P R E S U P U E S T O

OBRA:
PROPIETARIO:
LUGAR:
Item

CONSTRUCCION DEL MURO DE CONTENCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO
MUNICIPALIDAD DISTRITAL DE LLAPO
DISTRITO DE LLAPO
DEPARTAMENTO: ANCASH
COSTO AL: 6/15/2004
Descripcin Partida

A.02

TRABAJOS PRELIMINARES

A.02.03

TRAZO, REPLANTEO PRELIMINAR

A.03

MOVIMIENTO DE TIERRAS

A.03.01
A.03.03

Und.

Metrado

Precio Unitario

Parcial

M2

151.75

4.17

632.80

EXCAVACION DE ZANJAS HASTA 1.00 DE PROF.

M3

33.60

17.23

578.93

ACARREO DE MAT. EXCEDENTE DIST. PROM. 30 M

M3

14.40

11.48

165.31

A.03.04

RELLENO CON MATERIAL PROPIO

M3

14.40

10.04

144.58

A.04

OBRAS DE CONCRETO SIMPLE

A.04.01

CONCRETO F'C= 140 KG/CM2

M3

49.60

226.74

11,246.30

A.04.04

ENCOFRADO Y DESENCOFRADO P/MURO

M2

118.30

20.08

2,375.46

A.05.03

ACERO FY=4200 KG/CM P/ZAPATAS

KG

759.41

3.60

2,733.88

Costo Directo
Gastos Generales (10%)
Sub Total
I. G. V. (19%)
Total Presupuestado
SON: VEINTITRESMIL CUATROCIENTOS UNO Y 33/100 NUEVOS SOLES

Sub Total

632.80

888.82

16,355.64
17,877.26
1,787.73
19,664.98
3,736.35
23,401.33

A.07.01

TARRAJEO DE MURO INTERIOR/EXTERIOR

M2

509.40

12.73

6,484.66

A.07.02

TARRAJEO DE COLUMNAS

M2

63.75

19.92

1,269.90

A.07.03

TARRAJEO DE VIGAS

M2

73.20

23.07

1,688.72

A.07.04

VESTIDURA DE DERRAMES

ML

309.50

6.90

2,135.55

A.07.05

CERAMICA NACIONAL .30X.20 M. COLOR

M2

40.00

52.55

2,102.00

13,680.84

A.08

CIELO RASOS

A.08.01

CIELO RASO CON MEZCLA C:A 1:5

M2

97.25

21.06

2,048.09

2,048.09

A.09

PISOS

A.09.01

ACABADO PULIDO DE PISO DE CEMENTO E=2"

M2

131.75

22.49

2,963.06

2,963.06

A.10

PINTURA

A.10.01

PINTURA LATEX 2 MANOS CIELORASO Y VIGAS

M2

170.45

5.60

954.52

A.10.02

PINTURA LATEX 2 MANOS MUROS Y COLUMNAS

M2

573.15

5.30

3,037.70

A.11

CARPINTERIA DE MADERA

A.11.01

PUERTA DE TABLERO

M2

3.08

143.44

441.80

A.11.02

PUERTA CONTRAPLACADA

M2

15.94

131.89

2,102.33

A.11.03

VENTANA DE MADERA TORNILLO

M2

20.16

76.48

1,541.84

A.12

INSTALACIONES ELECTRICAS

A.12.01

SALIDA DE TECHO (CENTRO DE LUZ)

PTO

19.00

79.72

1,514.68

A.12.02

SALIDA TOMACORRIENTE C/LINEA A TIERRA

PTO

16.00

70.81

1,132.96

A.12.03

TABLERO DE DISTRIBUCION DE 3 CIRCUITOS

UND

1.00

120.00

120.00

A.12.04

TABLERO GENERAL DE DISTRIBUCION

UND

1.00

300.00

300.00

3,992.22

4,085.96

3,067.64

A.13

VIDRIOS

A.13.01

VIDRIOS SEMIDOBLES NACIONALES

A.14

APARATOS Y ACCESORIOS SANITARIOS

A.14.01

INODORO TANQUE BAJO BLANCO

A.14.02

LAVATORIO BLANCO VITRIFICADO

A.14.03

P2

217.00

3.10

672.70

PZA

6.00

252.00

1,512.00

UND

2.00

150.00

300.00

URINARIO REVESTIDO DE MAYOLICA

UND

1.00

200.00

200.00

A.14.04

LAVATORIO CORRIDO CON MAYOLICA

UND

1.00

200.00

200.00

A.15

INSTALACIONES SANITARIAS

A.15.01

SALIDA DE DESAGUE EN PVC

PTO

11.00

48.11

529.21

A.15.02

TUBERIA PVC SAL D=2"

ML

19.60

6.27

122.89

A.15.03

CAJA DE REGISTRO 12" X 24"

UND

4.00

52.06

208.24

672.70

2,212.00

860.34

P R E S U P U E S T O
OBRA:
PROPIETARIO:
LUGAR:
Item

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
DISTRITO DE LLAPO
DEPARTAMENTO: ANCASH
Descripcin Partida

Und.

Metrado

COSTO AL: 14/01/04

Precio Unitario

Parcial

A.16

SISTEMA DE AGUA FRIA

A.16.01

SALIDA DE AGUA FRIA

PTO

11.00

52.78

580.58

A.16.02

VALVULA DE COMPUERTA DE BRONCE 3/4"

UND

4.00

45.27

181.08

A.16.03

TUBERIA PVC SAP 3/4" C-10

ML

26.40

6.75

178.20

A.16.04

TUBERIA PVC SAP 1/2" C-10

ML

18.50

4.22

78.07

Costo Directo
Gastos Generales (10%)
Sub Total
I. G. V. (19%)
Total Presupuestado

Sub Total

1,017.93
118,945.66
11,894.57
130,840.23
24,859.64
155,699.88

SON: CIENTO VEINTISEIS TRECIENTOS SETENTA Y OCHO Y 25/100 NUEVOS SOLES

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DELMURO DE CONTENCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.01.01 TRAZO, REPLANTEO PRELIMINAR

Rendimiento:

800.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

4.17

Precio

Parcial

Materiales
YESO EN BOLSA DE 25 KG.

BLS

0.2500

15.65

3.91

CORDEL

ML

0.0100

0.60

0.01

Mano de Obra
CAPATAZ

HH

0.10

0.0010

10.34

0.01

OPERARIO

HH

1.00

0.0100

9.04

0.09

PEON

HH

2.00

0.0200

7.33

0.15

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:

CONSTRUCCION DEL MURO DE CONTENCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO
MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.02.01 EXCAVACION DE ZANJAS PARA MURO DE CONTENCION 1.00M DE PROF.

Rendimiento:

4.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

17.23

Precio

Parcial

Mano de Obra
CAPATAZ

HH

0.10

0.2000

10.34

2.07

PEON

HH

1.00

2.0000

7.33

14.66

3.0000

16.73

0.50

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO
A.02.02 RELLENO CON MATERIAL PROPIO

Rendimiento:

8.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

10.04

Precio

Parcial

Mano de Obra
CAPATAZ

HH

0.10

0.1143

10.34

1.18

PEON

HH

1.00

1.1429

7.33

8.38

5.0000

9.56

0.48

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:

%MO
A.02.03 ELIMINACION DE MATERIAL EXCEDENTE
40.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

45.00

Precio

Parcial

Materiales
TRANSPORTE MATERIAL VOLQ. 6 M3

M3

1.0000

Partida:

A.03.04 NIVELACION INT. Y APISONADO PARA FINAL PISO

Rendimiento:

400.000 M2/DIA

Descripcin
Mano de Obra

Und

45.00

45.00

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

Precio

1.37
Parcial

CAPATAZ

HH

0.10

0.0020

5.63

0.01

OPERARIO

HH

1.00

0.0200

5.00

0.10

PEON

HH

10.00

0.2000

3.13

0.63

5.0000

0.74

0.04

0.0400

15.00

0.60

Equipo
HERRAMIENTAS MANUALES

%MO

COMPACTADOR VIBR. TIPO PLANCHA

HM

2.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.04.01 CIMIENTO CORRIDO C:H (1:10 + 30% P.G.)


25.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

102.81

Precio

Parcial

Materiales
PIEDRA BASE

M3

0.4900

20.00

9.80

CEMENTO PORTLAND TIPO I

BLS

2.7000

19.45

52.52

HORMIGON

M3

0.9100

20.00

18.20

AGUA

M3

0.1600

5.00

0.80

Mano de Obra
CAPATAZ

HH

0.20

0.0640

5.63

0.36

OPERARIO

HH

2.00

0.6400

5.00

3.20

OFICIAL

HH

2.00

0.6400

4.38

2.80

PEON

HH

8.00

2.5600

3.13

8.01

5.0000

14.38

0.72

0.3200

20.00

6.40

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

Partida:
Rendimiento:
Descripcin

1.00

A.04.02 SOLADO PARA ZAPATAS (E=4", 1:12 C:H)


40.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

13.46

Precio

Parcial

Materiales
CEMENTO PORTLAND TIPO I

BLS

0.1800

19.45

3.50

HORMIGON

M3

0.0530

20.00

1.06

AGUA

M3

0.0030

5.00

0.02

Mano de Obra
OPERADOR DE EQUIPO LIVIANO

HH

0.20

0.2000

5.00

1.00

CAPATAZ

HH

0.20

0.0600

5.63

0.34

OPERARIO

HH

2.00

0.2000

5.00

1.00

OFICIAL

HH

2.00

0.1000

4.38

0.44

PEON

HH

8.00

0.6000

3.13

1.88

5.0000

4.66

0.23

0.2000

20.00

4.00

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

1.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.04.03 CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTOS

Rendimiento:

6.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

150.59

Precio

Parcial

Materiales
PIEDRA MEDIANA

M3

0.4220

30.00

12.66

CEMENTO PORTLAND TIPO I

BLS

3.6500

19.45

70.99

HORMIGON

M3

0.9760

20.00

19.52

AGUA

M3

0.1600

5.00

0.80

Mano de Obra
CAPATAZ

HH

0.10

0.1333

5.63

0.75

OPERARIO

HH

0.50

0.6667

5.00

3.33

OFICIAL

HH

1.00

1.3333

4.38

5.84

PEON

HH

4.00

5.3333

3.13

16.69

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

26.62

1.33

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.6667

20.00

13.33

VIBRADOR A GASOLINA 1 1/4" - 4 HP

HM

0.50

0.6667

8.00

5.33

Partida:
Rendimiento:
Descripcin

A.04.04 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTO


16.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

14.97

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.2600

2.50

0.65

CLAVOS CON CABEZA PROMEDIO

KG

0.1600

2.50

0.40

MADERA TORNILLO

P2

3.3460

2.60

8.70

Mano de Obra
CAPATAZ

HH

0.10

0.0500

5.63

0.28

OPERARIO

HH

1.00

0.5000

5.00

2.50

OFICIAL

HH

1.00

0.5000

4.38

2.19

5.0000

4.97

0.25

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.04.05 FALSO PISO 1:8 E=0.10 M.

Rendimiento:

120.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

16.68

Precio

Parcial

Materiales
CEMENTO PORTLAND TIPO I

BLS

0.5000

19.45

9.73

HORMIGON

M3

0.1310

20.00

2.62

AGUA

M3

0.0160

5.00

0.08

Mano de Obra
CAPATAZ

HH

0.30

0.0200

5.63

0.11

OPERARIO

HH

3.00

0.2000

5.00

1.00

PEON

HH

8.00

0.5333

3.13

1.67

5.0000

2.78

0.14

0.0667

20.00

1.33

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

1.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.05.01 CONCRETO F'C=210 KG/CM P/ZAPATAS

Rendimiento:

12.500 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

233.90

Precio

Parcial

Materiales
PIEDRA CHANCADA DE 3/4"

M3

0.8500

30.00

ARENA GRUESA

M3

0.4900

21.00

25.50
10.29

CEMENTO PORTLAND TIPO I

BLS

8.7200

19.45

169.60

AGUA

M3

0.2100

5.00

1.05

Mano de Obra
OPERADOR DE EQUIPO PESADO

HH

1.00

0.6400

5.63

3.60

OPERARIO

HH

1.00

0.6400

5.00

3.20

OFICIAL

HH

1.00

0.6400

4.38

2.80

PEON

HH

4.00

2.5600

3.13

8.01

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

17.62

0.88

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.3200

20.00

6.40

VIBRADOR A GASOLINA 1 1/4" - 4 HP

HM

0.50

0.3200

8.00

2.56

Partida:
Rendimiento:
Descripcin

A.05.02 ENCOFRADO Y DESENCOFRADO P/ZAPATAS


8.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

21.54

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.1000

2.50

CLAVOS CON 2 1/2", 3", 4"

KG

0.1500

2.50

0.25
0.38

MADERA TORNILLO

P2

4.0300

2.60

10.48

Mano de Obra
CAPATAZ

HH

0.10

0.1000

5.63

0.56

OPERARIO

HH

1.00

1.0000

5.00

5.00

OFICIAL

HH

1.00

1.0000

4.38

4.38

5.0000

9.94

0.50

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.03 ACERO FY=4200 KG/CM P/ZAPATAS

