Professional Documents
Culture Documents
Column2 NPRD-CSAP NPRD-CSAP CDC_AE NPRD-CSAP NPRD-CSAP NPRD-CSAP CDC_AE NPRD-CSAP CDC_AE NPRD-CSAP NPRD-CSAP NPRD-CSAP CDC_AE GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR NPRD-CSAP NPRD-CSAP
Column3 FIWDS108 FIQFINFIG110 $DSGTCD2 FIGAPL00 FICALLWMG005 FIKDSG25 $DSGTCC4 FIQDPCBPE040 $DMRQTBA FIQDPCBPE022 FIGVIS04 FIQDPCBPE076 $DZZP1C2 DRPW3122 DRPW3123 DRPW3124 DRPW3125 DRPW3126 DRPW3127 DRPW3128 DRPW3129 DRPW3130 DRPW3131 DRPW3132 DRPW3133 DRPW3134 DRPW3135 DRPW3136 FIQFINFIG112 FIQFINFIG112
Column4 RMS UNIX REM CAT 4 PQR # 13106232 // F/C AS PER DOC - AP RMS UNIX OPPS RESOLVED // F/C AS PER DOC -AP RMS UNIX OPPS RESOLVED // F/C AS PER DOC - AP RMS UNIX REM CAT 3 PQR # 13106265 // ESC TO NAGAR - AP RMS UNIX INF CYC 1ST ABEND - AP RMS UNIX REM CAT 4 PQR # 13106273 // F/C AS PER DOC - AP RMS MF OPPS RESOLVED // F/C AS PER FOLLOW UP -AP RMS UNIX REM CAT 4 PQR # 13106277 - AP RMS MF REM CAT 4 PQR # 13106280 // ESC TO ASHWORTH // F/C AS PER ASHWORTH RMS UNIX INF 1ST ABEND - AP RMS UNIX OOPS RESOLVED // F/C AS PER JASON -AP RMS UNIX REM CAT 4 PQR # 13106283 - AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS MF OPPS RESOLVED // R/R AS PER DOC- AP RMS UNIX OPPS RESOLVED // R/R AS PER DOC - AP RMS UNIX OPPS RESOLVED // F/C AS PER DOC - AP
Column5
Follow-ups
Lpar/Server
Dupont MF
Job Name
AE
$DMRFHUW $DAWHE*
$DSGKX30 $DSGKX31 $DSGKX32 $DSGKX33 $DSGKX34 $DSGKX35 $DSGKML1 $DSGKGN1 $DSGKGN2 $DSGKGN3 $DSGKGN4 $DSGKGN5 $DSGKGN6 $DSGKGN7 $DSGKGN8 $DSGKLGN $DSGKMAP $DSGKXP2
APR
GCR
#GMRMCI3
GCR GCR
#GCBDPTM
#GCBDXUP
NEXUS
MAR NIB
DUPONT ECS
NPSAPCRP
FIGPIP01
FIGPIP02
FIGPIP03
GCR
APR APR
#GCBDXUP
MQSCMDS MQSCMDS
Assurance
Follow-ups
Followup
If any connectivity issue in LPARS Please try logging in using the IP (cipb3270.lvs.dupont.com) 52.99.201.241 in the TSO session to login.
