\\vboxsrv\conversion_tmp\scratch_1\[153888056.xls.ms_office.xls]BQ5 Bill No.

1 - General Items

Item 1.0 Preliminaries

Description

Quantity

Unit

Rate RM

Amount RM

Allow for the provision of a) Performance Bond amounting to 5% of Contract Sum b) All Insurance in accordance to Preamble to Bill of Quantity 1.1 Contractor's Superintendence Provide all necessary superintendence during the execution of the works including appointment of a site agent Setting out and survey works Allow for the services of Licensed Surveyor, approved by the S.O. for setting out of the works and other survey works in accordance with the Specification Office Accomodation for Superintending Office and his staff Provide and maintain a site office for the S.O.'s supervision staff inclusive of furniture and fitting and all in accordance with drawings and specification. Contractor's Office and Accommodation Provide and maintain Contractor's office, store, workshop, workmen's accommodation necessary fencing and their removal or reinstatement on completion of the Works Services a) Allow for the provision or water, lighting power for the works and for S.O.'s and Contractor's offices and accommodation of the contractor's staff b) Allow for the provision of water, lighting and power for office accommodation for Superintending Officer and his staff c) Allow for the provision of First Aid Box, Helmet, Boots and all necessary services, guards, watching and pay all charges as required. 1.6 Telephone for S.O.'s Staff Allow for the installation of a handphone system for the exclusive use of S.O.'s representative and payment for all monthly charges including the bills for the telephone calls Sign Boards Supply, erect and maintain sign boards in accordance with the Specification and drawing Lump Sum 3,000.00 3,000.00

Lump Sum

5,000.00

5,000.00

Lump Sum

15,000.00

15,000.00

1.2

Lump Sum

5,000.00

5,000.00

1.3

Lump Sum

1.4

Lump Sum

5,000.00

5,000.00

1.5

Lump Sum

1,500.00

1,500.00

Lump Sum

Lump Sum

500.00

500.00

Lump Sum

1,000.00

1,000.00

1.7

Lump Sum

1,500.00

1,500.00

Total Carried Forward

37,500.00

Bill No. 1 - General Items (Cont'd)

Item

Description

Quantity

Unit

Rate RM

Amount RM 37,500.00

Brought Forward : 1.8 Progress Photographs Provide colour progress photographs to be taken when directed by the S.O. Each set shall consist of eight colour prints of postcard size. 6 sets of the photograph shall be submitted at forthnightly interval. Temporary Works Allow for the provision and maintenance of all temporary works including temporary drains, access road for both contractors and other contractors, temporary diversion and all others as specified by S.O.'s or as shown in the drawing. Plants Allow for mobilisation and demobilisation of all plants Working Hours for S.O.'s Supervisory's Staff Allow for the compliance of working hours for Superintending Officer's site representatives Clearing up site Allow for clearing up site during progress and on completion of works As-Built Drawings Allow for the preparation of as built drawings with Engineer and Licensed Surveyor endorsement and all attendance of the Superintending Officer to verify the accuracy of the drawings. The as-built drawings shall be prepared using Autocad or compatible computer software. 3 sets of paper prints and one set of diskette containing the file shall be submitted to the Engineer. 1.14 Traffic Control Allow for the provision and maintenance of temporary road diversion, all traffic or warning sign, signals, barricades, road barriers and blinking lamps as compliance with requirement of JKR and other relevant authorities in connection with the works Co-ordination Allow for co-ordination with other contractors working on the site Compliance to Specification and Conditions of Contract Allow for the compliance of Specification and conditions of Contract which are not specifically mentioned in the Bill

