIN DE CIRCUITO
DIFUSIN Y SENSIBILIZACIN
OBRAS PROVISIONALES
TRABAJOS PRELIMINARES
Actividad Actividad Actividad Actividad Actividad Actividad Actividad 3.3: 3.2: 3.1: 2.2: 2.1: 1.6: 1.5:
RESTAURACIN
OTROS
BARANDAS LATERALES
MATERIAL EDUCATIVO
EVENTOS INFORMATIVOS
MATRIZ DE MARCO LGICO TRADICIONAL Indicador Conocmiento de la Cultura Regaional = # Pers. Conoce / # Pers. NO Conoce, Meta = 100%, en 20 aos Medios de Verificacin Informacin primaria recoelctada por medio de una encuesta a cargo del Programa Qhapaq an
# Visitantes Anuales al Complejo Arqueolgico - Sector III, en el ao Sistema de control de visitas del Centro 10 de operacin del PIP se Arqueolgico Huanuco Pampa alcanzaran los 220,173 visitantes
Informes de Supervisin
Informes de Supervisin
Informes de Supervisin
S/. 309,290.65
Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
S/. 13,761.14
S/. 58,524.52
S/. 286,444.12
S/. 305,602.30
Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF Informes Financieros del PIP y complementado con el Sistema de Transparencia Econmica - MEF
S/. 303,090.91
S/. 2,824,157.93
S/. 59,000.00
S/. 82,600.00
S/. 23,600.00
S/. 59,000.00
S/. 0.00
Supuestos El 80% de los pobladores de la Regin permaneceran en la misma en los proximos 20 aos
El Centro Arqueolgico se integrara al 100% con los servicios que brindan los operadores tursticos en la Regin al ao 5 de operacin
La integracin de las actividades a su respectivo componente ser al 100%, es decir, de acuerdo a lo planeado al ao 2 de la fase de inversin La integracin de las actividades a su respectivo componente ser al 100%, es decir, de acuerdo a lo planeado al ao 2 de la fase de inversin La integracin de las actividades a su respectivo componente ser al 100%, es decir, de acuerdo a lo planeado al ao 2 de la fase de inversin Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado.
Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado. Se tendr los recursos disponibles al 100% la primera semana de cada mes, segn lo planeado.