You are on page 1of 2

PIU (POWER INTERFACE UNIT)

1.  Unmatched patented technology, unbeatable savings 2. Most trusted : Over 75,000 PIUs installed 3. Cutting Edge electrical interface and design Split type modular design Unique SMD technology 4. Options adaptable to any need 44 PIU variants 5. Fastest real time running operation Response time of 10 micro-second 6. Energy monitoring for better energy management Equipped with GPRS modem

Unmatched Advantages:
High upgradeability = Future proof investment Most advanced field team = Best after-sales service  2500 field engineers spread across all circles  Easy serviceability & repairs Highest MTBF of 70,000 hours in the industry temperature.

Description
Capacity Multi Phase Logic Mechanical IP Protection Safety MTBF Compliance Micro Controller

Standard Specification
Range of 5 to 50 KVA PIU will work on 1Phase, 2phase or 3Phase. Input voltage range on single phase 155V280V CNC Fabricated rack, using CRC Sheet duly powder coated, floor size 600x400 mm & height 1800 mm. 1.6 mm thick CRC sheet. Split type modular design. IP 21 The equipment will ensure IEC 60950 safety standards All material & workmanship will be of professional quality to ensure MTBF requirement. The MTBF of the PIU is more than 70000 hrs. CE, Tested for safety, EMI/RFI, ERTL compliance High-Speed micro controller True RMS for all voltage & current All the inputs to the measurement board will be duly protected against surge as per IEEE-62.41 The measurement circuit will be rated at least twice of the maximum input range, each independent for AMF & module

Time Event Logs RS 232/RS 485 Port for ACME use only Energy

Real time & date-programmable Last 500 events For PC interface to adjust the critical data and unload the alarms, This Port will be used for configuration of PFCs. Will be able to read the energy from Meter via 485 port Will be able to measure the DG energy (Cumulative KWH & Hrs) Will be able to measure the EB energy (Cumulative KWH & Hrs) Will be able to store data of DC energy meter fetched from power plants of cell-sites of the network.

Data Transfer

PIU will be equipped with suitable GPRS modem / GPRS DTU and able to process the data. It will be able to connect via RS485 port to DC power plants for energy meter reading or with any other specific equipment. All above reading will be extendable to NOC / TOC through GPRS Modem. Local storage of DC Energy will be available if meter goes faulty. Controller will be able to store energy data / performance data and alarms / events for last 500 events. Data communication will follow TOC protocol ver 2

Description Line Conditioning Module Type Power Rating

Standard Specification

Micro Controller based, true RMS, static line conditioner As Per Requirement, rated at 100% capacity. Temperature rise of the device and transformers will be as per class F specs. Facility to operate on Voltage range - 240-480 Normal L-L / 155 280 L-N 220 V +/- 10% 47-53 Hz Aviation light- ( -48 Volt ) with inbuilt functional feature Auto Phase selector Smoke Detector: AC distribution unitMains MCCB, DG MCCB Load Distribution

Charger suitable for charging the SMF/Conventional battery of upto150AH (20% of AH capacity settable) Provision of Auto manual mode selection

Photoelectric type -2 No, Sensitivity 3% / ft.

Rated input voltage range

125 Amp. ( suitable for 25 kva ) ACDB1 2X63A, 2X32A, 1X16A, 1X6 ACDB2 - 2X63A, 2X32A, 1X16A, 1X6 6A

Rated Output Voltage Input Frequency Range

Total Harmonic Distortion <3% (THD) %of Voltage/Current Efficiency at > 75 % load and 50 degree temperature Dynamic response time Response Time Protections: Voltage protection at incoming power input Voltage protection at MODULE Insulation Inter winding capacitance Input/Output isolation Winding In-rush Current Temperature Humidity Delays: DG on load Blackout delay DG cooling time DG start attempts DG Lock time After DG starts and supply is healthy 10 seconds between mains and DG contactor changeover. 5 minutes Three attempts with delay between attempts ( 40 -40 -40 sec )(settable) After three very short mains restoration 10-10-20 minutes, DG will run for 2hrs (settable) continuously. Settable from 0 to 30 seconds Automatic DG battery, SMPS charger with boost/trickle charging & with constant current charging facility (12V) High Voltage Disconnect (HVD) 485V after 10 milliseconds Low Voltage Disconnect (LVD) 155V after 5 seconds Input side HVD 485V; LVD 155V Output side - HVD 250V (immediate); LVD 190V after 3 sec >97% 400 V/micro-sec <10 ms

The PIU will be equipped with auto phase selector which will select any two phase or single phase out of 3 Phase. There will be a electrical and mechanical interlock between each contactor to avoid short circuit in case of electronic failure Factory set (ON at 38C and OFF at 36C) Mains/DG status, DG accumulated hours, DG voltage, DG Energy Measurement (DG KWH) Input Voltage, Output voltages for line conditioning module, Mains Energy Measurement (EB KWH) Battery running hrs (Accumulated) Mains ON, DG ON, Smoke/ Fire Alarm, Over Load, MODULE fail, Fuel Low, DG fail to start, DG fail to stop, Alternator fail, LLOP, DG overload, Mains Fail, System battery low, DG battery low, HCT/HWT, High Shelter temperature Alarms will be extended to NOC / TOC through changeover contact ( both NO, NC ) Four way splitter. Mains fail, Shelter Door open/ Intruder, DG Door open, Low fuel level, Common fault -- LLOP/Alt fault/HCT/HWT/V belt/Dg fail to start/DG fail to stop, Smoke/Fire, Load on DG, DG Fail to stop, DG Fail to start, DG over load, AC fail, Shelter high temperature, Rectifier fail, Site on battery, Low battery voltage, DC fuse fail

Set point-for high temperature alarm DG set measurements

Mains measurements

Battery measurements LED Indications:

>1000 mega ohms <10 NF 6KV Double wound with copper foil shielding 110 % for 60 Seconds (-5 to 55 deg) RH 95% (max.)

List of potential free dry contacts

Standard setting Dual DG Logic (Optional)

Setting in the PIU/ PIU can only change through Laptop only Will be provided as under: The command will always go to a higher capacity DG set After set time of 5 mins ( settable ) the PIU will sense the load and if it finds the load to be 80% ( settable ) of the lower DG capacity it will start the lower DG and switch off the bigger DG

Stop Command duration Battery charger & DG controller unit

ACME Tele Power Limited, Plot No 2, Sector 34, EHTP, Gurgaon - 122001, Haryana, India Phone : +91-124-4817000, +91-124-4817777, Fax: +91-124-4817111 Email: info@acme.in, Website: www.acmetelepower.com