Lump Sum

1,000.00

1,000.00

1.9

Lump Sum

5,000.00

5,000.00

1.10

Lump Sum

15,000.00

15,000.00

1.11

Lump Sum

1,000.00

1,000.00

1.12

Lump Sum

5,000.00

5,000.00

1.13

Lump Sum

1,500.00

1,500.00

Lump Sum

3,000.00

3,000.00

1.15

Lump Sum

2,000.00

3,000.00

1.16

Lump Sum

500.00

500.00

Total Carried To Summary

72,500.00

Bill No. 2 - Major Drainage Works & Internal Drainage System Item Precast Drain 2.1 Excavate and construct precast drain (brickwall to be paid separately) including lean concrete, mesh fabric, Grade 20 concrete bedding with X-distance as shown on drawing , jointing and stepping where required . (a) 300mm half round drain (b) 450mm half round drain Brickwork 2.2 Construct cement sand brickwall to sides of half round drain inclusive of R.C. Struts, crusher run, weep holes complete with geotextile wrapping to the thickness as shown on the drawings, cement mortar rendering and backfilling complete as shown on the drawing. (a) 225mm thick (b) 345mm thick (c) 450mm thick Pipe Culvert 2.3 Supply and construct precast pipe culvert Class "Y" to road crossing including spigot, socket, rubber ring and all necessary joint. Rate to include excavation, lean concrete, Grade 20 concrete bedding and surround, mesh fabric reinforcement, jointing and backfilling complete as shown on drawings : (Bakau piling to be paid separately) (a) 750 mm dia. (with concrete surround) (b) 900 mm dia. (with concrete surround) (c) 1050 mm dia. (with concrete surround) Culvert Sump For Pipe Culvert 2.4 Excavate, supply and construct cement sand brick sump at inlet and outlet of culvert to the thickness as shown in drawings. Rate to include lean concrete, Grade 20 concrete bedding, mesh fabric reinforcement, cement rendering, R.C strut, stainless steel steps and M.S grating complete as shown on drawing and excavation stabilisation measure during construction include sheet piling. (Bakau piling to be paid seperately). (a) Internal size 1050mm x 900mm, depth not exceeding 1.5m (b) Internal size 1050mm x 900mm, depth exceeding 1.5m, not exceeding 2.0m (c) Internal size 1200mm x 900mm, depth exceeding 1.5m, not exceeding 2.0m (d) Internal size 1200mm x 900mm, depth exceeding 2m, not exceeding 2.5m (e) Internal size 1350mm x 900mm, depth exceeding 2m, not exceeding 2.5m House Entrance Slab 2.5 Excavate, supply and construct house entrance slab over the drain and headwall complete as detailed as shown in the drawing. (a) 3600 mm x 1050mm x 100mm thick (b) 8720 mm x 1050mm x 100mm thick Total Carried Forward R.O R.O no. no. 350.00 670.00 393,237.00 5 1 R.O R.O R.O no. no. no. no. no. 850.00 1,100.00 1,350.00 1,600.00 1,850.00 4,250.00 1,100.00 34 R.O R.O lin.m lin.m lin.m 260.00 320.00 395.00 8,840.00 3,186 390 55 sq.m. sq.m. sq.m. 47.00 65.00 85.00 149,742.00 25,350.00 4,675.00 2,491 R.O lin. m. lin. m. 80.00 120.00 199,280.00 Description Quantity Unit Rate RM Amount RM

BQ 2 - 4

Bill No. 2 - Major Drainage Works & Internal Drainage System (Con't) Item 2.5 Description Brought Forward Excavate and construct 230 mm high x 230 mm thick brickwork head wall to sides of entrance slab inclusive of cement mortar plastering complete as shown on the drawing. M.S Grating 2.6 Supply and lay 600mm x 600mm m.s grating to house entrance slab complete as detailed as shown in the drawing. Slab Culvert Supply and construct 100mm thk. grade 20 concrete slab culvert over drain completed as shown on drawing PC slab over drain Supply and install 750 x 900 mm (w x L) grade 20 precast concrete slab over drain at backlane for each individual house completed as shown on drawing Quantity Unit Rate RM Amount RM 393,237.00

R.O

no.

35.00

R.O

no.

95.00

2.70

R.O

no.

350.00

2.80

R.O

no.

38.00

Bakau Piling 2.12 (a) Mobilisation, transport and set up all necessary bakau piling plant and equipment at sites, dismantle and remove them on completion of all bakau piling work (b) Supply, handle, pitch and drive 100mm diameter bakau piles (initial/ extension) including cutting off pile head

Lump Sum 1,000.00

1,000.00

4,900

lin.m no.

2.50 8.00

12,250.00 3,920.00

(c) Supply and fix 100mm dia. M.S Sleeve for jointing bakau piles. 490 M.S Sleve shall be of size 450mm long x 3mm thk.

