S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.

3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1 2.2 3 3.1 3.2

3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:Date of Inspection:Type of NODE:TEST ITEM INFRASTRUCTURE EARTH SYSTEM CHECK Check the Measured Earth value and date of measurement Check the availability of earth distribution diagram Check of earth connectivity Earth measurement carried out during inspection ENGINE ALTERNATOR CHECK Check the working of E/A sets (Main & S/B) and switchover of load Check for diesel availability E/A Capacity, make & date of installation FIRE ALARM and EXTINGUSHER CHECK Check the working of Fire alarm system Check whether A/C trips in case of fire or not? Check the availability and working of fire extinguishers/ sand bucket Check of Fire Hydrant System for telecom buildings > 15 m height AIR CONDITIONER CHECK Capacity and make of A/C with date of installation No of A/C installed/Working & Room Temp Check Maintenance schedule of A/C units POWER PLANT CHECK Make and Capacity of power plant in (Amp) & working load with date of installation No. of power plant modules in working conditions (out of total no..) BATTERY CHECK Capacity, make & date of Installation of Battery Availability of spare fuses Check for test discharge conducted No. of Hrs. battery sets is able to take load? (both set combined if available) check of log book being maintained for battery health General cleanliness of the battery room No. of faulty cells (both sets combined) Check of Voltage drop from battery output to switch room in power-on condition. Discharge test carried out during inspection DC emergency light in case of power failure No. of Inverters in working conditions with capacity (out of total no.) Anti static flooring check TRANSMISSION MEDIA / SYSTEM Check of redundancy of transmission media Check laying, termination and labeling of fiber / E1s on equipment and DDF/FDF. BTS Configuration of BTS & Check of CTU/TRU installed/working status(visual check) Down time for CONTROL card for the previous month

Availability of spare TREs / Control cards Sample check of emergency services like fire etc. Make sample calls(interMSC,inter Operator,PSTN etc) at the coverage cell borders of BTS and record observations VSWR alarm status (either from OMC-R or other means if any) BTS Infrastructure alarm extension and operational status Mains fail High Temp Low fuel DG on load FR FAIL BTS battery low Cabin door open Fire alarm TOWER Type of tower (GBT/RTT/Pole) with height Physical Check of Earthling and connectivity of tower legs Check of lighting arrester and aviation lamp Check whether maintenance schedule being followed COMMENTS Please write any comments if any

ANDHRA PRADESH

Observations

Earth measurement records were not available. Earth distribution diagram was not available

Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable

Test discharge was not conducted 3 hrs Good zero Terminal votage drop was <2V Not applicable Not applicable Not applicable OFC,LINEAR Laying, termination and labeling of fiber / E1s on equipment and DDF/FDF was good

Down time for CONTROL card for the previous month was nil

spare TREs cards are not available 1. sample calls on emergency services like 100/101/108 were made and found good. 1.Make sample calls from prime commercial locations are made and found good.

working Not applicable not working not working not working not working not working not working

1. physical connectivity of tower legs for earthing to the Ring earth.was checked and found good. 1Last date on which last painting / tightening of nuts bolts/checknuts/ other maintenance jobs etc., done was not available..

WEIGHTAGE SCORE DEFICIENCY CATAGORY 7 2 1 2 2 6 4 1 1 8 3 1 2 2 6 1 3 2 8 1 7 15 1 1 2 2 1 1 2 2 3 1 1 1 7 4 3 26 7 4

0 0 2 0

Critical Minor Major Major

4 Critical 1 Major 1 Minor 0 Disastrous Major Critical Critical Major Major Minor 1 Minor 7 Critical 1 0 0 2 0 1 2 2 3 X X X Minor Minor Major Disastrous Minor Minor Critical Critical Major Minor Minor Minor

REMARKS SCORE SCORE 1.5 NOK 1.5 NOK OK 0 NOK 0 4.5 OK 3 OK 1 OK 0.5 3 NOK 3 0 NA 5 3 1 1 8 1 7 12.5 1 0.5 0 2 1 1 2 2 3 1 1 1 10 3 4 1 4

X X X X X X

OK OK OK NOK NOK OK NOK OK OK OK OK

Critical 3 Minor 7 Critical 4 Critical

NOK OK OK OK

2 2 6 5 8 1 1X 1 1 1 1 1 1 6 2 2 2

1 2 6 5 1 0 0 0 0 0 0

Major Minor Major Critical

NOK OK OK OK OK

4 2 4 4 0 0 0 0 0 0 0 0 0 6 2 2 0

Major Major Major Major Major Major

NOK NOK NOK NOK NOK NOK

2 Major 0 Major 0 Minor

OK NOK NOK

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1 2.2 3 3.1 3.2

3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:Date of Inspection:Type of NODE:TEST ITEM INFRASTRUCTURE EARTH SYSTEM CHECK Check the Measured Earth value and date of measurement Check the availability of earth distribution diagram Check of earth connectivity Earth measurement carried out during inspection ENGINE ALTERNATOR CHECK Check the working of E/A sets (Main & S/B) and switchover of load Check for diesel availability E/A Capacity, make & date of installation FIRE ALARM and EXTINGUSHER CHECK Check the working of Fire alarm system Check whether A/C trips in case of fire or not? Check the availability and working of fire extinguishers/ sand bucket Check of Fire Hydrant System for telecom buildings > 15 m height AIR CONDITIONER CHECK Capacity and make of A/C with date of installation No of A/C installed/Working & Room Temp Check Maintenance schedule of A/C units POWER PLANT CHECK Make and Capacity of power plant in (Amp) & working load with date of installation No. of power plant modules in working conditions (out of total no..) BATTERY CHECK Capacity, make & date of Installation of Battery Availability of spare fuses Check for test discharge conducted No. of Hrs. battery sets is able to take load? (both set combined if available) check of log book being maintained for battery health General cleanliness of the battery room No. of faulty cells (both sets combined) Check of Voltage drop from battery output to switch room in power-on condition. Discharge test carried out during inspection DC emergency light in case of power failure No. of Inverters in working conditions with capacity (out of total no.) Anti static flooring check TRANSMISSION MEDIA / SYSTEM Check of redundancy of transmission media Check laying, termination and labeling of fiber / E1s on equipment and DDF/FDF. BTS Configuration of BTS & Check of CTU/TRU installed/working status(visual check) Down time for CONTROL card for the previous month

