You are on page 1of 6

MIS Committee 1 Maintain all the IT facilities.

Continuous effort of maintaining all the IT infrastructure and to ensure the IT facilities is in excellent order when needed. 2 Continous process to identify, upgrade or procure better software. The process of studying and finding the updated software or patch file in market to smoothly run current software in job environment. A continous effort to find the latest software in market that will improve the productivity or work. 3 Changing/upgrade programs for hardware and Software. This programme is evaluation from section 2 that each software update or change will effect of using other software or hardware in the PC. 4 Continous monitoring on existing software for adequency and productivity. The maintainence work treated to software that currently using in working environment to ensure that all software is accessed and reasonable in produce the excellent outcome to company. 5 Backup and Disaster Recovery Server data backup are set to two level backup and disaster recovery. First level is automated backup by server system and the second level is manually backup in 3 months time. This new procedures is enable user to trace data at any time with revision started from every single week. 6 Analysing and extending hardware to filled up the current work requirement and IT technolgy . This is the beginning foundation for new era of work in using the latest technology in IT. The analysing are performed from time to time to ensure that the latest technology is captured and being analyse in order to suit with hardware or software in JPT and also working environment.

Mission 4:

Application of Information Communication Technology in Work Process ICT HP Proliant DL 385 Server DATE On-maintain

DESCR

1) Function as File Server, DNS Ser printer and communication central p

2) This server is monitored for the s availablity and downtime event.

42 Work Station and 5 Laptop.

Nov '08

1) PC will slowly upgrade to meet th requirement of engineering and dra to suit the latest technology of AutoC requirement.

2) We have change 1 workstations to meet the minimum requirement s as agreed in MIS meeting. This is fo technology in future. (Shima)

3) 2 PC memory was upgrade to mi in order to handle the daily engenee work. (Zuraidah and Guan) 4) Renew Antivirus License 2008

5) Renew Webhosting and email se

6) Purchase a 500GB hard disk as b

Information Sharing Point ( Print Server and Hub)

On-maintain

1) We have use this type of informa sharing point to enable worker to ex information among themselves and act as output gateway for virtual dat

Internal networking system. ( LAN connection )

On-going

1) Our internal communication syste to establish communication between also user to user for data exchange

2) Current working environment is r communication and data transferrin some of engeneering or drafting file space and data transfering.

2) We still in planning to upgrade ou connection transfer rate from 10Mbp to allow robust data transfer. This w

time and product deliver time.

External network interface system. ( WAN to LAN Connection)

On-maintain

1) This kind of system connection is with the world. This external connec establish connection to our client in and information.

better software.

are or patch file in ment. A continous ove the productivity

software update or

ssed and reasonable

aster recovery. he second level ures is enable every single week.

current work

using the latest e to time to ensure that

DESCRIPTION 1) Function as File Server, DNS Server ,DHCP Server, printer and communication central point. 2) This server is monitored for the storage space availablity and downtime event.

1) PC will slowly upgrade to meet the current requirement of engineering and drafting work especially to suit the latest technology of AutoCAD 2008 minimum requirement. 2) We have change 1 workstations at May 2008 to meet the minimum requirement specification for AutoCAD 2008 as agreed in MIS meeting. This is for extended to AutoCAD 2008 technology in future.

3) 2 PC memory was upgrade to mininum 1.0 GB RAM in order to handle the daily engeneering and drafting (Zuraidah and Guan) 4) Renew Antivirus License 2008 5) Renew Webhosting and email service 6) Purchase a 500GB hard disk as backup storeage

1) We have use this type of information communication sharing point to enable worker to exchange the data and information among themselves and outside world. It also act as output gateway for virtual data to real world.

1) Our internal communication system is maintain to establish communication between user to server and also user to user for data exchange purpose. 2) Current working environment is require fast communication and data transferring system. Recently some of engeneering or drafting file required a lot of space and data transfering. 2) We still in planning to upgrade our internal connection transfer rate from 10Mbps to 100Mbps to allow robust data transfer. This will save our waiting

time and product deliver time.

1) This kind of system connection is used to communicate with the world. This external connection is used to establish connection to our client in order to exchange data and information.

You might also like