CHAPTER 1 - INTRODUCTION ............................................................................................................................... 1
1.0 INTRODUCTION......................................................................................................................................................... 2
1.1 Introduction .................................................................................................................................................... 2
1.2 Authorization .................................................................................................................................................. 2
1.3 Objectives and Scope ...................................................................................................................................... 2
1.4 General Description of Project Area & topography ........................................................................................ 2
1.5 Implementation of the Feasibility Study ......................................................................................................... 3
1.6 Present Study for Kandy North Water Supply Project ..................................................................................... 3
1.7 Source of Supply .............................................................................................................................................. 4
CHAPTER 2 - EXISTING WATER SUPPLY FACILITIES................................................................................................ 2
2.0 EXISTING WATER SUPPLY FACILITIES .............................................................................................................................. 5
2.1 Introduction .................................................................................................................................................... 5
2.2 Schemes Operated Under Community Water Supply and Sanitation Project ............................................. 5
2.3 Schemes operated under NWS&DB ................................................................................................................ 7
2.3.1 Borehole Scheme .................................................................................................................................... 7
2.3.2 Newly augmented Water Supply Schemes under NWS&DB .............................................................. 9
2.3.3 New Large scale Water Supply Projects Operated under NWS &DB ...................................................... 9
2.4 Schemes operated under Provincial Council/ Urban Council/ Municipal Council....................................... 10
2.5 Current level of service .................................................................................................................................. 11
2.5.1 Borehole Scheme .................................................................................................................................. 11
2.5.2 CWSSP Schemes ........................................................................................................................... 11
2.6 O&M setup and Billing and Collection ................................................................................................... 11
2.6.1 Borehole Scheme .................................................................................................................................. 11
2.6.2 CWSSP Schemes ........................................................................................................................... 11
2.7 Water Quality ............................................................................................................................................... 11
2.7.1 Borehole Scheme .................................................................................................................................. 11
2.7.2 CWSSP Schemes ........................................................................................................................... 11
2.8 Assessment & Recommendation................................................................................................................... 12
2.8.1 Borehole Schemes of NWSDB ............................................................................................................... 12
2.8.2 CWSSP Schemes ........................................................................................................................... 12
CHAPTER 3 - HEALTH AND SANITATION ............................................................................................................... 3
3.0 HEALTH AND SANITATION ................................................................................................................................. 13
3.1 Health ........................................................................................................................................................... 13
3.2 Sanitation ...................................................................................................................................................... 14
3.3 Garbage and Sewerage Disposal ................................................................................................................. 14
CHAPTER 4 ENVRIONMENTAL ASPECTS ............................................................................................................. 4
4.0 ENVIRONMENTAL ASPECT......................................................................................................................................... 15
4.1 Introduction .................................................................................................................................................. 15
4.2 Legal Requirement for EIA ............................................................................................................................ 15
4.3 Safety and Environment Measures ............................................................................................................... 16
4.4 Impact of Water Abstraction from the Mahaweli River................................................................................ 16
4.5 Water Quality Assessment and Balance
of contamination in the major surface water bodies in the project area ........................................................... 17
4.6 Other impact ................................................................................................................................................. 17
4.7 Constructions and Pipe laying in Hantana Environmental Protection area .................................................. 18
ii
iii
LIST OF TABLES
Table 2.1
Table 2.2
Table 2:3
Table 3.1
Table 3.2
Table 5.1
Table 5.2
Level of Employment
Table 5.3
Percentage of income distribution by income range, for regular and seasonal income SEDS survey.
Table 5.4
Table 5.5
Table 6.1
Table 6.2
Table 6.4
Table 6.5
Table 6.6
Coverage Factor
Table 6.7
Table 6.8
Table 6.9
Table 6.10
Table 6.11
Table 6.12
Table 6.13
Table 7.1
Table 7.1.1
Table 7.1.2
Incremental Cost
Table 8.1
Table 8.2
Table 8.3
iv
LIST OF MAPS
Map 9.1
Location map
Map 9.2
Map 9.3
1.
Unit
cm
ft.
g
gpcd
ha
hr
kg
km
km2, or sq.km
kV
kW
kWh
I, or L
1/day, or 1/d
1/sec, or 1/s
1pcd, or Lpcd
m
m/s, or m/sec
m2, or sq.m.
m3, or cu.m
m3/d, or cu.m/day
m3/min
m3/s, or cum.m/sec
MCM
mgd
mg/1
mm
Mpa
ppm
Rs.
V
2.
centimeter
foot
gram
gram per capita per day
hectare (1 ha = 10,000m2)
hour
kilogram
kilometer
square kilometer
kilovolt
kilowatt
kilowatt hour
liter
liter per day
liter per second
liter per capita per day
meter
meters per second
square meter
cubic meter
cubic meter per day
cubic meter per minute
cubic meter per second
million cubic meter
million gallons per day
milligram per liter
millimeter
megapascal
parts per million
Sri Lankan Rupee
volt
Water Quality
BOD3
COD
DO
EC
pH
SS
TS
3.
Organizations
ADB
CEA
CEB
CWSSP
FINNIDA
GS
IBRD
ICC
IDA
IMF
JICA
KMC
MASL
MHUD
MOF
MSL
NEMC
NHDA
NJS
NWSDB OR NWS&DB
OECD
OECF
PS
RDA
RSC
UC
UDA
UNDP
UNICEF
USAID
WHO
WRC
WRS
4.
Others
BOT
BWL
CED
CPI
EAC
EIA
EIRR
FIRR
FY
GDP
GL
GNP
GST
HWL
HH
IEE
LWL
L/S
NGO
NRW
ODA
OEU
P/S
SLS
STP
T.A
TWL
UFW
VAT
WID
WTP
WWTP
viii
CHAPTER 1
1.0
INTRODUCTION
1.1
Introduction
Kandy, the Capital of Hill country, situated in the Central Hill region of Sri Lanka was the last bastion of
the Sinhala kings and is a charming city offering a living record of a magnificent past and a picturesque
natural beauty to domain today. It has lot more to offer for the modern dwellers who find suitable place
to live. It has its own peaceful, easygoing nature with its history, culture, forested hills and a touch of
urban buzz. Situating only 115 km inland from the capital, climatically it is one of the most suitable
places to live in due to its 500m altitude. It has superb education facilities for children and infra-structure
facilities for adults. It is apparent that there is a big trend of immigration to Kandy and its suburbs from
all over the island during the last few decades.
Akurana, Poojapitiya, Harispattuwa, Gangawatakorale, Yatinuwara, Pathadumbara, Patha Hewaheta and
Kundasale are the sub urban D S divisions bordering the city. (Refer Location Map-Figure 9.1) The
higher education institutions such as University of Peradeniya, Co-operative Training School at Polgolla,
Police Training School at Balagolla, Open University of Sri Lanka at Polgolla, Navel training base at
Haragama, the advanced healthcare facilities through teaching hospitals with collaboration of the
University, the proposed Cancer Hospital at Hantana road, the Eye hospital, the government institutions
such as Ministry of Animal Production and Health, locating of the head office of the Agriculture
Department are reasons for notably increasing immigration trends in these divisional secretariats.
Furthermore it is now proposed to expand the city area by shifting the leading government and
commercial institutes to Kundasale and Patha Hewaheta D.S Divisions to minimize the urban congestion
and to allow room for increasing settlements and new development. Some of these are shifting the Central
Provincial Council office to Pallekele, shifting army and naval bases to Pallekele area (in addition to its
already established six camps), Upgrading of existing Police hospital, establishment of International
Buddhist Centre and setting up the International Cricket ground. A domestic Air port, extension of
Colombo Kandy highway to Kundasale are also been proposed to implement in the near future.
All these development means attracting more and more people to Kandy and hence a rapid settlement
process can be expected. This means a increase in water supply beyond its normal growth factors which
certainly overgrow its present water supply capacity. Therefore, National Water Supply and Drainage
Board (NWS&DB) and Kandy Municipal Council (KMC) have either to augment the present water
facilities or implement new water supply projects to cater this growing demand.
This report is a brief version of a comprehensive Master Plan prepared in order to enhance the water
supply facilities in the divisional secretariats in the northern part of Kandy City namely Akurana,
Pujapitiya, Harispattuwa, Patha Dumbara and Sections of Gangawata Korale & Thumpane. This consists
of a solid water supply proposal to increase the existing water supply, to provide new extensions and to
incorporate new service areas in the aforementioned area.
Nsg
1.2
Authorization
The NWS&DB has decided to speed up the Phase II of the Project Proposal by Greater Kandy Water
Supply Project by introducing new proposal to be in pace with the rapidly growing demand in the area.
His Excellency the President, Mahinda Rajapaksha implied his intension to complete these balance works
on his official visit to the Water Treatment Plant (WTP) in July 2010 and further instructed to forward
the details of financial requirements to the Treasury in order to arrange loan facilities.
1.3
The objective of this report is to formulate a Project Proposal to provide a 24-hour potable water supply
to Northern part of Kandy City covering Six (6) Divisional Secretariats (DS) viz. Pathadumbara,
Pujapitiya, Akurana, Harispattuwa and part of Gangawata Korale & Thumpane in the District of Kandy.
Identification of the demand-centers within the area that is not yet being served, strengthening of the
existing level of service by improving the system, appraising of existing water supply systems, surveying of
potential sources and the previous studies.
Scope of the Project:
ii)
iii)
iv)
v)
vi)
vii)
Construction of 2nd filter unit, 3rd clear water reservoir in Water Treatment Plant. (Plant capacity
will be improved to 100,000m3/day)
Construction of Service Reservoirs 28 Nos.
Construction of Pumping Stations- 17 Nos.
Supply & laying of Transmission Pipelines - 86 km
Supply & laying of Distribution Pipelines - 411 km
Construction of Quarters for NWS&DB staff
NRW reduction and Rehabilitation Programme.
1.4
i)
Proposed Kandy North water supply project covers the northern part of Kandy District which includes six
(6) DS divisions viz. Pathadumbara, Pujapitiya, Akurana, Harispattuwa and part of Gangawata Korale and
Thumpane.
Proposed Kandy North WSP is located in a mountainous region which spans over the northwestern part
of the hill country of Sri Lanka. Kandy city centre is surrounded by a triangular mountain range while its
three entrances located at each apex of the triangle and the other towards the valley on the eastern
mountain range. Elevation of these entrances are approximately 450m in the north side (A10 road), 520m
in the eastern side (A26 road), 580m southern side (B39 road) and 530m western direction (A1 road)
respectively.
The Meda Ela (Central Canal) originates from Kandy Lake spill and it flows southwestwards parallel to
Colombo - Kandy Road (A1) and discharges into Mahaweli River at Getambe. Urbanization of the city is
already commenced and is expanding towards the north, east and south entrances and has been developing
southwestward along the Meda Ela. However the situation towards the north and north-western
directions of the city is different, especially in Harispattuwa, Pujapitiya and Akurana DS areas located
amongst a range of hills with considerable habitation. Ground Elevations of places such as Barigama,
Medawala, Dunuwila, Jambugahapitiya and Doragamuwa areas exceed 600m MSL. Elevations of
Locations such as Godahena, Ankumbura and Galhinna in Pujapitiya area reach 750m MSL. Distance to
these hills from the Water Treatment Plant is approximately 10km, but the elevation difference is varies
between 150m to 300m.
Nsg
This is a peculiar situation which imposes restrictions on leading transmission mains and pumps.
Although it is possible to use variable speed pumps in moderately sloping areas, in the case of Galhinna,
Ankumbura and Godahena, it is not possible to use such variable speed pumps and the only alternative is
to provide with fixed speed pumps.
1.5
Rapidly increasing demand for potable water in Kandy city and suburbs has almost reached its supply
capacity. Several studies have been carried out on improving water supply and sanitation facilities in the
area during the last decade. The latest study was done by Japan International Cooperation Agency (JICA)
in 1999. It focused on formulating a Water Supply and Sewerage Master Plan targeting up to the year of
2015 while review and complement the existing Water Supply Master Plan for identified Divisional
secretariats in the Northern part of Kandy District and to conduct feasibility study for the priority areas
identified in the Master Plan.
Above study was concluded in February 1999, with a long term development plan to be implemented in
three phases for the planning horizon of 2015, Phase I to be completed in 2004, Phase II in 2008 and the
Phase III in 2013.
In 2005, new Master Plan reviews were conducted by the Master Plan Group, Grater Kandy Water
Supply Project of NWSDB
Stage I of the Phase I of Greater Kandy Water Supply Project (GKWSP) was implemented with a loan
package obtained from Japan Bank for International Cooperation (JBIC). Owing to financial constraints
Project works with a reduced scope was commenced in early 2004 and was completed in October 2006.
Construction work is in progress of stage II of the Phase I and due to be completed by end of 2012.
Since there had been a delay in implementing Phase I of GKWSP and also due to financial constraints,
some development works identified in the Phase II and III of total Master Plan of GKWSP are presently
being implemented with alternate funding sources for Udu/Yatinuwara, Kundasale and Haragama.
Water supply to some areas in Udunuwara and Yatinuwara DS Divisions were implemented under a
separate foreign funded project called Kandy South Water Supply Project funded by Denmark.
1.6
A preliminary review of the 2005 Master Plan Proposal was carried out in November 2011 by the Greater
Kandy Project Monitoring Unit under the supervision Regional Support Centre (Central)of National
Water Supply & Drainage Board. A full review of the proposal is underway at present.
Nsg
This study covers water supply facilities from water intake up to distribution reservoirs to meet
the design capacity targeting year 2035. Planning of distribution pipelines was done on a
hypothetical manner in previous Master Plan Study due to lack of data and information. Under
the current study, all main roads, by roads, steps and foot paths have been included to the
distribution network by using GPS instruments.
Continuous water supply throughout the day shall be assured even during dry season so that the
customers could avail a satisfactory water supply service.
New supply systems shall be connected to the existing systems in order to minimize the project
cost for transmission / storage / distribution.
2010 Grama Niladari data , Vote register of consecutive years and census data of 2001 and 2011
were used to predict the growth rates.
2010 Grama Niladari population data with appropriate growth factors to suit the area concerned
were used for demand calculation for the years 2015, 2020, 2025,2030 and 2035.
An awareness programme and discussions were held with Grama Niladaris in each DS offices to
identify areas which need water supply. This was done through a two questionnaire surveys
covering 5 DS divisions namely Pujapitiya, Pathadumbara, Akurana , Harispattuwa and
Thumpane.
Percentage of households not having safe drinking water at their premises
Percentage of households using unsafe drinking water
Percentage of households enjoying electrical power
Percentage of households receiving Samurdhi
34
5
94
31
Initial draft report of Kandy North Water Supply Project was send for PAC comments on 25.05.2012
Accordingly PAC has made following comments
1. Use new Census data for demand prediction and check the Migration factor
2. Breakdown the estimate for zonal basis and priority areas.
This report is revised as per the PAC comments.
1.7
Source of Supply
The same source identified on Phase I of GKWSP, 4.1km upstream of the Polgolla barrage has been taken
for the Kandy North Water Supply Project. An extensive hydrological study has been carried out in the
previous Master Plan studies to ascertain the availability of the water and was found to be adequate.
Nsg
CHAPTER 2
2.0
2.1
Introduction
1) Rapidly increasing water demand in Kandy City and its suburbs has almost reached the situation of
exceeding its supply capacity.
Latest official results available
follows:
Pipe borne water
Protected wells
Unprotected wells
Tube wells
River /tank /stream etc
Source : Statistics data 2011.
45 %
38 %
3%
4%
.05 %
Existing Water Supply facilities in Kandy District are provided by following three major
institutions:
- Community Water Supply and Sanitation project (CWSSP) Funded by ADB Project
- National Water Supply and Drainage Board
- Provincial Council/Urban Council/Municipal Council
2.2
Community Water Supply and Sanitation Project (CWSSP II) was implemented under the Ministry of
Urban Development and Water Supply to provide safe drinking water and enhance sanitation facilities
among the rural communities since January 1999 to December 2003. The project was implemented along
with Provincial Councils (PCs) and Pradeshiya Sabhas (PS) and provided improved water supply and
sanitation facilities to 478 GN divisions in Central Provincial Council Area.
Project objectives were implemented through Units set up at rural level and these units were guided by the
Ministry of Urban Development and Water Supply. Non-governmental Organizations (Local) were
deployed to assist the communities in setting up appropriate institutional mechanism i.e. Community
Based Organizations (CBOs) at community level. Their responsibilities cover the areas such as
dissemination of information, organizing of training, arrangements for hygiene education or conditions
and supervision of construction and support for procurement of goods, services and operation &
management of the scheme.
Most of areas in Pujapitiya and Harispaththuwa DS divisions are highly benefitted by CWSSP activities.
There are 20 schemes in Pujapitiya DS division and 7 schemes in Harispattuwa DS division were
implemented under CWSSP. Details of these Scheme are given in Annex report chapter 2.
Nsg
DS Division
Pujapitiya
Owissa
Pujapitiya
82
Kahatagastenna
Pujapitiya
165
Pahala Kitulgolla
Pujapitiya
80
Diddeniya
Pujapitiya
65
Ruwanpura
Harispattuwa
438
Watagoda
Pujapitiya
195
Owissa South
Pujapitiya
196
Pathiroda
Pujapitiya
105
Godahena
Pujapitiya
80
Dehiwatta
Pujapitiya
51
Morankanda
Pujapitiya
131
Ruwanpura
Harispattuwa
438
Harispattuwa
158
Ullandupitiya
Harispattuwa
189
Gonigoda- Pakumbura
Harispattuwa
189
Owathanne
Harispattuwa
160
Narangoda
Harispattuwa
179
Wihangunpola
Harispattuwa
193
Beneficiary Households
90
However, according to the water sample test results and the yield of water sources, it is perceptible that
CWSSP schemes are not reliable in providing safe drinking water to cater to the increasing demands in the
community. Further Studies are in progress to ascertain the feasibility of supplying bulk water from
NWSDB to CWSSP schemes at a reasonable price to enable CBOO to operate the schemes
independently.
Nsg
2.3
2.3.1
Borehole Schemes:
The existing borehole schemes are the first large scale water supply project in the Project Area which is
done by FINNIDA aid under Government of Finland. Several borehole schemes were constructed in
Kandy district under this project.
According to respective Officers-In-Charge (OICs) of the schemes and geologists of NWSDB (RSCCentral), yield of a majority of boreholes as at present are depleting thus creating severe water shortages in
the area. As a result, most of the boreholes had to be abandoned and at present only a few borehole
schemes are functioning with a low yield.
Yield (m3/day)
Design
880
390
1200
680
Present
300
300
80
328
460
200
No. of
Households
578
881
368
900
1285
2300
The existing Ankumbura water supply scheme was designed and constructed in the year 1983. Two
numbers of production boreholes are in use as the intake. Water is directly pumped to a 150 m3 capacity
storage tank located at an elevation of 636 m MSL. It has the benefit of not requiring a full treatment
process and it consists of an aerator, two slow sand filter units and a disinfection system. The water
quality test reports indicate that the treatment works are in a satisfactory level. Surveys indicate that
Ankumbura scheme covers 60% of the population in Ihalamulla, Egodamulla North and South, Pallegama
North and South GN divisions. The scheme is capable of producing 300m3/day which serves 578
families. Another 150 families are in the waiting list, expecting to obtain new connections from the
scheme.
b)
Alwatugoda water supply scheme was designed and constructed in 1983. Alawathugoda scheme is fed by
two borehole intakes situated at Owissa and Vilana. There are two production boreholes at Owissa.
During dry season water is obtained from a nearby stream. Water is pumped to the storage tank at 621 m
above MSL by two pumps functioning at 30 m3/hr. rate through a booster pump station.
There are two production boreholes in Vilana intake too. The water is pumped to a water tank at 618 m
above MSL. Chlorine is mixed directly to the storage tank for disinfection. Alawathugoda scheme covers
65% of the population in Balakaduwa, Alwathugoda, Mawathupola, Arabepola, Delgasgoda GN divisions.
Nsg
It is capable of serving 881 families with its daily production of 300m3/day. The level of service is not
satisfactory.
c)
The existing Galihinna Water Supply Scheme was designed and constructed in 1983. The intake consists
of two production boreholes. Water is directly pumped to the 150 m3 storage tank at a 743m above MSL.
Chlorine is mixed directly to the storage tank for disinfection. Galhinna scheme is capable of covering
50% of the population in Galhinna, Kovil Muduna, Udagama GN divisions and serves about 368 families
with its daily production of 80m3/day. This apparent people get water only for 2-3hrs per week under a
zonal supply basis. At present overall level of supply of the scheme is not satisfactory. There are about
300 families willing to have new water connections by this scheme but the production is inadequate to
fulfill their need.
d)
The existing Bokkawala water supply scheme was designed and constructed in the year 1987. Initially it
has been planned for a production of 483 m3/day. The Bokkawala scheme has altogether four production
boreholes, of which three located at Alagoda and one located at Dobagammana. Dobagammana borehole
is having a yield of 128 m3/day while the Alagoda boreholes are having a yield of 200 m3/day. Water is
pumped to a 300 m3 capacity storage tank at Nawinnapitiya at the elevation of 586m above MSL. The
water is pumped at a rate of 8m3/hr per 16 hrs per day at Dombagammana and at a rate of 10 m3/hr. for
20 hrs. at Alagoda. Disinfection is done by Chlorination. Water quality is satisfactory in all aspects
(physical, chemical and bacteriological) as per the test reports.
Bokkawala scheme covers some parts of 18 GN divisions in the Pujapitiya DS. About 900 families are
benefited at present by the scheme by its 328 m3/day production. Presently water supply is supplied
under zonal basis and each zone gets water once in three days. The people in the higher elevations get
water only once a week. There are about 863 families willing to obtain new water connections but the
scheme is unable to fulfill the requirement due to the inadequacy of production.
e)
As all other Borehole schemes Hedeniya WSS also had been designed and constructed by FINNIDA and
was implemented in the Year 1989. At the inception it had 5 borehole intakes at Madadeniya which had
reduced to three active ones today. Water is fed from this intake to a 300m3 capacity storage reservoir at
Madawala by Pujapitiya.
The scheme is combined with shallow well intake at Bolagala . The water is fed by gravity to a 150m3
capacity storage reservoir at Bolagala without treatment. As the both reservoirs were located
approximately at same elevation, a common distribution system is being shared.
Even though the possibility of contamination is at a very high point at Bolagala intake due to adjacent
paddy fields, the water is not being treated. Water quality reports prove the poor water quality.
Presently most of the Bore-Hole schemes are beyond its design period and are in need of replacing with
new source of water supply.
Some bore - hole schemes that have been already integrated by new large scale water treatment plants are
tabulated below.
Nsg
Balagolla
Huluganga Arathana
Polgolla
New Large scale Water Supply Projects Operated under NWS &DB
Nsg
And some areas of Udu/ Yatinuwara were implemented under separate foreign funded project called
Kandy South Water Supply Project funded by Denmark.
2.4
Some water supply schemes in the district are managed under local authorities such as KMC water supply
scheme, Wattegama water supply scheme, Dambawela water supply scheme, etc. from which KMC water
supply scheme lies within the proposed study area.
a.
The oldest water supply system in Kandy District is Kandy Municipal Council system. This is the one and
only local authority handled municipal water supply system in Sri Lanka. There about 150,000 urban
consumers benefited by KMC system.
Main source of water of the scheme is Mahaweli river where its intake and treatment plant located at
Gatambe, some 3km southwards to Kandy town. The plant has 33,400 m3/day production capacity. R2
and R3 are the main reservoirs of KMC system. In addition to that there are reservoirs located at
Dangolla, Bahirawakanda, Primrose and Periswatta. The water quality is satisfactory and it has its own
full treatment plant.
A water shearing policy has been adopted by KMC and NWS&DB after the implementation of Stage I of
the Greater Kandy Water Supply Project in order to feed the areas of Ampitiya and Thennekumbura
which is currently served by NWS&DB. Under Phase I Stage I of GKWSP Treated water is supplied to
Asgiriya reservoir from Katugastota WTP and extract water to Ampitiya (5000m3/day) and
Tennekumbura (2000m3/day) from R3 and R2 KMC reservoirs respectfully under this water sharing
mechanism.
2.5
2.5.2
CWSSP Schemes
It is observed that the supply is inadequate to feed the demand in almost all the schemes. Even the most
simple treatment process-Chlorination was not utilized by the CBOO hence lowering the quality of water.
Nsg
10
2.6
Water Quality
2.8.1
Almost all borehole schemes are operating under capacity. This might leads to severe water shortages and
health problems in future. It is the responsibility of NWS&DB to take immediate action to augment all
these schemes under a sustainable and reliable water supply system. All borehole schemes in Kandy North
Water Supply project area will be augmented and fed from Katugastota plant under KNWSP.
2.8.2 CWSSP Schemes
Government of Sri Lanka has already invested considerable funds for CWSSP schemes under ADB loans
for Pujapitiya and Harispattuwa D S divisions. Therefore it is recommended to utilize the infra structures
of these schemes (water tank, and distribution system) to get its optimum benefits. As sole authority to
provide safe drinking water facilities to nation, the NWS&DB should prepare rules and regulations to
manage the CWSSP system through the CBOO, NWS&DB being be the regulatory body.
NWSDB must taken action to ensure the sustainability of the schemes either by augmenting the existing
method of supply or feeding with bulk supply. The formalities, discussions and reviews have to be
Nsg
11
arranged in order to convince the community, CWSSP, CBOs and Local authorities. The proposed
Kandy North Water Supply Project is also designed after incorporating total demand of CWSSP schemes
covered areas.
Nsg
12
CHAPTER 3
3.0
3.1
Health
Sources of Drinking water fed to area covered under proposed Kandy North Supply Project includes
boreholes maintained by NWS&DB, dug-wells done by CWSSP, fully treated water from NWSDB
treatment plants, treated water from KMC treatment plant, shallow wells and springs, streams, tube wells
etc.
Studies indicate that CWSSP schemes which mostly use water from shallow wells and streams as the
source of supply and the NWSDB maintained some borehole WSSs do not satisfy Sri Lankan standards
for drinking water and subsequently could cause health problems.
Following tables depict the water born disease records of the six DS divisions covered by Kandy-North
Proposal. It confirms that water born diseases have not reached an epidemic situation.
Table 3.1 refers to year 2006 statistical data available at the General Hospital Kandy, for the Kandy
Municipal area. A considerable number of patients infected by water born diseases have been recorded in
year 2006 and the number has been decreased in next year's. It can be attributed to the enhanced quality of
drinking water made available by the commissioning of Phase I Stage I of Greater Kandy Water Supply
Project in October 2006.
Prior to implementing of phase I stage I of GKWSP, KMC supply had to be restricted to two days per
week on zonal basis in certain sections of the area. But after the implementation, KMC receives a bulk
supply from NWSDB, enabling KMC population to enjoy 100% coverage and 24 hrs uninterrupted
water supply improving the sanitation conditions of the community.
Table 3.1 - Water born diseases reported from - Kandy Hospital.
No. of Patients Recorded
2
7
1
1
3
3
60
4
5
2
4
41
1
1
1
2
1
6
2
30
2
30
1
1
2
1
1
2
3
4
5
33
1
1
16
59
11
15
41
1
7
2
1
5
8
2
2
4
24
2
3
3
9
12
5
2
36
3
2
5
2
2
4
1
1
4
6
6
7
5
3
32
2
4
1
1
2
9
2
2
2
1
3
3
1
12
1
2
1
8
31
16
2
3
2
5
2
4
1
1
12
27
11
23
1
23
68
1
21
1
4
9
1
8
2
4
31
115
1
3
3
37
3
2
1
2
11
70
2010
1
1
2
3
2
2
2009
3
5
5
1
2
1
17
2010
2
2
3
1
1
5
14
2009
7
3
8
5
3
2
1
29
2008
18
7
1
7
3
1
3
22
2007
4
1
3
4
7
3
1
Hepatitis
2006
1
1
2008
1
3
4
3
4
2
5
22
2007
2
4
2
5
3
1
7
24
2006
2008
1
4
12
9
3
2
7
38
Typhoid
2010
2007
Akurana
Kandy Four Gravets
KMC (Kandy)
Kundasale
Thalathuoya
Pujapitiya
Werellagama (Harispattuwa)
Total-Greater Kandy Area
Doluwa
Galagedara
Gampola
Hasalaka
Hatharaliyadda
Meda Mahanuwara
Nawalapitiya
Panwila
Wattegama
Ududumbara
Udunuwara
Yatinuwara
Other
Total
2006
Division
2009
Diarrhea
1
4
12
2
1
2
22
1
1
1
3
3
28
1
5
65
According to the MOH officials (Refer Table 3.2) data, water born diseases still prevail in semi Urban
DS divisions such as Harispattuwa, Akurana, and Pathadumbara adjacent to Kandy Municipal limits. It
can be assumed this is may be due to non availability of 100% NWS&DB water supply for these areas. It
Nsg
13
is anticipated that this situation can be contained after the implementation of Kandy North Water Supply
Project
2008
2009
2010
2006
2007
2008
2009
2010
2006
2007
2008
2009
2010
33
Dysentery
2007
Akurana
Hepatitis
2006
18
Typhoid
7 10 6 18 3
10
- 10 1
6 12 15 5
2010
2007
Harispatthuwa
2009
2006
MOH Area
2008
Diarrhoea
Pujapitiya
- 10 9
Gagawatakorele
Pathadumbara
35 14 7
23
4 56 -
98 25 28 30 31 19 12 7
23
46 20 9 66 9
60 41 30 30 33 59 41 31 27 23 68 115 37 70 65 -
6 12 15 5
3.2
Sanitation
Sanitary facilities available for the people of Kandy district is at a high level when compared to that of the
national data. Records indicate that only 5% do not have proper sanitation facilities in the district.
3.3
Kandy Municipal Council and the surrounding local authorities use a location at Tekkawatta in Gohagoda
GN Division of Harispattuwa electorate as their garbage dumping yard. It is observed that it infiltrates to
Mahaweli River during the rainy season. To solve this problem KMC has initiated the City Garbage
Management Project.
Meda-Ela is a canal passing through Kandy City parallel to Peradeniya-Kandy road which originates at the
spillway of Kandy Lake and falls into Mahaweli River just above the KMC intake. This stream gets
polluted as the people and the institutions in the proximity release their sewerage and wastewater directly
to the canal and ultimately it discharges to Mahaweli. In order to overcome this problem NWS&DB and
KMC jointly implement the Kandy City Sewerage project. Planning and basic designing work of this
sewerage project is complete and Tenders have been called. The project is scheduled to be completed by
year 2018.
Sewage and garbage disposal of other rural and semi-urban areas has not reached an alarming level and
respective local authorities handle the waste disposal system in their own areas. In addition most of the
rural communities dispose or burn their garbage at their own premises.
Nsg
14
CHAPTER 4
4.0
ENVIRONMENTAL ASPECTS
4.1
Introduction
In general, the project is conducive to the environment, giving a substantial contribution towards the
improvement of water quality in the project area, with all consequent positive effects on public health,
general socioeconomic development and visual impact.
Although no permanent negative effects are anticipated by this project, some critical environmental aspects
which will deserve an attentive environmental management may arise during the construction or operation
stage and should take appropriate steps to avoid nuisance to public.
4.2
The Environmental studies carried out under the present project include;
An Initial Environmental Examination (IEE), carried out by the JICA mission during the first phase of the
project (February - April 1998).
An Environmental Impact Assessment (EIA) executed with the help of a subcontracted local consultant,
during the second stage of the project, between August to November 1998;
A water, sewerage and sludge quality survey, carried out by means of two separate field campaigns,
respectively performed during the dry season (February - March, 1998) and during the rainy seasons (July
- August, 1998).
The IEE, completed in April 1998, was submitted for approval of NWS&DB, and the Central
Environmental Authority (CEA) of Sri Lanka, which is the statutory government Agency, empowered for
environmental licensing in the country.
The CEA, after reviewing the IEE and considering the size and the characterization of the different
project components, categorized this project as not prescribed under the gazette Extra Ordinary no
722/22 dated 24th June 1993, meaning that the project implementing agency (NWS&DB) has no
obligations to submit an EIA to the Central Environmental Authority (CEA) for the licensing of the
present project.
Nevertheless, CEA proposed a certain number of recommendations which imposed a deeper
environmental analysis, and the NWSDB officially requested the JICA study team to execute a full scale
EIA, as initially planned.
As mentioned in CEA conditions to implement the Greater Kandy Water Supply Project, following safety
and environmental measures will also be followed during implementation period of Kandy North Project
which has already been followed during Phase I Stage I and Stage II.
Nsg
15
4.3
4.4
Total anticipated water abstraction at the existing intake will be 150,000 m3/d when the project
complete, and this will have a direct impact on the overall water availability at Polgolla reservoir. This will
affect water users for power generation and agriculture. (Water is diverted from Polgolla reservoir).
On average, the percentage of abstraction for water supply from the Mahaweli River at Polgolla reservoir
is 2.85% of the total inflow. Assuming that 50% of abstraction returns back to the river, the actual water
loss to the system will not exceed 1.43% of available water, and is therefore considered negligible.
According to statistical analysis of available data, daily inflows are less than the anticipated abstraction
with a probability ranging from 5% of the time (daily low flows) to 13%. Minor impacts may be
expected on energy generation and agriculture, both based on water being diverted at Polgolla dam.
Formal agreements must be reached between the NWS&DB with the Mahaweli Authority of Sri Lanka
(MASL), on how to share the use of water in case of conflict (sought years), before the completion of the
Nsg
16
project., in addition to the current agreement of getting 180,000 m/day., to Greater Kandy Plant from
Mahaweli River - (Refer Annex-4 - Agreement Letter)
4.5
17
CHAPTER 5
5.0
The average family size was 4.6 from the findings of the sample survey. These figures are mostly in
accordance with the national level statistics and DS divisional data which were collected through AD
planning officers of each Divisional Secretariat in the project area.
Migration and period of settlement
Settlement habitation pattern has a direct concern on water supply planning. It is found that, 72 % of the
total sample is long term residents of the area since their birth and 28 % of the population have migrated
and settled down in the area due to various other reasons.
Nsg
18
^tw a{
a jtx f c}xv
c
F
Figure
5.1
The reasons
r
for migration
m
intoo the projectt area have beeen further reeviewed in thhe Table 5.1 in order to
have a clear underrstanding on their occupaation in the area.
a
Table 5.1 - Social con
ndition (Caauses for migration)
m
Over 20
Years
Between 10 to
20 Yearrs
Betweeen 5
to 10
1
Yea
ars
Betw
ween 3
too 5
Years
Lesss than
3Y
Years
To
otal
Marriiage
31.7
19.8
2.4
4
2.4
11.6
57
7.9
Educaation
0.0
0.0
0.0
0
0.0
00.0
0.0
0
Emplooyment
4.8
0.8
0.8
8
0.8
00.0
7.1
7
Land
6.3
9.5
6.3
3
4.8
00.0
27
7.0
Businness
0.0
0.0
0.0
0
0.0
00.0
0.0
0
Otherr
2.4
2.4
1.6
6
0.0
00.0
6.3
6
Not Stated
S
0.8
0.0
0.8
8
0.0
00.0
1.6
1
Totall
46.0
32.5
11..9
7.9
11.6
100
Caauses of
Migration
N
Nsg
19
^tw a{
a jtx f c}xv
c
Leveel of Emplooyment
According to the survey resultts, it is evidennt that unem
mployment rattio of femalees of the area is quite highher
than the male andd unemploym
ment percentaage is almost equal to the national figuures. Refer Table
T
5.2 andd
figuree 5.2.
T
Table
5.2 - Level
L
of Emp
ployment
Em
mployment Ratio
R
M
Male
Fema
ale
Employed
911.3
24.9
9
U
Unemployed
d
4
4.5
9.2
2
4
4.3
66.0
0
100
100
0
Figu
ure 5.2
N
Nsg
20
Income distribution
The Table 5.3 shows the data collected according to the monthly income and it is observed that certain
residents are reluctant to state their real income and expenditure due to various concerns.
Table 5.3 - Percentage of income distribution by income range, for regular and seasonal income - SEDS
survey.
Monthly
Income
Seasonal
Income
(Annual)
Net Income
(monthly)
5,000
2.7
14.9
1.8
2.7
2.0
3.3
5.5
9.5
3.8
12.4
5.8
11.5
30.8
8.9
30.2
28.2
5.8
29.5
11.8
4.7
12.6
60,000 <
5.5
4.4
7.3
0.4
44.1
0.0
Income Range
Drinking &
Cooking
Washing
Sanitary
Gardening
Season of
the year
Protected
Well
Unprotected
Well
Piped
Water
Tube
Well
Other
Protected
Other
Unprotected
Not
Stated
Total
Dry
62.7
4.9
13.6
9.3
0.3
7.4
1.8
100
Wet
65.6
4.2
14.2
7.9
0.4
7.0
0.7
100
Dry
51.3
9.3
12.0
0.6
0.0
25.4
1.3
100
Wet
54.1
8.5
13.5
0.4
0.0
21.4
2.0
100
Dry
59.1
6.6
15.0
4.7
0.2
10.7
3.8
100
Wet
61.4
5.8
15.0
3.4
0.2
13.0
1.1
100
Dry
23.7
1.6
5.9
1.1
0.2
6.7
60.9
100
Wet
24.4
1.3
5.7
0.9
0.2
6.5
61.0
100
Reference to table 5.4 it is shown that overall situation of the area covered by the study, it is evident that a
considerable number of dug wells are available in the area as sources of domestic water supplies. Most of
them are having water in shallow depths and water table fluctuations during the dry periods are marginal.
Nsg
21
According to the overall assessment, about 18.5% are using unprotected water sources for drinking,
cooking, washing and bathing. This might be considered as an alarming situation in respect to community
health. Further, a substantial number of household are compelled to use springs and streams as their
secondary water source during the drought periods when their primary source has limitations. However
the users have a feeling that around 63% percent of their current water sources are quit reliable in the
context of domestic supplies irrespective of the water quality and distance to the source.
The following observations were made during the field surveys in respect of user satisfaction on available
pipe water supplies in the area maintained by NWS&DB/PSS/CBO's.
All people have shown their dissatisfaction regarding supply hours, water quality, operation and
maintenance and water availability of all pipe borne water supplies.
Majority of poor people in the existing service area are facing critical problems during drought
period. They depend upon bowser supplies, transport water from faraway places or some other
alternative arrangements for domestic water.
5.3.2 Water Quality (user views)
In accordance with user views, they believe that water qualities of most of the water sources in the area are
acceptable in respect to the physical parameters and hence safe for drinking. As compared to dry zone
districts, chemical water quality problems are scarce in this area. However user perception on water quality
at some pipe water supply systems has been reported unsatisfactory.
Duration
37.9
10 - 30 minutes
40.9
31 - 59 minutes
7.9
Over an hour
13.3
Total
100
Distance to the sources and time spent for fetching water has been evaluated based on the user views in
order to ascertain the hardships faced by the users in their day to day life. According to the findings of the
house hold survey approximately 21.2 % of the sample populations are having problems with distance to
the sources and duration for water carrying. During the drought period some of the water sources dries up
and the situation become worse. Therefore the time spent for carrying water is dependent on the
availability of water at their primary sources. Refer Table 5.5.
Nsg
22
^tw a{
a jtx f c}xv
c
Piped borne
b
Water
N
Nsg
Incom
me level and saving potenntial
Patteern of expendditure and theeir priorities
Curreent contributtions or expeenses on wateer supply faciilities
Theirr willingness to get NWSS&DB water connection
23
Nsg
24
CHAPTER 6
6.0
TECHNICAL ASPECTS
6.1
25
6.1.2
Service reservoirs were identified on suitable high grounds in order to cater the maximum possible
population in the area, giving due attention to the following basic criteria.
i)
ii)
iii)
iv)
v)
Extents of the service zones were determined according to the Grama Niladhari Divisions which can be
served under the service reservoir. Some service zones were extended beyond the maximum pressure head
of 60m due to non availability of nearby reservoirs or towards low elevated locations by means of pressure
reducing valves.
6.1.3
Population data from Census of Population and Housing 2001 and 2012
Population data collected by the survey carried out by the Greater Kandy Water Supply Project based
on Grama Niladhari Divisions.
Statistics of Elections Department - Number of registered voters on electoral division basis.
Population data collected from Divisional Secretariats.
a) Current Population
2010 Grama Niladari population data were used as the base population in this planning process and the
information given by the Elections Department and 2001 and 2012 Census Data were utilized to
determine the population growth rate. This is compared with the projection given in JICA study team
based on the estimation given for DS areas.
b) Annual Growth Rate
To predict the growth rate of each DS division, the present and future development trends were studied in
each area together with migration trends (ex:- Kandy Colombo highway) etc.
The available data sources such as statistics of the registered voters in electoral divisions and the
population density of the G.N. divisions were also used to identify the growth pattern of the population.
c) Growth rate justification
According to the population densities of the D.S. divisions of the Kandy District, it is observed that the
D.S. divisions falling under the command area of the Kandy North project area has a higher population
density than the rest (refer Table 6.1 and Table 6.2)
Nsg
26
D.S Division
Akurana
2250
Harispattuwa
1800
Pujapitiya
Kandy Four Gravets
1100
2830
Pathadumbara
1900
Thumpane
323
D.S Division
Patha Hewaheta
750
Panwila
Udadumbara
Meda Dumbara
Udapalatha (Gampola)
Udunuwara
276
81
351
473
Yatinuwara
Kundasale
1480
1384
1600
As per the new government education policy which is still in review stage it is proposed that the primary
sections of all leading schools in cities will be shifted to suburbs of the cities. In case this takes effect,
migration of population will be increased in suburbs cities near to Kandy city.
Further it is justified that the above assumption are realistic, based on the growth pattern of the registered
voters of the D.S. divisions.
Average growth rate of voters according to the electoral divisions relevant to D.S. divisions considering the
statistics available for the period of 1998 - 2009 are given in Table 6.3.
Nsg
27
Table 6.3 - (a) Average Growth Rate of voters in the Project area
No
Registered Votes
DS Division
2010
2009
2008
2007
Growth rate
Gangawatakoralaya
38245
37445
36938
36702
36820
37845
1.38%
Harispattuwa
64173
62994
62746
61935
62340.5
63583.5
0.99%
Thumpane
53372
52612
52553
52169
52361
52992
0.60%
Pathadumbara
80884
78777
78688
76751
77719.5
79830.5
1.35%
Pujapitiya
43595
43108
42947
42621
42784
43351.5
0.66%
Akurana
42739
41613
41782
41196
41489
42176
0.82%
Source: Voters register Election Department
Population (Census)
No
DS Division
2011
2001
Annual Growth
Rate %
Harispattuwa
86684
78207
1.08
Thumpane
36509
35306
0.34
Pujapitiya
56808
53644
0.59
Pathadumbara
87518
80244
0.91
Akurana
62804
55366
1.34
According to the Table 6.3 (a) and (b) growth rates of some DS divisions are slightly deferent. Future
growth rates are predicted based on above two table and current and future trends of each DS division.
Growth justification of each D.S division is discussed below.
a. Akurana
Akurana is the D.S. division having the highest population density in the Harispattuwa electorate. It is
located along the Kandy - Jaffna road and is the most developed and urbanized area of the Harispattuwa
electorate. Also there is an existing water supply scheme operated and maintained under NWS&DB.
Presently there are large number applicants in waiting list for water supply but unable to cater from the
existing system. According to the current development pattern, especially as a commercial city, there is a
trend for migration inwards.
Current population growth rate of Akurana is about 1.34% as per the early updated 2011 census data.
High growth rate and migration trend can be expected after receiving water to Akurana area as per the
previous experience of Phase I Stage I of Greater Kandy Water Supply Project. Therefore, 1.3% initial
growth rate up to 2015 and then growth rate decreases to meet the national figures. Refer Table 6.3
Nsg
28
b. Harispattuwa
Harispattuwa D.S. division has a considerable population density when compared with the other D.S.
divisions of the district. This area consists with a good road network. Also the proposed Colombo Kandy Highway mark out across the Harispattuwa D.S. division. Triangle of minor cities namely
Gohagoda, Katugastota and Barigama are enclosed by three main roads. Therefore, the area will be
attracted by the migrants as a suburban area of the Kandy city and a continuous economical and social
development of the area can be expected.
Current population growth rate for the area as per census data is 1.08%. However, considering the
topography and other land limitations in the area a flat growth rate of 1.05% used for this division up to
2015. Then that growth rate further reduced. Refer Table 6.5.
c. Poojapitiya
Pujapitiya Divisional secretariat is having a low growth rate compared to adjacent Harispattuwa and
Akurana, D.S. divisions. It can be assumed that Pujapitiya also would get the same trend in development
as a residential area by replicating the migration pattern of Harispattuwa and Akurana. This development
can be further influenced by the implementation of the water supply project. The small towns in the area
namely Madawala, Poojapitiya and Bokkawala will be developed in future.
According to the Census data 2011, current population growth rate is 0.6%. However considering the
geographical location (hilly terrain) of this area and its remoteness may not attract migrating population
and therefore a larger population settlement cannot be expected in this division. Hence low growth rate
was adopted. Refer Table 6.5
d. Pathadumbara
In Pathadumbara D.S division, population density is considerably high and there are no sufficient water
supply facilities available in the area. Percentage of served population with available water facilities
according to the total demand indicates a lower value of about 25%.
Current population growth rate according to the census data is 0.9%. However Pathadumbara is one of
adjacent area of Kandy Municipality consisting small towns Polgolla, Madawala and Wattegama urban
areas. Also it has convenient access to Kandy through Wattegama- Matale road. Wattegama is an old
town council bordering the railway station and supports a large population with many economic activities.
There are many government institutions located in the area namely, Provincial centers of the Open
University of Sri Lanka, Faculty of Rajarata University, Teachers Training school, Cooperative Training
school and many other industrial organizations.
Therefore it is envisaged a possibility of further increase of growth rate with the new water supply facility
as there is a significantly high demand for water. This growth rate can be reached to a saturated level with
the increase of the population density. Considering the above facts, growth rate of 0.9 % assumed up to
year 2015 and 0.8 % flat growth rate is adopted after 2025. Refer Table 6.5
Nsg
29
Name of GND
Aniwatta East
Asgiriya
Bahirawakanda
Mapanawatura
Poornawatta East
Katukelle
Katukelle West
Deiyannewela
Nagastenna
Suduhumpola East
Suduhumpola West
GND No.