Availability of spare TREs / Control cards Sample check of emergency services like fire etc. Make sample calls(interMSC,inter Operator,PSTN etc) at the coverage cell borders of BTS and record observations VSWR alarm status (either from OMC-R or other means if any) BTS Infrastructure alarm extension and operational status Mains fail High Temp Low fuel DG on load FR FAIL BTS battery low Cabin door open Fire alarm TOWER Type of tower (GBT/RTT/Pole) with height Physical Check of Earthling and connectivity of tower legs Check of lighting arrester and aviation lamp Check whether maintenance schedule being followed COMMENTS Please write any comments if any

ANDHRA PRADESH

Observations

Earth measurement records were not available. Earth distribution diagram was not available Physical connectivity of the copper conductor leads from the +ve leads of the battery, power Plant, MDF verticals, cable Chamber

Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable

Test discharge was not conducted 3 HRS

nil

Not applicable Not applicable Not applicable OFC,CPE-8,LINEAR Laying, termination and labeling of fiber / E1s on equipment and DDF/FDF was good

Down time for CONTROL card for the previous month was nil

1. sample calls on emergency services like 100/101/108 were made and found good. 1.Make sample calls from prime commercial locations are made and found good.

Not applicable not working not working not working

1. physical connectivity of tower legs for earthing to the Ring earth.was checked and found good. 1Last date on which last painting / tightening of nuts bolts/checknuts/ other maintenance jobs etc., done was not available..

WEIGHTAGE SCORE DEFICIENCY CATAGORY 7 2 1 2 2 6 4 1 1 8 3 1 2 2 6 1 3 2 8 1 7 15 1 1 2 2 1 1 2 2 3 1 1 1 7 4 3 26 7 4

0 Critical Minor 2 Major 0 Major 4 Critical 1 Major 1 Minor 3 Disastrous Major Critical Critical Major Major Minor 1 Minor 7 Critical 1 0 0 2 0 0 2 2 3 X X X Minor Minor Major Disastrous Minor Minor Critical Critical Major Minor Minor Minor

REMARKS SCORE SCORE 1.5 NOK 1.5 NOK OK 0 NOK 0 4.5 OK 3 OK 1 OK 0.5 3 OK 3 0 NA 5 3 1 1 8 1 7 12.5 1 0.5 0 2 1 1 2 2 3 1 1 1 10 3 4 1 4

