Item
CONSTRUCCION DEL MURO DE CONTENCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO
MUNICIPALIDAD DISTRITAL DE LLAPO
DISTRITO DE LLAPO
DEPARTAMENTO: ANCASH
COSTO AL: 6/15/2004
Descripcin Partida
A.02
TRABAJOS PRELIMINARES
A.02.03
A.03
MOVIMIENTO DE TIERRAS
A.03.01
A.03.03
Und.
Metrado
Precio Unitario
Parcial
M2
151.75
4.17
632.80
M3
33.60
17.23
578.93
M3
14.40
11.48
165.31
A.03.04
M3
14.40
10.04
144.58
A.04
A.04.01
M3
49.60
226.74
11,246.30
A.04.04
M2
118.30
20.08
2,375.46
A.05.03
KG
759.41
3.60
2,733.88
Costo Directo
Gastos Generales (10%)
Sub Total
I. G. V. (19%)
Total Presupuestado
SON: VEINTITRESMIL CUATROCIENTOS UNO Y 33/100 NUEVOS SOLES
Sub Total
632.80
888.82
16,355.64
17,877.26
1,787.73
19,664.98
3,736.35
23,401.33
A.07.01
M2
509.40
12.73
6,484.66
A.07.02
TARRAJEO DE COLUMNAS
M2
63.75
19.92
1,269.90
A.07.03
TARRAJEO DE VIGAS
M2
73.20
23.07
1,688.72
A.07.04
VESTIDURA DE DERRAMES
ML
309.50
6.90
2,135.55
A.07.05
M2
40.00
52.55
2,102.00
13,680.84
A.08
CIELO RASOS
A.08.01
M2
97.25
21.06
2,048.09
2,048.09
A.09
PISOS
A.09.01
M2
131.75
22.49
2,963.06
2,963.06
A.10
PINTURA
A.10.01
M2
170.45
5.60
954.52
A.10.02
M2
573.15
5.30
3,037.70
A.11
CARPINTERIA DE MADERA
A.11.01
PUERTA DE TABLERO
M2
3.08
143.44
441.80
A.11.02
PUERTA CONTRAPLACADA
M2
15.94
131.89
2,102.33
A.11.03
M2
20.16
76.48
1,541.84
A.12
INSTALACIONES ELECTRICAS
A.12.01
PTO
19.00
79.72
1,514.68
A.12.02
PTO
16.00
70.81
1,132.96
A.12.03
UND
1.00
120.00
120.00
A.12.04
UND
1.00
300.00
300.00
3,992.22
4,085.96
3,067.64
A.13
VIDRIOS
A.13.01
A.14
A.14.01
A.14.02
A.14.03
P2
217.00
3.10
672.70
PZA
6.00
252.00
1,512.00
UND
2.00
150.00
300.00
UND
1.00
200.00
200.00
A.14.04
UND
1.00
200.00
200.00
A.15
INSTALACIONES SANITARIAS
A.15.01
PTO
11.00
48.11
529.21
A.15.02
ML
19.60
6.27
122.89
A.15.03
UND
4.00
52.06
208.24
672.70
2,212.00
860.34
P R E S U P U E S T O
OBRA:
PROPIETARIO:
LUGAR:
Item
Und.
Metrado
Precio Unitario
Parcial
A.16
A.16.01
PTO
11.00
52.78
580.58
A.16.02
UND
4.00
45.27
181.08
A.16.03
ML
26.40
6.75
178.20
A.16.04
ML
18.50
4.22
78.07
Costo Directo
Gastos Generales (10%)
Sub Total
I. G. V. (19%)
Total Presupuestado
Sub Total
1,017.93
118,945.66
11,894.57
130,840.23
24,859.64
155,699.88
Partida:
Rendimiento:
800.000 M2/DIA
Descripcin
Und
Cantidad
4.17
Precio
Parcial
Materiales
YESO EN BOLSA DE 25 KG.
BLS
0.2500
15.65
3.91
CORDEL
ML
0.0100
0.60
0.01
Mano de Obra
CAPATAZ
HH
0.10
0.0010
10.34
0.01
OPERARIO
HH
1.00
0.0100
9.04
0.09
PEON
HH
2.00
0.0200
7.33
0.15
CONSTRUCCION DEL MURO DE CONTENCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO
MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.02.01 EXCAVACION DE ZANJAS PARA MURO DE CONTENCION 1.00M DE PROF.
Rendimiento:
4.000 M3/DIA
Descripcin
Und
Cantidad
17.23
Precio
Parcial
Mano de Obra
CAPATAZ
HH
0.10
0.2000
10.34
2.07
PEON
HH
1.00
2.0000
7.33
14.66
3.0000
16.73
0.50
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
A.02.02 RELLENO CON MATERIAL PROPIO
Rendimiento:
8.000 M3/DIA
Descripcin
Und
Cantidad
10.04
Precio
Parcial
Mano de Obra
CAPATAZ
HH
0.10
0.1143
10.34
1.18
PEON
HH
1.00
1.1429
7.33
8.38
5.0000
9.56
0.48
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
%MO
A.02.03 ELIMINACION DE MATERIAL EXCEDENTE
40.000 M3/DIA
Descripcin
Und
Cantidad
45.00
Precio
Parcial
Materiales
TRANSPORTE MATERIAL VOLQ. 6 M3
M3
1.0000
Partida:
Rendimiento:
400.000 M2/DIA
Descripcin
Mano de Obra
Und
45.00
45.00
Cantidad
Precio
1.37
Parcial
CAPATAZ
HH
0.10
0.0020
5.63
0.01
OPERARIO
HH
1.00
0.0200
5.00
0.10
PEON
HH
10.00
0.2000
3.13
0.63
5.0000
0.74
0.04
0.0400
15.00
0.60
Equipo
HERRAMIENTAS MANUALES
%MO
HM
2.00
Partida:
Rendimiento:
Descripcin
Und
Cantidad
102.81
Precio
Parcial
Materiales
PIEDRA BASE
M3
0.4900
20.00
9.80
BLS
2.7000
19.45
52.52
HORMIGON
M3
0.9100
20.00
18.20
AGUA
M3
0.1600
5.00
0.80
Mano de Obra
CAPATAZ
HH
0.20
0.0640
5.63
0.36
OPERARIO
HH
2.00
0.6400
5.00
3.20
OFICIAL
HH
2.00
0.6400
4.38
2.80
PEON
HH
8.00
2.5600
3.13
8.01
5.0000
14.38
0.72
0.3200
20.00
6.40
Equipo
HERRAMIENTAS MANUALES
%MO
HM
Partida:
Rendimiento:
Descripcin
1.00
Cantidad
13.46
Precio
Parcial
Materiales
CEMENTO PORTLAND TIPO I
BLS
0.1800
19.45
3.50
HORMIGON
M3
0.0530
20.00
1.06
AGUA
M3
0.0030
5.00
0.02
Mano de Obra
OPERADOR DE EQUIPO LIVIANO
HH
0.20
0.2000
5.00
1.00
CAPATAZ
HH
0.20
0.0600
5.63
0.34
OPERARIO
HH
2.00
0.2000
5.00
1.00
OFICIAL
HH
2.00
0.1000
4.38
0.44
PEON
HH
8.00
0.6000
3.13
1.88
5.0000
4.66
0.23
0.2000
20.00
4.00
Equipo
HERRAMIENTAS MANUALES
%MO
HM
1.00
Partida:
Rendimiento:
6.000 M3/DIA
Descripcin
Und
Cantidad
150.59
Precio
Parcial
Materiales
PIEDRA MEDIANA
M3
0.4220
30.00
12.66
BLS
3.6500
19.45
70.99
HORMIGON
M3
0.9760
20.00
19.52
AGUA
M3
0.1600
5.00
0.80
Mano de Obra
CAPATAZ
HH
0.10
0.1333
5.63
0.75
OPERARIO
HH
0.50
0.6667
5.00
3.33
OFICIAL
HH
1.00
1.3333
4.38
5.84
PEON
HH
4.00
5.3333
3.13
16.69
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
26.62
1.33
HM
0.50
0.6667
20.00
13.33
HM
0.50
0.6667
8.00
5.33
Partida:
Rendimiento:
Descripcin
Cantidad
14.97
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.2600
2.50
0.65
KG
0.1600
2.50
0.40
MADERA TORNILLO
P2
3.3460
2.60
8.70
Mano de Obra
CAPATAZ
HH
0.10
0.0500
5.63
0.28
OPERARIO
HH
1.00
0.5000
5.00
2.50
OFICIAL
HH
1.00
0.5000
4.38
2.19
5.0000
4.97
0.25
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
120.000 M2/DIA
Descripcin
Und
Cantidad
16.68
Precio
Parcial
Materiales
CEMENTO PORTLAND TIPO I
BLS
0.5000
19.45
9.73
HORMIGON
M3
0.1310
20.00
2.62
AGUA
M3
0.0160
5.00
0.08
Mano de Obra
CAPATAZ
HH
0.30
0.0200
5.63
0.11
OPERARIO
HH
3.00
0.2000
5.00
1.00
PEON
HH
8.00
0.5333
3.13
1.67
5.0000
2.78
0.14
0.0667
20.00
1.33
Equipo
HERRAMIENTAS MANUALES
%MO
HM
1.00
Partida:
Rendimiento:
12.500 M3/DIA
Descripcin
Und
Cantidad
233.90
Precio
Parcial
Materiales
PIEDRA CHANCADA DE 3/4"
M3
0.8500
30.00
ARENA GRUESA
M3
0.4900
21.00
25.50
10.29
BLS
8.7200
19.45
169.60
AGUA
M3
0.2100
5.00
1.05
Mano de Obra
OPERADOR DE EQUIPO PESADO
HH
1.00
0.6400
5.63
3.60
OPERARIO
HH
1.00
0.6400
5.00
3.20
OFICIAL
HH
1.00
0.6400
4.38
2.80
PEON
HH
4.00
2.5600
3.13
8.01
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
17.62
0.88
HM
0.50
0.3200
20.00
6.40
HM
0.50
0.3200
8.00
2.56
Partida:
Rendimiento:
Descripcin
Cantidad
21.54
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.1000
2.50
KG
0.1500
2.50
0.25
0.38
MADERA TORNILLO
P2
4.0300
2.60
10.48
Mano de Obra
CAPATAZ
HH
0.10
0.1000
5.63
0.56
OPERARIO
HH
1.00
1.0000
5.00
5.00
OFICIAL
HH
1.00
1.0000
4.38
4.38
5.0000
9.94
0.50
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
200.000 KG/DIA
Descripcin
Und
Cantidad
2.46
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.50
0.13
ACERO CORRUGADO
KG
1.0650
1.80
1.92
Mano de Obra
CAPATAZ
HH
0.10
0.0040
5.63
0.02
OPERARIO
HH
1.00
0.0400
5.00
0.20
OFICIAL
HH
1.00
0.0400
4.38
0.18
5.0000
0.40
0.02
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
23.000 M3/DIA
Descripcin
Und
Cantidad
249.02
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.4200
21.00
8.82
M3
0.8500
30.00
25.50
BLS
9.7400
19.45
189.44
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.10