234
235
236
237
241
255
256
261
262
265
266
1589
2880
3275
2846
2484
2364
2019
2855
3994
2580
2376
Population growth rates determined for the DS divisions are given in Table 6.5
Nsg
30
DS Area
Akurana
Harispattuwa
Kandy Four Gravets
Thumpane
Pathadumbara
Poojapitiya
Population
growth rate
2010-2015 %
1.30
1.05
1.30
0.53
0.90
0.60
Population
growth rate
2015-2025 %
1.25
1.00
1.20
0.50
0.85
0.55
Population growth
rate 2025-2030 %
1.15
0.90
1.10
0.50
0.80
0.55
Population
growth rate
2030-2035 %
1.10
0.80
1.10
0.50
0.80
0.55
Division
Akurana
Harispattuwa
Pujapitiya
Pathadumbara
Thumpane
Gangawata Korale
Coverage Fact %
94
95
83
88
85
95
Nsg
31
Table 6.7 Predicted NRW percentages after implementing NRW reduction Programmes
D S Division
2010-2015
35
40
35
35
40
35
Harispatuwa
Akurana
Pujapitiya
Pathadumbara
Kandy Four Gravets
Thumpane
2030-2035
25
25
25
25
25
25
Description
Domestic
Non Domestic
NRW
Total
2000
101
58
115
274
KMC Area
2005
2010
108
115
61
65
95
81
264
261
2015
121
69
63
253
2020
121
69
63
253
2025
121
69
63
253
Source- The Detailed Design Study on Greater Kandy Water Supply Augmentation Project, 2002-Volume II-2
Table 6.9 - Per capita demand Outside KMC for different NRW %
Akurana
Harispattuwa
Pujapitiya
Pathadumbara
KMC
Galagedara
2015
149
183
166
171
253
134
2020
128
170
154
159
253
124
2025
128
170
154
159
253
124
2030
119
159
144
148
253
116
2035
119
159
144
148
253
116
Nsg
32
^tw a{ jtx
j f c}xv
(c)
(d) =
(c)/(b)
(e)
(
(g)
(h)
2015
2
2020
2025
2030
2035
1684
1,79
96
267
1,911
244
2,033
259
2,153
256
2,274
271
565
Thelambugahawattta
Akurana
2827
42
42
100
100
0..94
2657
2,83
34
422
3,016
6
385
3,209
409
3,398
404
4
3,589
427
566
Waragashinna
Akurana
1857
23
23
100
100
0..94
1746
1,86
62
277
1,981
253
2,108
269
2,232
266
2,357
281
572
Delgasthenna
Akurana
1400
32
21
66
100
0..94
864
92
22
137
981
125
1,044
133
1,105
132
2
1,167
139
576
Deegala
Akurana
732
108
10
100
0..96
65
69
9
10
73
78
10
83
10
0
88
10
577
Palle Deegala
Akurana
789
80
62
78
100
0..96
587
62
26
93
666
85
709
90
751
89
9
793
94
592
Kurudugahaela
Akurana
1649
43
100
0..93
143
153
23
163
21
173
22
183
22
2
193
23
593
Uggala
Akurana
1563
94
43
46
100
0..97
693
73
39
110
786
100
836
107
885
105
5
935
111
623
Deegahawathura
Pathadumbara
1025
113
10
100
0..89
81
86
6
13
92
12
98
12
104
12
2
110
13
10
624
Mahakumbura
Pathadumbara
900
78
100
0..94
33
35
5
37
39
41
43
9,12
22
1,357
9,706
1,239
10,327
1,316
10,935
1,30
01
11,549
1,374
G.S. No.
Average Daily
Demand
m3/day
0..94
Served
Population
100
Average Daily
Demand
m3/day
74
Served
Population
35
Average Daily
Demand
m3/day
47
Served
Population
2406
Average Daily
Demand
m3/day
Akurana
Served
Population
Akurana
Average Daily
Demand
m3/day
564
Served
Population
G.S. Division
Served
Population
in 2010
( b)
(a)
Total
P
Populat
ion
iin 2010
Coverage
v ag
Factor
2035
1.10%
14
5.75
81.16
10%
89.28
25%
119
Geographical
Factor
(%)
2030
1.15%
14
5.75
81.16
10%
89.28
25%
119
Served Area
Factor
(%)
2025
1.25%
14
5.75
81.16
10%
89.28
30%
128
Served Area
(hec)
2020
1.25%
14
5.75
81.16
10%
89.28
30%
128
Total Area
(hec)
2015
1.30%
14
5.75
81.16
10%
89.28
40%
149
D.S. Division
Akurana DS area
Design Parameters
Growth Raate
Domestic Average
A
Consumptionn
Average Fam
mily Size
Per Capita per day
Allow for non
n domestic
Per Capita per day
NRW
Demand peer capita per day
Thelabugahaawaththa SR
Total
Nsg
33
15
16
17
18
19
20
21
22
560
561
562
563
564
592
593
23
590
24
25
26
589
591
27
28
29
30
31
573
574
575
576
578
Kasawatta
Udaweliketiya
Palleweliketiya
Dodangolla
Akurana
Kurudugahaela
Uggala
Total
Rambuke Ela SR
Rambuke Ela
Total
Vilana Udagama SR
Vilana Udagama
Vilana Pallegama
Total
Dunuwila SR
Pangollamada
Malgamandeniya
Rathukoho
Deegala
Dunuvila North
32
579
Dunuvila South
33
Total
Nsg
2025
2030
2035
Average Daily
Demand
m3/day
2
2020
Average Daily
Demand
m3/day
2015
Average Daily
Demand
m3/day
(h)
Average Daily
Demand
m3/day
(
(g)
Average Daily
Demand
m3/day
(e)
0..64
292
311
46
331
42
352
45
373
444
394
47
660
93
25
27
100
0..89
158
169
25
180
23
192
24
203
244
214
25
Akurana
1,824
71
10
14
100
0..94
241
257
38
273
35
290
37
307
377
324
39
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
1,850
24
17
71
100
0..94
1232
1,3114
196
1,398
178
1,488
190
1,576
1888
1,665
198
2,677
43
43
100
100
0..94
2516
2,6884
399
2,856
364
3,039
388
3,218
3833
3,399
405
1,555
32
32
100
100
0..94
1462
1,5660
232
1,660
212
1,766
225
1,870
2233
1,975
235
2,713
38
38
100
100
0..94
2550
2,7220
405
2,894
369
3,079
393
3,260
3888
3,443
410
2,406
47
15
32
100
0..94
722
770
115
819
104
871
111
922
1100
974
116
1,649
43
18
42
100
0..93
642
685
102
729
93
776
99
822
988
868
103
1,563
94
11
12
100
0..97
177
Akurana
Akurana
Akurana
Akurana
Akurana
1,121
80
80
100
100
1..00
1,580
118
36
31
100
1..00
1,805
36
18
50
100
813
108
22
20
1,705
81
46
Akurana
2,026
67
18
Akurana
Akurana
Akurana
1,890
121
121
100
100
0..86
1625
Served
Population
100
Served
Population
77
Served
Population
23
Served
Population
30
Served
Population
596
Pujapitiya
Pujapitiya
Served
Population
in 2010
Coverage
v ag
Factor
Bulugohothenna
(d) =
(c)/(b)
Geographical
Factor
(%)
559
(c)
Served Area
Factor
(%)
14
( b)
Served Area
(hec)
544
545
(a)
Total
P
Populat
ion
iin 2010
Total Area
(hec)
12
13
Akuran SR
Bamunupola
Kiralagama
D.S. Division
G.S. No.
G.S. Division
^tw a{ jtx
j f c}xv
189
28
201
26
214
27
227
277
240
29
10,6659
1,586
11,3411
1,446
12,067
1,539
12,778
1,5222
13,496
1,607
1,7333
258
1,844
235
1,962
250
2,077
2477
2,194
261
1,7333
258
1,844
235
1,962
250
2,077
2477
2,194
261
1477
1,303
155
1,706
109
92
84
100
0..67
965
1,0229
153
1,095
140
1,165
149
1,234
1,721
254
192
76
100
1..00
1301
1,3888
207
1,477
188
1,572
200
1,664
1988
1,758
209
2,4117
360
2,572
328
2,737
349
2,898
3455
3,061
364
1121
1,1996
178
1,273
162
1,355
173
1,435
171
1,516
180
482
514
76
547
70
582
74
616
733
651
77
0..95
857
914
136
973
124
1,035
132
1,096
1300
1,158
138
100
0..96
159
170
25
181
23
193
25
204
244
215
26
57
100
1..00
968
1,0333
154
1,099
140
1,169
149
1,238
1477
1,308
156
27
100
1..00
544
580
86
617
79
657
84
696
833
735
87
4,4007
655
4,690
598
4,991
637
5,285
6288
5,583
664
34
19
42
100
0..98
423
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
769
98
818
104
866
1033
915
Average Daily
Demand
m3/day
45
108
Served
Population
1,022
723
2035
Average Daily
Demand
m3/day
678
Served
Population
0..66
2030
Average Daily
Demand
m3/day
100
Served
Population
100
2025
Average Daily
Demand
m3/day
110
Served
Population
110
2
2020
Average Daily
Demand
m3/day
1,028
Served
Population
in 2010
Akurana
Akurana
2015
Served
Population
(h)
Coverage
v ag
Factor
559
568
569
584
586
588
(
(g)
Geographical
Factor
(%)
42
43
44
45
46
47
48
(e)
Served Area
Factor
(%)
574
575
580
583
(d) =
(c)/(b)
Served Area
(hec)
37
38
39
40
41
(c)
(a)
Total
P
Populat
ion
iin 2010
Total Area
(hec)
585
587
Balakaduwa SR
Balakaduwa
Walahena
Total
Heepitiya SR
Malgamandeniya
Rathukoho
Mawathupola
Alawathugoda
Total
Dippitiya SR
Bulugohothenna
Melchena
Malwanahinna
Arambepola
Dippitiya
Delgasgoda
Total
( b)
D.S. Division
34
35
36
G.S. Division
G.S. No.
^tw a{ jtx
j f c}xv
109
451
67
480
61
511
65
541
644
571
68
1,1774
175
1,249
159
1,329
169
1,407
1677
1,486
177
90
1,580
118
42
36
100
1..00
562
599
89
637
81
678
86
718
855
758
1,805
36
100
0..95
143
153
23
163
21
173
22
183
222
193
23
2,217
102
48
47
100
0..94
981
1,0446
156
1,113
142
1,184
151
1,254
1499
1,325
158
4,592
140
39
28
100
0..93
1190
1,2669
189
1,350
172
1,437
183
1,522
181
1,608
191
3,0667
457
3,263
416
3,472
442
3,677
4377
3,884
462
244
2,341
71
49
69
100
0..94
1519
1,6220
241
1,724
220
1,834
234
1,942
231
2,051
1,214
34
31
91
100
1..00
1107
1,1881
176
1,257
160
1,338
171
1,417
1699
1,497
178
2,492
82
37
45
100
1..00
1124
1,1999
178
1,276
163
1,358
173
1,438
171
1,519
181
1,735
100
57
57
100
0..41
405
432
64
460
59
489
62
518
622
547
65
1,386
129
129
100
100
0..95
1317
1,4005
209
1,495
191
1,591
203
1,685
201
1,780
212
1,558
170
17
10
100
0..94
146
156
23
166
21
177
23
187
222
198
24
5,9993
891
6,378
814
6,787
866
7,187
8566
7,592
904
Kurugoda SR
49
50
51
52
53
54
55
56
57
559
561
562
567
568
569
570
571
572
Nsg
Bulugohothenna
Udaweliketiya
Palleweliketiya
Neerella
Melchena
Malwanahinna
Kurugoda
Hureegolla
Delgasthenna
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
2,341
71
12
17
100
0..94
372
397
59
422
54
449
57
475
577
502
60
3,450
43
16
100
0..94
528
563
84
599
76
637
81
674
800
712
85
1,918
32
28
100
0..94
507
541
80
576
73
613
78
649
777
685
82
2,152
43
40
93
100
0..94
1882
2,0008
299
2,137
273
2,274
290
2,408
2877
2,543
303
1,214
34
100
1..00
107
114
17
121
15
129
16
137
166
145
17
2,492
82
45
55
100
1..00
1368
1,4559
217
1,552
198
1,651
211
1,748
2088
1,846
220
1,908
41
41
100
100
0..94
1794
1,9114
285
2,037
260
2,168
276
2,296
2733
2,425
289
2,027
81
81
100
100
0..94
1905
2,0332
302
2,162
276
2,301
293
2,436
2900
2,573
306
1,754
32
11
34
100
0..94
567
605
90
644
82
685
87
725
866
766
91
35
64
65
66
67
68
69
70
574
575
576
581
582
584
580
582
583
584
587
588
589
Nsg
Malgamandeniya
Rathukoho
Deegala
Konakalagala
Marahela
Arambepola
Total
Alawathugoda SR
Mawathupola
Marahela
Alawathugoda
Arambepola
Walahena
Delgasgoda
Vilana Udagama
Total
Akurana Total
( b)
(c)
(d) =
(c)/(b)
(e)
(
(g)
Total Area
(hec)
Served Area
(hec)
Served Area
Factor
(%)
Geographical
Factor
(%)
Coverage
v ag
Factor
(h)
2015
2
2020
2025
2030
2035
11
76
10
81
10
86
100
91
11
763
114
812
104
864
110
915
1099
966
115
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Average Daily
Demand
m3/day
711
715
Served
Population
67
0..95
Average Daily
Demand
m3/day
1..00
100
Served
Population
100
42
Average Daily
Demand
m3/day
15
Served
Population
36
Average Daily
Demand
m3/day
118
1,805
Served
Population
1,580
Average Daily
Demand
m3/day
Akurana
Akurana
Akurana
Akurana
Akurana
Akurana
Served
Population
(a)
Total
P
Populat
ion
iin 2010
Served
Population
in 2010
D.S. Division
58
59
60
61
62
63
G.S. Division
G.S. No.
^tw a{ jtx
j f c}xv
813
108
15
14
100
0..96
108
115
17
122
16
130
17
138
166
146
17
1,234
59
59
100
100
0..99
1222
1,3004
194
1,388
177
1,477
188
1,564
1866
1,652
197
1,053
74
23
31
100
0..85
278
297
44
316
40
336
43
356
422
376
45
1,735
100
14
14
100
0..41
100
107
16
114
15
121
15
128
155
135
16
12,2290
1,829
13,0788
1,669
13,916
1,772
14,735
1,7552
15,563
1,854
177
2,217
102
54
53
100
0..94
1103
1,1777
175
1,252
160
1,332
170
1,410
1688
1,489
1,053
74
51
69
100
0..85
617
658
98
700
89
745
95
789
944
833
99
4,592
140
101
72
100
0..93
3081
3,2887
489
3,498
446
3,722
475
3,941
4699
4,163
496
1,735
100
29
29
100
0..41
206
220
33
234
30
249
32
264
311
279
33
1,022
45
26
58
100
0..98
579
618
92
658
84
700
89
741
888
783
93
1,558
170
42
25
100
0..94
362
386
57
411
52
437
56
463
555
489
58
1,706
109
17
16
100
0..67
178
190
28
202
26
215
27
228
277
241
29
6,5336
972
6,955
887
7,400
944
7,836
9322
8,277
985
57,3398
8,540
61,0766
7,791
64,988
8,284
68,815
8,1887
72,685
8,652
36
^tw a{ jtx
j f c}xv
Harispa
attuwa DS area
Nsg
4.16
4.16
4.16
112.18
112.18
112.18
6%
%
118.91
6%
118.91
6%
118.91
6%
118.91
6%
118.91
35%
%
1833
30%
170
30%
170
25%
159
25%
159
(h)
2015
2020
2025
2030
2035
Harispattuwaa
Harispattuwaa
703
41
41
100
100
0.95
668
704
129
7440
126
7778
132
8114
129
847
134
913
75
75
100
100
0.95
867
913
167
960
163
1,0009
171
1,055
167
1,0998
174
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Thumpane
Thumpane
986
83
83
100
100
0.95
937
987
181
1,0037
176
1,0090
185
1,140
181
1,1886
188
979
81
81
100
100
0.95
930
980
179
1,0030
175
1,0083
184
1,133
180
1,1779
187
947
52
52
100
100
0.95
900
948
173
996
169
1,0047
178
1,095
174
1,1440
181
1,172
121
121
100
100
0.95
1113
1
1,173
215
1,2233
209
1,2296
220
1,355
215
1,4110
224
1,596
169
169
100
100
0.95
1516
1
1,597
292
1,6678
285
1,7764
300
1,845
293
1,9220
304
Served Area
Factor
(%)
Geographical
Factor
(%)
Average Daily
Demand
m3/day
(g)
Served
Population
P
l i
(e)
Average Daily
Demand
m3/day
(d) =
(c)/(b)
Served
Population
(c)
Average Daily
Demand
m3/day
( b)
Served
Population
D.S.
Division
(a)
Total
Popu
lation
in
2010
Average Daily
Demand
m3/day
4800
481
4822
483
4844
485
486
4877
488
489
398
4022
4.16
112.18
Served
Population
3
4
5
6
7
8
9
10
11
12
13
14
4.16
112.18
Average Daily
Demand
m3/day
468
2035
0.8%
14
S d
Served
Population
Medawala SR
Gonigoda
GonigodaPalkumbura
Attaragama
Attaragama East
Attaragama Southh
Bothota
Medawala
Angoda
Dembaralawa
Doranegama
Amuwathdeniya
Ihagama
Kumburegama
Marawanagoda
2030
0.9%
14
Served
Population
in 2010
4677
2025
1.0%
14
Coverage
Factor
G.S. Divisionn
2020
1.0%
14
Served
Area
S dA
(hec)
G.S..
No..
20115
1.1%
%
144
Total Area
(hec)
Design Parrameters
Growth Raate
Domestic Average
A
Consumption
Average Family Size
Per Capita per day
Allow for non
n domestic
Per Capita per day
NRW
Demand peer capita per day
486
38
38
100
100
0.95
462
487
89
512
87
5338
91
5663
89
586
93
1,144
108
108
100
100
0.95
1087
1
1,145
209
1,2203
204
1,2264
215
1,322
210
1,3776
218
611
83
83
100
100
0.95
580
611
112
6442
109
6775
115
7006
112
735
117
720
68
68
100
100
0.95
687
724
132
761
129
8000
136
8337
133
871
138
921
54
54
100
100
0.95
875
922
169
969
165
1,0018
173
1,065
169
1,1008
176
751
84
25
30
100
0.82
183
193
35
2003
34
2113
36
2223
35
2322
37
835
51
31
60
100
0.82
411
433
79
455
77
4778
81
5000
79
5200
82
37
^tw a{ jtx
j f c}xv
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
408
411
4177
418
453
463
4644
465
4677
4800
481
4822
4900
491
455
456
461
4622
465
466
Nsg
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Served
Population
P
l i
Average Daily
Demand
m3/day
684
57
57
100
100
0.82
561
591
108
6221
105
6553
111
6883
108
711
113
791
93
93
100
100
0.82
649
684
125
719
122
7556
128
7991
125
8233
130
671
60
60
100
100
0.82
552
Served Area
Factor
(%)
Geographical
Factor
(%)
Average Daily
Demand
m3/day
2035
Served
Population
2030
Average Daily
Demand
m3/day
2025
Served
Population
2020
Average Daily
Demand
m3/day
2015
Served
Population
(h)
Average Daily
Demand
m3/day
(g)
S d
Served
Population
Thumpane
Thumpane
Thumpane
(e)
Served
Population
in 2010
Niyambepola
Idamegama
Palkumbura
Total
Rajapihilla SR
Hapugoda
Udabokalawela
Uduwawala Wesst
Uduwawala Nortth
Embulpuraya
Rajapihilla
Endaruthenna
Ulladupitiya Eastt
Gonigoda
Attaragama
Attaragama East
Attaragama Southh
Wathuwala
Uyanwatta
Total
Barigama SR
Hiriyalagammanaa
Kurunduwatta
Thittapajjala
Thittapajjala North
Ulladupitiya Eastt
Ulladupitiya Weest
(d) =
(c)/(b)
Coverage
Factor
403
4044
405
D.S.
Division
(c)
Served
Area
S dA
(hec)
15
16
17
G.S. Divisionn
( b)
Total Area
(hec)
G.S..
No..
(a)
Total
Popu
lation
in
2010
582
106
612
104
6443
109
6772
107
699
111
133,674
2,500
14,,371
2,439
15,105
2,565
15,7799
2,506
16,4441
2,607
117
1,040
110
65
59
100
0.95
581
612
112
6443
109
6776
115
7007
112
736
1,088
111
35
32
100
0.95
326
343
63
360
61
3778
64
3995
63
411
65
904
53
31
58
100
0.95
500
527
96
554
94
5882
99
6009
97
6344
101
825
56
56
100
100
0.95
785
827
151
869
148
9113
155
9555
151
9944
158
810
58
14
100
0.95
106
112
20
118
20
1224
21
1330
21
135
21
1,242
69
69
101
100
0.95
1186
1
1,250
229
1,3314
223
1,3381
235
1,444
229
1,5003
238
548
34
11
33
100
0.95
170
179
33
188
32
1998
34
2007
33
215
34
869
25
16
100
0.95
131
138
25
1445
25
1552
26
1559
25
165
26
703
46
13
100
0.95
86
91
17
9
96
16
1001
17
1006
17
1100
17
986
50
15
30
100
0.95
282
297
54
312
53
3228
56
3443
54
357
57
979
98
100
0.95
76
80
15
8
84
14
8
88
15
922
15
966
15
947
100
92
92
100
0.95
824
868
159
912
155
9559
163
1,003
159
1,0444
166
997
47
19
100
0.95
182
192
35
2002
34
2112
36
2222
35
231
37
1,173
24
21
100
0.95
232
244
45
256
43
2669
46
2881
45
2922
46
5
5,760
1,054
6,0053
1,027
6,3361
1,082
6,653
1,056
6,9223
1,098
153
1,210
64
42
66
100
0.95
759
800
146
8441
143
8884
150
9225
147
9633
682
55
27
49
100
0.95
318
335
61
352
60
3770
63
3887
61
4033
64
1,367
90
30
33
100
0.95
431
454
83
477
81
5001
85
5224
83
545
86
854
47
13
100
0.95
104
110
20
116
20
1222
21
1228
20
1333
21
869
25
21
83
100
0.95
687
724
132
761
129
8000
136
8337
133
871
138
828
67
65
97
100
0.95
767
808
148
8449
144
8992
152
9333
148
971
154
38
^tw a{ jtx
j f c}xv
1
2
3
4
5
6
7
8
9
10
11
12
4477
451
4522
455
456
4577
459
4600
469
473
4744
4777
13
478
14
15
479
485
Nsg
Served
Population
P
l i
Average Daily
Demand
m3/day
913
67
14
21
100
0.95
182
192
35
2002
34
2112
36
2222
35
231
37
1,573
123
84
68
100
0.95
1023
1
1,078
197
1,1133
192
1,1191
202
1,246
198
1,2997
206
1,062
61
61
99
100
0.95
1003
1
1,057
193
1,1111
189
1,1168
198
1,222
194
1,2772
202
1,050
92
86
93
100
0.95
928
978
179
1,0028
175
1,0080
183
1,129
179
1,1775
186
990
59
59
100
100
0.95
939
989
181
1,0039
176
1,0092
186
1,142
181
1,1888
188
Served Area
Factor
(%)
Geographical
Factor
(%)
Average Daily
Demand
m3/day
2035
Served
Population
2030
Average Daily
Demand
m3/day
2025
Served
Population
2020
Average Daily
Demand
m3/day
2015
Served
Population
(h)
Average Daily
Demand
m3/day
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
(g)
S d
Served
Population
469
4700
471
4722
473
4744
476
Harispattuwaa
(e)
Served
Population
in 2010
8
9
10
11
12
13
14
GonigodaPalkumbura
Viguhumpola
Arambegama
Aladeniya
Hedeniya
Narangoda
Kurundugolla
Rajasinghagama
Total
Yahalathanna SR
R
Kulugammana
Malagammana
Nugawela
Hiriyalagammanaa
Kurunduwatta
Yahalathenna Kaanda
Yahalathenna West
W
Ruwanpuraya
Viguhumpola
Narangoda
Kurundugolla
Karanduwawala Ihala
I
Karanduwawala
Pahala
Owathenna
Angoda
Total
(d) =
(c)/(b)
Coverage
Factor
468
D.S.
Division
(c)
Served
Area
S dA
(hec)
G.S. Divisionn
( b)
Total Area
(hec)
G.S..
No..
(a)
Total
Popu
lation
in
2010
705
30
24
79
100
0.95
528
556
102
584
99
6114
104
6442
102
668
106
1,595
67
41
61
100
0.95
920
969
177
1,0018
173
1,0070
182
1,119
177
1,1664
185
986
80
57
72
100
0.95
671
707
129
7443
126
7881
133
8117
130
8500
135
9
9,757
1,783
10,,254
1,741
10,7777
1,831
11,2273
1,788
11,7731
1,861
487
89
512
87
5338
91
5663
89
586
93
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
2,330
Harispattuwaa
Harispattuwaa
72
15
21
100
0.95
462
338
61
10
16
100
0.95
53
56
10
5
59
10
6
62
11
655
10
688
11
2,111
51
100
0.95
117
123
23
1229
22
1336
23
1442
23
148
23
1,210
64
100
0.95
108
114
21
1220
20
1226
21
1332
21
137
22
682
55
14
25
100
0.95
165
174
32
183
31
1992
33
2001
32
209
33
1,039
55
15
27
100
0.95
269
283
52
297
50
3112
53
3226
52
339
54
551
30
16
53
100
0.95
277
292
53
3007
52
3223
55
3338
54
3522
56
1,157
61
100
0.95
36
38
4
40
4
42
444
466
1,573
123
26
21
100
0.95
317
334
61
351
60
3669
63
3886
61
4022
64
705
30
20
100
0.95
132
139
25
1446
25
1553
26
1660
25
167
26
1,595
67
22
33
100
0.95
494
520
95
5447
93
5775
98
6001
95
625
99
680
50
41
82
100
0.95
532
561
103
590
100
6220
105
6448
103
6744
107
480
90
78
87
100
0.95
396
417
76
4338
74
4660
78
4881
76
501
79
729
486
73
122
15
5
21
4
100
100
0.95
0.95
143
19
151
20
3
3,709
28
4
679
159
2
21
3,8899
27
4
662
1667
2
22
4,0097
28
4
696
1775
233
4,285
28
4
680
1822
244
4,4660
29
4
707
39
^tw a{ jtx
j f c}xv
Total
Nsg
Harispattuwaa
Served
Population
P
l i
Average Daily
Demand
m3/day
730
55
38
68
100
0.95
474
499
91
5224
89
5551
94
5776
91
599
95
2,090
82
54
65
100
1.00
1369
1
1,442
264
1,5516
258
1,5593
271
1,666
264
1,7334
275
512
18
16
100
1.00
83
87
16
9
91
15
96
16
1000
16
1044
16
992
31
20
100
1.00
202
213
39
2224
38
2335
40
2446
39
256
41
311
25
25
100
100
1.00
311
328
60
3445
59
3663
62
3880
60
395
63
658
38
100
1.00
49
52
10
5
55
5
58
10
61
10
633
10
1,238
46
44
97
100
1.00
1203
1
1,267
232
1,3332
226
1,4400
238
1,464
232
1,5224
242
Served Area
Factor
(%)
Geographical
Factor
(%)
Average Daily
Demand
m3/day
2035
Served
Population
2030
Average Daily
Demand
m3/day
2025
Served
Population
2020
Average Daily
Demand
m3/day
2015
Served
Population
486
(h)
Average Daily
Demand
m3/day
23
(g)
S d
Served
Population
468
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
(e)
Served
Population
in 2010
22
Nugawela SR
Udadoolwala
Kulugammana
Kurundugahamadda
Ruwanpuraya
Malagammana
Pahala Doolwalaa
Hiriyalagammanaa
Dadahogama
Mapamadulla
Wathuwala
Uyanwatta
Nugawela
Thittapajjala
Embulpuraya
Batuambe
Endaruthenna
Ulladupitiya Eastt
Ulladupitiya Weest
Thittapajjala North
Gonigoda
Attaragama
GonigodaPalkumbura
Dembaralawa
(d) =
(c)/(b)
Coverage
Factor
4422
4477
448
4600
451
443
455
449
4500
4900
491
4522
461
453
4544
4644
465
466
4622
4677
4800
D.S.
Division
(c)
Served
Area
S dA
(hec)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
G.S. Divisionn
( b)
Total Area
(hec)
G.S..
No..
(a)
Total
Popu
lation
in
2010
901
81
79
98
100
1.00
881
928
170
975
166
1,0025
174
1,072
170
1,1116
177
1,360
24
24
100
100
1.00
1360
1
1,433
262
1,5506
256
1,5583
269
1,656
263
1,7223
273
997
45
19
100
1.00
193
203
37
213
36
2224
38
2334
37
2444
39
1,025
20
17
87
100
1.00
895
943
173
991
168
1,0042
177
1,090
173
1,1334
180
2,157
68
68
100
100
1.00
2157
2
2,273
416
2,3389
406
2,5511
427
2,626
416
2,7333
433
718
65
22
34
100
1.00
242
255
47
268
46
2882
48
2995
47
307
49
750
49
100
1.00
58
61
11
6
64
11
6
67
11
700
11
733
12
902
36
36
99
100
1.00
896
944
173
992
169
1,0043
177
1,091
173
1,1335
180
742
48
19
100
1.00
143
151
28
159
27
1667
28
1775
28
1822
29
635
26
13
48
100
1.00
305
321
59
3337
57
3554
60
3770
59
385
61
835
66
27
41
100
1.00
339
357
65
375
64
3994
67
4112
65
429
68
812
48
46
96
100
1.00
778
820
150
862
146
9006
154
9448
150
987
156
723
41
35
86
100
1.00
621
654
120
687
117
7222
123
7555
120
786
125
967
83
64
78
100
1.00
749
789
144
8229
141
8771
148
9111
144
948
150
904
75
42
56
100
1.00
508
535
98
562
95
5991
100
6118
98
6433
102
1,050
107
17
16
100
1.00
165
174
32
183
31
1992
33
2001
32
209
33
144,729
2,697
15,,479
2,630
16,2270
2,765
17,0017
2,698
17,7709
2,809
40
2025
2030
2035
Average Daily
Demand
m3/day
2020
Average Daily
Demand
m3/day
2015
Average Daily
Demand
m3/day
(h)
Average Daily
Demand
m3/day
(g)
Average Daily
Demand
m3/day
(e)
Served
Population
in 2010
(d) =
(c)/(b)
Served Area
Factor
(%)
Geographical
Factor
(%)
100
0.95
339
357
65
375
64
3994
67
4112
65
429
68
100
100
0.95
1512
1
1,593
291
1,6674
284
1,7759
299
1,840
292
1,9115
304
819
39
39
100
100
0.95
774
815
149
857
146
9001
153
9442
149
9800
155
143
Served
Population
P
l i
22
49
Served
Population
12
49
Served
Population
56
1,593
Served
Population
1,653
S d
Served
Population
D.S.
Division
(c)
Served
Area
S dA
(hec)
G.S. Divisionn
( b)
Total Area
(hec)
G.S..
No..
(a)
Total
Popu
lation
in
2010
Coverage
Factor
^tw a{ jtx
j f c}xv
Kulugammana SR
R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
4244
426
4277
433
436
4377
4422
443
4477
449
4500
451
4522
455
456
461
4900
491
4144
416
421
4222
423
4244
Nsg
Senarathgama Soouth
Uguressapitiya
Uggalla
Udamulla
Hamangoda Norrth
Hamangoda Soutth
Udadoolwala
Pahala Doolwalaa
Kulugammana
Dadahogama
Mapamadulla
Malagammana
Nugawela
Hiriyalagammanaa
Kurunduwatta
Thittapajjala
Wathuwala
Uyanwatta
Total
Kondadeniya SR
R
Etamurungagodaa
Inigala
Wegiriya
Rathmale
Kondadeniya
Senarathgama Soouth
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
808
35
32
93
100
0.95
711
749
137
787
134
8227
140
8665
137
9000
1,834
61
26
43
100
0.95
743
783
143
8223
140
8665
147
9005
143
9422
149
910
44
44
101
100
0.95
871
918
168
965
164
1,0014
172
1,060
168
1,1003
175
752
62
53
86
100
0.95
614
647
118
680
116
7115
121
7448
119
778
123
658
76
12
16
100
0.95
98
103
19
1008
18
1114
19
1119
19
1244
20
2,330
72
32
45
100
0.95
985
1
1,038
190
1,0091
185
1,1147
195
1,200
190
1,2449
198
865
55
55
100
100
0.95
822
866
158
910
155
9556
162
1,000
159
1,0441
165
799
52
52
100
100
0.95
757
798
146
8339
143
8882
150
9222
146
959
152
338
61
40
66
100
0.95
212
223
41
2334
40
2446
42
2557
41
267
42
2,111
51
20
39
100
0.95
779
821
150
863
147
9007
154
9449
150
988
157
1,210
64
14
22
100
0.95
253
267
49
281
48
2995
50
3009
49
3222
51
682
55
100
0.95
24
25
2
26
2
27
288
299
1,367
90
60
66
100
0.95
862
908
166
954
162
1,0003
170
1,049
166
1,0992
173
997
47
17
36
100
0.95
343
361
66
379
64
3998
68
4116
66
4333
69
1,173
24
33
100
0.95
371
391
72
411
70
4332
73
4552
72
4700
75
11,663
2,133
12,,257
2,084
12,8882
2,187
13,4473
2,135
14,0021
2,224
1,182
53
13
24
100
0.95
274
289
53
3004
52
3220
54
3335
53
349
55
1,988
32
32
99
100
0.95
1878
1
1,979
362
2,0080
353
2,1186
371
2,286
362
2,3779
377
982
57
100
0.95
49
52
10
5
55
5
58
10
61
10
633
10
1,828
54
35
65
100
0.95
1121
1
1,181
216
1,2241
211
1,3304
222
1,364
216
1,4119
225
1,506
47
47
99
100
0.95
1417
1
1,493
273
1,5569
267
1,6649
280
1,725
273
1,7995
285
1,653
56
44
79
100
0.95
1242
1
1,309
239
1,3376
234
1,4446
246
1,512
240
1,5773
249
41
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
4200
421
4222
428
429
4300
431
433
436
4300
431
4322
4344
435
443
439
4400
3
4
441
445
Hamangoda Norrth
Total
Wegiriya SR
Polwatta
Wegiriya
Rathmale
Madapathagama
Gohagoda
Narangaskumburra
Banwelgolla
Udamulla
Hamangoda Norrth
Total
Gohagoda SR
Narangaskumburra
Banwelgolla
Pallemulla
Haloluwa Pallegaama
Haloluwa
Pahala Doolwalaa
Total
Yatihalagala SR
Warathenna
Yatihalagala
Pallegama
Kumburegedara
Yatihalagala Udagaama
Total
Nsg
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
28
100
Average Daily
Demand
m3/day
Served
Population
P
l i
2035
Average Daily
Demand
m3/day
Served
Population
2030
Average Daily
Demand
m3/day
2025
Served
Population
486
2020
Average Daily
Demand
m3/day
0.95
2015
Served
Population
17
(h)
Average Daily
Demand
m3/day
61
(g)
S d
Served
Population
1,834
(e)
Served Area
Factor
(%)
Geographical
Factor
(%)
Harispattuwaa
(d) =
(c)/(b)
Served
Population
in 2010
436
D.S.
Division
(c)
Coverage
Factor
G.S. Divisionn
( b)
Served
Area
S dA
(hec)
G.S..
No..
(a)
Total
Popu
lation
in
2010
Total Area
(hec)
^tw a{ jtx
j f c}xv
512
94
5338
91
5665
96
5991
94
615
98
6
6,815
1,247
7,1163
1,217
7,5528
1,279
7,874
1,248
8,1993
1,299
2,378
42
42
100
100
0.95
2259
2
2,380
435
2,5501
425
2,6629
447
2,749
436
2,8661
454
982
57
54
94
100
0.95
879
926
169
973
165
1,0023
174
1,070
170
1,1113
176
1,828
54
19
35
100
0.95
609
642
117
675
115
7009
120
7441
117
771
122
653
29
29
99
100
0.95
615
648
119
681
116
7116
122
7449
119
779
124
1,615
50
50
100
100
0.95
1541
1
1,624
297
1,7707
290
1,7794
305
1,876
297
1,9552
309
540
46
11
24
100
0.95
122
129
24
1336
23
1443
24
1550
24
156
25
871
58
14
24
100
0.95
199
210
38
2221
38
2332
39
2443
39
2533
40
808
35
100
0.95
67
71
13
7
75
13
7
79
13
833
13
866
14
1,834
61
18
30
100
0.95
514
542
99
570
97
5999
102
6226
99
651
103
7
7,172
1,311
7,5539
1,282
7,9924
1,346
8,287
1,314
8,6222
1,367
540
46
35
76
100
0.95
387
408
75
4229
73
4551
77
4772
75
491
78
871
58
44
76
100
0.95
627
661
121
695
118
7330
124
7663
121
7944
126
942
47
47
101
100
0.95
903
951
174
1,0000
170
1,0051
179
1,099
174
1,1444
181
689
59
53
90
100
0.95
588
620
113
652
111
6885
116
7116
114
745
118
1,780
74
74
99
100
0.95
1680
1
1,770
324
1,8860
316
1,9955
332
2,045
324
2,1228
337
658
76
100
0.95
33
35
3
37
39
41
433
4
4,445
813
4,6673
794
4,9911
835
5,136
815
5,3445
847
Harispattuwaa
Harispattuwaa
970
95
51
54
100
0.95
495
522
95
5449
93
5777
98
6003
96
628
100
861
59
14
24
100
0.95
195
205
38
215
37
2226
38
2336
37
246
39
Harispattuwaa
Harispattuwaa
580
42
42
100
100
0.95
553
583
107
613
104
6444
109
6774
107
701
111
765
70
31
44
100
0.95
321
338
62
355
60
3773
63
3990
62
406
64
1
1,648
302
1,7732
294
1,8820
308
1,903
302
1,9881
314
42
^tw a{ jtx
j f c}xv
1
2
3
4
5
6
7
8
9
408
409
4100
411
4122
413
4144
415
419
Nsg
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Served
Population
P
l i
Average Daily
Demand
m3/day
992
33
14
42
100
1.00
421
439
80
461
78
4885
82
5007
80
528
84
512
18
16
86
100
1.00
443
462
85
486
83
5111
87
5334
85
556
88
890
98
13
13
100
1.00
115
120
22
1226
21
1332
22
1338
22
1444
23
773
54
100
1.00
41
43
4
45
4
47
499
511
760
72
18
25
100
1.00
189
197
36
2007
35
2118
37
2228
36
237
38
838
58
10
100
1.00
81
84
15
8
88
15
92
16
966
15
1000
16
610
54
51
95
100
1.00
582
607
111
6338
108
6771
114
7002
111
731
116
10
Served Area
Factor
(%)
Geographical
Factor
(%)
Average Daily
Demand
m3/day
2035
Served
Population
2030
Average Daily
Demand
m3/day
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
2025
Served
Population
438
441
435
443
4344
446
2020
Average Daily
Demand
m3/day
7
8
Harispattuwaa
2015
Served
Population
4400
(h)
Average Daily
Demand
m3/day
(g)
S d
Served
Population
445
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
Harispattuwaa
(e)
Served
Population
in 2010
Kurundugahamadda SR
Ruwanpuraya
Kurundugahamadda
Mahathenna
Bulathgolla
Yatihalagala
Udagama
Yatihalagala
Pallegama
Bogahakanda
Kumburegedara
Haloluwa
Pahala Doolwalaa
Haloluwa Pallegaama
Seewaleekanda
Total
Uduwawala SR
Hapugoda
Ranawana West
Ranawana East
Udabokalawela
Pallebokalawela
Katugasthota
Etamurungagodaa
Yatiwawala
Uduwawala East
Total
Harispattuwa Tootal
(d) =
(c)/(b)
Coverage
Factor
4600
448
458
4444
D.S.
Division
(c)
Served
Area
S dA
(hec)
1
2
3
4
G.S. Divisionn
( b)
Total Area
(hec)
G.S..
No..
(a)
Total
Popu
lation
in
2010
800
25
100
1.00
50
52
10
5
55
5
58
10
61
10
633
1,810
83
100
1.00
80
83
15
8
87
15
91
15
955
15
999
16
658
39
14
35
100
1.00
231
241
44
253
43
2666
45
2778
44
289
46
732
43
100
1.00
30
31
3
33
35
377
399
586
51
48
93
100
1.00
546
569
104
598
102
6229
107
6558
104
685
109
2
2,928
536
3,0077
523
3,2235
549
3,383
536
3,5222
560
1,040
110
45
41
100
0.95
402
424
78
4446
76
4669
80
4990
78
5100
81
1,496
61
61
100
100
0.95
1415
1
1,491
273
1,5567
266
1,6647
280
1,722
273
1,7992
284
1,813
67
67
100
100
0.95
1723
1
1,815
332
1,9908
324
2,0005
341
2,097
332
2,1882
346
1,088
111
76
69
100
0.95
708
746
136
784
133
8224
140
8662
137
897
142
972
88
88
101
100
0.95
928
978
179
1,0028
175
1,0080
183
1,129
179
1,1775
186
1,448
23
23
98
100
0.95
1349
1
1,421
260
1,4493
254
1,5569
267
1,641
260
1,7008
271
1,182
53
40
75
100
0.95
842
887
162
9332
158
9880
166
1,025
163
1,0667
169
1,803
29
29
101
100
0.95
1723
1
1,815
332
1,9908
324
2,0005
341
2,097
332
2,1882
346
1,132
48
30
62
100
0.95
666
702
128
7338
125
7776
132
8112
129
845
134
100,279
1,880
10,,804
1,835
11,3355
1,930
11,8875
1,883
12,3358
1,959
922,579
16,935
97,,301
16,528
102,,265
17,373
106,958
16,961
111,3306
17,652
43
^tw a{ jtx
j f c}xv
Pujapitiya DS area
Design Param
meters
2015
2020
20225
2030
2
2035
Growth Ratee
0.60%
0.55%
0.555%
0.55%
0..55%
14
14
144
14
14
Average Fam
mily Size
4.59
4.59
4.559
4.59
4
4.59
101.67
101.67
101.67
101.67
1001.67
6%
6%
6%
%
6%
6%
107.77
1007.77
30%
25%
2
25%
166
154
1554
144
144
11
618
Nsg
Megodagama
Pathadumba
ra
7709
30
23
100
18
118
17
121
6696
93
100
0.889
53
555
57
59
61
63
9908
32
16
50
100
0.882
372
3833
64
394
61
405
62
416
60
428
622
1,090
42
35
83
100
0.991
827
8522
141
876
135
900
139
925
133
951
1377
2,019
89
83
93
100
0.779
1488
1,5333
254
1,576
243
1,620
249
1,665
239
1,711
2466
1,015
26
26
100
100
0.774
751
7744
128
796
123
818
126
841
121
864
1244
9946
29
100
0.67
44
455
46
47
48
49
6621
30
100
0.887
36
377
38
39
40
41
1,160
52
52
100
100
0.991
1056
1,0888
180
1,118
172
1,149
177
1,181
170
1,214
1744
1,079
41
41
100
100
0.998
1057
1,0889
181
1,119
172
1,150
177
1,182
170
1,215
1755
9920
66
11
17
100
0.999
153
1588
26
162
25
167
26
172
25
177
25
0.64
106
1099
18
112
17
115
44
2030
2035
Average Daily
Demand
m3/day
Served
Population
20225
Average Daily
Demand
m3/day
2
2020
(h)
Served
Population
2015
(gg)
Average Daily
Demand
m3/day
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
(e)
Served
Population
Kahawaththa SR
Bamunupola
Kiralagama
Batugoda North
Diwanawatta
Mullegama South
Mullegama North
Kaluwana South
Kaluwana North
Kahawatta North
Kahawatta South
(d) =
(c)/(b)
Served
Population
in 2010
544
545
550
552
553
554
555
556
557
558
D.S.
Division
(c)
Coverage
g
Factor
1
2
3
4
5
6
7
8
9
10
G.S.Division
( b)
Geographical
Factor
(%)
G.S.
No.
((a)
T
Total
Poopul
attion
in
20010
Served Area
Factor
(%)
1077.77
30%
Served Area
(hec)
107.77
35%
Total Area
(hec)
107.77
NRW
A
D il
Average
Daily
Demand
m3/day
Served
Population
Served
Population
Average Daily
Demand
m3/day
177
1
2
3
4
5
6
7
8
527
528
529
530
531
532
533
534
1
2
3
4
5
6
7
8
9
10
517
522
523
524
525
526
527
530
532
534
11
536
Nsg
Total
Ankumbura SR
Batagolladeniya
Ihalamulla
Dehiwatta
Egodamulla South
Egodamulla Northh
Ankumbura South
Ankumbura Northh
Pallegama Pahala
Total
Galhinna SR
Rambukewela
Watagalathenna
Galkanda
Galhinna
Kovilamuduna
Palliya Kotuwa
Batagolladeniya
Egodamulla South
Ankumbura South
Pallegama Pahala
Ankumbura
Udagama
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
25
45
100
120
804
116
826
1199
1,205
101
60
59
100
0.557
408
4200
70
432
67
444
68
456
66
469
677
7,2883
1,207
7,487
1,154
7,695
1,184
7,909
11,139
8,129
1,1668
766
123
761
117
782
Average Daily
Demand
m3/day
7400
2035
A
D il
Average
Daily
Demand
m3/day
Served
Population
718
Served
Population
0.998
2030
Average Daily
Demand
m3/day
Served
Population
Geographical
Factor
(%)
Average Daily
Demand
m3/day
Girakaduwa
56
20225
Served
Population
631
1,642
2
2020
(h)
Average Daily
Demand
m3/day
13
Pathadumba
ra
Pathadumba
ra
2015
(gg)
Served
Population
Ambathenna
(e)
Served
Population
in 2010
629
(d) =
(c)/(b)
Coverage
g
Factor
12
D.S.
Division
(c)
Served Area
Factor
(%)
G.S.Division
( b)
Served Area
(hec)
G.S.
No.