X X X X X X

OK OK OK NOK NOK OK NOK NOK OK OK OK

0 Critical 3 Minor 7 Critical 4 Critical

NOK OK OK OK

2 2 6 5 8 1 1x 1 1 1 1 1 1 6 2 2 2

1 2 6 5 1

Major Minor Major Critical

NOK OK OK OK OK NOK OK NOK NOK OK OK

4 2 4 4 0 0 0 0 0 0 0 0 0 6 2 2 0

0 Major 1 0 Major 0 Major 1 1

2 Major 1 Major 0 Minor

OK NOK NOK

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:ANDHRA PRADESH Date of Inspection:Type of NODE:TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth measurement Earth valuerecords 2 and date were of 0measurement not Critical available. NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working of E/A sets (Main 4 & S/B) and 4 Critical switchover OK of load 3 Check for diesel availability 1 1 Major OK 1 E/A Capacity, make & date of installation 1 1 Minor OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working of Fire alarm system 3 3 Disastrous OK 3 Check whether Not A/C applicable trips in case of 1X fire or not?Major Check the availability Not applicable and working 2X of fire extinguishers/ Critical sand bucket 0 Check of Fire Not Hydrant applicable System for2telecom X buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Not make applicable of A/C with date 1 X of installation Major 3 No of A/C installed/Working Not applicable & Room 3 X Temp Major 1 Check Maintenance Not applicable schedule of A/C 2 X units Minor 1 POWER PLANT CHECK 8 8 Make and Capacity of power plant 1 in (Amp) 1 & Minor working load OK with date of installation 1 No. of power plant modules in working 7 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make & date of Installation 1 of Battery 1 Minor OK 1 Availability of spare fuses 1 0 Minor NOK 0.5 Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery 1 hrs sets is able to2take load? 0 (both Disastrous set combined NOK if available) 2 check of lognot book available. being maintained 1 for battery 0 Minor health NOK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty cells (both sets combined) 2 0 Critical NOK 2 Check of Voltage drop from battery 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test carried out during3inspection 0 Major NOK 3 DC emergency Notlight applicable in case of power 1 X failure Minor 1 No. of Inverters Not applicable in working conditions 1 X with capacity Minor(out of total no.) 1 Anti static flooring Not applicable check 1X Minor 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy DMW,LINEAR of transmission 4 media 0 Critical NOK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration of BTS & Check of 7 CTU/TRU installed/working 7 Critical OKstatus(visual check) 1 Down time for CONTROL card for 4 the previous 4 Critical month OK 4 Availability of spare spare TREs TREs cards / Control are2not cards available 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm status (either from OMC-R 5 or other 5 Critical means if OK any) 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail Not working 1 0 Major NOK 0 High Temp Not applicable 1X 0 Low fuel Not working 1 0 Major NOK 0 DG on load Not working 1 0 Major NOK 0 FR FAIL Not working 1 0 Major NOK 0 BTS batteryNot lowworking 1 0 Major NOK 0 Cabin door open Not working 1 0 Major NOK 0 Fire alarm Not working 1 0 Major NOK 0 TOWER 6 0 Type of tower (GBT/RTT/Pole) with height 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting arrester and aviation 2 lamp 1 Major NOK 2 Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:ANDHRA PRADESH Date of Inspection:20-06-2013 Type of Node:TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth measurement Earth valuerecords 2 and date were of 0measurement not Critical available. NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working of E/A sets (Main 4 & S/B) and 4 Critical switchover OK of load 3 Check for diesel availability 1 1 Major OK 1 E/A Capacity, make & date of installation 1 1 Minor OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working of Fire alarm system 3 3 Disastrous OK 3 Check whether Not A/C applicable trips in case of 1X fire or not?Major Check the availability Not applicable and working 2X of fire extinguishers/ Critical sand bucket 0 Check of Fire Not Hydrant applicable System for2telecom X buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Not make applicable of A/C with date 1 X of installation Major 3 No of A/C installed/Working Not applicable & Room 3 X Temp Major 1 Check Maintenance Not applicable schedule of A/C 2 X units Minor 1 POWER PLANT CHECK 8 8 Make and Capacity of power plant 1 in (Amp) 1 & Minor working load OK with date of installation 1 No. of power plant modules in working 7 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make & date of Installation 1 of Battery 1 Minor OK 1 Availability of spare fuses 1 0 Minor NOK 0.5 Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery sets is able to2take load? 0 (both Disastrous set combined NOK if available) 2 check of lognot book available. being maintained 1 for battery 0 Minor health NOK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty cells (both sets combined) 2 0 Critical NOK 2 Check of Voltage drop from battery 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test carried out during3inspection 0 Major NOK 3 DC emergency Notlight applicable in case of power 1 X failure Minor 1 No. of Inverters Not applicable in working conditions 1 X with capacity Minor(out of total no.) 1 Anti static flooring Not applicable check 1X Minor 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy OFC,LINEAR of transmission 4 media 0 Critical NOK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration of BTS & Check of 7 CTU/TRU installed/working 7 Critical OKstatus(visual check) 1 Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare TREs / Control 2 cards 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm status (either from OMC-R 5 or other 5 Critical means if OK any) 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail working 1 1 OK 0 High Temp Not applicable 1X 0 Low fuel working 1 1 OK 0 DG on load not working 1 0 Major NOK 0 FR FAIL working 1 1 OK 0 BTS batterynot lowworking 1 0 Major NOK 0 Cabin door open working 1 1 OK 0 Fire alarm working 1 1 OK 0 TOWER 6 0 Type of tower (GBT/RTT/Pole) with height 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting arrester and aviation 2 lamp 2 Major OK 2 Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:ANDHRA PRADESH Date of Inspection:19-06-2013 Type of Node:TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth measurement Earth valuerecords 2 and date were of 0measurement not Critical available. NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working Not installed of E/A sets (Main 4 & S/B) and 0 Critical switchover NOK of load 3 Check for diesel Not applicable availability 1x Major 1 E/A Capacity, Not make applicable & date of installation 1x Minor 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working of Fire alarm system 3 0 Disastrous NOK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability Not applicable and working 2x of fire extinguishers/ Critical sand bucket 0 Check of Fire Not Hydrant applicable System for2telecom x buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Not make applicable of A/C with date 1 x of installation Major 3 No of A/C installed/Working Not applicable & Room 3 x Temp Major 1 Check Maintenance Not applicable schedule of A/C 2 x units Minor 1 POWER PLANT CHECK 8 8 Make and Capacity of power plant 1 in (Amp) 1 & Minor working load OK with date of installation 1 No. of power plant modules in working 7 conditions 5 Critical (out of NOK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make & date of Installation 1 of Battery 0 Minor NOK 1 Availability of spare fuses 1 0 Minor NOK 0.5 Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery zero sets is able to2take load? 0 (both Disastrous set combined NOK if available) 2 check of log book being maintained 1 x for battery Minor health 1 General cleanliness of the battery 1 room x Minor 1 No. of faulty cells (both sets combined) 2 0 Critical NOK 2 Check of Voltage drop from battery 2 x output to Critical switch room in power-on condition. 