0.0348
5.63
0.20
OPERARIO
HH
2.00
0.6957
5.00
3.48
OFICIAL
HH
1.00
0.3478
4.38
1.52
PEON
HH
8.00
2.7826
3.13
8.71
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
13.91
0.70
HM
0.50
0.3478
20.00
6.96
HM
0.50
0.3478
8.00
2.78
Partida:
Rendimiento:
Descripcin
7.500 M2/DIA
Und
Cantidad
18.62
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.3000
2.50
0.75
CLAVOS DE 3"
KG
0.3300
2.50
0.83
P2
2.1800
3.00
6.54
Mano de Obra
OPERARIO
HH
1.00
1.0667
5.00
5.33
OFICIAL
HH
1.00
1.0667
4.38
4.67
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
Partida:
Rendimiento:
250.000 KG/DIA
Descripcin
Und
10.01
0.50
Cantidad
2.32
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0300
2.50
0.08
ACERO CORRUGADO
KG
1.0700
1.80
1.93
Mano de Obra
OPERARIO
HH
1.00
0.0320
5.00
0.16
OFICIAL
HH
1.00
0.0320
4.38
0.14
5.0000
0.30
0.02
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
6.000 M3/DIA
Descripcin
Und
Cantidad
262.98
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.5400
21.00
M3
0.8500
30.00
11.34
25.50
BLS
8.4300
19.45
163.96
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.12
0.1600
5.63
0.90
OPERARIO
HH
0.87
1.1600
5.00
5.80
OFICIAL
HH
0.87
1.1600
4.38
5.08
PEON
HH
7.20
9.6000
3.13
30.05
5.0000
41.83
2.09
0.8667
20.00
17.33
Equipo
HERRAMIENTAS MANUALES
%MO
HM
Partida:
Rendimiento:
Descripcin
0.65
Cantidad
20.65
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.3000
2.50
KG
0.2010
2.50
0.75
0.50
MADERA TORNILLO
P2
4.2500
2.60
11.05
Mano de Obra
CAPATAZ
HH
0.10
0.0800
5.63
0.45
OPERARIO
HH
1.00
0.8000
5.00
4.00
OFICIAL
HH
1.00
0.8000
4.38
3.50
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
Partida:
Rendimiento:
200.000 KG/DIA
Descripcin
Und
7.95
0.40
Cantidad
2.46
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.50
0.13
ACERO CORRUGADO
KG
1.0650
1.80
1.92
Mano de Obra
CAPATAZ
HH
0.10
0.0040
5.00
0.02
OPERARIO
HH
1.00
0.0400
5.00
0.20
OFICIAL
HH
1.00
0.0400
4.38
0.18
5.0000
0.40
0.02
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Und
Cantidad
235.54
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.5090
21.00
M3
0.7600
30.00
10.69
22.80
BLS
8.6600
19.45
168.44
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.12
0.0800
5.63
0.45
OPERARIO
HH
0.87
0.8000
5.00
4.00
OFICIAL
HH
0.87
0.8000
4.38
3.50
PEON
HH
7.20
4.0000
3.13
12.52
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
20.47
1.02
HM
0.65
0.4000
20.00
8.00
HM
0.65
0.4000
8.00
3.20
Partida:
Rendimiento:
Descripcin
Cantidad
24.45
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.2010
2.50
KG
0.2400
2.50
0.50
0.60
MADERA TORNILLO
P2
5.4100
2.60
14.07
Mano de Obra
CAPATAZ
HH
0.10
0.0889
5.63
0.50
OPERARIO
HH
1.00
0.8889
5.00
4.44
OFICIAL
HH
1.00
0.8889
4.38
3.89
5.0000
8.84
0.44
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
250.000 KG/DIA
Descripcin
Und
Cantidad
2.37
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.50
0.13
ACERO CORRUGADO
KG
1.0650
1.80
1.92
Mano de Obra
CAPATAZ
HH
0.10
0.0032
5.00
0.02
OPERARIO
HH
1.00
0.0320
5.00
0.16
OFICIAL
HH
1.00
0.0320
4.38
0.14
5.0000
0.32
0.02
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Und
Cantidad
234.67
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.5500
21.00
M3
0.7642
30.00
11.55
22.93
BLS
8.6600
19.45
168.44
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.10
0.0640
5.63
0.36
OPERARIO
HH
1.50
0.9600
5.00
4.80
OFICIAL
HH
1.00
0.6400
4.38
2.80
PEON
HH
6.50
4.1600
3.13
13.02
HM
0.50
0.3200
20.00
6.40
HM
0.50
0.3200
8.00
2.56
HM
0.50
0.3200
2.80
0.90
Equipo
Partida:
Rendimiento:
Descripcin
Cantidad
15.32
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.1000
2.50
0.25
KG
0.1000
2.50
0.25
MADERA TORNILLO
P2
3.5600
2.60
9.26
Mano de Obra
CAPATAZ
HH
0.10
0.0533
5.63
0.30
OPERARIO
HH
1.00
0.5333
5.00
2.67
OFICIAL
HH
1.00
0.5333
4.38
2.34
5.0000
5.30
0.27
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
200.000 KG/DIA
Descripcin
Und
Cantidad
2.46
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.50
0.13
ACERO CORRUGADO
KG
1.0650
1.80
1.92
Mano de Obra
CAPATAZ
HH
0.10
0.0040
5.00
0.02
OPERARIO
HH
1.00
0.0400
5.00
0.20
OFICIAL
HH
1.00
0.0400
4.38
0.18
5.0000
0.40
0.02
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Und
Cantidad
1.34
Precio
Parcial
Materiales
LADRILLO P/TECHO 15x30x30 8 HUECOS
KG
1.0560
1.08
1.14
Mano de Obra
CAPATAZ
HH
0.10
0.0005
5.00
0.00
OPERARIO
HH
1.00
0.0050
5.00
0.03
OFICIAL
HH
1.00
0.0050
4.38
0.02
PEON
HH
9.00
0.0450
3.13
0.14
5.0000
0.19
0.01
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
%MO
Descripcin
Und
Cantidad
32.83
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.50
ARENA GRUESA
M3
0.0330
21.00
0.06
0.69
UND
38.0000
0.50
19.00
BLS
0.2360
19.45
4.59
AGUA
M3
0.0800
5.00
0.40
MADERA TORNILLO
P2
0.3550
2.60
0.92
Mano de Obra
CAPATAZ
HH
0.10
0.0847
5.63
0.48
OPERARIO
HH
1.00
0.8466
5.00
4.23
PEON
HH
0.80
0.6772
3.13
2.12
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
5.0000
6.83
0.34
Rendimiento:
6.780 M2/DIA
Descripcin
Und
Cantidad
54.05
Precio
Parcial
Materiales
CLAVOS PARA MADERA C/C 3"
KG
0.0200
2.50
ARENA GRUESA
M3
0.0500
21.00
0.05
1.05
UND
65.0000
0.50
32.50
BLS
0.4700
19.45
9.14
AGUA
M3
0.0140
5.00
0.07
MADERA TORNILLO
P2
0.5800
2.80
1.62
Mano de Obra
CAPATAZ
HH
0.10
0.1180
5.63
0.66
OPERARIO
HH
1.00
1.1799
5.00
5.90
PEON
HH
0.80
0.8850
3.13
2.77
3.0000
9.33
0.28
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Cantidad
8.14
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.50
0.06
ARENA FINA
M3
0.0154
21.00
0.32
BLS
0.1170
19.45
2.28
MADERA TORNILLO
P2
0.5800
2.60
1.51
P2
0.0250
2.80
0.07
Mano de Obra
CAPATAZ
HH
0.10
0.0500
5.63
0.28
OPERARIO
HH
1.00
0.5000
5.00
2.50
PEON
HH
0.60
0.3000
3.13
0.94
5.0000
3.72
0.19
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.07.02 TARRAJEO DE COLUMNAS
8.000 M2/DIA
Und
Cantidad
12.40
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.50
0.06
ARENA FINA
M3
0.0154
21.00
0.32
BLS
0.1170
19.45
2.28
MADERA TORNILLO
P2
0.5800
2.60
1.51
P2
0.3880
2.80
1.09
Mano de Obra
CAPATAZ
HH
0.10
0.1000
5.63
0.56
OPERARIO
HH
1.00
1.0000
5.00
5.00
PEON
HH
0.40
0.4000
3.13
1.25
5.0000
6.82
0.34
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
6.500 M2/DIA
Descripcin
Und
Cantidad
14.06
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.50
0.06
ARENA FINA
M3
0.0154
21.00
0.32
BLS
0.1170
19.45
2.28
MADERA TORNILLO
P2
0.5800
2.60
1.51
P2
0.3880
2.80
1.09
Mano de Obra
CAPATAZ
HH
0.10
0.1231
5.63
0.69
OPERARIO
HH
1.00
1.2308
5.00
6.15
PEON
HH
0.40
0.4923
3.13
1.54
5.0000
8.39
0.42
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Cantidad
4.04
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0100
2.50
0.03
ARENA FINA
M3
0.0020
21.00
0.04
BLS
0.0210
19.45
0.41
MADERA TORNILLO
P2
0.1270
2.60
0.33
P2
0.0730
2.80
0.20
Mano de Obra
CAPATAZ
HH
0.10
0.0444
5.63
0.25
OPERARIO
HH
1.00
0.4444
5.00
2.22
PEON
HH
0.30
0.1333
3.13
0.42
5.0000
2.89
0.14
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
Cantidad
44.83
Precio
Parcial
Materiales
CEMENTO PORTLAND TIPO I
BLS
0.1870
19.45
3.64
P2
1.0500
28.00
29.40
PORCELANA
P2
0.1950
3.00
0.59