Total Carried to Summary

410,407.00

BQ 2 - 5

Bill No. 3 - Road Work

Item

Description Preparation of Pavement Formation

Quantity

Unit

Rate RM

Amount RM

3.1

Excavate and shape the road subgrade to the correct alignment, levels and gradients as shown on the drawings, including boxing out and consolidating by a 10 ton smooth-wheeled roller ; part return of excavated material to shoulder and medium including fill-in, ram and compact to the required formation level and gradient; removal of excess excavated material to filling ground designated by S.O. including filling in, ram and compaction. Sub-Base

15,301

sq.m.

2.50

38,252.50

3.2

Supply, spread and compact sand to the 50mm compacted thickness as shown in the drawings ram and compaction. Road-Base

15,301

sq.m.

2.50

38,252.50

3.3

Supply, spread and compact approved crushed rock road base to the compacted thickness as shown in the drawings (a) 225 mm thick 15,301 sq.m. 11.20
171,371.20

Asphaltic Concrete Surfacing 3.4 Supply and apply emulsified bituminous prime coat to surface of crushed rock road base Supply and apply bituminous tack coat to binder course surface prior to laying of wearing course Supply , lay and compact asphaltic concrete surfacing to the compacted thickness as shown in the drawing (a) wearing course - 50 mm thick (b) binder course - 60 mm thick Turfing 3.7 Supply and lay spot turfing to road median, road shoulder and at location as specified in the drawing, including 50mm of selected topsoil, pegging, watering and tendering to ensure growth of turf planted. Pavement Marking and Road Sign 3.8 Supply and install "BERHENTI" sign and 300mm wide stop lines pavement marking with Thermoplastic paint at all junction to JKR standard. 14,919 14,919 sq.m. sq.m. 12.50 13.50
186,487.50 201,406.50

15,301

sq.m.

0.70

10,710.70

3.5

14,919

sq.m.

0.70

10,443.30

3.6

3,963

sq.m.

2.50

9,907.50

11

no.

450.00

4,950.00

Total Carried Forward

671,781.70

BQ 3-6

Bill No. 3 - Road Work (Con't)

Item

Description Brought Forward :

Quantity

Unit

Rate RM

Amount RM 671,781.70

3.9

To supply and install all road signage complete at all the road junction governed under area as shown on the drawings to JKR satisfaction. To mark the pavement of the junction, accerelation and deceleration lane at all the road junction governed under Phase 1 as shown in the drawings or as directed by S.O. and to JKR satisfaction. (a) 100mm wide broken centre lines (b) 150mm wide pavement edge lines (d) Straight through direction arrow (e) Left and right turn direction arrow (g) Straight through, left and right turn direction arrow (f) Left or right turn direction arrow Kerb

no.

450.00

900.00

3.10

1,759 3,449 5 R.O 1 R.O

lin.m lin.m no. no. no. no.

2.50 3.50 80.00 100.00 120.00 90.00

4,397.50 12,071.50 400.00 120.00

3.11

Excavate, supply and construct precast kerb Type M1 including 1:3:6 concrete base and haunching, reinforcement and formwork, where required and painting complete as shown on drawing

225

lin.m

27.00

6,061.50

Scupper Drain 3.13 Excavate, supply and lay 225mm dia earthened ware pipe including 100mm thick 1:3:6 concrete foundation, backfilling to required level complete as shown in the drawing Guardrail 3.14 Supply and construct new G.I gaurd rail next to main drain at location as shown in the drawing 200 lin.m. 105.00
21,000.00

178

lin.m.

38.00

6,764.00

Replacement of Unsuitable Material 3.15 Excavate and remove from site unsuitable material below road formation level up to 600 mm deep and replace with compacted suitable material from contractor own source R.O m3 30.00

Total Carried To Summary

723,496.20

BQ 3-7

Bill No. 4 - Sewerage Reticulation

Item

Description

Quantity

Unit

Rate RM

Amount RM

4.1

Trench Excavation (i) Trench excavation of sewer pipe for depth exceeding 1.5 m but not exceeding 2.0 m including part backfill on completion, compaction, removal of surplus, shoring and/or sheet pile where necessary:(a) 225mm dia V.C. pipe (b) 300mm dia V.C. pipe (ii) -ditto- exceeding 2.0m but not exceeding 3.0m (a) 225mm dia V.C. pipe (b) 300mm dia V.C. pipe (iii) -ditto- exceeding 3.0m but not exceeding 4.0m (a) 225mm dia V.C. pipe (b) 300mm dia V.C. pipe (iv) -ditto- exceeding 3.0m but not exceeding 4.0m (a) 225mm dia D.I.(Ductile Iron). Pipe (b) 300mm dia V.C. pipe

