Process Puzzler: Restore Reboiler Reliability


Readers recommend ways to keep a thermosiphon operating properly

THIS MONTH'S PUZZLER We're having trouble with the vertical thermosiphon reboiler of the debutanizer column of our fluid catalytic cracker (FCC). The heating medium is the fractionation column bottoms, which arrive at the reboiler shell at a nominal 297F, following cooling from 682F in a steam-generating kettle reboiler at the discharge of the fractionation bottoms pump. During startup and shutdown, the discharge from the bottoms pump briefly spikes to 700715F. Last year, we abandoned in-place a corroded debutanizer kettle reboiler and have had problems ever since with the thermosiphon. We pull its tube bundle every 812 weeks to clean the fouling inside the tubes; now, we're having trouble pulling the bundle. The fractionation column bottoms pump, which was upgraded with a larger impeller and motor at the same time the kettle reboiler was abandoned, is seeing a drop in head, running loud and tripping vibration alarms. What's going on here? What can we do to improve the cycle time of the FCC? CHECK THREE ASPECTS Here are a few things to consider and investigate: 1. In reference to the exchanger you abandoned in-place for the new thermosiphon reboiler, was a hydraulic analysis conducted to validate if the location of the new thermosiphon exchanger and its associated piping and fittings support natural circulation of the tube-side fluid? There may be some hydraulic impacts that could cause an unstable thermosiphon operation. In addition, make sure the liquid level in the column sump is relatively constant to avoid cycling the thermosiphon due to a hydraulic imbalance caused by density differences and percent vaporization. 2. In reference to the fouling you are experiencing, what is the temperature difference between the two fluids in the thermosiphon? Normally, debutanizer column bottoms boil at 250260F at ~ 66 psig. What pressure does the debutanizer column operate at? The lower the pressure in the column bottoms, the lower the boiling point will be, of course. As a result, based on the heating medium you are using at 297F, the mean temperature difference will be higher and could cause a rapid boiling through the tubes. Gums and heavytype residue could polymerize from rapid boiling, which would prematurely foul the exchanger. If you're experiencing high spikes in the fractionation column bottoms temperature during transient operations, startups/shutdowns, then the temperature differences between the two fluids in the thermosiphon could result in rapid boiling, potentially facilitating polymerization in the tubes. 3. What are the constituents in the fractionation column bottoms used as the heating medium for the vertical thermosiphon? If there are heavies that, when cooled, can plate out in the shell, this could cause high shellside fouling, making the tube bundle difficult to remove. Consider a heating medium that's more consistent in temperature and is clean when cooled, i.e., low pressure (LP) steam. LP steam isn't normally subjected to spikes and could reduce fouling due to reduced temperature differences compared to the debutanizer bottoms boiling point temperature. This may require a new thermosiphon design due to condensing steam, because the heat transfer condensing coefficient for the steam will be higher than that of the fractionation bottoms stream if there's no phase change. If you're fouling on the shell side, this will impact your pump performance as well. Eric Roy, principal engineer Westlake Chemical Corp., Sulfur, La.

BLAME HIGH TEMPERATURE Clearly, the fouling is occurring on both sides of the thermosiphon reboiler. For the reboiler shell, the source of the fouling is the FCC reactor beds; for the tube-side, the fouling probably is the polymerization of the C5+ olefins. As the fouling inside the tubes continues, the heat transfer coefficients drop, temperature profiles become less uniform, and polymers are converted to coke and varnish that are difficult to remove. The reboiler shell fouling is a witch's brew of catalyst fines (carryover), coke particles and polymerized olefins. Take samples from tubes and shell and clean both next time. What are the root causes of this poor cycle time? Perhaps the catalyst selection or the operation of the reactors are culprits; spikes resulting from poor temperature control in the fractionation column may be occurring more often because of poor tuning or even soot coating the thermocouples these coatings could mean that all temperature readings here are lower than actual. Then, there's the persnickety nature of thermosiphons. Thermosiphons are limited to a turndown of about 2:1 unlike a valve tray, which can handle a quarter of its nominal capacity and still produce good product. A sudden change in column bottom level, composition or pressure, as is likely to occur during a shutdown or startup, can cause flow oscillations and even mechanical vibration, non-uniform temperature gradients and poor heat transfer coefficients. For example, if the bottom accumulates compounds of low volatility, like coke, unstable flow will occur in the thermosiphon. Sudden changes in a tray tower such as a rise in pressure can result in a drop in vapor velocity in the tower; vapor velocity is inversely proportional to tower pressure, which should also increase the flow from the thermosiphon because of residual heat. One oscillation can feed on another. Let's not rule out design errors completely because this is a new exchanger. It could be that the suction and

Featured Sponsors Ask the Experts A roster of leading authorities in many fields to help you address technical issues.