Rendimiento:

200.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

2.46

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.50

0.13

ACERO CORRUGADO

KG

1.0650

1.80

1.92

Mano de Obra
CAPATAZ

HH

0.10

0.0040

5.63

0.02

OPERARIO

HH

1.00

0.0400

5.00

0.20

OFICIAL

HH

1.00

0.0400

4.38

0.18

5.0000

0.40

0.02

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.05.04 CONCRETO F'C=210 KG/CM P/VIGA CIMENTACION

Rendimiento:

23.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

249.02

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.4200

21.00

8.82

PIEDRA CHANCADA DE 1/2"

M3

0.8500

30.00

25.50

CEMENTO PORTLAND TIPO I

BLS

9.7400

19.45

189.44

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.10

0.0348

5.63

0.20

OPERARIO

HH

2.00

0.6957

5.00

3.48

OFICIAL

HH

1.00

0.3478

4.38

1.52

PEON

HH

8.00

2.7826

3.13

8.71

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

13.91

0.70

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.3478

20.00

6.96

VIBRADOR A GASOLINA 1 1/4" - 4 HP

HM

0.50

0.3478

8.00

2.78

Partida:

A.05.05 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION

Rendimiento:
Descripcin

7.500 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

18.62

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.3000

2.50

0.75

CLAVOS DE 3"

KG

0.3300

2.50

0.83

MADERA TORNILLO P/ENCOFRADOS

P2

2.1800

3.00

6.54

Mano de Obra
OPERARIO

HH

1.00

1.0667

5.00

5.33

OFICIAL

HH

1.00

1.0667

4.38

4.67

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

Partida:

A.05.06 ACERO FY=4200 KG/CM P/VIGA DE CIMENTACION

Rendimiento:

250.000 KG/DIA

Descripcin

Und

10.01

0.50

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

2.32

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0300

2.50

0.08

ACERO CORRUGADO

KG

1.0700

1.80

1.93

Mano de Obra
OPERARIO

HH

1.00

0.0320

5.00

0.16

OFICIAL

HH

1.00

0.0320

4.38

0.14

5.0000

0.30

0.02

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.05.07 CONCRETO F'C=210 KG/CM P/COLUMNAS

Rendimiento:

6.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

262.98

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.5400

21.00

PIEDRA CHANCADA DE 1/2"

M3

0.8500

30.00

11.34
25.50

CEMENTO PORTLAND TIPO I

BLS

8.4300

19.45

163.96

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.12

0.1600

5.63

0.90

OPERARIO

HH

0.87

1.1600

5.00

5.80

OFICIAL

HH

0.87

1.1600

4.38

5.08

PEON

HH

7.20

9.6000

3.13

30.05

5.0000

41.83

2.09

0.8667

20.00

17.33

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

Partida:
Rendimiento:
Descripcin

0.65

A.05.08 ENCOFRADO Y DESENCOFRADO P/COLUMNAS


10.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

20.65

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.3000

2.50

CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.2010

2.50

0.75
0.50

MADERA TORNILLO

P2

4.2500

2.60

11.05

Mano de Obra
CAPATAZ

HH

0.10

0.0800

5.63

0.45

OPERARIO

HH

1.00

0.8000

5.00

4.00

OFICIAL

HH

1.00

0.8000

4.38

3.50

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

Partida:

A.05.09 ACERO FY=4200 KG/CM P/COLUMNAS

Rendimiento:

200.000 KG/DIA

Descripcin

Und

7.95

0.40

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

2.46

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.50

0.13

ACERO CORRUGADO

KG

1.0650

1.80

1.92

Mano de Obra
CAPATAZ

HH

0.10

0.0040

5.00

0.02

OPERARIO

HH

1.00

0.0400

5.00

0.20

OFICIAL

HH

1.00

0.0400

4.38

0.18

5.0000

0.40

0.02

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.05.10 CONCRETO F'C=175 KG/CM P/VIGAS


10.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

235.54

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.5090

21.00

PIEDRA CHANCADA DE 1/2" - 3/4"

M3

0.7600

30.00

10.69
22.80

CEMENTO PORTLAND TIPO I

BLS

8.6600

19.45

168.44

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.12

0.0800

5.63

0.45

OPERARIO

HH

0.87

0.8000

5.00

4.00

OFICIAL

HH

0.87

0.8000

4.38

3.50

PEON

HH

7.20

4.0000

3.13

12.52

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

20.47

1.02

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.65

0.4000

20.00

8.00

VIBRADOR A GASOLINA 1" 3/4" - 4 HP

HM

0.65

0.4000

8.00

3.20

Partida:
Rendimiento:
Descripcin

A.05.11 ENCOFRADO Y DESENCOFRADO P/VIGAS


9.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

24.45

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.2010

2.50

CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.2400

2.50

0.50
0.60

MADERA TORNILLO

P2

5.4100

2.60

14.07

Mano de Obra
CAPATAZ

HH

0.10

0.0889

5.63

0.50

OPERARIO

HH

1.00

0.8889

5.00

4.44

OFICIAL

HH

1.00

0.8889

4.38

3.89

5.0000

8.84

0.44

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.12 ACERO FY=4200 KG/CM P/COLUMNAS

Rendimiento:

250.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

2.37

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.50

0.13

ACERO CORRUGADO

KG

1.0650

1.80

1.92

Mano de Obra
CAPATAZ

HH

0.10

0.0032

5.00

0.02

OPERARIO

HH

1.00

0.0320

5.00

0.16

OFICIAL

HH

1.00

0.0320

4.38

0.14

5.0000

0.32

0.02

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.05.13 CONCRETO F'C=175 KG/CM P/LOSA ALIGERADA


12.500 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

234.67

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.5500

21.00

PIEDRA CHANCADA DE 1/2" - 3/4"

M3

0.7642

30.00

11.55
22.93

CEMENTO PORTLAND TIPO I

BLS

8.6600

19.45

168.44

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.10

0.0640

5.63

0.36

OPERARIO

HH

1.50

0.9600

5.00

4.80

OFICIAL

HH

1.00

0.6400

4.38

2.80

PEON

HH

6.50

4.1600

3.13

13.02

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.3200

20.00

6.40

VIBRADOR A GASOLINA 1" 3/4" - 4 HP

HM

0.50

0.3200

8.00

2.56

WINCHE DE DOS BALDES (350 KG.)

HM

0.50

0.3200

2.80

0.90

Equipo

Partida:
Rendimiento:
Descripcin

A.05.14 ENCOFRADO Y DESENCOFRADO P/LOSA ALIGERADA


15.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

15.32

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.1000

2.50

0.25

CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.1000

2.50

0.25

MADERA TORNILLO

P2

3.5600

2.60

9.26

Mano de Obra
CAPATAZ

HH

0.10

0.0533

5.63

0.30

OPERARIO

HH

1.00

0.5333

5.00

2.67

OFICIAL

HH

1.00

0.5333

4.38

2.34

5.0000

5.30

0.27

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.15 ACERO FY=4200 KG/CM P/LOSA ALIGERADA

Rendimiento:

200.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

2.46

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.50

0.13

ACERO CORRUGADO

KG

1.0650

1.80

1.92

Mano de Obra
CAPATAZ

HH

0.10

0.0040

5.00

0.02

OPERARIO

HH

1.00

0.0400

5.00

0.20

OFICIAL

HH

1.00

0.0400

4.38

0.18

5.0000

0.40

0.02

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.05.16 LADRILLO HUECO/ARCILLA 15X30X30 CM P/LOSA ALIGERADA


1600.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

1.34

Precio

Parcial

Materiales
LADRILLO P/TECHO 15x30x30 8 HUECOS

KG

1.0560

1.08

1.14

Mano de Obra
CAPATAZ

HH

0.10

0.0005

5.00

0.00

OPERARIO

HH

1.00

0.0050

5.00

0.03

OFICIAL

HH

1.00

0.0050

4.38

0.02

PEON

HH

9.00

0.0450

3.13

0.14

5.0000

0.19

0.01

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:

%MO

A.06.01 MURO DE SOGA LADRILLO KING KONG CON CEMENTO-CAL-ARENA


9.450 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

32.83

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.50

ARENA GRUESA

M3

0.0330

21.00

0.06
0.69

LADRILLO KK DE ARCILLA 9X14X24 CM

UND

38.0000

0.50

19.00

CEMENTO PORTLAND TIPO I

BLS

0.2360

19.45

4.59

AGUA

M3

0.0800

5.00

0.40

MADERA TORNILLO

P2

0.3550

2.60

0.92

Mano de Obra
CAPATAZ

HH

0.10

0.0847

5.63

0.48

OPERARIO

HH

1.00

0.8466

5.00

4.23

PEON

HH

0.80

0.6772

3.13

2.12

Equipo

HERRAMIENTAS MANUALES

%MO

Partida:

5.0000

6.83

0.34

A.06.02 MURO DE CABEZA LADRILLO KING KONG CON CEMENTO-CAL-ARENA

Rendimiento:

6.780 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

54.05

Precio

Parcial

Materiales
CLAVOS PARA MADERA C/C 3"

KG

0.0200

2.50

ARENA GRUESA

M3

0.0500

21.00

0.05
1.05

LADRILLO KK DE ARCILLA 9X14X24 CM

UND

65.0000

0.50

32.50

CEMENTO PORTLAND TIPO I

BLS

0.4700

19.45

9.14

AGUA

M3

0.0140

5.00

0.07

MADERA TORNILLO

P2

0.5800

2.80

1.62

Mano de Obra
CAPATAZ

HH

0.10

0.1180

5.63

0.66

OPERARIO

HH

1.00

1.1799

5.00

5.90

PEON

HH

0.80

0.8850

3.13

2.77

3.0000

9.33

0.28

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:
Descripcin

A.07.01 TARRAJEO DE MURO INTERIOR/EXTERIOR


16.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

8.14

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.50

0.06

ARENA FINA

M3

0.0154

21.00

0.32

CEMENTO PORTLAND TIPO I

BLS

0.1170

19.45

2.28

MADERA TORNILLO

P2

0.5800

2.60

1.51

MADERA CEDRO CEPILLADO

P2

0.0250

2.80

0.07

Mano de Obra
CAPATAZ

HH

0.10

0.0500

5.63

0.28

OPERARIO

HH

1.00

0.5000

5.00

2.50

PEON

HH

0.60

0.3000

3.13

0.94

5.0000

3.72

0.19

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.07.02 TARRAJEO DE COLUMNAS
8.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

12.40

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.50

0.06

ARENA FINA

M3

0.0154

21.00

0.32

CEMENTO PORTLAND TIPO I

BLS

0.1170

19.45

2.28

MADERA TORNILLO

P2

0.5800

2.60

1.51

MADERA CEDRO CEPILLADO

P2

0.3880

2.80

1.09

Mano de Obra
CAPATAZ

HH

0.10

0.1000

5.63

0.56

OPERARIO

HH

1.00

1.0000

5.00

5.00

PEON

HH

0.40

0.4000

3.13

1.25

5.0000

6.82

0.34

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.07.03 TARRAJEO DE VIGAS

Rendimiento:

6.500 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

14.06

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.50

0.06

ARENA FINA

M3

0.0154

21.00

0.32

CEMENTO PORTLAND TIPO I

BLS

0.1170

19.45

2.28

MADERA TORNILLO

P2

0.5800

2.60

1.51

MADERA CEDRO CEPILLADO

P2

0.3880

2.80

1.09

Mano de Obra
CAPATAZ

HH

0.10

0.1231

5.63

0.69

OPERARIO

HH

1.00

1.2308

5.00

6.15

PEON

HH

0.40

0.4923

3.13

1.54

5.0000

8.39

0.42

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:
Descripcin

A.07.04 VESTIDURA DE DERRAMES


18.000 ML/DIA
Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

4.04

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0100

2.50

0.03

ARENA FINA

M3

0.0020

21.00

0.04

CEMENTO PORTLAND TIPO I

BLS

0.0210

19.45

0.41

MADERA TORNILLO

P2

0.1270

2.60

0.33

MADERA CEDRO CEPILLADO

P2

0.0730

2.80

0.20

Mano de Obra
CAPATAZ

HH

0.10

0.0444

5.63

0.25

OPERARIO

HH

1.00

0.4444

5.00

2.22

PEON

HH

0.30

0.1333

3.13

0.42

5.0000

2.89

0.14

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO

A.07.05 MAYOLICA DE 15X15 CM. BLANCA DE PRIMERA


10.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

44.83

Precio

Parcial

Materiales
CEMENTO PORTLAND TIPO I

BLS

0.1870

19.45

3.64

MAYOLICA BLANCA 15X15 CM 1RA.