601 R.O

lin.m lin.m

20.00 20.00

12,026.00

596 105

lin.m lin.m

26.00 20.00

15,485.60 2,104.00

224 113

lin.m lin.m

55.00 20.00

12,325.50 2,256.00

R.O 211 R.O

lin.m lin.m lin.m

80.00 20.00 75.00

4,220.00

4.2

Extra over item 4.1 for trench excavation in mettalled road. Rate to include cutting of mettalled pavement with diamond cutter, reinstatement of mettalled road with 50mm thick sand blanket, 300mm thick crusher run, 50mm thick binder course and 60mm thick wearing coarse. Ditto ~ for trench excavation under existing road side drains. Rate to include reinstatement of road side drain. Ditto ~ for trench excavation under existing main drains. Rate to include reinstatement of pudu cut main drain. Pipe Laying Notes : All sewer with diameter less than 450mm shall be vitrified clay pipe (VCP) with flexible joint and comply with M.S 881 Part 1 1991, M.S. 1061;1986. Foundation base of sewer must be compacted with crushed run. All sewer with diameter 450mm and above shall be centrifugal spun reinforced concrete pipe (RCP) of class Z. All RCP shall be internally line with 12mm thick high alumina cement mortar. All pipe joints with flexible rubble rings joints.

4.3

R.O

Lump Sum

2,000.00

4.4

R.O

Lump Sum

1,000.00

4.5

Supply and lay sewer pipes complete including jointing, concrete/granular bedding, haunching all as specified (a) 225mm dia V.C. pipe (Class A bedding) (b) 300mm dia V.C. pipe (Class A bedding)

1,421 429

lin.m lin.m

105.00 100.00

149,205.00 42,900.00

4.6

Connection to Existing Mainhole Allow for connection of VCP pipe to existing manhole. Rate to include reinstatement and make good of existing manhole. Carried Forward

Lump Sum

1,000.00

1,000.00

241,522.10

BQ 4 - 8

Bill No. 4 - Sewerage Reticulation

Item

Description Brought Forward : Precast Concrete Manhole

Quantity

Unit

Rate RM

Amount RM 241,522.10

4.7

Excavate, supply and construct precast concrete manholes complete including lean concrete, Grade 20 cast in-situ concrete ring base, building in pipes, benching, precast r.c. chamber, Grade 20 mass concrete surround, formwork, stainless steel steps, precast r.c. cover slab complete as detailed and shoring and/or sheet pile where necessary during construction. (manhole cover and frames to be paid separately) (i) Manhole type 1 with chamber diameter 1200mm (for sewer pipe 225mm & 300mm) (a) below ground level to invert level not exceeding 2.0m (b) ditto exceeding 2.0m but not exceeding 3.0m (c) ditto exceeding 3.0m but not exceeding 4.0m (d) ditto exceeding 4.0m but not exceeding 5.0m 14 11 5 4 no no no no 2,000.00 2,800.00 3,300.00 3,301.00 28,000.00 30,800.00 16,500.00 13,204.00

4.8

Supply and fix the following for manhole backdrop including excavation: (a) D.I. Tee 225mm x 225mm dia including M.S. cover plate (c) 90 degree medium D.I. Bend 225mm dia. (e) D.I. Straights 225mm dia (g) concrete grade 15 mix including formwork N/A no 150.00

N/A N/A N/A

no lin.m cu.m

20.00 60.00 70.00

4.9

Supply and fix Heavy Duty ductile iron manhole covers and frames as specified

34

no

440.00

14,960.00

Carried Forward

344,986.10

BQ 4 - 9

Bill No. 4 - Sewerage Reticulation

Item

Description Brought Forward : Testing of Sewer Line

Quantity

Unit

Rate RM

Amount RM 344,986.10

4.6

(a) Carry out test for straightness and obstruction on all sewer lines as specified in Clause 4.3(a) of Section 5 of Specification (b) Carry out water testing on all sewer lines as specified in Clause 4.3(b) of Section 5 of Specification (c) Carry out air testing on all sewer lines as specified in Clause 4.3(c) of Section 5 of Specification (d) Carry out C.C.T.V. Test and submission of test report for sewer lines as directed by S.O. representative or IWK/JPP (i) 225mm dia. V.C. pipe

