Name of Company: Fast Find E&P Company Well Name & Number: Blazer Unit #1

Microsoft Excel 97

Drilling Application
SQUEEZE CEMENTING JOB
CEMENT WATER / SPACER

Date: July 8, 2013 11,520 10,689 11,240 6.059 6,613 4.276 4,587 2.764 1,126 3,219 66.3 91.3 101.3 Weight of Slurry, ppg? = Sacks to Use? = Yield/Sack, ft/sx? = Volume Left in Casing, bbls? =
MISCELLANEOUS

DEPTHS

MD Zone to Sqz, ft? = TVD Zone to Sqz, ft? = Depth Tool Set, ft? = Hole Size, in? = Length of DP1 ft? = I.D. of DP1 in? = Length of DP2 ft? = I.D. of DP2 in? = Spacer Column in DP, ft Cement Column in DP, ft ...The By-Pass is Closed ...The Spacer Clears Tool ...The Cement is at Zone

16.4 300 1.07 7.0 17.5 15.3 2.0 200 10.00 57.2 148.5 151.5

Spacer or H2O Ahead, bbls? = Spacer or H2O Behind, bbls? = Density Spacer or H2O, ppg? = Close By-Pass Early, bbls? =

15.0 5.0 8.34 10.0

DRILL PIPE or WORKSTRING

Formation Fracture, ppg? = Fluid Density in Use, ppg? = Volume Surface Lines, bbls? = MASP Safety Factor,? = Squeeze Tool to Zone, bbls Squeeze Cement, bbls ...The Cement Clears Tool ...The Cement is in Place THE END

Please review the User Notes provided for @ cell A24 prior to running this application. PRESSURES

Formation pressure By-Pass Closed - Hydrostatic Backside of Tool - Hydrostatic MASP When Squeezing Starts
CAPACITIES

9,727 8,840 8,942 473 0.2002 0.0357 0.0178 0.0074

VOLUMES and LENGTHS

BARRELS TO DISPLACE WHEN

Hole Volume, ft/ft Hole Volume, bbl/ft Inside DP1 bbl/ft Inside DP2 bbl/ft

USER NOTES 1. The process of squeezing should stop when the cement clears the tool and approximately 80% of the cement volume has cleared the squeeze tool to the top of the zone being squeezed. This presumes the final pressure has not been reached in advance of this point. 2. HOWCO recommends the Retrievable Squeeze Tool be set at least a minimum of 10 bbls above zone to be squeezed. If it is decided to trap a volume of water/spacer on the backside of the Squeeze Tool, a negative value for the amount of water/spacer to close the by-pass early must be used. Example, using 20 bbls water ahead with 10 of those bbls trapped on the backside will require a -10 bbls be used to close the by-pass early. 3. The lengths of drill pipe must equal the depth Squeeze Tool set. The Maximum Anticipated Squeeze Pressure is noted as MASP and the friction pressure is not considered for this calculation. Reference, HOWCO and DOWELL SCHLUMBERGER cementing handbooks. 4. A red triangle in the upper right hand corner of a cell signifies a user comment. Mover cursor over cell for viewing.

Name of Company: Fast Find E&P Company Well Name & Number: Blazer Unit #1
Microsoft Excel 97

Drilling Application
SWAB and SURGE PRESSURES
SEC 1 SEC 2 SEC 3 SEC SEC 4 4 SEC 5

Date: July 8, 2013


WELL GEOMETRY

Length of Each Annulus, ft? = Diameter of Each Annulus, in? = OD of Pipe Run in Each Annulus, in? =
DRILLING FLUID PROPERTIES

3,600 9.95 7.625 11.7 12 15


DEPTH CHECK

5,400 9.875 7.625


OTHER

Mud Weight, ppg? = Yield Point, lb/100ft? = Plastic Viscosity, cp? = Verify the Sum of Section Lengths Equals MD for the Well
RESULTS BY SECTION

