Civil Engineering Practice

RATE ANALYSIS
PCC (1:2:4) (Manual):Wet PCC = 10
Factor = 1.54
Dry PCC = 15.4
Material:Cement = 1x15.4/(7x.035)
= 62.857 bags
Sand = 4.4
Crush = 8.8
Labour:Mason = 0.1 day/
= 1 day
Waterman = 2.13 day/
=21.3 days
Labour = 0.7day/
= .7x(10+15.4)/2
= 8.89 days
Machinery:Viberator = 1 hour for 10
= 0.125 days
Sr# Resources
Quantity
Unit
Time (Day) Rate
Amount (Rs)
Material
62.85714
Bags
300
18857.14
1 Cement
Sand
4.4
212
932.8
Crush
8.8
1167
10269.6
Man Power
Mason
1
1
600
600
1
21.3
150
3195
2 Water Man
Simple Labour
1
8.89
250
2222.5
Machinery
1
0.125
1600
200
3 Viberator
Expanses On Material, Labour & Machinery
36277.04
Miscellaneous
Water Charges
400
36677.04
4
Sundries @7.5% Of Sum Of Resources
2750.778
Cost Without the Profit Of Contractor
39427.82
5 Profit @10%
3942.782
Total Amount For 10
of PCC(1:2:4)
43370.6
Total
Amount
For
1
of
PCC(1:2:4)
4337.06
6
122.7933
Total Amount For 1 of PCC(1:2:4)

www.onlinecivil.tk

Civil Engineering Practice

PCC (1:3:6) (Manual):Wet PCC = 10


Factor = 1.54
Dry PCC = 15.4
Material:Cement = 1x15.4/ (10x.035)
= 44 bags
Sand = 4.62
Crush = 9.24
Labour:Mason = 0.1 day/
= 1 day
Waterman = 2.13 day/
=21.3 days
Labour = 0.7day/
= .7x(10+15.4)/2
= 8.89 days

Sr# Resources
Quantity
Unit
Time (Day)
Rate
Amount (Rs)
Material
Cement
44
Bags
300
13200
1
Sand
4.62
212
979.44
Crush
9.24
1167
10783.08
Man Power
Mason
1
1
600
600
1
21.3
150
3195
2 Water Man
Simple Labour
1
8.89
250
2222.5
Machinery
1
0.125
1600
200
3 Viberator
Expanses On Material, Labour & Machinery
31180.02
Miscellenous
Water Charges
400
31580.02
4
Sundries @7.5% Of Sum Of Resources
2368.502
Cost Without the Profit Of Contractor
33948.52
5 Profit @10%
3394.852
Total Amount For 10 Of PCC(1:3:6)
37343.37
Total
Amount
For
1
of
PCC(1:3:6)
3734.337
6
105.7287
Total Amount For 1 of PCC(1:3:6)

www.onlinecivil.tk

Civil Engineering Practice

PCC (1:4:8) (Manual):Wet PCC = 10


Factor = 1.54
Dry PCC = 15.4
Material:Cement = 1x15.4/(13x.035)
= 33.85 bags
Sand = 4.74
Crush = 9.48
Labour:Mason = 0.1 day/
= 1 day
Waterman = 2.13 day/
=21.3 days
Labour = 0.7day/
= .7x(10+15.4)/2
= 8.89 days

Sr# Resources
Quantity
Unit
Time (Day) Rate
Amount (Rs)
Material
Cement
33.84615 Bags
300
10153.85
1
Sand
4.738462
212
1004.554
Crush
9.476923
1167
11059.57
Man Power
Mason
1
1
600
600
1
21.3
150
3195
2 Water Man
Simple Labour
1
8.89
250
2222.5
Machinery
1
0.125
1600
200
3 Viberator
Expanses On Material, Labour & Machinery
28435.47
Miscellaneous
Water Charges
400
28835.47
4
Sundries @7.5% Of Sum Of Resources
2162.66
Cost Without the Profit Of Contractor
30998.13
5 Profit @10%
3099.813
Total Amount For 10
of PCC(1:4:8)
34097.94
3409.794
6 Total Amount For 1 of PCC(1:4:8)
96.54004
Total Amount For 1 of PCC(1:4:8)

www.onlinecivil.tk

Civil Engineering Practice


PCC (1:2:4) (Mechanical):Wet PCC = 10
Factor = 1.54
Dry PCC = 15.4
Material:Cement = 1x15.4/(7x.035)
= 62.857 bags
Sand = 4.4
Crush = 8.8
Labour:Mason = 0.1 day/
= 1 day
Waterman = 2.13 day/
=21.3 days
Labour = 0.3day/
= 3 days
Machinery:Viberator = 1 hour for 10
= 0.125 days
Concrete Mixer + Lift Arrangement = 0.45days
Sr# Resources
Quantity Unit
Material
62.85714 Bags
1 Cement
Sand
4.4
Crush
8.8
Man Power
Mason
1
1
2 Water Man
Simple Labour
1
Machinery
3 Concrete Mixer + Lift Arrangement
Viberator
1
Expanses On Material, Labour & Machinery
Miscellaneous
Water Charges
4
Sundries @7.5% Of Sum Of Resources
Cost Without the Profit Of Contractor
5 Profit @10%
Total Amount For 10 of PCC(1:2:4)
6 Total Amount For 1 of PCC(1:2:4)
Total Amount For 1 of PCC(1:2:4)

www.onlinecivil.tk

Time (Day)
-

Rate

Amount (Rs)