www.chemicalprocessing.com/voices/process-puzzler/

1/3

6/12/13

Process Puzzler

discharge lines are undersized. It's important to remember that thermosiphons rely on two-phase flow at the discharge not the inlet, so check the size of both lines. Partially closing the suction line can temporarily curtail oscillation and could be a good check that oscillation has occurred. Another design issue could be the locations of the inlet and outlet. Maybe, the kettle reboiler is a better choice if it can be replaced or refitted; certainly, it would be better to have two reboilers if fouling is an issue. Another problem is the fractionation bottoms pump. From the description of lost head and vibration, it seems that some kind of erosion/corrosion is at work. Take this pump out of service immediately for non-destructive and destructive testing. A lined replacement should help; however, a closed impeller may be a better choice because it provides better protection to the leading edge than an open impeller. A good design practice is to maintain a velocity in the 912-ft/s range in all exchanger tubes to prevent fouling; this unfortunately requires hardening the material of construction to survive the erosion. Erosion is proportional to the cube of velocity. Dirk Willard, senior process engineer Superior Engineering, Hammond, Ind. AUGUST'S PUZZLER We're trying to settle a dispute between our on-site contractor and the company designing a vent scrubber for our alkylation spent acid tanks (see Figure 1). The design basis is a flow of 3,500 pounds per hour (pph) of a stream containing H2S (about 60 pph), N2, water, O2, 1,3 butadiene, 1,4 pentadiene, acetaldehyde, formaldehyde and other components from the tanks to a caustic scrubber and activated carbon bed (ACB) before going to a stack. This composition seems inaccurate but it's what we have. The gas molecular weight is 29.7 going into the scrubber and 29.1 exiting it. The initial pressure is only 3.2 in. water column (WC); the designer claims the pressure drop through the scrubber will be only 1 in. WC and that the drop through the ACB will be 0.5 in. WC. The designer proposes using a 3-in. schedule-40 carbon steel vent to convey vapor from three spent H2SO4 tanks, a distance of 175 ft.; the same 3-in. pipe will carry fumes 250 ft to the scrubber and then to the ACB 80 ft away; the stack is 120-ft high and 24-in. in diameter. The design doesn't include a blower or fan because of the fire risk, which also is why the firm chose steel rather than fiberglass pipe. It also lacks a flame arrestor before the scrubber; the designer says API-2210 doesn't require one because the existing conservation vent will provide sufficient protection. However, the contractor contends the conservation vent must be re-specified for the proposed design changes, the 3-in. pipe won't allow 3,500 pph, carbon steel will corrode and is, in fact, unnecessary, i.e., fiberglass will do because the vent isolates the vent system from flash back (agreeing with API-2210). The contractor also argues the pressure drops in the scrubber and ACB are too low. What do you think? Does the design need changing? If so, how? Send us your comments, suggestions or solutions for this question by July 12, 2013. We'll include as many of them as possible in the August 2013 issue and all on ChemicalProcessing.com. Send visuals a sketch is fine. E-mail us at ProcessPuzzler@putman.net or mail to Process Puzzler, Chemical Processing, 555 W. Pierce Road, Suite 301, Itasca, IL 60143. Fax: (630) 467-1120. Please include your name, title, location and company affiliation in the response. And, of course, if you have a process problem you'd like to pose to our readers, send it along and we'll be pleased to consider it for publication.

More from this perspective...


sorted by date: 1-20 of 92 Title Forestall Fermenter Fouling Readers suggest how to properly clean unit to eliminate scourge of w ild yeast . first prev | next last Date 05/20/2013

Beat Dryer Difficulties Readers suggest w ays to get a second-hand unit to perform better

03/28/2013

Pumping LPG: Take A Load Off Loading Readers suggest how to avoid problems in pumping liquefied petroleum gas.

02/28/2013

Process Puzzler: Preempt Pump Problems Readers suggest several options to improve reliability

02/01/2013

Get Rid Of Problems Not Just Off-Gas A variety of factors may compromise performance of an oxidizer.

01/15/2013

Cope With Condenser Constraints Readers suggest w ays to maintain performance on hot days.

12/10/2012

Process Puzzler: Replace the Tank

11/20/2012

www.chemicalprocessing.com/voices/process-puzzler/

2/3

6/12/13
A fiberglass vessel isn't appropriate for the intended use.

Process Puzzler

Worker Death: Place Blame Where It Really Belongs Readers suggest the actual culprits behind a w elder's death.

10/24/2012

Process Puzzler: Tame Tow er Temperature Turmoil Start-up conditions may provide key insights about w hat's causing problems.

09/20/2012

Make The Right Opening Move Readers suggest how to relate valve position to flow .

08/15/2012

Tap the Best Tie-in Readers consider w here to get compressed air for a pump.

07/25/2012

Vanquish Vacuum Pump Vexations Readers suggest how to pinpoint problems

06/11/2012

Burst a Bubble Readers suggest how to preclude ignition-temperature-test failures.

05/08/2012

Don't Scoff At the Expert Readers recommend significant upgrades to a relief system.

03/21/2012

Knock Out Polymerization Process Problems Tackling equipment and compatibility issues is crucial.

03/13/2012

Fight a Film Fiasco Readers suggest how to address heat exchanger fouling and inappropriate cleaning.

02/13/2012

Don't Be Stumped by a Sump Several steps can help handle gasoline-laden vent gas.

01/12/2012

Foil Coil Destruction A number of steps may pre-empt problems

12/13/2011

Chillers Require Cold-Eyed Review Readers suggest w ays to avoid temperatures sw ings and trips.

11/09/2011

Neutralization Requires Basic Rethink Waste disposal system shouldn't be treated as an afterthought.

10/06/2011

sorted by date: 1-20 of 92

first prev | next last

Advertise
General Information Advertiser Preview Editorial Calendar

Magazine
Current Issue Issue Archive Meet the Editors

Sister Web Sites


ControlGlobal.com PharmaManufacturing.com PlantServices.com Sustainable Plant Contact Us | Privacy Policy | Legal Disclaimers, Terms & Conditions

Copyright 2004-2013 Chemical Processing. All rights reserved.

www.chemicalprocessing.com/voices/process-puzzler/

3/3

You might also like