Measured Depth of Well, ft? = Measured Depth Last Casing Set? = Desired Running Speed for Pipe, fpm? = DO

9,000 3,600 200

Start with the Well Geometry entries from the top of the hole in SEC 1.
SEC 3 SEC 4 SEC 5

SEC 1

SEC 2

Critical Velocity, fpm Fluid Velocity Due to Pipe Movement Induced Pressure Difference Equivalent Change ECD, ppg Surge ECD, ppg Swab ECD, ppg

262 562 414 2.21 13.91 9.49 THE END

249 578 750 2.49 14.19 9.21

Name of Company: Fast Find E&P Company Well Name & Number: Blazer Unit #1
Microsoft Excel 97

Drilling Application
PRIMARY CEMENTING JOB
PREV CSG.

Date: July 8, 2013


THIS CSG.

GEOMETRY

CEMENT PLAN

LENGTH

YIELD

% EXCESS

Depth Set, Ft? = Casing OD, in? = Nominal ID, in? = Average Hole or Bit Size, in? = Mud Pump Output, bbl/stk? =

9,000 11.875 6.875 9.875

3,600 10.75 9.95 0.1170 8,913


SACKS

Lead - Open Hole? = Tail - Open Hole? = Between Strings? = On Top of Liner? =

2,000 1,080 0 0

3.04 1.07 0 0

100 100 Notes @ Cell A29

Depth TOL Set or Depth Sub Sea Hanger? = Run String I.D. for Liner or Sub Sea Job? =
2nd STAGE CEMENTING

Anticipated Depth Float or Landing Collar Set? =


RESULTS - LEAD CEMENT 1st STAGE

Shoe Joint Open Hole Between Strings and Top of Liner Total Cement
RESULTS - TAIL CEMENT 1st STAGE

0 -312 0 -312
SACKS

Depth Stage or DV Tool Set, ft? =


CEMENT PLAN
LENGTH YIELD % EXCESS

Lead (OH)? = Tail (OH)? = Between-Csg? =


2nd STAGE RESULTS SACKS

Shoe Joint Open Hole Total Cement


CAPACITIES

21 -479 -458 -0.2291 -0.2373 0.2578 0.5400 THE END

Total Lead Cement Total Tail Cement Total Between Strings


DISPLACEMENT BBLS

0 0 0
STKS

Cased Hole Annulus, ft/ft Open Hole Annulus, ft/ft Shoe Joint, ft/ft Previous Casing, ft/ft

Land Plug 1st Stage Land Plug 2nd Stage Land Plug for Liner / Subsea Job

409 0 0

3,498 0 0

This application will calculate the Cement and Displacement volumes for a ... 1. Long string job, namely any casing job that extends back to the wellhead sub sea or surface. 2. Liner job regardless of BOP stack location. 3. Stage or DV Tool job using Lead and /or Tail cements. 4. 'Between Strings' can be a column length of cement between the casing being run and previous casing set or the length of liner overlap with cement or the actual length of liner overlap. Some Regulatory Agencies mandate the tail cement extend a minimum of 20% above the setting depth of the DV Tool, i.e., (5,000 x .20) =1,000' of tail cement to extend above the DV Tool. 5. A cell with a red triangle in the upper right hand corner signifies a comment, mover cursor over cell for viewing.