300
212
1167

18857.14
932.8
10269.6

1
21.3
3

600
150
250

600
3195
750

0.45
0.125

18000
1600

8100
200
42904.54
400
43304.54
3247.841
46552.38
4655.238
51207.62
5120.762
144.9819

Civil Engineering Practice


RCC (1:2:4) (Mechanical):Wet RCC = 10
Factor = 1.50
Dry PCC = 15.0
Material:Cement = 62.857 bags
Sand = 4.4
Crush = 8.8
Steel = 1% volume of concrete
= 10/100x1x7850
= 785 kg
Labour:Mason = 0.1 day/
Waterman = 2.13 day/
Labour = 0.3day/
Steel Cutter = 250 kg/day
Steel fixer = 1000kg/day
Machinery:Viberator = 1 hour for 10
= 0.125 days
Concrete Mixer + Lift Arrangement = 0.45days
Sr# Resources
Quantity
Unit
Material
Cement
61.22449 Bags
4.285714
1 Sand
Crush
8.571429
Steel
785 Kg
Man Power
Mason
1
1
2 Water Man
Simple Labour
1
Steel Cutter / Binder
1
Steel Fixer
1
Machinery
3 Concrete Mixer + Lift Arrangement
Viberator
1
Expanses On Material, Labour & Machinery
Miscellanous
Water Charges
4
Sundries @ 8% Of Sum Of Resources
Cost Without the Profit Of Contractor
Profit @10%
5 Total Amount For 10 of RCC(1:2:4)
Total Amount For 1 of RCC(1:2:4)
Total Amount For 1 of RCC(1:2:4)
www.onlinecivil.tk

Time (Day) Rate


-

Amount (Rs)

300
212
1167
60

18367.35
908.5714
10002.86
47100

1
21.3
3
3.14
0.785

600
150
250
600
600

600
3195
750
1884
471

0.45
0.125

18000
1600

8100
200
91578.78
400
91978.78
7358.302
99337.08
9933.708
109270.8
10927.08
309.3737

Civil Engineering Practice


RCC (1:1.5:3) (Mechanical):Wet RCC = 10
Factor = 1.50
Dry PCC = 15.0
Material:Cement = 77.92 bags
Sand = 4.09
Crush = 8.18
Steel = 2% volume of concrete
= 10/100x2x7850
= 1570 kg
Labour:Mason = 0.1 day/
Waterman = 2.13 day/
Labour = 0.3day/
Steel Cutter = 250 kg/day
Steel fixer = 1000kg/day
Machinery:Viberator = 1 hour for 10
Concrete Mixer + Lift Arrangement = 0.45days
Sr# Resources
Quantity
Unit
Material
Cement
77.92208 Bags
4.090909
1 Sand
Crush
8.181818
Steel
1570 Kg
Man Power
Mason
1
1
2 Water Man
Simple Labour
1
Steel Cutter / Binder
1
Steel Fixer
1
Machinery
3 Concrete Mixer + Lift Arrangement
Viberator
1
Expanses On Material, Labour & Machinery
Miscellanous
Water Charges
4

Sundries @ 8% Of Sum Of Resources


Cost Without the Profit Of Contractor
Profit @10%
Total Amount For 10
of RCC(1:1.5:3)
Total Amount For 1 of RCC(1:1.5:3)
Total Amount For 1 of RCC(1:1.5:3)

www.onlinecivil.tk

Time (Day) Rate


-

Amount (Rs)

300
212
1167
60

23376.62
867.2727
9548.182
94200

1
21.3
3
6.28
1.57

600
150
250
600
600

600
3195
750
3768
942

0.45
0.125

18000
1600

8100
200
145547.1
400
145947.1
11675.77
157622.8
15762.28
173385.1
17338.51
490.8979

Civil Engineering Practice

SHUTTERING (Steel):The Quantity of Shuttering = 10


Rate of Shuttering & Supports per day = 45 Rs/
= 485 Rs/
Sr# Resources
Man Power
1 Carpenter
Labour
Miscellaneous
Shuttering Plates

Quantity Unit
1
1

Time (Day)

10

3
4

Sundries @7.5% of Sum Of Resources


Cost Without the Profit Of Contractor
Profit @10%
Total Amount For 10
of Steel Shuttering
Total Amount For 1 of Steel Shuttering
Total Amount For 1 of Steel Shuttering

Rate

Amount (Rs)

0.3
0.45

600
250

180
112.5

484.5

43605
43897.5
3292.313
47189.81
4718.981
51908.79
5190.879
482.2014

SHUTTERING (Wood):The Quantity of Shuttering = 10


Rate of Shuttering & Supports per day = 25 Rs/
= 269.124 Rs/
Sr# Resources
Quantity Unit
Time (Day) Rate
Amount (Rs)
Man Power
1
0.3
600
180
1 Carpenter
Labour
1
0.45
250
112.5
Miscellanous
Shuttering Plates
10
9 269.124
24221.16
24513.66
2
Sundries @7.5% of Sum Of Resources
1838.525
Cost Without the Profit Of Contractor
26352.19
3 Profit @10%
2635.219
Total Amount For 10
of Steel Shuttering
28987.41
2898.741
4 Total Amount For 1 of Steel Shuttering
Total Amount For 1 of Steel Shuttering
269.2755