P2

1.0500

28.00

29.40

PORCELANA

P2

0.1950

3.00

0.59

AGUA

P2

0.0040

5.00

0.02

Mano de Obra
CAPATAZ

HH

0.20

0.1600

5.63

0.90

OPERARIO

HH

2.00

1.6000

5.00

8.00

PEON

HH

0.70

0.5600

3.13

1.75

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

5.0000

10.65

0.53

A.08.01 CIELO RASO CON MEZCLA C:A 1:5

Rendimiento:

10.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

14.28

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0090

2.50

0.02

ARENA FINA

M3

0.0160

21.00

0.34

CEMENTO PORTLAND TIPO I

BLS

0.1170

19.45

2.28

MADERA TORNILLO

P2

2.1550

2.60

5.60

MADERA CEDRO CEPILLADO

P2

0.0180

2.80

0.05

Mano de Obra
CAPATAZ

HH

0.10

0.0800

5.63

0.45

OPERARIO

HH

1.00

0.8000

5.00

4.00

PEON

HH

0.30

0.4000

3.13

1.25

5.0000

5.70

0.29

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:
Rendimiento:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.09.01 ACABADO PULIDO DE PISO DE CEMENTO E=2"
40.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

16.75

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.0540

21.00

1.13

CEMENTO PORTLAND TIPO I

BLS

0.5270

19.45

10.25

MADERA CEDRO CEPILLADO

P2

0.1300

2.80

0.36

Mano de Obra
CAPATAZ

HH

0.10

0.0200

5.63

0.11

OPERARIO

HH

1.00

0.2000

5.00

1.00

OFICIAL

HH

0.50

0.1000

4.35

0.44

PEON

HH

3.00

0.6000

3.13

1.88

5.0000

3.43

0.17

0.0700

20.00

1.40

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

Partida:
Rendimiento:
Descripcin

0.35

A.10.01 PINTURA LATEX 2 MANOS CIELORASO Y VIGAS


60.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

4.52

Precio

Parcial

Materiales
LIJA PARA MADERA

HJA

0.2000

2.00

0.40

ANDAMIO DE MADERA

P2

0.0100

2.60

0.03

IMPRIMANTE

KG

0.2000

4.50

0.90

PINTURA LATEX

GLN

0.0440

45.00

1.98

Mano de Obra
CAPATAZ

HH

0.10

0.0133

5.63

0.07

OPERARIO

HH

1.00

0.1333

5.00

0.67

PEON

HH

1.00

0.1333

3.13

0.42

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO

5.0000

1.16

0.06

A.10.02 PINTURA LATEX 2 MANOS MUROS Y COLUMNAS


60.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

4.39

Precio

Parcial

Materiales
LIJA PARA MADERA

HJA

0.2000

2.00

0.40

ANDAMIO DE MADERA

P2

0.0100

2.60

0.03

IMPRIMANTE

KG

0.2100

4.50

0.95

PINTURA LATEX

GLN

0.0440

45.00

1.98

Mano de Obra
CAPATAZ

HH

0.10

0.0114

5.63

0.06

OPERARIO

HH

1.00

0.1143

5.00

0.57

PEON

HH

1.00

0.1143

3.13

0.36

5.0000

0.99

0.05

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:
Rendimiento:
Descripcin

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.11.01 PUERTA DE TABLERO
3.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

104.99

Precio

Parcial

Materiales
CLAVOS PARA MADERA C/C 2"

KG

0.0710

2.50

0.18

BISAGRA 4"

PZA

2.5500

5.00

12.75

LIJA

UND

1.0000

2.00

2.00

COLA SINTETICA

GLN

0.1000

25.00

2.50

MADERA TORNILLO

P2

21.5500

2.60

56.03

Mano de Obra
OPERARIO

HH

1.00

2.6667

5.00

13.33

PEON

HH

2.00

5.3333

3.13

16.69

5.0000

30.03

1.50

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.11.02 PUERTA CONTRAPLACADA
6.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

111.95

Precio

Parcial

Materiales
CLAVOS PARA MADERA C/C 2"

KG

0.0800

2.50

0.20

BISAGRA 4"

PZA

1.5000

5.00

7.50

LIJA

UND

0.8200

2.00

1.64

COLA SINTETICA

GLN

0.4000

25.00

10.00

MADERA TORNILLO

P2

16.0000

2.60

41.60

TRIPLAY DE 4' X 8' X 6 MM.

P3

1.0700

22.00

23.54

THINER

P4

0.5600

18.50

10.36

BARNIZ

P5

0.2500

12.45

3.11

Mano de Obra
OPERARIO

HH

2.00

2.6667

5.00

13.33

5.0000

13.33

0.67

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.11.03 VENTANA DE MADERA TORNILLO

Rendimiento:

2.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

55.34

Precio

Parcial

Materiales
CLAVOS DE 2"

KG

0.0550

2.50

COLA SINTETICA

GLN

0.1400

25.00

0.14
3.50

MADERA TORNILLO

P2

10.9000

2.60

28.34

Mano de Obra
CAPATAZ

HH

0.10

0.4000

5.63

2.25

OPERARIO

HH

1.00

4.0000

5.00

20.00

5.0000

22.25

1.11

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.12.01 SALIDA DE TECHO (CENTRO DE LUZ)

Rendimiento:

5.150 PTO/DIA

Descripcin

Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

63.29

Precio

Parcial

Materiales
CONDUCTOR TW SOLIDO 1X2.5 mm2-14

ML

16.0000

0.25

4.00

FLUORESCENTE CIRCULAR 32 W

UND

1.0000

30.00

30.00

INTERRUPTOR SIMPLE BAKELITA 2 G.

UND

1.0000

4.66

4.66

CAJA RECTANG. GALV. LIVIANA 2"X4"

UND

1.0000

0.85

0.85

CAJA OCTOGONAL LIVIANA 4"

UND

1.0000

0.85

0.85

CINTA AISLANTE

ML

1.0000

0.20

0.20

PEGAMENTO P/TUBERIA PVC (ELECT.)

GLN

0.0202

60.00

1.21

TUBO PVC SEL (E/C) 3/4" X 3.00 M.

ML

6.5000

0.50

3.25

UNION PVC CEL 3/4"

PZA

2.5000

0.40

1.00

CURVAS PVC CEL 3/4"

PZA

2.5000

0.42

1.05

Mano de Obra
CAPATAZ

HH

0.10

0.1553

5.63

0.87

OPERARIO

HH

1.00

1.5534

5.00

7.77

OFICIAL

HH

1.00

1.5534

4.38

6.80

5.0000

15.45

0.77

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO
A.12.02 SALIDA DE TECHO (CENTRO DE LUZ)

Rendimiento:

5.330 PTO/DIA

Descripcin

Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

37.89

Precio

Parcial

Materiales
CONDUCTOR TW SOLIDO 1X4 mm2-12

ML

TOMACORRIENTE DOBLE C/L. TIERRA

UND

21.0000

0.51

10.71

1.0000

4.66

4.66

CAJA RECTANG. GALV. LIVIANA 2"X4"

UND

1.0000

0.85

0.85

PEGAMENTO P/TUBERIA PVC (ELECT.)

GLN

0.0199

60.00

1.19

TUBO PVC SEL (E/C) 3/4" X 3.00 M.

ML

7.0000

0.50

3.50

UNION PVC CEL 3/4"

PZA

2.0000

0.40

0.80

CURVAS PVC CEL 3/4"

PZA

1.2000

0.42

0.50

Mano de Obra
CAPATAZ

HH

0.10

0.1501

5.63

0.85

OPERARIO

HH

1.00

1.5009

5.00

7.50

OFICIAL

HH

1.00

1.5009

4.38

6.57

5.0000

14.92

0.75

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO

A.12.03 TABLERO DE DISTRIBUCION DE 3 CIRCUITOS

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

120.00

Precio

Parcial

Materiales
TABLERO DE DISTRIBUCION DE 3 CIRC.

UND

1.0000

120.00

120.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.12.04 TABLERO GENERAL DE DISTRIBUCION

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

300.00

Precio

Parcial

Materiales
TABLERO GENERAL DE DISTRIBUCION
Partida:

UND

1.0000

300.00

300.00

A.13.01 VIDRIOS SEMIDOBLES NACIONALES

Rendimiento:

0.000 P2/DIA

Descripcin

Und

Costo Unitario Directo (P2)


Cuadrilla

Cantidad

3.10

Precio

Parcial

Materiales
VIDRIOS SEMIDOBLES NACIONALES
Partida:

P2

1.0000

3.10

3.10

A.14.01 INODORO TANQUE BAJO BLANCO

Rendimiento:

0.000 PZA/DIA

Descripcin

Und

Costo Unitario Directo (PZA)


Cuadrilla

Cantidad

180.00

Precio

Parcial

Materiales
INODORO TANQUE BAJO BLANCO C/A
Partida:

PZA

1.0000

180.00

180.00

A.14.02 LAVATORIO BLANCO VITRIFICADO

Rendimiento:

7.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

160.43

Precio

Parcial

Materiales
LAVATORIO 20"x17" 2 LLAVES BLANCO

UND

1.0000

150.00

150.00

Mano de Obra
CAPATAZ

HH

0.10

0.1143

5.63

0.64

OPERARIO

HH

1.00

1.1429

5.00

5.71

PEON

HH

1.00

1.1429

3.13

3.58

Equipo

HERRAMIENTAS MANUALES
Partida:

%MO

5.0000

9.94

0.50

A.14.03 URINARIO REVESTIDO DE MAYOLICA

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

120.00

Precio

Parcial

Materiales
URINARIO REVESTIDO DE MAYOLICA
Partida:

UND

1.0000

120.00

120.00

A.14.04 LAVATORIO CORRIDO CON MAYOLICA

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

200.00

Precio

Parcial

Materiales
LAVATORIO CORRIDO CON MAYOLICA

UND

1.0000

200.00

200.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:
Rendimiento:
Descripcin

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.15.01 SALIDA DE DESAGUE EN PVC
4.000 PTO/DIA
Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

28.82

Precio

Parcial

Materiales
TUBO PVC SAL 3"

ML

1.0000

1.41

1.41

TUBO PVC SAL 4"

ML

0.6000

3.39

2.03

CODO PVC SAL 2" X 90

PZA

0.5000

0.85

0.43

CODO PVC SAL 3" X 90

PZA

0.5000

1.69

0.85

CODO PVC SAL 4" X 90

PZA

0.8000

3.81

3.05

YEE PVC SAL 2" X 2"

PZA

0.2000

1.27

0.25

YEE PVC SAL 4" X 4"

PZA

0.6000

4.24

2.54

Mano de Obra
CAPATAZ

HH

0.10

0.2000

5.63

1.13

OPERARIO

HH

1.00

2.0000

5.00

10.00

PEON

HH

1.00

2.0000

3.13

6.26

5.0000

17.39

0.87

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.15.02 TUBERIA PVC SAL D=2"
25.000 ML/DIA
Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

3.28

Precio

Parcial

Materiales
PEGAMENTO P/TUBERIA PVC

ML

0.0010

60.00

0.06

TUBO PVC SAL 2" X 3 M.

ML

0.2100

1.41

0.30

0.0320

5.63

0.18

Mano de Obra
CAPATAZ

HH

0.10

OPERARIO

HH

1.00

0.3200

5.00

1.60

PEON

HH

1.00

0.3200

3.13

1.00

5.0000

2.78

0.14

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.15.03 CAJA DE REGISTRO 12" X 24"

Rendimiento:

4.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

38.01

Precio

Parcial

Materiales
CAJA PRE FAB. 12" X 24" INC. TAPA

ML

1.0000

25.00

25.00

Mano de Obra
CAPATAZ

HH

0.10

0.2000

5.63

1.13

OPERARIO

HH

0.50

1.0000

5.00

5.00

PEON

HH

1.00

2.0000

3.13

6.26

5.0000

12.39

0.62

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:
Descripcin

A.16.01 SALIDA DE AGUA FRIA


4.000 PTO/DIA
Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

29.41

Precio

Parcial

Materiales
GRIFO DE BRONCE DE 1/2"

UND

1.0000

3.39

3.39

CINTA TEFLON

ML

1.8000

0.20

0.36

PEGAMENTO P/TUBERIA PVC

GLN

0.0311

60.00

1.87

TUB. PVC - C10R 1/2" X 5 M.

ML

1.5000

1.00

1.50

TUB. PVC - C10R 3/4" X 5 M.