2 Discharge test carried out during3inspection x Major 3 DC emergency light in case of power 1 x failure Minor 1 No. of Inverters in working conditions 1 x with capacity Minor(out of total no.) 1 Anti static flooring check 1x Minor 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy OFC,LINEAR of transmission 4 media 0 Critical NOK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration of BTS & Check of 7 CTU/TRU installed/working 7 Critical OKstatus(visual check) 1 Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare TREs / Control 2 cards 1 Major NOK 4 Sample check of emergency services 2 like fire 2etc. Minor OK Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm status (either from OMC-R 5 or other 5 Critical means if any) 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail Not working 1 0 Major NOK 0 High Temp Not applicable 1x 0 Low fuel Not working 1 0 Major NOK 0 DG on load Not working 1 0 Major NOK 0 FR FAIL Not working 1 0 Major NOK 0 BTS batteryNot lowworking 1 0 Major NOK 0 Cabin door open Not working 1 0 Major NOK 0 Fire alarm Not working 1 0 Major NOK 0 TOWER Not working 6 0 0 Type of tower (GBT/RTT/Pole) with height 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting arrester and aviation 2 lamp 2 Major OK 2 Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:ANDHRA PRADESH Date of Inspection:17-06-2013 Type of Exchange:TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth measurement Earth valuerecords 2 and date were of 0measurement not Critical available. NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working of E/A sets (Main 4 & S/B) and 0 Critical switchover NOK of load 3 Check for diesel availability 1 1 Major OK 1 E/A Capacity, make & date of installation 1 1 Minor OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working of Fire alarm system 3 3 Disastrous OK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability Not applicable and working 2x of fire extinguishers/ Critical sand bucket 0 Check of Fire Not Hydrant applicable System for2telecom x buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Not make applicable of A/C with date 1 x of installation Major 3 No of A/C installed/Working Not applicable & Room 3 x Temp Major 1 Check Maintenance Not applicable schedule of A/C 2 x units Minor 1 POWER PLANT CHECK 8 8 Make and Capacity of power plant 1 in (Amp) 1 & Minor working load OK with date of installation 1 No. of power plant modules in working 7 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make & date of Installation 1 of Battery 1 Minor OK 1 Availability of spare fuses 1 0 Minor NOK 0.5 Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery sets is able to2take load? 2 (both Disastrous set combined OK if available) 2 check of log book being maintained 1 for battery 0 Minor health NOK 1 General cleanliness of the battery 1 room 0 Minor NOK 1 No. of faulty zero cells (both sets combined) 2 2 Critical OK 2 Check of Voltage drop from battery 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test carried out during3inspection 3 Major OK 3 DC emergency Notlight applicable in case of power 1 x failure Minor 1 No. of Inverters Not applicable in working conditions 1 x with capacity Minor(out of total no.) 1 Anti static flooring Not applicable check 1x Minor 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy of transmission 4 media 0 Critical NOK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration of BTS & Check of 7 CTU/TRU installed/working 7 Critical OKstatus(visual check) 1 Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare TREs / Control 2 cards 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample calls(interMSC,inter 6 Operator,PSTN 6 Major etc) at the OK coverage cell borders 2 of BTS and record observation VSWR alarm status (either from OMC-R 5 or other 5 Critical means if OK any) 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail working 1 1 OK 0 High Temp Not applicable 1x 0 Low fuel not working 1 0 NOK 0 DG on load not working 1 0 NOK 0 FR FAIL working 1 1 0 BTS batterynot lowworking 1 0 NOK 0 Cabin door open working 1 1 OK 0 Fire alarm working 1 1 OK 0 TOWER 6 0 Type of tower (GBT/RTT/Pole) with height 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting arrester and aviation 2 lamp 1 Major NOK 2 Check whether maintenance schedule 2 being0followed Minor NOK 2 COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:ANDHRA PRADESH Date of Inspection:18-06-2013 Type of Node GSM 2G BTS -BSNL,I/D TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth value2 and date of 0measurement Critical NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working of E/A sets (Main 4 & S/B) and 4 Critical switchover OK of load 3 Check for diesel availability 1 1 Major OK 1 E/A Capacity, make & date of installation 1 1 Minor OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working not installed of Fire alarm system 3 0 Disastrous NOK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability not installed and working 2 of fire extinguishers/ 0 Critical sand NOK bucket 0 Check of Fire Not Hydrant applicable System for2telecom x buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and make of A/C with date 1 of installation 1 Major OK 3 No of A/C installed/Working & Room 3 Temp 0 Major NOK 1 Check Maintenance schedule of A/C 2 units 0 Minor NOK 1 POWER PLANT CHECK 8 8 Make and Capacity of power plant 1 in (Amp) 1 & Minor working load OK with date of installation 1 No. of power plant modules in working 7 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make & date of Installation 1 of Battery 1 Minor OK 1 Availability of spare fuses 1 0 Minor NOK 0.5 Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery 3 hrs sets is able to2take load? 2 (both Disastrous set combined OK if available) 2 check of log book being maintained 1 for battery 0 Minor health NOK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty zero cells (both sets combined) 2 2 Critical OK 2 Check of Voltage drop from battery 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test carried out during3inspection 3 Major OK 3 DC emergency light in case of power 1 failure 0 Minor NOK 1 No. of Inverters Not applicable in working conditions 1 x with capacity Minor(out of total no.) 1 Anti static flooring Anti static check flooring was 1 not earthed 0 Minor NOK 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy of transmission 4 media 4 Critical OK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration of BTS & Check of 7 CTU/TRU installed/working 7 Critical OKstatus(visual check) 1 Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare TREs / Control 2 cards 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm status (either from OMC-R 5 or other 5 Critical means if OK any) 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail working 1 1 OK 0 High Temp not working 1 0 Major NOK 0 Low fuel not working 1 0 Major NOK 0 DG on load working 1 1 OK 0 FR FAIL not working 1 0 Major NOK 0 BTS batterynot lowworking 1 0 Major NOK 0 Cabin door open working 1 1 OK 0 Fire alarm not working 1 0 Major NOK 0 TOWER 6 0 Type of tower (GBT/RTT/Pole) with height 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting arrester and aviation 2 lamp 0 Major NOK 2 Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Name of Circle:ANDHRA PRADESH Date of Inspection:18-06-2013 Type of Node GSM 2G BTS- BSNL,I/D TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth records Earth were value not 2 and available date of 0measurement Critical NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement Measured carried aerth out value during 2 was 0.5 inspection ohms. 2 Major OK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working of E/A sets (Main 4 & S/B) and 4 Critical switchover OK of load 3 Check for diesel Diesel availability availability =180 1 ltrs. 1 Major OK 2.Diesel Consumption 1 record is properly maintaine E/A Capacity, make & date of installation 1 1 Minor OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working of Fire alarm system 3 0 Disastrous NOK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability and working 2 of fire extinguishers/ 0 Critical sand NOK bucket 0 Check of Fire Not Hydrant applicable System for2telecom x buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and make of A/C with date 1 of installation 1 Major OK 3 No of A/C installed/Working & Room 3 Temp 0 Major NOK 1 Check Maintenance schedule of A/C 2 units 0 Minor NOK 1 POWER PLANT CHECK 8 8 Make and Capacity of power plant 1 in (Amp) 1 & Minor working load OK with date of installation 1 No. of power plant modules in working 7 conditions 5 Critical (out of NOK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make & date of Installation 1 of Battery 1 Minor OK 1 Availability of spare fuses 1 0 Minor NOK 0.5 Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery sets is able to2take load? 2 (both Disastrous set combined OK if available) 2 check of log book being maintained 1 for battery 0 Minor health