CSIDC/MKD/TECH/2013-14/31 Technical Particulars For Galvanized Steel Pipes & Tubes TSC 18-07-2013

Schedule 1 : ISI Marked Galvanized Steel Tubes screwed, one end (ISI Marked ) socketed other end protected with plastic thread protector. Specification: ISI` marked to IS 1239 (Part1)/2004 with up-to-date amendments in random lengths of 4 to 7 meters, screwed at both ends as per IS.554:1999 with up-to-date amendments (ISI marked) socketed at one end & other end protected with plastic protector. Class 1.Light 2.Light 3.Light 4.Light 5.Light 6.Light 7.Light 8.Light 9.Light 10.Medium 11.Medium 12.Medium 13.Medium 14.Medium 15.Medium 16.Medium 17.Medium 18.Medium 19.Medium 20.Medium 21.Heavy 22.Heavy 23.Heavy 24.Heavy 25.Heavy 26.Heavy 27.Heavy 28.Heavy 29.Heavy 30.Heavy 31.Heavy Nominal Bore Size (mm) 15 20 25 32 40 50 65 80 100 15 20 25 32 40 50 65 80 100 125 150 15 20 25 32 40 50 65 80 100 125 150

Schedule 2 : ISI Marked Galvanized Steel Tubes screwed, one end (ISI makred) socketed, other end protected with plastic thread protector. Specification: ISI` marked to IS 1239(Part1)/2004 with upto date amendments in lengths of 6 meters, screwed at both ends as per IS.554:1999 with upto date amendments (ISI Marked) socketed at one end & other end protected with plastic protector.

1/5

Class Nominal Bore Size (mm) 1.Light 15 2.Light 20 3.Light 25 4.Light 32 5.Light 40 6.Light 50 7.Light 65 8.Light 80 9.Light 100 10.Medium 15 11.Medium 20 12.Medium 25 13.Medium 32 14.Medium 40 15.Medium 50 16.Medium 65 17.Medium 80 18.Medium 100 19.Medium 125 20.Medium 150 21.Heavy 15 22.Heavy 20 23.Heavy 25 24.Heavy 32 25.Heavy 40 26.Heavy 50 27.Heavy 65 28.Heavy 80 29.Heavy 100 30.Heavy 125 31.Heavy 150 Schedule 3 : ISI Marked Galvanized Steel Tubes both ends plain. (ERW/HFW/HFIW) Specification: ISI` marked to IS 1239(Part-1):2004 with up-to-date amendments in random lengths of 4 to 7 meters, with plain ends. Class Nominal Bore size (mm) 1.Light 15 2.Light 20 3.Light 25 4.Light 32 5.Light 40 6.Light 50 7.Light 65 8.Light 80 9.Light 100 10.Medium 15 11.Medium 20 12.Medium 25 13.Medium 32 14.Medium 40 15.Medium 50 16.Medium 65 17.Medium 80 2/5

18.Medium 100 19.Medium 125 20.Medium 150 21.Heavy 15 22.Heavy 20 23.Heavy 25 24.Heavy 32 25.Heavy 40 26.Heavy 50 27.Heavy 65 28.Heavy 80 29.Heavy 100 30.Heavy 125 31.Heavy 150 Schedule 4 : ISI Marked Galvanized Steel Tubes both ends plain. (ERW/HFW/HFIW) Specification: ISI` marked to IS 1239(Part-1): 2004 with up-to-date amendments in lengths of 6 meters, with plain ends. Class Nominal Bore size (mm) 1.Light 15 2.Light 20 3.Light 25 4.Light 32 5.Light 40 6.Light 50 7.Light 65 8.Light 80 9.Light 100 10.Medium 15 11.Medium 20 12.Medium 25 13.Medium 32 14.Medium 40 15.Medium 50 16.Medium 65 17.Medium 80 18.Medium 100 19.Medium 125 20.Medium 150 21.Heavy 15 22.Heavy 20 23.Heavy 25 24.Heavy 32 25.Heavy 40 26.Heavy 50 27.Heavy 65 28.Heavy 80 29.Heavy 100 30.Heavy 125 31.Heavy 150

3/5

Schedule 5 : ISI Marked Galvanized Steel Tubes - 3 M Cut length (ERW/HFW/HFIW) Specification: ISI` marked to IS 1239(Part1):2004 with up-to-date amendments in lengths of 3 meters, screwed at both ends as per IS.554:1999 with up-to-date amendments, and ISI Marked socketed as per IS 1239 (Part 2)/1992 reaffirmed 2002, with-up-to date amendments at one end & other end protected with plastic protector.