((a)
T
Total
Poopul
attion
in
20010
Total Area
(hec)
^tw a{ jtx
j f c}xv
2,496
91
17
19
100
0.999
462
4766
79
489
75
503
77
517
74
531
6668
79
59
75
100
0.771
354
3655
61
375
58
385
59
396
57
407
588
1,549
68
43
63
100
0.778
764
7877
130
809
125
831
128
854
123
878
1266
49
1,124
89
26
29
100
0.990
295
3044
50
312
48
321
49
330
47
339
1,172
210
14
100
0.998
77
799
13
81
12
83
13
85
12
87
13
1,114
80
38
48
100
0.992
487
5022
83
516
79
530
82
545
78
560
800
1,274
115
50
43
100
0.779
438
4511
75
464
71
477
73
490
70
504
722
7720
49
26
53
100
1.000
382
3944
65
405
62
416
64
428
62
440
63
3,3558
556
3,451
530
3,546
545
3,645
523
3,746
5377
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
1,373
215
100
0.887
11
111
11
11
11
11
8855
62
18
29
100
0.990
223
2300
38
236
36
243
37
250
36
257
377
Pujapitiya
4460
138
12
100
0.61
24
255
26
27
28
29
2,420
67
48
72
100
0.889
1543
1,5990
264
1,634
252
1,679
258
1,726
248
1,774
2555
1,115
34
34
100
100
1.000
1115
1,1449
191
1,181
182
1,214
187
1,248
179
1,283
1844
1,897
36
36
100
100
0.994
1783
1,8337
305
1,888
291
1,940
299
1,994
287
2,049
2944
2,496
91
39
43
100
0.999
1059
1,0991
181
1,121
173
1,152
177
1,184
170
1,217
1755
1,124
89
11
12
100
0.990
125
1299
21
133
20
137
21
141
20
145
21
1,114
80
28
35
100
0.992
359
3700
61
380
59
391
60
402
58
413
59
7720
49
14
100
1.000
103
1066
18
109
17
112
17
115
17
118
177
7729
58
58
100
100
0.887
634
6533
108
671
103
690
106
709
102
729
1055
45
1
2
3
4
5
6
7
8
9
10
11
12
13
502
503
513
516
517
518
519
520
521
522
527
541
547
508
2
3
4
5
510
511
512
542
Nsg
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
6624
54
51
94
100
88
586
84
602
877
8855
96
45
47
100
1.000
401
4133
68
424
65
436
67
448
64
460
666
744
90
555
85
570
Average Daily
Demand
m3/day
5400
2035
A
D il
Average
Daily
Demand
m3/day
Served
Population
524
Served
Population
Served
Population
0.889
2030
Average Daily
Demand
m3/day
Average Daily
Demand
m3/day
20225
Served
Population
2
2020
(h)
Average Daily
Demand
m3/day
Geographical
Factor
(%)
2015
(gg)
Served
Population
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
(e)
Served
Population
in 2010
Welgala
Alawatta
Uda Kithulgolla
Pahala Kithulgolla
Total
Godahena SR
Bokkawala
Wewala
Medagoda
Weligalla
Rambukewela
Dolapihilla North
Dolapihilla South
Kahatagasthenna
Godahena
Watagalathenna
Batagolladeniya
Watagoda
Diddeniya
Total
Pujapitiya I
Marathugoda
North
Alagoda
Madadeniya
Warakadeniya
Ovissa North
(d) =
(c)/(b)
Coverage
g
Factor
537
538
539
540
D.S.
Division
(c)
Served Area
Factor
(%)
12
13
14
15
G.S.Division
( b)
Served Area
(hec)
G.S.
No.
((a)
T
Total
Poopul
attion
in
20010
Total Area
(hec)
^tw a{ jtx
j f c}xv
8860
62
55
89
100
0.559
450
4644
77
477
73
490
75
504
72
518
1,352
193
79
41
100
0.61
338
3488
58
358
55
368
57
378
54
389
566
8,9556
1,486
9,204
1,417
9,460
1,455
9,724
11,397
9,994
1,4336
9905
98
100
0.779
22
233
24
25
26
27
1,091
75
56
75
100
0.67
546
5633
93
579
89
595
92
612
88
629
900
4491
71
10
14
100
0.998
68
700
12
72
11
74
11
76
11
78
11
1,053
137
47
34
100
0.889
322
3322
55
341
52
350
54
360
52
370
53
1,373
215
130
60
100
0.887
722
7444
123
765
118
786
121
808
116
830
1199
9975
57
40
70
100
0.778
534
5500
91
565
87
581
89
597
86
614
888
1,126
137
114
83
100
0.888
825
8500
141
874
135
898
138
923
133
949
1366
7757
118
109
92
100
0.773
510
5255
87
540
83
555
85
570
82
586
844
1,120
66
25
38
100
0.771
301
3100
51
319
49
328
50
337
48
346
500
8855
62
44
71
100
0.990
546
5633
93
579
89
595
92
612
88
629
900
2,496
91
26
29
100
0.999
706
7277
121
747
115
768
118
789
113
811
1177
9949
122
72
59
100
0.336
202
2088
34
214
33
220
34
226
32
232
33
1,022
67
11
16
100
0.883
139
1433
24
147
23
151
23
155
22
159
23
5,6008
929
5,766
888
5,926
911
6,091
875
6,260
8988
Pujapitiya
9985
80
23
29
100
0.997
275
2833
47
291
45
299
46
307
44
316
45
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
8804
58
39
67
100
0.884
454
4688
78
481
74
494
76
508
73
522
75
1,095
64
50
78
100
0.991
779
8033
133
825
127
848
131
872
125
896
1299
4417
34
34
100
100
0.773
304
3133
52
322
50
331
51
340
49
349
500
7733
60
12
100
0.774
63
655
11
67
10
69
11
71
10
73
100
46
1
2
3
4
5
6
7
8
9
10
1
2
510
513
514
515
518
541
542
543
546
547
492
493
Nsg
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
2035
Average Daily
Demand
m3/day
2030
A
D il
Average
Daily
Demand
m3/day
Served
Population
20225
54
58
100
0.889
360
3711
62
381
59
392
60
403
58
414
59
42
55
100
0.998
544
5611
93
577
89
593
91
609
88
626
900
1,022
67
100
0.883
13
133
13
13
13
13
1,071
63
63
100
100
0.881
868
8944
148
919
141
945
145
971
140
998
1433
5539
33
27
82
100
0.886
379
3911
65
402
62
413
64
424
61
436
63
9908
32
16
50
100
0.882
372
3833
64
394
61
405
62
416
60
428
622
7756
64
56
88
100
0.993
615
6344
105
652
100
670
103
689
99
708
1022
1,090
42
17
100
0.991
165
1700
28
175
27
180
28
185
27
190
277
2,019
89
100
0.779
108
1111
18
114
18
117
18
120
17
123
188
9946
29
27
93
100
0.67
590
6088
101
625
96
642
99
660
95
678
977
6621
30
15
50
100
0.887
270
2788
46
286
44
294
45
302
43
310
45
6,3446
1,053
6,524
1,005
6,705
1,032
6,890
991
7,080
1,0117
Served
Population
93
77
Average Daily
Demand
m3/day
6696
1,017
Geographical
Factor
(%)
Served
Population
2
2020
Average Daily
Demand
m3/day
2015
Served
Population
(h)
Average Daily
Demand
m3/day
(gg)
Served
Population
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
(e)
Served
Population
in 2010
Kiralagama
Paleepana
Diddeniya
Batagalla North
Batagalla South
Batugoda North
Batugoda South
Diwanawatta
Mullegama South
Kaluwana South
Kaluwana North
Total
Pujapitiya II
Alagoda
Medagoda
Uggahakumbura
Dombagammana
Dolapihilla North
Watagoda
Ovissa North
Ovissa South
Paleepana
Diddeniya
Total
Bokkawala
Gallella
Maruddana
(d) =
(c)/(b)
Coverage
g
Factor
545
546
547
548
549
550
551
552
553
555
556
D.S.
Division
(c)
Served Area
Factor
(%)
6
7
8
9
10
11
12
13
14
15
16
G.S.Division
( b)
Served Area
(hec)
G.S.
No.
((a)
T
Total
Poopul
attion
in
20010
Total Area
(hec)
^tw a{ jtx
j f c}xv
8804
58
19
33
100
0.884
221
2288
38
234
36
241
37
248
36
255
377
4491
71
58
82
100
0.998
393
4055
67
416
64
428
66
440
63
452
65
5586
23
22
96
100
0.771
398
4100
68
421
65
433
67
445
64
457
666
1,086
63
63
100
100
0.995
1032
1,0663
176
1,093
168
1,123
173
1,154
166
1,186
1700
9975
57
17
30
100
0.778
227
2344
39
241
37
248
38
255
37
262
388
9949
122
50
41
100
0.336
140
1444
24
148
23
152
23
156
22
160
23
7733
60
52
87
100
0.774
470
4844
80
497
77
511
79
525
75
540
788
9985
92
58
63
100
0.886
534
5500
91
565
87
581
89
597
86
614
888
1,017
77
35
45
100
0.998
453
4677
77
480
74
493
76
507
73
521
75
1,022
67
46
69
100
0.883
582
6000
99
617
95
634
98
652
94
670
966
4,5885
759
4,712
726
4,844
746
4,979
716
5,117
7366
6631
64
56
88
100
0.779
436
4499
74
461
71
474
73
487
70
501
722
7753
82
76
93
100
0.449
342
3522
58
362
56
372
57
382
55
393
566
47
14
14
15
509
513
516
Nsg
6698
69
54
78
100
80
497
77
511
79
525
75
540
788
6691
58
58
100
100
0.990
622
6411
106
659
101
677
104
696
100
715
1033
81
Average Daily
Demand
m3/day
2035
A
D il
Average
Daily
Demand
m3/day
Served
Population
Served
Population
2030
Average Daily
Demand
m3/day
4844
Served
Population
470
20225
Average Daily
Demand
m3/day
0.886
2
2020
Served
Population
(h)
Average Daily
Demand
m3/day
Geographical
Factor
(%)
2015
(gg)
Served
Population
508
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
Pujapitiya
(e)
Served
Population
in 2010
13
Harankahawa
Henegama
Ambaruppa
Pathirada
Molagoda
Udahingulwala
Bokkawala
Wewala
Waldeniya
Pahala Hingulwalaa
Marathugoda
North
Marathugoda Soutth
Medagoda
Weligalla
Total
Total Pujapitiya
(d) =
(c)/(b)
Coverage
g
Factor
494
495
496
497
498
499
502
503
504
507
D.S.
Division
(c)
Served Area
Factor
(%)
3
4
5
6
7
8
9
10
11
12
G.S.Division
( b)
Served Area
(hec)
G.S.
No.
((a)
T
Total
Poopul
attion
in
20010
Total Area
(hec)
^tw a{ jtx
j f c}xv
6656
48
41
85
100
0.887
488
5033
83
517
80
531
82
546
78
561
5548
214
40
19
100
0.69
71
733
12
75
12
77
12
79
11
81
122
8808
50
50
100
100
0.882
663
6833
113
702
108
722
111
742
107
763
1100
1,012
307
85
28
100
0.889
249
2577
43
264
41
271
42
279
40
287
41
9905
98
56
57
100
0.779
409
4211
70
433
67
445
69
457
66
470
688
1,091
75
19
25
100
0.67
185
1911
32
196
30
201
31
207
30
213
31
9970
82
82
100
100
0.993
902
9299
154
955
147
982
151
1,009
145
1,037
1499
8870
47
40
85
100
0.775
555
5722
95
588
91
604
93
621
89
638
922
Pujapitiya
9985
80
41
51
100
0.997
490
5055
84
519
80
533
82
548
79
563
81
Pujapitiya
Pujapitiya
Pujapitiya
9979
120
90
75
100
0.993
683
7044
117
724
111
744
115
765
110
786
1133
4491
71
100
0.998
20
211
22
23
24
25
1,053
137
74
54
100
0.889
506
5211
86
535
82
550
85
565
81
581
83
7,3006
1,210
7,509
1,157
7,717
1,190
7,932
11,139
8,154
1,1774
43,4442
7,200
44,653
6,877
45,893
7,063
47,170
66,780
48,480
6,9666
48
^tw a{ jtx
j f c}xv
Pathadum
mbara DS area
(a)
T
Total
Poopula
ttion
in
22010
( b)
(c)
(d) =
(c)/(b)
(e)
(g)
(h)
Served
Population
in 2010
Served
Population
P
l i
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
Served
Population
A
D il
Average
Daily
Demand
m3/day
Served
Population
Average
g Dailyy
Demand
m3/day
2035
0.80%
14
4.36
107.03
4%
111.31
25%
148
C
Coverage
Factor
2030
0.80%
14
4.36
107.03
4%
111.31
25%
148
Geographical
Factor
(%)
D.S.
Division
2025
0.85%
14
4.36
107.03
4%
111.31
30%
159
Served Area
Factor
(%)
G.S. Division
2020
0.85%
14
4.36
107.03
4%
111.31
30%
159
Served Area
(hec)
G.S.
No.
20015
0.990%
14
44.36
1077.03
4%
1111.31
335%
171
Total Area
(hec)
Design Paraameters
Growth Ratte
Domestic Average Consumption
Average Fam
mily Size
Per Capita per
p day
Allow for noon domestic
Per Capita per
p day
NRW
Demand perr capita per day
61
47
113
97
25
7
107
19
41
15
95
20
100
100
100
100
00.68
0
0.97
1
1.00
0
0.94
319
180
2205
330
3344
1888
2,3006
3455
57
32
395
59
348
196
2,4066
360
55
31
383
57
363
204
2,510
376
58
32
399
60
378
212
2,612
391
56
31
388
58
393
221
2,718
407
58
33
4
403
60
2015
2
2015
20025
20300
2035
Doragamuwa SR
1
2
3
4
598
599
600
602
Udurawana
Puwakgahadeniya
Doragamuwa
Walpaladeniya
Pathadumbara
Pathadumbara
1,145
1,243
2,329
1,790
612
Galadeniya
Pathadumbara
2,914
149
56
38
100
1
1.00
1095
1,1445
196
1,1944
190
1,246
198
1,297
193
1,350
2
200
6
7
620
623
Yatawara
Pathadumbara
Deegahawathura
Pathadumbara
1,422
1,200
285
113
22
17
8
15
100
100
00.88
0
0.89
97
161
101
1688
17
29
105
175
17
28
110
183
17
29
114
190
17
28
119
198
18
29
625
Aluthgama
Pathadumbara
1,294
85
14
16
100
0
0.92
196
2055
35
214
34
223
35
232
34
241
36
626
Bogahakumbura
Pathadumbara
1,496
79
65
82
100
0
0.88
1083
1,1333
194
1,1822
188
1,233
196
1,283
190
1,335
1
198
5,9225
1,014
6,1800
983
6,448
1,024
6,709
995
6,982
1,,035
Total
Nsg
Pathadumbara
Pathadumbara
49
Served
Population
Average
g Dailyy
Demand
m3/day
00.99
0
0.96
0
0.99
0
0.88
0
0.93
0
0.98
0
0.52
0
0.57
A
D il
Average
Daily
Demand
m3/day
100
100
100
100
100
100
100
100
2035
Served
Population
100
22
66
31
16
71
90
14
20300
Average Daily
Demand
m3/day
42
14
44
19
8
40
47
14
20025
Served
Population
42
61
66
62
47
56
52
101
2
2015
Average Daily
Demand
m3/day
C
Coverage
Factor
1,448
1,217
9920
1,288
1,563
1,642
1,258
1,205
2015
Served
Population
(h)
Average Daily
Demand
m3/day
(g)
Served
Population
P
l i
(e)
Served
Population
in 2010
(d) =
(c)/(b)
Geographical
Factor
(%)
D.S.
Division
(c)
Served Area
Factor
(%)
G.S. Division
( b)
Served Area
(hec)
G.S.
No.
(a)
T
Total
Poopula
ttion
in
22010
Total Area
(hec)
^tw a{ jtx
j f c}xv
1434
259
605
347
232
1149
591
95
1,5000
271
6333
3633
2433
1,2002
6188
999
257
46
108
62
42
206
106
17
1,565
283
660
379
254
1,2544
645
103
249
45
105
60
40
199
103
16
1,633
295
689
395
265
1,308
673
107
260
47
110
63
42
208
107
17
1,699
307
717
411
276
1,361
700
111
252
46
106
61
41
202
104
16
1,768
319
746
428
287
1,416
728
116
2262
47
1
111
64
43
2
210
1
108
17
4,9229
844
5,143
817
5,365
854
5,582
828
5,808
8
862
Moragaskotuwa SR
R
1
2
3
4
5
6
7
8
616
617
618
619
628
629
630
631
Egodagama
Millanga
Megodagama
Molagodayawatta
Moonamale
Ambathenna
Kendaliyadda
Girakaduwa
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Total
Kahalla SR
1
605
Kahalla
Pathadumbara
2,196
130
130
100
100
0
0.88
1932
2,0221
346
2,108
335
2,199
350
2,288
340
2,381
3
353
606
Kalugalawatta
Pathadumbara
2,234
57
57
100
100
0
0.88
1966
2,0556
352
2,145
341
2,238
356
2,329
346
2,424
3
360
607
Galewatta
Pathadumbara
2,040
40
40
100
100
0
0.88
1795
1,8777
321
1,958
311
2,043
325
2,126
316
2,212
3
328
608
Nawayalathenna
Pathadumbara
2,342
70
58
82
100
0
0.88
1693
1,7771
303
1,848
294
1,928
307
2,006
298
2,088
3
310
611
Udathalavinna
Madige
Pathadumbara
3,409
46
24
52
100
0
0.88
1565
1,6337
280
1,708
272
1,782
283
1,854
275
1,929
2
286
617
Millanga
Pathadumbara
1,217
61
19
31
100
0
0.96
364
381
65
397
63
414
66
431
64
449
67
618
Megodagama
Pathadumbara
9920
66
22
34
100
0
0.99
306
3200
55
334
53
348
55
362
54
377
56
619
Molagodayawatta
Pathadumbara
1,288
62
43
69
100
0
0.88
786
8222
141
858
136
895
142
931
138
969
1
144
10,885
1,863
11,356
1,805
11,847
1,884
12,327
1,831
12,829
1,904
Total
Nsg
50
(c)
(d) =
(c)/(b)
(e)
(g)
(h)
Served Area
Factor
(%)
Geographical
Factor
(%)
C
Coverage
Factor
Served
Population
in 2010
Served
Population
P
l i
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
Served
Population
A
D il
Average
Daily
Demand
m3/day
Served
Population
Average
g Dailyy
Demand
m3/day
G.S. Division
( b)
Served Area
(hec)
G.S.
No.
(a)
T
Total
Poopula
ttion
in
22010
Total Area
(hec)
^tw a{ jtx
j f c}xv
Pathadumbara
2,342
1,764
2,045
70
27
60
5
27
60
7
100
100
100
100
100
00.88
0
0.88
0
0.92
147
1552
1881
1544
1,6223
1,9667
26
278
337
161
1,693
2,0522
26
269
326
168
1,766
2,141
27
281
340
175
1,838
2,228
26
273
331
182
1,913
2,319
27
2
284
3
344
Pathadumbara
1,390
119
53
45
100
0
0.95
588
6155
105
642
102
670
107
697
103
725
1
108
Pathadumbara
3,036
95
70
74
100
0
0.88
1968
2,0558
352
2,1477
341
2,240
356
2,331
346
2,426
3
360
6,4117
1,098
6,695
1,064
6,985
1,111
7,269
1,079
7,565
1,,123
D.S.
Division
2015
2
2015
20025
20300
2035
Balanagala SR
1
2
3
608
610
613
614
615
Nawayalathenna
Balanagala
Pallethalavinna
Pallethalavinna
Ihala
Udathalavinna
Pathadumbara
Pathadumbara
Total
Pitiyagedara SR
1
2
3
4
5
6
7
8
597
636
640
642
643
644
645
670
Eriyagasthenna
Pathadumbara
Leemagahadeniya
Madawala
Pitiyegedara
Walala
Ketakahala
Thalkotuwa
Pallegama
Pathadumbara
Kundasale
1,358
1,764
2,102
1,203
8801
1,026
1,227
1,187
90
86
97
42
58
171
45
70
15
17
70
13
38
148
45
70
17
19
72
31
66
86
100
100
100
100
100
100
100
100
100
100
00.70
0
0.99
0
0.99
0
0.90
0
0.98
0
0.99
0
0.99
0
0.95
158
337
1499
335
519
876
1215
1128
1655
3522
1,5668
3500
5433
916
1,2771
1,1880
28
60
269
60
93
157
218
202
172
367
1,6366
365
566
956
1,3266
1,231
27
58
260
58
90
152
211
196
179
383
1,707
381
590
997
1,383
1,284
28
61
271
61
94
159
220
204
186
399
1,776
396
614
1,038
1,439
1,336
28
59
264
59
91
154
214
198
194
415
1,848
412
639
1,080
1,497
1,390
29
62
2
274
61
95
1
160
2
222
2
206
671
Wavinna
Kundasale
1,163
115
15
13
100
0
0.95
144
151
26
158
25
165
26
172
26
179
27
10
672
Udagama North
Kundasale
9960
44
14
100
0
0.95
124
1300
22
136
22
142
23
148
22
154
23
11
676
Ihala Gonagama
Kundasale
8887
210
15
100
0
0.95
60
633
11
66
10
69
11
72
11
75
11
6,6889
1,146
6,979
1,109
7,280
1,158
7,576
1,126
7,883
1,,170
Total
Nsg
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
51
( b)
(c)
(d) =
(c)/(b)
(e)
(g)
(h)
D.S.
Division
Served Area
(hec)
Served Area
Factor
(%)
Geographical
Factor
(%)
C
Coverage
Factor
Served
Population
in 2010
Served
Population
P
l i
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
Served
Population
A
D il
Average
Daily
Demand
m3/day
Served
Population
Average
g Dailyy
Demand
m3/day
G.S.
No.
(a)
T
Total
Poopula
ttion
in
22010
Total Area
(hec)
^tw a{ jtx
j f c}xv
Walpaladeniya
Meegammana
West
Udathalavinna
Madige
Galadeniya
Pathadumbara
1,790
97
19
20
100
0
0.94
330
3455
59
360
57
376
60
391
58
407
60
Pathadumbara
1,300
88
14
16
100
0
0.94
196
2055
35
214
34
223
35
232
34
241
36
Pathadumbara
3,409
46
22
48
100
0
0.88
1435
1,5001
257
1,5666
249
1,634
260
1,700
252
1,769
2
263
Pathadumbara
Pallethalavinna Ihala
Pathadumbara
Millanga
Moonamale
Total
Jambugahapitiya SR
R
Galadeniya
Deegahawathura
Mahakumbura
Aluthgama
Paranagama
Moonamale
Kendaliyadda
Girakaduwa
Pathadumbara
2,914
1,390
1,217
1,563
149
119
61
47
31
33
29
16
21
28
47
33
100
100
100
100
11.00
0
0.95
0
0.96
0
0.93
606
366
546
479
6344
3833
571
501
4,1440
109
66
98
86
710
661
400
596
523
4,3200
105
64
95
83
687
690
417
622
546
4,508
110
66
99
87
717
718
434
647
568
4,690
107
64
96
84
695
747
452
673
591
4,880
1111
67
1
100
88
7
725
2,914
1,200
9943
1,294
7778
1,563
1,258
1,205
1,186
1,705
2,026
2,074
1,860
149
113
78
85
76
47
52
101
53
81
67
43
94
62
86
75
85
76
24
5
38
53
35
39
5
35
42
76
96
100
100
51
10
38
100
43
58
12
37
100
100
100
100
100
100
100
100
100
100
100
100
100
11.00
0
0.89
0
0.94
0
0.92
0
0.70
0
0.93
0
0.52
0
0.57
0
0.80
1
1.00
1
1.00
0
0.93
0
0.97
1213
813
852
1190
545
742
63
258
949
737
1179
224
672
1,2669
8500
891
1,2445
5700
776
666
2700
9922
771
1,2333
2344
7033
217
146
153
213
98
133
11
46
170
132
211
40
120
1,3244
887
930
1,299
595
810
69
282
1,035
804
1,2866
244
733
211
141
148
207
95
129
11
45
165
128
205
39
117
1,381
925
970
1,355
621
845
72
294
1,080
839
1,342
255
765
220
147
154
215
99
134
11
47
172
133
213
41
122
1,437
963
1,009
1,410
646
879
75
306
1,124
873
1,397
265
796
213
143
150
209
96
130
11
45
167
130
207
39
118
1,495
1,002
1,050
1,467
672
915
78
318
1,170
908
1,454
276
828
2222
1
149
1
156
2
218
1
100
1
136
12
47
1
174
1
135
2
216
41
1
123
9,8770
1,690
10,298
1,641
10,744
1,708
11,180
1,658
11,633
1,729
G.S. Division
2015
2
2015
20025
20300
2035
Udathalavinna SR
1
602
603
611
4
5
6
7
612
614
617
628
1
2
3
4
5
6
7
8
9
10
11
12
13
612
623
624
625
627
628
630
631
632
578
579
592
593
Nsg
Mandandawela
Dunuvila North
Dunuvila South
Kurudugahaela
Uggala
Total
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Pathadumbara
Akurana
Akurana
Akurana
Akurana
52
^tw a{ jtx
j f c}xv
Average Daily
Demand
m3/day
Served
Population
A
D il
Average
Daily
Demand
m3/day
Served
Population
Average
g Dailyy
Demand
m3/day
2035
Served
Population
20300
Average Daily
Demand
m3/day
20025
Served
Population
2
2015
Average Daily
Demand
m3/day
D.S.
Division
2015
Served
Population
P
l i
(h)
Served
Population
in 2010
(g)
C
Coverage
Factor
(e)
Geographical
Factor
(%)
(d) =
(c)/(b)
Served Area
Factor
(%)
(c)
Served Area
(hec)
( b)
Total Area
(hec)
G.S.
No.
(a)
T
Total
Poopula
ttion
in
22010
594
Wattegama
Pathadumbara
2,767
94
81
86
100
0
0.88
2098
2,1994
376
2,289
364
2,388
380
2,485
369
2,586
3
384
2
3
595
596
Wattegama North
Gunembill
Pathadumbara
Pathadumbara
3,134
9931
56
85
18
3
32
4
100
100
00.62
0
0.88
625
29
6544
300
112
5
682
31
108
5
711
32
113
5
740
33
110
5
770
34
1114
5
597
Eriyagasthenna
Pathadumbara
1,358
90
49
54
100
0
0.70
518
5422
93
565
90
589
94
613
91
638
95
598
Udurawana
Pathadumbara
1,145
61
34
56
100
0
0.68
434
4544
78
474
75
494
79
514
76
535
79
6
7
8
9
599
600
601
602
Puwakgahadeniya
Pathadumbara
Pathadumbara
Pathadumbara
47
113
148
97
39
7
148
58
82
6
100
59
100
100
100
100
00.97
1
1.00
0
0.82
0
0.94
988
134
1766
997
1,0333
1400
1,8447
1,0443
177
24
316
179
1,078
146
1,9277
1,088
171
23
306
173
1,125
152
2,010
1,135
179
24
320
180
1,171
158
2,092
1,181
174
23
310
175
1,219
164
2,177
1,229
1181
24
3
323
1
182
10
603
Pathadumbara
1,300
88
45
51
100
0
0.94
622
6500
111
678
108
707
112
736
109
766
1
114
11
604
Doragamuwa
Meegammana
Walpaladeniya
Meegammana
West
Meegamawatta
1,243
2,329
2,146
1,790
Pathadumbara
2,416
129
100
0
0.88
149
156
27
163
26
170
27
177
26
184
27
12
13
615
620
Pathadumbara
Pathadumbara
3,036
1,422
95
285
14
138
15
48
100
100
00.88
0
0.88
394
606
4122
6344
71
109
430
661
68
105
449
690
71
110
467
718
69
107
486
747
72
1
111
14
621
Udathalavinna
Yatawara
Yatawara
Kandagama
Pathadumbara
1,347
320
32
10
100
0
0.88
119
1244
21
129
21
135
21
140
21
146
22
15
622
Ihala Yatawara
Pathadumbara
2,593
222
104
47
100
0
0.85
1033
1,0880
185
1,1277
179
1,176
187
1,224
182
1,274
1
189
16
641
Yatirawana
Pathadumbara
2,610
32
73
228
100
0
0.77
4585
4,7995
821
5,0022
795
5,218
830
5,430
806
5,651
8
839
17
642
Pitiyegedara
Total
Total
Pathadumbara
Pathadumbara
1,203
42
29
69
100
0
0.90
748
G.S. Division
Waththegama SR
Nsg
Pathadumbara
7822
134
816
130
851
135
886
132
922
1
137
16,570
2,839
17,286
2,747
18,032
2,867
18,765
2,785
19,528
2
2,898
65,4225
11,204
68,2577
10,853
71,209
11,323
74,098
10,997
77,108
111,446
53
^tw a{ jtx
j f c}xv
Nsg
Average
Daily
Demand
m3/day
Served
Population
Average
Daily
D
d
Demand
m3/day
Served
Population
Average
Daily
Demand
m3/day
250
257
258
260
Served
Population
9
10
11
12
Average
g
Daily
Demand
m3/day
241
Served
Population
Average
Daily
Demand
m3/day
240
Mahaiyawa
Poorna Watta
West
Poorna Watta
East
Pitakanda Gama
Mahanuwara
Ihala Katukele
Welata
Served
Population
Mapanawathura
Wattaranthenna
Served
Population
in 2010
233
235
237
238
239
D.S.
Division
(a)
Total
Popul
ation
in
2010
Coverage
Factor
2
3
4
5
6
22035
1
1.10%
14
5.01
9
93.15
6%
9
98.74
25%
253
Geographic
al Factor
(%)
232
Asgiriya SR
Nuwara
Dodamwala
Aniwatta West
Asgiriya
2030
1.10%
14
5.01
93.15
6%
98.74
25%
253
Served
Area Factor
Ar
F t r
(%)
G.S. Division
2025
2
1.20%
14
5.01
93.15
9
6%
98.74
9
30%
3
253
Served
Area (hec)
G.S.
No.
2020
1.20%
14
5.01
93.15
6%
98.74
30%
253
Total Area
(hec)
Design Param
meters
Growth Rate
Domestic Aveerage Consumption
Average Famiily Size
Per Capita peer day
Allow for nonn domestic
Per Capita peer day
NRW
Demand per capita
c
per day
KFG
1,824
87
76
87
8
100
1.00
1593
1,699
430
1,803
456
1,914
4
484
2,022
5122
2,136
5400
KFG
KFG
KFG
KFG
KFG
1,548
2,880
2,846
3,152
1,810
44
36
39
83
67
22
16
39
83
60
50
5
44
4
1000
1000
90
9
100
100
100
100
100
1.00
1.00
1.00
1.00
1.00
774
1280
2846
3152
1621
826
1,365
3,036
3,362
1,729
209
345
768
851
437
877
1,449
3,223
3,569
1,835
222
367
815
903
464
931
1,538
3,421
3,788
1,948
2236
3
389
8
866
9
958
4
493
983
1,624
3,613
4,001
2,058
2499
411
9144
1,0112
521
1,038
1,715
3,816
4,226
2,174
2633
4344
9655
1,0669
5500
KFG
5,982
20
18
90
9
100
1.00
5384
5,743
1,453
6,096
1,542
6,471
1,637
6,835
1,7229
7,219
1,8226
KFG
2,484
26
26
1000
100
1.00
2484
2,650
670
2,813
712
2,986
7
755
3,154
7988
3,331
8433
KFG
KFG
KFG
KFG
1,660
2,763
2,397
3,021
21
107
66
115
11
21
13
20
52
5
20
2
20
2
17
100
100
100
100
1.00
1.00
1.00
1.00
870
542
472
525
928
578
503
560
235
146
127
142
985
614
534
594
249
155
135
150
1,046
652
567
631
2265
1
165
1
143
1
160
1,105
689
599
666
2800
1744
1522
1688
1,167
728
633
703
2955
1844
1600
1788
( b)
(c )
(d)) =
(c)/
/(b)
(e)
(g)
(h)
20015
20200
54
2025
2030
2035
^tw a{ jtx
j f c}xv
KFG
KFG
KFG
KFG
1,840
1,850
62
68
24
40
39
3
59
5
100
100
1.00
1.00
Average
Daily
Demand
m3/day
Served
Population
Average
Daily
D
d
Demand
m3/day
Served
Population
Average
Daily
Demand
m3/day
2035
Served
Population
234
2030
Average
g
Daily
Demand
m3/day
20
2025
Served
Population
229
20200
Average
Daily
Demand
m3/day
19
20015
Served
Population
243
262
261
255
(h)
Served
Population
in 2010
15
16
17
18
KFG
(g)
Coverage
Factor
266
(e)
Geographic
al Factor
(%)
14
KFG
(d)) =
(c)/
/(b)
Served
Area Factor
Ar
F t r
(%)
256
D.S.
Division
(c )
Served
Area (hec)
13
G.S. Division
( b)
Total Area
(hec)
G.S.
No.
(a)
Total
Popul
ation
in
2010
2,019
29
18
62
6
100
1.00
1253
1,337
338
1,419
359
1,506
3
381
1,591
4033
1,680
4255
2,376
23
19
83
8
100
1.00
1963
2,094
530
2,223
562
2,360
5
597
2,493
631
2,633
6666
KFG
KFG
KFG
KFG
3,891
3,994
2,855
2,364
42
36
30
42
15
22
16
9
36
3
61
6
53
5
21
2
100
100
100
100
1.00
1.00
1.00
1.00
1400
2441
1523
507
1,493
2,604
1,625
541
378
659
411
137
1,585
2,764
1,725
574
401
699
436
145
1,682
2,934
1,831
609
4426
7
742
4
463
1
154
1,777
3,099
1,934
643
4500
7844
4899
1633
1,877
3,273
2,043
679
4755
8288
5177
1722
KFG
2,351
72
15
21
2
100
1.00
490
523
132
555
140
589
1
149
622
1577
657
1666
KFG
KFG
1,589
23
12
52
5
100
1.00
829
1
2
221
222
Katukele West
Suduhumpala
West
Mulgampala
Nagasthenna
Deiyannewela
Katukele
Watapuluwa
West
Aniwatta East
SubTotal
Hotels,Private
hospitals &
others
Total
Upland SR
Thalwatta
Lewella
223
Aruppala West
KFG
2,663
39
39
1000
100
1.00
2663
2,841
719
3,016
763
3,201
8
810
3,381
8555
3,571
9033
4
5
6
7
224
225
227
228
KFG
KFG
KFG
KFG
1,522
3,895
2,925
2,353
21
63
71
21
21
63
71
21
1000
1000
1000
1000
100
100
100
100
1.00
1.00
1.00
1.00
1522
3895
2925
2353
1,624
4,155
3,120
2,510
411
1,051
789
635
1,724
4,410
3,312
2,664
436
1,116
838
674
1,830
4,681
3,516
2,828
4
463
1,184
8
890
7
715
1,933
4,944
3,714
2,987
4899
1,2551
9400
7566
2,042
5,222
3,923
3,155
5177
1,3221
9933
7988
229
KFG
2,351
72
57
79
7
100
1.00
1861
1,985
502
2,107
533
2,236
5
566
2,362
5988
2,495
6311
230
Aruppala East
Nittawela
Mavilmada
Watapuluwa
Watapuluwa
West
Watapuluwa
South
KFG
1,527
31
31
1000
100
1.00
1527
1,629
412
1,729
437
1,835
4
464
1,938
4900
2,047
5188
10
231
Mahaweli Uyana
KFG
1,120
55
55
1000
100
1.00
1120
1,195
302
1,268
321
1,346
3
341
1,422
3600
1,502
3800
21
Nsg
KFG
884
224
938
237
996
2
252
1,052
2666
1,111
2811
34,080
8,622
36,175
9,149
38,400
9,,715
40,560
10,263
42,839
10,8337
3,000
759
3,000
759
3,000
7
759
3,000
7599
3,000
7599
37,080
9,381
39,175
9,908
41,400
100,474
43,560
11,0222
45,839
11,5996
712
1088
759
1,161
192
294
806
1,232
204
312
856
1,308
2217
3
331
904
1,382
2299
3500
955
1,460
2422
3699
3,000
55
G.S.
No.
G.S. Division
D.S.
Division
(a)
Total
Popul
ation
in
2010
Total Area
(hec)
Served
Area (hec)
Served
Area Factor
Ar
F t r
(%)
Geographic
al Factor
(%)
Coverage
Factor
Served
Population
in 2010
Served
Population
Average
Daily
Demand
m3/day
Served
Population
Average
g
Daily
Demand
m3/day
Served
Population
Average
Daily
Demand
m3/day
Served
Population
Average
Daily
D
d
Demand
m3/day
Served
Population
Average
Daily
Demand
m3/day
^tw a{ jtx
j f c}xv
11
250
Pitakanda Gama
KFG
1,660
21
10
48
4
100
1.00
790
843
213
895
226
950
2
240
1,003
2544
1,059
2688
12
239
KFG
1,810
67
10
100
1.00
189
202
51
214
54
227
5
57
240
611
253
644
13
226
Mahaiyawa
Siyambalagasthe
nna
SubTotal
KFG
3,254
30
30
1000
100
1.00
3254
3,471
878
3,684
932
3,910
9
989
4,130
1,0445
4,362
1,1004
25,495
6,449
27,061
6,846
28,724
7,,267
30,340
7,6778
32,046
8,1008
2,000
506
2,000
506
2,000
5
506
2,000
5066
2,000
5066
27,495
6,955
29,061
7,352
30,724
7,,773
32,340
8,1884
34,046
8,614
14
(c )
(d)) =
(c)/
/(b)
(e)
(g)
(h)
232
2
3
4
5
6
235
236
255
256
258
1
2
( b)
Total
Bahirawakanda SR
R
Nuwara
Dodamwala
Asgiriya
Bahirawa Kanda
Katukele
Katukele West
Ihala Katukele
Sub Total
Hotels & others
221
275
Total
Thalwathta SR
Thalwatta
Thennakumbura
Total
Total KFG
Nsg
2,000
20015
20200
2025
2030
2035
KFG
1,824
87
11
13
100
1.000
231
246
62
261
66
277
7
70
293
744
309
788
KFG
KFG
KFG
KFG
KFG
2,880
3,275
2,364
2,019
2,397
36
41
42
29
66
20
41
30
3
53
56
5
1000
71
7
10
80
8
100
100
100
100
100
1.000
1.000
1.000
1.000
1.000
1600
3275
1689
209
1925
1,707
3,493
1,802
223
2,053
432
884
456
56
519
1,812
3,708
1,913
237
2,179
458
938
484
60
551
1,923
3,936
2,031
252
2,313
4487
9
996
5
514
6
64
5
585
2,031
4,157
2,145
266
2,443
5144
1,0552
5433
677
6188
2,145
4,391
2,266
281
2,580
5433
1,1111
5733
71
6533
9,524
2,409
10,110
2,557
10,732
2,,716
11,335
2,8668
11,972
3,0229
KFG
KFG
KFG
800
1,840
6,037
62
137
38
41
61
6
30
3
100
100
1.000
1.000
1128
1807
800
209
800
209
800
2
209
800
2099
800
2099
10,324
2,618
10,910
2,766
11,532
2,,925
12,135
3,0777
12,772
3,238
1,203
1,928
3,131
304
488
792
1,277
2,046
3,323
323
518
841
1,355
2,172
3,527
3343
5
550
8
893
1,431
2,294
3,725
3622
5800
9422
1,511
2,423
3,934
3822
6133
9955
78,030
19,746
82,469
20,867
87,183
222,065
91,760
23,2225
96,591
24,4443
56
^tw a{ jtx
j f c}xv
Galaged
dara DS Area
Design Paraameters
Growth Ratte
Domestic Average Consumption
Average Fam
mily Size
Per Capita per
p day
Allow for noon domestic
Per Capita per
p day
NRW
Demand perr capita per day
Nsg
Served
Population
Average Daily
Demand
m3/day
2035
Average Daily
Demand
m3/day
2030
Served
Population
2025
Average Daily
Demand
m3/day
2020
Served
Population
2015
Average Daily
Demand
m3/day
(h)
Served
Population
368
(g)
Average Daily
Demand
m3/day
12
(e)
Served
Population
306
303
307
302
310
372
309
(d) =
(c)/(b)
Served
Population
in 2010
5
6
7
8
9
10
11
(cc
Coverage
Factor
301
304
305
(b)
20035
0.550%
14
5
5.79
8
81
8
8%
8
87
25%
1
116
Geographical
Factor (%)
2
3
4
2030
0.50%
14
5.79
81
8%
87
25%
116
Served Area
Factor (%)
300
Galagedara
Galagedara
Galagedara
West
Bonakot
Haddapitiya
Damunugasthe
nna
Akkarawatta
Delgasyaya
Rockhill
Pethigewela
Gunadaha
Udalagama
Galagedara
Madige
D.S.
Division
((a)
T
Total
Popuulation
in 22010
20255
0.50%
%
14
5.799
81
8%
87
30%
%
124
Served Area
(hec)
G.S.Division
2020
0.50%
14
5.79
81
8%
87
30%
124
Total Area
(hec)
G.S.
No.
2015
0.53%
14
5.79
81
8%
87
35%
134
Thumpane
6682
48
488
100
100.000
1.00
682
700
94
718
89
736
92
7755
88
7774
90
Thumpane
1,,057
63
633
100
100.000
1.00
1057
1,085
145
1,112
138
1,140
142
1,,169
136
1,199
139
Thumpane
Thumpane
5533
8831
23
95
233
955
100
100
100.000
100.000
1.00
1.00
533
831
547
853
73
114
561
875
70
109
575
897
72
112
5590
9920
69
107
6005
9443
70
110
Thumpane
5599
149
1449
100
100.000
1.00
599
615
82
631
79
647
81
6663
77
6880
79
Thumpane
Thumpane
Thumpane
Thumpane
Thumpane
Thumpane
3322
3356
6623
4475
7793
5585
32
75
13
96
190
25
322
199
100
100
955
255
100
25
80
10
50
100
100.000
100.000
100.000
100.000
100.000
100.000
1.00
1.00
1.00
1.00
1.00
1.00
322
89
498
48
397
585
331
91
511
49
408
601
44
12
68
7
55
81
339
93
524
50
418
616
42
12
65
6
52
77
348
95
537
51
429
632
43
12
67
6
53
79
3357
97
5551
52
4440
6648
41
11
64
6
51
75
3666
99
5665
53
4551
6664
43
11
66
6
52
77
Thumpane
7782
16
166
100
100.000
1.00
782
803
108
823
102
844
105
8865
100
8887
103
57
^tw a{ jtx
j f c}xv
Nsg
Served
Population
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
Served
Population
Average Daily
Demand
m3/day
2035
Average Daily
Demand
m3/day
2030
Served
Population
2025
Average Daily
Demand
m3/day
2020
Served
Population
Ethamulla
Nikathenna
Diyapalagoda
Total
2015
Served
Population
in 2010
Kandekumbura
(h)
Coverage
Factor
360
361
362
400
401
Udapitiya
Niyangoda
Adungama
Palkumbura
(g)
Geographical
Factor (%)
17
18
19
20
21
Palukopiwatta
(e)
Served Area
Factor (%)
369
308
311
358
Galagedara
Madige west
D.S.
Division
(d) =
(c)/(b)
Served Area
(hec)
13
14
15
16
G.S.Division
(cc
Total Area
(hec)
G.S.
No.
((a)
T
Total
Popuulation
in 22010
(b)
Thumpane
1,,029
47
477
100
100.000
1.00
1029
1,057
142
1,084
135
1
1,111
138
1,,139
132
1,168
136
Thumpane
Thumpane
Thumpane
7781
3352
9907
77
50
51
777
500
511
100
100
100
100.000
100.000
100.000
1.00
1.00
1.00
781
352
907
802
361
931
107
48
125
822
370
955
102
46
119
843
379
979
105
47
122
8864
3389
1,,004
100
45
117
8886
3999
1,0029
103
46
120
Thumpane
6655
31
311
100
100.000
1.00
655
673
90
690
86
707
88
7725
84
7443
86
Thumpane
Thumpane
Thumpane
Thumpane
6678
7776
4476
4477
78
87
70
45
788
877
422
133
100
100
60
30
100.000
100.000
100.000
100.000
1.00
1.00
1.00
1.00
678
776
286
143
696
797
294
147
93
107
39
20
714
817
301
151
89
102
37
19
732
838
309
155
91
104
38
19
7750
8859
3317
1159
87
100
37
18
7669
8881
3225
1663
89
102
38
19
12,352
1,654
12,664
1,576
1
12,984
1,616
133,313
1,545
13,6649
1,585
58
Table 6.11 Summery of Water Demand Prediction in Kandy North Area - Katugastota Plant
No
D S Division
Harispatuwa
Akurana
Pujapitiya
Pathadumbara
Kandy Four
Gravets
Thumpane Kopiwatta
Item
2015
2020
2025
2030
2035
Served Population
92,579
97,301
102,265
106,958
111,306
16,935
16,528
17,373
16,961
17,652
20,322
19,834
20,848
20,353
21,182
Served Population
57,398
61,076
64,988
68,815
72,685
8,540
7,791
8,284
8,187
8,652
10,248
9,349
9,941
9,824
10,382
Served Population
43,442
44,653
45,893
47,170
48,480
7,200
6,877
7,063
6,780
6,966
8,640
8,252
8,476
8,136
8,359
Served Population
65,425
68,257
71,209
74,098
77,108
11,204
10,853
11,323
10,997
11,446
13,445
13,024
13,588
13,196
13,735
Served Population
78,030
82,469
87,183
91,760
96,591
19,746
20,867
22,065
23,225
24,443
23,695
25,040
26,478
27,870
29,332
Served Population
12,352
12,664
12,984
13,313
13,649
1,654
1,576
1,616
1,545
1,585
1,985
1,891
1,939
1,854
1,902
349,200 366,400
384,500
402,100
419,800
Served Population
Total
Nsg
65,300
64,500
67,700
67,700
70,700
78,300
77,400
81,300
81,200
84,900
Galagedara &
Mawathagama
4,375
4,375
4,375
4,375
5,250
5,250
5,250
5,250
Total GKWSP
65,300
68,875
72,075
72,075
75,075
78,300
82,650
86,550
86,450
90,150
59
Water Production Increase of Katugastota WTP & Demand increase in Kandy North Area
120,000
Water Production at
Max Demand(m3/day)
Demand/Supply (m3/day)
100,000
80,000
60,000
40,000
20,000
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
Year
Figure 6.1 Water Production Increase of katugasthota WTP and Demand increase in Kandy North
Area
Nsg
60
SERVICE
LEVEL
IMPROVED
POPULATION
NEW
CONSUMERS
SERVICE
LEVEL
IMPROVED
POPULATION
NEW
CONSUMERS
SERVICE
LEVEL
IMPROVED
POPULATION
2035
NEW
CONSUMERS
2030
SERVICE
LEVEL
IMPROVED
POPULATION
2025
NEW
CONSUMERS
2020
Akurana DS area
Thelabugahawaththa SR
Akuran SR
Rambuke Ela SR
Vilana Udagama SR
Dunuwila SR
Balakaduwa SR
Heepitiya SR
Dippitiya SR
Kurugoda SR
Alawathugoda SR
Akurana Total
1,844
2,572
4,690
1,249
3,263
6,378
1,391
21,387
9,706
11,341
13,078
5,564
39,689
1,962
2,737
4,991
1,329
3,472
6,787
1,480
22,758
10,327
12,067
13,916
5,920
42,230
2,077
2,898
5,285
1,407
3,677
7,187
1,567
24,098
10,935
12,778
14,735
6,269
44,717
2,194
3,061
5,583
1,486
3,884
7,592
1,655
25,455
11,549
13,496
15,563
6,622
47,230
Harispaththuwa DS area
Medawala SR
Rajapihilla SR
Barigama SR
Yahalathanna SR
Nugawela SR
Kulugammana SR
Kondadeniya SR
Wegiriya SR
Gohagoda SR
Yatihalagala SR
Kurundugahamada SR
Uduwawala SR
Harispaththuwa Total
2,051
3,899
3,077
2,161
11,188
14,371
6,053
8,203
15,479
12,257
7,163
7,539
4,673
1,732
8,643
86,113
2,155
4,097
3,235
2,271
11,758
15,105
6,361
8,622
16,270
12,882
7,528
7,924
4,911
1,820
9,084
90,507
2,255
4,285
3,383
2,375
12,298
15,799
6,653
9,018
17,017
13,473
7,874
8,287
5,136
1,903
9,500
94,660
2,346
4,460
3,522
2,472
12,800
16,441
6,923
9,385
17,709
14,021
8,193
8,622
5,345
1,981
9,886
98,506
Pujapitiya DS area
Kahawaththa SR
Ankumbura SR
Galhinna SR
Godahena SR
Pujapitiya I
Pujapitiya II
Bokkawala
Total Pujapitiya
1,035
2,761
5,766
1,957
1,414
2,253
15,186
7,487
2,416
6,443
4,567
3,298
5,256
29,467
1,064
2,838
5,926
2,012
1,453
2,315
15,608
7,695
2,482
6,622
4,694
3,391
5,402
30,285
1,094
2,917
6,091
2,067
1,494
2,380
16,042
7,909
2,552
6,807
4,823
3,485
5,552
31,128
1,124
2,998
6,260
2,124
1,535
2,446
16,487
8,129
2,622
6,996
4,956
3,582
5,708
31,993
G.S. Division
Nsg
61
SERVICE
LEVEL
IMPROVED
POPULATION
NEW
CONSUMERS
SERVICE
LEVEL
IMPROVED
POPULATION
NEW
CONSUMERS
SERVICE
LEVEL
IMPROVED
POPULATION
2035
NEW
CONSUMERS
2030
SERVICE
LEVEL
IMPROVED
POPULATION
2025
NEW
CONSUMERS
2020
Pathadumbara DS area
Doragamuwa SR
Moragaskotuwa SR
Kahalla SR
Balanagala SR
Pitiyagedara SR
Udathalavinna SR
Jambugahapitiya SR
Waththegama SR
Polgolla SR
Bangalawatta SR
Pihilladeniya SR
Napana SR
Total Pathadumbara
6,180
5,143
6,979
4,320
10,298
6,914
39,834
11,356
6,695
10,372
4,549
12,403
7,696
2,579
55,650
6,448
5,365
7,280
4,508
10,744
7,213
41,558
11,847
6,985
10,819
4,745
12,940
8,027
2,690
58,053
6,709
5,582
7,576
4,690
11,180
7,506
43,243
12,327
7,269
11,259
4,938
13,465
8,352
2,800
60,410
6,982
5,808
7,883
4,880
11,633
7,811
44,997
12,829
7,565
11,717
5,138
14,012
8,690
2,914
62,865
39,175
29,061
10,910
3,323
82,469
41,400
30,724
11,532
3,527
87,183
43,560
32,340
12,135
3,725
91,760
45,839
34,046
12,772
3,934
96,591
5,066
92,661
7,598
300,986
5,194
96,875
G.S. Division
Galagedara DS area
Total Galagedara
Total
Nsg
7,790
5,325
7,988
5,460
8,189
316,049 101,006 330,663 105,199 345,374
62
^tw a{
a jtx f c}xv
c
P
Factorr and theree effects on system dessign
6.1.88. Seasonal Demand, Peak
Wateer consumptiion of the peeople living inn the commaand area is fluuctuating witth respect to the seasonal
changges of the yeaar and it is not a considerrable fluctuattion in the Kandy
K
Regionn as per the Billing
B
&
Colleection Reporrt.