AGUA
P2
0.0040
5.00
0.02
Mano de Obra
CAPATAZ
HH
0.20
0.1600
5.63
0.90
OPERARIO
HH
2.00
1.6000
5.00
8.00
PEON
HH
0.70
0.5600
3.13
1.75
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
5.0000
10.65
0.53
Rendimiento:
10.000 M2/DIA
Descripcin
Und
Cantidad
14.28
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0090
2.50
0.02
ARENA FINA
M3
0.0160
21.00
0.34
BLS
0.1170
19.45
2.28
MADERA TORNILLO
P2
2.1550
2.60
5.60
P2
0.0180
2.80
0.05
Mano de Obra
CAPATAZ
HH
0.10
0.0800
5.63
0.45
OPERARIO
HH
1.00
0.8000
5.00
4.00
PEON
HH
0.30
0.4000
3.13
1.25
5.0000
5.70
0.29
Equipo
HERRAMIENTAS MANUALES
%MO
Descripcin
Und
Cantidad
16.75
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.0540
21.00
1.13
BLS
0.5270
19.45
10.25
P2
0.1300
2.80
0.36
Mano de Obra
CAPATAZ
HH
0.10
0.0200
5.63
0.11
OPERARIO
HH
1.00
0.2000
5.00
1.00
OFICIAL
HH
0.50
0.1000
4.35
0.44
PEON
HH
3.00
0.6000
3.13
1.88
5.0000
3.43
0.17
0.0700
20.00
1.40
Equipo
HERRAMIENTAS MANUALES
%MO
HM
Partida:
Rendimiento:
Descripcin
0.35
Cantidad
4.52
Precio
Parcial
Materiales
LIJA PARA MADERA
HJA
0.2000
2.00
0.40
ANDAMIO DE MADERA
P2
0.0100
2.60
0.03
IMPRIMANTE
KG
0.2000
4.50
0.90
PINTURA LATEX
GLN
0.0440
45.00
1.98
Mano de Obra
CAPATAZ
HH
0.10
0.0133
5.63
0.07
OPERARIO
HH
1.00
0.1333
5.00
0.67
PEON
HH
1.00
0.1333
3.13
0.42
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
5.0000
1.16
0.06
Cantidad
4.39
Precio
Parcial
Materiales
LIJA PARA MADERA
HJA
0.2000
2.00
0.40
ANDAMIO DE MADERA
P2
0.0100
2.60
0.03
IMPRIMANTE
KG
0.2100
4.50
0.95
PINTURA LATEX
GLN
0.0440
45.00
1.98
Mano de Obra
CAPATAZ
HH
0.10
0.0114
5.63
0.06
OPERARIO
HH
1.00
0.1143
5.00
0.57
PEON
HH
1.00
0.1143
3.13
0.36
5.0000
0.99
0.05
Equipo
HERRAMIENTAS MANUALES
%MO
Cantidad
104.99
Precio
Parcial
Materiales
CLAVOS PARA MADERA C/C 2"
KG
0.0710
2.50
0.18
BISAGRA 4"
PZA
2.5500
5.00
12.75
LIJA
UND
1.0000
2.00
2.00
COLA SINTETICA
GLN
0.1000
25.00
2.50
MADERA TORNILLO
P2
21.5500
2.60
56.03
Mano de Obra
OPERARIO
HH
1.00
2.6667
5.00
13.33
PEON
HH
2.00
5.3333
3.13
16.69
5.0000
30.03
1.50
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.11.02 PUERTA CONTRAPLACADA
6.000 M2/DIA
Und
Cantidad
111.95
Precio
Parcial
Materiales
CLAVOS PARA MADERA C/C 2"
KG
0.0800
2.50
0.20
BISAGRA 4"
PZA
1.5000
5.00
7.50
LIJA
UND
0.8200
2.00
1.64
COLA SINTETICA
GLN
0.4000
25.00
10.00
MADERA TORNILLO
P2
16.0000
2.60
41.60
P3
1.0700
22.00
23.54
THINER
P4
0.5600
18.50
10.36
BARNIZ
P5
0.2500
12.45
3.11
Mano de Obra
OPERARIO
HH
2.00
2.6667
5.00
13.33
5.0000
13.33
0.67
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
2.000 M2/DIA
Descripcin
Und
Cantidad
55.34
Precio
Parcial
Materiales
CLAVOS DE 2"
KG
0.0550
2.50
COLA SINTETICA
GLN
0.1400
25.00
0.14
3.50
MADERA TORNILLO
P2
10.9000
2.60
28.34
Mano de Obra
CAPATAZ
HH
0.10
0.4000
5.63
2.25
OPERARIO
HH
1.00
4.0000
5.00
20.00
5.0000
22.25
1.11
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
5.150 PTO/DIA
Descripcin
Und
Cantidad
63.29
Precio
Parcial
Materiales
CONDUCTOR TW SOLIDO 1X2.5 mm2-14
ML
16.0000
0.25
4.00
FLUORESCENTE CIRCULAR 32 W
UND
1.0000
30.00
30.00
UND
1.0000
4.66
4.66
UND
1.0000
0.85
0.85
UND
1.0000
0.85
0.85
CINTA AISLANTE
ML
1.0000
0.20
0.20
GLN
0.0202
60.00
1.21
ML
6.5000
0.50
3.25
PZA
2.5000
0.40
1.00
PZA
2.5000
0.42
1.05
Mano de Obra
CAPATAZ
HH
0.10
0.1553
5.63
0.87
OPERARIO
HH
1.00
1.5534
5.00
7.77
OFICIAL
HH
1.00
1.5534
4.38
6.80
5.0000
15.45
0.77
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
A.12.02 SALIDA DE TECHO (CENTRO DE LUZ)
Rendimiento:
5.330 PTO/DIA
Descripcin
Und
Cantidad
37.89
Precio
Parcial
Materiales
CONDUCTOR TW SOLIDO 1X4 mm2-12
ML
UND
21.0000
0.51
10.71
1.0000
4.66
4.66
UND
1.0000
0.85
0.85
GLN
0.0199
60.00
1.19
ML
7.0000
0.50
3.50
PZA
2.0000
0.40
0.80
PZA
1.2000
0.42
0.50
Mano de Obra
CAPATAZ
HH
0.10
0.1501
5.63
0.85
OPERARIO
HH
1.00
1.5009
5.00
7.50
OFICIAL
HH
1.00
1.5009
4.38
6.57
5.0000
14.92
0.75
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
120.00
Precio
Parcial
Materiales
TABLERO DE DISTRIBUCION DE 3 CIRC.
UND
1.0000
120.00
120.00
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
300.00
Precio
Parcial
Materiales
TABLERO GENERAL DE DISTRIBUCION
Partida:
UND
1.0000
300.00
300.00
Rendimiento:
0.000 P2/DIA
Descripcin
Und
Cantidad
3.10
Precio
Parcial
Materiales
VIDRIOS SEMIDOBLES NACIONALES
Partida:
P2
1.0000
3.10
3.10
Rendimiento:
0.000 PZA/DIA
Descripcin
Und
Cantidad
180.00
Precio
Parcial
Materiales
INODORO TANQUE BAJO BLANCO C/A
Partida:
PZA
1.0000
180.00
180.00
Rendimiento:
7.000 UND/DIA
Descripcin
Und
Cantidad
160.43
Precio
Parcial
Materiales
LAVATORIO 20"x17" 2 LLAVES BLANCO
UND
1.0000
150.00
150.00
Mano de Obra
CAPATAZ
HH
0.10
0.1143
5.63
0.64
OPERARIO
HH
1.00
1.1429
5.00
5.71
PEON
HH
1.00
1.1429
3.13
3.58
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
5.0000
9.94
0.50
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
120.00
Precio
Parcial
Materiales
URINARIO REVESTIDO DE MAYOLICA
Partida:
UND
1.0000
120.00
120.00
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
200.00
Precio
Parcial
Materiales
LAVATORIO CORRIDO CON MAYOLICA
UND
1.0000
200.00
200.00
Cantidad
28.82
Precio
Parcial
Materiales
TUBO PVC SAL 3"
ML
1.0000
1.41
1.41
ML
0.6000
3.39
2.03
PZA
0.5000
0.85
0.43
PZA
0.5000
1.69
0.85
PZA
0.8000
3.81
3.05
PZA
0.2000
1.27
0.25
PZA
0.6000
4.24
2.54
Mano de Obra
CAPATAZ
HH
0.10
0.2000
5.63
1.13
OPERARIO
HH
1.00
2.0000
5.00
10.00
PEON
HH
1.00
2.0000
3.13
6.26
5.0000
17.39
0.87
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.15.02 TUBERIA PVC SAL D=2"
25.000 ML/DIA
Und
Cantidad
3.28
Precio
Parcial
Materiales
PEGAMENTO P/TUBERIA PVC
ML
0.0010
60.00
0.06
ML
0.2100
1.41
0.30
0.0320
5.63
0.18
Mano de Obra
CAPATAZ
HH
0.10
OPERARIO
HH
1.00
0.3200
5.00
1.60
PEON
HH
1.00
0.3200
3.13
1.00
5.0000
2.78
0.14
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
4.000 UND/DIA
Descripcin
Und
Cantidad
38.01
Precio
Parcial
Materiales
CAJA PRE FAB. 12" X 24" INC. TAPA
ML
1.0000
25.00
25.00
Mano de Obra
CAPATAZ
HH
0.10
0.2000
5.63
1.13
OPERARIO
HH
0.50
1.0000
5.00
5.00
PEON
HH
1.00
2.0000
3.13
6.26
5.0000
12.39
0.62
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Cantidad
29.41
Precio
Parcial
Materiales
GRIFO DE BRONCE DE 1/2"
UND
1.0000
3.39
3.39
CINTA TEFLON
ML
1.8000
0.20
0.36
GLN
0.0311
60.00
1.87
ML
1.5000
1.00
1.50
ML
1.0000
1.50
1.50
PZA
1.0000
0.42
0.42
PZA
0.5000
0.85
0.43
PZA
2.0000
0.42
0.84
PZA
1.0000
0.85
0.85
Mano de Obra
CAPATAZ
HH
0.10
0.2000
5.63
1.13
OPERARIO
HH
1.00
2.0000
5.00
10.00
PEON
HH
1.00
2.0000
3.13
6.26
5.0000
17.39
0.87
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.16.02 VALVULA DE COMPUERTA DE BRONCE 3/4"
15.000 UND/DIA
Und
Cantidad
33.65
Precio
Parcial
Materiales
CINTA TEFLON
ML
2.0000
0.20
0.40
UND
2.0000
5.93
11.86
UND
2.0000
1.53
3.06
UND
1.0000
13.56
13.56
Mano de Obra
CAPATAZ
HH
0.10
0.0533
5.63
0.30
OPERARIO
HH
1.00
0.5333
5.00
2.67
PEON
HH
1.00
0.5333
3.13
1.67
3.0000
4.64
0.14
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.16.03 TUBERIA PVC SAP 3/4" C-10
30.770 ML/DIA
Und
Cantidad
4.11
Precio
Parcial
Materiales
CINTA TEFLON
ML
0.1204
0.20
0.02