Column1
Whenever $DMRFHUW abends no need to create a pqr and we need to c/c it until any further info from suneetha If we are not able to contact William Patsko for these jobs from the no. given in Bomb, please call +44 1438 734489 If the person we are calling has Bell call privacy service and ask us to enter 10 digit no. then enter 302-781-1010. Don't enter 877-366-3330
As per Srinivas from storage "We can force complete these below jobs if any of these abend with ABEND=S000 U0888"
If these jobs wait for the condition ZAMRZIT1_ZMR100TH_OK, we can add the condition and run the jobs as per Devarajan. If the Job abends in STEP012 please do not call or create PQR , The comments in Step012 is "CANCEL JOB & SUCC IN QUE-DO NOT SUBMIT PQR-DO NOT CALL" You can directly force complete the job as per NIMESH if it abends with a 028 code in Goodjob (2nd) step. FORCE OK. As per Judy
Mark no longer supports this job. Till we get any contact info for this job Force complete this job. Dont create a PQR , Inform C Lee Hutts Whenever a TBGIS job abends, create a PQR and assign to TSR group EAPPL-BAP-IMAS . They are not test jobs, so don't force the jobs to OK or delete the jobs in ControlM If these jobs wait for the condition #VRD2PTS_#VRD2PP1_OK add the condition and make jobs run as per William Patsko. This ususlly happens on Monday morning(Sunday Odate)
As per Bhuvana there is no need to create any PQR for the following jobs on NPSAPCRP server if they abend in future. But when the job abends we need to send a mail to the following mail ids. bhuvaneswari.sadasivam@usa.dupont.com KRISH2R1@cdclnm1.email.dupont.com PHLLA2J@nanotes1.email.dupont.com SARAV2M@nanotes1.email.dupont.com Maria Teresa is supporting these jobs, refer to mail from Lochan no need to mail Tony Hanson//fc and send mail to scheduling If it fails with condition code 16 then force complete the job as per Bala no need to call RACF or MVS team for following jobs.Put a mail .refer to terrys mail for further info
If the job MQSCMDS fails please drop an email to William M Ramsey/Inform William M Ramsey if available online.
R/R the job as per mail from Jerold R Le Baron in in-ndc-Pca Please follow updated on call schedule for APP Basis , refer mail sent by Muru Sent mail to Grover Sent mail to Grover If job abends pls send mail to MVS team(sathish,senthil,daniel f lavoie,Sadeesh,bala k tanneru)In week ends if it abends pls make call to sathish t sambandan As per Jerold R Le Baron,if this job abends,Please rerun,if it fails again rerun the job, If 3rd abend, contact Jerold.Refer in-ndc-pca mail by Jerold. If those jobs abended, We can force complete as per Sathish(MVS Team) If this job abend on GCR we can force complete it until further notice from Sathish(MVS Team),as he is working on that job
FZQDPCSTM007 and FZQDPCSTM008 jobs need to be put on hold till these jobs gets deactivated by schedulers Mail has been dropped to schedulers regarding these jobs by support team.
Column1
Quantitative Resourc
Column1 NDQA-CSAP
Column2 EB1
NPSAPWP1
FIWWMU01
NPSAPCP1
FICSURWMU001A
AE
$DYY*
NPSAPPP1 AE
FIPCMU43*/FIPCMU44*/FIPCMU4 5* $DRPSMSD
NIB
#PRSSOXG
Cyclic jobs Production NPRD-CSAP AE AE AE APR NPMG1400 AE production Cyclic jobs FIKGNUTD $DRSVRA3 $DPCEPC6 $DFIXCHK #APFIR2B MGPCDRPWKP
IF we get late shouts $DRLP991 and $DRLP992 for two jobs waiting for UI's UI7286 and U 12 characters job
APR
#AP* Jobs
Assurance
Column3 Attender
Column2 Nandhini
Quantitative Resource
Column3
If the reason for the failure is 'No Idoc Ready for processing' in Step1 then no action is required at our end. 1. No need to hold the job and 2. No PQR required
Although this job is cyclic but after 1st abend, the job will not run for next time as it misses some condition ,so, we need to follow documentation if this job abends as per Chuck
Lee's no. updated (302) 379-4989 (Cell) Murali Mohan Somisetty Pedda is oncall for few applications.His oncall mobile is not working so, call him on his personal no. 9177601776 for any issues.Also, confirm from him till what time we have to call him on his personal no. instead of oncall no.