F
Figure
6.2 Average
A
consuumption in Kandy
K
regionn in domesticc sector 20100 & 2011
Dailyy Peak Factorr
d
for outfflow readingss in Wegiriyaa Service Reservoir Greateer Kandy Waater Supply
Case study data done
projeect is as follow
ws
Peakk Factor:
As peer the Demannd factor graaph taken forr Phase I Stagge II design, it
i is considerred 2 times peak
p factor foor
desiggning of distrribution diam
meters.
N
Nsg
63
^tw a{
a jtx f c}xv
c
Water Resources
R
N
Nsg
64
65
on downstream release and flow for power generation. NWS&DB also install new computerized gauge
station at Meewathura water treatment plant to get daily flow rates at Mahaweli river.
According to information obtained from the Irrigation Department for the Mahaweli River flow from
October 1989 to September 1999 measured at Peradeniya was determined to be 213.68 m3/d or
2,046,000 m3/d, and for 7 day average median flow was 24.57 m3/s or 2,122,900 m3/d.
Storage volume of Polgolla Reservoir is 4.1 MCM at normal operating level (at 440.74 m AMSL, surface
area 1.2 km2) and the minimum storage volume is 2.0 MCM at 438.90 m AMSL (surface area 0.75 km2).
Average retention time in Pogolla Reservoir is around two days based on the median flow at Peradeniya.
However, due to accumulation of silt periodically the actual retention time may become much lower than
two days, from time to time.
The Normal Operating Level at Polgolla reservoir has been set at 440.74 m AMSL. However, under
normal circumstances when there is no rain or a threat of floods, it has now been the established a policy
not to open the gates to discharge any excess flow up to 10:00 p.m. of the day, due to safety concerns of
the people using the river downstream. As a consequence, at times the water level would rise up to about
441 m AMSL during daytime according to the Polgolla Headworks management. With this rise the
discharge downstream will increase considerably, which will amply alert the downstream users to be
cautions, and if the level continues to rise further, the gates will be opened irrespective of the time of the
day.
The Low Water Level is set at 438.30 m AMSL, and any further drop in this level will cause the power
generation at Ukuwela Power Station to be shutdown. The lowest water level recorded during silt
removal was 434.34 m AMSL.
Under flood conditions the gates will be kept open to control the reservoir level, as designed. According
to the historical data on the maximum discharge in the river, it is evident that there is no possibility for
the flood water level to rise above 441 m AMSL even under worst possible flood conditions. Table 6.10
summarizes a historical record of the 39 worst floods of the river in the past 58 years from 1943, and the
high flood levels reached on each occasion. The table has been prepared on the decreasing order of the
intensity of the floods.
Polgolla Dam was commissioned in 1976 and the highest flood recorded after this date was in 1978, with
the level reaching 440.2 m AMSL at Polgolla. In August 1985, Kotmale Reservoir was also
commissioned, which was located upstream of Polgolla Dam. This has facilitated the control of
floodwaters in a more effective manner. Thus, the risk of raising the flood water level above 440.70 m
AMSL is extremely remote, with the proper regulation of the sluice gates of Kotmale Reservoir, Polgolla
Dam and the downstream Victoria Reservoir, which was commissioned in April, 1985.
Mahaweli Authority has also evaluated data in respect of worst flood discharges up to return period of
500 years as shown in the following Table.
Table 6.11 Forecast of Worst Flood Conditions
Return Period
(Years)
500
300
200
100
50
Nsg
66
The Mahaweli Authority has set the minimum flow of the river at 180,000 m3/d except for extremely dry
weather conditions. However, it is recorded that in 1992 a serious drought took place causing the rainfall
in January to fall to about 40% of its normal average monthly rainfall level with February and March
having no rainfall. The river flows also reflected this reduction of rainfall by dropping down the flow to
166,600 m3/d. The number of days recording the flows below 180,000 m3/d was eight in 1992, two in
1993 and there in 1997. The maximum daily demand of Greater Kandy existing feeding area and
proposed Kandy North project area in year 2017 is assessed to be 182,500 m3/d of which the existing
systems (KMC, Nilambe Oya, Hulu Ganga, Udu / Yatinuwara etc.) will continue to supply 65,040 m3/d
from year 2005 to 2015. Hence, the required abstraction from Mahaweli River is 102,000 m3/d in
2035. (Say 110,000 m3/d), and according to the past flow records of the river this appears to be realistic.
Nevertheless, the possibility of arising abnormally high dry periods in future cannot be ruled out, and in
such situations restricting the supply will become inevitable. This underscores the need to preserve the
existing groundwater sources for possible standby utilization in such a situation.
As already mentioned the source of supply for KMC system and a few other systems is the Mahaweli
River. The proposed Kandy North Water Supply System is also based on the same source, as there is no
other alternative surface water or ground water source, which can provide a bulk volume of 110,000 m3/d
with a suitable raw water quality. NWS&DB has already secured the water rights from the Mahaweli
Authority for the utilization of 180,000 m3/d from the river, which includes the existing systems utilizing
Mahaweli River as the source such as KMC system (33,400 m3/d). Hence there is still a certain surplus
remaining for further extraction from the river elsewhere, if the need arises (agreement between
NWS&DB and MASL is attached in Annex 6.2).
67
6.3 Design Aspect and Water Supply Proposal - Kandy North Project
Water Supply to Harispattuwa Division
Harispattuwa DS division is one of the growing demand centers in Kandy North area covering 84
numbers of GN divisions. Total area of the division is 50.25 km2.
The intake and water treatment plant is located in Gohagoda and Katugastota areas respectively and
belongs to Harispattuwa D S division.
Kandy North Water Supply Project is designed in order to cover the entire Harispattuwa division by
expanding water supply facilities to other areas. Kurudugahamada (elevation 675 m MSL), Barigama (600
m MSL), Yahalatenna (625 m MSL) and Uduwawala (510 m MSL) are the reservoirs that will be
constructed under Kandy North proposal. These new reservoirs will be fed from Yatiwawala booster
pump station and intermediate pump stations.
The 800mmdia trunk line from A4 pumps of WTP at Katugastota to cater the Harispattuwa and
Poojapitiya divisions was laid up to Yatiwawala intermediate elevated reservoir under Phase I Stage II of
the Greater Kandy Project. The pumping main of Pujapitiya was laid up to Rajapihilla under the Phase I
Stage II of the same project and this line will be extended to Madawala under phase I Stage III of the
Greater Kandy Project.
Harispattuwa was one of the highly water shortage area during 1980s and Finida project was implemented
to solve this problem. These existing water supply areas were augmented by Phase I Stage I & II of Greater
Kandy water supply project.
Refer line diagram 1.
Water Supply to Pujapitiya D S Division
Pujapitiya DS division has 67 GN divisions and total area is 58.60 km2.
Pujapitiya is the high water shortage division in Kandy district and 85% of division will be covered by
Kandy North Water Supply Project. Transmission main to feed Pujapitiya will be laid along Madewela
Pujapitiya road.
Pujapitiya 1 and 2, Bokkawala, Godahena and Galinna are the new reservoirs which will be constructed
under this project. Water supply will be extended upto Ankumbura existing scheme under KNWSP.
Refer line diagram 1I.
Water Supply to Akurana Division
Akurana DS division has 35 GN divisions and total area is 30.40 km2.
Akurana, Kahawatta, Kurugoda were the newly constructed service reservoirs of Phase I Stage I and
Thelambugahawatta is Phase I Stage II reservoir under Greater Kandy Water Supply Project. Dippitiya,
Rambukeelagama, Vilana Udagama, Balakaduwa and Heepitiya are the new reservoirs under the Kandy
North Project and Vilana and Owissa existing reservoirs are also fed from the system. Dunuwila will be
catered from Pathadumbara transmission under the Kandy North Proposal.
Refer line diagram 1II.
Nsg
68
69
Mawathagama proposal is also prepared and send for Tressury to allocate funds. Under this water
problem in Galagedara, Kopiwatta high elevated areas and Mawathagama BOI and suburbs will be solved.
Service level of Galagedara area will be further improved under Kandy North Water Supply Project.
Refer line diagram V1.
Nsg
70
Name of Reservoir
KNWSP
Reservoir Capacity/m3
Akurana DS
1
Rambuke Ela
100
Vilana Udagama
100
Dunuwila
200
Balakaduwa
100
Heepitiya
150
Dippitiya
250
Akurana
400
Harispatthuwa DS
Barigama
350
Yahalathanne
250
10
Bogahakanda Kurudugahamada
150
11
Uduwawala
600
12
Doragamuwa
350
13
Moragaskotuwa
250
14
Pihilladeniya
300
15
Bangalawatta
400
16
Pitiyegedara
350
17
Udathalawinna
250
18
Wattegama
650
19
Jambugahapitiya
500
20
Napana
100
21
Polgolla
200
Pathadumbara DS
Pujapitiya DS
22
Galhinna
300
23
Godahena
250
24
Pujapitiya 02
250
25
Pujapitiya 01
300
26
Bokkawala
300
27
Radagaspanawatta
50
28
200
Gangawatakoralaya DS
Nsg
28
71
6.4
NWS&DB mission statement states that serve the nation by providing sustainable water and sanitation
solution ensuring total user satisfaction to achieve that mission statement there should be sustainable,
reliable and efficient operation and maintenance mechanism to operate that water supply system.
The main objective of a regular operation and maintenance programme is to provide an uninterrupted
equitably distributed and adequate amount of safe water supply with a reasonable charge to all consumers.
Any omission due to lack of O&M funds or negligence of such proper operations and maintenance may
lead to unexpected damage to customers as well as assets of water supply which take more time and
money for the repairs.
Requirement of O & M staff and budget for smooth functioning of Kandy North Water Supply project is
under Preparation.
Nsg
72
CHAPTER 7
7.0
7.1
Financial Aspects
Cost Estimation
The based year for the financial analysis is year 2012.
The following works are proposed to be accomplished under Kandy North Water Supply Project.
i. Construction of 2nd Filtration unit for Water Treatment Plant
ii. Construction of Clear Water Reservoir for Water Treatment Plant (3rd Unit)
iii. Improvements of water treatment plant (Supply and installation chemical pumps and Clear
water pumps)
iv. Construction of Service Reservoirs - 28 Nos.
v. Construction of Pumping Stations - 17 Nos.
vi. Installation of Transmission Pipelines - 86 km
vii. Installation of Distribution Pipelines - 411 km
viii. Construction of Quarters for NWS&DB staff
ix. NRW reduction and rehabilitation programme
7.2
In general, most of the rates are based on the NWS&DB rate book 2012. 27% overhead and profit were
added to the basic rates. Greater Kandy Water Supply Project Phase I Stage II MAGA Engineering rates
(2009 January - ICB contract) with inflations were used when the rates are not available in the NWSDB
rate book.
I. Transmission and Distribution Pipes
There are about 86 km of transmission lines and 411 km of distribution lines to be laid under Kandy
North Water Supply Project.
Cost estimation was done for laying of transmission and distribution pipelines according to specification 2
(i.e. backfilling with quarry dust and imported earth).
Estimates are mainly based on 2012 NWS&DB rate book. The supplying and laying cost for DI pipes,
PVC pipes and fittings are separately estimated.
For this estimate it was assumed;
Nsg
Laying cost covers the excavation with earth work support and dewatering if necessary, installation of
pipes with fittings, sand bedding, backfilling with surrounding material (quarry dust / sand) and imported
soil with compaction (95% - 100%) etc.
In addition provisions have been made for temporary reinstatement of pipe laying trenches.
The detailed estimates are given in Annex 7.1.2.2, Annex 7.1.2.3, Annex 7.1.3.2, Annex 7.1.3.3, Annex
7.1.4.2, Annex 7.1.4.3, Annex 7.1.5.2, Annex 7.1.5.3, Annex 7.1.6.2 & Annex 7.1.6.3.
Nsg
74
Nsg
75
ITEMS
UNIT
QTY
AMOUNT 2012
(Rs.Mn)
01
Item
505
02
Item
Item
Item
Item
1
1
1
1
3
12
16
9
Item
1
320
64
26
103
249
1
216
53
174
23
40
257
03
Item
Item
Item
05
Item
Item
Item
Item
1
1
1
1
1
1
1
1
29
06
km
86
546
07
km
86
480
08
km
411
493
09
km
10
Nos
411
50
1,473
211
11
Nos
17
63
12
Nos
324
13
Road Reinstatement
km
km
86
411
111
280
Item
139
14
Item
Item
Item
15
Item
1,000
16
Item
32
6,912
Allow
829
Item
Item
69
SUB TOTAL - 02
Allow for 10% contingencies. (10% of sub total 01)
Allow
Allow
691
Allow
9,746
1,170
10,916
SUB TOTAL - 03
Allow for the VAT.(12% of sub total 03)
TOTAL AMOUNT
Nsg
553
8,364
691
76
ITEM
NO
ITEMS
UNIT
AMOUNT
2012 (Rs.Mn)
Reference
01
Item
1,043
Annex 7.1.1
02
Item
803
Annex 7.1.2
03
Item
1,077
Annex 7.1.3
04
Item
1,746
Annex 7.1.4
05
Item
717
Annex 7.1.5
06
Item
171
Annex 7.1.6
07
1,356
Annex 7.1.7
SUB TOTAL - 01
6,912
Allow
829
Item
69
Custom duty
Item
553
SUB TOTAL - 02
8,364
Allow
691
Allow
691
SUB TOTAL - 03
Allow for the VAT.(12% of sub total 03)
TOTAL AMOUNT
Nsg
9,746
Allow
1,170
10,916
77
Item
Intake (50,000 - 110,000)
- Pumps
- Transmission Main
- Administration, consultancy, Land acquisition, custom duty
- Price escallation & Contingencies
Water Treatment Plant
- Construction of Clear Water Reservoir
- Construction of Filtration Unit
- Site work (WTP-Plant water)
- Installation of new pumps at Clear Water Pumping Station
- Installation of new pumps at Chemical Building
- Electrical sub station & Generator Building
- Admin Building ( Controls )
- Site work (WTP-Electrical)
- Genral Cost
- Administration, consultancy, Land acquisition, custom duty
- Price escallation & Contingencies
Production/
Demand
(m3)
Incremental
Cost
(Rs./m3)
64
26
19
18
126
60,000
2,100
103
249
1
216
53
174
23
40
95
200
191
1,345
50,000
26,900
1,518
1,436
898
736
1,017
1,174
537
5,798
261,800
1,132
2,966
1,128
400
3,126
7,620
148,600
Investment
(MRs)
Nsg
78
Item
Investment
(MRs)
Nsg
Production/ Demand
(m3)
261
364
663
177
462
904
1,607
985
5,423
Incremental Cost
(Rs./m3)
186,400
1,035
861
1,169
725
2,898
1,729
2,408
8,417
286,100
242
300
885
995
2,180
111,000
79
7.2.2
Calculation FIRR
80
The FIRR is calculated on the basis of the projected incremental revenues attributable to the project. This
is calculated as the projected incremental volume of water sold multiplied by the proposed water tariff
plus new connection charges.
Water Production and Sales
Total water production is calculated according to the water demand and improvements of water treatment
plant.
No. of connections are calculated assuming monthly water consumption as 14m3 for a family and that is
0.6 m3/day for a connection. The determination of the demand and the production quantities are dealt
with in more detail in chapter 5 of this report.
Sale of water to the KMC is priced at Rs 16.00 per CUM (current national bulk rate) while that to the
others is priced at Rs 24.00 per CuM for Domestic consumers and at Rs. 37.00 per CuM for Non
domestic consumers.
Capital Costs
Capital costs are described in the Kandy North Water Supply Project estimate. The expected construction
is estimated to be completed on 2018. Specific replacement costs have been provided over the evaluation
period for the rehabilitation and or replacement of mechanical and electrical equipment.
NWSDB receives the funds required to implement the proposals from the treasury and 15 % of the total
funds to be repayable from NWS&DB within 20 years after a grace period of 06 years, at 10 % interest
rate as per the subsidiary loan agreement (balance 75% of loan to be paid by treasury from taxes).
Operating Costs
Incremental operating costs are based on the expected incremental costs of additional water production
and sales. The cost of operation and maintenance for the project is computed by calculating year 2008,
2009 & 2010 O&M costs for the Greater Kandy Plant and its two distribution zones Akurana and
Harispattuwa.
The O&M cost of GKWSP plant and distribution zone can be categorized as follows.
1)
2)
3)
4)
Personal cost for head works which includes personal salaries, overtime etc.
Electric / Energy cost.
Chemical cost (including chlorine, alum, lime and bleaching powder etc.).
Repair and maintenance cost which includes the cost of leak repair, new connection and
extension of distribution system etc.
5) Establishment cost - This include the telephone bills, vehicle cost maintaining of office
equipments, security and rental etc.
6) Overhead (head office, RSC and Manager (O&M) Kandy North office). This was assumed as
Rs. 50/- per connection per month.
When calculating the O&M cost, personal expenses, energy cost, chemical cost, repairs and maintenance
cost of transmission and distribution and establishment costs are taken and considering the total water
production of those years (Year 2010, 2009 & 2008), above costs are calculated as a cost in Rs. per m3.
Annual extension and new connection costs are taken and considering the no. of new connections given in
those years, cost per connection is calculated.
Nsg
81
Revenue
Revenue is calculated from the income from water selling to KMC and other consumers and the income
from new connections. The actual selling quantities and selling prices for the year 2010 was considered
and increment of tariff is considered as 25% for every 05 years and the increment of connection fees is
considered as 25% for every 10 years.
The economical analysis (referred to NWSDB) for the Kandy North project investment and returns is
carried out based on the above. The IRR is found to be 10.2%, indicating that the investment is
economically viable. The details are given in Table 7.2.1. Total O & M. cost and revenue details are
attached in Annex 7.2.
Nsg
82
CHAPTER 8
8.0
8.1
Conclusion
A complete master plan review of water supply up to the planning horizon of 2035 for the Greater Kandy
area is carried out in this exercise and the study reveals that in years 2013 and 2017 additional major
augmentation is required to meet the demand. The augmentation required in year 2013 is identified as
the priority project as the Kandy North Water Supply Project and the project proposals are prepared for
seeking funds. However, water demand in the project area continues to increase gradually and the need for
the next Phase of the project is clear in 2015. This may be reviewed again in the future and appropriate
decisions could be taken depending on the performance of the already completed project components.
The following conclusions are arrived based on the facts discussed in the preceding chapters by
implementing the Kandy North Water Supply Project.
1. The majority of the existing borehole water supply schemes have their own limitations in
production and quality of water, and there is an urgent need for rehabilitation of augmentation
from Kandy North Water Supply Project. The need has been proven through the high demand
and beneficiary interest as shown in the socio-economic surveys and the consultation made with
the relevant authorities including NWSDB, Divisional Secretaries, health authorities, private
sector agencies etc.
2. Scarcity of reliable and safe water sources in there, especially during the dry spells of the year, has
made the problem acute.
3. Capacity building of the O&M authorities by providing physical facilities, actively involving the
O&M staff in project functions, making them aware of the importance of consumer relations etc.
need to be done. Expansion of resources and their functions at the NRW unit Kandy is an
absolute need.
4. It is recommended to undertake public hearing as an ongoing process of the proposed project for
its overall success.
5. It will be possible to improve the service level of nearly 450,000 of existing consumers and to
provide service facilities to new Beneficiary population of nearly 250,000 with an improved
coverage of 85 %.
6. Rapid expansion of population associated with rural industries and other economic activities;
suburbs of the Kandy North area, has become highly inhabited and will continue to be more
inhabited in the future.
7. A larger portion of the people (62 %) in the Kandy North area do not access to safe drinking
water and suffer for want of water. Further the situation is aggravated by the recent development
works carried out in the area and the hamlet expansion.
8. Large number of applicants (more than 42,000) for supply connection in the waiting list is a solid
commitment to the fact that they are determined to get water as they undergo untold hardships
for want of water.
Nsg
83
9. People are willing to get the service connection since the average monthly water bill value for a
rural family is less than Rs 355.00 for nearly 80 % of the consumers in the Kandy region. Also
about 80 % of the household in the project area pay more than SLRs 640.00 and about 60 %
pay more than RS 440.00 as the monthly electricity bills. This is a positive indicator that majority
of the households will get the supply connections.
10. The O & M cost is Rs 21.00 per m3 of water and the domestic billing rate is Rs 24.00 per m3 for
other existing consumers. Therefore continuous and formulated tariff revision is required for
smooth functioning of Kandy North Project and to meet the Mahinda Chinthana goals.
11. Once the project is implemented it will cover an area of 340sq. km. This is a tremendous
achievement in terms of infrastructure development with pipe borne water, which will create a
greater development potential impact in the rural economy paving way for more and more
investment in the area.
12. Water service available means that good sanitation practices which leads to healthy life of the
inhabitants in the area leading to improved health conditions which means a saving medical
expenses amounting to about Rs 500.00 Mn a year.
8.2 Recommendation
Production cost of water under the project is summarized in Table 8.1 and given below.
Table 8.1 Production cost summery
capital cost in
SLRs Mn
Cumulative
Water
Production
(m3/day)
9,746
100,000
Unit cost of
Production
(Year 2018)
Rs/m3
22.00
Financial Analysis of the Project for a period of 50 years from 2006 - 2057 is given in Table 7.2 and it
gives following results.
Loan installment at 20 Years is Rs. 222 million. Average domestic consumption is 14 units.
With the present tariff, cost of 14 units is Rs.180.00
Nsg
84
Capital
cost in
SLRs Mn
Additional
Water
Production
(m3/day)
Beneficiary
Families
Per Family
Investment
(Rs)
Overall
investment per
m3
(Rs)
9,746
50,000
75,000
130,000
195,000
According to the data depicted in the table 8.3, the Project is operationally as well as financially viable
without 75% Capital Cost Recovering.
The construction activities of Kandy North Water Supply Project should be implemented comply with
CEA regulations, NBRO regulation and RDA traffic regulations with close supervision of NWS&DB and
other utilization organizations.
The incremental cost (Refer Table 7.1.2) of this Kandy North water supply project is very law compared
with other water supply projects due to most of facilities such as intake, water treatment plant at
Katugastota and transmission main are already constructed under phase I stage I and II of Greater Kandy
water supply project to meet the final demand. (year 2035).
After implementation, Kandy North water supply project will be benifited total of 450,000 people in
Kandy city and suburbs 6 DS divisions.
The project is technically feasible, economically viable, and socially acceptable with no adverse
environmental degradation. Since a major portion of the spade work for the Kandy North Water supply
project is already accomplished by already constructed GKWSP intake facility to match with the year
2030 demand and lands are already acquired for improvement of water treatment plant. It is strongly
recommended to consider the Kandy North Water Supply Project proposals favorably and make necessary
arrangements to seek suitable funding agency to implement the Kandy North Water Supply Project in
order to provide the anticipated facilities.
According to the activity programme constructions will be completed during year 2016 if funding
agencies are finalized end of 2012.
Nsg
85
Table 7.2
Phase I Stage I
2006
2007
30,500
31,000
11.13
11.32
10,000
10,500
Description
1 Water Production at WTP Katugastota m3/d
2 Total Water Production MCM/year
3 Water sale to KMC m3/d
4 Amount of water sale to NWSDB consumers m3/d [(1-3)*(1-Non Revenue*)]
5a No. of Connections [(4) / 0.6]
5b New Connections
6 Billing Quantity; m3/d (KMC) MCM Per Year [(3)*365/106]
13,325
11,635
1,446
3.65
13,325
16,413
4,778
3.83
2008
31,500
11.50
11,000
2009
32,000
11.68
11,500
13,325
18,166
1,753
4.02
13,325
19,239
1,073
4.20
Phase I Stage II
2010
2011
32,500
33,000
11.86
12.05
12,000
12,500
13,325
20,595
1,356
4.38
13,325
21,255
660
4.56
2012
39,000
14.24
16,500
Phase II
2013
39,500
14.42
16,500
2014
40,000
14.60
16,500
2015
41,000
14.97
17,000
2016
41,500
15.15
17,500
2017
42,000
15.33
17,500
2018
45,000
16.43
18,000
2019
50,000
18.25
18,500
2020
55,000
20.08
19,000
2021
60,000
21.90
19,500
2022
65,000
23.73
20,000
2023
66,000
24.09
20,000
15,750
26,250
4,995
6.02
16,100
26,833
583
6.02
16,450
27,417
583
6.02
16,800
28,000
583
6.21
16,800
28,000
6.39
17,150
28,583
583
6.39
18,900
31,500
2,917
6.57
22,050
36,750
5,250
6.75
25,200
42,000
5,250
6.94
28,350
47,250
5,250
7.12
31,500
52,500
5,250
7.30
32,200
53,667
1,167
7.30
4.52
4.52
4.52
4.52
4.52
4.52
5.35
5.47
5.58
5.70
5.70
5.82
6.42
7.48
8.55
9.62
10.69
10.93
0.34
8.51
58
109
13
32
211
0.34
8.70
61
109
13
105
288
0.34
8.88
64
109
13
39
224
0.34
9.06
67
109
13
24
212
0.34
9.24
70
109
13
30
221
0.34
9.43
73
109
13
15
209
0.40
11.77
96
128
15
110
349
0.41
11.90
96
131
15
13
256
0.42
12.03
96
168
19
13
296
0.43
12.34
124
171
20
13
328
0.43
12.52
128
171
20
0
319
0.44
12.65
128
175
20
13
335
0.48
13.47
131
192
22
64
410
0.56
14.80
135
281
33
116
564
0.64
16.13
173
321
37
144
676
0.72
17.47
178
361
42
144
725
0.80
18.80
183
401
47
144
774
0.82
19.05
183
410
48
32
672
24.83
33.07
25.22
23.39
23.92
22.14
29.69
21.48
24.62
26.58
25.46
26.53
30.47
38.09
41.89
41.51
41.20
35.27
52.5
9.0
77.0
6.7
7.5
4.9
9.9
18.0
7.0
54.4
9.2
79.8
6.9
7.7
5.1
10.3
60.6
9.8
56.4
9.4
82.8
7.0
8.0
5.3
10.6
22.7
10.9
58.5
9.6
85.8
7.1
8.3
5.5
11.0
14.2
11.5
60.6
9.8
88.9
7.3
8.6
5.7
11.4
18.3
12.4
62.8
10.0
92.1
7.4
8.9
5.9
11.8
9.1
12.8
75.7
12.0
111.0
9.0
10.7
7.1
14.3
70.1
15.8
123
123
78.2
12.6
114.7
9.3
11.1
7.4
14.7
8.3
16.1
123
123
80.8
13.1
118.5
9.7
11.5
7.6
15.2
8.5
16.5
123
123
84.4
13.6
123.9
10.2
12.0
7.9
15.9
8.7
18.5
123
123
90.0
14.5
132.0
10.8
12.8
8.5
17.0
9.0
18.9
123
74
197
98.4
16.3
144.3
12.1
14.0
9.2
18.5
46.1
20.8
123
74
197
111.5
19.4
163.5
14.4
15.8
10.5
21.0
84.6
24.3
123
74
197
125.1
53.7
183.4
16.8
17.8
11.8
23.6
86.3
30.5
123
74
197
139.2
61.6
204.1
19.3
19.8
13.1
26.2
88.0
34.3
244
244
213
213
212
212
223
223
221
221
326
326
272
395
281
404
295
418
313
436
380
576
465
662
549
746
606
802
123
74
197
153.8
69.8
225.6
21.9
21.8
14.5
29.0
89.8
38.1
12.70
677
874
123
74
197
159.3
72.8
233.6
22.8
22.6
15.0
30.0
20.3
39.0
192
192
123
123
87.2
13.9
127.9
10.4
12.4
8.2
16.4
18.5
31.75
327
449
19
44
11
(2)
(12)
24
(140)
(108)
(90)
(131)
(101)
(166)
(98)
(70)
(77)
(99)
(140)
21.56
18.54
18.12
18.80
18.33
22.88
18.90
19.27
19.72
21.56
20.44
23.11
25.47
27.34
27.65
28.53
25.54
Refer
Annex
7.2.1
Refer
Annex
7.2.2
10.2%
7,086.14
7,034.15
10%
17.29
Year of
Semi-annual
Constructio
instalment
n Complete
Value of semi-annual Instalment for capital Recovery (MRs) Stage I
Value of semi-annual Instalment for capital Recovery (MRs) Stage II
Value of semi-annual Instalment for capital Recovery (MRs) Phase II
Income
Sale price to KMC Rs.
Sale price to other consumers - Domestic Rs.
Sale price to other consumers - Non Domestic Rs.
New Connections & Other revenues
Cost of O & M after full implementation of Project
3
Personal Expenses for headworks,Intake,WTP,Pumping stations per annum (Rs/m
) - Plant
3
) - SR to customers
Personal Expenses for headworks,Intake,WTP,Pumping stations per annum (Rs/m
doorstep
Energy Cost - Plant (Rs/m3)
Energy Cost - Intermediate pump houses (Rs/m3)
Chemicals Cost (Rs/m3)
3
Repairs and Maintenanace Cost of Transmission Distribution and Reservoir (Rs/m
)
Establishment Cost (Rs/m3)
Extension & New connection Cost (Rs/connection)
Over Head for personal (Head office /RSC/Manager O&M) Rs/Connection/month
Repair and maintenance cost per annum -phase II MRs
Note :
Personal expenses includes Perm/casual salaries, overtime, EPF/ETF, medical expenses
Energy cost includes utility & electricity costs
Chemical cost includes chemical, chlorine, Alum, Lime, Bleaching powder & all other chemical costs
Repair & maintenance cost includes extension cost, new connection cost, defective meter cost, E&M cost
Establishment cost includes cost of vehicles, hired vehicles, telephone, security, rent etc.
Domestic - 93% & Non Domestic - 7%
615
812
123
74
161
Grace
Period
2007
2012
2018
6
6
6
For stage I
For stage II
Loan MRs
(As per
No. of
Repay
Repayment
subsidary
installme
Completion agreement Start
nts
15% of
Capit
2013
2018
2024
20
20
20
2033
2038
2044
1205
631
1369
Interest
Rate
Note :
It is assumed 15% of the total loan will be repaid by NWSDB within 20 years period after 6
year Grace period.
Interest rate - 10%
8%
10%
10%
16.00
24.00
37.00
22,000.00
For Phase II
5.11
1.86
2.09
5.83
7.50
1.50
0.73
0.48
0.96
13,750
50.00
1 of 3
25%
2%
25%
10%
30%
30%
25%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Table 7.2.xlsx
Table 7.2
2024
67,000
24.46
20,500
2025
68,000
24.82
21,000
2026
69,000
25.19
21,500
2027
70,000
25.55
22,000
2028
71,000
25.92
22,500
2029
72,000
26.28
23,000
2030
72,000
26.28
23,000
2031
72,500
26.46
23,500
2032
73,000
26.65
24,000
2033
73,500
26.83
24,500
2034
74,000
27.01
25,000
2035
75,000
27.38
25,500
2036
75,500
27.56
25,500
2037
76,000
27.74
26,000
2038
76,500
27.92
26,000
2039
77,000
28.11
26,500
2040
77,500
28.29
26,500
2041
78,000
28.47
27,000
2042
78,500
28.65
27,000
2043
79,000
28.84
27,000
2044
79,500
29.02
27,000
2045
80,000
29.20
27,500
2046
80,500
29.38
27,500
2047
81,000
29.57
27,500
2048
81,500
29.75
28,000
32,550
54,250
583
7.48
32,900
54,833
583
7.67
35,625
59,375
4,542
7.85
36,000
60,000
625
8.03
36,375
60,625
625
8.21
36,750
61,250
625
8.40
36,750
61,250
8.40
36,750
61,250
8.58
36,750
61,250
8.76
36,750
61,250
8.94
36,750
61,250
9.13
37,125
61,875
625
9.31
37,500
62,500
625
9.31
37,500
62,500
9.49
37,875
63,125
625
9.49
37,875
63,125
9.67
38,250
63,750
625
9.67
38,250
63,750
9.86
38,625
64,375
625
9.86
39,000
65,000
625
9.86
39,375
65,625
625
9.86
39,375
65,625
10.04
39,750
66,250
625
10.04
40,125
66,875
625
10.04
40,125
66,875
10.22
11.05
11.17
12.09
12.22
12.35
12.47
12.47
12.47
12.47
12.47
12.47
12.60
12.73
12.73
12.86
12.86
12.98
12.98
13.11
13.24
13.37
13.37
13.49
13.62
13.62
0.83
19.36
187
518
60
16
781
0.84
19.67
240
523
61
16
840
0.91
20.85
245
567
66
125
1,003
0.92
21.17
251
573
66
17
907
0.93
21.49
257
579
67
17
920
0.94
21.81
262
731
85
17
1,095
0.94
21.81
328
731
85
0
1,144
0.94
21.99
335
731
85
0
1,151
0.94
22.17
342
731
85
0
1,158
0.94
22.36
349
731
85
0
1,165
0.94
22.54
356
914
106
0
1,376
0.95
22.86
454
923
107
21
1,506
0.96
23.00
454
932
108
21
1,516
0.96
23.18
463
932
108
0
1,504
0.97
23.31
463
942
109
21
1,536
0.97
23.50
472
1,177
137
0
1,786
0.98
23.63
590
1,189
138
27
1,944
0.98
23.82
602
1,189
138
0
1,928
0.99
23.95
602
1,200
139
27
1,968
1.00
24.09
602
1,212
141
27
1,981
1.01
24.23
602
1,530
177
27
2,335
1.01
24.41
766
1,530
177
0
2,473
1.02
24.55
766
1,544
179
27
2,516
1.03
24.68
766
1,559
181
27
2,532
1.03
24.87
780
1,559
181
0
2,519
40.34
42.69
48.09
42.86
42.80
50.22
52.44
52.33
52.22
52.11
61.06
65.89
65.95
64.89
65.87
76.01
82.25
80.96
82.16
82.23
96.40
101.31
102.50
102.59
101.32
123
74
161
358
164.9
75.0
241.9
23.5
23.4
15.5
31.1
10.4
39.4
123
74
161
358
170.7
77.3
250.4
24.2
24.2
16.1
32.2
10.6
43.8
123
74
161
358
182.8
88.0
268.2
27.6
26.0
17.2
34.5
11.8
47.9
123
74
161
358
199.6
95.4
292.7
29.9
28.3
18.8
37.6
53.8
123
74
161
358
205.0
97.3
300.7
30.5
29.1
19.3
38.6
53.8
74
161
235
222.0
103.2
325.7
32.3
31.5
20.9
41.9
53.8
74
161
235
229.5
106.4
336.7
33.3
32.6
21.6
43.3
13.8
59.8
161
161
261.9
121.0
384.1
37.9
37.2
24.6
49.4
15.3
67.8
161
161
268.8
123.4
394.3
38.7
38.2
25.3
50.7
67.8
161
161
283.3
130.9
415.5
41.0
40.2
26.6
53.4
16.2
69.1
290.8
134.8
426.5
42.2
41.3
27.3
54.8
16.5
69.8
298.5
137.5
437.7
43.1
42.4
28.1
56.3
76.7
774
1,132
812
1,047
831
1,066
877
1,112
907
1,142
945
1,106
953
1,114
999
1,160
1,007
1,168
1,076
1,237
1,104
1,104
1,120
1,120
306.3
141.6
449.3
44.4
43.5
28.8
57.7
17.2
77.5
197.51
1,364
1,364
314.4
145.8
461.1
45.7
44.6
29.6
59.3
17.5
78.2
756
1,114
161
161
276.0
127.1
404.8
39.8
39.2
26.0
52.0
15.9
68.4
20.19
1,069
1,230
161
161
248.5
115.2
364.4
36.1
35.3
23.4
46.8
14.7
61.0
161
161
255.1
117.5
374.1
36.8
36.2
24.0
48.1
61.0
750
1,107
74
161
235
235.7
109.6
345.7
34.3
33.5
22.2
44.4
14.1
60.4
47.55
947
1,182
74
161
235
242.0
111.8
354.9
35.0
34.4
22.8
45.6
60.4
704
1,062
123
74
161
358
210.5
99.2
308.8
31.1
29.9
19.8
39.7
53.8
206.13
999
1,357
74
161
235
216.2
101.2
317.1
31.7
30.7
20.3
40.8
53.8
650
1,007
123
74
161
358
189.2
90.7
277.5
28.4
26.9
17.8
35.7
12.0
48.4
20.00
747
1,104
123
74
161
358
195.7
93.5
287.0
29.3
27.8
18.4
36.9
12.3
48.9
625
983
123
74
161
358
176.7
85.4
259.2
26.8
25.1
16.6
33.3
84.0
47.4
182.14
937
1,294
1,196
1,196
322.7
148.7
473.3
46.6
45.8
30.3
60.8
78.2
28.75
1,235
1,235
(202)
(167)
(292)
(154)
(184)
(12)
30
19
(199)
118
310
394
334
362
430
672
784
760
738
744
1,231
1,353
1,152
1,336
1,284
25.56
26.17
37.19
27.55
28.81
28.53
28.77
29.26
37.49
30.26
30.78
32.04
34.38
32.69
33.85
33.90
35.32
35.38
37.32
37.33
38.05
38.37
46.42
40.46
41.52
2 of 3
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Table 7.2.xlsx
2050
82,500
30.11
28,000
2051
83,000
30.30
28,000
2052
83,500
30.48
28,500
40,500
67,500
625
10.22
40,875
68,125
625
10.22
41,250
68,750
625
10.22
41,250
68,750
10.40
13.75
13.88
14.00
14.00
1.03
25.00
780
1,967
228
27
3,001
1.04
25.14
975
1,985
230
34
3,223
1.05
25.28
975
2,003
232
34
3,244
1.05
25.46
992
2,003
232
0
3,228
120.04
128.22
128.33
126.78
331.1
153.1
485.7
48.0
47.0
31.1
62.4
18.2
78.9
339.8
157.6
498.4
49.4
48.2
32.0
64.1
18.6
87.6
348.7
162.3
511.5
50.8
49.5
32.8
65.7
19.0
88.4
1,256
1,256
1,296
1,296
1,329
1,329
357.8
165.5
524.8
51.9
50.8
33.6
67.4
88.4
240.63
1,581
1,581
1,746
1,928
1,915
1,647
41.95
43.03
43.86
51.87
Table 7.2
3 of 3
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Table 7.2.xlsx
DESCRIPTION
Annex 7.2.1.2
INCOME
TOTAL PRODUCTION
INCOME PER m3
(Rs)
(m3)
(Rs)
2010
2009
2008
147,730,717.00
112,041,593.00
70,769,614.00
New Connections
19,794,256.00
15,812,124.00
15,716,253.00
Other Revenues
5,109,145.00
10,863,927.00
172,634,118.00
138,717,644.00
2010
77,681,000.00
77,681,000.00
INCOME
(Rs)
2009
72,286,000.00
72,286,000.00
Billing
Total
2010
2010
2009
2008
Avg
19.81
16.31
10.03
15.39
2.65
2.30
2.23
2.39
8,470,601.00
0.69
1.58
1.20
1.16
94,956,468.00
23.16
20.19
13.46
18.94
2010
INCOME PER m3
(Rs)
2009
2008
7,455,509
2009
6,869,128
2008
7,055,277
INCOME
DESCRIPTION
Water Sale to KMC
Total
2008
44,944,000.00
44,944,000.00
TOTAL PRODUCTION
(m3)
2010
2009
2008
4,259
4,196
4,160
18,239.26
17,227.36
10,803.85
18,239.26
17,227.36
10,803.85
Avg
15,423.49
15,423.49
Table 7.2.xlsx
DESCRIPTION
Annex 7.2.2.2
O & M COST
TOTAL PRODUCTION
COST PER m3
(Rs)
(m3)
(Rs)
2010
2009
2008
59,557,252.00
47,438,733.00
Energy Cost
87,352,505.00
Chemicals Cost
Repairs and Maintenanace Cost of
Transmission and Distribution
Establishment Cost (Subsistence, Vehicle
running, Hired vehicles, Telephone, etc.)