UND
0.2000
0.85
0.17
UND
1.0300
1.50
1.55
Mano de Obra
CAPATAZ
HH
0.10
0.0260
5.63
0.15
OPERARIO
HH
1.00
0.2600
5.00
1.30
PEON
HH
1.00
0.2600
3.13
0.81
5.0000
2.26
0.11
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
200.000 ML/DIA
Descripcin
Und
Cantidad
2.57
Precio
Parcial
Materiales
PEGAMENTO PLASTICO PVC
UND
0.0200
60.00
1.20
UND
1.0300
1.00
1.03
Mano de Obra
OPERARIO
HH
1.00
0.0400
5.00
0.20
PEON
HH
1.00
0.0400
3.13
0.13
5.0000
0.33
0.02
Equipo
HERRAMIENTAS MANUALES
%MO
ARIOS
Sub Total
3.92
0.25
ARIOS
Sub Total
16.73
0.00
0.50
15.72
Sub Total
1.80
9.56
17.97
0.48
0.99
63.63
Sub Total
45.00
63.63
131.75
Sub Total
19.76
0.26
2.64
0.74
26.35
29.25
1.46
0.64
5.27
ARIOS
45.28
Sub Total
22.19
122.26
41.20
81.32
7.24
2.90
28.98
28.98
14.38
115.92
7.12
14.49
8.84
10.60
Sub Total
1.91
0.56
4.58
0.03
2.12
0.64
2.12
176.77
1.06
4.65
6.36
12.30
0.61
4.23
2.12
ARIOS
7.08
Sub Total
2.99
25.84
6.91
103.97
1.13
0.94
4.72
9.44
26.62
37.76
2.64
4.72
20.00
4.72
90.58
Sub Total
23.55
14.49
9.75
303.08
4.53
45.29
52.86
4.97
45.29
0.25
4.76
95.11
131.75
Sub Total
65.88
17.26
12.43
2.11
2.64
26.35
2.78
70.26
99.25
4.96
1.47
8.79
ARIOS
7.40
Sub Total
6.29
3.63
64.53
206.44
1.55
4.74
4.74
4.74
17.62
18.94
1.66
2.37
9.84
2.37
31.36
Sub Total
3.14
4.70
11.10
126.38
3.14
31.36
33.15
9.94
31.36
0.50
3.29
65.86
114.25
Sub Total
5.71
2.04
121.68
0.46
4.57
0.40
4.57
0.02
0.48
9.60
ARIOS
3.82
Sub Total
1.60
3.25
37.21
224.68
0.70
0.13
2.66
1.33
13.91
10.63
14.75
0.74
1.33
10.43
1.33
35.00
Sub Total
10.50
11.55
8.12
76.30
37.33
10.01
37.33
74.67
0.50
3.73
217.85
Sub Total
6.54
2.00
233.10
6.97
0.30
6.97
0.02
0.70
13.94
ARIOS
4.76
Sub Total
2.57
4.05
40.13
201.72
0.88
0.76
5.52
5.52
41.83
45.70
57.50
2.88
19.43
4.13
85.00
Sub Total
25.50
17.09
12.30
361.25
6.80
68.00
7.95
68.00
142.80
0.40
7.14
715.95
Sub Total
35.80
2.04
762.49
2.86
28.64
0.40
28.64
0.02
3.01
60.14
ARIOS
7.94
Sub Total
4.04
6.03
68.76
202.85
1.46
0.64
6.35
6.35
20.47
31.76
2.25
3.18
12.22
3.18
83.45
Sub Total
16.77
20.03
15.17
451.46
7.42
74.18
45.10
8.84
74.18
0.44
7.79
155.78
879.95
Sub Total
44.00
2.04
937.15
2.82
28.16
0.32
28.16
0.02
2.96
59.13
ARIOS
9.10
Sub Total
5.01
6.95
78.81
203.83
1.67
0.58
8.74
5.82
20.98
37.86
2.91
2.91
9.86
2.91
97.25
Sub Total
9.73
9.73
9.76
346.21
5.18
51.86
53.00
5.30
51.86
0.27
5.45
108.91
310.95
Sub Total
15.55
2.04
331.16
1.24
12.44
0.40
12.44
0.02
1.31
26.12
ARIOS
815.00
Sub Total
1.14
860.64
0.41
4.08
4.08
0.19
36.68
0.01
2.26
45.23
199.50
Sub Total
4.39
6.58
7,581.00
47.08
15.96
25.66
70.82
16.90
168.90
6.83
135.10
320.90
0.34
16.04
55.20
Sub Total
1.10
2.76
3,588.00
25.94
0.77
44.44
32.02
6.51
65.13
9.33
48.85
0.28
3.61
120.50
ARIOS
509.40
Sub Total
11.21
7.84
59.60
295.45
4.23
12.74
25.47
254.70
3.72
152.82
0.19
21.65
63.75
Sub Total
1.40
0.98
7.46
36.98
5.25
24.74
6.38
63.75
432.99
6.82
25.50
0.34
4.78
95.63
73.20
Sub Total
1.61
1.13
8.56
42.46
5.25
28.40
9.01
90.09
8.39
36.04
0.42
6.76
135.14
ARIOS
309.50
Sub Total
3.10
0.62
6.50
39.31
1.01
22.59
13.74
137.54
2.89
41.26
0.14
9.63
192.54
40.00
Sub Total
7.48
42.00
7.80
33.64
0.16
6.40
64.00
10.65
22.40
92.80
0.53
4.64
97.25
Sub Total
0.88
1.56
11.38
209.57
8.29
1.75
7.78
77.80
5.70
38.90
0.29
6.22
124.48
ARIOS
131.75
Sub Total
7.11
69.43
11.75
17.13
2.64
26.35
13.18
3.43
79.05
121.21
6.06
1.57
9.22
170.45
Sub Total
34.09
1.70
34.09
3.31
7.50
2.27
22.72
1.16
22.72
47.71
0.06
2.39
573.15
Sub Total
114.63
5.73
120.36
3.35
25.22
6.53
65.51
0.99
65.51
0.05
6.88
137.56
ARIOS
3.08
Sub Total
0.22
7.85
3.08
0.31
73.46
66.37
30.03
16.43
1.50
1.23
8.21
15.94
Sub Total
1.28
23.91
13.07
6.38
255.04
17.06
8.93
97.95
3.99
24.64
13.33
42.51
0.67
2.13
42.51
20.16
Sub Total
1.11
2.82
31.98
219.74
22.25
80.64
1.11
4.44
8.06
88.70
ARIOS
19.00
Sub Total
304.00
19.00
19.00
19.00
19.00
19.00
0.38
123.50
47.50
47.07
47.50
2.95
29.51
15.45
29.51
0.77
3.10
16.00
Sub Total
336.00
16.00
61.98
16.00
0.32
112.00
32.00
22.22
19.20
2.40
24.01
14.92
24.01
0.75
2.52
50.43
1.00
Sub Total
120.00
1.00
ARIOS
1.00
Sub Total
300.00
1.00
217.00
Sub Total
3.10
217.00
6.00
Sub Total
180.00
6.00
2.00
Sub Total
150.00
2.00
0.23
2.29
9.94
2.29
4.80
0.50
0.24
1.00
Sub Total
120.00
1.00
1.00
Sub Total
200.00
1.00
ARIOS
11.00
Sub Total
11.00
6.60
5.50
5.50
8.80
2.20
10.56
6.60
2.20
22.00
17.39
22.00
0.87
2.31
19.60
Sub Total
0.02
0.36
4.12
0.63
46.20
6.27
2.78
6.27
0.14
0.66
13.17
4.00
Sub Total
25.00
4.00
0.80
4.00
12.39
8.00
0.62
0.64
12.80
ARIOS
11.00
Sub Total
11.00
19.80
0.34
16.50
11.00
11.00
5.50
22.00
11.15
11.00
2.20
22.00
17.39
22.00
0.87
2.31
4.00
Sub Total
8.00
8.00
46.20
8.00
28.88
4.00
0.21
2.13
4.64
2.13
0.14
0.13
4.48
26.40
Sub Total
3.18
5.28
1.74
27.19
0.69
6.86
2.26
6.86
0.11
0.72
14.41
ARIOS
18.50
Sub Total
0.37
2.23
19.06
0.74
0.33
0.74
0.02
0.07
1.48
Und.
Precio
Cant. Requerida
Parcial
KG
2.72
107.59
292.65
KG
2.72
89.19
242.58
KG
2.72
1.49
4.06
KG
2.72
1.10
3.00
KG
2.72
14.49
39.42
KG
2.72
74.12
201.61
CLAVOS DE 2"
KG
2.72
1.11
3.02
CLAVOS DE 3"
KG
2.72
11.55
31.42
ACERO CORRUGADO
KG
2.14
2,385.57
5,105.12
ARENA FINA
M3
50.00
12.13
606.44
M3
37.81
6.29
237.82
ARENA GRUESA
M3
25.21
33.31
839.63
PIEDRA MEDIANA
M3
33.61
2.99
100.42
M3
37.81
7.29
275.75
M3
37.81
12.99
491.10
PIEDRA BASE
M3
33.61
22.19
745.71
ML
0.36
304.00
109.44
ML
0.55
336.00
184.80
UND
252.00
6.00
1,512.00
UND
150.00
2.00
300.00
UND
200.00
1.00
200.00
UND
200.00
1.00
200.00
UND
4.00
11.00
44.00
FLUORESCENTE CIRCULAR 32 W
UND
26.00
19.00
494.00
UND
120.00
1.00
120.00
UND
20.00
16.00
320.00
UND
5.50
19.00
104.50
UND
0.85
35.00
29.75
UND
1.00
19.00
19.00
UND
300.00
1.00
300.00
UND
1.05
11,169.00
11,727.45
UND
2.15
860.64
1,850.38
BLS
22.27
748.75
16,674.62
UND
25.00
4.00
100.00
M2
25.00
42.00
1,050.00
BISAGRA DE 4"
PZA
5.00
31.76
158.82
BLS
15.68
1.52
23.79
CINTA AISLANTE
ML
0.20
19.00
3.80
CINTA TEFLON
ML
1.30
30.98
40.27
GLN
125.00
0.70
87.78
GLN
125.00
0.36
45.21
GLN
125.00
0.37
46.25
PORCELANA
KG
4.50
7.80
35.10
LIJA
UND
1.30
16.15
21.00
CORDEL
ML
0.60
1.52
0.91
M3
66.00
63.63
4,199.58
GLB
1,000.00
1.00
1,000.00
HORMIGON
M3
32.00
65.94
2,109.95
COLA SINTETICA
GLN
25.00
9.51
237.66
HJA
1.30
148.72
193.34
AGUA
M3
5.00
33.68
168.39
GLB
300.00
1.00
300.00
ALMACEN
GLB
300.00
1.00
300.00
GLB
350.00
1.00
350.00
MADERA TORNILLO
P2
2.80
2,831.57
7,928.38
P2
3.10
107.34
332.76
ANDAMIO DE MADERA
P2
2.80
7.44
20.82
P2
2.80
76.30
213.64
P2
2.80
32.02
89.64
PLN
25.50
17.06
434.92
THINER
GLN
13.15
8.93
117.38
IMPRIMANTE
KG
4.50
154.45
695.03
PINTURA LATEX
GLN
45.00
32.72
1,472.33
BARNIZ
GLN
33.40
3.99
133.10
UND
1.50
5.28
7.92
UND
5.93
8.00
47.44
NIPLE DE F G DE 3/4"
UND
1.53
8.00
12.24
ML
1.00
19.06
19.06
ML
1.00
16.50
16.50
ML
1.50
38.19
57.29
PZA
0.50
11.00
5.50
PZA
1.00
5.50
5.50
PZA
0.50
22.00
11.00
PZA
1.00
11.00
11.00
ML
1.41
4.12
5.80
ML
2.00
11.00
22.00
ML
2.60
6.60
17.16
PZA
1.00
5.50
5.50
PZA
2.00
5.50
11.00
PZA
3.50
8.80
30.80
PZA
2.00
2.20
4.40
PZA
5.50
6.60
36.30
ML
0.56
235.50
131.88
PZA
1.20
79.50
95.40
PZA
0.60
66.70
40.02
UND
18.00
4.00
72.00
P2
3.10
217.00
672.70
66,657.95
66,657.95
32,655.72
1,491.94
100,805.62
Und.