ML

1.0000

1.50

1.50

TEE PVC SAP ROSCADO 1/2"

PZA

1.0000

0.42

0.42

TEE PVC SAP ROSCADO 3/4"

PZA

0.5000

0.85

0.43

CODO PVC SAP - C10 1/2" X 90

PZA

2.0000

0.42

0.84

CODO PVC SAP - C10 3/4" X 90

PZA

1.0000

0.85

0.85

Mano de Obra
CAPATAZ

HH

0.10

0.2000

5.63

1.13

OPERARIO

HH

1.00

2.0000

5.00

10.00

PEON

HH

1.00

2.0000

3.13

6.26

5.0000

17.39

0.87

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.16.02 VALVULA DE COMPUERTA DE BRONCE 3/4"
15.000 UND/DIA
Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

33.65

Precio

Parcial

Materiales
CINTA TEFLON

ML

2.0000

0.20

0.40

UNION UNIVERSAL F GALV. 3/4"

UND

2.0000

5.93

11.86

NIPLE DE F GALV. 3/4"

UND

2.0000

1.53

3.06

VALVULA COMPUERTA BRONCE 3/4"

UND

1.0000

13.56

13.56

Mano de Obra
CAPATAZ

HH

0.10

0.0533

5.63

0.30

OPERARIO

HH

1.00

0.5333

5.00

2.67

PEON

HH

1.00

0.5333

3.13

1.67

3.0000

4.64

0.14

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.16.03 TUBERIA PVC SAP 3/4" C-10
30.770 ML/DIA
Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

4.11

Precio

Parcial

Materiales
CINTA TEFLON

ML

0.1204

0.20

0.02

UNION SIMPLE F GALV. 3/4"

UND

0.2000

0.85

0.17

TUB. PVC - C10R 3/4" X 5 M.

UND

1.0300

1.50

1.55

Mano de Obra
CAPATAZ

HH

0.10

0.0260

5.63

0.15

OPERARIO

HH

1.00

0.2600

5.00

1.30

PEON

HH

1.00

0.2600

3.13

0.81

5.0000

2.26

0.11

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.16.04 TUBERIA PVC SAP 1/2" C-10

Rendimiento:

200.000 ML/DIA

Descripcin

Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

2.57

Precio

Parcial

Materiales
PEGAMENTO PLASTICO PVC

UND

0.0200

60.00

1.20

TUB. PVC SAP C-10 D=1/2"

UND

1.0300

1.00

1.03

Mano de Obra
OPERARIO

HH

1.00

0.0400

5.00

0.20

PEON

HH

1.00

0.0400

3.13

0.13

5.0000

0.33

0.02

Equipo
HERRAMIENTAS MANUALES

%MO

ARIOS

CATIVO INICIAL N 1621 - LLAPO

Sub Total

3.92

0.25

ARIOS

CATIVO INICIAL N 1621 - LLAPO

Sub Total

16.73

0.00

0.50
15.72
Sub Total
1.80
9.56

17.97

0.48

0.99
63.63

Sub Total
45.00

63.63
131.75

Sub Total

19.76

0.26
2.64
0.74

26.35

29.25

1.46
0.64

5.27

ARIOS

45.28
Sub Total
22.19
122.26
41.20
81.32

7.24
2.90
28.98
28.98

14.38

115.92

7.12

14.49

8.84

10.60
Sub Total
1.91
0.56
4.58

0.03
2.12
0.64
2.12

176.77

1.06
4.65

6.36

12.30

0.61
4.23

2.12

ARIOS

7.08
Sub Total
2.99
25.84
6.91
103.97

1.13
0.94
4.72
9.44

26.62

37.76
2.64
4.72

20.00

4.72
90.58

Sub Total
23.55
14.49
9.75

303.08
4.53
45.29

52.86

4.97

45.29

0.25

4.76

95.11

131.75
Sub Total
65.88
17.26
12.43

2.11
2.64
26.35

2.78

70.26

99.25

4.96
1.47

8.79

ARIOS

7.40
Sub Total
6.29
3.63
64.53
206.44

1.55
4.74
4.74
4.74

17.62

18.94
1.66
2.37

9.84

2.37
31.36

Sub Total
3.14
4.70
11.10

126.38
3.14
31.36

33.15

9.94

31.36

0.50

3.29

65.86

114.25
Sub Total
5.71
2.04

121.68
0.46
4.57

0.40

4.57

0.02

0.48

9.60

ARIOS

3.82
Sub Total
1.60
3.25
37.21
224.68

0.70
0.13
2.66
1.33

13.91

10.63

14.75

0.74
1.33
10.43

1.33
35.00

Sub Total
10.50
11.55
8.12

76.30
37.33

10.01

37.33

74.67

0.50

3.73
217.85

Sub Total
6.54
2.00

233.10
6.97

0.30

6.97

0.02

0.70

13.94

ARIOS

4.76
Sub Total
2.57
4.05
40.13
201.72

0.88
0.76
5.52
5.52

41.83

45.70

57.50

2.88
19.43

4.13
85.00

Sub Total
25.50
17.09
12.30

361.25
6.80
68.00

7.95

68.00

142.80

0.40

7.14
715.95

Sub Total
35.80
2.04

762.49
2.86
28.64

0.40

28.64

0.02

3.01

60.14

ARIOS

7.94
Sub Total
4.04
6.03
68.76
202.85

1.46
0.64
6.35
6.35

20.47

31.76
2.25
3.18

12.22

3.18
83.45

Sub Total
16.77
20.03
15.17

451.46
7.42
74.18

45.10

8.84

74.18

0.44

7.79

155.78

879.95
Sub Total
44.00
2.04

937.15
2.82
28.16

0.32

28.16

0.02

2.96

59.13

ARIOS

9.10
Sub Total
5.01
6.95
78.81
203.83

1.67
0.58
8.74
5.82

20.98

37.86
2.91
2.91

9.86

2.91
97.25

Sub Total
9.73
9.73
9.76

346.21
5.18
51.86

53.00

5.30

51.86

0.27

5.45

108.91

310.95
Sub Total
15.55
2.04

331.16
1.24
12.44

0.40

12.44

0.02

1.31

26.12

ARIOS

815.00
Sub Total
1.14

860.64
0.41
4.08
4.08

0.19

36.68

0.01

2.26

45.23

199.50
Sub Total
4.39
6.58
7,581.00
47.08
15.96
25.66

70.82
16.90
168.90

6.83

135.10

320.90

0.34

16.04
55.20

Sub Total
1.10
2.76
3,588.00
25.94
0.77
44.44

32.02
6.51
65.13

9.33

48.85

0.28

3.61

120.50

ARIOS

509.40
Sub Total
11.21
7.84
59.60
295.45
4.23

12.74
25.47
254.70

3.72

152.82

0.19

21.65
63.75

Sub Total
1.40
0.98
7.46
36.98
5.25

24.74
6.38
63.75

432.99

6.82

25.50

0.34

4.78

95.63

73.20
Sub Total
1.61
1.13
8.56
42.46
5.25

28.40
9.01
90.09

8.39

36.04

0.42

6.76

135.14

ARIOS

309.50
Sub Total
3.10
0.62
6.50
39.31
1.01

22.59
13.74
137.54

2.89

41.26

0.14

9.63

192.54

40.00
Sub Total
7.48
42.00
7.80
33.64

0.16
6.40
64.00

10.65

22.40

92.80

0.53

4.64
97.25

Sub Total
0.88
1.56
11.38
209.57
8.29

1.75
7.78
77.80

5.70

38.90

0.29

6.22

124.48

ARIOS

131.75
Sub Total
7.11
69.43
11.75

17.13
2.64
26.35
13.18

3.43

79.05

121.21

6.06
1.57

9.22
170.45

Sub Total
34.09
1.70
34.09
3.31

7.50
2.27
22.72

1.16

22.72

47.71

0.06

2.39
573.15

Sub Total
114.63
5.73
120.36
3.35

25.22
6.53
65.51

0.99

65.51

0.05

6.88

137.56

ARIOS

3.08
Sub Total
0.22
7.85
3.08
0.31
73.46

66.37

30.03

16.43

1.50

1.23

8.21

15.94
Sub Total
1.28
23.91
13.07
6.38
255.04
17.06
8.93
97.95

3.99

24.64

13.33

42.51

0.67

2.13

42.51

20.16
Sub Total
1.11
2.82
31.98

219.74

22.25

80.64

1.11

4.44

8.06
88.70

ARIOS

19.00
Sub Total
304.00
19.00
19.00
19.00
19.00
19.00
0.38
123.50
47.50
47.07

47.50
2.95
29.51

15.45

29.51

0.77

3.10
16.00

Sub Total
336.00
16.00

61.98

16.00
0.32
112.00
32.00
22.22

19.20
2.40
24.01

14.92

24.01

0.75

2.52

50.43

1.00
Sub Total
120.00

1.00

ARIOS

1.00
Sub Total
300.00

1.00
217.00

Sub Total
3.10

217.00
6.00

Sub Total
180.00

6.00
2.00

Sub Total
150.00

2.00
0.23
2.29

9.94

2.29

4.80

0.50

0.24
1.00

Sub Total
120.00

1.00
1.00

Sub Total
200.00

1.00

ARIOS

11.00
Sub Total
11.00
6.60
5.50
5.50
8.80
2.20
10.56

6.60
2.20
22.00

17.39

22.00

0.87

2.31
19.60

Sub Total
0.02
0.36

4.12
0.63

46.20

6.27
2.78

6.27

0.14

0.66

13.17

4.00
Sub Total
25.00

4.00
0.80
4.00

12.39

8.00

0.62

0.64

12.80

ARIOS

11.00
Sub Total
11.00
19.80
0.34
16.50
11.00
11.00
5.50
22.00
11.15

11.00
2.20
22.00

17.39

22.00

0.87

2.31
4.00

Sub Total
8.00
8.00

46.20

8.00
28.88

4.00
0.21
2.13

4.64

2.13

0.14

0.13

4.48

26.40
Sub Total
3.18
5.28
1.74

27.19
0.69
6.86

2.26

6.86

0.11

0.72

14.41

ARIOS

18.50
Sub Total
0.37
2.23

19.06
0.74

0.33

0.74

0.02

0.07

1.48

PRECIOS Y CANTIDADES DE MATERIALES REQUERIDOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
Insumo

Und.

Precio

Cant. Requerida

Parcial

ALAMBRE NEGRO NACIONAL # 16

KG

2.72

107.59

292.65

ALAMBRE NEGRO NACIONAL # 8

KG

2.72

89.19

242.58

CLAVOS PARA MADERA C/C 2"

KG

2.72

1.49

4.06

CLAVOS PARA MADERA C/C 3"

KG

2.72

1.10

3.00

CLAVOS CON CABEZA PROMEDIO

KG

2.72

14.49

39.42

CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

2.72

74.12

201.61

CLAVOS DE 2"

KG

2.72

1.11

3.02

CLAVOS DE 3"

KG

2.72

11.55

31.42

ACERO CORRUGADO

KG

2.14

2,385.57

5,105.12

ARENA FINA

M3

50.00

12.13

606.44

PIEDRA CHANCADA DE 3/4"

M3

37.81

6.29

237.82

ARENA GRUESA

M3

25.21

33.31

839.63

PIEDRA MEDIANA

M3

33.61

2.99

100.42

PIEDRA CHANCADA DE 1/2"

M3

37.81

7.29

275.75

PIEDRA CHANCADA DE 1/2" Y 3/4"

M3

37.81

12.99

491.10

PIEDRA BASE

M3

33.61

22.19

745.71

CONDUCTOR TW SOLIDO 1X2.5 MM2 - 14 AWG

ML

0.36

304.00

109.44

CONDUCTOR TW SOLIDO 1X2.5 MM2 - 12 AWG

ML

0.55

336.00

184.80

INODORO TANQUE BAJO BLANCO C/A

UND

252.00

6.00

1,512.00

LAVATORIO 20"x17" 2 LLAVES BLANCO

UND

150.00

2.00

300.00

URINARIO REVESTIDO DE MAYOLICA

UND

200.00

1.00

200.00

LAVATORIO CORRIDO CON MAYOLICA

UND

200.00

1.00

200.00

GRIFO DE BRONCE DE 1/2"

UND

4.00

11.00

44.00

FLUORESCENTE CIRCULAR 32 W

UND

26.00

19.00

494.00

TABLERO DE DISTRIBUCION 3 CIRCUITOS

UND

120.00

1.00

120.00

TOMACORRIENTE DOBLE C/LINEA DE TIERRA

UND

20.00

16.00

320.00

INTERRUPTOR SIMPLE BAKELITA - 2 GOLPES

UND

5.50

19.00

104.50

CAJA RECTANGULAR GALV. LIVIANA 2" X 4"

UND

0.85

35.00

29.75

CAJA OCTOGONAL LIVIANA 4"

UND

1.00

19.00

19.00

TABLERO GENERAL DE DISTRIBUCION

UND

300.00

1.00

300.00

LADRILLO KK DE ARCILLA 9X14X24 CM

UND

1.05

11,169.00

11,727.45

LADRILLO P/TECHO 15x30x30 8 HUECOS

UND

2.15

860.64

1,850.38

CEMENTO PORTLAND TIPO I

BLS

22.27

748.75

16,674.62

CAJA PRE FAB. 12" X 24" INC. TAPA

UND

25.00

4.00

100.00

CERAMICA NACIONAL .30X.20 M. COLOR

M2

25.00

42.00

1,050.00

BISAGRA DE 4"

PZA

5.00

31.76

158.82

YESO EN BOLSA DE 25 KG.

BLS

15.68

1.52

23.79

CINTA AISLANTE

ML

0.20

19.00

3.80

CINTA TEFLON

ML

1.30

30.98

40.27

PEGAMENTO P/TUBERIA PVC (ELECT.)