NOK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty zero cells (both sets combined) 2 2 Critical OK 2 Check of Voltage drop from battery 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test carried out during3inspection 3 Major OK 3 DC emergency light in case of power 1 failure 0 Minor NOK 1 No. of Inverters in working conditions 1 x with capacity Minor(out of total no.) 1 Anti static flooring Anti static check flooring was 1 not earthed 0 Minor NOK 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy of transmission 4 media Critical NOK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration of BTS & Check of 7 CTU/TRU installed/working 7 Critical OKstatus(visual check) 1 Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare TREs / Control 2 cards 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm status (either from OMC-R 5 or other 5 Critical means if OK any) 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail 1 0 Major NOK 0 High Temp 1 0 Major NOK 0 Low fuel 1 0 Major NOK 0 DG on load 1 0 Major NOK 0 FR FAIL 1 0 Major NOK 0 BTS battery low 1 0 Major NOK 0 Cabin door open 1 0 Major NOK 0 Fire alarm 1 0 Major NOK 0 TOWER 6 0 Type of tower (GBT/RTT/Pole) with height 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting arrester and aviation 2 lamp 1 Major NOK 2 Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:TUNI T/E-Rajahmundry Name of Circle:ANDHRA PRADESH Date of Inspection:19-06-2013 Type of Node GSM 2G BTS -BSNL,I/D TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth records Earth were value not 2 and available date of 0measurement Critical NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working working ofon E/A total sets load (Main 4 perfectly. & S/B) and 4 Critical switchover OK of load 3 Check for diesel availability 1 1 Major OK 1 E/A Capacity, make & date of installation 1 1 Minor OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working Hooter of was Fire not alarm working,Make:globe system 3 0 Disastrous NOK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability and working 2 of fire extinguishers/ 0 Critical sand NOK bucket 0 Check of Fire Not Hydrant applicable System for2telecom x buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and make of A/C with date 1 of installation 1 Major OK 3 No of A/C installed/Working & Room 3 Temp 2 Major NOK 1 Check Maintenance schedule of A/C 2 units 2 Minor OK 1 POWER PLANT CHECK 8 8 Make and Capacity of power plant 1 in (Amp) 1 & Minor working load OK with date of installation 1 No. of power plant modules in working 7 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make & date of Installation 1 of Battery 1 Minor OK 1 Availability of spare fuses 1 0 Minor NOK 0.5 Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery sets is able to2take load? 0 (both Disastrous set combined NOK if available) 2 check of log book being maintained 1 for battery 1 Minor health OK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty cells (both sets combined) 2 0 Critical NOK 2 Check of Voltage drop from battery 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test Terminal carried votage out during drop 3inspection was 0.9v 3 Major NOK 3 DC emergency DC emergency light in caselight of power in 1 case failure of power 1 Minor failure are OK working 1 No. of Inverters in working conditions 1 with capacity 0 Minor(out of NOK total no.) 1 Anti static flooring Anti static check flooring was 1 not earthed 0 Minor NOK 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy OFC,STM-16 of transmission RING-OK 4 media 4 Critical OK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration of BTS & Check of 7 CTU/TRU installed/working 7 Critical OKstatus(visual check) 1 Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare TREs / Control 2 cards 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm status (either from OMC-R 5 or other 5 Critical means if OK any) 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail Not working 1 0 Major NOK 0 High Temp Not working 1 0 Major NOK 0 Low fuel Not working 1 0 Major NOK 0 DG on load Not working 1 0 Major NOK 0 FR FAIL Not working 1 0 Major NOK 0 BTS batteryNot lowworking 1 0 Major NOK 0 Cabin door open Not working 1 0 Major NOK 0 Fire alarm Not working 1 0 Major NOK 0 TOWER 6 0 Type of tower (GBT/RTT/Pole) with height 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting arrester and aviation 2 lamp 1 Major NOK 2 Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Rajanagaram-Rajahmundry Name of Circle:ANDHRA PRADESH Date of Inspection:20-06-2013 Type of Node GSM 2G BTS- BSNL,I/D TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth records Earth were value not 2 and available date of 0measurement Critical NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement measured carried earth value out during 2 was 0.5 inspection ohms 2 Major OK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working not working of E/A sets (Main 4 & S/B) and 0 Critical switchover NOK of load 3 Check for diesel Diesel availability availability =.half 1 tank available 1 Major OK 2.Diesel 1 Consumption record is properly E/A Capacity, 1. make capacity & date =56kva,make=kirloskar,DOI=not of installation 1 1 Minor available. OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working not installed. of Fire alarm system 3 0 Disastrous NOK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability S/W ROOM;C02-1NO,4.5 and working 2 of KGS,LRD=18/3/08 fire extinguishers/ 0 Critical sand P/P NOK ROOM;C02-1NO,4.5 bucket 0 KGS,LRD=18/3/08 E/A ROO Check of Fire Not Hydrant applicable System for2telecom x buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Capacity=1.5 make of A/C TRS,:Mak=Hitachi with date 1 of installation and 1 Major video con OK 3 No of A/C installed/Working No.of AC installed-=2,working=1,room & Room 3 Temp 1 Major temp=very NOKghigh 1 Check Maintenance AC log book schedule was not of A/C 2 available units 0 Minor NOK 1 POWER PLANT CHECK 8 8 Make and Capacity Make=I.T.I,Capacity=5*100AMPS, of power plant 1 in (Amp) 1 & Minor working load OK with =100AMPS, date ofDOI=NOT installation 1 AVAILABLE No. of power 1. plant Number modules of modules in working 7 installed=2,working=2 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make 1. capacity & date =600ah,2sets, of Installation 1 Make=power of Battery 1 Minor exide,DOI=18/06/08,Amaraja,DOI=29/10/09 OK 1 Availability of 1. spare 125fuses amps fuses 1 are using 0 Minor NOK 0.5 . 2. spare fuses not available Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery 3 hrs sets is able to2take load? 2 (both Disastrous set combined OK if available) 2 check of logNo book log being book maintained 1 for battery 0 Minor health NOK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty zero cells (both sets combined) 2 2 Critical OK 2 Check of Voltage Voltage drop drop from was battery 0.8v 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test Terminal carried votage out during drop 3inspection was 0.3v 3 Major OK 3 DC emergency DC emergency light in caselights of power 1 not failure working 0 Minor NOK 1 No. of Inverters 1kva-1no,PEC in working conditions 1 with capacity 1 Minor(out of OK total no.) 1 Anti static flooring Anti static check flooring was 1 earthed1 Minor OK 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy ofc,ring of transmission 4 media 4 Critical OK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration 1. TREs/TRUs of BTS & Check available of 7 CTU/TRU in all sectors=8 installed/working 7 Critical OK 2.status(visual installed/working/faulty check) 1 TREs/TRUs.=8 . Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of Spare spare TREs TREs cards / Control are2 not cards available 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm Main status :1.12,1.02,1.11 (either from OMC-R 5 or other 5 Critical means if OK any) S/B:1.11,1.19,1.15 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail not working 1 0 Major NOK 0 High Temp not working 1 0 Major NOK 0 Low fuel not working 1 0 Major NOK 0 DG on load not working 1 0 Major NOK 0 FR FAIL not working 1 0 Major NOK 0 BTS batterynot lowworking 1 0 Major NOK 0 Cabin door open not working 1 0 Major NOK 0 Fire alarm not working 1 0 Major NOK 0 TOWER 6 0 Type of tower 1. Type (GBT/RTT/Pole) of tower=GBT, with height 2. height=No records 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting 1. Lightning arrester arrester=available. and aviation 2 lamp 2 Major OK 2. Aviation2lamp=working Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write any comments if any