Precio
Cant. Requerida
Parcial
HH
9.04
2.12
HH
9.04
4.74
19.16
42.81
CAPATAZ
HH
10.34
188.80
1,952.16
OPERARIO
HH
9.04
1,779.44
16,086.09
OFICIAL
HH
8.16
522.82
4,266.23
PEON
HH
7.33
1,403.72
10,289.26
32,655.72
Und.
Precio
Cant. Requerida
Parcial
MEZCLADORA DE CONCRETO DE 9 - 11 P3
HM
20.00
53.25
1,065.00
HM
15.00
5.27
79.05
HM
9.52
2.37
22.54
HM
9.52
6.05
57.58
HM
9.52
6.09
57.96
HM
9.52
2.91
27.72
TEODOLITO
HM
30.00
6.07
182.10
1,491.94
I N S U M O S C O M O D I N E S O P O R C E N T A J E S ESTI M A D O S
OBRA:
PROPIETARIO:
FECHA:
Insumo
Und.
HERRAMIENTAS MANUALES
% MO
Precio
Cant. Requerida
822.44
1.00
STI M A D O S
Parcial
822.44
Rendimiento:
0.000 GLB/DIA
Descripcin
Und
Cantidad
300.00
Precio
Parcial
Materiales
ALMACEN
Partida:
GLB
1.0000
300.00
300.00
Rendimiento:
1.000 GLB/DIA
Descripcin
Und
Cantidad
350.00
Precio
Parcial
Materiales
CARTEL DE OBRA INC/INST. TRANSP.
Partida:
GLB
1.0000
350.00
350.00
Rendimiento:
0.000 GLB/DIA
Descripcin
Und
Cantidad
300.00
Precio
Parcial
Materiales
AGUA
Partida:
GLB
1.0000
300.00
300.00
Rendimiento:
0.000 GLB/DIA
Descripcin
Und
Cantidad
1,000.00
Precio
Parcial
Materiales
TRANSPORTE DE MAQUIN. Y EQUIPO
Partida:
Rendimiento:
Descripcin
GLB
1.0000
1,000.00
1,000.00
Cantidad
1.76
Precio
Parcial
Mano de Obra
CAPATAZ
HH
0.10
0.0200
10.34
0.21
PEON
HH
1.00
0.2000
7.33
1.47
5.0000
1.67
0.08
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
200.000 M2/DIA
Descripcin
Und
Cantidad
2.19
Precio
Parcial
Materiales
YESO EN BOLSA DE 20 KG.
BLS
0.0100
15.68
0.16
CORDEL
ML
0.0100
0.60
0.01
MADERA TORNILLO
P2
0.0490
2.80
0.14
Mano de Obra
OPERARIO
HH
1.00
0.0400
9.04
0.36
PEON
HH
1.00
0.0400
7.33
0.29
5.0000
0.65
0.03
0.0400
30.00
1.20
Equipo
HERRAMIENTAS MANUALES
%MO
TEODOLITO
HM
1.00
Rendimiento:
4.000 M3/DIA
Descripcin
Und
Cantidad
17.56
Precio
Parcial
Mano de Obra
CAPATAZ
HH
0.10
0.2000
10.34
2.07
PEON
HH
1.00
2.0000
7.33
14.66
5.0000
16.73
0.84
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
A.03.02 RELLENO CON MATERIAL PROPIO
Rendimiento:
8.000 M3/DIA
Descripcin
Und
Cantidad
8.78
Precio
Parcial
Mano de Obra
CAPATAZ
HH
0.10
0.1000
10.34
1.03
PEON
HH
1.00
1.0000
7.33
7.33
5.0000
8.36
0.42
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
%MO
A.03.03 ELIMINACION DE MATERIAL EXCEDENTE
40.000 M3/DIA
Descripcin
Und
Cantidad
66.00
Precio
Parcial
Materiales
TRANSPORTE MATERIAL VOLQ. 6 M3
M3
1.0000
Partida:
Rendimiento:
400.000 M2/DIA
Descripcin
Und
66.00
66.00
Cantidad
2.35
Precio
Parcial
Mano de Obra
CAPATAZ
HH
0.10
0.0020
10.34
0.02
OPERARIO
HH
1.00
0.0200
9.04
0.18
PEON
HH
10.00
0.2000
7.33
1.47
5.0000
1.67
0.08
0.0400
15.00
0.60
Equipo
HERRAMIENTAS MANUALES
%MO
HM
2.00
Partida:
Rendimiento:
Descripcin
Und
Cantidad
144.87
Precio
Parcial
Materiales
PIEDRA BASE
M3
0.4900
33.61
16.47
BLS
2.7000
22.27
60.13
HORMIGON
M3
0.9100
32.00
29.12
AGUA
M3
0.1600
5.00
0.80
Mano de Obra
CAPATAZ
HH
0.20
0.0640
10.34
0.66
OPERARIO
HH
2.00
0.6400
9.04
5.79
OFICIAL
HH
2.00
0.6400
8.16
5.22
PEON
HH
8.00
2.5600
7.33
18.76
5.0000
30.43
1.52
0.3200
20.00
6.40
Equipo
HERRAMIENTAS MANUALES
%MO
HM
Partida:
Rendimiento:
1.00
Descripcin
Und
Cantidad
19.64
Precio
Parcial
Materiales
CEMENTO PORTLAND TIPO I
BLS
0.1800
22.27
4.01
HORMIGON
M3
0.0530
32.00
1.70
AGUA
M3
0.0030
5.00
0.02
Mano de Obra
OPERADOR DE EQUIPO LIVIANO
HH
0.20
0.2000
9.04
1.81
CAPATAZ
HH
0.20
0.0600
10.34
0.62
OPERARIO
HH
2.00
0.2000
9.04
1.81
OFICIAL
HH
2.00
0.1000
8.16
0.82
PEON
HH
8.00
0.6000
7.33
4.40
5.0000
9.45
0.47
0.2000
20.00
4.00
Equipo
HERRAMIENTAS MANUALES
%MO
HM
1.00
Partida:
Rendimiento:
6.000 M3/DIA
Descripcin
Und
Cantidad
207.43
Precio
Parcial
Materiales
PIEDRA MEDIANA
M3
0.4220
33.61
14.18
BLS
3.6500
22.27
81.29
HORMIGON
M3
0.9760
32.00
31.23
AGUA
M3
0.1600
5.00
0.80
1.38
Mano de Obra
CAPATAZ
HH
0.10
0.1333
10.34
OPERARIO
HH
0.50
0.6667
9.04
6.03
OFICIAL
HH
1.00
1.3333
8.16
10.88
PEON
HH
4.00
5.3333
7.33
39.09
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
57.38
2.87
HM
0.50
0.6667
20.00
13.33
HM
0.50
0.6667
9.52
6.35
Partida:
Rendimiento:
Descripcin
Und
Cantidad
20.08
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.2600
2.72
0.71
KG
0.1600
2.72
0.44
MADERA TORNILLO
P2
3.3460
2.80
9.37
Mano de Obra
CAPATAZ
HH
0.10
0.0500
10.34
0.52
OPERARIO
HH
1.00
0.5000
9.04
4.52
OFICIAL
HH
1.00
0.5000
8.16
4.08
5.0000
9.12
0.46
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
120.000 M2/DIA
Descripcin
Und
Cantidad
22.96
Precio
Parcial
Materiales
CEMENTO PORTLAND TIPO I
BLS
0.5000
22.27
11.14
HORMIGON
M3
0.1310
32.00
4.19
AGUA
M3
0.0160
5.00
0.08
Mano de Obra
CAPATAZ
HH
0.30
0.0200
10.34
0.21
OPERARIO
HH
3.00
0.2000
9.04
1.81
PEON
HH
8.00
0.5333
7.33
3.91
5.0000
5.92
0.30
0.0667
20.00
1.33
Equipo
HERRAMIENTAS MANUALES
%MO
HM
1.00
Partida:
Rendimiento:
Descripcin
Und
Cantidad
286.52
Precio
Parcial
Materiales
PIEDRA CHANCADA DE 3/4"
M3
0.8500
37.81
ARENA GRUESA
M3
0.4900
25.21
32.14
12.35
BLS
8.7200
22.27
194.19
AGUA
M3
0.2100
5.00
1.05
Mano de Obra
OPERADOR DE EQUIPO PESADO
HH
1.00
0.6400
9.04
5.79
OPERARIO
HH
1.00
0.6400
9.04
5.79
OFICIAL
HH
1.00
0.6400
8.16
5.22
PEON
HH
4.00
2.5600
7.33
18.76
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
35.56
1.78
HM
0.50
0.3200
20.00
6.40
HM
0.50
0.3200
9.52
3.05
Partida:
Rendimiento:
Descripcin
Cantidad
31.11
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.1000
2.72
KG
0.1500
2.72
0.27
0.41
MADERA TORNILLO
P2
4.0300
2.80
11.28
Mano de Obra
CAPATAZ
HH
0.10
0.1000
10.34
1.03
OPERARIO
HH
1.00
1.0000
9.04
9.04
OFICIAL
HH
1.00
1.0000
8.16
8.16
5.0000
18.23
0.91
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
200.000 KG/DIA
Descripcin
Und
Cantidad
3.18
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.72
0.14
ACERO CORRUGADO
KG
1.0650
2.14
2.28
Mano de Obra
CAPATAZ
HH
0.10
0.0040
10.34
0.04
OPERARIO
HH
1.00
0.0400
9.04
0.36
OFICIAL
HH
1.00
0.0400
8.16
0.33
5.0000
0.73
0.04
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
23.000 M3/DIA
Descripcin
Und
Cantidad
302.20
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.4200
25.21
M3
0.8500
37.81
10.59
32.14
BLS
9.7400
22.27
216.91
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.10
0.0348
10.34
0.36
OPERARIO
HH
2.00
0.6957
9.04
6.29
OFICIAL
HH
1.00
0.3478
8.16
2.84
PEON
HH
8.00
2.7826
7.33
20.40
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
29.88
1.49
HM
0.50
0.3478
20.00
6.96
HM
0.50
0.3478
9.52
3.31
Partida:
Rendimiento:
Descripcin
Cantidad
