Name of Work:
: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061)
: Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita SOUNDNESS OF CEMENT IS: 4031 Part - III (Le - Chatelier's Method)
Date of Testing Test Started at (time) Test Completed on (date) Test Completed at (time)
Temparature
Humidity
Sl. No.
Measured Distance in between Soundness (B-A) IS Value limites the two separating indicator in terms of Le (mm) Chatelier's Before putting in After (mm) boiling water (A) (3hrs.) Putting in boiling water 10a 10a 10 Average =
a a
Remarks
Material Engineer
Name of Work:
: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita CONCRETE CUBE STRENGTH RESULTS
Concrete Mix : Cement Content : Grade of Cement: Size of cube mm: 150x150x150
Grade
Date of Casting : Date of testing : RFI No. : Results of Compressive Strength 7 Days 28 days
Strucure : Sl. No. Wt. (Kg.) Load at failure (Kg.) Compressive Strength N/mm2 Average
Comments:
Material Engineer
Comments:
Material Engineer
PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) : Package No.PWD-NH( R)/GHY/08-09/03
Packeg No.
Name of Contractor : Bhagya Kalita Concrete batching plant production Grade:________________________________ Destination:____________________________ Brande of Cement:_______________________ Total Cement Consumption (bags):___________ Sl. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 FOR THE CONTRACTOR FOR THE ENGINEER Lab Technician Material Engineer Truck No. Load (m3) Cum Load (m3)
Date:___________
Remarks
Name of Contractor : Bhagya Kalita SPECIFIC GRAVITY TEST AND WATER ABSORPTION (IS 2386 PART - III)
Description of Sample: Test number Weight of SSD sample in air (w1) g Weight of pycnometre + water + agg. (W2) g Weight of pycnometre + water (W3) g Weight of oven dry sample (W4) g Relative density on an oven dried basis Relative density on SSD basis Apparent Relative density Water absorption (% of dry mass) Average apparent specific gravity Average bulk specific gravity on SSD basis Water percent absorption
Remarks
FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. Name of Contractor : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita
SPECIFIC GRAVITY AND WATER ABSORPTION (IS 2386 PART - III) Date of Test : Size of AGG. : Sample Source : BASKET METHOD - ZERO BASKET IN WATER Description Temparature 0C Volumetric Control Factor (V.C.F.) 1. Weight of SSD Agg. In Air g. (W1) 2. Weight of SSD Agg. In Water g. (W2) 2. Weight of Oven Dried Agg. In air g. (W2) Specific Gravity W3/(W1-W2) x VCF Apparent Specific Gravity W3/(W3-W2) x VCF Absorption {(W1-W3)/W3}x100
Comments:
Average
FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
Sieve Size (mm) Passing Passing 63.0 50.0 50.0 40.0 40.0 25.0 25.0 20.0 20.0 16.0 16.0 12.5 12.5 10.0 10.0 6.3
Total A= gms. B= gms. Combined flakiness and Elongation indices = (C/A + D/B) = Specification Limit Bitumenious Courses WMM 30% 30% (Max%) Remarks :
C= Concrete 35%
gms.
D=
gms.
FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
Remarks : FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work:: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061)
Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita BINDER CONTENT TEST Code Referance :ASTM:D-2172 (1975) Plant:______________ Date of test :____________________ Type of Mix _________ Sampled from :____________________ Location in Work :Start KmLHS or RHS Grade of bitume : 60/70 Sl. No. 1 2 3 4 5 6 7 Details Weight of Mix Initial weight of filter paper Weight of aggregate after extraction Weight of filter paper after extraction with fine materials increased weight of filter Weight of Binder W5 = W1 - (W2+W4) Binder Content BC = W5 / W1 x 100 sym. W1 W2 Unit gm m gm gm gm gm % Sample No. 1 2
W4 W5 BC
Remarks :
Lab Technician
Material Engineer
Structure/ Location
Sectional Grade Slump Age of Date of Area of (mm) specimen Testing Concrete (cm2)
Avg. Load at Comp. Comp. failure Strength strength (kN) (N/mm2) (N/mm2)