GLN

125.00

0.70

87.78

PEGAMENTO P/TUBERIA PVC

GLN

125.00

0.36

45.21

PEGAMENTO PLASTICO PVC

GLN

125.00

0.37

46.25

PORCELANA

KG

4.50

7.80

35.10

LIJA

UND

1.30

16.15

21.00

CORDEL

ML

0.60

1.52

0.91

TRANSPORTE MATERIAL VOLQ. 6 M3

M3

66.00

63.63

4,199.58

TRANSPORTE DE MAQUINARIA Y EQUIPO

GLB

1,000.00

1.00

1,000.00

HORMIGON

M3

32.00

65.94

2,109.95

COLA SINTETICA

GLN

25.00

9.51

237.66

LIJA PARA MADERA

HJA

1.30

148.72

193.34

AGUA

M3

5.00

33.68

168.39

AGUA PARA CONSTRUCCION

GLB

300.00

1.00

300.00

ALMACEN

GLB

300.00

1.00

300.00

CARTEL DE OBRA INC. INSTALACION Y TRANSPORTE

GLB

350.00

1.00

350.00

MADERA TORNILLO

P2

2.80

2,831.57

7,928.38

MADERA CEDRO CEPILLADO

P2

3.10

107.34

332.76

ANDAMIO DE MADERA

P2

2.80

7.44

20.82

MADERA PARA ENCOFRADO

P2

2.80

76.30

213.64

MADERA TORNILLO CEPILLADA

P2

2.80

32.02

89.64

TRIPLAY 4' X 8' X 6 MM.

PLN

25.50

17.06

434.92

THINER

GLN

13.15

8.93

117.38

IMPRIMANTE

KG

4.50

154.45

695.03

PINTURA LATEX

GLN

45.00

32.72

1,472.33

BARNIZ

GLN

33.40

3.99

133.10

UNION SIMPLE DE F G DE 3/4"

UND

1.50

5.28

7.92

UNION UNIVERSAL DE F G DE 3/4"

UND

5.93

8.00

47.44

NIPLE DE F G DE 3/4"

UND

1.53

8.00

12.24

TUBERIA PVC SAP C-10 D=1/2"

ML

1.00

19.06

19.06

TUB. PVC SAP C/10 1/2" X 5 M.

ML

1.00

16.50

16.50

TUB. PVC SAP C/10 3/4" X 5 M.

ML

1.50

38.19

57.29

TEE PVC SAP ROSCADO 1/2"

PZA

0.50

11.00

5.50

TEE PVC SAP ROSCADO 3/4"

PZA

1.00

5.50

5.50

CODO PVC SAP C/10 1/2" X 90

PZA

0.50

22.00

11.00

CODO PVC SAP C/10 3/4" X 90

PZA

1.00

11.00

11.00

TUBO PVC SAL 2" X 3 M.

ML

1.41

4.12

5.80

TUBO PVC SAL 3" X 3 M.

ML

2.00

11.00

22.00

TUBERIA PVC SAL 4"

ML

2.60

6.60

17.16

CODO PVC SAL 2" X 90

PZA

1.00

5.50

5.50

CODO PVC SAL 3" X 90

PZA

2.00

5.50

11.00

CODO PVC SAL 4" X 90

PZA

3.50

8.80

30.80

YEE PVC SAL 2" X 2"

PZA

2.00

2.20

4.40

YEE PVC SAL 4" X 4"

PZA

5.50

6.60

36.30

TUBO PVC SEL (E/C) 3/4" X 3.00 M.

ML

0.56

235.50

131.88

UNION PVC SEL 3/4"

PZA

1.20

79.50

95.40

CURVA PVC SEL 3/4"

PZA

0.60

66.70

40.02

VALVULA COMPUERTA BRONCE 3/4"

UND

18.00

4.00

72.00

P2

3.10

217.00

672.70

VIDRIO TRANSPARENTE INCOLORO MEDIOIDOBLE

66,657.95

66,657.95
32,655.72
1,491.94
100,805.62

PRECIOS Y CANTIDADES DE HORAS HOMBRE REQUERIDO


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
Insumo

Und.

Precio

Cant. Requerida

Parcial

OPERADOR DE EQUIPO LIVIANO

HH

9.04

2.12

OPERADOR DE EQUIPO PESADO

HH

9.04

4.74

19.16
42.81

CAPATAZ

HH

10.34

188.80

1,952.16

OPERARIO

HH

9.04

1,779.44

16,086.09

OFICIAL

HH

8.16

522.82

4,266.23

PEON

HH

7.33

1,403.72

10,289.26
32,655.72

ALQUILER Y CANTIDADES DE HORAS MAQUINA REQUERIDO


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
Insumo

Und.

Precio

Cant. Requerida

Parcial

MEZCLADORA DE CONCRETO DE 9 - 11 P3

HM

20.00

53.25

1,065.00

COMPACTADOR VIBR. TIPO PLANCHA 4 HP

HM

15.00

5.27

79.05

VIBRADOR DE 3/4" - 2"

HM

9.52

2.37

22.54

VIBRADOR A GASOLINA 1 1/4" - 4 HP

HM

9.52

6.05

57.58

VIBRADOR A GASOLINA 1 3/4" - 4 HP

HM

9.52

6.09

57.96

WINCHE DE DOS BALDES (350 KG) M. E.

HM

9.52

2.91

27.72

TEODOLITO

HM

30.00

6.07

182.10
1,491.94

I N S U M O S C O M O D I N E S O P O R C E N T A J E S ESTI M A D O S
OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Insumo

Und.

HERRAMIENTAS MANUALES

% MO

Precio

Cant. Requerida
822.44

1.00

STI M A D O S

Parcial
822.44

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.01.01 ALMACEN GENERAL

Rendimiento:

0.000 GLB/DIA

Descripcin

Und

Costo Unitario Directo (GLB)


Cuadrilla

Cantidad

300.00

Precio

Parcial

Materiales
ALMACEN
Partida:

GLB

1.0000

300.00

300.00

A.01.02 CARTEL DE OBRA

Rendimiento:

1.000 GLB/DIA

Descripcin

Und

Costo Unitario Directo (GLB)


Cuadrilla

Cantidad

350.00

Precio

Parcial

Materiales
CARTEL DE OBRA INC/INST. TRANSP.
Partida:

GLB

1.0000

350.00

350.00

A.01.03 AGUA PARA LA CONSTRUCCION

Rendimiento:

0.000 GLB/DIA

Descripcin

Und

Costo Unitario Directo (GLB)


Cuadrilla

Cantidad

300.00

Precio

Parcial

Materiales
AGUA
Partida:

GLB

1.0000

300.00

300.00

A.02.01 TRANSPORTE DE MAQUINARIA Y EQUIPO

Rendimiento:

0.000 GLB/DIA

Descripcin

Und

Costo Unitario Directo (GLB)


Cuadrilla

Cantidad

1,000.00

Precio

Parcial

Materiales
TRANSPORTE DE MAQUIN. Y EQUIPO
Partida:
Rendimiento:
Descripcin

GLB

1.0000

1,000.00

1,000.00

A.02.02 LIMPIEZA DE TERRENO MANUAL


40.000 M2/DIA
Und

Costo Unitario Directo (GLB)


Cuadrilla

Cantidad

1.76

Precio

Parcial

Mano de Obra
CAPATAZ

HH

0.10

0.0200

10.34

0.21

PEON

HH

1.00

0.2000

7.33

1.47

5.0000

1.67

0.08

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.02.03 TRAZO, REPLANTEO PRELIMINAR

Rendimiento:

200.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

2.19

Precio

Parcial

Materiales
YESO EN BOLSA DE 20 KG.

BLS

0.0100

15.68

0.16

CORDEL

ML

0.0100

0.60

0.01

MADERA TORNILLO

P2

0.0490

2.80

0.14

Mano de Obra
OPERARIO

HH

1.00

0.0400

9.04

0.36

PEON

HH

1.00

0.0400

7.33

0.29

5.0000

0.65

0.03

0.0400

30.00

1.20

Equipo
HERRAMIENTAS MANUALES

%MO

TEODOLITO

HM

1.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.03.01 EXCAVACION DE ZANJAS EN CIMIENTOS Y ZAPATAS

Rendimiento:

4.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

17.56

Precio

Parcial

Mano de Obra
CAPATAZ

HH

0.10

0.2000

10.34

2.07

PEON

HH

1.00

2.0000

7.33

14.66

5.0000

16.73

0.84

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO
A.03.02 RELLENO CON MATERIAL PROPIO

Rendimiento:

8.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

8.78

Precio

Parcial

Mano de Obra
CAPATAZ

HH

0.10

0.1000

10.34

1.03

PEON

HH

1.00

1.0000

7.33

7.33

5.0000

8.36

0.42

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:

%MO
A.03.03 ELIMINACION DE MATERIAL EXCEDENTE
40.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

66.00

Precio

Parcial

Materiales
TRANSPORTE MATERIAL VOLQ. 6 M3

M3

1.0000

Partida:

A.03.04 NIVELACION INT. Y APISONADO PARA FINAL PISO

Rendimiento:

400.000 M2/DIA

Descripcin

Und

66.00

66.00

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

2.35

Precio

Parcial

Mano de Obra
CAPATAZ

HH

0.10

0.0020

10.34

0.02

OPERARIO

HH

1.00

0.0200

9.04

0.18

PEON

HH

10.00

0.2000

7.33

1.47

5.0000

1.67

0.08

0.0400

15.00

0.60

Equipo
HERRAMIENTAS MANUALES

%MO

COMPACTADOR VIBR. TIPO PLANCHA

HM

2.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.04.01 CIMIENTO CORRIDO C:H (1:10 + 30% P.G.)


25.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

144.87

Precio

Parcial

Materiales
PIEDRA BASE

M3

0.4900

33.61

16.47

CEMENTO PORTLAND TIPO I

BLS

2.7000

22.27

60.13

HORMIGON

M3

0.9100

32.00

29.12

AGUA

M3

0.1600

5.00

0.80

Mano de Obra
CAPATAZ

HH

0.20

0.0640

10.34

0.66

OPERARIO

HH

2.00

0.6400

9.04

5.79

OFICIAL

HH

2.00

0.6400

8.16

5.22

PEON

HH

8.00

2.5600

7.33

18.76

5.0000

30.43

1.52

0.3200

20.00

6.40

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

Partida:
Rendimiento:

1.00

A.04.02 SOLADO PARA ZAPATAS (E=4", 1:12 C:H)


40.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

19.64

Precio

Parcial

Materiales
CEMENTO PORTLAND TIPO I

BLS

0.1800

22.27

4.01

HORMIGON

M3

0.0530

32.00

1.70

AGUA

M3

0.0030

5.00

0.02

Mano de Obra
OPERADOR DE EQUIPO LIVIANO

HH

0.20

0.2000

9.04

1.81

CAPATAZ

HH

0.20

0.0600

10.34

0.62

OPERARIO

HH

2.00

0.2000

9.04

1.81

OFICIAL

HH

2.00

0.1000

8.16

0.82

PEON

HH

8.00

0.6000

7.33

4.40

5.0000

9.45

0.47

0.2000

20.00

4.00

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

1.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.04.03 CONCRETO 1:8 + 25% P.M. P/SOBRECIMIENTOS

Rendimiento:

6.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

207.43

Precio

Parcial

Materiales
PIEDRA MEDIANA

M3

0.4220

33.61

14.18

CEMENTO PORTLAND TIPO I

BLS

3.6500

22.27

81.29

HORMIGON

M3

0.9760

32.00

31.23

AGUA

M3

0.1600

5.00

0.80
1.38

Mano de Obra
CAPATAZ

HH

0.10

0.1333

10.34

OPERARIO

HH

0.50

0.6667

9.04

6.03

OFICIAL

HH

1.00

1.3333

8.16

10.88

PEON

HH

4.00

5.3333

7.33

39.09

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

57.38

2.87

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.6667

20.00

13.33

VIBRADOR A GASOLINA 1 1/4" - 4 HP

HM

0.50

0.6667

9.52

6.35

Partida:
Rendimiento:

A.04.04 ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTO


16.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

20.08

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.2600

2.72

0.71

CLAVOS CON CABEZA PROMEDIO

KG

0.1600

2.72

0.44

MADERA TORNILLO

P2

3.3460

2.80

9.37

Mano de Obra
CAPATAZ

HH

0.10

0.0500

10.34

0.52

OPERARIO

HH

1.00

0.5000

9.04

4.52

OFICIAL

HH

1.00

0.5000

8.16

4.08

5.0000

9.12

0.46

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.04.05 FALSO PISO 1:8 E=0.10 M.