HOLE SIZE CALCULATION

Name of Company: Fast Find E&P Company Well Name & Number: Blazer Unit #1
Microsoft Excel 97

Drilling Application
MUD SOLIDS ANALYSIS
INPUT INFORMATION

Date: July 8, 2013 20,000 80 1 12 4.2

Chlorides, ppm? = % Water? = % Oil or (Lubricant)? = Mud Weight, ppg? = Weight Material, SG? = Dissolved Solids, % Corrected Solids, % Specific Gravity of Solids Low Gravity Solids, % Low Gravity Solids, ppb High Gravity Solids, %

Bentonite, SG? = Drill Solids, SG? = Drill Solids, CEC? = Bentonite, CEC? = Mud MBT, ppb? =

2.65 2.65 15 60 25 118.79 0.25 2.33 9.78 90.68 9.20

CALCULATED ANALYSIS

0.89 High Gravity Solids, ppb 18.11 Commercial Bentonite, % 3.34 Commercial Bentonite, ppb 10.03 Drill Solids, % 93.01 Drill Solids, ppb 8.08 Sodium Chloride, ppb THE END

I N N E R R O W . S

O U T E R R O W . S

D U L L C H A BIT R

COMPANY:
Bit No. 1 2 UR 3 4 5 6 7 Serial Number J91BX E19CV 42395 J50XH 17249 M53XB LE2414 M57XB

Amerada Hess Corporation


Date Pulled 2-10-96 2-13-96 2-14-96 2-18-96 2-22-96 2-28-96 3-2-96 Size Inches 26 17 1/2 22 14 3/4 14 3/4 10 5/8 10 5/8 10 5/8 Mfg. or Make HTC HTC STC HTC Hycalog HTC STC HTC Bit Type R-1 R-1 UR ATX-1 R61H GT-1 FDSS GT-1 IADC Jets - 32nds Code 1 2 3 4 5 116 18 18 18 116 116 116 PDC 116 116 116 18 18 18 16 16 16 18 18 18 18 18 16 16 16 16 16 16 16 16 16 6 TFA 0.7455 0.7455 0.5890 1.2425 0.5890 Depth In 333 805 805 4,000 7,322 9,850 Depth Out 805 4,000 4,000 7,322 9,850 10,736 Feet Drilled 472 3,195 3,195 3,322 2,528 886 1,216 Hours On Bit 6 28.5 17 49 59 52 57 Avg ROP 78.7 112.1 187.9 67.8 42.8 17.0 21.3 Avg Avg Mud Mud WOB Pump PSI Weight GPM 0/5 750 8.7 855 0/10 0/8 20/25 15/20 25/30 30/35 2300 1600 3000 3400 3350 3400 9.2 9.2 9.5 12.5 15.2 16.2 933 982 796 766 590 590

L B O E C A A R G T I A I N U O G G GRADING N S E

O T H E R C H A . R

R E A S O N P U L L E . D

Bit PSI

Drop
1 2 2 4 1 5 5 1 3 2 4 1 5 5 NO NO NO NO NO NO NO A A A A A A A 1 2 1 3 X 6 8 I NO TD 1054 1327 368 1598 438 1404 1497 1 NO TD 1 NO TD 1 NO NB I I I NO TD NO NB NO NB

Bit HHP 526 722 211 742 196 483 515

Bit Type Hole HP/in2 Formation Angle Remarks 0.990 SD/SH/GUM 0.25 RM Drill Conductor Hole 3.004 0.554 4.343 1.144 5.453 5.812 SD/SH/GUM SD/SH/GUM SD/SH/GUM SD/SH/GUM SD/SH SD/SH 0.5 0.5 0.25 0.4 1.75 1 RM Drill Cmt. & Surf Hole RM Bit #2 with UR RM Drill Cmt. & Intm Hole CP PDC w/MWD to Csg.Pt. RM Drilling to KOP. RM Drilling to KOP.

I N I T I A L S

Bit Record

18 18 18 18 18 18 1.4910

0.5890 10,736 11,952 0.5890 11,952

Page... 1
OPERATOR'S REPRESENTATIVE(S) DRILLING CONTRACTOR RIG NO. FIELD/BLOCK LEASE WELL NUMBER AFE NUMBER SPUD DATE T.D. DATE

Of... 1

RF Moore, CR Palmer

ENSCO and ADTI

ENSCO 84

Breton Sound Block 55

OSC-G-4492

Turn-Key by ADTI

2-10-96