Total
2010
2010
2009
2008
Avg
43,339,368.00
5.11
4.29
4.05
4.48
85,441,164.00
79,061,588.00
7.50
7.72
7.39
7.53
8,454,822.00
8,507,723.00
8,345,701.00
0.73
0.77
0.78
0.76
5,600,582.00
5,594,819.00
5,801,443.00
0.48
0.51
0.54
0.51
11,226,050.00
13,508,897.00
9,553,383.00
0.96
1.22
0.89
1.03
14.78
14.50
13.65
14.31
11,653,009
2009
11,066,628
2008
10,705,277
Table 7.2.xlsx
POOJAPITIYA
RAJAPIHILLA
DEMAND
MAX
/(m3/day)
7,192
Source
year
GKWSP
2015
GKWSP
2025
7,056 m3/Day
GKWSP
2030
6,767 m3/Day
GKWSP
2035
6,959 m3/Day
MSL =
Source
HT 4
B
585 m
HGL=590m
HTL 5
GKWSP
Proposal
Q=
Q=
6,959
88
Length=
Diameter =
5000
300
H/L
Original
Proposal
m3/Day
l/Sec
5.94
8,250
104.17
2063
2025
8,328
105.15
2082
2030
2035
8,257
8,378
104.26
105.79
2064
2095
GKWSP
2015
GKWSP
GKWSP
GKWSP
DEMAND MAX
/(m3/day)
2015
GKWSP
2025
1,298
16.39
GKWSP
GKWSP
2030
2035
1,268
1,318
16.02
16.64
HTL 6
6 hrs
Q=
Q=
Length=
Diameter =
HT 10
NUGAWELA
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2025
2030
2035
Q=
HWL583MSL
GKWSP Original
Proposal Proposal
15,337
m3/Day
194
5250
450
H/L
3.56
l/Sec
m
mm
m/km
325
317
329
Diameter =
300
H/L
B
HT 3
Original
Proposal
1,318
17
83
HGL=575m
UDUWAWALA
HT 12 HWL510MSL
Capacity Phase II - 600 m3/Day
for 6 hrs
316
Q=
Length=
HTL 4
m
mm
m/km
Source
Res Cap
GKWSP
Proposal
year
GKWSP
HWL563MSL
DEMAND
(22hrs)
/(l/
)
Source
year
HWL532MSL
DEMAND DEMAND(
MAX
22hrs)
/(m3/day)
/(l/sec)
1,265
15.97
0.27
m3/Day
l/Sec
m
year
GKWSP
GKWSP
2015
2025
2,256
2,316
28.48
29.24
564
579
GKWSP
2030
2,260
28.53
565
GKWSP
2035
2,351
29.68
588
HTL 3
Q=
Q=
Length=
Diameter =
16,655
210
m3/Day
l/Sec
1200
600
H/L
1.02
GKWSP
Proposal
HTL 12
GKWSP Original
Proposal Proposal
mm
m/km
Source
Q=
Q=
m
mm
m/km
Length=
Diameter =
Original
Proposal
2,351
29.68
m3/Day
l/Sec
1300
200
5.75
m
mm
m/km
f=7.7m/Km
HT 2
DEMAND
DEMAND(2 Res Cap for
MAX/(m3/d
2hrs)
ay)
/(l/sec)
6 hrs
3,236
40.86
809
3,317
41.88
829
3,239
40.89
810
3,370
42.55
842
HTL 2
HTL 10
Q=
Q=
Length=
Diameter =
GKWSP
Original
Proposal Proposal
3,370
43
1480
350
H/L
HT 8
0.73
m3/Day
l/Sec
m
mm
m/km
Q=
Q=
Length=
Diameter =
GKWSP Original
Proposal Proposal
19,006
230
2200
700
H/L
0.57
m3/Day
l/Sec
m
mm
m/km
Summary A4 Pump
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 1_Harispattuwa.xls
Summary
Capacity Phase II - 350 m3/Day
Source
year
GKWSP
2015
year
Res Cap
DEMAND MND(22hrs) /
for 6 hrs
2,140
27.02
GKWSP
Proposal
GKWSP
2025
2,197
27.74
549
GKWSP
2030
2,146
27.09
536
f=2.17m/Km
Q=
2035
2,233
28.20
Original
Proposal
558
HGL=632.55m
HTL 9
GKWSP
Proposal
3,084
Q=
Length=
Original
Proposal
39
l/Sec
2900
Diameter =
2025
2030
(only
1,265 Rajaphihilla)
(only
18,942 Rajaphihilla)
18,643
2035
16,655
MSL 490
HT 7
HTL 7
m/km
6426
851 m3/Day
Q=
11
Length=
550
Diameter =
150
l/Sec
f=1.46m/Km
Q=
mm
H/L
3.56
6,425
Q=
.GKWSP
Proposal
m/km
Q=
Q=
Length=
3,756
250
H/L
m3/Day
81
l/Sec
Length=
500
Diameter =
300
mm
Q=
9,794
Q=
l/Sec
m
2015
2,560
Diameter =
500
mm
2025
9,636
GKWSP
Proposal
m/km
Q=
Q=
Length=
Diameter =
2,669
34
200
250
H/L
HGL=630m
m3/Day
l/Sec
m
mm
2.45
28,800
Q=
348
l/Sec
Length=
2000
Diameter =
800
Q=
Q=
Length=
Diameter =
m/km
2030
2035
mm
0.64
MSL =
m/km
442 m
GKWSP
Proposal
9,408
9,794
Q=
Q=
0
0
1525
160
Original
Proposal
4,591
58
year
2015
DEMAND
MAX
/(m3/day)
4,408
2020
4,520
2025
4,415
2030
4,591
Including
Yatihalagal
a
m3/Day
l/Sec
HT 0
Original
Proposal
m3/Day
l/Sec
m
mmPVC
Length=
520
Diameter =
350
H/L
mm
m/km
1.30
HT 12(14)
Kulugammana
HWL630MSL
Katugastota WTP
m3/Day
m/km
HT 9
YAHALATHENNA
year
124
mm
4.61
m3/Day
0.93
28,051
26,449
Summary A2Pump
DEMAND
MAX
/(m3/day)
1200
H/L
28,578
Summary
Length=
m3/Day
l/Sec
m
47
2400
Diameter =
HT 12
Original
Proposal
f=3.4m/Km
Original
GKWSP Proposal Proposal
2025
2030
2035
HT 0
Q=
H/L
HTL 11
3,824
GKWSP Original
Proposal Proposal
HT 1
mm
3.20
2015
HTL 1
250
H/L
Q=
m3/Day
year
DEMAND
MAX
/(m3/day)
2015
HTL 8
535
B
GKWSP
DEMAND
MAX
/(m3/day)
HWL605MSL
BARIGAMA
Kondadeniya
HWL583.5MSL
HWL532MSL
Source
year
GKWSP
2015
GKWSP
GKWSP
GKWSP
2025
2030
2035
DEMAND DEMAND(2
Res Cap
MAX
2hrs)
for 6 hrs
/(m3/day)
/(l/sec)
815
10.29
204
835
817
851
10.55
10.32
10.74
Source
209
204
213
year
GKWSP
2015
GKWSP
GKWSP
GKWSP
2025
2030
2035
DEMAND DEMAND(2
Res Cap for
MAX
2hrs)
6 hrs
/(m3/day)
/(l/sec)
2,560
32.32
640
2,626
2,563
2,669
33.15
32.36
33.70
656
641
667
Source
year
GKWSP
2015
GKWSP
GKWSP
GKWSP
2025
2030
2035
DEMAND DEMAND(2
Res Cap
MAX
2hrs)
for 6 hrs
/(m3/day)
/(l/sec)
1,496
18.89
374
1,535
1,498
1,559
19.38
18.91
19.68
384
374
390
GKWSP Original
Proposal Proposal
Q=
Q=
Length=
Diameter =
1,559
H/L
Q=
Q=
Wegiriya
Note:
Existing Transmisson Lines
Proposed Transmission Lines for Phase II
DEMAND
MAX
/(m3/day)
year
GKWSP
2015
1,573
19.86
393
GKWSP
GKWSP
GKWSP
2025
2030
2035
1,615
1,577
1,639
20.39
19.91
20.70
404
394
410
l/Sec
m
mm
0.37
GKWSP Original
Proposal Proposal
1,639
21
Length=
100
Diameter =
150
DEMAND(
Res Cap for
22hrs)
6 hrs
/(l/sec)
Source
m3/Day
20
1000
300
H/L
m/km
GKWSP
Proposal
Q=
Q=
Length=
Diameter =
Q=
Length=
Diameter =
.GKWSP Original
Proposal Proposal
672
8
1200
150
H/L
Pallemula
m3/Day
l/Sec
3.11
m
mm
m/km
m3/Day
l/Sec
mm
11.98
m/km
GKWSP
Proposal
Q=
Q=
Original
Proposal
1,393
18
1720
200
H/L
m3/Day
l/Sec
2.18
m
mm
m/km
m3/Day
l/Sec
m
mm
2.30
820
250
H/L
Length=
Diameter =
Q=
Original
Proposal
3,032
38
HT 13
m/km
Kurudugahamada
HTL
HWL610MSL
Source
year
GKWSP
GKWSP
GKWSP
2015
2025
2030
DEMAND
MAX
/(m3/day)
976
1,001
978
GKWSP
2035
1,016
DEMAND(2
Res Cap for
2hrs)
6 hrs
/(l/sec)
12.32
244
12.64
250
12.35
245
12.83
GKWSP Original
Proposal Proposal
254
Q=
Q=
Length=
1,016
13
60
Diameter =
200
Sorce
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2025
2030
2035
H/L
m3/Day
l/Sec
m
mm
1.22
m/km
8.12
8.35
8.12
8.48
GKWSP
Proposal
161
165
161
168
Q=
Q=
Yatihalagala
Source
GKWSP
GKWSP
GKWSP
GKWSP
year
2015
2025
2030
2035
DEMAND
MAX
/(m3/day)
362
370
362
377
HWL512MSL
DEMAND
(22hrs)
/(l/sec)
Res Cap
for 6 hrs
4.58
4.67
4.58
4.76
91
92
91
94
GKWSP Original
Proposal Proposal
Q=
Q=
Length=
Diameter =
377
5
750
110
H/L
Original
Proposal
377
5
Length=
2070
Diameter =
110
H/L
m3/Day
l/Sec
m
mmPVC
3.57
m/km
m3/Day
l/Sec
m
mmPVC
3.57
m/km
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 1_Harispattuwa.xls
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
5,256
2,449
2,449
3,230
2015
5,621
2,507
2,507
3,440
2020
2,767
2,767
3,772
2025
3,055
3,055
4,139
Primrose
Asgiriya
Dangolla
R2
R3
Uplands
Peiriswatta
2010
1,546
2,890
2,890
1,646
2015
1,653
2,956
2,956
1,762
2020
3,264
3,264
1946
2025
3,604
3,604
2,148
2010
14,153
14,153
13668
2015
14,482
14,482
14560
2020
15,988
15,988
15976
2025
17,650
17,650
17538
2,513
2,513
2,381
2010
1,159
2015
1,240
2,570
2,570
2,480
2020
2,838
2,838
2,638
2025
3,133
3,133
2,813
2010
10,821
13504
13504
9018
2015
11,573
13817
13817
9238
2020
15254
15254
9731
2025
16841
16841
10277
2010
3,451
5024
5024
4500
2015
3,692
5141
5141
4751
2020
5676
5676
5148
2025
6266
6266
5586
2010
19,740
6,281
6,281
8934
2015
19,153
6,426
6,426
9516
2020
7,094
7,094
10445
2025
7,832
7,832
11461
2010
628
628
850
2015
643
643
960
2020
709
709
1086
2025
784
784
1226
3 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Ampiitya
Elhena
Mullepihilla low
Mullepihilla high
Meekanuwa
TennekumburaTalwatte
Gurudeniya
Hantana Place
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2504
2010
3,402
1,998
1,998
2015
3,641
1,337
1,337
2796
2020
1,475
1,475
3085
2025
1,628
1,628
3408
2010
1,928
1,928
1344
2015
2,152
2,152
1487
2020
2,375
2,375
1639
2025
2,622
2,622
1824
2010
503
503
374
2015
560
560
418
2020
619
619
461
2025
684
684
510
2010
442
442
228
2015
492
492
253
2020
544
544
280
2025
600
600
310
2010
630
1,906
1,906
912
2015
661
2,126
2,126
1020
2020
2,347
2,347
1128
2025
2,592
2,592
1236
2244
2010
787
1,397
1,397
2015
827
1,494
1,494
2508
2020
1,650
1,650
2760
2025
1,822
1,822
3054
2010
787
580
580
580
2015
827
647
647
647
2020
715
715
715
2025
790
790
790
2010
787
657
657
990
2015
827
705
705
1093
2020
786
786
1207
2025
870
870
1332
4 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Hantana (Upper)
Hantana (Lower)
Heerassagala (Lower)
H'gala (Middle)
H'gala (Upper)
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
787
1,983
1,983
1,983
2015
827
2,266
2,266
2,266
2020
2,550
2,550
2,550
2025
2,833
2,833
2,833
2010
473
634
634
634
2015
496
724
724
724
2020
815
815
815
2025
905
905
905
2010
748
660
660
660
2015
785
738
738
738
2020
812
812
812
2025
899
899
899
2010
309
2,311
2,311
2294
2015
331
2,365
2,365
2456
2020
2,611
2,611
2711
2025
2,882
2,882
2995
2010
787
1,138
1,138
1133
2015
827
1,226
1,226
1252
2020
1,367
1,367
1314
2025
1,514
1,514
1525
584
584
883
2010
787
2015
827
667
667
970
2020
751
751
1070
2025
834
834
1175
52,257
64,163
64,163
60,990
2015
53,808
66,041
66,041
65,335
2020
73,007
73,007
71,289
2025
80,640
80,640
77,984
2010
2,414
1,915
1,915
1,915
2015
2,749
2,105
2,105
2,105
2020
2,288
2,288
2,288
2025
2,494
2,494
2,494
Pujapitiya DS Division
Bokkawela (Ex)
5 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Pujapitiya 01
Pujapitiya 02
Ankumbura
Galhinna
Godahena
Kahawatta
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
815
1,218
1,218
1,218
2015
928
1,340
1,340
1,340
2020
1,457
1,457
1,457
2025
1,585
1,585
1,585
2010
1,640
1,640
1,640
2015
1,804
1,804
1,804
2020
1,961
1,961
1,961
2025
2,135
2,135
2,135
2010
731
731
731
2015
802
802
802
2020
875
875
875
2025
953
953
953
2010
1,952
1,952
1,952
2015
2,143
2,143
2,143
2020
2,333
2,333
2,333
2025
2,537
2,537
2,537
2010
1,484
1,484
1,484
2015
1,632
1,632
1,632
2020
1,776
1,776
1,776
2025
1,932
1,932
1,932
2010
3,435
1,339
1,339
3600
2015
3,912
1,472
1,472
3900
2020
1,601
1,601
4260
2025
1,745
1,745
4680
6,664
10,279
10,279
12,540
2015
7,589
2020
11,298
11,298
13,726
12,291
12,291
14,950
2025
13,381
13,381
16,316
2010
1,201
2,281
2,281
2,281
2015
1,368
2,549
2,549
2,549
2020
2,814
2,814
2,814
2025
3,108
3,108
3,108
Harispatuwa DS Division
Madadeniya (Ex)
6 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Barigama
Yatihalagala
Kulugammana
Rajapihilla
Kondadeniya
Gohagoda - Pallemulla
Bogahakanda
Yahalatenna
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
2,254
2,254
2,254
2015
2,515
2,515
2,515
2020
2,777
2,777
2,777
2025
3,062
3,062
3,062
2010
1,758
408
408
600
2015
2,000
456
456
660
2020
504
504
696
2025
557
557
768
4920
2010
1,201
2,699
2,699
2015
1,368
3,010
3,010
5520
2020
3,323
3,323
6120
2025
3,668
3,668
6720
2010
801
1,438
1,438
3696
2015
912
1,603
1,603
4124
2020
1,770
1,770
4554
2025
1,957
1,957
5026
2010
2,003
1,585
1,585
1800
2015
2,281
1,769
1,769
2040
2020
1,955
1,955
2220
2025
2,155
2,155
2424
2010
3,164
1,052
1,052
1,181
2015
3,603
1,174
1,174
1,318
2020
1,298
1,298
1,457
2025
1,430
1,430
1,608
2010
120
308
308
308
2015
137
344
344
344
2020
378
378
378
2025
419
419
419
2010
822
822
822
2015
918
918
918
2020
1,015
1,015
1,015
2025
1,120
1,120
1,120
7 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Moragahakanda
Wegiriya
Udawawala
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
1,595
1,595
1,595
2015
1,781
1,781
1,781
2020
1,964
1,964
1,964
2025
2,171
2,171
2,171
2010
1,740
1,740
1,999
2015
1,940
1,940
2,186
2020
2,144
2,144
2,407
2025
2,364
2,364
2,676
2010
1,522
2,314
2,314
2,314
2015
1,733
2,584
2,584
2,584
2020
2,854
2,854
2,854
2025
3,149
3,149
3,149
11,770
18,496
18,496
23,770
2015
13,402
20,643
20,643
26,539
2020
22,796
22,796
29,256
2025
25,160
25,160
32,251
2010
1,386
3240
2015
1,579
3720
Akurana DS Division
Akurana
Thelambugahawatta
Rabukeelgama
Owissa
2020
4200
2025
4800
2010
362
2760
2015
412
3180
2020
3600
2025
4020
2010
1,282
494
2015
1,460
637
2020
721
2025
815
2010
2,083
1,598
2015
2,372
1,529
2020
2,068
2025
2,338
8 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Kurugoda
Heepitiya
Wilana
Dunuwila
Balakaduwa
Dippitiya
Alawatugoda
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
1,566
3120
2015
1,784
3540
2020
3984
2025
4512
2010
2,531
636
636
2015
2,883
821
821
2020
928
928
2025
1,050
1,050
2010
677
677
2015
874
874
2020
989
989
2025
1,117
1,117
2010
930
930
2015
1,062
1,062
2020
1,201
1,201
2025
1,361
1,361
2010
334
334
2015
431
431
2020
487
487
2025
551
551
2010
1,368
1,368
2015
1,564
1,564
2020
1,769
1,769
2025
2,003
2,003
2010
2015
2020
2025
8,848
14,828
10,305
2015
10,078
17,300
12,012
2020
19,915
13,558
2025
23,074
15,394
9 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
Pathabumbara DS Division
Kahalla
Balanagala
Bangalawatta
Polgolla
Wattegama
Pitiyegedara
Udathalawinna
Napana
2010
1,038
3,290
3,290
3180
2015
1,075
3,763
3,763
3600
2020
4,154
4,154
3960
2025
4,586
4,586
4440
2010
1,199
1,531
1,531
1,531
2015
1,241
1,751
1,751
1,751
2020
1,933
1,933
1,933
2025
2,135
2,135
2,135
2010
958
3,338
3,338
3,338
2015
992
3,816
3,816
3,816
2020
4,216
4,216
4,216
2025
4,652
4,652
4,652
2010
1,406
1,406
1,406
2015
1,608
1,608
1,608
2020
1,776
1,776
1,776
2025
1,962
1,962
1,962
2010
2,790
2,790
2,790
2015
3,188
3,188
3,188
2020
3,520
3,520
3,520
2025
3,889
3,889
3,889
2010
1,158
1,746
1,746
1,746
2015
1,199
2,116
2,116
2,116
2020
2,460
2,460
2,460
2025
2,872
2,872
2,872
2010
995
995
995
2015
1,138
1,138
1,138
2020
1,255
1,255
1,255
2025
1,388
1,388
1,388
2010
400
672
672
672
2015
414
768
768
768
2020
848
848
848
2025
936
936
936
10 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Pihilladeniya
Doragamuwa
Moragas Kotuwa
Jambugahapitiya
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
799
2,096
2,096
2,096
2015
827
2,690
2,690
2,690
2020
3,253
3,253
3,253
2025
3,962
3,962
3,962
2010
1,412
1,412
1,412
2015
1,614
1,614
1,614
2020
1,781
1,781
1,781
2025
1,968
1,968
1,968
2010
1,398
1,398
1,398
2015
1,598
1,598
1,598
2020
1,764
1,764
1,764
2025
1,948
1,948
1,948
2010
539
2,569
2,569
2,569
2015
558
3,024
3,024
3,024
2020
3,469
3,469
3,469
2025
3,991
3,991
3,991
6,091
23,243
23,243
23,133
2015
6,306
27,074
27,074
26,911
2020
30,429
30,429
30,235
2025
34,289
34,289
34,143
Pathahewahata DS Division
Haragama Udarata Sadalla
Gurudeniya
Maligatenna
2010
163
163
2015
218
218
2020
272
272
2025
326
326
2010
404
404
2015
539
539
2020
673
673
2025
808
808
2010
1,282
1,282
2015
1,709
1,709
2020
2,137
2,137
2025
2,564
2,564
11 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Mudunakade
Anuragama
Year
Detail Design
M/P 2005
SAPROF
2010
2,226
2,226
2015
2,968
2,968
2020
3,710
3,710
2025
4,452
4,452
2010
1,166
1,166
2015
1,554
1,554
2020
1,943
1,943
2025
2,331
2,331
M/P 2006
5,241
5,241
2015
6,988
6,988
2020
8,735
8,735
2025
10,481
10,481
12 of 51
600 m3
Akurana
508MSL
Demand/(
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
Q=
Q=
Water source
0 m3/d
g
Original
Proposal
Proposal
4,800
Length=
1220
Diameter =
200
Kurugoda
Demand/(m
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
m3/d)
3240
3720
4,200
4,800
GKWSP
600 m3
m3/Day
year
2010
2015
2020
2025
Demand/(m3
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
3/d)
6,600
7,473
GKWSP
Original
Proposal
Proposal
7,473
Length=
75
Diameter =
500
569MSL
year
2010
2015
2020
2025
/d)
3120
3540
3,984
4,512
m3/Day
m
mm
Q=
m
mm
GKWSP
g
Original
GKWSP
g
Original
Proposal
Proposal
Proposal
Proposal
8,532
Length=
2455
Diameter =
350
m3/Day
Q=
m
mm
Q=
GKWSP
Original
Proposal
Proposal
4,020
4,512
Length=
1365
Diameter =
350
m3/Day
m
mm
m3/Day
Length=
910
910 m
Diameter =
250
250 mm
GKWSP
Proposal
Q=
Unit
500 m3
Thelabugahawatta
561.5MSL
16,005 m3/Day
Demand/(m3
600 m3
Kahawatta
516MSL
Sorce
GKWSP
year
2010
GKWSP
2015
GKWSP
2020
3,600
GKWSP
2025
4,020
/d)
2760
3180
Demand/(m
Sorce
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
GKWSP
2025
Q=
3/d)
3600
3900
4,260
4,680
GKWSP
Original
Proposal
Proposal
20,685
Length=
75
Diameter =
500
600 M3
Kahalla
491MSL
Demand/(
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
m3/Day
m
mm
GKWSP
Original
Proposal
Proposal
Q=
25,485
Length=
3690
Diameter =
500
Q=
GKWSP
Original
Proposal
29,925
m3/d)
3180
3600
3,960
4,440
m3/Day
m
mm
Q=
Proposal
year
2010
2015
2020
2025
GKWSP
Original
Proposal
Proposal
y
m3/Day
4,440
Length=
830
Diameter =
200
mm
m3/Day
Length=
887
Diameter =
600
mm
450 m3
Balanagala
513 MSL
100 M3
Bangalawatta
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
Demand/(m3
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
Q=
/d)
519.2MSL
Demand/(
1531
1751
1,933
2,135
m3/d)
3338
3816
4,216
4,652
GKWSP
Original
GKWSP
Original
Proposal
Proposal
Proposal
Proposal
m3/Day
Q=
Diameter =
mm
Diameter =
Q=
Length=
Q=
GKWSP
Original
Proposal
Proposal
29,925
Diameter =
m3/Day
Length=
421
Diameter =
600
mm
GKWSP
Original
Proposal
Proposal
Length= 3527 m
m3/Day
Length= 188 m
Diameter = 300 mm
Diameter = 300mm
m
mm
GKWSP
Original
Proposal
Proposal
Q = GKWSP
m3/Day
Length=
Diameter =
mm
mm
100 M3
Phill d i
Philladeniya
Sorce
year
Demand/(
SUMMARY A3 PUMP
m3/d)
Demand/(
GKWSP
2010
2010
15,900
GKWSP
2015
2015
17,940
GKWSP
2020
3,253
2020
26,604
GKWSP
2025
3,962
2025
29,925
year
KATUGASTOTA WTP
MSL 442m
Q=38905 m3/d
m3/d)
2096
2690
522 MSL
m3/Day
mm
4100
KATUGASTOTA WTP
year
MSL 442m
Q=48,000 m3/d
Summary A1 pump
year
GKWSP Original
m3/d)
2960
Sorce
year
2025
2030
30,991
Q=
24
2015
8,555
Length=
1285
2020
86,905
GKWSP
2020
9,292
Diameter=
200
2025
91,421
GKWSP
2025
9,917
H/L
4.01
2030
10,583
GKWSP
Original
Proposal
Proposal
GKWSP
Original
Proposal
Proposal
Thalwatta/Thennekumbura 540msl
m3/Day
Q=
391
m3/Day
Length=
980
980 m
800
800 mm
Length=
158
2020
Diameter =
450
H/L
2.44
m3/Day
Sorce
year
Demand/(
mm
Proposal
1.908945
2020 m
Q=
400 mm
233
Length=
1285
Diameter =
700
H/L
0.79
GKWSP
2015
GKWSP
2020
1,064
GKWSP
2025
GKWSP
2030
Original
GKWSP
Original
Proposal
Proposal
Q=
m3/d)
GKWSP
Diameter =
H/L
Q=
m3/d)
GKWSP
GKWSP
2020
Demand/(
51,217
(m3/d)
25,045
Proposal Proposal
556 MSL
2015
Demand/
2015
Upland
974
Length=
1285
Diameter =
150
H/L
2.56
m3/Day
year
2015
2020
2025
2030
Q=
Original
Proposal
Proposal
20
Length=
Diameter =
Length=
mm
Diameter =
Q=
Length=
Diameter =
KMC WTP
m
mm
2020
13,087
1,141
GKWSP
2025
665
GKWSP
2030
14,900
1,224
GKWSP
2030
712
Proposal
m3/Day
m
0.58
GKWSP
Original
Proposal
Proposal
45
Bahiravakanda
Sorce
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2020
2025
2030
500
H/L
2.02
m
mm
621MSL
Demand/(
m3/d)
2,894
3,139
3,347
3,572
R 3
1136m3
Demand/(
m3/d)
6,782
7,045
7,270
7,508
200
m3/Day
R 2
year
2015
2020
2025
2030
200
500
Q=
Length=
Diameter =
GKWSP
Original
Proposal
Proposal
5,033
m3/Day
m
mm
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2015
2020
2025
2030
m3/d)
4,415
4,736
5,009
5,305
GKWSP
Original
GKWSP
Original
Proposal
Proposal
Proposal
Proposal
Proposal
m
mm
39
m3/Day
Length=
860
860 m
Diameter =
300
200 mm
H/L
1.35
Q=
4,950
Length=
1800
Diameter =
300
H/L 10303.03
617MSL
Demand/(
Original
Q=
Proposal
188
Length=
GKWSP
m3/Day
Original
Diameter =
Proposal
5,226
GKWSP
Proposal
Q=
mm
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
12,054
13,961
GKWSP Original
m3/Day
GKWSP
m3/d)
2025
m3/d)
1,259
1,375
1,476
1,580
5,167
2015
GKWSP
600m3
Proposal Proposal
GKWSP
620
635MSL
Q=
year
2020
Demand/(
m3/Day
568
Demand/(
Sorce
GKWSP
3636m3
GKWSP
m3/d)
2015
mm
Length= 490+1800
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
Diameter = 500+250
Primrose
Sorce
510msl
Demand/(
GKWSP
Q=
495m3
Gurudeniya
Asgiriya
m3/Day
m
mm
33500 m3/DAY
GKWSP
Original
Proposal
Proposal
Demand/(m
year
GKWSP
Original
Proposal
Proposal
Q=
33
Length=
Diameter =
Q=
3/d)
59
2015
28,497
Length=
1000
2020
30,635
Diameter =
350
H/L
1.34
2025
2030
Sorce
year
Demand/(
m3/d)
m
mm
200m3
200m3
Heera. Low
Hantana place
Sorce
year
GKWSP
2015
GKWSP
2020
GKWSP
GKWSP
2025
2030
900m3
Demand/(
Ampitiya
Demand/(
Sorce
year
GKWSP
2015
1,940
658
GKWSP
2020
2,119
707
757
GKWSP
GKWSP
2025
2030
2,273
2,438
m3/d)
586MSL
m3/d)
m3/Day
Demand/(
Sorce
year
mm
GKWSP
2015
GKWSP
GKWSP
GKWSP
2020
2025
2030
m3/d)
2,364
2,582
2,770
2,970
GKWSP
Original
Proposal
Proposal
Q=
Dangolla
m3/Day
22
Length=
1265
Diameter =
250
250m3
Q=
m3/Day
m
GKWSP
2015
2,286
Sorce
year
GKWSP
2020
2,412
GKWSP
2015
GKWSP
2025
2,516
GKWSP
GKWSP
2030
2,628
Original
GKWSP
Original
Proposal
Proposal
Proposal
30
m3/Day
900
Diameter =
250
mm
H/L
1.96
1365m3
Demand/(
GKWSP
Proposal
Length=
mm
Heera. Middle
602
Q=
11
Length=
1890
Diameter =
150
H/L
3.43
Demand/(
year
1,040
GKWSP
2015
2020
1,139
GKWSP
2020
396
Sorce
year
GKWSP
2025
1,219
GKWSP
2025
424
GKWSP
2015
GKWSP
2030
1,308
GKWSP
2030
456
GKWSP
GKWSP
GKWSP
2020
2025
2030
m3/d)
GKWSP
Original
GKWSP Original
GKWSP
Original
Proposal
Proposal Proposal
Proposal
Proposal
m3/Day
Length=
760
Diameter =
150
mm
200m3
Heera. Upper
Sorce
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2020
2025
2030
Q=
10
Length=
Diameter =
m
150
479
543
594
397
mm
Demand/(
m3/d)
m3/Day
Q=
14
Length=
1700
Diameter =
150
H/L
5.58
390m3
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2020
2025
2030
m3/d)
658
719
772
826
100m3
m3/Day
m
mm
Length=
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2020
2025
2030
Demand/(
m3/d)
664
724
776
834
GKWSP
Original
Proposal
Proposal
m3/Day
1200
Diameter =
(high)
m3/d)
865
943
1,010
1,085
mm
Mullephilla
Demand/(
Sorce
New)
Q=
Hantana (high)
Demand/(
Sorce
Mullephilla (Low
362
Proposal
Q=
m
mm
Hantana (law)
Sorce
m3/d)
m3/Day
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2015
2020
2025
2030
Demand/(
m3/d)
377
413
442
473
567 MSL
m3/Day
m
mm
1136m3
Q=
Length=
Diameter =
GKWSP
Original
Proposal
Proposal
16
m3/Day
m
mm
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
Demand/(
m3/d)
1,020
1,087
1,168
1,240
Elhena
900m3
GKWSP
Original
Proposal
Proposal
Q=
31
Length=
1950
Diameter =
200
H/L
6.33
Meekanuwa
250m3
Sorce
Demand/(
year
586MSL
Demand/(
m3/d)
m3/Day
Sorce
year
GKWSP
2015
GKWSP
2015
1,970
GKWSP
2020
1,190
mm
GKWSP
2020
2,153
GKWSP
2025
1,274
GKWSP
2025
2,310
GKWSP
2030
1,367
GKWSP
2030
2,476
WATER SOURCE
m3/d)
1,088
1300 m3
Q=
Length=
Diameter =
H/L
GKWSP
Original
Proposal
Proposal
26
60
225 PVC
Q=
GKWSP
Original
Proposal
Proposal
17
Length=
m3/Day
m
Diameter =
mm
2.45
GKWSP
Original
Proposal
Proposal
Q=
m3/Day
Length=
736
Diameter =
150
mm
H/L
1.12
90m3
Meddepathna
GKWSP
Original
Proposal
Proposal
Q=
Length=
1000
Diameter =
100
620MSL
50m3
Radagaspanawatta 697MSL
Demand/(
Sorce
year
GKWSP
2015
GKWSP
GKWSP
GKWSP
2020
2025
2030
m3/d)
225
275
365
455
Sorce
year
GKWSP
2015
GKWSP
GKWSP
GKWSP
2020
2025
2030
Demand/(m
3/d)
100
125
175
200
m3/Day
m
mm
m3/Day
m
250
mm
POOJAPITIYA
RAJAPIHILLA
Sorce
GKWSP
DEMAND
DEMAND
MAX
MAX
23hrs)
/(m3/day)
/(l/sec)
/(m3/day)
year
2010
HWL532MSL
Sorce
GKWSP
8,209 m3/Day
GKWSP
2015
9,024 m3/Day
GKWSP
2020
9,888 m3/Day
GKWSP
2025
10,683 m3/Day
HT 4
MSL =
year
2010
3,696
44.64
GKWSP
2015
4,124
49.81
1031
GKWSP
2020
4,554
55.00
1139
GKWSP
2025
5,026
60.70
1257
HTL 5
GKWSP
Original
Proposal
Proposal
Q=
10683
Q=
129
Length=
GKWSP
2015
GKWSP
2020
GKWSP
m3/Day
DEMAND
(23h s)
27.55
2,549
30.79
637
2,814
33.99
704
HTL 6
Original
Proposal
Proposal
Q=
5,026
Q=
m3/Day
61
l/Sec
Length=
75
Diameter =
600
HTL 4
2025
3,108
37.54
777
l/Sec
Q=
500
H/L
DEMAND
MAX
2,281
GKWSP
Q=
mm
m/km
1.01
GKWSP
Original
Proposal
Proposal
13,791
5250
500
H/L
NUGAWELA
HWL583MSL
H/L
m3/Day
167
Length=
Diameter =
HT 10
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
HGL=575m
l/Sec
0.10
mm
m/km
Q=
18,817
Q=
227
Diameter =
HT 3
HTL 12
/(m3/day)
/(l/sec)
GKWSP
2010
2,314
27.95
GKWSP
2015
2,584
31.21
GKWSP
GKWSP
2020
2025
2,854
3,149
34.47
38.03
GKWSP Proposal
m3/Day
l/Sec
1165
mm
Original
Proposal
Q=
3,149
m3/Day
Q=
38.03
l/Sec
Length=
1300
Diameter =
200
600
H/L
mm
1.61
(23hrs)
year
Proposal Proposal
Length=
DEMAND
MAX
Sorce
m/km
1.18
m
mm
9.09
m/km
m/km
f=7.7m/Km
HT 2
DEMAND
DEMAND(2 Res Cap for
MAX/(m3/da 3hrs)/(l/se
c)
6 hrs
y)
year
2010
2015
2020
2025
1,595
1,781
1,964
2,171
HTL 10
Q=
19.26
21.51
23.72
26.22
399
445
491
543
HTL 2
GKWSP
Original
GKWSP Original
Proposal
Proposal
Proposal Proposal
2,171
Q=
m3/Day
26
Length=
Q=
350
H/L
Q=
l/Sec
1795
Diameter =
Length=
mm
0.30
Diameter =
m/km
21,966
m3/Day
265
l/Sec
1385
700
mm
H/L
0.74
HT 8
BARIGAMA
HWL510MSL
HTL 3
GKWSP Original
5000
Diameter =
year
2010
UDUWAWALA
HWL563MSL
585 m
Sorce
GKWSP
924
DEMAND
MADADENIYA
HGL=590m
HT 12
for 6 hrs
m/km
Summary A4 Pump
DEMAND MAX
Summary
HWL605MSL
year
/(m3/day)
DEMAND
MAX
year
Sorce
year
DEMAND
MAX
GKWSP
2010
2,254
27.22
564
GKWSP
2015
2,515
30.37
629
HTL 8
B
GKWSP
Original
Proposal
Proposal
/(m3/day)
2010
2015
2020
f=2.17m/Km
(only
3,696 Rajaphihilla)
(only
4,124 Rajaphihilla)
20,110
HTL 1
GKWSP
GKWSP
2020
2,777
33.54
694
GKWSP
2025
3,062
36.98
766
Q=
HGL=632.55m
Q=
Length=
HTL 9
Proposal
4,182
Proposal
51
MSL 490
mm
2.13
HT 7
HTL 7
m/km
#VALUE!
1,120 m3/Day
14
Proposal
HT 1
l/Sec
f=1.46m/Km
GKWSP
Original
Proposal
Proposal
Summary
8,616
9,644
2020
32,364
2025
35,458
Original
HT 0
Proposal
Q=
35,458
Q=
428
l/Sec
Length=
1850
Diameter =
800
H/L
HTL 11
Q=
21,966
300
H/L
Q=
l/Sec
2900
Diameter =
2025
m3/Day
2010
2015
m3/Day
Katugastota WTP
mm
0.94
m/km
MSL =
442 m
Summary A2Pum
DEMAND
DEMAND
MAX
Length=
550
Q = year
.GKWSP
Diameter =
200
H/L
mm
Proposal
m/km
1.34
Q=
13,492
Q=
Proposal
m3/Day
4,601
11,321
year
/(m3/day)
year
/(m3/day)
163
l/Sec
2010
4,920
2010
5,580
Length=
1300
2015
5,520
2015
6,210
Diameter =
500
mm
2020
12,254
2020
6,786
m/km
2025
13,492
2025
7,482
l/Sec
Length=
540
Diameter =
500
mm
MAX
m3/Day
Original
f=3.4m/Km
Q=
m3/Day
Q=
Original
Q=
56
Length=
2100
Diameter =
350
H/L
l/Sec
H/L
1.20
Q=
7,482
mm
Q=
90
.GKWSP Proposal
m/km
Original
GKWSP
Proposal
Q=
Q=
Length=
HGL=630m
Diameter =
HT 12
Q=
6,772
82
250
350
H/L
m3/Day
m
m3/Day
Length=
1525
Diameter =
160
Sorce
GKWSP
year
2010
GKWSP
GKWSP
GKWSP
2015
2020
2025
918
1,015
1,120
m
mm
l/Sec
H/L
2.95
m/km
m/km
Kondadeniya
520
350
mm
Q=
DEMAND
MAX
/(m3/day)
822
Length=
Diameter =
mmPVC
HWL630MSL
YAHALATHENNA
m3/Day
l/Sec
HT
Proposal
0
Q=
l/Sec
Proposal
Original
Proposal
f=3.4m/Km
HT 9
1.55
GKWSP Proposal
6,720
Q=
81
Length=
HWL532MSL
m3/Day
l/Sec
440
Sorce
GKWSP
year
2010
DEMAND
MAX
/(m3/day)
1,800
GKWSP
GKWSP
GKWSP
2015
2020
2025
2,040
2,220
2,424
DEMAND
(23hrs)
/(l/sec)
21.74
6 hrs
Proposal Proposal
450
Q=
510
555
606
Length=
1410
Diameter =
300
2,424
m3/Day
Original
11.09
12.26
13.53
230
254
280
Diameter =
300
H/L
mm
5.13
m/km
24.64
26.81
29.28
Q=
29
H/L
l/Sec
0.78
Q=
5,058
mm
Q=
61
m/km
HT 12(14)
Kulugammana
GKWSP Proposal
Length=
950
Diameter =
250
HWL583.5MSL
H/L
Proposal
m3/Day
l/Sec
m
mm
7.37
m/km
GKWSP Original
584
#DIV/0!
Sorce
GKWSP
year
2010
GKWSP
GKWSP
GKWSP
Proposal Proposal
DEMAND
DEMAND(2 Res Cap for
MAX/(m3/da 3hrs)/(l/se
c)
6 hrs
y)
4,920
59.42
1230
2015
5,520
66.67
1380
2020
6,120
73.91
1530
2025
6,720
81.16
Wegiriya
1680
Sorce
year
GKWSP
2010
DEMAND
MAX
/(m3/day)
2,000
GKWSP
GKWSP
GKWSP
2015
2020
2025
2,190
2,410
2,680
Q=
2,680
Q=
32
m3/Day
l/Sec
Length=
100
Diameter =
150
mm
H/L
27.39
m/km
Original
26.45
29.11
32.37
548
603
670
GKWSP Proposal
Q=
2,378
Q=
29
Length=
1720
Diameter =
200
H/L
Q=
.GKWSP
Original
Proposal
Proposal
419
Q=
1600
Diameter =
200
H/L
m3/Day
l/Sec
m
mm
5.41
m/km
m3/Day
Length=
Pallemula
Proposal
l/Sec
m
mm
0.22
HT 13
m/km
+675 MSL
Kurudugahamada
HTL 12
HWL675MSL
Sorce
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
GKWSP
2025
DEMAND
MAX
/(m3/day)
GKWSP Original
Proposal Proposal
1,180
1,320
1,460
14.32
16.02
17.72
295
330
365
Length=
90
1,610
19.54
403
Diameter =
200
Q=
1,610
Q=
19
H/L
DEMAND
(23hrs)
/(l/sec)
3.72
4.15
Sorce
year
GKWSP
GKWSP
2010
2015
DEMAND
MAX
/(m3/day)
308
344
GKWSP
2020
378
4.57
95
GKWSP
2025
419
5.06
105
m3/Day
l/Sec
m
mm
2.63
m/km
Original
hrs
GKWSP Proposal
77
86
Yatihalagala
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
DEMAND
MAX
/( 3/d
600 )
660
696
768
HWL512MSL
Q=
768
Q=
Length=
2070
Diameter =
110
Proposal
m3/Day
l/Sec
m
mmPVC
GKWSP Original
Proposal Proposal
Q=
768
Q=
Length=
Diameter =
l/Sec
750
110
H/L
H/L
m3/Day
mmPVC
12.29
m/km
12.29
m/km
Res Cap
for 6 hrs
579
646
714
787
mp
Including
Yatihalagal
a
T0
No
2010
1 A1 Pump
Bahirawakanda
2015
3,440
3,770
4,140
Asgiriya
13,670
14,560
15,980
17,540
Uplands
8,940
9,516
10,445
11,460
1,650
1,820
715
790
Gurudeniya
Sub Total for A1 Pump
25,840
27,516
32,560
35,750
Kondadeniya
1,800
2,040
2,220
2,425
Gohagoda/Pallemulla
1,180
1,320
1,460
Wegiriya
2,190
2,410
600
660
695
5,580
6,210
6,785
7,485
Kahalla
3,180
3,600
3,960
4,440
Kahawatta
3,600
3,900
4,260
4,680
Akurana
3,240
3,720
4,200
4,800
10,020
11,220
12,420
13,920
Kurugoda
3,120
3,540
3,984
4,512
Thelambugahawatta
2,760
3,180
3,600
4,020
Rabukeelagama
638
722
Vilana Udagama
875
991
Vilana
689
779
1,379
1,559
Balakaduwa
432
488
Heepitiya
823
931
1,769
2,003
Sub Total 1
Owissa
Dipitiya
Sub Total 2
5,880
6,720
14,189
16,005
15,900
17,940
26,609
29,925
3,700
4,125
4,555
5,025
Udawawala
2,854
3,149
Madadeniya (Ex)
2,814
3,108
Poojapitoya
9,888
10,683
20,111
21,965
4 A4 Pump
Rezoning
should be
2,680 done due to
line
770 constration
1,610
2,000
Yatihalagala
3 A3 Pump
2025
3,230
Talwatte
2 A2 Pump
2020
Rajapihilla
Sub Total 1
3,700
4,125
No
2010
2015
2020
Kulugammana
3,360
3,750
4,150
4,600
Nugawela
4,300
4,800
3,350
3,700
Barigama
2,500
2,700
Yahala thanne
1,015
1,120
378
419
Kurudugahamada(Bogahakanda)
Sub Total 2
5 R2
2025
7,660
8,550
11,393
12,539
11,360
12,675
31,504
34,504
58,680
64,341
97,458
107,664
R2(Including Tennekumbura)
9,018
9,238
9,731
10,277
R3
4,500
4,751
5,148
5,586
850
960
1,086
1,228
Ampitiya
2,504
2,796
3,085
3,408
Elhena
1,344
1,487
1,639
1,824
Mullepihilla - New
374
418
461
510
Mullepihilla high
228
253
280
310
Madepathana
200
225
275
365
Meekanuwa
912
1,020
1,128
1,236
Hantana Place
990
1,093
1,207
1,330
750
815
905
2,550
2,833
812
899
Peiriswatta
Hantana low
Hantana high
Hantana call link
Heerassagala (Lower)
2,294
2,456
2,711
2,995
Heerassagala (Middle)
1,133
1,252
1,314
1,525
883
1,128
1,272
1,440
25,230
27,827
33,514
36,671
Heerassagala (Upper)
Sub Total for R2 pump
2,381
2,480
2,638
2,813
Primrose
1,646
1,762
1946
2,148
29,257
32,069
38,098
41,632
Reservoir Location
2010
2015
2020
2025
Annex 2
A1 Pump
A2 Pump
2010
2011
2012
2013
2010
Bahirawakanda
2,690
2,740
2,790
2,850
3,230
Asgiriya
11,390
11,620
11,850
12,090
13,668
Uplands
7,445
7,590
7,740
7,890
8,934
21,525
21,950
22,380
22,830
25,832
Kondadeniya
1,500
1,530
1,561
1,592
1,800
983
1,003
1,023
1,044
1,180
1,667
1,700
1,734
1,769
2,000
500
510
520
531
600
4,650
4,743
4,838
4,935
5,580
Kahalla
2,650
2,703
2,757
2,812
3,180
Kahawatta
3,000
3,060
3,121
3,184
3,600
Akurana
2,700
2,754
2,809
2,865
3,240
Sub Total 1
8,350
8,517
8,687
8,861
10,020
Kurugoda
2,600
2,652
2,705
2,759
3,120
Thelambugahawatta
2,300
2,346
2,393
2,441
2,760
Sub Total 2
4,900
4,998
5,098
5,200
5,880
13,250
13,515
13,785
14,061
15,900
Rajapihilla
3,083
3,140
3,200
3,264
3,700
Kulugammana
2,800
2,856
2,913
2,971
3,360
Nugawela
3,580
3,652
3,725
3,799
4,300
9,463
9,653
9,846
10,043
11,360
48,888
49,866
50,863
51,881
58,672
50,000
50,000
50,000
50,000
50,000
Gohagoda/Pallemulla
Wegiriya
Yatihalagala
A3 Pump
A4 Pump
(m /d)
Reservoir Location
Pump
Annex 2
WTP KMC
Max Demand
3
Average Demand (m /d)
R2
2010
2011
2012
2013
2010
R2
5,682
5,795
5,911
6,029
6,818
R3
3,750
3,825
3,902
3,980
4,500
708
723
737
752
850
Thennekumbura
2,000
2,040
2,081
2,122
2,200
Ampitiya
2,087
2,128
2,171
2,214
2,504
Elhena
1,120
1,142
1,165
1,189
1,344
Mullepihilla - New
312
318
324
331
374
Mullepihilla high
190
194
198
202
228
Madepathana
167
170
173
177
200
Meekanuwa
760
775
791
807
912
Hantana Place
825
842
858
875
990
Heerassagala (Lower)
1,912
1,950
1,989
2,029
2,294
Heerassagala (Middle)
944
963
982
1,002
1,133
Heerassagala (Upper)
736
751
766
781
883
21,192
21,616
22,048
22,489
25,230
1,984
2,024
2,064
2,106
2,381
1,984
2,024
2,064
2,106
2,381
Primrose
1,372
1,399
1,427
1,456
1,646
1,372
1,399
1,427
1,456
1,646
24,381
24,868
25,366
25,873
29,257
33,600
33,600
33,600
33,600
33,600
Peiriswatta
Dangolla
Primrose
(m /d)
Reservoir Location
Pump
Annex 2
Annex 2
Annex 2
A1 Pump
A2 Pump
Max Demand
Pump
Name
(m3/d)
Reservoir Name
2010
2012
2015
2017
2020
2010
Bahirawakanda(Deleted)
2,690
2,800
2,970
3,090
3,280
3,230
Asgiriya
9,200
9,570
10,160
10,570
11,220
11,040
Uplands
Sub Total for A1 Pump(Except
Bahirawakanda)
6,300
6,550
6,950
7,230
7,670
7,560
15,500
16,120
17,110
17,800
18,890
18,600
Kondadeniya
1,500
1,560
1,660
1,730
1,840
1,800
983
1,020
1,080
1,120
1,190
1,180
1,667
1,730
1,840
1,910
2,030
2,000
500
520
550
570
600
600
4,650
4,830
5,130
5,330
5,660
5,580
Gohagoda/Pallemulla
Wegiriya
Yatihalagala
Sub Total A2 Pump
0
A3 Pump
Kahalla
1,100
1,140
1,210
1,260
1,340
1,320
Kahawatta
3,000
3,120
3,310
3,440
3,650
3,600
Akurana
2,700
2,810
2,980
3,100
3,290
3,240
Sub Total 1
6,800
7,070
7,500
7,800
8,280
8,160
Kurugoda
2,600
2,710
2,880
3,000
3,180
3,120
Thelambugahawatta
2,300
2,390
2,540
2,640
2,800
2,760
Sub Total 2
4,900
5,100
5,410
5,630
5,970
5,880
11,700
12,170
12,910
13,430
14,250
14,040
0
A4 Pump
Rajapihilla
3,080
3,200
3,400
3,540
3,760
3,700
Madadeniya
1,850
1,920
2,040
2,120
2,250
3,000
Sub Total 1
4,930
5,120
5,440
5,660
6,010
6,700
Kulugammana
2,800
2,910
3,090
3,210
3,410
3,360
Nugawela
3,580
3,720
3,950
4,110
4,360
4,300
Sub Total 2
6,380
6,630
7,040
7,320
7,770
7,660
11,310
11,750
12,480
12,980
13,780
14,360
43,160
44,870
47,630
49,540
52,580
52,580
50,000
50,000
50,000
50,000
50,000
50,000
Annex 2
WTP KMC
Max Demand
R2
2010
2012
2015
2017
2020
2010
R2
5,682
5,910
6,270
6,520
6,920
6,818
R3
3,750
3,900
4,140
4,310
4,570
4,500
708
740
790
820
870
850
Thennekumbura
2,000
2,080
2,210
2,300
2,440
2,200
Ampitiya
2,087
2,170
2,300
2,390
2,540
2,504
Elhena
1,120
1,170
1,240
1,290
1,370
1,344
Mullepihilla - New
312
320
340
350
370
374
Mullepihilla high
190
200
210
220
230
228
Madepathana
167
170
180
190
200
200
Meekanuwa
760
790
840
870
920
912
Hantana Place
825
860
910
950
1,010
990
Heerassagala (Lower)
1,912
1,990
2,110
2,200
2,330
2,294
19,512
20,300
21,540
22,410
23,770
23,214
1,984
2,060
2,190
2,280
2,420
2,381
1,984
2,060
2,190
2,280
2,420
2,381
Primrose
1,372
1,430
1,520
1,580
1,680
1,646
1,372
1,430
1,520
1,580
1,680
1,646
22,868
23,790
25,250
26,270
27,870
27,241
Bahirawakanda Added
2,690
2,800
2,970
3,090
3,280
3,230
25,558
26,590
28,220
29,360
31,150
30,471
33,600
33,600
33,600
33,600
33,600
33,600
Peiriswatta
Dangolla
Primrose
(m3/d)
Reservoir Location
Pump
Annex 2
Annex 2
Annex4
Original-2002
Name of Service Reservoir
Drawing
Pipe
Number Diameter
(mm)
20-C-05
20-C-05
Thelambugahawatta Junction To
Thelambugahawatta Reservoir
20-C-06
Material
DI / PVC
Pipeline
Pipe
Pipeline
Material
Length
Length Diameter
DI / PVC
(m)
(mm)
(m)
400
400
400
DI
655
987
378
500
DI
491
952
20-C-06
250
250
DI
250
DI
225
PVC
1,200
849
645
266
400
400
400
DI
250
DI
250
DI
2,020
2,053
645
266
GKWSP Revised-2007
Pipeline
Pipe
Material
Length
Diameter
DI / PVC
(m)
(mm)
450
450
450
DI
2,020
250
DI
75
250
DI
250
DI
1,700
645
266
20-C-20
20-C-20
20-C-21
350
DI
1,002
350
DI
1,000
350
DI
200
DI
628
200
DI
628
20-C-21
225
PVC
636
225
PVC
636
250
280
DI
PVC
20-C-22
150
160
150
150
DI
PVC
DI
DI
80
681
150
160
DI
PVC
80
681
150
160
DI
PVC
20-C-23
200
DI
300
DI
815
300
DI
800
DI
2,000
800
DI
2,000
700
DI
2,200
700
DI
2,200
600
DI
1,200
600
DI
1,200
300
DI
85
500
DI
1,500
400
DI
550
300
DI
200
Heerassagala Junction To
Heerassagala Low Reservoir
Heerassagala Low Reservoir To
Heerassagala Middle Reservoir
Heerassagala Middle Reservoir To
Heerassagala To Heerassagala Upper
Reservoir
KMC R2 SR & PS To Hantana Place
SR
77
739
500
DI
1,500
200
DI
350
1,000
628
636
80
681
77
739
REMARKS
Original-2002
Name of Service Reservoir
Drawing
Pipe
Number Diameter
(mm)
Material
DI / PVC
Japanese Apprasal-2007
Pipeline
Pipe
Pipeline
Material
Length
Length Diameter
DI / PVC
(m)
(mm)
(m)
Pipeline
Pipe
Material
Length
Diameter
DI / PVC
(m)
(mm)
225
PVC
60
225
PVC
60
225
PVC
60
225
200
200
PVC
DI
DI
175
1,050
2,040
225
200
200
PVC
DI
DI
175
1,050
2,040
280
250
250
PVC
DI
DI
175
1,050
2,040
225
PVC
586
225
PVC
586
280
PVC
586
150
DI
480
160
PVC
20-C-18
20-C-19
150
DI
160
90
962
86
PVC
149
290
931
150
DI
2,395
Annex4
GKWSP Revised-2007
150
DI
160
90
962
86
PVC
149
REMARKS
Annex 2
Reservoir Location
2010
2015
2020
2025
Land
Extend
Remarks
2007
1 Bahirawakanda
3,230
3,440
3,772
4,139
1,030
204
600
600
830
600 30P
No Capacity change
2,381
2,480
2,638
2,813
700
118
500
500
580
500 26P
No Capacity change
3 Uplands
8,934
9,516
10,445
11,461
2,870
4 Elhena
1,344
1,487
1,639
1,824
460
374
418
461
510
130
7 Heerassagala (Lower)
8 Heerassagala (Middle)
9 Heerassagala (Upper)
10 Kulugammana
11 Kondadeniya
12 Gohagoda/Pallemulla
**
990
2,294
1,093
2,456
1,207
2,711
1,332
2,995
27
25
330
2,960
3,000
2,840
300
300
460
300 13.2P
100
100
110
100 42P
No Capacity change
200 30P
200
750
200
200
200
3,000 68P
330
750
300 14.5P
1,133
1,252
1,314
1,525
380
250
250
380
250 18P
883
970
1,070
1,175
290
200
200
290
200 14.5P
3,400
1,800
1,181
3,750
2,040
1,318
4,150
2,220
1,457
4,600
2,424
1,608
1,150
610
400
13 Thelambugahawatta
2,760
3,180
3,600
4,020
1,010
14 Bangalawatta
3,338
3,816
4,216
4,652
950
15 Pihilladeniya
2,096
2,690
3,253
3,962
670
Moragirikanda
2,700
3,030
3,350
3,700
930
16 Meddapathane
200
225
275
365
90
300
300
150
100
200
200
450
200
200
850
310
250
500 213P
300 19.2P
250 10.5P
500
500
1,010
100
300
300
850
300 9.5P
100
200
200
570
200 19.2P
930
90
90
500 16.2P
930
90 6P
Note: Lands were acquired according to the original design capacities. But as per the new demands, proposed reservoir capacities changed.