Rendimiento:

120.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

22.96

Precio

Parcial

Materiales
CEMENTO PORTLAND TIPO I

BLS

0.5000

22.27

11.14

HORMIGON

M3

0.1310

32.00

4.19

AGUA

M3

0.0160

5.00

0.08

Mano de Obra
CAPATAZ

HH

0.30

0.0200

10.34

0.21

OPERARIO

HH

3.00

0.2000

9.04

1.81

PEON

HH

8.00

0.5333

7.33

3.91

5.0000

5.92

0.30

0.0667

20.00

1.33

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

1.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.05.01 CONCRETO F'C=210 KG/CM P/ZAPATAS


12.500 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

286.52

Precio

Parcial

Materiales
PIEDRA CHANCADA DE 3/4"

M3

0.8500

37.81

ARENA GRUESA

M3

0.4900

25.21

32.14
12.35

CEMENTO PORTLAND TIPO I

BLS

8.7200

22.27

194.19

AGUA

M3

0.2100

5.00

1.05

Mano de Obra
OPERADOR DE EQUIPO PESADO

HH

1.00

0.6400

9.04

5.79

OPERARIO

HH

1.00

0.6400

9.04

5.79

OFICIAL

HH

1.00

0.6400

8.16

5.22

PEON

HH

4.00

2.5600

7.33

18.76

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

35.56

1.78

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.3200

20.00

6.40

VIBRADOR A GASOLINA 3/4" - 2"

HM

0.50

0.3200

9.52

3.05

Partida:
Rendimiento:
Descripcin

A.05.02 ENCOFRADO Y DESENCOFRADO P/ZAPATAS


8.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

31.11

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.1000

2.72

CLAVOS CON 2 1/2", 3", 4"

KG

0.1500

2.72

0.27
0.41

MADERA TORNILLO

P2

4.0300

2.80

11.28

Mano de Obra
CAPATAZ

HH

0.10

0.1000

10.34

1.03

OPERARIO

HH

1.00

1.0000

9.04

9.04

OFICIAL

HH

1.00

1.0000

8.16

8.16

5.0000

18.23

0.91

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.03 ACERO FY=4200 KG/CM P/ZAPATAS

Rendimiento:

200.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

3.18

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.72

0.14

ACERO CORRUGADO

KG

1.0650

2.14

2.28

Mano de Obra
CAPATAZ

HH

0.10

0.0040

10.34

0.04

OPERARIO

HH

1.00

0.0400

9.04

0.36

OFICIAL

HH

1.00

0.0400

8.16

0.33

5.0000

0.73

0.04

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.05.04 CONCRETO F'C=210 KG/CM P/VIGA CIMENTACION

Rendimiento:

23.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

302.20

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.4200

25.21

PIEDRA CHANCADA DE 1/2"

M3

0.8500

37.81

10.59
32.14

CEMENTO PORTLAND TIPO I

BLS

9.7400

22.27

216.91

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.10

0.0348

10.34

0.36

OPERARIO

HH

2.00

0.6957

9.04

6.29

OFICIAL

HH

1.00

0.3478

8.16

2.84

PEON

HH

8.00

2.7826

7.33

20.40

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

29.88

1.49

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.3478

20.00

6.96

VIBRADOR A GASOLINA 1 1/4" - 4 HP

HM

0.50

0.3478

9.52

3.31

Partida:
Rendimiento:
Descripcin

A.05.05 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION


7.500 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

27.08

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.3000

2.72

0.82

CLAVOS DE 3"

KG

0.3300

2.72

0.90

MADERA PARA ENCOFRADOS

P2

2.1800

2.80

6.10

Mano de Obra
OPERARIO

HH

1.00

1.0667

9.04

9.64

OFICIAL

HH

1.00

1.0667

8.16

8.70

5.0000

18.35

0.92

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.06 ACERO FY=4200 KG/CM P/VIGA DE CIMENTACION

Rendimiento:

250.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

2.95

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0300

2.72

0.08

ACERO CORRUGADO

KG

1.0700

2.14

2.29

Mano de Obra
OPERARIO

HH

1.00

0.0320

9.04

0.29

OFICIAL

HH

1.00

0.0320

8.16

0.26

5.0000

0.55

0.03

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.05.07 CONCRETO F'C=210 KG/CM P/COLUMNAS

Rendimiento:

6.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

348.32

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.5400

25.21

PIEDRA CHANCADA DE 1/2"

M3

0.8500

37.81

13.61
32.14

CEMENTO PORTLAND TIPO I

BLS

8.4300

22.27

187.74

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.12

0.1600

10.34

1.65

OPERARIO

HH

0.87

1.1600

9.04

10.49

OFICIAL

HH

0.87

1.1600

8.16

9.47

PEON

HH

7.20

9.6000

7.33

70.37

5.0000

91.97

4.60

0.8667

20.00

17.33

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

Partida:
Rendimiento:
Descripcin

0.65

A.05.08 ENCOFRADO Y DESENCOFRADO P/COLUMNAS


10.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

28.58

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.3000

2.72

CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.2010

2.72

0.82
0.55

MADERA TORNILLO

P2

4.2500

2.80

11.90

Mano de Obra
CAPATAZ

HH

0.10

0.0800

10.34

0.83

OPERARIO

HH

1.00

0.8000

9.04

7.23

OFICIAL

HH

1.00

0.8000

8.16

6.53

5.0000

14.59

0.73

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.09 ACERO FY=4200 KG/CM P/COLUMNAS

Rendimiento:

200.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

3.18

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.72

0.14

ACERO CORRUGADO

KG

1.0650

2.14

2.28

Mano de Obra
CAPATAZ

HH

0.10

0.0040

10.34

0.04

OPERARIO

HH

1.00

0.0400

9.04

0.36

OFICIAL

HH

1.00

0.0400

8.16

0.33

5.0000

0.73

0.04

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.05.10 CONCRETO F'C=175 KG/CM P/VIGAS

Rendimiento:

10.000 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

293.26

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.5090

25.21

PIEDRA CHANCADA DE 1/2" - 3/4"

M3

0.7600

37.81

12.83
28.74

CEMENTO PORTLAND TIPO I

BLS

8.6600

22.27

192.86

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.12

0.0800

10.34

0.83

OPERARIO

HH

0.87

0.8000

9.04

7.23

OFICIAL

HH

0.87

0.8000

8.16

6.53

PEON

HH

7.20

4.0000

7.33

29.32

Equipo
HERRAMIENTAS MANUALES

%MO

5.0000

43.91

2.20

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.65

0.4000

20.00

8.00

VIBRADOR A GASOLINA 1 3/4" - 4 HP

HM

0.65

0.4000

9.52

3.81

Partida:
Rendimiento:
Descripcin

A.05.11 ENCOFRADO Y DESENCOFRADO P/VIGAS


9.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

33.37

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.2010

2.72

CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.2400

2.72

0.55
0.65

MADERA TORNILLO

P2

5.4100

2.80

15.15

Mano de Obra
CAPATAZ

HH

0.10

0.0889

10.34

0.92

OPERARIO

HH

1.00

0.8889

9.04

8.04

OFICIAL

HH

1.00

0.8889

8.16

7.25

5.0000

16.21

0.81

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.12 ACERO FY=4200 KG/CM P/VIGAS

Rendimiento:

250.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

3.03

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.72

0.14

ACERO CORRUGADO

KG

1.0650

2.14

2.28

Mano de Obra
CAPATAZ

HH

0.10

0.0032

10.34

0.03

OPERARIO

HH

1.00

0.0320

9.04

0.29

OFICIAL

HH

1.00

0.0320

8.16

0.26

5.0000

0.58

0.03

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.05.13 CONCRETO F'C=175 KG/CM P/LOSA ALIGERADA

Rendimiento:

12.500 M3/DIA

Descripcin

Und

Costo Unitario Directo (M3)


Cuadrilla

Cantidad

294.09

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.5500

25.21

PIEDRA CHANCADA DE 1/2" - 3/4"

M3

0.7642

37.81

13.87
28.89

CEMENTO PORTLAND TIPO I

BLS

8.6600

22.27

192.86

AGUA

M3

0.1840

5.00

0.92

Mano de Obra
CAPATAZ

HH

0.10

0.0640

10.34

0.66

OPERARIO

HH

1.50

0.9600

9.04

8.68

OFICIAL

HH

1.00

0.6400

8.16

5.22

PEON

HH

6.50

4.1600

7.33

30.49

MEZCLADORA DE CONCRETO 9-11 P3

HM

0.50

0.3200

20.00

6.40

VIBRADOR A GASOLINA 1 3/4" - 4 HP

HM

0.50

0.3200

9.52

3.05

WINCHE DE DOS BALDES (350 KG.)

HM

0.50

0.3200

9.52

3.05

Equipo

Partida:
Rendimiento:
Descripcin

A.05.14 ENCOFRADO Y DESENCOFRADO P/LOSA ALIGERADA


15.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

20.72

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 8

KG

0.1000

2.72

0.27

CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.1000

2.72

0.27

MADERA TORNILLO

P2

3.5600

2.80

9.97

Mano de Obra
CAPATAZ

HH

0.10

0.0533

10.34

0.55

OPERARIO

HH

1.00

0.5333

9.04

4.82

OFICIAL

HH

1.00

0.5333

8.16

4.35

5.0000

9.72

0.49

Equipo
HERRAMIENTAS MANUALES

%MO

Partida:

A.05.15 ACERO FY=4200 KG/CM P/LOSA ALIGERADA

Rendimiento:

200.000 KG/DIA

Descripcin

Und

Costo Unitario Directo (KG)


Cuadrilla

Cantidad

3.18

Precio

Parcial

Materiales
ALAMBRE NEGRO NACIONAL # 16

KG

0.0500

2.72

0.14

ACERO CORRUGADO

KG

1.0650

2.14

2.28

Mano de Obra
CAPATAZ

HH

0.10

0.0040

10.34

0.04

OPERARIO

HH

1.00

0.0400

9.04

0.36

OFICIAL

HH

1.00

0.0400

8.16

0.33

5.0000

0.73

0.04

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.05.16 LADRILLO HUECO/ARCILLA 15X30X30 CM P/LOSA ALIGERADA


1600.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

2.71

Precio

Parcial

Materiales
LADRILLO P/TECHO 15x30x30 8 HUECOS

UND

1.0560

2.15

2.27

Mano de Obra
CAPATAZ

HH

0.10

0.0005

10.34

0.01

OPERARIO

HH

1.00

0.0050

9.04

0.05

OFICIAL

HH

1.00

0.0050

8.16

0.04

PEON

HH

9.00

0.0450

7.33

0.33

5.0000

0.42

0.02

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:

%MO

A.06.01 MURO DE SOGA LADRILLO KING KONG CON CEMENTO-CAL-ARENA


9.450 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

61.61

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.72

ARENA GRUESA

M3

0.0330

25.21

0.06
0.83

LADRILLO KK DE ARCILLA 9X14X24 CM

UND

38.0000

1.05

39.90

CEMENTO PORTLAND TIPO I

BLS

0.2360

22.27

5.26

AGUA

M3

0.0800

5.00

0.40

MADERA TORNILLO

P2

0.3550

2.80

0.99

Mano de Obra
CAPATAZ

HH

0.10

0.0847

10.34

0.88

OPERARIO

HH

1.00

0.8466

9.04

7.65

PEON

HH

0.80

0.6772

7.33

4.96

5.0000

13.49

0.67

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:

%MO

A.06.02 MURO DE CABEZA LADRILLO KING KONG CON CEMENTO-CAL-ARENA


6.780 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

101.02

Precio

Parcial

Materiales
CLAVOS PARA MADERA C/C 3"

KG

0.0200

2.72

ARENA GRUESA

M3

0.0500

25.21

0.05
1.26

LADRILLO KK DE ARCILLA 9X14X24 CM

UND

65.0000

1.05

68.25

CEMENTO PORTLAND TIPO I

BLS

0.4700

22.27

10.47

AGUA

M3

0.0140

5.00

0.07

MADERA TORNILLO CEPILLADA

P2

0.5800

2.80

1.62

Mano de Obra
CAPATAZ

HH

0.10

0.1180

10.34

1.22

OPERARIO

HH

1.00

1.1799

9.04

10.67

PEON

HH

0.80

0.8850

7.33

6.49

5.0000

18.37

0.92

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:
Descripcin

A.07.01 TARRAJEO DE MURO INTERIOR/EXTERIOR


16.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

12.73

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.72

0.06

ARENA FINA

M3

0.0154

50.00

0.77

CEMENTO PORTLAND TIPO I

BLS

0.1170

22.27

2.61

MADERA TORNILLO

P2

0.5800

2.80

1.62

MADERA CEDRO CEPILLADO

P2

0.0250

3.10

0.08

Mano de Obra
CAPATAZ

HH

0.10

0.0500

10.34

0.52

OPERARIO

HH

1.00

0.5000

9.04

4.52

PEON

HH

0.60

0.3000

7.33

2.20

5.0000

7.24

0.36

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.07.02 TARRAJEO DE COLUMNAS
8.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

19.92

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.72

0.06

ARENA FINA

M3

0.0154

50.00

0.77

CEMENTO PORTLAND TIPO I

BLS

0.1170

22.27

2.61

MADERA TORNILLO

P2

0.5800

2.80

1.62

MADERA CEDRO CEPILLADO

P2

0.3880

3.10

1.20

Mano de Obra
CAPATAZ

HH

0.10

0.1000

10.34

1.03

OPERARIO

HH

1.00

1.0000

9.04

9.04

PEON

HH

0.40

0.4000

7.33

2.93

5.0000

13.01

0.65

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.07.03 TARRAJEO DE VIGAS
6.500 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

