You are on page 1of 12

PUBLIC WORKS DEPARTMENT

NH Works, Assam
AP Works Under MOSRT&H, Govt. of India

Name of Work:

: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061)

Packeg No. Name of Contractor

: Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita SOUNDNESS OF CEMENT IS: 4031 Part - III (Le - Chatelier's Method)

Grade of Cement Nane of Cement Bathch No. Date of Manufacturing etc

Ordinary Portland IS 8112-1989

Date of Testing Test Started at (time) Test Completed on (date) Test Completed at (time)

Temparature

Humidity

Sl. No.

Measured Distance in between Soundness (B-A) IS Value limites the two separating indicator in terms of Le (mm) Chatelier's Before putting in After (mm) boiling water (A) (3hrs.) Putting in boiling water 10a 10a 10 Average =
a a

Remarks

10 "a" denotes Unaerated.

FOR THE CONTRACTOR

FOR THE ENGINEER Lab Technician

Material Engineer

PUBLIC WORKS DEPARTMENT


NH Works, Assam
AP Works Under MOSRT&H, Govt. of India

Name of Work:

: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita CONCRETE CUBE STRENGTH RESULTS

Packeg No. Name of Contractor

Concrete Mix : Cement Content : Grade of Cement: Size of cube mm: 150x150x150

Grade

Date of Casting : Date of testing : RFI No. : Results of Compressive Strength 7 Days 28 days

Strucure : Sl. No. Wt. (Kg.) Load at failure (Kg.) Compressive Strength N/mm2 Average

Comments:

FOR THE CONTRACTOR Lab Technician

FOR THE ENGINEER

Material Engineer

PUBLIC WORKS DEPARTMENT


NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita COMPACTING FACTOR Sl. No. 1 2 3 Description Weight of partially compacted concrete Weight of fully compacted concrete Compacting factor Sym. A B A/B Unit Kg. Kg. Weight

Packeg No. Name of Contractor

Comments:

FOR THE CONTRACTOR

FOR THE ENGINEER Lab Technician

Material Engineer

PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) : Package No.PWD-NH( R)/GHY/08-09/03

Packeg No.

Name of Contractor : Bhagya Kalita Concrete batching plant production Grade:________________________________ Destination:____________________________ Brande of Cement:_______________________ Total Cement Consumption (bags):___________ Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 FOR THE CONTRACTOR FOR THE ENGINEER Lab Technician Material Engineer Truck No. Load (m3) Cum Load (m3)

Date:___________

Remarks

PUBLIC WORKS DEPARTMENT


NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita Water Absorption of Bricks Date of Sampling Place of Sampling Date of testing Trade mark/brand Name Sl. No. Sample No. : : : : SSD Weight in gms Water Average absorption Water in % absorption Remarks

Packeg No. Name of Contractor

Dry weight in gms

FOR THE CONTRACTOR

FOR THE ENGINEER Lab Technician Material Engineer

PUBLIC WORKS DEPARTMENT


NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita Crushing strength of Bricks Date of Sampling Place of Sampling Date of testing Trade mark/brand Name Sl. No. Sample No. : : : : Area in Cm2 Crushing Load in Kgs. Crushing strength in Kgs./Cm2 Average crushing strength Remarks

Packeg No. Name of Contractor

FOR THE CONTRACTOR

FOR THE ENGINEER Lab Technician Material Engineer

PUBLIC WORKS DEPARTMENT


NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03

Name of Contractor : Bhagya Kalita SPECIFIC GRAVITY TEST AND WATER ABSORPTION (IS 2386 PART - III)

Description of Sample: Test number Weight of SSD sample in air (w1) g Weight of pycnometre + water + agg. (W2) g Weight of pycnometre + water (W3) g Weight of oven dry sample (W4) g Relative density on an oven dried basis Relative density on SSD basis Apparent Relative density Water absorption (% of dry mass) Average apparent specific gravity Average bulk specific gravity on SSD basis Water percent absorption

Date Tested: Aggregate 1

W4 W1-(W2-W3) W1 W1-(W2-W3) W4 W4-(W2-W3) 100 (W1-W4) W4

Remarks

FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer

PUBLIC WORKS DEPARTMENT


NH Works, Assam AP Works Under MOSRT&H, Govt. of India

Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. Name of Contractor : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita

SPECIFIC GRAVITY AND WATER ABSORPTION (IS 2386 PART - III) Date of Test : Size of AGG. : Sample Source : BASKET METHOD - ZERO BASKET IN WATER Description Temparature 0C Volumetric Control Factor (V.C.F.) 1. Weight of SSD Agg. In Air g. (W1) 2. Weight of SSD Agg. In Water g. (W2) 2. Weight of Oven Dried Agg. In air g. (W2) Specific Gravity W3/(W1-W2) x VCF Apparent Specific Gravity W3/(W3-W2) x VCF Absorption {(W1-W3)/W3}x100
Comments:

Average

FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer

PUBLIC WORKS DEPARTMENT


NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita FLAKINESS & ELONGATION INDICES (IS 2386 PART - I) Date :____________________ Serial No. : _______________________ Sampled at :________________________ Source of Materials : _______________________ Material for AC / BM / DBM / WMM / Concrete:_______________ Wt. of Agg. Rat on thickness guage (gms.) Wt. of Agg. Passing Wt. of agg. Ret. On length gauge thickness guage after Ret. On thickness gauge (gms.) (gms.)

Sieve Size (mm) Passing Passing 63.0 50.0 50.0 40.0 40.0 25.0 25.0 20.0 20.0 16.0 16.0 12.5 12.5 10.0 10.0 6.3

Weight Ret in (gms.)

Total A= gms. B= gms. Combined flakiness and Elongation indices = (C/A + D/B) = Specification Limit Bitumenious Courses WMM 30% 30% (Max%) Remarks :

C= Concrete 35%

gms.

D=

gms.

FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer

PUBLIC WORKS DEPARTMENT


NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita FLAKINESS & ELONGATION INDICES (IS 2386 PART - I) Date :____________________ Source. : _______________________ Sampled at :________________________ Nature of Work : _______________________ Kind of Material :________________________ Test No. 1 Weight of surface dry sample passing 12.5 mm and retained on 10mm IS sieves (A gm) Weight of fraction passing 2.36 mm IS sieve. After the test (B Gm.) AIV = B/A x 100 Average value of AIV Test No. 2 Test No. 3 Test No. 4

Remarks : FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer

PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work:: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061)

Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita BINDER CONTENT TEST Code Referance :ASTM:D-2172 (1975) Plant:______________ Date of test :____________________ Type of Mix _________ Sampled from :____________________ Location in Work :Start KmLHS or RHS Grade of bitume : 60/70 Sl. No. 1 2 3 4 5 6 7 Details Weight of Mix Initial weight of filter paper Weight of aggregate after extraction Weight of filter paper after extraction with fine materials increased weight of filter Weight of Binder W5 = W1 - (W2+W4) Binder Content BC = W5 / W1 x 100 sym. W1 W2 Unit gm m gm gm gm gm % Sample No. 1 2

W4 W5 BC

Remarks :

FOR THE CONTRACTOR

FOR THE ENGINEER

Lab Technician

Material Engineer

COMPRESSIVE STRENGTH OF CONCRETE


JOB NO: 037-AS-2009-10-079

Cube Date of No Casting

Structure/ Location

Sectional Grade Slump Age of Date of Area of (mm) specimen Testing Concrete (cm2)

Wt. of Cube (gm)

Avg. Load at Comp. Comp. failure Strength strength (kN) (N/mm2) (N/mm2)

ContracAPWD tor's Represen Remarks. Represen tative tative

You might also like