Therefore, need to recheck the reservoir demands and availability of land area for new proposed reservoir capacities.
(Need to finalized)
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 1_Harispattuwa.xls
Annex 2
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 1_Harispattuwa.xls
Annex 2
Total
Reservoir
Capacity
3
(m )
Reservoir Location
2010
1 Elhena
2015
2020
2025
1,344
1,487
1,639
1,824
460
374
418
461
510
130
3 Hantana Place
990
1,093
1,207
1,332
4 Thelambugahawatta
2,760
3,180
3,600
5 Gohagoda/Pallemulla
1,181
1,318
200
225
6 Meddapathane
Existing
Reservoir
Capacity
3
(m )
Japanese
OriginalRequired
Apprasal- Capacity
2002
2007
GKWSP
REVIEW
Land
Extend
300
300
460
300 13.2P
100
100
110
100 42P
330
200
200
330
200 30P
4,020
1,010
500
500
1,010
500 16.2P
1,457
1,608
400
200
200
250
275
365
90
90
250 10.5P
100 6P
25
150
90
Remarks
Elevated
3,230
3,440
3,772
4,139
1,030
204
600
600
830
600 30P
2,381
2,480
2,638
2,813
700
118
500
500
580
500 26P
3 Uplands
8,934
9,516
10,445
11,461
2,870
27
2,960
3,000
2,840
1,500 68P
4 Heerassagala (Lower)
2,294
2,456
2,711
2,995
750
200
200
750
5 Heerassagala (Middle)
300 14.5P
1,133
1,252
1,314
1,525
380
250
250
380
250 18P
883
970
1,070
1,175
290
200
200
290
200 14.5P
7 Kondadeniya
1,800
2,040
2,220
2,424
610
300
200
200
310
8 Rajaphilla
1,440
1,600
1,770
1,960
490
300
300 19.2P
200
6 Heerassagala (Upper)
190
2,700
3,030
3,350
3,700
930
930
600
600
3,400
3,750
4,150
4,600
1,150
300
100
450
850
500 213P
2 Bangalawatta
3,338
3,816
4,216
4,652
950
100
300
300
850
300 9.5P
3 Pihilladeniya
2,096
2,690
3,253
3,962
670
100
200
200
570
200 19.2P
Note-
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 1_Harispattuwa.xls
Annex 2
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 1_Harispattuwa.xls
Annex 1
Reservoir Location
2010
2015
2020
2025
Total Reservoir
GKWSP
Existing
Capacity (25%
Required
Reservoir
Proposed
of Max
Capacity
Capacity
Capacity
Demand)
(m3)
3
(m )
(m3)
(m3)
Remarks
1 Bahirawakanda
3,230
3,440
3,772
4,139
1,030
204
830
600
2 Dangolla
2,381
2,480
2,638
2,813
700
118
580
500
3 Uplands
8,934
9,516
10,445
11,461
2,870
27
2,840
1,500
4 Elhena
1,344
1,487
1,639
1,824
460
460
300
374
418
461
510
130
110
100
6 Hantana Place
990
1,093
1,207
1,332
330
330
200
7 Heerassagala (Lower)
2,294
2,456
2,711
2,995
750
750
300
8 Heerassagala (Middle)
1,133
1,252
1,314
1,525
380
380
250
883
970
1,070
1,175
290
290
200
10 Thelambugahawatta
2,760
3,180
3,600
4,020
1,010
1,010
500
11 Kondadeniya
1,800
2,040
2,220
2,424
610
300
310
300
Original -200m3
12 Gohagoda/Pallemulla
1,181
1,318
1,457
1,608
400
150
250
250
Original -200m3
200
225
275
365
90
90
100
New
14 Nugawela
2,700
3,030
3,350
3,700
930
930
600
New
15 Rajaphilla
1,440
1,600
1,770
1,960
490
190
200
New
9 Heerassagala (Upper)
13 Meddapathane
25
300
Original -2960m3
Original -200m3
600
Total
6,500 m3
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line
diagrammes\Line Diagram 1_Harispattuwa.xls
Annex 5
Drawing
Number
Thelambugahawatta
Pipe
Diameter
(mm)
225
Material DI
/ PVC
Pipeline
Length (m)
PVC
200
160
PVC
880
160
PVC
880
110
PVC
890
110
PVC
890
160
PVC
1,400
160
PVC
1,400
90
PVC
750
90
PVC
750
160
PVC
290
160
PVC
290
250
DI
240
250
DI
240
225
PVC
1,030
225
PVC
1,030
1,090
225
PVC
1,090
40-C-08
40-C-09
40-C-10
40-C-11
Bangalawatta
40-C-20
No Design Changed
PVC
No Design Changed
Pihilladeniya
40-C-21
225
PVC
Kulugammana
40-C-22
250
DI
170
250
DI
170
100
DI
100
100
DI
100
90
PVC
430
90
PVC
430
250
DI
60
250
DI
60
225
PVC
170
225
PVC
170
40-C-25
300
DI
70
300
DI
70
No Design Changed
40-C-26
225
PVC
340
225
PVC
340
No Design Changed
250
DI
140
250
DI
140
225
PVC
670
225
PVC
670
40-C-28
160
PVC
430
160
PVC
430
40-C-29
160
PVC
540
160
PVC
540
40-C-30
160
PVC
160
PVC
Hantana Place
40-C-31
225
PVC
380
225
PVC
380
40-C-24
Gohagoda New
(Pallemulla)
Elhena
No Design Changed
300
DI
170
No Design Changed
40-C-23
Kondadeniya
290
No Design Changed
40-C-27
No Design Changed
Need to Check
No Design Changed
Original-2002
Name of Service
Reservoir
Drawing
Number
Heerassagala Upper
40-C-32
Pipe
Diameter
(mm)
160
Material DI
/ PVC
Pipeline
Length (m)
PVC
340
225
PVC
140
225
PVC
140
160
PVC
370
160
PVC
370
110
PVC
590
110
PVC
590
250
DI
220
250
DI
220
200
DI
40
200
DI
40
40-C-36
110
PVC
160
110
PVC
160
Bahirawakanda
40-C-37
250
DI
120
250
DI
120
Need to Check
Heerassagala Low
40-C-41
250
DI
280
250
DI
280
No Design Changed
40-C-33
40-C-34
Heerassagala Middle
Annex 5
No Design Changed
Already Laid by Kandy South
40-C-35
No Design Changed
YIELD
TOTAL
MSL
BH NO
SUPPLY
/(m3/Day)
MSL
BH NO
SUPPLY
/(m3/d)
/(m3/D)
/(m3/d)
450 BH 1
1000
BH 2
BH 3
B
Length=
K1
2005
Length=
Diameter =
Length=
1525 m
160 mmPVC
Diameter =
1100
2,545
2010
3,638
990 m
Q/(m3/Day )
160 mmPVC
Kondadeniya
1050
2010
2007
Length=
520 m
Diameter =
350 mmDI
Kondadeniya
2005
5191
2010
5543
2007
2010
7054
8423
Total No of Conection
Total No of Waiting List
160 m
Diameter =
Q=38905 m3/d
mmPVC
Length=
350 m
225 mmPVC
MSL 442m
BH 3
Q/(m3/Day )
Length=
Diameter =
BH 2
Diameter =
K2
KATUGASTOTA WTP
BH 1
MSL 531.2
200 mmDI
DEMAND
Sorce
Jica
year
2005
Jica
2010
GKWSP
2007
/(m3/d)
1706
Q/(m3/Day )
TWO LINES
1750
Length=
1,494
GKWSP
2010
No of Conection
No of Waiting List
Diameter =
2005
520 m
Length=
5"a
160 mmPVC
Diameter =
2756
910 m
2010
2850
300 mmDI
2007
4,039
2010
5,223
1,585
1149
5"
1030
Q/(m3/Day )
Length=
14
Kulugammana
MSL 579.2
Diameter =
2005
2435
950 m
2010
2693
250 mmDI
2007
3015
2010
3200
DEMAND
MAX/(m3/
Sorce
year
Jica
2005
Jica
GKWSP
2007
3,545
GKWSP
2010
4,638
2010
day)
1500
1550
No of Conection
2042
No of Waiting List
3101
Q/(m3/Day )
2005
2010
Wegiriya
65a
528 MSL
Length=
Diameter =
897
943
100 m
2007
1639
150 mmPVC
2010
1,740
65'
DEMAND
65
Sorce
Jica
year
2005
/(m3/d)
897
Jica
GKWSP
2010
2007
943
1,639
GKWSP
2010
1,740
No of Conection
2136
No of Waiting List
874
Pallemula
Q/(m3/Day )
Length=
2005
1720 m
Diameter =
200 mmDI
1538
2010
1750
2007
2010
1,376
1460
524MSL
DEMAND
Sorce
year
Jica
Jica
2005
2010
GKWSP
2007
2010
GKWSP
No of Conection
No of Waiting List
/(m3/d)
1044
1096
Q/(m3/Day )
Length=
991
Diameter =
2005
2010
90 m
200 mmDI
1,052
1044
1096
2007
991
2010
1052
6501
480
528
Q/(m3/Day )
Length=
1250 m
Diameter =
64B
Bogahakanda
90 mmPVC
2005
2010
494
654
2007
385
2010
408
560MSL
Q/(m3/Day )
DEMAND
Sorce
year
Jica
2005
100
Jica
2010
200
/(m3/d)
Length=
Diameter =
1140 m
110 mmPVC
2005
100
2010
200
6401
According to Review of Greater Kandy Water Supply Master Plan Phase II Prposed Bogahakaansda Reservoir is to be located
at Kurudugahamada at MSL 600 and the Transmisson root for the reservoir is selected along the Haloluwa-Kurudugahamada
Q/(m3/Day )
road(Sumanathissa Mawata)
Length=
`
64
2005
820 m
Diameter =
90 mmPVC
454
385
2010
408
DEMAND
Sorce
Jica
Jica
year
2005
2010
GKWSP
2007
385
GKWSP
2010
408
/(m3/d)
394
454
Q/(m3/Day )
Length=
Diameter =
750 m
2005
2010
394
454
160 mmPVC
2007
385
2010
408
64'
Length=
3000 m
Diameter =
160 mmPVC
SUPPLY
/(m3/d)
0
BH NO
BH 1
BH 2
BH 3
394
2010
2007
YIELD
/(m3/Day)
5807
5533
Akurana
600 m3
600 m3
508MSL
Kurugoda
DEMAND/
Sorce
year
Jica
2005
(m3/d)
2333
Jica
2010
2946
GKWSP
2007
1,981
GKWSP
2010
2,946
Q=
Length=
Water source
0 m3/d
Diameter =
569MSL
DEMAND/
Sorce
Jica
year
2005
(m3/d)
2402
Jica
2010
2815
GKWSP
2007
2,178
GKWSP
2010
2,815
m3/Day
1222 m
200 mm
Q=
m3/Day
Length=
3821 m
Diameter =
350 mm
500 m3
Q=
Thelabugahawatta
561.5MSL
m3/Day
DEMAND/
Length=
Diameter =
Q=
m3/Day
Sorce
Jica
Jica
GKWSP
GKWSP
m
mm
6571
7643
4159
year
2005
2010
2007
(m3/d)
1836
1882
0
2010
5761
600 m3
Kahawatta
600 M3
516MSL
Kahalla
DEMAND/
Sorce
Jica
year
2005
943
Jica
2010
GKWSP
GKWSP
2007
2,840
2010
3,038
491MSL
DEMAND
Sorce
(m3/d)
year
Jica
1211
Q=
Length=
Diameter =
0 m3/Day
3698 m
500 mm
2005
/(m3/d)
1679
Jica
2010
GKWSP
2007
2,225
2916
GKWSP
2010
2,916
7514
8854
6999
8799
Q=
1679
2916
2225
m3/Day
Length=
832 m
Diame=
200 mm
2916
Q=
0 m3/Day
Length=
884 m
Diame=
600 mm
9193
11770
9224
450 m3
11715
Balanagala
100 M3
513 MSL
Bangalawatta
DEMAND/
Sorce
Jica
year
2005
(m3/d)
1306
Jica
2010
1800
GKWSP
GKWSP
2007
2010
Q=
Length=
Diameter =
Q=
Length=
Diameter =
Q=
Length=
Diameter =
0 m3/Day
1062 m
600 mm
m3/Day
1790 m
600 mm
/(m3/d)
1412
2010
1600
GKWSP
2007
GKWSP
2010
225 mm
3772
Length= 3527 m
4600
0
0
Diameter = 300 mm
Length= 188 m
Diameter = 300mm
12965
Q=
16370
9224
Diameter = DI 200
m3/Day
Length=
100 m
492 m
PVC 225 mm
mm
11715
Philladeniya
DEMAND/
MSL 442m
Q=38905 m3/d
2005
m3/Day
Sorce
KATUGASTOTA WTP
year
Jica
1200 m
100 M3
MAX. DEMAND(m3/d)
519MSL
DEMAND
Sorce
Jica
year
2005
(m3/d)
1054
Jica
2010
1200
GKWSP
2007
GKWSP
2010
Jica
522 MSL
Q=
Length=
1120
Diameter =
250
Asgiriya
4100m3
2960m3
567MSL
Uplands
556MSL
KATUGASTOTA WTP
MSL 442m
Sorce
year
Q=38905 m3/d
Jica
2005
Jica
Q=
Length=
2007
GKWSP
2010
11237
19608
m3/Day
Length=
Diameter =
3/d)
2010
GKWSP
Q=
17590
28185
m3/Day
Demand/(m
Diameter =
Q=
mm
Length=
mm
Diameter =
2010
2007
GKWSP
2010
m3/Day
m
mm
m3/Day
Length=
Jica
6435
Jica
GKWSP
Diameter =
m
mm
Bahiravakanda
600m3
635MSL
Demand/(m
year
4383
3/d)
mm
Diameter =
Primrose
Sorce
2005
Length=
Q=
495m3
year
Jica
Q=
6353
8577
m3/Day
Demand/(m
Sorce
621MSL
Demand/(
Sorce
3/d)
year
m3/d)
2005
2217
Jica
2005
1970
Jica
2010
2296
Jica
2010
2142
GKWSP
2007
GKWSP
2007
GKWSP
2010
GKWSP
2010
R 2
3636m3
R 3
1136m3
Demand/(m
Q=
Length=
Diameter =
m3/Day
2217
2296
Q=
Length=
mm
Diameter =
m3/Day
5817
Sorce
Jica
7609
Jica
2010
GKWSP
2007
GKWSP
2010
mm
Q=
9257
Q=
Length=
Diameter =
m3/Day
year
2005
Length=
11480
Diameter =
617MSL
Demand/(m
3/d)
12996
Q=
5818
Length=
Diameter =
m3/Day
1045
1796
m3/Day
4772
5813
mm
Sorce
Jica
year
2005
Jica
2010
GKWSP
2007
GKWSP
2010
3/d)
3974
4151
798
Q=
mm
m3/Day
Length=
mm
Diameter =
1662
0
mm
KMC WTP
33500 m3/DAY
Q=
Length=
Diameter =
Length=
Diameter =
3440
3871
mm
Heera. Low
200m3
Q=
m3/Day
Hantana place
200m3
Demand/(m
Ampitiya
900m3
Demand/(m
586MSL
Demand/(m
Sorce
year
Sorce
year
Sorce
year
m3/Day
2399
Jica
2005
2289
Jica
2005
1045
Jica
2005
1581
2470
Jica
2010
2411
Jica
2010
1483
Jica
2010
2232
GKWSP
GKWSP
2007
2010
GKWSP
GKWSP
2007
2010
GKWSP
GKWSP
2007
2010
mm
3/d)
3/d)
3/d)
0
Q=
1151
Q=
m3/Day
Length=
Dangolla
1460
Diameter =
m3/Day
Length=
Q=
313
m3/Day
Length=
mm
Diameter =
Sorce
year
2005
2399
Jica
2010
2470
GKWSP
2007
GKWSP
2010
3/d)
Heera. Middle
250m3
1365m3
Demand/(m
Hantana (law)
100m3
Demand/(m
Sorce
year
Sorce
year
Jica
2005
880
Jica
2005
Jica
GKWSP
GKWSP
2010
2007
2010
910
Jica
GKWSP
GKWSP
2010
2007
2010
184
3/d)
3/d)
Q=
m3/Day
Length=
Q=
m3/Day
Length=
Diameter =
271
550
mm
Diameter =
mm
390m3
200m3
Heera. Upper
Sorce
Jica
year
2005
Jica
GKWSP
GKWSP
2010
2007
2010
H
(hi
h)
Hantana
(high)
Demand/(m
Sorce
year
3/d)
Demand/(m
Jica
2005
271
Jica
2010
129
550
GKWSP
GKWSP
2007
2010
3/d)
0
129
730
0
0
mm
mm
Demand/(m
Jica
1300 m3
517
Diameter =
WATER SOURCE
Mullephilla
Demand/(m
Sorce
year
Jica
2005
517
Jica
GKWSP
GKWSP
2010
2007
2010
730
3/d)
(m3/d)
Summary A3 pump
Demand/(
year
m3/d)
2020
78,353
2015
28,626
2025
79,476
2020
30,609
2025
17,001
Summary A4 pump
Summary
Demand/(
year
y
year
y
m3/d)
KATUGASTOTA WTP
2020
15,320
2025
27,846
2015
MSL 442m
Q=48,000 m3/d
2020
2025
Summary A2 pump
Demand/(
year
m3/d)
2015
4,820
2020
5,221
2025
5,599
y A1 pump
Demand/(
m3/d)
25,045
27,203
29,030
Existing
150 m3
Phase 111
Galhinna
745MSL
100 m3
PJ 9
Existing
150 m3
Phase 11
300 m3
Year
632MSL
PJ11
Demand m3/d
2015
2025
2030
2035
667
654
628
646
Demand m3/d
PJL10
2015
2025
2030
1,783
1,748
1,676
Q=
Q=
Length=
2035
1,724
Diameter =
H/L
Q=
Q=
Length=
Diameter =
H/L
GKWSP Original
Proposal Proposal
1,724
21.8
4000
200
m/km
3.24
PJL
Phase 11
250 m3
m3/Day
l/Sec
m
mm
Godahena
650MSL
Year
Demand m3/d
2015
2025
2030
2035
1,115
1,093
1,050
1,078
PJL9
Q=
Q=
Length=
Diameter =
H/L
GKWSP Original
Proposal Proposal
646
8.2
6100
m3/Day
l/Sec
m
150
2.14
Note:
mm
m/km
PJ10
GKWSP Original
Proposal Proposal
1,723
21.8
600
200
m/km
3.24
m3/Day
l/Sec
m
mm
PJ7
PJL7
Q=
Q=
Length=
PJ8
PJL4
Q=
Bokkawala
Year
Existing
300 m3
Phase 11
300 m3
2015
2025
590MSL
Demand m3/d
1,452
1,427
2030
1,367
2035
1,408
Q=
Length=
Diameter =
H/L
GKWSP
Proposal
Original
Proposal
1,408
m3/Day
17.8
2300
200
2.23
GKWSP
Proposal
PJL3
l/Sec
m
mm
Q=
2,291
Q=
Length=
Diameter =
H/L
m/km
Original
Proposal
5.48
Diameter =
H/L
m3/Day
28.9
950
200
GKWSP Original
Proposal Proposal
3,448
43.53
3400
m3/Day
l/Sec
m
250
3.94
mm
m/km
PJL1
l/Sec
m
mm
Q=
Q=
Length=
Diameter =
m/km
PJ3
PJ4
H/L
PJL2
PJL6
Q=
Q=
Length=
GKWSP
Original
Proposal
Proposal
883
11.2
210
Diameter =
H/L
150
3.82
m3/Day
l/Sec
m
GKWSP
Proposal
Q=
Q=
Length=
5,738
72.5
400
Diameter =
300
H/L
4.16
Phase 11
250 m3
Pujapitiya 2
Year
m3/Day
l/Sec
m
Madadeniya to Pujapitiya
included in Harispaththuwa
line diagram. (Node PJ1 -
mm
m/km
PJT2)
PJ2
mm
PJL5
m/km
Q=
Q=
Length=
Diameter =
2015
2025
2030
2035
585MSL
Demand m3/d
911
895
858
883
m3/Day
l/Sec
m
mm
Original
Proposal
H/L
PJ6
GKWSP Original
Proposal Proposal
6,959
87.9
5000
300
m/km
5.94
PJ5
Phase 11
300
m3
Pujapitiya 1
585MSL
Year
Demand m3/d
2015
2025
2030
2035
1,264
1,238
1,188
1,220
GKWSP Original
Proposal Proposal
1,220
15.4
1150
150
m/km
6.94
m3/Day
l/Sec
m
mm
PJ1
Madadeniya
Year
Phase 11
650
m3
2015
2025
2030
2035
564MSL
Demandm3/d
7,192
7,056
6,767
6,959
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 2_Pujapitiya.xlsx
Ankubura
Year
Existing
150 m3
Galhinna
745MSL
PJ 9
Existing
Year
150 m3
Phase 11
300 m3
Phase 111
200 m3
Max 2010
1952
Max 2015
2143
Max 2020
2333
Max 2025
2537
Max 2010
Max 2015
731
802
875
100 m3
953
Max 2025
Original
Proposal
Proposal
PJL10
11.5(l/s), 6.1 km
Gravity
Original
Proposal
Q=
953
Q=
11.5
l/Sec
6100
Length=
2,537
30.6
m3/Day
l/Sec
Length=
4000
Diameter =
200
H/L
Godahena
PJ
Q=
6.10
GKWSP
Proposal
Diameter =
Q=
H/L
PJ11
Demandm3/d
GKWSP
632MSL
Demandm3/d
Year
Phase 11
300 m3
200
1.00
mm
m/km
650MSL
Demandm3/d
Max 2010
1484
Max 2015
1632
1776
mm
200 m3
1932
Max 2025
m3/Day
PJ10
m/km
PJL9
GKWSP
Original
g
Proposal
Proposal
Q=
Q=
34.8
l/Sec
Length=
600
Diameter =
200
mm
H/L
7.71
m/km
PJ7
PJL7
GKWSP
Original
Proposal
Proposal
Q=
m3/Day
Q=
PJ8
Bokkawala
Year
Existing
300 m3
590MSL
Demandm3/d
PJL4
Original
Proposal
Proposal
Q=
2,494
, 9
Q=
Length=
Max 2010
1915
Diameter =
Max 2015
2105
H/L
2288
300 m3
2494
Max 2025
GKWSP
PJL3
GKWSP
Original
Proposal
Proposal
65
Length=
3400
Diameter =
200
H/L
l/Sec
m
mm
PJL1
m3/Day
m
/D y
Q=
4,629
,6 9
30.1
l/Sec
Q=
55.9
l/Sec
Q=
2300
3400
Q=
200
5.91
Length=
mm
m3/Day
m
/D y
200
H/L
m/km
PJ3
PJ4
55.9 (l/s), 0.95km
DI-300, f = 2.38
m/Km
30.1 (l/s),2.3km
DI-300,
f=0.76m/Km
PJL2
GKWSP
Original
Proposal
Proposal
Q=
2,135
Q=
25.8
GKWSP
Original
Proposal
Proposal
Q=
Diameter =
m3/Day
l/Sec
Length=
210
Diameter =
200
mm
H/L
GKWSP
Original
Proposal
p
Proposal
p
m3/Day
140.5
Length=
210
Diameter =
200
H/L
Q=
Length=
PJL6
m/km
m/
m
mm
m/km
18.55
24.80
101.98
l/Sec
m
mm
m/km
141(l/s), 5.0 km
DI-500, f = 1.2m/Km
m3/Day
PJL
121.3
l/Sec
210
200
77.76
mm
m/km
PJ2
PJL5
GKWSP
Original
Proposal
Proposal
Madadeniya to
included in Hari
line diagram. (N
PJT2)
Q=
19.1
l/Sec
Length=
1150
Diameter =
200
H/L
PJ6
m/km
Madadeniya 564MSL
Year
Pujapitiya
Year
Phase 11
300 m3
Phase 111
250 m3
2.55
PJ1
mm
585MSL
Demandm3/d
Max 2010
1640
Max 2015
1804
Max 2020
1961
Max 2025
2135
PJ5
Pujapitiya 1
Year
Phase 11
400
m3
Max 2010
585MSL
Demandm3/d
1218
Max 2015
1340
Max 2020
1457
Max 2025
1585
Phase 11
650
m3
Demandm3/d
Max 2010
2281
Max 2015
2549
Max 2020
2814
Max 2025
3108
178 (l/s)
Ankubura
Year
Galhinna
745MSL
Existing
Year
150 m3
Phase 11
300 m3
Phase 111
200 m3
Max 2010
1952
Max 2015
2143
Max 2020
2333
Max 2025
2537
PJ 9
632MSL
PJ11
Demandm3/d
Existing
150 m3
Max 2010
Max 2015
Phase 111
Max 2020
1111
100 m3
Max 2025
1176
Demandm3/d
944
1036
PJL10
GKWSP
Original
Proposal
Proposal
Q=
#REF!
Q=
#REF!
Length=
PJL8
H/L
Godahena
Year
650MSL
l/Sec
83
Diameter
Di
t =
m3/Day
m
200
#REF!
mm
m/km
PJ10
Demandm3/d
Phase 11
Max 2010
1484
300 m3
Max 2015
1632
Phase 111
200 m3
Max 2020
1776
Max 2025
1932
PJL9
34.8 (l/s), 0.6 km,DI-300, f
PJ7
PJL7
66 5 (l/s),
66.5
(l/s) 3.4
3 4 km,DI
km DI-300
300,
PJ8
Bokkawala
Year
Existing
300 m3
Max 2010
590MSL
Demandm3/d
1915
Max 2015
2105
2288
300 m3
2494
Max 2025
PJL3
PJL4
30.1 (l/s),2.3km
PJ4
PJL2
PJ3
PJL1
PJ2
PJL5
PJL6
PJ6
Pujapitiya 2
Year
Phase 11
300 m3
Phase 111
250 m3
3
141(l/s), 5.0 km
DI-500, f = 1.2m/Km
PJ5
585MSL
Pujapitiya 1
Demandm3/d
Max 2010
1640
Max 2015
1804
Max 2020
1961
M 2025
Max
2135
Year
Phase 11
400
m3
585MSL
Demandm3/d
Max 2010
1218
Max 2015
1340
Max 2020
1457
M 2025
Max
1585
PJ1
Madadeniya
Year
Phase 11
650
m3
564MSL
Demandm3/d
Max 2010
2281
Max 2015
2549
Max 2020
2814
Max 2025
3108
178 (l/s)
Node
Line
Length (km)
Demand
(m3/d)for
Year 2025
Flow (l/s)
Dia (mm)
DI
Friction loss
(m)
Avilable
total Head
(m)
Total Head
Loss (m)
Reservoir
Remarks
PJT2
from kahawatta
pump station
PJTL2
4.8
12944
149.81
500
6.384
85
PJTL4
1.4
11182
129.42
450
2.52
PJTL3
0.45
1758
20.35
150
5.058
Pujapitiya 1
PJTL5
0.95
5125
59.32
400
0.684
Towards
Bokkawala
PJTL6
0.21
2364
27.36
150
4.998
Pujapitiya 2
PJTL7
2.3
2761
31.96
350
1.173
80.761 Bokkawala
Towards
Godahena
63.552 Galhinna
97.484 Galhinna
PJT3
PJT3
76.442
PJT4
PJT4
PJT5
PJT4
PJT6
PJT6
PJT7
PJT6
PJT8
PJT4
PJTL8
3.8
6057
70.1
400
3.552
70
PJTL9
2.3
2817
32.6
300
1.173
105
PJTL10
0.1
3236
37.45
300
0.1
PJTL11
6.1
1097
12.7
200
9.943
PJT9
PJT9
PJT10
PJT9
63.552 Godahena
PJT11
PJT11
PJT12
18
Ankubura(Gravity)
Line
PJ1
Dia (mm)
DI
Stage 1
Length (km)
Stage 11
Phase 11
PJL1
500
5000
PJL2
400
400
PJL3
300
950
PJL4
350
2300
PJL5
150
1150
PJL6
200
200
PJL7
300
3400
PJL8
300
4000
PJL9
300
600
PJL10
200
6100
PJ2
PJ3
PJ4
PJ8
PJ2
PJ5
PJ4
PJ6
PJ3
PJ7
PJ9
PJ7
PJ10
PJ11
TOTAL
24100
Phase 111
Remarks
Included in Harispathtuwa
Division
Existing
150 m3
PJ 9
Galhinna
Existing
150 m3
Phase 11
300 m3
Phase 111
200 m3
745MSL
Year
632MSL
Demandm3/d
Max 2010
Max 2015
731
802
Phase 111
Max 2020
875
100 m3
Max 2025
953
Demandm3/d
PJL10
Max 2010
1952
Max 2015
2143
Q (L/S/)=
11.5
Max 2020
2333
L(m)=
6100
Max 2025
2537
PJL8
Q (L/S/)=
30.6
L(m)=
4000
D(mm)=
300
hf(m/Km)=
0.85
Head Loss=
3.39
Godahena
Year
Phase 11
300 m3
Phase 111
200 m3
D(mm)=
200
hf(m/Km)=
1.00
Head Loss=
6.08
650MSL
PJ10
Demandm3/d
Max 2010
1484
Max 2015
1632
Max 2020
1776
Max 2025
1932
PJL9
Q (L/S/)=
46.7
L(m)=
600
D(mm)=
300
hf(m/Km)=
1.84
Head Loss=
1.11
PJ7
PJL7
Q (L/S/)=
77.3
L(m)=
3400
D(mm)=
300
hf(m/Km)=
4.69
Head Loss=
15.94
PJ8
Bokkawala
Year
Existing
300 m3
590MSL
PJL4
Demandm3/d
Max 2010
1915
Q (L/S/)=
30.1
Max 2015
2105
L(m)=
2300
2288
D(mm)=
300
300 m3
2494
hf(m/Km)=
0.82
Head Loss=
1.89
Max 2025
PJ4
PJL1
PJL2
PJL3
Q (L/S/)=
55.9
Q (L/S/)=
133.2
Q (L/S/)=
152.4
L(m)=
950
L(m)=
400
L(m)=
5000
D(mm)=
300
D(mm)=
400
D(mm)=
500
hf(m/Km)=
2.58
hf(m/Km)=
3.16
hf(m/Km)=
1.37
Head Loss=
2.45
Head Loss=
1.27
Head Loss=
6.84
PJ3
PJ2
PJL6
PJL5
Q (L/S/)=
25.8
Q (L/S/)=
19.2
L(m)=
200
L(m)=
1150
D(mm)=
200
D(mm)=
200
hf(m/Km)=
4.44
hf(m/Km)=
2.56
Head Loss=
0.89
Head Loss=
2.94
PJ6
Pujapitiya 2
Year
Phase 11
300 m3
Phase 111
250 m3
PJ5
585MSL
Pujapitiya 1
Demandm3/d
Max 2010
1640
Max 2015
1804
Max 2020
1961
Max 2025
2135
Year
Phase 11
400
m3
585MSL
Demandm3/d
Max 2010
1218
Max 2015
1340
Max 2020
1457
Max 2025
1585
PJ1
Madadeniya
Year
Phase 11
650
m3
564MSL
Demandm3/d
Max 2010
2281
Max 2015
2549
Max 2020
2814
Max 2025
3108
178 (l/s)
Vilana Udagama
Rambuke Elagama
Max.(m3/d)
725MSL
Max.(m3/d)
AL4
Phase 11
2015
432
100 m3
2025
419
Length
1.80
Km
2030
2035
414
Diameter
100
mm DI
437
Demand
hf
A4
Phase 11
2015
310
100m3
2025
2030
2035
300
A5
Owissa Intake
Owissa OLD
296
Water source
313
610MSL
Vilana old
610MSL
Max.(m3/d)
313
(m3/d)
3.95
l/s
500
300
3.44
m/Km
m3
Max.(m3/d)
Existing
Exiting
2015
2025
2030
2035
4
5
778
300
755
m3
746
788
A14
2015
2025
2030
2035
389
378
373
394
AL13
AL12
AL3
Length
0.80
Km
Length
1.30
Km
Diameter
100
mm DI
Demand
394
(m3/d)
A13
Length
4.70
Km
Diameter
150
mm DI
Diameter
150
mm DI
Demand
788
(m3/d)
Demand
750
(m3/d)
9.95
l/s
9.47
l/s
2.63
m/Km
2.40
m/Km
hf
hf
hf
Length
2.30
Km
Diameter
150
mm DI
Demand
1,182
(m3/d)
hf
Kurugoda
675MSL
Phase 11
Max (m3/d)
Max.(m3/d)
AL8
2015
2025
2030
2035
Length
1,039
Diameter
350
mm
1,027
Demand
2225
(m3/d)
28.09
l/s
400 m3
0.29
m/Km
1000 m3
1,085
hf
1.50
Km
2015
2025
2030
2035
600
A10
m3
Phase 111
615MSL
AL9
2,195
l/s
5.57
m/Km
Length
3.50
Km
Phase 11
2,102
Diameter
200
mm DI
150
2,225
Demand
1,949
(m3/d)
m3
24.61
l/s
3.46
m/Km
hf
Heepitiya
2015
2025
2030
2035
A11
Max.(m3/d)
Phase 11
AL10
548
100
530
Length
2.0
Km
524
Diameter
100
mm DI
554
Demand
212
(m3/d)
2.68
l/s
1.08
m/Km
hf
AL2
675MSL
Balakaduwa
Max.(m3/d)
2,126
A3
m3
A15
2015
2025
2030
2035
210
203
200
212
Akurana 1 511MSL
Length
2.0
Km
Thelambugahawatta
Diameter
200
mm
Phase 1
Demand
1,835
(m3/d)
23.17
l/s
3.09
m/Km
hf
14.92
Max (m3/d)
Max.(m3/d)
Stage 1
1,069
m/Km
570MSL
Phase 1
250 m3
l/s
5.26
AL11
A12
Dippitiya
4.97
AL7
A8
0.90
Km
600 m3
Diameter
300
mm
Phase 111
Demand
1649
(m3/d)
20.82
l/s
0.35
m/Km
hf
Exisisting
Max (m3/d}
600 m3
2015
1,038
1,628
2025
1,007
1,579
2030
996
1,561
2035
1,052
Stage 11
Length
AL5
Length
560MSL
Max.(m3/d)
A9
2015
2025
2030
2035
350 m3
950
1,649
AL 16
2.1
Km
Diameter
200
mm
Length
1.40
Demand
1,949
(m3/d)
Diameter
200
mm
24.61
l/s
Demand
1052
(m3/d)
3.46
m/Km
hf
A 18
hf
Length
A2
AL6
Kahawatte
2.50
Km
Diameter
350
mm
Demand
3874
(m3/d)
48.91
l/s
0.81
m/Km
hf
A7
AL0
Length
AL1
Length
1.30
Km
Diameter
250
mm
Demand
3,784
(m3/d)
47.77
l/s
3.98
m/Km
hf
A1
v
2015
2025
1,448
2030
2035
1,367
520MSL
l/s
1.11
m/Km
Max (m3/d)
Phase 1
2015
10,910
Stage 1
2025
10,597
600m3
2030
2035
10,438
1,421
1,402
13.28
From Katugastota W T P
10,987
A 17
600m3
Km
Diameter
300
mm DI
Demand
4,660
(m3/d)
58 84
58.84
l/s
hf
Max. (m3/d)
Km
2.41 m/Km
A0
Akurana 2
AL 15
Length
Diameter
Demand
Note:
0 7 Km
0.7
150 mm DI
Phase 11
2015
865
877 (m3/d)
400 m3
2025
839
2030
830
2035
877
11.07 l/s
hf
511 MSL
Max (m3/d}
3.20 m/Km
A 16
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 3_Akurana.xlsx
Node
1
1
2
2
3
3
4
4
5
2
6
7
7
8
8
9
8
10
10
11
11
12
12
13
12
14
11
15
6320
300
2200
hf /m/km
hf /m
4.2
9.3
Elevation/ m
520
Pump Head /m
Residual Head /m
67
10.7
120
5.8
567
3
3314
250
2000
3.1
6.2
675
1098
200
4700
1.2
5.6
9.4
660
800
150
1800
2.7
4.9
77
7.1
67
11.5
725
6
3006
250
2100
2.6
5.5
570
520
9960
350
2500
4.6
11.6
4192
350
900
0.9
0.8
455
560
10
5768
350
1,380
1.7
73
2.3
20.6
9.1
570
11
4165
250
3500
4.8
16.6
7.4
615
12
2592
250
2300
2.0
4.5
13
1728
250
1300
0.9
1.2
550
69
11.1
610
14
864
250
800
0.3
0.2
12.1
610
15
541
150
2000
1.3
2.6
75
675
7.4
Vilana Udagama
Rambuke Elagama
Max.(m3/d)
725MSL
Max.(m3/d)
Phase 11
Phase 11
AL4
250
2010
677
m3
2015
775
Length
1.80
Km
2020
875
Diameter
150
mm
2025
991
Demand
A4
hf
A5
200
2010
494
m3
2015
565
2020
638
2025
722
Owissa Intake
Owissa
Water source
1
500
(m3/d)
l/s
Existing
300
2010
1,017
300
2010
509
2.24
m/Km
m3
2015
1,164
m3
2015
582
2020
658
2025
744
2020
1,317
2025
1,488
AL13
Length
0.80
1.30
Km
Diameter
150
mm
mm
Demand
744
(m3/d)
200
Diameter
250
mm
Demand
1,488
(m3/d)
Demand
1,713
(m3/d)
17.97
l/s
2.10
m/Km
l/s
A14
Length
Diameter
m/Km
Exiting
A13
Km
0.92
4.70
20.69
610MSL
Max.(m3/d)
722
AL3
hf
Vilana old
8.72
AL12
Length
610MSL
Max.(m3/d)
hf
hf
Km
8.99
l/s
2.36
m/Km
A12
AL11
Length
2.30
Km
Diameter
250
mm
Demand
2,232
26.96
1.50
hf
Dippitiya
Kurugoda
675MSL
Phase 11
Max.(m3/d)
m3
400
570MSL
Stage 1
615MSL
1,368
Length
1.38
Km
2015
1,564
Diameter
350
mm
m3
2015
3,048
Length
2020
1,769
Demand
5404
(m3/d)
Phase 111
2020
3,446
Diameter
2025
2,003
65.27
l/s
400 m3
2025
3,899
Demand
m/Km
1000 m3
hf
A3
1.50
2010
2,666
AL2
2.0
Km
Thelambugahawatta
300
mm
Phase 1
Demand
3,716
hf
1.58
AL7
(m3/d)
A8
l/s
m/Km
AL5
Length
2.1
Km
Diameter
250
mm
Demand
2,146
25.92
Phase 11
mm
250
2010
636
m3
2015
728
Length
2.0
Km
2020
823
Diameter
150
mm
2025
931
Demand
488
(m3/d)
5.89
l/s
1.08
m/Km
(m3/d)
44.09
l/s
1.53
A11
m/Km
hf
1.39
Exisisting
Max (m3/d}
600 m3
2010
Stage 11
Length
0.90
Km
Diameter
350
mm
Demand
3652
(m3/d)
44.11
l/s
0.72
m/Km
hf
560MSL
Max.(m3/d)
A9
2,400
600 m3
2010
2,489
2015
2,400
Phase 111
2015
2,851
2020
2,400
2020
3,228
2025
2,400
2025
3,652
350 m3
950
(m3/d)
l/s
Length
1.40
Km
Diameter
200
mm
2400
(m3/d)
Demand
m/Km
28.99
hf
Length
A2
AL6
Diameter
350
mm
Demand
9056
(m3/d)
2010
1,932
l/s
2015
2,143
2020
20,111
m/Km
2020
2,338
2025
23,173
2025
2,556
AL1
Km
Diameter
300
Demand
5,862
(m3/d)
70.80
l/s
3.68
m/Km
hf
Max (m3/d)
Phase 1
Km
hf
1.30
520MSL
l/s
m/Km
2.50
109.37
Length
Kahawatte
A7
5.09
3.89
Max. (m3/d)
Length
Km
Diameter
400
mm
Demand
5,863
(m3/d)
70.81
l/s
mm
hf
0.91 m/Km
Stage 1
2010
15,068
600m3
2015
17,497
From Katugastota W T P
1180
1
A1
Akurana 2
511 MSL
Max (m3/d}
Length
0.7 Km
Diameter
300 mm
Demand
3,299 (m3/d)
39.84 l/s
Phase 11
2010
546
500 m3
2015
1,295
Phase 111
2020
2,188
Phase 11
AL10
hf
Akurana 1 511MSL
Length
44.88
Km
300
3,651
675MSL
Max.(m3/d)
3.50
AL9
hf
Diameter
Balakaduwa
Heepitiya
Max.(m3/d)
2010
A10
600
l/s
m/Km
Max.(m3/d)
Phase 1
AL8
400
(m3/d)
A15
150
2010
334
m3
2015
382
2020
432
2025
488
hf
1.27 m/Km
500 m3
2025
3,299
Length /(m)
Line
Diameter / (mm)
AL1
300
2500
AL2
300
2000
AL3
250
4700
AL4
150
1800
AL5
250
AL6
350
AL7
350
AL8
350
AL9
300
3500
AL10
150
2000
AL11
250
2300
AL12
200
1300
AL13
A14
TOTAL
150
800
Stage 1
A1
A2
A3
A4
A5
A2
2100
A10
A7
2500
A8
900
A9
A8
1400
A10
A11
A15
A11
A12
A13
A12
3900
900
20900
2100
Remarks
Vilana Udagama
Rambuke Elagama
Max.(m3/d)
725MSL
Max.(m3/d)
Phase 11
Phase 11
AL4
250
2010
677
m3
2015
775
Length
1.80
Km
2020
875
Diameter
150
mm
2025
991
Demand
A4
hf
A5
200
2010
494
m3
2015
565
2020
638
2025
722
Owissa Intake
Owissa
Water source
((m3/d))
l/s
300
2010
1,017
300
2010
509
2.24
m/Km
m3
2015
1,164
m3
2015
582
2020
1,317
2020
658
2025
1,488
2025
744
500
Existing
g
Exiting
g
A14
AL13
A13
Length
0.80
Km
1.30
Km
Diameter
150
mm
Km
Diameter
200
mm
Demand
744
(m3/d)
Demand
1,488
(m3/d)
8.99
l/s
17.97
l/s
2.36
m/Km
2.10
m/Km
hf
250
mm
Demand
1,713
(m3/d)
20.69
l/s
0.92
m/Km
hf
Length
Diameter
610MSL
Max.(m3/d)
722
AL3
4.70
Vilana old
8.72
AL12
Length
610MSL
Max.(m3/d)
hf
A12
AL11
Length
2.30
Km
Diameter
250
mm
Demand
2,232
(m3/d)
26.96
l/s
hf
Dippitiya
675MSL
Phase 11
400
Phase 1
AL8
400
m3
Max.(m3/d)
Stage 1
615MSL
1.38
Km
2015
1,564
Diameter
350
mm
m3
2015
3,048
Length
3.50
Km
Phase 11
2020
1,769
Demand
5404
(m3/d)
Phase 111
2020
3,446
Diameter
300
mm
250
2010
636
2025
2,003
65.27
l/s
400 m3
2025
3,899
Demand
3,651
(m3/d)
m3
2015
728
Length
2.0
Km
m/Km
1000 m3
44.09
l/s
2020
823
Diameter
150
mm
2025
931
Demand
488
(m3/d)
5.89
l/s
1.08
m/Km
1.50
2,666
1.53
hf
AL2
Length
2.0
Km
Thelambugahawatta
300
mm
Phase 1
hf
3,716
(m3/d)
44.88
l/s
1 58
1.58
m/Km
AL7
A8
Length
m/Km
/K
AL5
Length
2.1
Km
Diameter
250
mm
Demand
hf
2,146
(m3/d)
25.92
l/s
1.39
0.90
Exisisting
350
mm
Demand
3652
(m3/d)
44.11
l/s
0.72
m/Km
A9
600 m3
2010
Max (m3/d}
2010
2,400
2,489
2015
2,400
Ph s 111
Phase
2015
2 851
2,851
2020
2 400
2,400
350 m3
2020
3,228
2025
2,400
2025
3,652
AL 16
A 18
950
Length
200
mm
Demand
2400
(m3/d)
28.99
l/s
hf
A2
520MSL
Km
Diameter
350
mm
Demand
9056
(m3/d)
2010
1,932
l/s
2015
2,143
m/Km
2020
2,338
2025
2,556
3.89
AL0
AL1
A1
Km
Length
Km
Diameter
400
mm
Demand
5,863
(m3/d)
5.09
m/Km
Max (m3/d)
Phase 1
2.50
hf
1.30
Kahawatte
Length
109.37
Length
A7
Km
Diameter
m/Km
AL6
1.40
Max. (m3/d)
Stage 1
2010
15,068
600m3
2015
17,497
A 17
2020
20,111
2025
23,173
From Katugastota W T P
1180
A0
AL 15
Akurana 2
Max (m3/d}
511 MSL
Phase 11
AL10
600 m3
Stage 11
Km
Di
Diameter
t
hf
560MSL
Max.(m3/d)
Max.(m3/d)
hf
Akurana 1 511MSL
Diameter
Demand
Max.(m3/d)
A11
675MSL
Balakaduwa
Length
hf
2010
Heepitiya
1,368
A10
600
AL9
2010
A3
m/Km
570MSL
Kurugoda
Max.(m3/d)
1.50
A15
150
2010
334
m3
2015
382
2020
432
2025
488
hf
1.27 m/Km
A 16
500 m3
2025
3,299
Note:
Existing Transmisson Lines
Proposed Transmission Lines for Phase II
2015
2025
2030
Phase 11
2035
Capacity
3
500m
Max.(m3/d)
2015
2025
2030
2035
2,028
2,050
1,990
2,075
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
PTL 9
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