Please follow updated on call schedule for APP Basis , refer mail sent by William Moore in in-ndc-pca
Nexus On call no Update check mail form Champaka and from me A cat 2 pqr has to be created for this cyclic job, EVEN IF ITS FAILS FOR THE FIRST TIME. *********INFORM MURU BEFORE ZERO DOWN RESOURCES FOR PB1/PP1 ********** Need to create only one PQR for these these jobs for one day as per SUSAN LEACH C/C this job if the CC is less than or equals to 8 as per Rayudu. Please refer mail from Rayudu
If the job abends ..please let MVS(Sathish) Know as per Sathish Suneetha's New Contact # 262 844 2962. Check Suneetha's mail in in-ndc-pca Please see the message for the alert and take action according to the message For cyc 3rd abend hold and delete the job as per chuck n follow documentation If we get a late shout for this job , we have to add the condition "f_ais_kp1_tdloc" WE SHOULD NOT FORCE COMPLETE THE JOB $DRSVRA3 IF IT ABENDS,PLEASE CONTACT SATHISH T SAMBANDAN Donot rerun $DPCEPC6 even once
houts $DRLP991 and $DRLP992 for two jobs waiting for UI's UI7286 and UI1309 please consider complete both UI's and jobs As per RON( no Check the Message field which is in the alert screen for the Production jobs especially 12 characters job.please follow as per Message field instruction.For Further information check Muru's mail with subject " DuPont has complained -- Batch operators not informing Business of batch abends"
If any #AP* job abends,please contact Muru,and create CAT 5 PQR for Force completing. Please keep an eye on the PQRs assigned to BATCH-AE team. If you encounter any PQR being assigned to BATCH-AE team, check the PQR diary carefully if the PQR is intended for us or not. If you see that the PQR is not intended for our team, re-assign it back to the team from which it came mentioning the proper reason.If you have any doubts, contact Schedulers at that very point of time
FZQDPCSTM007 and FZQDPCSTM008 jobs need to be put on hold till these jobs
Column1 12/8/2012
Remarks
If it abends with any other reason for consecutive three times then we need to follow the normal procedure that is 1. Hold the job 2. Raise a PQR and call
Follow up
follow up
Follow-up
oth UI's and jobs As per RON( not needed to inform him)
Shift I
Requested by
Bob Martz
Alerts Cleanup
Sno. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Server name Jobname PQR no.
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65
66 67 68 69 70 71 72
Column1 Column2 Column3 Column4
ECS CLEA
PQR resolved/closed
Column5
ECS CLEANUP
Column6
Not in Queue
PQR No.
Remarks
Remarks
Column10
New Da
LPAR No. of Jobs Pending Job Names
MAR GCR
0 0
AE MAR GCR
0 0 0
Comments
TIME (IST)
ACTIVITY
6:30 AM 7:00 AM 7:15AM 7:30 AM 8:30 AM 9:00 AM 9:15AM 9:30 AM 10:45 AM 11:35 AM
Check Turnover Sheet Mainframe Check (Abends,Late,WE,wait) Check voice message (Call 720800 dail * dail 720502# pass:13579#) Check quant. resource Value on ECS Mainframe Check (Abends,Late,WE,wait) Check NIB Pending Jobs Check voice message (Call 720800 dail * dail 720502# pass:13579#) Check NIB New DAY Process Mainframe Check (Abends,Late,WE,wait) $DRSID20 (MON > THU , SAT) (RACF)
12:00 PM 12:00 PM 12:15 PM 12:15 PM 12:30 PM 12:30 PM 13:00 PM 13:00 PM 13:15 PM 13:30 PM 14:15 PM
