Professional Practice 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 The third phase of an architect's regular services.

Project financing falls under what kind of service of the architect. Comprehensive planning falls under what service of the architect. The fee of the architect for design-build services on a guaranteed maximum cost aside from his fee for regular design services. What percentage of an architect's work is liability under the civil code. For interior design services, the architect shall be paid what percentage of the fee upon submission of the final design. When the owner fails to implement the plans and documents for construction as prepared by the architect, the architect is entitled to receive what percentage of his fee. The minimum fee per appearance of an architect when rendering service as an expert witness shall be. The minimum basic fee for specialized decorative building. The minimum basic fee for industrial buildings with a project cost below 50 million pesos. The minimum basic fee for hospitals with a project cost below 50 million pesos. In design-build services, the single-point-responsibility of project delivery puts the legal liability for both the design and construction on the. The release of 10% retention by the owner shall be done after how many months from the date of final payment. Printed documents stipulating the procedural and administrative aspect of the contract. An outline specification enumerating the type and trade names of materials to be used. A price given by a contractor, sub-contractor, material supplier or vendor to furnish materials, labor or both. A statement from the architect confirming the amount of money due the contractor for work accomplished. A bond furnished by the contractor and his surety as a guarantee to execute the work in accordance with the terms of the contract. An offer to perform the work prescribed in a contract at a specified cost. The fee of the architect for design-build services by administration. A stipulation of the use of specific products or processes without provision for substitution. A list of instructions stipulating the manner on which bids are to be prepared. The performance and Payment Bonds shall be released by the owner after the expiration of how many months from the final acceptance of the work. The Guarantee Bond is released how many months after the date of final payment. How many days shall the Building Official issue a certificate of occupancy after final inspection of the project. A statute specifying the period of time within which legal action must be brought for alleged damage or injury. A bond, the form or content of which is prescribed by statute. A rule that certain kinds of contracts are enforceable unless signed and in writing or unless there is a written memorandum of their terms signed by the party to be charged. A contract transferring the right of possession of buildings, property, etc., for a fixed period of time, usually for periodical compensation called 'rent'. A tenure by lease; real estate held under a lease. The person receiving a possessory interest in buildings, property, etc., by lease. The person granting a possessory interest in buildings, property, etc., by lease. Range of the multiplier for Multiple of Direct Personnel Expense. This type of compensation is only applied to non-creative work. Contract documents phase Pre-design services Specialized allied services 10% 10% 50% 85% PHP 500.00 12% 6% 8% Architect 3 months General conditions Schedule of material and finishes Quotation Certificate of payment Performance bond Bid 7% Closed specification Instruction to bidders 2 months 12 months / 1 yr 30 days Statute of Limitation Statutory Bond Statute of Frauds Lease Leasehold Lessee Lessor 2-2.5 Multiple of Direct Personnel Expenses TRUE Percentage of Construction Cost Multiple of Direct Personnel Expenses Percentage of Construction Cost 50 kms. Professional Fee Plus Expenses Architect Letter of transmittal 3 Contractor TRUE Owner

35 Supervision Work is a non-creative work, true or false. 36 A world-wide used method of compensation for architectural services. 37 This method of compensation is applied only to pre-design services, supervision work, and other works which the Architect may perform other than the regular and specialized allied services. 38 This type of compensation is similar to the concept being charged by realtors, developers, and lawyers. 39 For reimbursable expenses, how many kilometers from the Architect's office shall a work be located to allow reimbursable expenses. 40 This method of compensation is frequently used where there is continuing relationship on a series of projects. 41 The full-time construction inspector shall be under the technical control and supervision of the ___. 42 Submission of shop drawings shall be accompanied by a ___ in duplicate. 43 How many sets of shop drawings for approval shall the contractor submit to the Architect? 44 Who shall have the responsibility of securing, but not liable for non-issuance, of the final occupancy permit. 45 True or false, can the owner relegate to the contractor the responsibility of establishing the lot lines, boundary lines, easements, and benchmarks provided that the owner pays the contractor for such works? 46 Who shall have the responsibility for establishing lot lines, boundary lines, easements, and benchmarks?

