EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-088 31 March 2013 30 March 2013 8.00-22.00


21.00 S 22.00 S 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 Griding M/C 4" Griding M/C 7" Activities (Yesterday) Install Steel Structure Trim Cooler Install Formwork Foundation Cooling Water Grouting Foundation Drum 03D018 Grouting Foundation For 03P020A/B/C Remove sand Bag From Gutter Installation Insulation For 05T009 Preparation Fabrication Pipe 24",28" 304H Shop Fabrication Steel Structure Area 03A 03A 03B 03B 03B 05 Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set Set DB Kg. Q'ty 4 12 9 Q'ty 1 13 26 1 3 1 1 28 No. 4 5 6 No. 1 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fabrication Pipe 24",28" 304H Area Shop Unit DB Q'ty 28 No. 1 2 3 4 5 6 7 8 Activities (Tomorrow) Install Steel Structure Trim Cooler Area 03A Unit Set Set Set Set Set Set Set DB Q'ty 1 13 26 1 1 1 1 28 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 4 15 14 9 2 9 4 4 4 3 7 5 1 48 32 120 112 72 16 72 32 32 32 24 56 40 8 2 1 7 5 1 2 4 2 11 10 7 2 12 6 33 30 21 6 6 8 3 25 19 3 6 4 15 14 9 2 9 4 4 4 3 7 5 1 106 60 38 153 142 93 22 72 38 32 40 27 81 59 11 1,035 Description 2 1 2 4 Indirect 1 2 3 2 1 1 8 16 24 16 8 8 16 8 16 32 2 1 1 1 3 3 3 6 1 2 3 2 1 1 2 1 2 4 8 16 27 16 8 8 19 11 16 38 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 3 3 1 No. 7 8 9 Crane 55T. Crane 70T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 4 15 14 9 2 9 4 4 4 3 7 5 1 48 32 120 112 72 16 72 32 32 32 24 56 40 8 6 4 15 14 9 2 9 4 4 4 3 7 5 1 106 Unit ea ea ea 48 32 120 112 72 16 72 32 32 32 24 56 40 8 848 Q'ty 2 1 2 4 Indirect 1 2 3 2 1 1 8 16 24 16 8 8 16 8 16 32 1 2 3 2 1 1 2 1 2 4 8 16 24 16 8 8 16 8 16 32

EQUIPMENT AND MACHINERY REPORT

Install Steel Structur Cooling water Pipe Support 03A

Install Steel Structur Cooling water Pipe Support 03A Install Formwork Foundation Cooling Water 03A Remove sand Bag From Gutter Install Steel Structure Reactor 03R003 Installation Insulation For 02E007A Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H 03B 03B 02 05 Shop

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1