Lump Sum

2,000.00

2,000.00

Lump Sum

2,000.00

2,000.00

N/A

278

lin.m

25.00

6,937.50

4.7

Excavate beyond foundation level as directed by the S.O. and backfill with selected material (Provisional) Service Connection

Rate only

cu.m

4.8

(a) Excavate, supply and lay 150mm dia. V.C. service pipe in class A bedding, 225mm dia. x 150mm dia. v.c. 'Y' junction including concrete thrust block, 150mm dia. x 45 degree v.c. short bend, end cap at location as directed by S.O. (Provisional) complete as shown on the drawings (b) Supply and install Marker complete as shown on the drawings (c) To excavate, supply and construct last manhole within housing lot at the depth of 1.35m as shown on the drawings d) To supply and install end cap and install marker to D.I pipe for future connection to last manhole of P.S.No.4 IWK Inspection

91 Rate Only

no no

450.00 50.00

40,950.00

Rate Only

no

L.s

165.00

4.9

Allow for liasing with IWK/JPP for interim inspection during construction and final inspection for handing over

Lump Sum

4,000.00

4,000.00

Total Carried To Summary

400,873.60

BQ 4 - 10

Bill No. 5 - Water Reticulation

Item

Description

Quantity

Unit

Rate RM

Amount RM

TRENCH EXCAVATION Excavate in all material below completed platform level Trench excavation shall be measured once only to the full depth of the trench. 5.1 Excavation trench not exceeding 1.5 m deep for water mains. Rate to include backfilling,compaction, dewatering, timbering and removal of surplus excavated material for : (a) 150mm dia. pipe (b) 200mm dia. pipe (c) 300mm dia. pipe (d) 450mm dia. pipe 5.2 -ditto- exceeding 1.5m (a) 150mm dia pipe (b) 200mm dia. pipe (c) 300mm dia. pipe (d) 450mm dia. pipe Remove unsuitable materials beyond nominal limits of trench excavations as orded by the S.O. and backfill with selected materials; rate to include disposal material to spoil pit as directed (provisional) Supply, fill, spread and compact approved sand in pipe trenches and at road crossing. Rate to include transportation of sand. Import selected earth from borrow site, rate to include excavation, backfilling, ramming and compaction (provisional) 2,005 R.O R.O 356 lin.m lin.m lin.m lin.m 8.00 10.00 15.00 20.00 16,040.00

7,120.00

R.O R.O R.O R.O 10

lin.m lin.m lin.m lin.m cu.m

15.00 20.00 30.00 40.00 15.00 150.00

5.3

5.4

109

cu.m

35.00

3,815.00

5.5

10

cu.m

15.00

150.00

PIPE LAYING Notes: (a) All spigot and socket ended pipes and specials shall be suitable for internally & externally welded slip joints (b) All steel pipe shall be concrete lined internally and bitumen coated externally. All exposed steel pipes and specials shall be externally painted. (c) The rate for joining pipe, special or fitting shall be deemed to include the supply and installation of all joint coupling or mechanical coupling and jointing material complete (d) All flanges shall be suitable for a rating of 16 bars unless specified otherwise

Total Carried To Forward

27,275.00

BQ 5 - 11A

Bill No. 5 - Water Reticulation

Item

Description Brought Forward (e) The thickness of steel shells and concrete lining shall be as stated in the specifications (f) Plain ended pipes shall be suitable for mechanical coupling or internally and externally welded collar joints (g) all pipe diameters mentioned refer to nominal diameter. P/E means plain ended B/F means both end flanged F/PE means one flanged end and one plain ended

Quantity

Unit

Rate RM

Amount RM 27,275.00

5.6

Supply, lay and join spigot and socket ended standard or sized steel water pipe; Rate to include loading, transport, handle, repair lining and coating where required, cutting, internally & externally welding and protection to welded joints and painting as specified. (a) 150mm dia. pipe (b) 200mm dia. pipe (b) 300mm dia. pipe (d) 450mm dia. pipe Culvert Crossing 2,005 R.O R.O 356 lin.m lin.m lin.m lin.m 88.00 126.00 200.00 300.00 176,440.00