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Prattipadu-Rajahmundry Name of Circle:ANDHRA PRADESH Date of Inspection:18-06-2013 Type of Node GSM 2G BTS -BSNL,I/D TEST ITEM Observations WEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Earth records Earth were value not 2 and available date of 0measurement Critical NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement Earth pits carried are unable out during 2 totrace inspection out. 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working working ofon E/A total sets load (Main 4 perfectly. & S/B) and 4 Critical switchover OK of load 3 Check for diesel Diesel availability availability =80ltrs 1 1 Major OK 2.Diesel Consumption 1 record is properly maintained E/A Capacity, 1. make capacity & date =40KVA,Make=Kirloskatr, of installation 1 1 Minor DOI= 17/06.2001 OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working not working, of Fire Make:Globe alarm system 3 0 Disastrous NOK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability S/W ROOM;CO2-1NO and working 2,4.5 of fire KGSto extinguishers/ 0 be Critical refilled sand NOK bucket P/P ROOM;CO2-3NO 0 4.5KGS to be refilled Check of Fire Not Hydrant applicable System for2telecom X buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Capacity=1.5TRS,Make=LG,Hitachi make of A/C with date 1 of installation 1 Major OK 3 No of A/C installed/Working 1. No .of A/C installed=2, & Room 3 Temp Working= 3 Major 2 OKType =split, & Room 1 Temp=ok . Check Maintenance AC log book schedule was not of A/C 2 available units 0 Minor NOK 1 POWER PLANT CHECK 8 8 Make and Capacity Make=HBL of power nife,,Capacity=6*100AMPS, plant 1 in (Amp) 1 & Minor working working load OK load with =200AMPS, date of installation DOI= 1 17/06/2001. No. of power 1. plant Number modules of modules in working 7 installed=4, conditions 2 Critical working=01 (out of NOK total no..) ; faulty modules=03 7 . 2. Log book entry not avail BATTERY CHECK 15 12.5 Capacity, make 1. capacity & date =600ah, of Installation 2sets, 1 of Make=mnicrotex Battery 1 Minor OK , DOI=10/11/2010. 1 Availability of 1. 125 spare amps fuses fuses are 1 using 0 Minor NOK 0.5 . 2. spare fuses not available Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery 4 HRS sets is able to2take load? 2 (both Disastrous set combined OK if available) 2 check of logLast book entry:12/6/13 being maintained 1 for battery 1 Minor health OK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty ZERO cells (both sets combined) 2 2 Critical OK 2 Check of Voltage Voltage drop drop from was battery 0.6V 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test Terminal carried votage out during drop 3inspection was <2V 3 Major OK 3 DC emergency DC emergency light in caselights of power 1 not working failure 0 Minor NOK 1 No. of Inverters Not applicable in working conditions 1 x with capacity Minor(out of total no.) 1 Anti static flooring Anti static check flooring was 1 not earthed 0 Minor NOK 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy OFC,STM-16 of transmission RING-OK 4 media 4 Critical OK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration 1. TREs/TRUs of BTS & Check available of 7 CTU/TRU in all sectors=8 installed/working 7 Critical OK 2. status(visual installed/working/faulty check) 1 TREs/TRUs.= . Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare spare TREs TREs cards / Control are2not cards available 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm Main:1.11,1.14,1.09 status (either from OMC-R 5 or other 5 Critical means if OK any) S/B:1.07,1.02.1.12 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail not working, 1 0 Major NOK 0 High Temp not working, 1 0 Major NOK 0 Low fuel not working, 1 0 Major NOK 0 DG on load not working, 1 0 Major NOK 0 FR FAIL not working, 1 0 Major NOK 0 BTS batterynot lowworking, 1 0 Major NOK 0 Cabin door open not working, 1 0 Major NOK 0 Fire alarm not working, 1 0 Major NOK 0 TOWER 6 0 Type of tower 1. Type (GBT/RTT/Pole) of tower=GBT, with2. height height=NO RECORDS 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting 1. Lightning arrester arrester=Not and aviation 2 available lamp 0 Major NOK 2. Aviation 2 lamp=Not working Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write Tower any comments premises are if any not good and trees are growing along tower