To Kahawatta/Akurana SR
Max.(m3/d)
Max. (m3/d)
2015
2025
786
763
754
12
796
Head Loss
26.2
2600
200
4.56
11.9
Head Loss
786
763
2030
754
2035
796
PTL 11
BP2
PTL 10
10
2015
2025
2030
2035
655 MSL
Max.(m3/d)
25.7
4800
200
4.41
21.2
Doragamuwa
611.5 MSL
Phase 11 Max.(m3/d)
Capacity
2015
3
350m
2025
2030
2035
Max. (m3/d)
2015
2,003
2025
1,993
2030
1,949
2035
2,038
09
10,910
10,597
10,438
10,987
Q (L/S)=
10.0
L(m)=
D(mm)=
hf(m/km)=
Head Loss
3300
150
3.14
10.4
1,217
1,230
1,195
1,242
PTL 5
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
43.9
1200
250
4.00
4.8
Max. (m3/d)
Wattegama
557MSL
New
Max.(m3/d)
Capacity
2015
3,407
3
2025
3,440
650m
2030
3,342
2035
3,478
Max. (m3/d)
PTL 8
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
138.7
1600
700
0.22
2015
2025
2030
4,031
4,043
3,938
Head Loss
0.4
2035
4,112
BP1
PTL 25
Q (L/S)=
L(m)=
51.9
100
D(mm)=
hf(m/km)=
300
2.25
Head Loss
0.2
2015
2025
2030
2035
3,407
3,440
3,342
3,478
1,400
06
PTL 6
08
Max. (m3/d)
IBP 1
2015
2025
2030
2035
25
1,013
1,025
995
1,033
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
13.0
2700
150
5.10
Head Loss
13.8
Moragaskotuwa 525MSL
New
Max.(m3/d)
Capacity
2015
1,013
Phase11
2025
1,025
26
3
2030
995
250m
2035
1,033
PTL 7
Q (L/S)=
62.9
L(m)=
D(mm)=
hf(m/km)=
800
300
3.20
Head Loss
2.6
PTL 24
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
151.8
2000
500
1.36
Head Loss
2.7
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
28.9
1000
200
5.46
Head Loss 5.5
23
Kahalla
New
Capacity
24 600m3
550m3
1150m3
491MSL
Max.(m3/d)
2015
2,236
2025
2,260
2030
2,197
2035
2,286
2035
Head Loss
Head Loss
180.6
600
800
0.19
0.1
124.5
1400
400
2.79
3.9
14
Head Loss
Max.(m3/d)
2015
10,982
2025
11,065
2030
10,758
2035
11,209
02
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
322.2
750
600
2.25
1.7
Balanagala
515 MSL
Existing Max.(m3/d)
Capacity
2015
450m3
2025
2030
450m3
2035
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
Max. (m3/d)
2015
1,318
2025
1,332
2030
1,295
2035
1,346
03
17.0
1200
225
1.16
1.4
15
BP3
PTL 13
BP5
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
PTL 15
Max. (m3/d)
2015
3,918
2025
4,285
2030
4,640
2035
5,026
17.0
150
300
0.28
0.0
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
63.5
1400
350
1.54
2.2
16
01
From WTP
Bodigala
530 MSL
Existing
Max.(m3/d)
C
Capacity
it
2015
450m3
2025
2030
2035
3,564
3
564
3,896
4,222
4,571
17
PTL 16
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
57.7
5050
300.0
2.73
Head Loss
13.8
1,390
1,349
1,403
2,526
2,736
2,934
3,144
Max. (m3/d)
19
PTL 12
2025
2030
2035
22
13
Head Loss
25,141
24,947
24 388
24,388
25,516
1,318
1,332
1,295
1,346
BP4
PTL 1
2015
2025
2030
2035
61.6
4200
300
3.08
12.9
PTL 18
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
141.5
1900
600
0.49
0.9
Pitiyegedara
550MSL
New
Max.(m3/d)
Capacity
2015
1,375
07
9,863
PTL 2
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
Max. (m3/d)
2015
4,782
2025
4,830
2030
4,691
2035
4,880
IBP2
PTL 22
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
852
860
834
870
17.7
1300
200
2.21
2.9
PTL 4
PTL
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
05
350m3
Max. (m3/d)
2015
9,665
2025
9,733
2030
9,463
PTL 23
Max. (m3/d)
2015
2,236
2025
2,260
2030
2,197
2035
2,286
Uyanwatte
U
tt 501.6
501 6 MSL
Existing Max.(m3/d)
Capacity
2015
354
110m3
2025
389
2030
419
2035
455
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
64.6
2700
300
3.37
9.1
PTL 21
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
Head Loss
2015
2025
2030
2035
39.7
1400
250
3.32
4.6
2,526
2,736
2,934
3,144
20
Max. (m3/d)
2015
4,096
2025
2030
2035
4,438
4,768
5,118
PTL 20
Q (L/S)=
L(m)=
D(mm)=
hf(m/km)=
PTL 19
Head Loss
24.9
500
225
2.34
1.2
PTL
21
Pihilladeniya524.5 MSL
Existing 100m3
Max.(m3/d)
N
New Capacity
C
it
Stage 11 200m3
2015
Phase 11 300m3
2025
2030
2035
1,570
1,702
1,834
1,974
Q (L/S)=
L(m)=
D(
D(mm)=
)
hf(m/km)=
Head Loss
8.3
6050
160
1.60
9.7
654
18
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 4_Pathadumbara.xlsx
4100
Demand/(
KATUGASTOTA WTP
year
MSL 442m
Q=48,000 m3/d
Summary A1 pump
year
2960
Source
year
Demand/(
m3/d)
H/L
495m3
Source
GKWSP
GKWSP
GKWSP
GKWSP
Primrose
year
2015
2020
2025
2030
24
48,546
GKWSP
2015
8,346
Length=
1285
2020
2025
78,598
85,151
GKWSP
2025
9,326
Diameter=
200
GKWSP
2030
9,818
H/L
3.90
2035
10,336
GKWSP
Q=
Length=
Diameter =
Q=
2015
Demand/(
m3/d)
22,139
24,631 (Including Thalwatta& Gurudeniya)
25,981 (Including Thalwatta& Gurudeniya)
27,409
556 MSL
m3/d)
GKWSP
Proposal
2015
2020
2025
2030
Upland
GKWSP Original
Proposal Proposal
GKWSP Original
Proposal Proposal
346
m3/Day
980
980 m
800
800 mm
Q=
Length=
Diameter =
H/L
155
2020
450
Thalwatta/Thennekumbura 540msl
m3/Day
m3/Day
mm
1.866674
Q=
Length=
Diameter =
2.35
Source
year
Demand/(
m3/d)
GKWSP
2015
950
GKWSP
2025
1,072
GKWSP
2030
GKWSP
2035
0.63
H/L
GKWSP Original
Proposal Proposal
192
1285
700
Original
Proposal
Gurudeniya
Source
year
GKWSP
2015
568
GKWSP
2020
1,130
GKWSP
1,194
GKWSP
Q=
Length=
1285
Diameter =
150
H/L
2.56
m3/Day
Source
2015
2025
10,474
620
GKWSP
2030
11,021
2025
665
GKWSP
2035
11,596
2030
712
Q=
Length=
Diameter =
GKWSP Original
Proposal Proposal
Q=
45
Length= 490+1800
Diameter = 500+250
635MSL
Demand/(
m3/d)
1,259
1,375
1,476
1,580
600m3
Bahiravakanda
Source
year
Demand/(
m3/d)
GKWSP
GKWSP
GKWSP
GKWSP
2015
2025
2030
2035
H/L
GKWSP Original
Proposal Proposal
20
m3/Day
m
mm
Q=
Length=
Diameter =
Q=
Length=
Diameter =
KMC WTP
GKWSP
Original
Proposal
Proposal
5,226
m3/Day
m
mm
GKWSP Original
Proposal Proposal
5,167
m3/Day
m
mm
Source
GKWSP
GKWSP
GKWSP
GKWSP
Q=
Length=
Diameter =
H/L
year
2015
2020
2025
2030
GKWSP Original
Proposal Proposal
39
m3/Day
860
860 m
300
200 mm
1.35
1.27
2,894
3,139
3,347
3,572
R3
1136m3
m3/d)
6,782
7,045
7,270
7,508
GKWSP Original
Proposal Proposal
146
200
200
500
500
621MSL
Demand/(
Q=
Length=
Diameter =
9,381
m3/Day
m
mm
R2
3636m3
Demand/(
m3/d)
GKWSP
m3/Day
m
mm
0.41
year
GKWSP
m
mm
Asgiriya
510msl
Demand/(
m3/d)
Original
Proposal
2020 m
400 mm
GKWSP
Proposal
617MSL
Demand/(
Q=
Length=
Diameter =
GKWSP Original
Proposal Proposal
5,033
m3/Day
m
mm
Source
GKWSP
GKWSP
GKWSP
GKWSP
Q=
Length=
Diameter =
year
2015
2020
2025
2030
m3/d)
4,415
4,736
5,009
5,305
GKWSP Original
Proposal Proposal
4,950
1800
300
m3/Day
m
mm
H/L 10303.03
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
33500 m3/DAY
GKWSP Original
Proposal Proposal
Q=
33
Length=
Diameter =
GKWSP
Proposal
Demand/(m
3/d)
28,497
Q=
Length=
59
1000
2020
30,635
Diameter =
350
2025
2030
H/L
1.34
Original
Proposal
m3/Day
m
mm
Hantana place
200m3
200m3
Heera. Low
Ampitiya
900m3
Demand/(
m3/d)
Source
Demand/(
m3/d)
Source
year
mm
GKWSP
2015
GKWSP
GKWSP
GKWSP
2020
2025
2030
Q=
Length=
Source
year
GKWSP
2015
GKWSP
2020
GKWSP
GKWSP
2025
2030
Demand/(
m3/d)
2,286
Demand/(
m3/d)
Source
year
GKWSP
2015
GKWSP
2015
1,940
GKWSP
2020
658
GKWSP
2020
2,119
GKWSP
GKWSP
2025
2030
707
757
GKWSP
GKWSP
2025
2030
2,273
2,438
m3/Day
2,364
2,582
2,770
2,970
602
GKWSP Original
Proposal Proposal
Dangolla
year
586MSL
GKWSP Original
Proposal Proposal
22
1265
Diameter =
250m3
250
2,412
GKWSP
2015
2,516
2,628
GKWSP
GKWSP
GKWSP
2020
2025
2030
GKWSP
Proposal
Q=
Length=
Diameter =
1,040
GKWSP
2015
362
1,139
1,219
1,308
GKWSP
GKWSP
GKWSP
2020
2025
2030
Original
Proposal
GKWSP Original
Proposal Proposal
m3/Day
m
mm
Q=
Length=
Diameter =
10
2015
2020
2025
2030
m3/d)
479
543
594
397
Capacity
Phase II 200
GKWSP
m3/Day GKWSP
GKWSP
GKWSP
year
2015
2020
2025
2030
Q=
Length=
Diameter =
H/L
390m3
Demand/(
m3/d)
658
719
772
826
11
1890
150
H/L
3.43
m3/Day
m
mm
100m3
396
424
456
Source
GKWSP
GKWSP
GKWSP
GKWSP
Mullephilla (Low
New)
year
2015
2020
2025
2030
Demand/(
m3/d)
664
724
776
834
GKWSP Original
Proposal Proposal
m3/Day
m
mm
150
Q=
Length=
Diameter =
Hantana (law)
Demand/(
m3/d)
Demand/(
GKWSP
GKWSP
GKWSP
GKWSP
1.96
year
Heera. Upper
year
H/L
m3/Day
m
mm
Source
5
760
150
Source
30
900
250
1365m3
Demand/(
m3/d)
year
Q=
Length=
Diameter =
mm
Heera. Middle
Source
200m3
m3/Day
m
GKWSP Original
Proposal Proposal
14
1700
150
m3/Day
m
mm
5.58
GKWSP Original
Proposal Proposal
Q=
6
Length=
1200
Diameter =
m3/Day
m
mm
Hantana (high)
Demand/(
Source
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2020
2025
2030
Mullephilla
(high)
m3/d)
865
943
1,010
1,085
Source
GKWSP
GKWSP
GKWSP
GKWSP
year
2015
2020
2025
2030
Demand/(
m3/d)
377
413
442
473
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
567 MSL
Note:
Existing Transmisson Lines
Proposed Transmission Lines under KNWSP
m3/Day
m
mm
1136m3
GKWSP Original
Proposal Proposal
Q=
16
Length=
Diameter =
m3/Day
m
mm
Source
GKWSP
GKWSP
GKWSP
GKWSP
year
2015
2020
2025
2030
m3/d)
1,020
1,087
1,168
1,240
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
Elhena
900m3
GKWSP Original
Proposal Proposal
Q=
Length=
Diameter =
31
1950
200
m3/Day
m
mm
6.33
WATER SOURCE
H/L
250m3
Meekanuwa
Source
GKWSP
GKWSP
year
2015
2020
Demand/(
m3/d)
1,970
2,153
GKWSP
GKWSP
2025
2030
2,310
2,476
Source
year
Demand/(
m3/d)
GKWSP
GKWSP
GKWSP
2015
2020
2025
1,088
1,190
1,274
GKWSP
2030
1,367
586MSL
1300 m3
GKWSP Original
Proposal Proposal
GKWSP Original
Proposal Proposal
Q=
26
Length=
60
Diameter =
225 PVC
H/L
Q=
Length=
Diameter =
m3/Day
m
mm
17
250
m3/Day
m
mm
GKWSP Original
Proposal Proposal
2.45
Q=
Length=
Diameter =
H/L
90m3
GKWSP
Proposal
m3/Day
736
150
m
mm
Q=
Length=
Diameter =
1.12
Meddepathna
year
GKWSP
GKWSP
GKWSP
GKWSP
2015
2020
2025
2030
Radagaspanawat
ta
697MSL
m3/d)
225
275
365
455
m3/Day
m
mm
620MSL
Demand/(
Source
3
1000
100
Original
Proposal
Capacity
Phase II 50
m3/Day
Source
GKWSP
GKWSP
GKWSP
GKWSP
year
2015
2025
2030
2035
Demand/(m3
/d)
100
125
175
200
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
5,256
2,449
2,449
3,230
2015
5,621
2,507
2,507
3,440
2020
2,767
2,767
3,772
2025
3,055
3,055
4,139
Primrose
Asgiriya
Dangolla
R2
R3
Uplands
Peiriswatta
2010
1,546
2,890
2,890
1,646
2015
1,653
2,956
2,956
1,762
2020
3,264
3,264
1946
2025
3,604
3,604
2,148
2010
14,153
14,153
13668
2015
14,482
14,482
14560
2020
15,988
15,988
15976
2025
17,650
17,650
17538
2,513
2,513
2,381
2010
1,159
2015
1,240
2,570
2,570
2,480
2020
2,838
2,838
2,638
2025
3,133
3,133
2,813
2010
10,821
13504
13504
9018
2015
11,573
13817
13817
9238
2020
15254
15254
9731
2025
16841
16841
10277
2010
3,451
5024
5024
4500
2015
3,692
5141
5141
4751
2020
5676
5676
5148
2025
6266
6266
5586
2010
19,740
6,281
6,281
8934
2015
19,153
6,426
6,426
9516
2020
7,094
7,094
10445
2025
7,832
7,832
11461
2010
628
628
850
2015
643
643
960
2020
709
709
1086
2025
784
784
1226
5 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Ampiitya
Elhena
Mullepihilla low
Mullepihilla high
Meekanuwa
TennekumburaTalwatte
Gurudeniya
Hantana Place
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2504
2010
3,402
1,998
1,998
2015
3,641
1,337
1,337
2796
2020
1,475
1,475
3085
2025
1,628
1,628
3408
2010
1,928
1,928
1344
2015
2,152
2,152
1487
2020
2,375
2,375
1639
2025
2,622
2,622
1824
2010
503
503
374
2015
560
560
418
2020
619
619
461
2025
684
684
510
2010
442
442
228
2015
492
492
253
2020
544
544
280
2025
600
600
310
2010
630
1,906
1,906
912
2015
661
2,126
2,126
1020
2020
2,347
2,347
1128
2025
2,592
2,592
1236
2244
2010
787
1,397
1,397
2015
827
1,494
1,494
2508
2020
1,650
1,650
2760
2025
1,822
1,822
3054
2010
787
580
580
580
2015
827
647
647
647
2020
715
715
715
2025
790
790
790
2010
787
657
657
990
2015
827
705
705
1093
2020
786
786
1207
2025
870
870
1332
6 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Hantana (Upper)
Hantana (Lower)
Heerassagala (Lower)
H'gala (Middle)
H'gala (Upper)
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
787
1,983
1,983
1,983
2015
827
2,266
2,266
2,266
2020
2,550
2,550
2,550
2025
2,833
2,833
2,833
2010
473
634
634
634
2015
496
724
724
724
2020
815
815
815
2025
905
905
905
2010
748
660
660
660
2015
785
738
738
738
2020
812
812
812
2025
899
899
899
2010
309
2,311
2,311
2294
2015
331
2,365
2,365
2456
2020
2,611
2,611
2711
2025
2,882
2,882
2995
2010
787
1,138
1,138
1133
2015
827
1,226
1,226
1252
2020
1,367
1,367
1314
2025
1,514
1,514
1525
584
584
883
2010
787
2015
827
667
667
970
2020
751
751
1070
2025
834
834
1175
52,257
64,163
64,163
60,990
2015
53,808
66,041
66,041
65,335
2020
73,007
73,007
71,289
2025
80,640
80,640
77,984
2010
2,414
1,915
1,915
1,915
2015
2,749
2,105
2,105
2,105
2020
2,288
2,288
2,288
2025
2,494
2,494
2,494
Pujapitiya DS Division
Bokkawela (Ex)
7 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Pujapitiya 01
Pujapitiya 02
Ankumbura
Galhinna
Godahena
Kahawatta
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
815
1,218
1,218
1,218
2015
928
1,340
1,340
1,340
2020
1,457
1,457
1,457
2025
1,585
1,585
1,585
2010
1,640
1,640
1,640
2015
1,804
1,804
1,804
2020
1,961
1,961
1,961
2025
2,135
2,135
2,135
2010
731
731
731
2015
802
802
802
2020
875
875
875
2025
953
953
953
2010
1,952
1,952
1,952
2015
2,143
2,143
2,143
2020
2,333
2,333
2,333
2025
2,537
2,537
2,537
2010
1,484
1,484
1,484
2015
1,632
1,632
1,632
2020
1,776
1,776
1,776
2025
1,932
1,932
1,932
2010
3,435
1,339
1,339
3600
2015
3,912
1,472
1,472
3900
2020
1,601
1,601
4260
2025
1,745
1,745
4680
6,664
10,279
10,279
12,540
2015
7,589
2020
11,298
11,298
13,726
12,291
12,291
14,950
2025
13,381
13,381
16,316
2010
1,201
2,281
2,281
2,281
2015
1,368
2,549
2,549
2,549
2020
2,814
2,814
2,814
2025
3,108
3,108
3,108
Harispatuwa DS Division
Madadeniya (Ex)
8 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Barigama
Yatihalagala
Kulugammana
Rajapihilla
Kondadeniya
Gohagoda - Pallemulla
Bogahakanda
Yahalatenna
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
2,254
2,254
2,254
2015
2,515
2,515
2,515
2020
2,777
2,777
2,777
2025
3,062
3,062
3,062
2010
1,758
408
408
600
2015
2,000
456
456
660
2020
504
504
696
2025
557
557
768
4920
2010
1,201
2,699
2,699
2015
1,368
3,010
3,010
5520
2020
3,323
3,323
6120
2025
3,668
3,668
6720
2010
801
1,438
1,438
3696
2015
912
1,603
1,603
4124
2020
1,770
1,770
4554
2025
1,957
1,957
5026
2010
2,003
1,585
1,585
1800
2015
2,281
1,769
1,769
2040
2020
1,955
1,955
2220
2025
2,155
2,155
2424
2010
3,164
1,052
1,052
1,181
2015
3,603
1,174
1,174
1,318
2020
1,298
1,298
1,457
2025
1,430
1,430
1,608
2010
120
308
308
308
2015
137
344
344
344
2020
378
378
378
2025
419
419
419
2010
822
822
822
2015
918
918
918
2020
1,015
1,015
1,015
2025
1,120
1,120
1,120
9 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Moragahakanda
Wegiriya
Udawawala
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
1,595
1,595
1,595
2015
1,781
1,781
1,781
2020
1,964
1,964
1,964
2025
2,171
2,171
2,171
2010
1,740
1,740
1,999
2015
1,940
1,940
2,186
2020
2,144
2,144
2,407
2025
2,364
2,364
2,676
2010
1,522
2,314
2,314
2,314
2015
1,733
2,584
2,584
2,584
2020
2,854
2,854
2,854
2025
3,149
3,149
3,149
11,770
18,496
18,496
23,770
2015
13,402
20,643
20,643
26,539
2020
22,796
22,796
29,256
2025
25,160
25,160
32,251
2010
1,386
3240
2015
1,579
3720
Akurana DS Division
Akurana
Thelambugahawatta
Rabukeelgama
Owissa
2020
4200
2025
4800
2010
362
2760
2015
412
3180
2020
3600
2025
4020
2010
1,282
494
2015
1,460
637
2020
721
2025
815
2010
2,083
1,598
2015
2,372
1,529
2020
2,068
2025
2,338
10 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Kurugoda
Heepitiya
Wilana
Dunuwila
Balakaduwa
Dippitiya
Alawatugoda
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
1,566
3120
2015
1,784
3540
2020
3984
2025
4512
2010
2,531
636
636
2015
2,883
821
821
2020
928
928
2025
1,050
1,050
2010
677
677
2015
874
874
2020
989
989
2025
1,117
1,117
2010
930
930
2015
1,062
1,062
2020
1,201
1,201
2025
1,361
1,361
2010
334
334
2015
431
431
2020
487
487
2025
551
551
2010
1,368
1,368
2015
1,564
1,564
2020
1,769
1,769
2025
2,003
2,003
2010
2015
2020
2025
8,848
14,828
10,305
2015
10,078
17,300
12,012
2020
19,915
13,558
2025
23,074
15,394
11 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
Pathabumbara DS Division
Kahalla
Balanagala
Bangalawatta
Polgolla
Wattegama
Pitiyegedara
Udathalawinna
Napana
2010
1,038
3,290
3,290
3180
2015
1,075
3,763
3,763
3600
2020
4,154
4,154
3960
2025
4,586
4,586
4440
2010
1,199
1,531
1,531
1,531
2015
1,241
1,751
1,751
1,751
2020
1,933
1,933
1,933
2025
2,135
2,135
2,135
2010
958
3,338
3,338
3,338
2015
992
3,816
3,816
3,816
2020
4,216
4,216
4,216
2025
4,652
4,652
4,652
2010
1,406
1,406
1,406
2015
1,608
1,608
1,608
2020
1,776
1,776
1,776
2025
1,962
1,962
1,962
2010
2,790
2,790
2,790
2015
3,188
3,188
3,188
2020
3,520
3,520
3,520
2025
3,889
3,889
3,889
2010
1,158
1,746
1,746
1,746
2015
1,199
2,116
2,116
2,116
2020
2,460
2,460
2,460
2025
2,872
2,872
2,872
2010
995
995
995
2015
1,138
1,138
1,138
2020
1,255
1,255
1,255
2025
1,388
1,388
1,388
2010
400
672
672
672
2015
414
768
768
768
2020
848
848
848
2025
936
936
936
12 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Pihilladeniya
Doragamuwa
Moragas Kotuwa
Jambugahapitiya
Year
Detail Design
M/P 2005
SAPROF
M/P 2006
2010
799
2,096
2,096
2,096
2015
827
2,690
2,690
2,690
2020
3,253
3,253
3,253
2025
3,962
3,962
3,962
2010
1,412
1,412
1,412
2015
1,614
1,614
1,614
2020
1,781
1,781
1,781
2025
1,968
1,968
1,968
2010
1,398
1,398
1,398
2015
1,598
1,598
1,598
2020
1,764
1,764
1,764
2025
1,948
1,948
1,948
2010
539
2,569
2,569
2,569
2015
558
3,024
3,024
3,024
2020
3,469
3,469
3,469
2025
3,991
3,991
3,991
6,091
23,243
23,243
23,133
2015
6,306
27,074
27,074
26,911
2020
30,429
30,429
30,235
2025
34,289
34,289
34,143
Pathahewahata DS Division
Haragama Udarata Sadalla
Gurudeniya
Maligatenna
2010
163
163
2015
218
218
2020
272
272
2025
326
326
2010
404
404
2015
539
539
2020
673
673
2025
808
808
2010
1,282
1,282
2015
1,709
1,709
2020
2,137
2,137
2025
2,564
2,564
13 of 51
ANNEX 1
GREATER KANDY WATER SUPPLY PROJECT
WATER DEMAND
Max Demand(m3/day)
Reservoir Location
Mudunakade
Anuragama
Year
Detail Design
M/P 2005
SAPROF
2010
2,226
2,226
2015
2,968
2,968
2020
3,710
3,710
2025
4,452
4,452
2010
1,166
1,166
2015
1,554
1,554
2020
1,943
1,943
2025
2,331
2,331
M/P 2006
5,241
5,241
2015
6,988
6,988
2020
8,735
8,735
2025
10,481
10,481
14 of 51
600 m3
Akurana
508MSL
Demand/(
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
Q=
Q=
Water source
0 m3/d
g
Original
Proposal
Proposal
4,800
Length=
1220
Diameter =
200
Kurugoda
Demand/(m
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
m3/d)
3240
3720
4,200
4,800
GKWSP
600 m3
m3/Day
year
2010
2015
2020
2025
Demand/(m3
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
3/d)
6,600
7,473
GKWSP
Original
Proposal
Proposal
7,473
Length=
75
Diameter =
500
569MSL
year
2010
2015
2020
2025
/d)
3120
3540
3,984
4,512
m3/Day
m
mm
Q=
m
mm
GKWSP
g
Original
GKWSP
g
Original
Proposal
Proposal
Proposal
Proposal
8,532
Length=
2455
Diameter =
350
m3/Day
Q=
m
mm
Q=
GKWSP
Original
Proposal
Proposal
4,020
4,512
Length=
1365
Diameter =
350
m3/Day
m
mm
m3/Day
Length=
910
910 m
Diameter =
250
250 mm
GKWSP
Proposal
Q=
Unit
500 m3
Thelabugahawatta
561.5MSL
16,005 m3/Day
Demand/(m3
600 m3
Kahawatta
516MSL
Sorce
GKWSP
year
2010
GKWSP
2015
GKWSP
2020
3,600
GKWSP
2025
4,020
/d)
2760
3180
Demand/(m
Sorce
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
GKWSP
2025
Q=
3/d)
3600
3900
4,260
4,680
GKWSP
Original
Proposal
Proposal
20,685
Length=
75
Diameter =
500
600 M3
Kahalla
491MSL
Demand/(
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
m3/Day
m
mm
GKWSP
Original
Proposal
Proposal
Q=
25,485
Length=
3690
Diameter =
500
Q=
GKWSP
Original
Proposal
29,925
m3/d)
3180
3600
3,960
4,440
m3/Day
m
mm
Q=
Proposal
year
2010
2015
2020
2025
GKWSP
Original
Proposal
Proposal
y
m3/Day
4,440
Length=
830
Diameter =
200
mm
m3/Day
Length=
887
Diameter =
600
mm
450 m3
Balanagala
513 MSL
100 M3
Bangalawatta
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
Demand/(m3
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
Q=
/d)
519.2MSL
Demand/(
1531
1751
1,933
2,135
m3/d)
3338
3816
4,216
4,652
GKWSP
Original
GKWSP
Original
Proposal
Proposal
Proposal
Proposal
m3/Day
Q=
Diameter =
mm
Diameter =
Q=
Length=
Q=
GKWSP
Original
Proposal
Proposal
29,925
Diameter =
m3/Day
Length=
421
Diameter =
600
mm
GKWSP
Original
Proposal
Proposal
Length= 3527 m
m3/Day
Length= 188 m
Diameter = 300 mm
Diameter = 300mm
m
mm
GKWSP
Original
Proposal
Proposal
Q = GKWSP
m3/Day
Length=
Diameter =
mm
mm
100 M3
Phill d i
Philladeniya
Sorce
year
Demand/(
SUMMARY A3 PUMP
m3/d)
Demand/(
GKWSP
2010
2010
15,900
GKWSP
2015
2015
17,940
GKWSP
2020
3,253
2020
26,604
GKWSP
2025
3,962
2025
29,925
year
KATUGASTOTA WTP
MSL 442m
Q=38905 m3/d
m3/d)
2096
2690
522 MSL
m3/Day
mm
POOJAPITIYA
RAJAPIHILLA
DEMAND
DEMAND
Sorce
GKWSP
year
2020
MAX
/(m3/day)
8,046 m3/Day
HWL532MSL
MAX
Sorce
year
GKWSP
2015
/(m3/day)
1,301
GKWSP
2020
1,408
22hrs)
/(l/sec) for 6 hrs
16.42
325
17.77
HT 12
HWL510MSL
UDUWAWALA
352
DEMAND DEMAND Res Cap
GKWSP
2025
8,536 m3/Day
GKWSP
2030
9,140 m3/Day
MSL =
HT 4
MADADENIYA
HWL563MSL
2025
1,511
19.08
GKWSP
2030
1,616
20.41
585 m
DEMAND MAX
Sorce
HGL=590m
HTL 5
GKWSP
Proposal
Q=
9,140
Q=
115
Length=
Diameter =
year
/(m3/day)
DEMAND
(22hrs)
378
Sorce
404
GKWSP
Original
Proposal
Proposal
Proposal
m3/Day
l/Sec
HTL 6
for 6 hrs
GKWSP
2015
2,177
27.48
544
GKWSP
2020
2,357
29.76
589
GKWSP
2025
2,527
31.91
632
2030
2,707
34.18
677
HTL 4
GKWSP
Proposal
mm
2.42
Q=
11,847
Q=
150
Length=
m/km
Diameter =
NUGAWELA
HWL583MSL
DEMAND
year
2015
2020
2025
GKWSP
2030
HTL 10
(22hrs)
/(m3/day
GKWSP
2015
2,318
29.27
580
2020
2,514
31.74
629
Q=
1,616
Q=
20
m3/Day
GKWSP
2025
2,693
34.00
673
l/Sec
GKWSP
2030
2,888
36.47
Length=
83
722
Diameter =
300
HTL 3
22hrs)
day)
1,537
1,664
1,786
/(l/sec)
19.41
21.02
22.55
1,913
24.15
Q=
1,913
Q=
24
Length=
1480
Diameter =
350
H/L
H/L
m3/Day
l/Sec
m
450
mm
2.21
HGL=575m
0.40
GKWSP Original
Proposal Proposal
mm
m/km
Q = 13,463
m3/Day
Q=
170
l/Sec
1200
Length=
HT 3
Diameter =
600
H/L
mm
0.69
GKWSP
Proposal
HTL 12
Original
Proposal
Q=
2,888
Q=
36.47
Length=
1300
Diameter =
250
m/km
m3/Day
l/Sec
m
mm
2.84
m/km
m/km
f=7.7m/Km
HT 2
MAX/(m3/
GKWSP
Proposal
Original
Proposal
5250
H/L
HT 10
Sorce
GKWSP
GKWSP
GKWSP
MAX
Res Cap
400
year
GKWSP
Original
5000
H/L
HT 8
GKWSP
for 6 hrs
384
416
446
478
HTL 2
Original
Proposal
GKWSP Original
Proposal Proposal
m3/Day
Q=
16,352
l/Sec
Q=
197
m
mm
0.26
m/km
Length=
2200
Diameter =
700
H/L
m3/Day
l/Sec
m
mm
0.43
m/km
Summary A4 Pump
DEMAND
BARIGAMA
Summary
HWL605MSL
MAX
year
/(m3/day)
DEMAND
year
DEMAND
Sorce
year
MAX
MAX
GKWSP
2015
2,202
27.80
551
2020
2,383
30.09
596
GKWSP
2025
2,557
32.29
639
GKWSP
2030
2,740
34.59
685
3,934
2020
22,453
2025
23,984
2030
25,696
(only
GKWSP
2015
GKWSP
Proposal
HTL 8
B
HGL=632.55m
Q=
Length=
Proposal
Proposal
Diameter =
2025
3,782
48
l/Sec
2900
MSL 490
2
HT 1
mm
1.92
GKWSP
Proposal
16,352
300
HTL 1
15,266
2030
m3/Day
H/L
Q=
1,301 Rajaphihilla
(only
14,324 Rajaphihilla
2020
f=2.17m/Km
Q=
HTL 9
2015
Original
Proposal
HT 7
HTL 7
m/km
7433
1,043 m3/Day
13
25,696
Q=
310
Length=
2000
Diameter =
800
H/L
HTL 11
Q=
Q=
l/Sec
Original
GKWSP Proposal Proposal
f=1.46m/Km
Original
Proposal
HT 0
Katugastota WTP
m3/Day
l/Sec
m
mm
0.52
MSL =
m/km
442 m
Summary
Summary A2Pump
DEMAND
DEMAND
MAX
MAX
Length=
550
Diameter =
150
H/L
Q=
mm
Q=
.GKWSP
Proposal
m/km
5.19
7,432
Q=
Q=
Original
Proposal
f=3.4m/Km
52
2400
Diameter =
300
l/Sec
500
Diameter =
300
mm
Sorce
year
2.29
m/km
Q=
3,278
Q=
41
Length=
200
2015
4,534
2015
2,633
2020
4,909
mm
2020
8,129
2025
5,261
2030
Yatihalagal
a
5,642
m/km
0.85
2025
8,718
2030
9,344
GKWSP
Proposal
m3/Day
Q=
l/Sec
mm
3.59
Sorce
year
Diameter =
22hrs)
day)
m3/Day
l/Sec
520
350
H/L
mm
1.90
m/km
mmPVC
Kondadeniya
MAX/(m3/
71
m/km
HWL583.5MSL
DEMAND
hrs
209
160
5,642
Q=
Including
HT 12(14)
Kulugammana
for 6
Diameter =
Q=
Length=
Q=
1525
Original
Proposal
HT 0
Original
Proposal
m3/Day
Length=
/(m3/day
)
l/Sec
m
250
H/L
500
year
/(m3/day)
l/Sec
GKWSP
Proposal
HWL630MSL
2hrs)
Diameter =
mm
HT 9
MAX
118
1200
H/L
Diameter =
DEMAND
Q=
Length=
year
m3/Day
HGL=630m
YAHALATHENNA
9,344
l/Sec
H/L
HT 12
94
Length=
Q=
m3/Day
4,153
Length=
m3/Day
HWL532MSL
for 6 hrs
Sorce
year
MAX
/(m3/day)
1,537
2hrs)
/(l/sec)
19.41
GKWSP Original
Proposal Proposal
for 6 hrs
GKWSP
2015
/(m3/day)
836
GKWSP
2015
2,633
/(l/sec)
33.24
658
GKWSP
2015
384
Q=
1,915
GKWSP
GKWSP
2020
2025
906
972
11.44
12.27
227
243
GKWSP
GKWSP
2020
2025
2,854
3,056
36.03
38.59
713
764
GKWSP
GKWSP
2020
2025
1,666
1,786
21.03
22.55
416
446
Q=
24
Length=
1000
GKWSP
2030
1,043
13.17
261
GKWSP
2030
3,278
41.39
820
GKWSP
2030
1,915
24.18
479
Diameter =
300
H/L
m3/Day
GKWSP
Proposal
l/Sec
0.55
Original
Proposal
Q=
3,727
mm
Q=
47
m/km
Length=
Diameter =
m3/Day
l/Sec
820
250
H/L
mm
4.55
m/km
GKWSP Original
Proposal Proposal
#DIV/0!
Wegiriya
Q=
2,015
Q=
25
l/Sec
m3/Day
Length=
100
Diameter =
150
mm
year
MAX
22hrs)
/(l/sec)
20.44
H/L
6 hrs
405
17.54
m/km
GKWSP
2015
/(m3/day)
1,619
GKWSP
GKWSP
2020
2025
1,753
1,879
22.14
23.73
438
470
Q=
1,712
GKWSP
2030
2,015
25.44
504
Q=
22
GKWSP
Proposal
Length=
Diameter =
Original
Proposal
1720
Q=
371
Q=
Original
Proposal
Pallemula
1200
Diameter =
100
H/L
mm
3.20
m/km
m3/Day
DEMAND
Length=
200
H/L
.GKWSP
Proposal
m3/Day
l/Sec
Sorce
GKWSP
GKWSP
l/Sec
m
mm
5.52
HT 13
m/km
Kurudugahamada
HTL
HWL610MSL
year
2015
2020
MAX
22hrs)
/(m3/day)
1,004
1,087
/(l/sec)
12.68
13.73
GKWSP Original
Proposal Proposal
for 6 hrs
251
272
Q=
1,249
Q=
16
GKWSP
2025
1,164
14.70
291
Length=
60
GKWSP
2030
1,249
15.77
312
Diameter =
200
H/L
DEMAND MAX
m
mm
1.78
m/km
Sorce
year
GKWSP
GKWSP
2015
2020
296
322
s) /(l/sec)
3.74
4.06
GKWSP
2025
347
4.38
87
GKWSP
2030
371
4.68
93
/(m3/day)
m3/Day
l/Sec
GKWSP
Proposal
for 6 hrs
74
80
Yatihalagala
DEMAND
MAX
HWL512MSL
for 6 hrs
93
GKWSP Original
Proposal Proposal
Sorce
GKWSP
year
2015
373
4.71
GKWSP
GKWSP
2020
2025
403
432
5.09
5.45
101
108
Length=
750
GKWSP
2030
463
5.85
116
Diameter =
110
Q=
463
Q=
H/L
Original
Proposal
Q=
463
Q=
Length=
2070
Diameter =
110
H/L
m3/Day
l/Sec
m
mmPVC
5.24
m/km
m3/Day
l/Sec
m
mmPVC
5.24
m/km
POOJAPITIYA
RAJAPIHILLA
Sorce
GKWSP
DEMAND
DEMAND
MAX
MAX
23hrs)
/(m3/day)
/(l/sec)
/(m3/day)
year
2010
HWL532MSL
Sorce
GKWSP
8,209 m3/Day
GKWSP
2015
9,024 m3/Day
GKWSP
2020
9,888 m3/Day
GKWSP
2025
10,683 m3/Day
HT 4
MSL =
year
2010
3,696
44.64
GKWSP
2015
4,124
49.81
1031
GKWSP
2020
4,554
55.00
1139
GKWSP
2025
5,026
60.70
1257
HTL 5
GKWSP
Original
Proposal
Proposal
Q=
10683
Q=
129
Length=
GKWSP
2015
GKWSP
2020
GKWSP
m3/Day
DEMAND
(23h s)
27.55
2,549
30.79
637
2,814
33.99
704
HTL 6
Original
Proposal
Proposal
Q=
5,026
Q=
m3/Day
61
l/Sec
Length=
75
Diameter =
600
HTL 4
2025
3,108
37.54
777
l/Sec
Q=
500
H/L
DEMAND
MAX
2,281
GKWSP
Q=
mm
m/km
1.01
GKWSP
Original
Proposal
Proposal
13,791
5250
500
H/L
NUGAWELA
HWL583MSL
H/L
m3/Day
167
Length=
Diameter =
HT 10
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
HGL=575m
l/Sec
0.10
mm
m/km
Q=
18,817
Q=
227
Diameter =
HT 3
HTL 12
/(m3/day)
/(l/sec)
GKWSP
2010
2,314
27.95
GKWSP
2015
2,584
31.21
GKWSP
GKWSP
2020
2025
2,854
3,149
34.47
38.03
GKWSP Proposal
m3/Day
l/Sec
1165
mm
Original
Proposal
Q=
3,149
m3/Day
Q=
38.03
l/Sec
Length=
1300
Diameter =
200
600
H/L
mm
1.61
(23hrs)
year
Proposal Proposal
Length=
DEMAND
MAX
Sorce
m/km
1.18
m
mm
9.09
m/km
m/km
f=7.7m/Km
HT 2
DEMAND
DEMAND(2 Res Cap for
MAX/(m3/da 3hrs)/(l/se
c)
6 hrs
y)
year
2010
2015
2020
2025
1,595
1,781
1,964
2,171
HTL 10
Q=
19.26
21.51
23.72
26.22
399
445
491
543
HTL 2
GKWSP
Original
GKWSP Original
Proposal
Proposal
Proposal Proposal
2,171
Q=
m3/Day
26
Length=
Q=
350
H/L
Q=
l/Sec
1795
Diameter =
Length=
mm
0.30
Diameter =
m/km
21,966
m3/Day
265
l/Sec
1385
700
mm
H/L
0.74
HT 8
BARIGAMA
HWL510MSL
HTL 3
GKWSP Original
5000
Diameter =
year
2010
UDUWAWALA
HWL563MSL
585 m
Sorce
GKWSP
924
DEMAND
MADADENIYA
HGL=590m
HT 12
for 6 hrs
m/km
Summary A4 Pump
DEMAND MAX
Summary
HWL605MSL
year
/(m3/day)
DEMAND
MAX
year
Sorce
year
DEMAND
MAX
GKWSP
2010
2,254
27.22
564
GKWSP
2015
2,515
30.37
629
HTL 8
B
GKWSP
Original
Proposal
Proposal
/(m3/day)
2010
2015
2020
f=2.17m/Km
(only
3,696 Rajaphihilla)
(only
4,124 Rajaphihilla)
20,110
HTL 1
GKWSP
GKWSP
2020
2,777
33.54
694
GKWSP
2025
3,062
36.98
766
Q=
HGL=632.55m
Q=
Length=
HTL 9
Proposal
4,182
Proposal
51
MSL 490
mm
2.13
HT 7
HTL 7
m/km
#VALUE!