106,800.00

5.7

Supply, lay and join steel pipe and special for crossing over culvert or sump rate to include 1 No. flanged off-take tee for air valve connection, welding, jointing 4 nos. steel gusseted bends and 75mm x 6mm thk. M.S. steel strap as shown on drawing (a) 150mm dia. pipe STEEL SPECIALS Supply and fix steel specials P/E. Rate to include VA Dresser joint or mechanical coupling and jointing material complete 7 no 2,800.00 19,600.00

5.8

150mm dia. P/E bend (a) up to 30 degree (b) more than 60 degree Tee barrel plain ended and with flanged branch (a) 150mm x 150mm dia Hydrant tee, barrel plain ended with flanged concentric branch (a) 150mm x 100mm dia TAPERS Supply and fix cross P/E (a) 200mm x 150mm (b) 300mm x 200 mm Total Carried Forward

11 7

no no

210.00 220.00

2,310.00 1,540.00

5.9

12

no

240.00

2,880.00

5.10

11

no

210.00

2,310.00

5.11

2 R.O

no no

450.00 900.00

900.00

340,055.00

BQ 5 - 12A

Bill No. 5 - Water Reticulation

Item

Description Brought Forward :

Quantity

Unit

Rate RM

Amount RM 340,055.00

5.12

END CAPS Supply and fix end caps (a) 150mm dia (b) 200mm dia (c) 300mm dia (d) 450mm dia Short piece short piece x 600mm long P/E for sluice valve connection (a) 150mm dia. (b) 200mm dia. (c) 300mm dia. (d) 450mm dia 8 Rate Only Rate Only 2 no. no. no. no 52.80 77.00 132.00 250.00 422.40 1 R.O R.O 1 no no no no 220.00 253.00 710.00 850.00 220.00

850.00

5.13

500.00

5.14

600mm long flanged and plain ended short piece for sluice valve connection (a) 150mm dia. (b) 200mm dia. (c) 300mm dia. (d) 450mm dia 8 Rate Only Rate Only 2 no. no. no. no 660.00 1,210.00 1,870.00 2,000.00 5,280.00

4,000.00

5.15

Flanged Adaptor Supply and fix flanged adaptor for sluice valve connection (a) 150mm dia. (b) 200mm dia. (c) 300mm dia. (d) 450mm dia Valves Supply and fix cast iron fittings and specials for air valve, sluive valve and Hydrant. Rate to include mechanical coupling and jointing material 8 Rate Only Rate Only 2 no. no. no. no 300.00 500.00 800.00 900.00 2,400.00

1,800.00

5.16

Air Valves a) 50mm dia. double orifice air valve complete with isolating stopcock Sluice Valves a) 150mm dia. double flanged sluice valves suitable for a working pressure of 16 bars b) 200mm dia. ditto c) 300mm dia. ditto (d) 450mm dia Double oulet pillar hydrant

no

650.00

4,550.00

5.17

8 Rate Only Rate Only 2

no no no no

700.00 960.00 2,000.00 3,500.00

5,600.00

7,000.00

5.18

(a) 100mm dia. x 300mm B/F ductile iron lengthening piece (b) 100mm dia. x 500mm B/F ductile iron lengthening piece (c) 100mm dia. x 1000mm B/F ductile iron lengthening piece (d) 100mm dia. sluice valve, P.N. 16 rating, B/F (e) 100mm dia. Ductile iron duckfoot bend (f) Ductile iron double outlet pillar and painted as directed by the S.O., rate to include concrete base Total Carried Forward

11 11 11 11 11

no no no no no

110.00 132.00 187.00 412.50 9.00

1,210.00 1,452.00 2,057.00 4,537.50 99.00

11

no

305.00

3,355.00 385,387.90

BQ 5 - 13A

Bill No. 5 - Water Reticulation

Item

Description Brought Forward : Scour valve Scour valve including 100 mm dia. sluice valve, ductile iron lengthening piece, flanged spigot, gibault coupling and short length of 100mm dia. uPVC Pipe class D to drain complete as shown on drawing. Rate to include reinstatement of drains to its original state ( excluding tee) Washout Washout at dead end including 100mm dia. sluice valve, brick chamber and short length of uPVC pipe class D to drain complete as shown on Drawing. Rate to include reinstatement of drains to its original state P.C Markers and Chambers Supply and fix precast concrete marker, including painting as directed for (a) sluice valve (b) air valve (c) scour valve/ washout (e) pipe Supply and construct precast concrete chamber as detailed on drawing; rate to include excavation, sand bedding, complete with covers requirement (a) hydrant valve (b) sluice valve (c) air valve Supply and construct brickwork chamber as detailed on drawing; rate to include excavation, sand bedding , complete with covers to JBA requirement (a) scour valve Thrust and Anchor Blocks