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3 1.6.4 1.6.5 1.6.6 1.6.7 1.6.8 1.6.9 1.7 1.8 1.9 2 2.1

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Lalacheruvu-Rajahmundry Name of Circle:ANDHRA PRADESH Date of Inspection:17-06-2013 Type of Node GSM 2G BTS -BSNL,I/D TEST ITEM ObservatiosWEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Measured Earth earth value value 2 and was date 0.8 ohms of 0measurement Critical on 25/08/2012. NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working E/A working of E/A perfectly sets (Main 4on & full S/B) load. and 4 Critical switchover OK of load 3 Check for diesel Diesel availability availability =.250LTRS 1 1 Major OK 2.Diesel Consumption 1 record is properly maintain E/A Capacity, 1. make capacity=75KVA, & date of installation Make=Kirloskar,DOI=10/02/2002. 1 1 Minor OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working working, ofMake:Globe Fire alarm system 3 3 Disastrous OK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability S/W ROOM:Co2-01no,4.5KGS, and working 2 of fire extinguishers/ last 2 Critical refilled on sand 16/04/2013. OK bucket 0 PP ROO Check of Fire Not Hydrant applicable System for2telecom X buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Capacity=1.5TRS,Make:Sriram,LG,VIDEOCON make of A/C with date 1 of installation 1 Major OK 3 No of A/C installed/Working 1. No .of A/C installed=7, & Room 3 Temp Working=5 2 Major NOK Type=Split,window,& 1 Room Temp=20DC . Check Maintenance AC maintenance schedule register of A/C 2 units was available. 2 Minor OK 1 POWER PLANT CHECK 8 8 Make and Capacity Make=I.T.I,Capacity=8*100AMPS, of power plant 1 in (Amp) 1 &working Minor workingload load OK =160AMPS,DOI= with date of installation 20/9/1999 1 No. of power 1. plant Number modules of modules in working 7 installed=7,working=7 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make 1. capacity=2500AH,2SETS, & date of Installation 1 ofMake=Amaraja, Battery 1 Minor OK DOI=16/9/2011. 1 Availability of 1. spare 200amps fuses fuse are 1 using. 0 Minor NOK 0.5 . 2. spare fuses not available Check for test Test discharge discharge conducted was not 2 conducted 0 Major NOK 0 No. of Hrs. battery 3 hrs sets is able to2take load? 2 (both Disastrous set combined OK if available) 2 check of logLast book entry:15/03/2013. being maintained 1 for battery 1 Minor health OK 1 General cleanliness Good of the battery 1 room 1 Minor OK 1 No. of faulty zero cells (both sets combined) 2 2 Critical OK 2 Check of Voltage Voltage drop drop from was battery 0.1v 2 output to 2 Critical switch room OK in power-on condition. 2 Discharge test Terminal carried votage out during drop 3inspection was 0.6v 3 Major OK 3 DC emergency DC emergency light in caselights of power 1 are not failure working 0 Minor NOK 1 No. of Inverters 1KVA-3NO,3/3 in workingMake=control conditions 1 with and capacity 1 drives. Minor(out of OK total no.) 1 Anti static flooring Anti static check flooring was 1 not earthed 0 Minor NOK 1 TRANSMISSION MEDIA / SYSTEM 7 10 Check of redundancy OFC,STM-16,RING-OK of transmission 4 media 4 Critical OK 3