27.08
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.3000
2.72
0.82
CLAVOS DE 3"
KG
0.3300
2.72
0.90
P2
2.1800
2.80
6.10
Mano de Obra
OPERARIO
HH
1.00
1.0667
9.04
9.64
OFICIAL
HH
1.00
1.0667
8.16
8.70
5.0000
18.35
0.92
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
250.000 KG/DIA
Descripcin
Und
Cantidad
2.95
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0300
2.72
0.08
ACERO CORRUGADO
KG
1.0700
2.14
2.29
Mano de Obra
OPERARIO
HH
1.00
0.0320
9.04
0.29
OFICIAL
HH
1.00
0.0320
8.16
0.26
5.0000
0.55
0.03
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
6.000 M3/DIA
Descripcin
Und
Cantidad
348.32
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.5400
25.21
M3
0.8500
37.81
13.61
32.14
BLS
8.4300
22.27
187.74
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.12
0.1600
10.34
1.65
OPERARIO
HH
0.87
1.1600
9.04
10.49
OFICIAL
HH
0.87
1.1600
8.16
9.47
PEON
HH
7.20
9.6000
7.33
70.37
5.0000
91.97
4.60
0.8667
20.00
17.33
Equipo
HERRAMIENTAS MANUALES
%MO
HM
Partida:
Rendimiento:
Descripcin
0.65
Cantidad
28.58
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.3000
2.72
KG
0.2010
2.72
0.82
0.55
MADERA TORNILLO
P2
4.2500
2.80
11.90
Mano de Obra
CAPATAZ
HH
0.10
0.0800
10.34
0.83
OPERARIO
HH
1.00
0.8000
9.04
7.23
OFICIAL
HH
1.00
0.8000
8.16
6.53
5.0000
14.59
0.73
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
200.000 KG/DIA
Descripcin
Und
Cantidad
3.18
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.72
0.14
ACERO CORRUGADO
KG
1.0650
2.14
2.28
Mano de Obra
CAPATAZ
HH
0.10
0.0040
10.34
0.04
OPERARIO
HH
1.00
0.0400
9.04
0.36
OFICIAL
HH
1.00
0.0400
8.16
0.33
5.0000
0.73
0.04
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
10.000 M3/DIA
Descripcin
Und
Cantidad
293.26
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.5090
25.21
M3
0.7600
37.81
12.83
28.74
BLS
8.6600
22.27
192.86
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.12
0.0800
10.34
0.83
OPERARIO
HH
0.87
0.8000
9.04
7.23
OFICIAL
HH
0.87
0.8000
8.16
6.53
PEON
HH
7.20
4.0000
7.33
29.32
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
43.91
2.20
HM
0.65
0.4000
20.00
8.00
HM
0.65
0.4000
9.52
3.81
Partida:
Rendimiento:
Descripcin
Cantidad
33.37
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.2010
2.72
KG
0.2400
2.72
0.55
0.65
MADERA TORNILLO
P2
5.4100
2.80
15.15
Mano de Obra
CAPATAZ
HH
0.10
0.0889
10.34
0.92
OPERARIO
HH
1.00
0.8889
9.04
8.04
OFICIAL
HH
1.00
0.8889
8.16
7.25
5.0000
16.21
0.81
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
250.000 KG/DIA
Descripcin
Und
Cantidad
3.03
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.72
0.14
ACERO CORRUGADO
KG
1.0650
2.14
2.28
Mano de Obra
CAPATAZ
HH
0.10
0.0032
10.34
0.03
OPERARIO
HH
1.00
0.0320
9.04
0.29
OFICIAL
HH
1.00
0.0320
8.16
0.26
5.0000
0.58
0.03
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
12.500 M3/DIA
Descripcin
Und
Cantidad
294.09
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.5500
25.21
M3
0.7642
37.81
13.87
28.89
BLS
8.6600
22.27
192.86
AGUA
M3
0.1840
5.00
0.92
Mano de Obra
CAPATAZ
HH
0.10
0.0640
10.34
0.66
OPERARIO
HH
1.50
0.9600
9.04
8.68
OFICIAL
HH
1.00
0.6400
8.16
5.22
PEON
HH
6.50
4.1600
7.33
30.49
HM
0.50
0.3200
20.00
6.40
HM
0.50
0.3200
9.52
3.05
HM
0.50
0.3200
9.52
3.05
Equipo
Partida:
Rendimiento:
Descripcin
Cantidad
20.72
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 8
KG
0.1000
2.72
0.27
KG
0.1000
2.72
0.27
MADERA TORNILLO
P2
3.5600
2.80
9.97
Mano de Obra
CAPATAZ
HH
0.10
0.0533
10.34
0.55
OPERARIO
HH
1.00
0.5333
9.04
4.82
OFICIAL
HH
1.00
0.5333
8.16
4.35
5.0000
9.72
0.49
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
200.000 KG/DIA
Descripcin
Und
Cantidad
3.18
Precio
Parcial
Materiales
ALAMBRE NEGRO NACIONAL # 16
KG
0.0500
2.72
0.14
ACERO CORRUGADO
KG
1.0650
2.14
2.28
Mano de Obra
CAPATAZ
HH
0.10
0.0040
10.34
0.04
OPERARIO
HH
1.00
0.0400
9.04
0.36
OFICIAL
HH
1.00
0.0400
8.16
0.33
5.0000
0.73
0.04
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Und
Cantidad
2.71
Precio
Parcial
Materiales
LADRILLO P/TECHO 15x30x30 8 HUECOS
UND
1.0560
2.15
2.27
Mano de Obra
CAPATAZ
HH
0.10
0.0005
10.34
0.01
OPERARIO
HH
1.00
0.0050
9.04
0.05
OFICIAL
HH
1.00
0.0050
8.16
0.04
PEON
HH
9.00
0.0450
7.33
0.33
5.0000
0.42
0.02
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
%MO
Descripcin
Und
Cantidad
61.61
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.72
ARENA GRUESA
M3
0.0330
25.21
0.06
0.83
UND
38.0000
1.05
39.90
BLS
0.2360
22.27
5.26
AGUA
M3
0.0800
5.00
0.40
MADERA TORNILLO
P2
0.3550
2.80
0.99
Mano de Obra
CAPATAZ
HH
0.10
0.0847
10.34
0.88
OPERARIO
HH
1.00
0.8466
9.04
7.65
PEON
HH
0.80
0.6772
7.33
4.96
5.0000
13.49
0.67
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
%MO
Descripcin
Und
Cantidad
101.02
Precio
Parcial
Materiales
CLAVOS PARA MADERA C/C 3"
KG
0.0200
2.72
ARENA GRUESA
M3
0.0500
25.21
0.05
1.26
UND
65.0000
1.05
68.25
BLS
0.4700
22.27
10.47
AGUA
M3
0.0140
5.00
0.07
P2
0.5800
2.80
1.62
Mano de Obra
CAPATAZ
HH
0.10
0.1180
10.34
1.22
OPERARIO
HH
1.00
1.1799
9.04
10.67
PEON
HH
0.80
0.8850
7.33
6.49
5.0000
18.37
0.92
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Cantidad
12.73
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.72
0.06
ARENA FINA
M3
0.0154
50.00
0.77
BLS
0.1170
22.27
2.61
MADERA TORNILLO
P2
0.5800
2.80
1.62
P2
0.0250
3.10
0.08
Mano de Obra
CAPATAZ
HH
0.10
0.0500
10.34
0.52
OPERARIO
HH
1.00
0.5000
9.04
4.52
PEON
HH
0.60
0.3000
7.33
2.20
5.0000
7.24
0.36
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.07.02 TARRAJEO DE COLUMNAS
8.000 M2/DIA
Und
Cantidad
19.92
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.72
0.06
ARENA FINA
M3
0.0154
50.00
0.77
BLS
0.1170
22.27
2.61
MADERA TORNILLO
P2
0.5800
2.80
1.62
P2
0.3880
3.10
1.20
Mano de Obra
CAPATAZ
HH
0.10
0.1000
10.34
1.03
OPERARIO
HH
1.00
1.0000
9.04
9.04
PEON
HH
0.40
0.4000
7.33
2.93
5.0000
13.01
0.65
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.07.03 TARRAJEO DE VIGAS
6.500 M2/DIA
Und
Cantidad
23.07
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0220
2.72
0.06
ARENA FINA
M3
0.0154
50.00
0.77
BLS
0.1170
22.27
2.61
MADERA TORNILLO
P2
0.5800
2.80
1.62
P2
0.3880
3.10
1.20
Mano de Obra
CAPATAZ
HH
0.10
0.1231
10.34
1.27
OPERARIO
HH
1.00
1.2308
9.04
11.13
PEON
HH
0.40
0.4923
7.33
3.61
5.0000
16.01
0.80
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
Descripcin
Und
Cantidad
6.90
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0100
2.72
0.03