23.07

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0220

2.72

0.06

ARENA FINA

M3

0.0154

50.00

0.77

CEMENTO PORTLAND TIPO I

BLS

0.1170

22.27

2.61

MADERA TORNILLO

P2

0.5800

2.80

1.62

MADERA CEDRO CEPILLADO

P2

0.3880

3.10

1.20

Mano de Obra
CAPATAZ

HH

0.10

0.1231

10.34

1.27

OPERARIO

HH

1.00

1.2308

9.04

11.13

PEON

HH

0.40

0.4923

7.33

3.61

5.0000

16.01

0.80

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:

A.07.04 VESTIDURA DE DERRAMES


18.000 ML/DIA

Descripcin

Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

6.90

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0100

2.72

0.03

ARENA FINA

M3

0.0020

50.00

0.10

CEMENTO PORTLAND TIPO I

BLS

0.0210

22.27

0.47

MADERA TORNILLO

P2

0.1270

2.80

0.36

MADERA CEDRO CEPILLADO

P2

0.0730

3.10

0.23

Mano de Obra
CAPATAZ

HH

0.10

0.0444

10.34

0.46

OPERARIO

HH

1.00

0.4444

9.04

4.02

PEON

HH

0.30

0.1333

7.33

0.98

5.0000

5.45

0.27

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:

%MO
A.07.05 CERAMICA NACIONAL .30X.20 M. COLOR
10.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

52.55

Precio

Parcial

Materiales
CEMENTO PORTLAND TIPO I

BLS

0.1870

22.27

4.16

CERAMICA NACIONAL .30X.20 M. COLOR

M2

1.0500

25.00

26.25

PORCELANA

KG

0.1950

4.50

0.88

AGUA

P2

0.0040

5.00

0.02

Mano de Obra
CAPATAZ

HH

0.20

0.1600

10.34

1.65

OPERARIO

HH

2.00

1.6000

9.04

14.46

PEON

HH

0.70

0.5600

7.33

4.10

5.0000

20.22

1.01

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.08.01 CIELO RASO CON MEZCLA C:A 1:5
10.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

21.06

Precio

Parcial

Materiales
CLAVOS CON CABEZA 2 1/2", 3", 4"

KG

0.0090

2.72

0.02

ARENA FINA

M3

0.0160

50.00

0.80

CEMENTO PORTLAND TIPO I

BLS

0.1170

22.27

2.61

MADERA TORNILLO

P2

2.1550

2.80

6.03

MADERA CEDRO CEPILLADO

P2

0.0180

3.10

0.06

Mano de Obra
CAPATAZ

HH

0.10

0.0800

10.34

0.83

OPERARIO

HH

1.00

0.8000

9.04

7.23

PEON

HH

0.30

0.4000

7.33

2.93

5.0000

10.99

0.55

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:
Rendimiento:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.09.01 ACABADO PULIDO DE PISO DE CEMENTO E=2"
40.000 M2/DIA

Descripcin

Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

22.49

Precio

Parcial

Materiales
ARENA GRUESA

M3

0.0540

25.21

1.36

CEMENTO PORTLAND TIPO I

BLS

0.5270

22.27

11.74

MADERA CEDRO CEPILLADO

P2

0.1300

3.10

0.40

Mano de Obra
CAPATAZ

HH

0.10

0.0200

10.34

0.21

OPERARIO

HH

1.00

0.2000

9.04

1.81

OFICIAL

HH

0.50

0.1000

8.16

0.82

PEON

HH

3.00

0.6000

7.33

4.40

5.0000

7.23

0.36

0.0700

20.00

1.40

Equipo
HERRAMIENTAS MANUALES

%MO

MEZCLADORA DE CONCRETO 9-11 P3

HM

Partida:
Rendimiento:
Descripcin

0.35

A.10.01 PINTURA LATEX 2 MANOS CIELORASO Y VIGAS


60.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

5.60

Precio

Parcial

Materiales
LIJA PARA MADERA

HJA

0.2000

1.30

0.26

ANDAMIO DE MADERA

P2

0.0100

2.80

0.03

IMPRIMANTE

KG

0.2000

4.50

0.90

PINTURA LATEX

GLN

0.0440

45.00

1.98

Mano de Obra
CAPATAZ

HH

0.10

0.0133

10.34

0.14

OPERARIO

HH

1.00

0.1333

9.04

1.21

PEON

HH

1.00

0.1333

7.33

0.98

5.0000

2.32

0.12

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO

A.10.02 PINTURA LATEX 2 MANOS MUROS Y COLUMNAS


60.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

5.30

Precio

Parcial

Materiales
LIJA PARA MADERA

HJA

0.2000

1.30

0.26

ANDAMIO DE MADERA

P2

0.0100

2.80

0.03

IMPRIMANTE

KG

0.2100

4.50

0.95

PINTURA LATEX

GLN

0.0440

45.00

1.98

Mano de Obra
CAPATAZ

HH

0.10

0.0114

10.34

0.12

OPERARIO

HH

1.00

0.1143

9.04

1.03

PEON

HH

1.00

0.1143

7.33

0.84

5.0000

1.99

0.10

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:
Rendimiento:
Descripcin

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.11.01 PUERTA DE TABLERO
3.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

143.44

Precio

Parcial

Materiales
CLAVOS PARA MADERA C/C 2"

KG

0.0710

2.72

0.19

BISAGRA 4"

PZA

2.5500

5.00

12.75

LIJA

UND

1.0000

1.30

1.30

COLA SINTETICA

GLN

0.1000

25.00

2.50

MADERA TORNILLO

P2

21.5500

2.80

60.34

Mano de Obra
OPERARIO

HH

1.00

2.6667

9.04

24.11

PEON

HH

2.00

5.3333

7.33

39.09

5.0000

63.20

3.16

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.11.02 PUERTA CONTRAPLACADA
6.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

131.89

Precio

Parcial

Materiales
CLAVOS PARA MADERA C/C 2"

KG

0.0800

2.72

0.22

BISAGRA 4"

PZA

1.5000

5.00

7.50

LIJA

UND

0.8200

1.30

1.07

COLA SINTETICA

GLN

0.4000

25.00

10.00

MADERA TORNILLO

P2

16.0000

2.80

44.80

TRIPLAY DE 4' X 8' X 6 MM.

PLN

1.0700

25.50

27.29

THINER

GLN

0.5600

13.15

7.36

BARNIZ

GLN

0.2500

33.40

8.35

2.6667

9.04

24.11

5.0000

24.11

1.21

Mano de Obra
OPERARIO

HH

2.00

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.11.03 VENTANA DE MADERA TORNILLO
2.000 M2/DIA
Und

Costo Unitario Directo (M2)


Cuadrilla

Cantidad

76.48

Precio

Parcial

Materiales
CLAVOS DE 2"

KG

0.0550

2.72

COLA SINTETICA

GLN

0.1400

25.00

0.15
3.50

MADERA TORNILLO

P2

10.9000

2.80

30.52

Mano de Obra
CAPATAZ

HH

0.10

0.4000

10.34

4.14

OPERARIO

HH

1.00

4.0000

9.04

36.16

5.0000

40.30

2.01

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.12.01 SALIDA DE TECHO (CENTRO DE LUZ)

Rendimiento:

5.150 PTO/DIA

Descripcin

Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

79.72

Precio

Parcial

Materiales
CONDUCTOR TW SOLIDO 1X2.5 mm2-14 AWGML

16.0000

0.36

5.76

FLUORESCENTE CIRCULAR 32 W

UND

1.0000

26.00

26.00

INTERRUPTOR SIMPLE BAKELITA 2 G.

UND

1.0000

5.50

5.50

CAJA RECTANGULAR LIVIANA 2"X4"

UND

1.0000

0.85

0.85

CAJA OCTOGONAL LIVIANA 4"

UND

1.0000

1.00

1.00

CINTA AISLANTE

ML

1.0000

0.20

0.20

PEGAMENTO P/TUBERIA PVC (ELECT.)

GLN

0.0202

125.00

2.53

TUBO PVC SEL (E/C) 3/4" X 3.00 M.

ML

6.5000

0.56

3.64

UNION PVC SEL 3/4"

PZA

2.5000

1.20

3.00

CURVAS PVC SEL 3/4"

PZA

2.5000

0.60

1.50

Mano de Obra
CAPATAZ

HH

0.10

0.1553

10.34

1.61

OPERARIO

HH

1.00

1.5534

9.04

14.04

OFICIAL

HH

1.00

1.5534

8.16

12.68

5.0000

28.32

1.42

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO
A.12.02 SALIDA TOMACORRIENTE C/LINEA A TIERRA

Rendimiento:

5.330 PTO/DIA

Descripcin

Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

70.81

Precio

Parcial

Materiales
CONDUCTOR TW SOLIDO 1X4 mm2-12

ML

21.0000

0.55

11.55

TOMACORRIENTE DOBLE C/L. TIERRA

UND

1.0000

20.00

20.00

CAJA RECTANG. GALV. LIVIANA 2"X4"

UND

1.0000

1.00

1.00

PEGAMENTO P/TUBERIA PVC (ELECT.)

GLN

0.0199

125.00

2.49

TUBO PVC SEL (E/C) 3/4" X 3.00 M.

ML

7.0000

0.56

3.92

UNION PVC SEL 3/4"

PZA

2.0000

1.20

2.40

CURVAS PVC SEL 3/4"

PZA

1.2000

0.60

0.72

Mano de Obra
CAPATAZ

HH

0.10

0.1501

10.34

1.55

OPERARIO

HH

1.00

1.5009

9.04

13.57

OFICIAL

HH

1.00

1.5009

8.16

12.25

5.0000

27.37

1.37

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO

A.12.03 TABLERO DE DISTRIBUCION DE 3 CIRCUITOS

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

120.00

Precio

Parcial

Materiales
TABLERO DE DISTRIBUCION DE 3 CIRC.

UND

1.0000

120.00

120.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:
Partida:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004
A.12.04 TABLERO GENERAL DE DISTRIBUCION

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

300.00

Precio

Parcial

Materiales
TABLERO GENERAL DE DISTRIBUCION
Partida:

UND

1.0000

300.00

300.00

A.13.01 VIDRIOS SEMIDOBLES NACIONALES

Rendimiento:

0.000 P2/DIA

Descripcin

Und

Costo Unitario Directo (P2)


Cuadrilla

Cantidad

3.10

Precio

Parcial

Materiales
VIDRIOS SEMIDOBLES NACIONALES
Partida:

P2

1.0000

3.10

3.10

A.14.01 INODORO TANQUE BAJO BLANCO

Rendimiento:

0.000 PZA/DIA

Descripcin

Und

Costo Unitario Directo (PZA)


Cuadrilla

Cantidad

252.00

Precio

Parcial

Materiales
INODORO TANQUE BAJO BLANCO C/A
Partida:

PZA

1.0000

252.00

252.00

A.14.02 LAVATORIO BLANCO VITRIFICADO

Rendimiento:

7.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

150.00

Precio

Parcial

Materiales
LAVATORIO 20"x17" 2 LLAVES BLANCO

UND

1.0000

150.00

150.00

Mano de Obra
CAPATAZ

HH

0.10

0.1143

10.34

1.18

OPERARIO

HH

1.00

1.1429

9.04

10.33

PEON

HH

1.00

1.1429

7.33

8.38

5.0000

19.89

0.99

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO
A.14.03 URINARIO REVESTIDO DE MAYOLICA

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

200.00

Precio

Parcial

Materiales
URINARIO REVESTIDO DE MAYOLICA
Partida:

UND

1.0000

200.00

200.00

A.14.04 LAVATORIO CORRIDO CON MAYOLICA

Rendimiento:

0.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

200.00

Precio

Parcial

Materiales
LAVATORIO CORRIDO CON MAYOLICA

UND

1.0000

200.00

200.00

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:
Rendimiento:
Descripcin

A.15.01 SALIDA DE DESAGUE EN PVC


4.000 PTO/DIA
Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

48.11

Precio

Parcial

Materiales
TUBO PVC SAL 3"

ML

1.0000

2.00

2.00

TUBO PVC SAL 4"

ML

0.6000

2.60

1.56

CODO PVC SAL 2" X 90

PZA

0.5000

1.00

0.50

CODO PVC SAL 3" X 90

PZA

0.5000

2.00

1.00

CODO PVC SAL 4" X 90

PZA

0.8000

3.50

2.80

YEE PVC SAL 2" X 2"

PZA

0.2000

2.00

0.40

YEE PVC SAL 4" X 4"

PZA

0.6000

5.50

3.30

Mano de Obra
CAPATAZ

HH

0.10

0.2000

10.34

2.07

OPERARIO

HH

1.00

2.0000

9.04

18.08

PEON

HH

1.00

2.0000

7.33

14.66

5.0000

34.81

1.74

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.15.02 TUBERIA PVC SAL D=2"
25.000 ML/DIA
Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

6.27

Precio

Parcial

Materiales
PEGAMENTO P/TUBERIA PVC

GLN

0.0010

125.00

0.13

TUBO PVC SAL 2" X 3 M.