Page 1 of 3

Professional Practice 47 Who shall pay for the services of a licensed surveyor for confirmation and certification of the location of column centers, piers, walls, pits, trenches, pipe work, culvert work, utility lines, and other similar works required by the contract. 48 Professional Fee for the Architect as a full-time supervisor. 49 Professional fee for the Construction Manager. 50 Four types of Contracts for construction management 51 Under PD 1096, what should be the proportion of sidewalk width to that of the road rightof-way? 52 At what interest rate per month should a client pay the architect should the former fail to pay the latter beyond 30 days from receipt of billing? 53 What code holds the architect responsible for the building/structure he designed for a certain period of time. 54 What type of compensation is applied to cases where the architect's personal time is required, such as conferences, joint venture activities, etc.? 55 What type of bond guarantees payment on all obligations arising from the contract? 56 What type of compensation is applied to most of Gov't projects and entails more paper works and is advantageous to both client and architect. 57 Professional Fee for the Project Manager. 58 If the Project Manager is hired by the owner, who shall have the responsibility of hiring the Construction Manager? 59 True or false, based on the Civil Code, the Project Manager has no legal responsibility insofar as design and construction is concerned. 60 His primary responsibility is the exercise of overall cost control which relieves the owner of many of the anxieties that usually beset , particularly those concerned with forecasting cost and completion dates. 61 In the architect's code of ethics, to whom does the architect has responsibility to seek opportunities for constructive service in civic and urban affairs? 62 What PD created the PRC which regulates the practice of various professionals. 63 Architect XYZ uses paid advertisements without sanction by professional consensus and years of experience. His action is unethical with respect to his relation to whom? 64 Additional information on contract documents issued to bidders before date of bidding. 65 The offer of a bidder to perform the work described by the contract documents when made out and submitted on the prescribed proposal form, properly signed and sealed. 66 The cashier's check or surety bond accompanying the proposal submitted by the bidder, as a guarantee that the bidder will enter into a contract with the owner for the construction of the work, if the contract is awarded to him. 67 Instructions which may be issued prior to the bidding to supplement and/or modify drawings, specifications, and/or general conditions of the contract. 68 Written or printed description of work to be done describing qualities of material and mode of construction. 69 Means information, advice or notification pertinent to the project delivered in person or sent by registered mail to the individual, firm or corporation at the last known business address of such individual, firm or corporation. 70 Includes labor or materials or both as equipment, transportation, or other facilities necessary to commence and complete the construction called for in the contract. 71 Means to build-in, mount in position, connect or apply any object specified ready for the intended use. 72 Means to purchase and/or fabricate and deliver to jobsite. 73 Means to furnish and install. 74 No further retention shall be made on the balance of the contract when how many percent of the contract has been completed? 75 No payment shall be made on contracts in excess of how many percent of the contract price. 76 The guarantee bond is equal to how many percent of the contract price? 77 How many percent of the architect's fee is payable to the architect upon completion of the preparation of the schematic design phase and up to final design development phase? 78 Standard factor computed for changes and/or revisions made on completed contracts. 79 Approximately, how many square meters of office space for the architect is built by the contractor as temporary facilities for the project. 80 All trees and other plants that need to be transplanted elsewhere within ___ meters shall be done by the ___ at his own expense. 81 If there is a variance/discrepancy between the drawings and specifications, what shall be followed? 82 How many days prior to bidding shall the contractor seek the architect's clarification as to the particular areas of work which requires evaluation of the architect? 83 How many days upon written notice can a contractor terminate a contract with a valid reason?

Contractor 1-1.5% 1.5-3% Firm Fixed Price Fixed Price Incentive CPIF / CPAF Cost Plus Fixed Fee (1/6) 2% Civil Code Per Diem+Reimb. Expenses Payment Bond Lump Sum / Fixed Fee 2-5% Project Manager TRUE Project Manager Public / People PD 223 People / Public Bid Bulletin Proposal Proposal Bond Special Provisions Specifications Written Notice Work Install Furnish Provide 50% 65% 30% 30% 2.5 12 sqm. 50 / Contractor Specifications 15 Days 15 Days

Page 2 of 3

Professional Practice 84 Suspension of work for ___ days by order of any court or other public authority through no act or fault of the contractor gives the him the right to terminate contract. 85 True or false, the contractor can terminate contract if the owner should fail to pay the contractor any sum within 15 days after its award by arbitration 86 True or false, the contractor can terminate contract if the owner should fail to act upon any request for payment within 30 days after its certification by the architect. 87 Who declares bankruptcy as a valid reason for the termination of a contract? 88 True or false, upon termination of contract and upon the decision of the architect that materials and equipment left by the contractor which do not belong to him can be used and rent of such shall be borne by the failing contractor. 89 True or false, in case of suspension of work, all unpaid work executed including expenses incurred during suspension shall be evaluated by the architect and charged to the owner. 90 True or false, the owner has no right to claim liquidated damages if he takes over the work from the contractor for failure to complete the project. 91 How many days prior to canceling an insurance be given to the owner stipulating the intention to cancel? 92 How many percent of the contract amount is the Performance Bond? 93 How many percent of the contract amount is the Payment Bond? 94 A contract provision setting forth the damages a party must pay in the event of his breach. 95 Basic Fee for Physical Planning Type 1 or site such as industrial estates, commercial centers, sports complex, resorts, etc. 96 Predecessor of PD 1096 97 What presidential decree institutionalized the profession of environmental planning? 98 It is a right enforceable against specific property to secure payment of an obligation. 99 Minimum basic fee for simple projects. 100 Minimum basic fee for alterations/renovations. 101 When the architect is engaged to render opinion or advise, clarification or explanation on technical matters pertaining to his profession, the minimum basic fee shall be ___. 102 When rendering service as an expert witness, the architect is compensated ___/ hr. 103 Minimum basic fee for Group 5 Projects (monumental). 104 What is Group 6 Project classification? 105 Minimum Basic fee for housing projects. 106 107 108 109 110 111 Under what classification of Project does Hospitals and Medical Buildings fall? Under what classification of Project does Stadium fall? Minimum Per diem paid to the architect if work is beyond 50 kms. From office. On the remaining 15% work fee of the architect, where does the 5% go. Repairs and corrective works at the expense of the contractor should be done within how many days after written notice by owner? Failure on the part of the contractor to remove condemned work shall give the owner right to remove said work at contractor's exepense and contractor shall pay the owner the expenses incurred within how many days from removal by the owner of said work? Contract time reckoning shall commence on the ___ from receipt of ___. An area of a city where municipal buildings are grouped. Any article of property not consisting of or affixed to land plus any interest in land that is less than a freehold. No person who is not a citizen of the Philippines may take the board exams or practice the profession unless the country of his relation allows the same ___.

90 Days False (30 days) False (15 days) Contractor TRUE TRUE FALSE 10 days 15% 15% Penalty Clause 5,000 for First 50 Hectares R.A. 6451 PD 1308 Liens 6% 50% 200 / hr 500 12% Repetitive Construction 10% of 1st unit 60% 2nd-10th Unit 30% 11th and above Group 3 (Exceptional Character) Group 3 (Exceptional Character) PHP 750.00 Construction Phase Service 5 days 10 days 7th day / Notice to Proceed Civic Center Chattel Reciprocity

112 113 114 115