Class 1. 2. 3. 4 5. 6. Medium Medium Medium Heavy Heavy Heavy

Nominal bore size (mm) 32 50 65 32 50 65

NOTE TO TENDERERS:1. Tenderers shall clearly indicate the process of manufacturing i.e. welded ERW/HFIW/HFW in their offer as per cl. 6.3 of IS 1239 (Part1)/2004 both for tubes & socket. Copy of valid BIS license should be enclosed along with the tender. Tolerance in the weight of Steel Tube (Galvanized) shall be as per clause-9 of IS: 1239 (Part-1)/2004 with up-to-date amendments. The supplier shall offer the stores in bundles duly weighed with a packing list indicating the nos. and length of pipes included in each bundle. The bundle weight shall be approx one ton. The weight shall be cross checked at the time of inspection by the inspecting officer and on receipt by the consignee. The stores shall be ( pre- dispatch) Inspected by the approved Technical Agency. The tenderer should enclose valid BIS license to IS 1239/(Part I)/2004 and IS:1239/ (Part-2)/1992 with up-to-date amendments .

2. 3.

4.

5. 6.

4/5

PRICE VARIATION CLAUSE:


The tenderer shall quote firm and fixed prices except for Price Variation Clause as indicated below:1) The prices are based on The prices of Steel and Zinc as under:(a) BASE PRICE OF H.R. COIL: Prices shall be based on average SAIL e- works prices of H.R. Coil for 1- H.R. Coil For 2mm @ Rs. 35580.00 PMT

23-

H.R. Coil For H.R. Coil For

2.5mm and @ Rs. 35380.00 PMT 2.5mm to 10 mm @ Rs. 35080.00 PMT

(for various sizes and quality of GI Pipe as per BIS@ PMT respectively Exclusive of Excise Duty and Sales Tax/ VAT. This is based on SAIL Circular No. CSIDC/RMD-BHI/SAIL-CORRS/2013-14/268 dt 12.07.2013. b) BASE PRICE OF ZINC:The rates are based on the price of Special High Grade Zinc, of Hindustan Zinc, Ltd. For CHANDRIA smelter Chanderia i.e. Rs. 138,700/- PMT EXCLUSIVE OF ED and Sales Tax vide circular dated 15.07.2013 The price variation will be allowed only at every increase or decrease in the raw material price of HR. Coil and Zinc of Rs.500/- or more PMT. No variation will be carried out for variation less than Rs.500/PMT.A/Ls to the R/C. regarding price variation of Zinc shall be issued not earlier than once in a quarter (3 months) taking into account all the increase (s)/ decrease (s) during the period. 3) The price variation clause shall continue to operate even after the expiry of the validity period of the rate contract, till the date of delivery agreed to between the indentors and suppliers. 4) In the event of variation in SAIL prices of HR Coil and M/s HZL Ex-smelter prices of zinc on which the quotation is based, an adjustment in the contract price will be regulated with reference to the date of tendering for inspection of stores and will be applicable only to the stores tendered for inspection on or after 30 days from the date of variation in the prices of steel (HR Coil) and Zinc are made effective and will be applicable for stores/ quantitiessupplied within original fixed delivery period which fall in or after 30 days from the effective date of variation. The price variation will be applicable on the finished weight of pipe. 5) The variation will be applicable to the material weight of manufactured pipes as given in the schedule in the ratio of 1:0.96 i.e.960 kgs of H.R. Coil is required for each M/T of finished G.I. Pipes. In respect of Zinc the tube prices will be adjusted on the basis of consumption of 40 kgs of Zinc being required for galvanizing one metric tonne of black tube i.e. quantity variation of 1:0:04. (6) Increase /decrease claimed in the prices of pipes resulting from change in total prices of steel and Zinc on account of revision notified by SAIL and M/s HZL than those mentioned above will be supported by a copy of SAIL and HZL notification. Revision claim on count of any decrease/ Increase in the total cost of steel and Zinc resulting from statutory orders will be justified with reference to the relevant notification. The rate contract holding firm shall submit price variation claim as and when there is any change in the SAIL and HZLs ex-smelter prices duly supported by the documentary evidence along with details calculations for consideration of the purchaser. SPECIAL NOTE: A) Any variation in the amount of MODVAT due to variation in price of R/C on account of change in the rate of excise duty shall be passed on to purchaser. b) The prices thus revised will declared firm and final for respective periods on request of the R/C holding firms. Such request should accompany with fall clause certificate and raw material certificate duly signed and stamped from authorized Charted Accountant clearly indicating date(s)/ Periods in the certificate for which prices are required to declared firm and final. c) The above PVC is being allowed taking raw material used is H.R. Coil. The firms shall use the H.R. Coil only for manufacturing the goods and SKELP shall not be used in any case. A necessary certificate in this regard shall be given by the firms to the QA Officer while tendering the stores for inspection. In the SAILand HZLs Ex-smelter prices duly supported by the documentary evidence along with details calculations.

Recommended by Technical Specification Committee Dated 18-07-2013