Professional Documents
Culture Documents
No. KOMPONEN
Pekerjaan Timbunan
UNIT
KUANTITAS
Jam
Jam
0.005
0.02
HARGA SATUAN
JUMLAH (Rp)
(Rp)
A
1
2
TENAGA KERJA
Mandor
Pekerja
BAHAN
-
C
1
2
3
4
5
D
E
F
PERALATAN
Bulldozer
Jam
0.005
400000
Wheel Loader
Jam
0.0068
300000
Dump Truck
Jam
0.0133
300000
Water Tank T.
Jam
0.01
150000
Tandom Roller
Jam
0.0044
450000
JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
OVER HEAD DAN PROFIT (10%XD)
HARGA SATUAN (D + E)
10587.5
8318.75
52.9375
166.375
2000.000
2040.00
3990.000
1500.000
1980.000
11729.313
1172.931
12902.2438
No. KOMPONEN
UNIT
KUANTITAS
HARGA SATUAN
JUMLAH (Rp)
(Rp)
A
1
2
TENAGA KERJA
Mandor
Pekerja
Jam
Jam
0.0058
0.0235
10587.5
8318.75
61.4075
195.490625
B
1
BAHAN
Sirtu
m3
1.09
191773.34
209032.94
C
1
2
3
4
5
D
E
F
PERALATAN
Dump Truck
Jam
0.0133
300000
Motor Grader
Jam
0.0058
400000
Water Tank T.
Jam
0.048
150000
Tandom Roller
Jam
0.0044
450000
Wheel Loader
Jam
0.0068
300000
JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
OVER HEAD DAN PROFIT (10%XD)
HARGA SATUAN (D + E)
Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
fine agregat
191773.34
3990.000
2320.000
7200.00
1980.000
2040.00
226819.839
22681.984
249501.8226
Uraian Pekerjaan
No. KOMPONEN
UNIT
KUANTITAS
HARGA
JUMLAH (Rp)
SATUAN (Rp)
A
1
2
TENAGA KERJA
Mandor
Pekerja
Jam
Jam
0.00952
0.038
10587.5
8318.75
100.793
316.113
B
1
2
BAHAN
Agregat Kasar
Agregat Halus
m3
m3
0.704
0.396
379323.34
191773.34
267043.631
75942.243
C
1
2
3
PERALATAN
Dump Truck
Jam
0.0133
300000
Motor Grader
Jam
0.009
400000
Water Tank T.
Jam
0.048
150000
4 Tandom Roller
Jam
0.005
450000
5 Wheel Loader
Jam
0.0068
300000
D JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
E OVER HEAD DAN PROFIT (10%XD)
F HARGA SATUAN (D + E)
Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
course agregat 379323.34
fine agregat
191773.34
3990.000
3600.000
7200.000
2250.000
2040.000
362482.780
36248.278
398731.0575
Uraian Pekerjaan
No. KOMPONEN
UNIT
KUANTITAS
HARGA
JUMLAH (Rp)
SATUAN (Rp)
A
1
2
TENAGA KERJA
Mandor
Pekerja
Jam
Jam
0.0033
0.013
B
1
2
3
4
BAHAN
Course Agregat
Fine Agregat
Filler (traksi)
Aspal
m3
m3
m3
m3
0.6875
0.5246
0.12
0.1654
C
1
2
3
4
5
6
7
D
E
F
PERALATAN
Asphalt Finisher
Jam
0.00667
900000
Pneumatic T.R.
Jam
0.00308
500000
Dump Truck
Jam
0.0133
300000
Water Tank T.
Jam
0.048
150000
Tandom Roller
Jam
0.00606
450000
Wheel Loader
Jam
0.00689
300000
AMP
Jam
0.0033
1500000
JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
OVER HEAD DAN PROFIT (10%XD)
HARGA SATUAN (D + E)
Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
course agregat
379323.34
fine agregat
191773.34
filler
457973.34
Aspal
8645.64
10587.5
8318.75
34.93875
108.144
379323.34
260784.796
191773.34
100604.294
457973.34
54956.8
8645.64 1429.989
6003.000
1540.000
3990.000
7200.000
2727.000
2067.00
4950.000
446395.963
44639.596
491035.559
Uraian Pekerjaan
No. KOMPONEN
UNIT
KUANTITAS
HARGA
JUMLAH (Rp)
SATUAN (Rp)
A
1
2
TENAGA KERJA
Mandor
Pekerja
Jam
Jam
0.1818
0.1818
10587.5
8318.75
1924.8075
1512.34875
B
1
2
BAHAN
Aspal
Minyak Tanah
kg
Liter
1.323
0.484
8645.64
6565.64
11438.182
3177.77
C
1
PERALATAN
asphalt sprayer
Jam
0.6071
150000
91065.00
D
E
F
Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
Aspal
8645.64
minyak tanah
6565.64
109118.108
10911.811
120029.919
84700
66550