$DTACC99 (ALL DAYS) (WOCS) $DFICLSO (MON > SAT) (SAP) Mainframe Check (Abends,Late,WE,wait) Check voice message (Call 720800 dail * dail 720502# pass:13579#) $DFIDBR1(TUES>SUN) (SAP) DSR call- 9*018007821258 pin- 7727254# $DFISTA1 (MON > SAT) (SAP) $DTAST05 (ALL DAYS) (WOCS) Mainframe Check (Abends,Late,WE,wait)
14:15 PM
Check MAR Pending Jobs Check MAR New DAY Process ##MOSTOP (SUN) (APR) ##MOSTAR (SUN ) (APR) ##MOSPMO (SUN ) (APR) Check GCR Pending Jobs Check GCR New DAY Process Check quant. resource Value on ECS
16:30 PM
16:30 PM 16:30 PM
Mainframe Check (Abends,Late,WE,wait) Send Shift Turnover Sheet NDC DSR call- 9*6(8888046831) pin- 8441912#
Mainframe Check (Abends,Late,WE,wait) Check AE Pending Jobs Check voice message (Call 720800 dail * dail 720502# pass:13579#) $DVR3962 (MON > FRI) (PAYROLL) Check AE New DAY Process Mainframe Check (Abends,Late,WE,wait) Cleanup- Previous ODAT jobs and alerts Check voice message (Call 720800 dail * dail 720502# pass:13579#) ZAMO9005 (MON > FRI)
21:00 PM 22:00 PM 22:15 PM 22:10 PM 22:30 PM 22:30 PM 22.30 PM 12:00 AM 12:00 AM 12:00 AM 12:15 AM
Mainframe Check (Abends,Late,WE,wait) #APIMYX1 (ALL DAY) Check voice message (Call 720800 dail * dail 720502# pass:13579#) Send Shift Turnover Sheet Handover Shift CHECK TUROVER SHEET SYXXCDPL (NIB) Cleanup- Previous ODAT jobs and alerts Check quant. resource Value on ECS Mainframe Check (Abends,Late,WE,wait) Check voice message (Call 720800 dail * dail 720502# pass:13579#)
12:30 AM 2:00 AM 2:15 AM 2:30 AM 2:30 AM 2:05 AM 3:00 AM 4:00 AM 4:15 AM 4:30 AM 5:00 AM
Mainframe Check (Abends,Late,WE,wait) Check APR Pending Jobs Check voice message (Call 720800 dail * dail 720502# pass:13579#) Mainframe Check (Abends,Late,WE,wait) Check APR New DAY Process Add Cond. 'N_OPER_PROD_START'(Sat,Sun) (AE) Asia PAC Daily Status Report Mainframe Check (Abends,Late,WE,wait) Check voice message (Call 720800 dail * dail 720502# pass:13579#) Check #SMFTSMF (NIB)
NDC DSR call- 9*6(8888046831) pin- 8441912# Mainframe Check (Abends,Late,WE,wait) Check voice message (Call 720800 dail * dail 720502# pass:13579#) Send Shift Turnover Sheet ``````
Column2
Column1
Done
Done Done Done Done Done Done Done Done Done Done
Done Done Done Done Done Done Done Done Done Done Done Done
Product Line: Region(s): Account(s): Doc. Ref. Number: Owner: Owner / Business Approval: Issue Number: Amendment Record No. 0.1 1 1.1 1.2 2.0 2.1 2.2 2.2 2.3 2.3 2.3 2.3
Review Date 2/15/2007 2/27/2007 3/13/2007 17/7/2007 19/10/2007 19/02/09 14/10/09 9/2/2010 29/04/2010 23/06/2010 23/08/2010
25/02/11
Reviewed / Amended / created By Ponnusundar Murugiah Ponnusundar Murugiah Kanishka Bhargava Prasad Vallabhajosyula Ponnusundar Murugiah Ajith Ekta Bhatia Pankaj Gandhi Pankaj Gandhi Pankaj Gandhi Pankaj Gandhi Ekta Bhatia
Nature of Change First version Turnover,Quantative resource added and Asiapac Sheet added Incident details,Day2Day activity,Cleanup,AsiaPac, Turnover 9X5 Shift Activities, Cleanup for 3 shifts. Approved New Day Tracker, Follow ups Tracker added, Asiapac Sheet Deleted Reviewed and Updated as per Quality Policy Reviewed Updated Owner's name, business approver's name. Reviewed Reviewed Reviewed