ARENA FINA
M3
0.0020
50.00
0.10
BLS
0.0210
22.27
0.47
MADERA TORNILLO
P2
0.1270
2.80
0.36
P2
0.0730
3.10
0.23
Mano de Obra
CAPATAZ
HH
0.10
0.0444
10.34
0.46
OPERARIO
HH
1.00
0.4444
9.04
4.02
PEON
HH
0.30
0.1333
7.33
0.98
5.0000
5.45
0.27
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
%MO
A.07.05 CERAMICA NACIONAL .30X.20 M. COLOR
10.000 M2/DIA
Descripcin
Und
Cantidad
52.55
Precio
Parcial
Materiales
CEMENTO PORTLAND TIPO I
BLS
0.1870
22.27
4.16
M2
1.0500
25.00
26.25
PORCELANA
KG
0.1950
4.50
0.88
AGUA
P2
0.0040
5.00
0.02
Mano de Obra
CAPATAZ
HH
0.20
0.1600
10.34
1.65
OPERARIO
HH
2.00
1.6000
9.04
14.46
PEON
HH
0.70
0.5600
7.33
4.10
5.0000
20.22
1.01
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.08.01 CIELO RASO CON MEZCLA C:A 1:5
10.000 M2/DIA
Und
Cantidad
21.06
Precio
Parcial
Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"
KG
0.0090
2.72
0.02
ARENA FINA
M3
0.0160
50.00
0.80
BLS
0.1170
22.27
2.61
MADERA TORNILLO
P2
2.1550
2.80
6.03
P2
0.0180
3.10
0.06
Mano de Obra
CAPATAZ
HH
0.10
0.0800
10.34
0.83
OPERARIO
HH
1.00
0.8000
9.04
7.23
PEON
HH
0.30
0.4000
7.33
2.93
5.0000
10.99
0.55
Equipo
HERRAMIENTAS MANUALES
%MO
Descripcin
Und
Cantidad
22.49
Precio
Parcial
Materiales
ARENA GRUESA
M3
0.0540
25.21
1.36
BLS
0.5270
22.27
11.74
P2
0.1300
3.10
0.40
Mano de Obra
CAPATAZ
HH
0.10
0.0200
10.34
0.21
OPERARIO
HH
1.00
0.2000
9.04
1.81
OFICIAL
HH
0.50
0.1000
8.16
0.82
PEON
HH
3.00
0.6000
7.33
4.40
5.0000
7.23
0.36
0.0700
20.00
1.40
Equipo
HERRAMIENTAS MANUALES
%MO
HM
Partida:
Rendimiento:
Descripcin
0.35
Cantidad
5.60
Precio
Parcial
Materiales
LIJA PARA MADERA
HJA
0.2000
1.30
0.26
ANDAMIO DE MADERA
P2
0.0100
2.80
0.03
IMPRIMANTE
KG
0.2000
4.50
0.90
PINTURA LATEX
GLN
0.0440
45.00
1.98
Mano de Obra
CAPATAZ
HH
0.10
0.0133
10.34
0.14
OPERARIO
HH
1.00
0.1333
9.04
1.21
PEON
HH
1.00
0.1333
7.33
0.98
5.0000
2.32
0.12
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
Cantidad
5.30
Precio
Parcial
Materiales
LIJA PARA MADERA
HJA
0.2000
1.30
0.26
ANDAMIO DE MADERA
P2
0.0100
2.80
0.03
IMPRIMANTE
KG
0.2100
4.50
0.95
PINTURA LATEX
GLN
0.0440
45.00
1.98
Mano de Obra
CAPATAZ
HH
0.10
0.0114
10.34
0.12
OPERARIO
HH
1.00
0.1143
9.04
1.03
PEON
HH
1.00
0.1143
7.33
0.84
5.0000
1.99
0.10
Equipo
HERRAMIENTAS MANUALES
%MO
Cantidad
143.44
Precio
Parcial
Materiales
CLAVOS PARA MADERA C/C 2"
KG
0.0710
2.72
0.19
BISAGRA 4"
PZA
2.5500
5.00
12.75
LIJA
UND
1.0000
1.30
1.30
COLA SINTETICA
GLN
0.1000
25.00
2.50
MADERA TORNILLO
P2
21.5500
2.80
60.34
Mano de Obra
OPERARIO
HH
1.00
2.6667
9.04
24.11
PEON
HH
2.00
5.3333
7.33
39.09
5.0000
63.20
3.16
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.11.02 PUERTA CONTRAPLACADA
6.000 M2/DIA
Und
Cantidad
131.89
Precio
Parcial
Materiales
CLAVOS PARA MADERA C/C 2"
KG
0.0800
2.72
0.22
BISAGRA 4"
PZA
1.5000
5.00
7.50
LIJA
UND
0.8200
1.30
1.07
COLA SINTETICA
GLN
0.4000
25.00
10.00
MADERA TORNILLO
P2
16.0000
2.80
44.80
PLN
1.0700
25.50
27.29
THINER
GLN
0.5600
13.15
7.36
BARNIZ
GLN
0.2500
33.40
8.35
2.6667
9.04
24.11
5.0000
24.11
1.21
Mano de Obra
OPERARIO
HH
2.00
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.11.03 VENTANA DE MADERA TORNILLO
2.000 M2/DIA
Und
Cantidad
76.48
Precio
Parcial
Materiales
CLAVOS DE 2"
KG
0.0550
2.72
COLA SINTETICA
GLN
0.1400
25.00
0.15
3.50
MADERA TORNILLO
P2
10.9000
2.80
30.52
Mano de Obra
CAPATAZ
HH
0.10
0.4000
10.34
4.14
OPERARIO
HH
1.00
4.0000
9.04
36.16
5.0000
40.30
2.01
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
5.150 PTO/DIA
Descripcin
Und
Cantidad
79.72
Precio
Parcial
Materiales
CONDUCTOR TW SOLIDO 1X2.5 mm2-14 AWGML
16.0000
0.36
5.76
FLUORESCENTE CIRCULAR 32 W
UND
1.0000
26.00
26.00
UND
1.0000
5.50
5.50
UND
1.0000
0.85
0.85
UND
1.0000
1.00
1.00
CINTA AISLANTE
ML
1.0000
0.20
0.20
GLN
0.0202
125.00
2.53
ML
6.5000
0.56
3.64
PZA
2.5000
1.20
3.00
PZA
2.5000
0.60
1.50
Mano de Obra
CAPATAZ
HH
0.10
0.1553
10.34
1.61
OPERARIO
HH
1.00
1.5534
9.04
14.04
OFICIAL
HH
1.00
1.5534
8.16
12.68
5.0000
28.32
1.42
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
A.12.02 SALIDA TOMACORRIENTE C/LINEA A TIERRA
Rendimiento:
5.330 PTO/DIA
Descripcin
Und
Cantidad
70.81
Precio
Parcial
Materiales
CONDUCTOR TW SOLIDO 1X4 mm2-12
ML
21.0000
0.55
11.55
UND
1.0000
20.00
20.00
UND
1.0000
1.00
1.00
GLN
0.0199
125.00
2.49
ML
7.0000
0.56
3.92
PZA
2.0000
1.20
2.40
PZA
1.2000
0.60
0.72
Mano de Obra
CAPATAZ
HH
0.10
0.1501
10.34
1.55
OPERARIO
HH
1.00
1.5009
9.04
13.57
OFICIAL
HH
1.00
1.5009
8.16
12.25
5.0000
27.37
1.37
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
120.00
Precio
Parcial
Materiales
TABLERO DE DISTRIBUCION DE 3 CIRC.
UND
1.0000
120.00
120.00
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
300.00
Precio
Parcial
Materiales
TABLERO GENERAL DE DISTRIBUCION
Partida:
UND
1.0000
300.00
300.00
Rendimiento:
0.000 P2/DIA
Descripcin
Und
Cantidad
3.10
Precio
Parcial
Materiales
VIDRIOS SEMIDOBLES NACIONALES
Partida:
P2
1.0000
3.10
3.10
Rendimiento:
0.000 PZA/DIA
Descripcin
Und
Cantidad
252.00
Precio
Parcial
Materiales
INODORO TANQUE BAJO BLANCO C/A
Partida:
PZA
1.0000
252.00
252.00
Rendimiento:
7.000 UND/DIA
Descripcin
Und
Cantidad
150.00
Precio
Parcial
Materiales
LAVATORIO 20"x17" 2 LLAVES BLANCO
UND
1.0000
150.00
150.00
Mano de Obra
CAPATAZ
HH
0.10
0.1143
10.34
1.18
OPERARIO
HH
1.00
1.1429
9.04
10.33
PEON
HH
1.00
1.1429
7.33
8.38
5.0000
19.89
0.99
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
A.14.03 URINARIO REVESTIDO DE MAYOLICA
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
200.00
Precio
Parcial
Materiales
URINARIO REVESTIDO DE MAYOLICA
Partida:
UND
1.0000
200.00
200.00
Rendimiento:
0.000 UND/DIA
Descripcin
Und
Cantidad
200.00
Precio
Parcial
Materiales
LAVATORIO CORRIDO CON MAYOLICA
UND
1.0000
200.00
200.00
Partida:
Rendimiento:
Descripcin
Cantidad
48.11
Precio
Parcial
Materiales
TUBO PVC SAL 3"
ML
1.0000
2.00
2.00
ML
0.6000
2.60
1.56
PZA
0.5000
1.00
0.50
PZA
0.5000
2.00
1.00
PZA
0.8000
3.50
2.80
PZA
0.2000
2.00
0.40
PZA
0.6000
5.50
3.30
Mano de Obra
CAPATAZ
HH
0.10
0.2000
10.34
2.07
OPERARIO
HH
1.00
2.0000
9.04
18.08
PEON
HH
1.00
2.0000
7.33
14.66
5.0000
34.81
1.74
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.15.02 TUBERIA PVC SAL D=2"
25.000 ML/DIA
Und
Cantidad
6.27
Precio
Parcial
Materiales
PEGAMENTO P/TUBERIA PVC
GLN
0.0010
125.00
0.13
ML
0.2100
1.41
0.30
Mano de Obra
CAPATAZ
HH
0.10
0.0320
10.34
0.33
OPERARIO
HH
1.00
0.3200
9.04
2.89
PEON
HH
1.00
0.3200
7.33
2.35
5.0000
5.57
0.28
