Uraian Pekerjaan

No. KOMPONEN

Pekerjaan Timbunan

UNIT

KUANTITAS

Jam
Jam

0.005
0.02

HARGA SATUAN
JUMLAH (Rp)
(Rp)

A
1
2

TENAGA KERJA
Mandor
Pekerja

BAHAN
-

C
1
2
3
4
5
D
E
F

PERALATAN
Bulldozer
Jam
0.005
400000
Wheel Loader
Jam
0.0068
300000
Dump Truck
Jam
0.0133
300000
Water Tank T.
Jam
0.01
150000
Tandom Roller
Jam
0.0044
450000
JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
OVER HEAD DAN PROFIT (10%XD)
HARGA SATUAN (D + E)

10587.5
8318.75

52.9375
166.375

2000.000
2040.00
3990.000
1500.000
1980.000
11729.313
1172.931
12902.2438

ANALISA HARGA PEKERJAAN BADAN JALAN PER M3


Uraian Pekerjaan
:
Pekerjaan Lapis Pondasi Bawah

No. KOMPONEN

UNIT

KUANTITAS

HARGA SATUAN
JUMLAH (Rp)
(Rp)

A
1
2

TENAGA KERJA
Mandor
Pekerja

Jam
Jam

0.0058
0.0235

10587.5
8318.75

61.4075
195.490625

B
1

BAHAN
Sirtu

m3

1.09

191773.34

209032.94

C
1
2
3
4
5
D
E
F

PERALATAN
Dump Truck
Jam
0.0133
300000
Motor Grader
Jam
0.0058
400000
Water Tank T.
Jam
0.048
150000
Tandom Roller
Jam
0.0044
450000
Wheel Loader
Jam
0.0068
300000
JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
OVER HEAD DAN PROFIT (10%XD)
HARGA SATUAN (D + E)

Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
fine agregat
191773.34

3990.000
2320.000
7200.00
1980.000
2040.00
226819.839
22681.984
249501.8226

Satuan harga/ jam hari kerja


10587.5
8318.75

Uraian Pekerjaan

No. KOMPONEN

Pekerjaan Lapis Pondasi Atas

UNIT

KUANTITAS

HARGA
JUMLAH (Rp)
SATUAN (Rp)

A
1
2

TENAGA KERJA
Mandor
Pekerja

Jam
Jam

0.00952
0.038

10587.5
8318.75

100.793
316.113

B
1
2

BAHAN
Agregat Kasar
Agregat Halus

m3
m3

0.704
0.396

379323.34
191773.34

267043.631
75942.243

C
1
2
3

PERALATAN
Dump Truck
Jam
0.0133
300000
Motor Grader
Jam
0.009
400000
Water Tank T.
Jam
0.048
150000
4 Tandom Roller
Jam
0.005
450000
5 Wheel Loader
Jam
0.0068
300000
D JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
E OVER HEAD DAN PROFIT (10%XD)
F HARGA SATUAN (D + E)

Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
course agregat 379323.34
fine agregat
191773.34

3990.000
3600.000
7200.000
2250.000
2040.000
362482.780
36248.278
398731.0575

Satuan harga/ jam hari kerja


10587.5
8318.75

Uraian Pekerjaan

No. KOMPONEN

Pekerjaan Lapis Permukaan

UNIT

KUANTITAS

HARGA
JUMLAH (Rp)
SATUAN (Rp)

A
1
2

TENAGA KERJA
Mandor
Pekerja

Jam
Jam

0.0033
0.013

B
1
2
3
4

BAHAN
Course Agregat
Fine Agregat
Filler (traksi)
Aspal

m3
m3
m3
m3

0.6875
0.5246
0.12
0.1654

C
1
2
3
4
5
6
7
D
E
F

PERALATAN
Asphalt Finisher
Jam
0.00667
900000
Pneumatic T.R.
Jam
0.00308
500000
Dump Truck
Jam
0.0133
300000
Water Tank T.
Jam
0.048
150000
Tandom Roller
Jam
0.00606
450000
Wheel Loader
Jam
0.00689
300000
AMP
Jam
0.0033
1500000
JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN
OVER HEAD DAN PROFIT (10%XD)
HARGA SATUAN (D + E)

Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
course agregat
379323.34
fine agregat
191773.34
filler
457973.34
Aspal
8645.64

10587.5
8318.75

34.93875
108.144

379323.34
260784.796
191773.34
100604.294
457973.34
54956.8
8645.64 1429.989

6003.000
1540.000
3990.000
7200.000
2727.000
2067.00
4950.000
446395.963
44639.596
491035.559

Satuan harga/ jam hari kerja


10587.5
8318.75

Uraian Pekerjaan

No. KOMPONEN

Pekerjaan Prime Coat

UNIT

KUANTITAS

HARGA
JUMLAH (Rp)
SATUAN (Rp)

A
1
2

TENAGA KERJA
Mandor
Pekerja

Jam
Jam

0.1818
0.1818

10587.5
8318.75

1924.8075
1512.34875

B
1
2

BAHAN
Aspal
Minyak Tanah

kg
Liter

1.323
0.484

8645.64
6565.64

11438.182
3177.77

C
1

PERALATAN
asphalt sprayer

Jam

0.6071

150000

91065.00

D
E
F

JUMLAH HARGA TENAGA KERJA, BAHAN, PERALATAN


OVER HEAD DAN PROFIT (10%XD)
HARGA SATUAN (D + E)

Asumsi
Satuan harga/ hari kerja
Mandor
84700
pekerja
66550
Asumsi
Satuan harga/ m3
Aspal
8645.64
minyak tanah
6565.64

109118.108
10911.811
120029.919

Satuan harga/ jam hari kerja


10587.5
8318.75

84700
66550