ML

0.2100

1.41

0.30

Mano de Obra
CAPATAZ

HH

0.10

0.0320

10.34

0.33

OPERARIO

HH

1.00

0.3200

9.04

2.89

PEON

HH

1.00

0.3200

7.33

2.35

5.0000

5.57

0.28

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO
A.15.03 CAJA DE REGISTRO 12" X 24"

Rendimiento:

4.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

52.06

Precio

Parcial

Materiales
CAJA PRE FAB. 12" X 24" INC. TAPA

ML

1.0000

25.00

25.00
2.07

Mano de Obra
CAPATAZ

HH

0.10

0.2000

10.34

OPERARIO

HH

0.50

1.0000

9.04

9.04

PEON

HH

1.00

2.0000

7.33

14.66

5.0000

25.77

1.29

Equipo
HERRAMIENTAS MANUALES

%MO

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.16.01 SALIDA DE AGUA FRIA

Rendimiento:

4.000 PTO/DIA

Descripcin

Und

Costo Unitario Directo (PTO)


Cuadrilla

Cantidad

52.78

Precio

Parcial

Materiales
GRIFO DE BRONCE DE 1/2"

UND

1.0000

4.00

4.00

CINTA TEFLON

ML

1.8000

1.30

2.34

PEGAMENTO P/TUBERIA PVC

GLN

0.0311

125.00

3.89

TUB. PVC - C10R 1/2" X 5 M.

ML

1.5000

1.00

1.50

TUB. PVC - C10R 3/4" X 5 M.

ML

1.0000

1.50

1.50

TEE PVC SAP ROSCADO 1/2"

PZA

1.0000

0.50

0.50

TEE PVC SAP ROSCADO 3/4"

PZA

0.5000

1.00

0.50

CODO PVC SAP - C10 1/2" X 90

PZA

2.0000

0.50

1.00

CODO PVC SAP - C10 3/4" X 90

PZA

1.0000

1.00

1.00

Mano de Obra
CAPATAZ

HH

0.10

0.2000

10.34

2.07

OPERARIO

HH

1.00

2.0000

9.04

18.08

PEON

HH

1.00

2.0000

7.33

14.66

5.0000

34.81

1.74

Equipo
HERRAMIENTAS MANUALES
Partida:

%MO
A.16.02 VALVULA DE COMPUERTA DE BRONCE 3/4"

Rendimiento:

15.000 UND/DIA

Descripcin

Und

Costo Unitario Directo (UND)


Cuadrilla

Cantidad

45.27

Precio

Parcial

Materiales
CINTA TEFLON

ML

2.0000

1.30

2.60

UNION UNIVERSAL F GALV. 3/4"

UND

2.0000

5.93

11.86

NIPLE DE F GALV. 3/4"

UND

2.0000

1.53

3.06

VALVULA COMPUERTA BRONCE 3/4"

UND

1.0000

18.00

18.00

Mano de Obra
CAPATAZ

HH

0.10

0.0533

10.34

0.55

OPERARIO

HH

1.00

0.5333

9.04

4.82

PEON

HH

1.00

0.5333

7.33

3.91

5.0000

9.28

0.46

Equipo
HERRAMIENTAS MANUALES
Partida:
Rendimiento:
Descripcin

%MO
A.16.03 TUBERIA PVC SAP 3/4" C-10
30.770 ML/DIA
Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

6.75

Precio

Parcial

Materiales
CINTA TEFLON

ML

0.1204

1.30

0.16

UNION SIMPLE F GALV. 3/4"

UND

0.2000

1.50

0.30

TUB. PVC - C10R 3/4" X 5 M.

UND

1.0300

1.50

1.55

Mano de Obra
CAPATAZ

HH

0.10

0.0260

10.34

0.27

OPERARIO

HH

1.00

0.2600

9.04

2.35

PEON

HH

1.00

0.2600

7.33

1.91

Equipo

HERRAMIENTAS MANUALES

%MO

5.0000

4.53

0.23

ANALISIS DE COSTOS UNITARIOS


OBRA:
PROPIETARIO:
FECHA:

CONSTRUCCION DEL CENTRO EDUCATIVO INICIAL N 1621 - LLAPO


MUNICIPALIDAD DISTRITAL DE LLAPO
15/01/2004

Partida:

A.16.04 TUBERIA PVC SAP 1/2" C-10

Rendimiento:

200.000 ML/DIA

Descripcin

Und

Costo Unitario Directo (ML)


Cuadrilla

Cantidad

4.22

Precio

Parcial

Materiales
PEGAMENTO PLASTICO PVC

UND

0.0200

125.00

2.50

TUB. PVC SAP C-10 D=1/2"

UND

1.0300

1.00

1.03

Mano de Obra
OPERARIO

HH

1.00

0.0400

9.04

0.36

PEON

HH

1.00

0.0400

7.33

0.29

5.0000

0.65

0.03

Equipo
HERRAMIENTAS MANUALES

%MO

ARIOS

1.00
Sub Total
300.00

1.00
1.00

Sub Total
350.00

1.00
1.00

Sub Total
300.00

1.00
1.00

Sub Total
1,000.00

1.00
151.75

Sub Total
3.04
1.67

30.35

0.08

758.75
151.75

Sub Total
1.52
1.52
0.30

7.44
6.07

0.65

6.07
0.61

1.23

6.07

12.14

ARIOS

79.25
Sub Total
15.85
16.73

158.50

0.84

8.72

174.35

15.72
Sub Total
1.57
8.36

15.72

0.42

0.86

17.29

63.63
Sub Total
66.00

63.63
131.75

Sub Total
0.26
2.64
1.67

26.35
1.46

0.68

5.27

29.25

ARIOS

45.28
Sub Total
22.19
122.26
41.20
106.52

7.24
2.90
28.98
28.98

30.43

115.92

7.92

14.49

176.77

8.84

10.60
Sub Total
1.91
0.56
5.72

0.03
2.12
0.64
2.12
1.06

9.45

6.36
0.61

4.47

2.12

12.30

ARIOS

7.08
Sub Total
2.99
25.84
6.91
127.50

1.13
0.94
4.72
9.44

57.38

37.76

52.86

2.64
4.72
22.55

4.72
90.58

Sub Total
23.55
14.49
10.51

303.08
4.53
45.29

9.12

45.29

0.46

4.76

95.11

131.75
Sub Total
65.88
17.26
15.41

2.11
2.64
26.35

5.92

70.26
4.96

1.63

8.79

99.25

ARIOS

7.40
Sub Total
6.29
3.63
64.53
239.74

1.55
4.74
4.74
4.74

35.56

18.94

33.15

1.66
2.37
11.22

2.37
31.36

Sub Total
3.14
4.70
11.96

126.38
3.14
31.36

18.23

31.36

0.91

3.29

65.86

114.25
Sub Total
5.71
2.42

121.68
0.46
4.57

0.73

4.57

0.04

0.48

9.60

ARIOS

3.82
Sub Total
1.60
3.25
37.21
260.56

0.70
0.13
2.66
1.33

29.88

10.63

14.75

0.74
1.33
11.76

1.33
35.00

Sub Total
10.50
11.55
7.82

76.30
37.33

18.35

37.33

0.92

3.73

74.67

217.85
Sub Total
6.54
2.37

233.10
6.97

0.55

6.97

0.03

0.70

13.94

ARIOS

4.76
Sub Total
2.57
4.05
40.13
234.41

0.88
0.76
5.52
5.52

91.97

45.70

57.50

2.88
21.93

4.13
85.00

Sub Total
25.50
17.09
13.26

361.25
6.80
68.00

14.59

68.00

0.73

7.14

142.80

715.95
Sub Total
35.80
2.42

762.49
2.86
28.64

0.73

28.64

0.04

3.01

60.14

ARIOS

7.94
Sub Total
4.04
6.03
68.76
235.35

1.46
0.64
6.35
6.35

43.91

31.76

45.10

2.25
3.18
14.00

3.18
83.45

Sub Total
16.77
20.03
16.35

451.46
7.42
74.18

16.21

74.18

0.81

7.79

155.78

879.95
Sub Total
44.00
2.42

937.15
2.82
28.16

0.58

28.16

0.03

2.96

59.13

ARIOS

9.10
Sub Total
5.01
6.95
78.81
236.54

1.67
0.58
8.74
5.82

45.06

37.86

37.86

2.91
2.91
12.49

2.91
97.25

Sub Total
9.73
9.73
10.51

346.21
5.18
51.86

9.72

51.86

0.49

2.59

51.86

310.95
Sub Total
15.55
2.42

331.16
1.24
12.44

0.73

12.44

0.04

0.62

12.44

ARIOS

815.00
Sub Total
2.27

860.64
0.41
4.08
4.08

0.42

36.68

0.02

2.26

45.23

199.50
Sub Total
4.39
6.58
7,581.00
47.08
15.96
47.44

70.82
16.90
168.90

13.49

135.10

0.67

16.04

320.90

55.20
Sub Total
1.10
2.76
3,588.00
25.94
0.77
81.73

32.02
6.51
65.13

18.37

48.85

0.92

6.02

120.50

ARIOS

509.40
Sub Total
11.21
7.84
59.60
295.45
5.14

12.74
25.47
254.70

7.24

152.82

0.36

21.65

432.99

63.75
Sub Total
1.40
0.98
7.46
36.98
6.26

24.74
6.38
63.75

13.01

25.50

0.65

1.28

25.50

73.20
Sub Total
1.61
1.13
8.56
42.46
6.26

28.40
9.01
90.09

16.01

36.04

0.80

6.76

135.14

ARIOS

309.50
Sub Total
3.10
0.62
6.50
39.31
1.18

22.59
13.74
137.54

5.45

41.26

0.27

2.06

41.26

40.00
Sub Total
7.48
42.00
7.80
31.31

0.16
6.40
64.00

20.22

22.40

1.01

4.64

92.80

97.25
Sub Total
0.88
1.56
11.38
209.57
9.52

1.75
7.78
77.80

10.99

38.90

0.55

6.22

124.48

ARIOS

131.75
Sub Total
7.11
69.43
13.50

17.13
2.64
26.35
13.18

7.23

79.05

79.05

3.95
1.76

9.22
170.45

Sub Total
34.09
1.70
34.09
3.17

7.50
2.27
22.72

2.32

22.72

0.12

1.14

22.72

573.15
Sub Total
114.63
5.73
120.36
3.21

25.22
6.53
65.51

1.99

65.51

0.10

6.88

137.56

ARIOS

3.08
Sub Total
0.22
7.85
3.08
0.31
77.08

66.37

63.20

16.43

3.16

1.23

8.21
24.64

15.94
Sub Total
1.28
23.91
13.07
6.38
255.04
17.06
8.93
106.58

3.99

24.11

42.51

1.21

2.13

42.51

20.16
Sub Total
1.11
2.82
34.17

219.74

40.30

80.64

2.01

4.44

8.06
88.70

ARIOS

19.00
Sub Total
304.00
19.00
19.00
19.00
19.00
19.00
0.38
123.50
47.50
49.98

47.50
2.95
29.51

28.32

29.51

1.42

3.10

61.98

16.00
Sub Total
336.00
16.00
16.00
0.32
112.00
32.00
42.08

19.20
2.40
24.01

27.37

24.01

1.37

2.52
1.00

Sub Total
120.00

1.00

50.43

ARIOS

1.00
Sub Total
300.00

1.00
217.00

Sub Total
3.10

217.00
6.00

Sub Total
252.00

6.00
2.00

Sub Total
150.00

2.00
0.23
2.29

19.89

2.29

0.99

0.24
1.00

Sub Total
200.00

1.00
1.00

Sub Total
200.00

1.00

4.80

ARIOS

11.00
Sub Total
11.00
6.60
5.50
5.50
8.80
2.20
11.56

6.60
2.20
22.00

34.81

22.00

1.74

2.31

46.20

19.60
Sub Total
0.02
0.42

4.12
0.63
6.27

5.57

6.27

0.28

0.31

6.27

4.00
Sub Total
25.00

4.00
0.80
4.00

25.77

8.00

1.29

0.40

8.00

ARIOS

11.00
Sub Total
11.00
19.80
0.34
16.50
11.00
11.00
5.50
22.00
16.23

11.00
2.20
22.00

34.81

22.00

1.74

2.31

46.20

4.00
Sub Total
8.00
8.00
8.00
35.52

4.00
0.21
2.13

9.28

2.13

0.46

0.22

4.48

26.40
Sub Total
3.18
5.28
2.00

27.19
0.69
6.86

4.53

6.86

14.41

0.23

0.72

ARIOS

18.50
Sub Total
0.37
3.53

19.06
0.74

0.65

0.74

0.03

0.07

1.48

You might also like