2.2 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 5 5.1 5.2 5.3 5.4 6 6.1

Check laying, Laying, termination termination and labeling and 3 labeling of fiber 3of Minor /fiber E1s on / E1s equipment OK on equipment and DDF/FDF. and DDF/FDF 4 was good BTS 26 Configuration 1. TREs/TRUs of BTS & Check available of 7 CTU/TRU in all sectors= installed/working 7 Critical 12 OK 2. status(visual installed/working/faulty check) 1 TREs/TRUs.=12 . Down time Down for CONTROL time for card CONTROL for 4 thecard previous for 4 the Critical month previousOK month was nil 4 Availability of spare spare TREs TREs cards / Control are2 not cards available 1 Major NOK 4 Sample check 1. of sample emergency calls on services emergency 2 like fire services 2etc. Minor like 100/101/108 OK were made and found good. Make sample 1.Make calls(interMSC,inter sample calls from 6 Operator,PSTN prime 6 commercial Major etc) at locations the OK coverage are made cell borders and 2 found of BTS good. and record observation VSWR alarm Main:1.10,1.11,1.06 status (either from OMC-R 5 or other 5 Critical means if OK any) S/B:1.14,1.12,1.19 4 BTS Infrastructure alarm extension 8 and operational status 4 Mains fail working 1 1 Major OK 0 High Temp Not working 1 0 Major NOK 0 Low fuel Not working 1 0 Major NOK 0 DG on load Not working 1 0 Major NOK 0 FR FAIL Not working 1 0 Major NOK 0 BTS batteryNot lowworking 1 0 Major NOK 0 Cabin door open Not working 1 0 Major NOK 0 Fire alarm Not working 1 0 Major NOK 0 TOWER 6 0 Type of tower 1. Type (GBT/RTT/Pole) of tower.=RTM, with 2. height heigh=no records 6 Physical Check 1. physical of Earthling connectivity and connectivity 2 of tower 2 of legs Major tower for earthing legs OK to the Ring earth.was checked and found good. Check of lighting 1. Lightning arrester arrester=(available and aviation 2 lamponly 0 Major for one mar NOK instead of 3 mars.)Not 2 available.. Check whether 1Last maintenance date on which schedule 2 last painting being0followed /Minor tightening NOK of nuts bolts/checknuts/ 2 other maintenance jobs etc., COMMENTS 0 Please write Lightening any comments arrester if any was not earthed.

e and Infrastructure)

S.No 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.2 1.3.3 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.5.2 1.6 1.6.1 1.6.2 1.6.3

GSM-BTS(2G) TECHNICAL INSPECTION SCHEDULE Approximate time - 2 Days Including infra (May vary depending on size of Node and Infrastructure) Name of Station:Killari mansion-Rajahmundry Name of Circle:ANDHRA PRADESH Date of Inspection:22-06-2013 Type of Node GSM 2G BTS -BSNL,I/D TEST ITEM ObservatiosWEIGHTAGE SCORE DEFICIENCYREMARKS CATAGORYSCORE INFRASTRUCTURE SCORE EARTH SYSTEM CHECK 7 1.5 Check the Measured Measured Earth earth value value 2 and was date 0.5 of ohms,on 0measurement Critical 04/10/2012. NOK 1.5 Check the availability Earth distribution of earthdiagram distribution 1 was diagram not 0 Minor available NOK Check of earth Physical connectivity connectivity2of the copper 2 Major conductorOK leads from the +ve leads 0 of the battery, power Plant, M Earth measurement carried out during 2 inspection 0 Major NOK 0 ENGINE ALTERNATOR CHECK 6 4.5 Check the working working of manually E/A setson (Main 4 total &load S/B)perfectly. and 2 Critical switchover NOK of load 3 Check for diesel Diesel availability availability =. Half 1 tank available 1 Major OK 2.Diesel 1 Consumption record is properly E/A Capacity, 1. make capacity & date =15kva,make=Eicher,DOI=not of installation 1 1 Minor avaialble. OK 0.5 FIRE ALARM and EXTINGUSHER CHECK 8 3 Check the working not installed of Fire alarm system 3 0 Disastrous NOK 3 Check whether Not A/C applicable trips in case of 1x fire or not?Major Check the availability not installed and working 2 of fire extinguishers/ 0 Critical sand NOK bucket 0 Check of Fire Not Hydrant applicable System for2telecom x buildings Critical > 15 m height NA AIR CONDITIONER CHECK 6 5 Capacity and Capacity= make of 1.5trs,:Mak=LG,Citizen A/C with date 1 of installation 1 Major OK 3 No of A/C installed/Working 1. No .of A/C installed=2, & Room 3 Temp Working=1 1 Major (suddenly NOK tripping), Type=split-2no, 1 & Room Temp . =very high Check Maintenance AC maintenance schedule register of A/C 2 units was not 0available. Minor NOK 1 POWER PLANT CHECK 8 8 Make and Capacity Make=Valeru,Capacity4*50amps,working of power plant 1 in (Amp) 1 & Minor working load load OK =140amps, with date of DOI=not installation 1 available. No. of power P/P plant modules modules installed=4,working=04 in working 7 conditions 7 Critical (out of OK total no..) 7 BATTERY CHECK 15 12.5 Capacity, make 1. capacity=600ah,1 & date of Installation set,make= 1 of Battery microtex, 1 Minor DOI= OK 11/06/08 1 Availability of 1. spare protective fuses fuses are 1 not using 0 Minor NOK 0.5 . 2. spare fuses not available Check for test Test discharge discharge conducted was not conducted

e and Infrastructure)