Quantity

Unit

Rate RM

Amount RM 385,387.90

5.19

no

1,200.00

3,600.00

5.20

no.

1,200.00

3,600.00

5.21

10 7 3 5

no no no no

75.00 75.00 75.00 75.00

750.00 525.00 225.00 375.00

5.22

11 10 7

no no no

300.00 300.00 300.00

3,300.00 3,000.00 2,100.00

5.23

no

650.00

1,950.00

5.24

Supply and construct thrust, diaphram and anchor blocks. Rate to include excavation backfilling, compaction, concrete mix as specified, formwork, steel reinforcement and all as shown on the drawings.

10

cu.m

260.00

2,600.00

Total Carried Forward

407,412.90

BQ 5 - 14A

Bill No. 5 - Water Reticulation

Item

Description Brought Forward : Miscellaneous

Quantity

Unit

Rate RM

Amount RM 407,412.90

5.25

Allow for pressure and leakage test including supply of water and instruments. Allow for disinfection and flushing of pipe including supply for chemicals, sampling and chemical analysis Service Connection

Lump Sum

3,500.00

0.00

5.26

Lump Sum

2,000.00

0.00

5.27

Excavate and provide 25mm dia service connection at the following M.S pipe rate to include malleable D.I. Clamp saddle, ferrul, tapping complete (a) 150mm dia Excavate, supply and lay 25mm dia S.S. pipe from tapping point up to the meter position rate to include bends, laying through drain and all reinstatement back to its original conditions, Supplying and laying sand or quarry dush to S.Steel service connection pipe at road crossing and all as shown on the drawings. Supply and fix (all fitting shall be of Stainless Steel) (a) 15mm dia ball cock (b) 25mm x 15mm Elbow (c) 20mm Nipple (d) 20mm Integrated Lockable Valve (ILV) (e) 25mm x 20mm Bush (f) 25mm x 20mm Reducer (g) 15mm Nipple Zone Meter (District Metering)

91

no

120.00

10,920.00

5.28

382

lin.m

55.00

21,021.00

5.29

91 91 91 91 91 91 91

no no no no no no no

9.00 17.00 7.50 40.00 5.30 18.00 6.00

819.00 1,547.00 682.50 3,640.00 482.30 1,638.00 546.00

5.3

Supply and install a zone meter complete with by pass and all necessary fitting, bends, felxible coupling,flange adapter, valves and bulk meter (provisional) Sampling Box Supply and install a PUAS approved sampling box. Location to be reconfirmed by PUAS.

Rate Only

no

15,000.00

5.31

Rate Only

no

5,000.00

Total Carried to Summary

448,708.70

BQ 5 - 15A

ANDALAS DEVELOPMENT SDN BHD SUMMARY OF TENDER Contract For Construction And Completion of Road & Drainage Works, Sewer Reticulation, Water Reticulation And Ancillary Work For Bungalow lots at Phase 3 For Cadangan Pembangunan Perumahan Di Atas Lot 707, Mukim Tanjung Duabelas, Daerah Kuala Langat Selangor Darul Ehsan

\\vboxsrv\conversion_tmp\scratch_1\[153888056.xls.ms_office.xls]BQ5

Bill No

Description

Amount RM

1 2 3 4 5

General Items Major Drainage Works & Internal Drainage System Road Work Sewerage Reticulation Water Reticulation

72,500.00 410,407.00 723,496.20 400,873.60 448,708.70

Sub-Total Amount

2,055,985.50

Add Levy as required by The Construction Industry Development Board = Sub-Total Amount x ( 0.125%/99.875% )

2,573.20

Total carried forward to Form of Tender

2,058,558.70

Summary

(REV.1)