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
A.15.03 CAJA DE REGISTRO 12" X 24"
Rendimiento:
4.000 UND/DIA
Descripcin
Und
Cantidad
52.06
Precio
Parcial
Materiales
CAJA PRE FAB. 12" X 24" INC. TAPA
ML
1.0000
25.00
25.00
2.07
Mano de Obra
CAPATAZ
HH
0.10
0.2000
10.34
OPERARIO
HH
0.50
1.0000
9.04
9.04
PEON
HH
1.00
2.0000
7.33
14.66
5.0000
25.77
1.29
Equipo
HERRAMIENTAS MANUALES
%MO
Partida:
Rendimiento:
4.000 PTO/DIA
Descripcin
Und
Cantidad
52.78
Precio
Parcial
Materiales
GRIFO DE BRONCE DE 1/2"
UND
1.0000
4.00
4.00
CINTA TEFLON
ML
1.8000
1.30
2.34
GLN
0.0311
125.00
3.89
ML
1.5000
1.00
1.50
ML
1.0000
1.50
1.50
PZA
1.0000
0.50
0.50
PZA
0.5000
1.00
0.50
PZA
2.0000
0.50
1.00
PZA
1.0000
1.00
1.00
Mano de Obra
CAPATAZ
HH
0.10
0.2000
10.34
2.07
OPERARIO
HH
1.00
2.0000
9.04
18.08
PEON
HH
1.00
2.0000
7.33
14.66
5.0000
34.81
1.74
Equipo
HERRAMIENTAS MANUALES
Partida:
%MO
A.16.02 VALVULA DE COMPUERTA DE BRONCE 3/4"
Rendimiento:
15.000 UND/DIA
Descripcin
Und
Cantidad
45.27
Precio
Parcial
Materiales
CINTA TEFLON
ML
2.0000
1.30
2.60
UND
2.0000
5.93
11.86
UND
2.0000
1.53
3.06
UND
1.0000
18.00
18.00
Mano de Obra
CAPATAZ
HH
0.10
0.0533
10.34
0.55
OPERARIO
HH
1.00
0.5333
9.04
4.82
PEON
HH
1.00
0.5333
7.33
3.91
5.0000
9.28
0.46
Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin
%MO
A.16.03 TUBERIA PVC SAP 3/4" C-10
30.770 ML/DIA
Und
Cantidad
6.75
Precio
Parcial
Materiales
CINTA TEFLON
ML
0.1204
1.30
0.16
UND
0.2000
1.50
0.30
UND
1.0300
1.50
1.55
Mano de Obra
CAPATAZ
HH
0.10
0.0260
10.34
0.27
OPERARIO
HH
1.00
0.2600
9.04
2.35
PEON
HH
1.00
0.2600
7.33
1.91
Equipo
HERRAMIENTAS MANUALES
%MO
5.0000
4.53
0.23
Partida:
Rendimiento:
200.000 ML/DIA
Descripcin
Und
Cantidad
4.22
Precio
Parcial
Materiales
PEGAMENTO PLASTICO PVC
UND
0.0200
125.00
2.50
UND
1.0300
1.00
1.03
Mano de Obra
OPERARIO
HH
1.00
0.0400
9.04
0.36
PEON
HH
1.00
0.0400
7.33
0.29
5.0000
0.65
0.03
Equipo
HERRAMIENTAS MANUALES
%MO
ARIOS
1.00
Sub Total
300.00
1.00
1.00
Sub Total
350.00
1.00
1.00
Sub Total
300.00
1.00
1.00
Sub Total
1,000.00
1.00
151.75
Sub Total
3.04
1.67
30.35
0.08
758.75
151.75
Sub Total
1.52
1.52
0.30
7.44
6.07
0.65
6.07
0.61
1.23
6.07
12.14
ARIOS
79.25
Sub Total
15.85
16.73
158.50
0.84
8.72
174.35
15.72
Sub Total
1.57
8.36
15.72
0.42
0.86
17.29
63.63
Sub Total
66.00
63.63
131.75
Sub Total
0.26
2.64
1.67
26.35
1.46
0.68
5.27
29.25
ARIOS
45.28
Sub Total
22.19
122.26
41.20
106.52
7.24
2.90
28.98
28.98
30.43
115.92
7.92
14.49
176.77
8.84
10.60
Sub Total
1.91
0.56
5.72
0.03
2.12
0.64
2.12
1.06
9.45
6.36
0.61
4.47
2.12
12.30
ARIOS
7.08
Sub Total
2.99
25.84
6.91
127.50
1.13
0.94
4.72
9.44
57.38
37.76
52.86
2.64
4.72
22.55
4.72
90.58
Sub Total
23.55
14.49
10.51
303.08
4.53
45.29
9.12
45.29
0.46
4.76
95.11
131.75
Sub Total
65.88
17.26
15.41
2.11
2.64
26.35
5.92
70.26
4.96
1.63
8.79
99.25
ARIOS
7.40
Sub Total
6.29
3.63
64.53
239.74
1.55
4.74
4.74
4.74
35.56
18.94
33.15
1.66
2.37
11.22
2.37
31.36
Sub Total
3.14
4.70
11.96
126.38
3.14
31.36
18.23
31.36
0.91
3.29
65.86
114.25
Sub Total
5.71
2.42
121.68
0.46
4.57
0.73
4.57
0.04
0.48
9.60
ARIOS
3.82
Sub Total
1.60
3.25
37.21
260.56
0.70
0.13
2.66
1.33
29.88
10.63
14.75
0.74
1.33
11.76
1.33
35.00
Sub Total
10.50
11.55
7.82
76.30
37.33
18.35
37.33
0.92
3.73
74.67
217.85
Sub Total
6.54
2.37
233.10
6.97
0.55
6.97
0.03
0.70
13.94
ARIOS
4.76
Sub Total
2.57
4.05
40.13
234.41
0.88
0.76
5.52
5.52
91.97
45.70
57.50
2.88
21.93
4.13
85.00
Sub Total
25.50
17.09
13.26
361.25
6.80
68.00
14.59
68.00
0.73
7.14
142.80
715.95
Sub Total
35.80
2.42
762.49
2.86
28.64
0.73
28.64
0.04
3.01
60.14
ARIOS
7.94
Sub Total
4.04
6.03
68.76
235.35
1.46
0.64
6.35
6.35
43.91
31.76
45.10
2.25
3.18
14.00
3.18
83.45
Sub Total
16.77
20.03
16.35
451.46
7.42
74.18
16.21
74.18
0.81
7.79
155.78
879.95
Sub Total
44.00
2.42
937.15
2.82
28.16
0.58
28.16
0.03
2.96
59.13
ARIOS
9.10
Sub Total
5.01
6.95
78.81
236.54
1.67
0.58
8.74
5.82
45.06
37.86
37.86
2.91
2.91
12.49
2.91
97.25
Sub Total
9.73
9.73
10.51
346.21
5.18
51.86
9.72
51.86
0.49
2.59
51.86
310.95
Sub Total
15.55
2.42
331.16
1.24
12.44
0.73
12.44
0.04
0.62
12.44
ARIOS
815.00
Sub Total
2.27
860.64
0.41
4.08
4.08
0.42
36.68
0.02
2.26
45.23
199.50
Sub Total
4.39
6.58
7,581.00
47.08
15.96
47.44
70.82
16.90
168.90
13.49
135.10
0.67
16.04
320.90
55.20
Sub Total
1.10
2.76
3,588.00
25.94
0.77
81.73
32.02
6.51
65.13
18.37
48.85
0.92
6.02
120.50
ARIOS
509.40
Sub Total
11.21
7.84
59.60
295.45
5.14
12.74
25.47
254.70
7.24
152.82
0.36
21.65
432.99
63.75
Sub Total
1.40
0.98
7.46
36.98
6.26
24.74
6.38
63.75
13.01
25.50
0.65
1.28
25.50
73.20
Sub Total
1.61
1.13
8.56
42.46
6.26
28.40
9.01
90.09
16.01
36.04
0.80
6.76
135.14
ARIOS
309.50
Sub Total
3.10
0.62
6.50
39.31
1.18
22.59
13.74
137.54
5.45
41.26
0.27
2.06
41.26
40.00
Sub Total
7.48
42.00
7.80
31.31
0.16
6.40
64.00
20.22
22.40
1.01
4.64
92.80
97.25
Sub Total
0.88
1.56
11.38
209.57
9.52
1.75
7.78
77.80
10.99
38.90
0.55
6.22
124.48
ARIOS
131.75
Sub Total
7.11
69.43
13.50
17.13
2.64
26.35
13.18
7.23
79.05
79.05
3.95
1.76
9.22
170.45
Sub Total
34.09
1.70
34.09
3.17
7.50
2.27
22.72
2.32
22.72
0.12
1.14
22.72
573.15
Sub Total
114.63
5.73
120.36
3.21
25.22
6.53
65.51
1.99
65.51
0.10
6.88
137.56
ARIOS
3.08
Sub Total
0.22
7.85
3.08
0.31
77.08
66.37
63.20
16.43
3.16
1.23
8.21
24.64
15.94
Sub Total
1.28
23.91
13.07
6.38
255.04
17.06
8.93
106.58
3.99
24.11
42.51
1.21
2.13
42.51
20.16
Sub Total
1.11
2.82
34.17
219.74
40.30
80.64
2.01
4.44
8.06
88.70
ARIOS
19.00
Sub Total
304.00
19.00
19.00
19.00
19.00
19.00
0.38
123.50
47.50
49.98
47.50
2.95
29.51
28.32
29.51
1.42
3.10
61.98
16.00
Sub Total
336.00
16.00
16.00
0.32
112.00
32.00
42.08
19.20
2.40
24.01
27.37
24.01
1.37
2.52
1.00
Sub Total
120.00
1.00
50.43
ARIOS
1.00
Sub Total
300.00
1.00
217.00
Sub Total
3.10
217.00
6.00
Sub Total
252.00
6.00
2.00
Sub Total
150.00
2.00
0.23
2.29
19.89
2.29
0.99
0.24
1.00
Sub Total
200.00
1.00
1.00
Sub Total
200.00
1.00
4.80
ARIOS
11.00
Sub Total
11.00
6.60
5.50
5.50
8.80
2.20
11.56
6.60
2.20
22.00
34.81
22.00
1.74
2.31
46.20
19.60
Sub Total
0.02
0.42
4.12
0.63
6.27
5.57
6.27
0.28
0.31
6.27
4.00
Sub Total
25.00
4.00
0.80
4.00
25.77
8.00
1.29
0.40
8.00
ARIOS
11.00
Sub Total
11.00
19.80
0.34
16.50
11.00
11.00
5.50
22.00
16.23
11.00
2.20
22.00
34.81
22.00
1.74
2.31
46.20
4.00
Sub Total
8.00
8.00
8.00
35.52
4.00
0.21
2.13
9.28
2.13
0.46
0.22
4.48
26.40
Sub Total
3.18
5.28
2.00
27.19
0.69
6.86
4.53
6.86
14.41
0.23
0.72
ARIOS
18.50
Sub Total
0.37
3.53
19.06
0.74