1,120 m3/Day
14
Proposal
HT 1
l/Sec
f=1.46m/Km
GKWSP
Original
Proposal
Proposal
Summary
8,616
9,644
2020
32,364
2025
35,458
Original
HT 0
Proposal
Q=
35,458
Q=
428
l/Sec
Length=
1850
Diameter =
800
H/L
HTL 11
Q=
21,966
300
H/L
Q=
l/Sec
2900
Diameter =
2025
m3/Day
2010
2015
m3/Day
Katugastota WTP
mm
0.94
m/km
MSL =
442 m
Summary A2Pum
DEMAND
DEMAND
MAX
Length=
550
Q = year
.GKWSP
Diameter =
200
H/L
mm
Proposal
m/km
1.34
Q=
13,492
Q=
Proposal
m3/Day
4,601
11,321
year
/(m3/day)
year
/(m3/day)
163
l/Sec
2010
4,920
2010
5,580
Length=
1300
2015
5,520
2015
6,210
Diameter =
500
mm
2020
12,254
2020
6,786
m/km
2025
13,492
2025
7,482
l/Sec
Length=
540
Diameter =
500
mm
MAX
m3/Day
Original
f=3.4m/Km
Q=
m3/Day
Q=
Original
Q=
56
Length=
2100
Diameter =
350
H/L
l/Sec
H/L
1.20
Q=
7,482
mm
Q=
90
.GKWSP Proposal
m/km
Original
GKWSP
Proposal
Q=
Q=
Length=
HGL=630m
YAHALATHENNA
Diameter =
HT 12
Q=
6,772
82
250
350
H/L
m3/Day
m
m3/Day
Length=
1525
Diameter =
160
year
2010
GKWSP
GKWSP
GKWSP
2015
2020
2025
918
1,015
1,120
m
mm
l/Sec
H/L
2.95
m/km
mm
m/km
Q=
Sorce
GKWSP
520
350
Kondadeniya
Length=
Diameter =
mmPVC
HWL630MSL
DEMAND
MAX
/(m3/day)
822
m3/Day
l/Sec
HT
Proposal
0
Q=
l/Sec
Proposal
Original
Proposal
f=3.4m/Km
HT 9
1.55
GKWSP Proposal
6,720
Q=
81
Length=
HWL532MSL
m3/Day
l/Sec
440
Sorce
GKWSP
year
2010
DEMAND
MAX
/(m3/day)
1,800
GKWSP
GKWSP
GKWSP
2015
2020
2025
2,040
2,220
2,424
DEMAND
(23hrs)
/(l/sec)
21.74
6 hrs
Proposal Proposal
450
Q=
510
555
606
Length=
1410
Diameter =
300
2,424
m3/Day
Original
11.09
12.26
13.53
230
254
280
Diameter =
300
H/L
mm
5.13
m/km
24.64
26.81
29.28
Q=
29
H/L
l/Sec
0.78
Q=
5,058
mm
Q=
61
m/km
HT 12(14)
Kulugammana
GKWSP Proposal
Length=
950
Diameter =
250
HWL583.5MSL
H/L
Proposal
m3/Day
l/Sec
m
mm
7.37
m/km
GKWSP Original
584
#DIV/0!
Sorce
GKWSP
year
2010
GKWSP
GKWSP
GKWSP
Proposal Proposal
DEMAND
DEMAND(2 Res Cap for
MAX/(m3/da 3hrs)/(l/se
c)
6 hrs
y)
4,920
59.42
1230
2015
5,520
66.67
1380
2020
6,120
73.91
1530
2025
6,720
81.16
Wegiriya
1680
Sorce
year
GKWSP
2010
DEMAND
MAX
/(m3/day)
2,000
GKWSP
GKWSP
GKWSP
2015
2020
2025
2,190
2,410
2,680
Q=
2,680
Q=
32
m3/Day
l/Sec
Length=
100
Diameter =
150
mm
H/L
27.39
m/km
Original
26.45
29.11
32.37
548
603
670
GKWSP Proposal
Q=
2,378
Q=
29
Length=
1720
Diameter =
200
H/L
Q=
.GKWSP
Original
Proposal
Proposal
419
Q=
1600
Diameter =
200
H/L
m3/Day
l/Sec
m
mm
5.41
m/km
m3/Day
Length=
Pallemula
Proposal
l/Sec
m
mm
0.22
HT 13
m/km
+675 MSL
Kurudugahamada
HTL 12
HWL675MSL
Sorce
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
GKWSP
2025
DEMAND
MAX
/(m3/day)
GKWSP Original
Proposal Proposal
1,180
1,320
1,460
14.32
16.02
17.72
295
330
365
Length=
90
1,610
19.54
403
Diameter =
200
Q=
1,610
Q=
19
H/L
DEMAND
(23hrs)
/(l/sec)
3.72
4.15
Sorce
year
GKWSP
GKWSP
2010
2015
DEMAND
MAX
/(m3/day)
308
344
GKWSP
2020
378
4.57
95
GKWSP
2025
419
5.06
105
m3/Day
l/Sec
m
mm
2.63
m/km
Original
hrs
GKWSP Proposal
77
86
Yatihalagala
Sorce
GKWSP
GKWSP
GKWSP
GKWSP
year
2010
2015
2020
2025
DEMAND
MAX
/( 3/d
600 )
660
696
768
HWL512MSL
Q=
768
Q=
Length=
2070
Diameter =
110
Proposal
m3/Day
l/Sec
m
mmPVC
GKWSP Original
Proposal Proposal
Q=
768
Q=
Length=
Diameter =
l/Sec
750
110
H/L
H/L
m3/Day
mmPVC
12.29
m/km
12.29
m/km
Res Cap
for 6 hrs
579
646
714
787
mp
Including
Yatihalagal
a
T0
No
2010
1 A1 Pump
Bahirawakanda
2015
3,440
3,770
4,140
Asgiriya
13,670
14,560
15,980
17,540
Uplands
8,940
9,516
10,445
11,460
1,650
1,820
715
790
Gurudeniya
Sub Total for A1 Pump
25,840
27,516
32,560
35,750
Kondadeniya
1,800
2,040
2,220
2,425
Gohagoda/Pallemulla
1,180
1,320
1,460
Wegiriya
2,190
2,410
600
660
695
5,580
6,210
6,785
7,485
Kahalla
3,180
3,600
3,960
4,440
Kahawatta
3,600
3,900
4,260
4,680
Akurana
3,240
3,720
4,200
4,800
10,020
11,220
12,420
13,920
Kurugoda
3,120
3,540
3,984
4,512
Thelambugahawatta
2,760
3,180
3,600
4,020
Rabukeelagama
638
722
Vilana Udagama
875
991
Vilana
689
779
1,379
1,559
Balakaduwa
432
488
Heepitiya
823
931
1,769
2,003
Sub Total 1
Owissa
Dipitiya
Sub Total 2
5,880
6,720
14,189
16,005
15,900
17,940
26,609
29,925
3,700
4,125
4,555
5,025
Udawawala
2,854
3,149
Madadeniya (Ex)
2,814
3,108
Poojapitoya
9,888
10,683
20,111
21,965
4 A4 Pump
Rezoning
should be
2,680 done due to
line
770 constration
1,610
2,000
Yatihalagala
3 A3 Pump
2025
3,230
Talwatte
2 A2 Pump
2020
Rajapihilla
Sub Total 1
3,700
4,125
No
2010
2015
2020
Kulugammana
3,360
3,750
4,150
4,600
Nugawela
4,300
4,800
3,350
3,700
Barigama
2,500
2,700
Yahala thanne
1,015
1,120
378
419
Kurudugahamada(Bogahakanda)
Sub Total 2
5 R2
2025
7,660
8,550
11,393
12,539
11,360
12,675
31,504
34,504
58,680
64,341
97,458
107,664
R2(Including Tennekumbura)
9,018
9,238
9,731
10,277
R3
4,500
4,751
5,148
5,586
850
960
1,086
1,228
Ampitiya
2,504
2,796
3,085
3,408
Elhena
1,344
1,487
1,639
1,824
Mullepihilla - New
374
418
461
510
Mullepihilla high
228
253
280
310
Madepathana
200
225
275
365
Meekanuwa
912
1,020
1,128
1,236
Hantana Place
990
1,093
1,207
1,330
750
815
905
2,550
2,833
812
899
Peiriswatta
Hantana low
Hantana high
Hantana call link
Heerassagala (Lower)
2,294
2,456
2,711
2,995
Heerassagala (Middle)
1,133
1,252
1,314
1,525
883
1,128
1,272
1,440
25,230
27,827
33,514
36,671
Heerassagala (Upper)
Sub Total for R2 pump
2,381
2,480
2,638
2,813
Primrose
1,646
1,762
1946
2,148
29,257
32,069
38,098
41,632
Reservoir Location
2010
2015
2020
2025
Annex 2
A1 Pump
A2 Pump
2010
2011
2012
2013
2010
Bahirawakanda
2,690
2,740
2,790
2,850
3,230
Asgiriya
11,390
11,620
11,850
12,090
13,668
Uplands
7,445
7,590
7,740
7,890
8,934
21,525
21,950
22,380
22,830
25,832
Kondadeniya
1,500
1,530
1,561
1,592
1,800
983
1,003
1,023
1,044
1,180
1,667
1,700
1,734
1,769
2,000
500
510
520
531
600
4,650
4,743
4,838
4,935
5,580
Kahalla
2,650
2,703
2,757
2,812
3,180
Kahawatta
3,000
3,060
3,121
3,184
3,600
Akurana
2,700
2,754
2,809
2,865
3,240
Sub Total 1
8,350
8,517
8,687
8,861
10,020
Kurugoda
2,600
2,652
2,705
2,759
3,120
Thelambugahawatta
2,300
2,346
2,393
2,441
2,760
Sub Total 2
4,900
4,998
5,098
5,200
5,880
13,250
13,515
13,785
14,061
15,900
Rajapihilla
3,083
3,140
3,200
3,264
3,700
Kulugammana
2,800
2,856
2,913
2,971
3,360
Nugawela
3,580
3,652
3,725
3,799
4,300
9,463
9,653
9,846
10,043
11,360
48,888
49,866
50,863
51,881
58,672
50,000
50,000
50,000
50,000
50,000
Gohagoda/Pallemulla
Wegiriya
Yatihalagala
A3 Pump
A4 Pump
(m /d)
Reservoir Location
Pump
Annex 2
WTP KMC
Max Demand
3
Average Demand (m /d)
R2
2010
2011
2012
2013
2010
R2
5,682
5,795
5,911
6,029
6,818
R3
3,750
3,825
3,902
3,980
4,500
708
723
737
752
850
Thennekumbura
2,000
2,040
2,081
2,122
2,200
Ampitiya
2,087
2,128
2,171
2,214
2,504
Elhena
1,120
1,142
1,165
1,189
1,344
Mullepihilla - New
312
318
324
331
374
Mullepihilla high
190
194
198
202
228
Madepathana
167
170
173
177
200
Meekanuwa
760
775
791
807
912
Hantana Place
825
842
858
875
990
Heerassagala (Lower)
1,912
1,950
1,989
2,029
2,294
Heerassagala (Middle)
944
963
982
1,002
1,133
Heerassagala (Upper)
736
751
766
781
883
21,192
21,616
22,048
22,489
25,230
1,984
2,024
2,064
2,106
2,381
1,984
2,024
2,064
2,106
2,381
Primrose
1,372
1,399
1,427
1,456
1,646
1,372
1,399
1,427
1,456
1,646
24,381
24,868
25,366
25,873
29,257
33,600
33,600
33,600
33,600
33,600
Peiriswatta
Dangolla
Primrose
(m /d)
Reservoir Location
Pump
Annex 2
Annex 2
Annex 2
A1 Pump
A2 Pump
Max Demand
Pump
Name
(m3/d)
Reservoir Name
2010
2012
2015
2017
2020
2010
Bahirawakanda(Deleted)
2,690
2,800
2,970
3,090
3,280
3,230
Asgiriya
9,200
9,570
10,160
10,570
11,220
11,040
Uplands
Sub Total for A1 Pump(Except
Bahirawakanda)
6,300
6,550
6,950
7,230
7,670
7,560
15,500
16,120
17,110
17,800
18,890
18,600
Kondadeniya
1,500
1,560
1,660
1,730
1,840
1,800
983
1,020
1,080
1,120
1,190
1,180
1,667
1,730
1,840
1,910
2,030
2,000
500
520
550
570
600
600
4,650
4,830
5,130
5,330
5,660
5,580
Gohagoda/Pallemulla
Wegiriya
Yatihalagala
Sub Total A2 Pump
0
A3 Pump
Kahalla
1,100
1,140
1,210
1,260
1,340
1,320
Kahawatta
3,000
3,120
3,310
3,440
3,650
3,600
Akurana
2,700
2,810
2,980
3,100
3,290
3,240
Sub Total 1
6,800
7,070
7,500
7,800
8,280
8,160
Kurugoda
2,600
2,710
2,880
3,000
3,180
3,120
Thelambugahawatta
2,300
2,390
2,540
2,640
2,800
2,760
Sub Total 2
4,900
5,100
5,410
5,630
5,970
5,880
11,700
12,170
12,910
13,430
14,250
14,040
0
A4 Pump
Rajapihilla
3,080
3,200
3,400
3,540
3,760
3,700
Madadeniya
1,850
1,920
2,040
2,120
2,250
3,000
Sub Total 1
4,930
5,120
5,440
5,660
6,010
6,700
Kulugammana
2,800
2,910
3,090
3,210
3,410
3,360
Nugawela
3,580
3,720
3,950
4,110
4,360
4,300
Sub Total 2
6,380
6,630
7,040
7,320
7,770
7,660
11,310
11,750
12,480
12,980
13,780
14,360
43,160
44,870
47,630
49,540
52,580
52,580
50,000
50,000
50,000
50,000
50,000
50,000
Annex 2
WTP KMC
Max Demand
R2
2010
2012
2015
2017
2020
2010
R2
5,682
5,910
6,270
6,520
6,920
6,818
R3
3,750
3,900
4,140
4,310
4,570
4,500
708
740
790
820
870
850
Thennekumbura
2,000
2,080
2,210
2,300
2,440
2,200
Ampitiya
2,087
2,170
2,300
2,390
2,540
2,504
Elhena
1,120
1,170
1,240
1,290
1,370
1,344
Mullepihilla - New
312
320
340
350
370
374
Mullepihilla high
190
200
210
220
230
228
Madepathana
167
170
180
190
200
200
Meekanuwa
760
790
840
870
920
912
Hantana Place
825
860
910
950
1,010
990
Heerassagala (Lower)
1,912
1,990
2,110
2,200
2,330
2,294
19,512
20,300
21,540
22,410
23,770
23,214
1,984
2,060
2,190
2,280
2,420
2,381
1,984
2,060
2,190
2,280
2,420
2,381
Primrose
1,372
1,430
1,520
1,580
1,680
1,646
1,372
1,430
1,520
1,580
1,680
1,646
22,868
23,790
25,250
26,270
27,870
27,241
Bahirawakanda Added
2,690
2,800
2,970
3,090
3,280
3,230
25,558
26,590
28,220
29,360
31,150
30,471
33,600
33,600
33,600
33,600
33,600
33,600
Peiriswatta
Dangolla
Primrose
(m3/d)
Reservoir Location
Pump
Annex 2
Annex 2
Annex4
Original-2002
Name of Service Reservoir
Drawing
Pipe
Number Diameter
(mm)
20-C-05
20-C-05
Thelambugahawatta Junction To
Thelambugahawatta Reservoir
20-C-06
Material
DI / PVC
Pipeline
Pipe
Pipeline
Material
Length
Length Diameter
DI / PVC
(m)
(mm)
(m)
400
400
400
DI
655
987
378
500
DI
491
952
20-C-06
250
250
DI
250
DI
225
PVC
1,200
849
645
266
400
400
400
DI
250
DI
250
DI
2,020
2,053
645
266
GKWSP Revised-2007
Pipeline
Pipe
Material
Length
Diameter
DI / PVC
(m)
(mm)
450
450
450
DI
2,020
250
DI
75
250
DI
250
DI
1,700
645
266
20-C-20
20-C-20
20-C-21
350
DI
1,002
350
DI
1,000
350
DI
200
DI
628
200
DI
628
20-C-21
225
PVC
636
225
PVC
636
250
280
DI
PVC
20-C-22
150
160
150
150
DI
PVC
DI
DI
80
681
150
160
DI
PVC
80
681
150
160
DI
PVC
20-C-23
200
DI
300
DI
815
300
DI
800
DI
2,000
800
DI
2,000
700
DI
2,200
700
DI
2,200
600
DI
1,200
600
DI
1,200
300
DI
85
500
DI
1,500
400
DI
550
300
DI
200
Heerassagala Junction To
Heerassagala Low Reservoir
Heerassagala Low Reservoir To
Heerassagala Middle Reservoir
Heerassagala Middle Reservoir To
Heerassagala To Heerassagala Upper
Reservoir
KMC R2 SR & PS To Hantana Place
SR
77
739
500
DI
1,500
200
DI
350
1,000
628
636
80
681
77
739
REMARKS
Original-2002
Name of Service Reservoir
Drawing
Pipe
Number Diameter
(mm)
Material
DI / PVC
Japanese Apprasal-2007
Pipeline
Pipe
Pipeline
Material
Length
Length Diameter
DI / PVC
(m)
(mm)
(m)
Pipeline
Pipe
Material
Length
Diameter
DI / PVC
(m)
(mm)
225
PVC
60
225
PVC
60
225
PVC
60
225
200
200
PVC
DI
DI
175
1,050
2,040
225
200
200
PVC
DI
DI
175
1,050
2,040
280
250
250
PVC
DI
DI
175
1,050
2,040
225
PVC
586
225
PVC
586
280
PVC
586
150
DI
480
160
PVC
20-C-18
20-C-19
150
DI
160
90
962
86
PVC
149
290
931
150
DI
2,395
Annex4
GKWSP Revised-2007
150
DI
160
90
962
86
PVC
149
REMARKS
Annex 2
Reservoir Location
2010
2015
2020
2025
Land
Extend
Remarks
2007
1 Bahirawakanda
3,230
3,440
3,772
4,139
1,030
204
600
600
830
600 30P
No Capacity change
2,381
2,480
2,638
2,813
700
118
500
500
580
500 26P
No Capacity change
3 Uplands
8,934
9,516
10,445
11,461
2,870
4 Elhena
1,344
1,487
1,639
1,824
460
374
418
461
510
130
7 Heerassagala (Lower)
8 Heerassagala (Middle)
9 Heerassagala (Upper)
10 Kulugammana
11 Kondadeniya
12 Gohagoda/Pallemulla
**
990
2,294
1,093
2,456
1,207
2,711
1,332
2,995
27
25
330
2,960
3,000
2,840
300
300
460
300 13.2P
100
100
110
100 42P
No Capacity change
200 30P
200
750
200
200
200
3,000 68P
330
750
300 14.5P
1,133
1,252
1,314
1,525
380
250
250
380
250 18P
883
970
1,070
1,175
290
200
200
290
200 14.5P
3,400
1,800
1,181
3,750
2,040
1,318
4,150
2,220
1,457
4,600
2,424
1,608
1,150
610
400
13 Thelambugahawatta
2,760
3,180
3,600
4,020
1,010
14 Bangalawatta
3,338
3,816
4,216
4,652
950
15 Pihilladeniya
2,096
2,690
3,253
3,962
670
Moragirikanda
2,700
3,030
3,350
3,700
930
16 Meddapathane
200
225
275
365
90
300
300
150
100
200
200
450
200
200
850
310
250
500 213P
300 19.2P
250 10.5P
500
500
1,010
100
300
300
850
300 9.5P
100
200
200
570
200 19.2P
930
90
90
500 16.2P
930
90 6P
Note: Lands were acquired according to the original design capacities. But as per the new demands, proposed reservoir capacities changed.
Therefore, need to recheck the reservoir demands and availability of land area for new proposed reservoir capacities.
(Need to finalized)
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
Annex 2
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
Annex 2
Total
Reservoir
Capacity
3
(m )
Reservoir Location
2010
1 Elhena
2015
2020
2025
1,344
1,487
1,639
1,824
460
374
418
461
510
130
3 Hantana Place
990
1,093
1,207
1,332
4 Thelambugahawatta
2,760
3,180
3,600
5 Gohagoda/Pallemulla
1,181
1,318
200
225
6 Meddapathane
Existing
Reservoir
Capacity
3
(m )
Japanese
OriginalRequired
Apprasal- Capacity
2002
2007
GKWSP
REVIEW
Land
Extend
300
300
460
300 13.2P
100
100
110
100 42P
330
200
200
330
200 30P
4,020
1,010
500
500
1,010
500 16.2P
1,457
1,608
400
200
200
250
275
365
90
90
250 10.5P
100 6P
25
150
90
Remarks
Elevated
3,230
3,440
3,772
4,139
1,030
204
600
600
830
600 30P
2,381
2,480
2,638
2,813
700
118
500
500
580
500 26P
3 Uplands
8,934
9,516
10,445
11,461
2,870
27
2,960
3,000
2,840
1,500 68P
4 Heerassagala (Lower)
2,294
2,456
2,711
2,995
750
200
200
750
5 Heerassagala (Middle)
300 14.5P
1,133
1,252
1,314
1,525
380
250
250
380
250 18P
883
970
1,070
1,175
290
200
200
290
200 14.5P
7 Kondadeniya
1,800
2,040
2,220
2,424
610
300
200
200
310
8 Rajaphilla
1,440
1,600
1,770
1,960
490
300
300 19.2P
200
6 Heerassagala (Upper)
190
2,700
3,030
3,350
3,700
930
930
600
600
3,400
3,750
4,150
4,600
1,150
300
100
450
850
500 213P
2 Bangalawatta
3,338
3,816
4,216
4,652
950
100
300
300
850
300 9.5P
3 Pihilladeniya
2,096
2,690
3,253
3,962
670
100
200
200
570
200 19.2P
Note-
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
Annex 2
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line diagrammes\Line Diagram 5_KFG.xls
Annex 1
Reservoir Location
2010
2015
2020
2025
Total Reservoir
GKWSP
Existing
Capacity (25%
Required
Reservoir
Proposed
of Max
Capacity
Capacity
Capacity
Demand)
(m3)
3
(m )
(m3)
(m3)
Remarks
1 Bahirawakanda
3,230
3,440
3,772
4,139
1,030
204
830
600
2 Dangolla
2,381
2,480
2,638
2,813
700
118
580
500
3 Uplands
8,934
9,516
10,445
11,461
2,870
27
2,840
1,500
4 Elhena
1,344
1,487
1,639
1,824
460
460
300
374
418
461
510
130
110
100
6 Hantana Place
990
1,093
1,207
1,332
330
330
200
7 Heerassagala (Lower)
2,294
2,456
2,711
2,995
750
750
300
8 Heerassagala (Middle)
1,133
1,252
1,314
1,525
380
380
250
883
970
1,070
1,175
290
290
200
10 Thelambugahawatta
2,760
3,180
3,600
4,020
1,010
1,010
500
11 Kondadeniya
1,800
2,040
2,220
2,424
610
300
310
300
Original -200m3
12 Gohagoda/Pallemulla
1,181
1,318
1,457
1,608
400
150
250
250
Original -200m3
200
225
275
365
90
90
100
New
14 Nugawela
2,700
3,030
3,350
3,700
930
930
600
New
15 Rajaphilla
1,440
1,600
1,770
1,960
490
190
200
New
9 Heerassagala (Upper)
13 Meddapathane
25
300
Original -2960m3
Original -200m3
600
Total
6,500 m3
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Report\Line
diagrammes\Line Diagram 5_KFG.xls
Annex 5
Drawing
Number
Thelambugahawatta
Pipe
Diameter
(mm)
225
Material DI
/ PVC
Pipeline
Length (m)
PVC
200
160
PVC
880
160
PVC
880
110
PVC
890
110
PVC
890
160
PVC
1,400
160
PVC
1,400
90
PVC
750
90
PVC
750
160
PVC
290
160
PVC
290
250
DI
240
250
DI
240
225
PVC
1,030
225
PVC
1,030
1,090
225
PVC
1,090
40-C-08
40-C-09
40-C-10
40-C-11
Bangalawatta
No Design Changed
PVC
290
No Design Changed
40-C-20
Pihilladeniya
40-C-21
225
PVC
Kulugammana
40-C-22
250
DI
170
250
DI
170
100
DI
100
100
DI
100
90
PVC
430
90
PVC
430
250
DI
60
250
DI
60
225
PVC
170
225
PVC
170
40-C-25
300
DI
70
300
DI
70
No Design Changed
40-C-26
225
PVC
340
225
PVC
340
No Design Changed
250
DI
140
250
DI
140
225
PVC
670
225
PVC
670
40-C-28
160
PVC
430
160
PVC
430
40-C-29
160
PVC
540
160
PVC
540
40-C-30
160
PVC
160
PVC
Hantana Place
40-C-31
225
PVC
380
225
PVC
380
Elhena
DI
170
No Design Changed
40-C-24
Gohagoda New
(Pallemulla)
300
No Design Changed
40-C-23
Kondadeniya
No Design Changed
40-C-27
No Design Changed
Need to Check
No Design Changed
Original-2002
Name of Service
Reservoir
Drawing
Number
Heerassagala Upper
40-C-32
Pipe
Diameter
(mm)
160
Material DI
/ PVC
Pipeline
Length (m)
PVC
340
225
PVC
140
225
PVC
140
160
PVC
370
160
PVC
370
110
PVC
590
110
PVC
590
250
DI
220
250
DI
220
200
DI
40
200
DI
40
40-C-36
110
PVC
160
110
PVC
160
Bahirawakanda
40-C-37
250
DI
120
250
DI
120
Need to Check
Heerassagala Low
40-C-41
250
DI
280
250
DI
280
No Design Changed
No Design Changed
40-C-33
40-C-34
Heerassagala Middle
Annex 5
40-C-35
No Design Changed
YIELD
TOTAL
MSL
BH NO
SUPPLY
/(m3/Day)
MSL
BH NO
SUPPLY
/(m3/d)
/(m3/D)
/(m3/d)
450 BH 1
1000
BH 2
BH 3
B
Length=
K1
2005
Length=
Diameter =
Length=
1525 m
160 mmPVC
Diameter =
1100
2,545
2010
3,638
990 m
Q/(m3/Day )
160 mmPVC
Kondadeniya
1050
2010
2007
Length=
520 m
Diameter =
350 mmDI
Kondadeniya
2005
5191
2010
5543
2007
2010
7054
8423
Total No of Conection
Total No of Waiting List
160 m
Diameter =
Q=38905 m3/d
mmPVC
Length=
350 m
225 mmPVC
MSL 442m
BH 3
Q/(m3/Day )
Length=
Diameter =
BH 2
Diameter =
K2
KATUGASTOTA WTP
BH 1
MSL 531.2
200 mmDI
DEMAND
Sorce
Jica
year
2005
Jica
2010
GKWSP
2007
/(m3/d)
1706
Q/(m3/Day )
TWO LINES
1750
Length=
1,494
GKWSP
2010
No of Conection
No of Waiting List
Diameter =
2005
520 m
Length=
5"a
160 mmPVC
Diameter =
2756
910 m
2010
2850
300 mmDI
2007
4,039
2010
5,223
1,585
1149
5"
1030
Q/(m3/Day )
Length=
14
Kulugammana
MSL 579.2
Diameter =
2005
2435
950 m
2010
2693
250 mmDI
2007
3015
2010
3200
DEMAND
MAX/(m3/
Sorce
year
Jica
2005
Jica
GKWSP
2007
3,545
GKWSP
2010
4,638
2010
day)
1500
1550
No of Conection
2042
No of Waiting List
3101
Q/(m3/Day )
2005
2010
Wegiriya
65a
528 MSL
Length=
Diameter =
897
943
100 m
2007
1639
150 mmPVC
2010
1,740
65'
DEMAND
65
Sorce
Jica
year
2005
/(m3/d)
897
Jica
GKWSP
2010
2007
943
1,639
GKWSP
2010
1,740
No of Conection
2136
No of Waiting List
874
Pallemula
Q/(m3/Day )
Length=
2005
1720 m
Diameter =
200 mmDI
1538
2010
1750
2007
2010
1,376
1460
524MSL
DEMAND
Sorce
year
Jica
Jica
2005
2010
GKWSP
2007
2010
GKWSP
No of Conection
No of Waiting List
/(m3/d)
1044
1096
Q/(m3/Day )
Length=
991
Diameter =
2005
2010
90 m
200 mmDI
1,052
1044
1096
2007
991
2010
1052
6501
480
528
Q/(m3/Day )
Length=
1250 m
Diameter =
64B
Bogahakanda
90 mmPVC
2005
2010
494
654
2007
385
2010
408
560MSL
Q/(m3/Day )
DEMAND
Sorce
year
Jica
2005
100
Jica
2010
200
/(m3/d)
Length=
Diameter =
1140 m
110 mmPVC
2005
100
2010
200
6401
According to Review of Greater Kandy Water Supply Master Plan Phase II Prposed Bogahakaansda Reservoir is to be located
at Kurudugahamada at MSL 600 and the Transmisson root for the reservoir is selected along the Haloluwa-Kurudugahamada
Q/(m3/Day )
road(Sumanathissa Mawata)
Length=
`
64
2005
820 m
Diameter =
90 mmPVC
454
385
2010
408
DEMAND
Sorce
Jica
Jica
year
2005
2010
GKWSP
2007
385
GKWSP
2010
408
/(m3/d)
394
454
Q/(m3/Day )
Length=
Diameter =
750 m
2005
2010
394
454
160 mmPVC
2007
385
2010
408
64'
Length=
3000 m
Diameter =
160 mmPVC
SUPPLY
/(m3/d)
0
BH NO
BH 1
BH 2
BH 3
394
2010
2007
YIELD
/(m3/Day)
5807
5533
Akurana
600 m3
600 m3
508MSL
Kurugoda
DEMAND/
Sorce
year
Jica
2005
(m3/d)
2333
Jica
2010
2946
GKWSP
2007
1,981
GKWSP
2010
2,946
Q=
Length=
Water source
0 m3/d
Diameter =
569MSL
DEMAND/
Sorce
Jica
year
2005
(m3/d)
2402
Jica
2010
2815
GKWSP
2007
2,178
GKWSP
2010
2,815
m3/Day
1222 m
200 mm
Q=
m3/Day
Length=
3821 m
Diameter =
350 mm
500 m3
Q=
Thelabugahawatta
561.5MSL
m3/Day
DEMAND/
Length=
Diameter =
Q=
m3/Day
Sorce
Jica
Jica
GKWSP
GKWSP
m
mm
6571
7643
4159
year
2005
2010
2007
(m3/d)
1836
1882
0
2010
5761
600 m3
Kahawatta
600 M3
516MSL
Kahalla
DEMAND/
Sorce
Jica
year
2005
943
Jica
2010
GKWSP
GKWSP
2007
2,840
2010
3,038
491MSL
DEMAND
Sorce
(m3/d)
year
Jica
1211
Q=
Length=
Diameter =
0 m3/Day
3698 m
500 mm
2005
/(m3/d)
1679
Jica
2010
GKWSP
2007
2,225
2916
GKWSP
2010
2,916
7514
8854
6999
8799
Q=
1679
2916
2225
m3/Day
Length=
832 m
Diame=
200 mm
2916
Q=
0 m3/Day
Length=
884 m
Diame=
600 mm
9193
11770
9224
450 m3
11715
Balanagala
100 M3
513 MSL
Bangalawatta
DEMAND/
Sorce
Jica
year
2005
(m3/d)
1306
Jica
2010
1800
GKWSP
GKWSP
2007
2010
Q=
Length=
Diameter =
Q=
Length=
Diameter =
Q=
Length=
Diameter =
0 m3/Day
1062 m
600 mm
m3/Day
1790 m
600 mm
/(m3/d)
1412
2010
1600
GKWSP
2007
GKWSP
2010
225 mm
3772
Length= 3527 m
4600
0
0
Diameter = 300 mm
Length= 188 m
Diameter = 300mm
12965
Q=
16370
9224
Diameter = DI 200
m3/Day
Length=
100 m
492 m
PVC 225 mm
mm
11715
Philladeniya
DEMAND/
MSL 442m
Q=38905 m3/d
2005
m3/Day
Sorce
KATUGASTOTA WTP
year
Jica
1200 m
100 M3
MAX. DEMAND(m3/d)
519MSL
DEMAND
Sorce
Jica
year
2005
(m3/d)
1054
Jica
2010
1200
GKWSP
2007
GKWSP
2010
Jica
522 MSL
Q=
Length=
1120
Diameter =
250
Asgiriya
4100m3
2960m3
567MSL
Uplands
556MSL
KATUGASTOTA WTP
MSL 442m
Sorce
year
Q=38905 m3/d
Jica
2005
Jica
Q=
Length=
2007
GKWSP
2010
11237
19608
m3/Day
Length=
Diameter =
3/d)
2010
GKWSP
Q=
17590
28185
m3/Day
Demand/(m
Diameter =
Q=
mm
Length=
mm
Diameter =
2010
2007
GKWSP
2010
m3/Day
m
mm
m3/Day
Length=
Jica
6435
Jica
GKWSP
Diameter =
m
mm
Bahiravakanda
600m3
635MSL
Demand/(m
year
4383
3/d)
mm
Diameter =
Primrose
Sorce
2005
Length=
Q=
495m3
year
Jica
Q=
6353
8577
m3/Day
Demand/(m
Sorce
621MSL
Demand/(
Sorce
3/d)
year
m3/d)
2005
2217
Jica
2005
1970
Jica
2010
2296
Jica
2010
2142
GKWSP
2007
GKWSP
2007
GKWSP
2010
GKWSP
2010
R 2
3636m3
R 3
1136m3
Demand/(m
Q=
Length=
Diameter =
m3/Day
2217
2296
Q=
Length=
mm
Diameter =
m3/Day
5817
Sorce
Jica
7609
Jica
2010
GKWSP
2007
GKWSP
2010
mm
Q=
9257
Q=
Length=
Diameter =
m3/Day
year
2005
Length=
11480
Diameter =
617MSL
Demand/(m
3/d)
12996
Q=
5818
Length=
Diameter =
m3/Day
1045
1796
m3/Day
4772
5813
mm
Sorce
Jica
year
2005
Jica
2010
GKWSP
2007
GKWSP
2010
3/d)
3974
4151
798
Q=
mm
m3/Day
Length=
mm
Diameter =
1662
0
mm
KMC WTP
33500 m3/DAY
Q=
Length=
Diameter =
Length=
Diameter =
3440
3871
mm
Heera. Low
200m3
Q=
m3/Day
Hantana place
200m3
Demand/(m
Ampitiya
900m3
Demand/(m
586MSL
Demand/(m
Sorce
year
Sorce
year
Sorce
year
m3/Day
2399
Jica
2005
2289
Jica
2005
1045
Jica
2005
1581
2470
Jica
2010
2411
Jica
2010
1483
Jica
2010
2232
GKWSP
GKWSP
2007
2010
GKWSP
GKWSP
2007
2010
GKWSP
GKWSP
2007
2010
mm
3/d)
3/d)
3/d)
0
Q=
1151
Q=
m3/Day
Length=
Dangolla
1460
Diameter =
m3/Day
Length=
Q=
313
m3/Day
Length=
mm
Diameter =
Sorce
year
2005
2399
Jica
2010
2470
GKWSP
2007
GKWSP
2010
3/d)
Heera. Middle
250m3
1365m3
Demand/(m
Hantana (law)
100m3
Demand/(m
Sorce
year
Sorce
year
Jica
2005
880
Jica
2005
Jica
GKWSP
GKWSP
2010
2007
2010
910
Jica
GKWSP
GKWSP
2010
2007
2010
184
3/d)
3/d)
Q=
m3/Day
Length=
Q=
m3/Day
Length=
Diameter =
271
550
mm
Diameter =
mm
390m3
200m3
Heera. Upper
Sorce
Jica
year
2005
Jica
GKWSP
GKWSP
2010
2007
2010
H
(hi
h)
Hantana
(high)
Demand/(m
Sorce
year
3/d)
Demand/(m
Jica
2005
271
Jica
2010
129
550
GKWSP
GKWSP
2007
2010
3/d)
0
129
730
0
0
mm
mm
Demand/(m
Jica
1300 m3
517
Diameter =
WATER SOURCE
Mullephilla
Demand/(m
Sorce
year
Jica
2005
517
Jica
GKWSP
GKWSP
2010
2007
2010
730
3/d)
(m3/d)
Summary A3 pump
Demand/(
year
m3/d)
2020
78,353
2015
28,626
2025
79,476
2020
30,609
2025
17,001
Summary A4 pump
Summary
Demand/(
year
y
year
y
m3/d)
KATUGASTOTA WTP
2020
15,320
2025
27,846
2015
MSL 442m
Q=48,000 m3/d
2020
2025
Summary A2 pump
Demand/(
year
m3/d)
2015
4,820
2020
5,221
2025
5,599
y A1 pump
Demand/(
m3/d)
25,045
27,203
29,030
ITEMS
Annex 7.1.1
AMOUNT 2012
(Rs.Mn)
REFERENCE
UNIT
QTY
Item
64
Annex 7.1.1.1
320
26
Annex 7.1.1.2
Intake
1
Item
103
Annex 7.1.1.3
- Filtration Unit
Item
249
Annex 7.1.1.4
Item
Annex 7.1.1.5
Item
216
Annex 7.1.1.6
- Chemical Building
Item
53
Annex 7.1.1.7
Item
174
Annex 7.1.1.8
Item
23
Annex 7.1.1.9
10
Item
40
Annex 7.1.1.10
11
Item
95
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles, training,
power supply, catchment protection
1,043
Allow
125
Item
10
Custom duty
Item
83
SUB TOTAL - 02
1,262
Allow
104
Allow
104
TOTAL AMOUNT
1,470
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.1_Intake & WTP.xlsx
NO.
PUMP STATION
INTAKE
TOTAL-MEC
POWER NO. OF
FOREIGN
LOCAL
(KW)
GENS
(Yen)
(Rs)
750
TOTAL
TOTAL-ELEC
FOREIGN (Yen)
35,847,000.00
LOCAL (Rs)
11,205,000.00
TOTAL
FOREIGN (Yen)
Annex 7.1.1.1
Page 1
TOTAL
LOCAL (Rs)
(Rs)
35,847,000.00
11,205,000.00
63,541,620.00
35,847,000.00
11,205,000.00
63,541,620.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
Annex 7.1.1.2
Page 1
ITEM DESCRIPTION
UNIT
QUANTITY
RATE(Rs)
AMOUNT(Rs)
REMARKS
Supply DI
1
320
49,905.00
15,969,600
Nr
156,407
312,814
Nr
185,976
743,904
Nr
338,880
338,880
Laying DI
900 mm dia. DI Pipe
320
25,432.00
8,138,240
25,503,438
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
Annex 7.1.1.3
Page 1
DESCRIPTION
2.1
2.2
AMOUNT (Rs)
83,202,842.10
14,997,020.33
504,604.80
3.1
2,851,577.40
3.2
1,025,052.00
102,581,096.63
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
BILL DESCRIPTION
M & E Work
2.1 Supplying
2.2 Laying
Annex 7.1.1.4
Page 1
FOREIGN
LOCAL
COMPONE
COMPONENT
NT
Rs
Yen
TOTAL (Rs)
94,543,255
1,578,184
96,847,405
5,654,400
79,161,600
121,230,336
14,790,000
5,826,100
23,296,106
37,166
3,892,040
5,719,544
Yard piping
3.1 Supplying
3.2 Laying
Total
1,423,417
116,448,238
90,457,924
1,423,417
248,516,807
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
2.1
2.2
2.3
2.4
ITEM DESCRIPTION
Excavation and Earth Work
Excavation (manual & machine) in all classes of soils
(other than a hard stratum which requires drilling and
blasting), for pits up to depth of 5.0m return soil for refill
compacted in layers not exceeding 150mm. Contractors
attention is drawn here to take extra care to avoid any
possible damages to the existing casted piles and any other
structure during excavation
Provide timber shoring arrangement supported with 50mm
dia. Heavy duty GI pipes and 50mm thick timber planks to
excavated area depth not exceeding 5.0m depth
commencing at existing ground level.
Allow provision for dewatering. Extra care should be taken
by the contractor not to cause earth collapse or damages to
adjacent structures.
Filling with selected excavated material
Concrete Work
Furnish, place, compact and cure cement concrete grade 15
laid within forms in:
2.1 a) Screed of base slab
UNIT
600
395
m2
180
931
150,000
m3
160
577
33
13,716.00
m3
247
16,256
488
18,199
29
18,199
172
1,299
3,244
1,299
mt
55
192,189
Item
m
m
Formwork
Furnish, fabricate, erect and strike formwork to concrete
2.5 a) Sides and soffits of slabs
2.6 b) Sides of walls
Reinforcement
Furnish, fabricate, place and tie medium grade ribbed or
2.7 deformed steel 460N/mm2 including binding wire, cover
and spacer blocks complete
Water Proofing
3,032
Item
Item
1,000,000
Item
m
1,650
200,000
500,000
4
Item
12,700
1,800,000
300
1,611
m2
300
302
Total
AMOUNT REMAR
(Rs)
KS
237,000
NWS&DB
2011 B1-C3c
167,580
NWS&DB
2011 B1-E3c
150,000
92,253
NWS&DB
2011 B1-F2a
452,628
NWS&DB
2011 B1-G3
4,015,232
8,881,161
527,774
NWS&DB
2011 WRS
NWS&DB
2011 WRS
NWS&DB
2011 WRS
4,214,637
NWS&DB
2011 WRS
NWS&DB
2011 WRS
10,570,401
NWS&DB
2011 WRS
223,464
5,002,800
MAGA+PE(I
CTAD
indices)
1,000,000
60,000
500,000
THAISI
*.7+PE(ICTA
D indices)
VO/THAISI
50,800
1,800,000
VO/THAISI
483,210
90,600
NWS&DB
2011 B1-N8
37,782,107
Item
No.
A
Description
Unit
Qty.
Rate
Amount
Remarks
Concrete Work
Furnish, Place, Compact & Cure Cement Concrete Grade 35 in
m3
11
17,660.53
194,265.86
A-2 Walls
m3
70
17,660.53
1,236,237.31
30
17,660.53
529,815.99
m3
40
17,660.53
706,421.32
A-3
SR-27-2-8
Form Work
Furnish, fabricate, erect and strike formwork to concrete
B-1 In Wall
m2
700
890.09
623,060.90
m2
130
890.09
115,711.31
m2
190
890.09
169,116.53
m.t
16
141,227.30
Reinforcement Work
1050
18,021.30
1410
5,241.50
D-2
D-3
240
18,260.00
530
70,950.00
E-1
F
2,259,636.72 SR-27-2-27
Structural Works
SR-27-2-17
Quotation from
18,922,365.00 Colonial
Hardware
Quotation from
7,390,515.00 Commercial
Hardware
Quotation from
4,382,400.00 Colonial
Hardware
Perforated PE Pipes
Supply & Place Perforated PE Pipes, dia
1000mm
Stainless Steel Plate
37,603,500.00
Item
No.
Description
Unit
Qty.
Rate
Amount
Quotation from
179,718,000.00 Colonial
Hardware
7780
23,100.00
12
7,810.00
93,720.00
7,810.00
46,860.00
Miscellaneous Work
m
m
253,991,625.94
Remarks
NO.
DESCRIPTION
TOTAL
Annex 7.1.1.5
Page 1
AMOUNT (Rs)
1,000,000.00
200,000.00
1,200,000.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake &
WTP.xlsx
DESCRIPTION
Clear water pump station
Annex 7.1.1.6
Page 1
TOTAL-MEC
FOREIGN (Yen) LOCAL (Rs)
92,910,100.00
TOTAL
11,824,755.00
TOTAL-ELEC
FOREIGN (Yen) LOCAL (Rs)
44,266,000.00
3,840,000.00
TOTAL
FOREIGN (Yen) LOCAL (Rs)
TOTAL
(Rs)
137,176,100.00
15,664,755.00
215,941,861.00
137,176,100.00
15,664,755.00
215,941,861.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
DESCRIPTION
Chemical Building
Annex 7.1.1.7
Page 1
TOTAL-MEC
FOREIGN (Yen) LOCAL (Rs)
17,156,000.00
2,920,800.00
TOTAL
TOTAL-ELEC
FOREIGN (Yen)
LOCAL (Rs)
15,955,000.00
1,946,000.00
TOTAL
FOREIGN (Yen)
LOCAL (Rs)
TOTAL
(Rs)
33,111,000.00
4,866,800.00
53,208,860.00
33,111,000.00
4,866,800.00
53,208,860.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
DESCRIPTION
TOTAL
Annex 7.1.1.8
Page 1
TOTAL-ELEC
FOREIGN (Yen)
LOCAL (Rs)
TOTAL
(Rs)
111,200,000.00
5,560,000.00
167,912,000.00
1,750,000.00
3,890,000.00
6,445,000.00
112,950,000.00
9,450,000.00
174,357,000.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
DESCRIPTION
TOTAL
Annex 7.1.1.9
Page 1
TOTAL
FOREIGN (Yen) LOCAL (Rs)
TOTAL
(Rs)
13,670,000.00
683,500.00
20,641,700.00
1,300,000.00
750,000.00
2,648,000.00
14,970,000.00
1,433,500.00
23,289,700.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
Annex 7.1.1.10
Page 1
TOTAL-ELEC
FOREIGN (Yen) LOCAL (Rs)
DESCRIPTION
TOTAL
(Rs)
21,000,000.00
3,050,000.00
33,710,000.00
2,250,000.00
2,700,000.00
5,985,000.00
TOTAL
23,250,000.00
5,750,000.00
39,695,000.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.1_Intake & WTP.xlsx
ITEMS
UNIT
QTY
Annex 7.1.2
AMOUNT
2012
(Rs.Mn)
REFERENCE
Nos
39
Annex 7.1.2.1
km
8.4
54
Annex 7.1.2.2
km
8.4
45
Annex 7.1.2.3
km
92
115
Annex 7.1.2.4
km
92
344
Annex 7.1.2.5
Nos
37
Annex 7.1.2.6
Nos
Annex 7.1.2.7
Road Reinstatement
10
11
Annex 7.1.2.8
km
8.4
10
km
92
64
Access Roads
Annex 7.1.2.9
Item
Item
1.4
Annex 7.1.2.10
Total Transmission
Item
0.3
Total Distribution
Item
2.7
Service Reservoirs
Item
2.2
Pump stations
Item
1.7
Preliminaries
Item
73
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
803
Allow
96
Item
Custom duty
Item
64
SUB TOTAL - 02
971
Allow
80
Allow
80
TOTAL AMOUNT
1,132
Note :
# 2nd Filter unit construction is required to implement the Harispattuwa proposal upto year 2020.
# Total cost estimate for WTP & Intake improvements are 1,500 MRs.
# Rates based on NWS&DB 2012 Rate book
# Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.2_Harispattuwa.xlsx
Annex 7.1.2.1
Page 1
Harispattuwa
Sub No
Reservoir Name
Capacity (m3)
Cost per
m3 / (Rs)
(Note-1)
Total Cost
(MRs)
Harispattuwa
1
Barigama
350
30,500
10.68
Yahalathanne
250
36,000
9.00
Bogahakanda Kurudugahamada
150
45,000
6.75
Uduwawala
600
21,000
12.60
39
Notes
3
1 Cost per m is taken from Table 02
2 Rates based on NWS&DB 2012 Rate Book
3
Civil Cost (Rs/m )
For Ground Reservoirs
For Water Towers
64,000.00
90,000.00
52,500.00
79,000.00
45,000.00
72,000.00
40,500.00
67,500.00
36,000.00
64,000.00
33,000.00
61,500.00
30,500.00
58,500.00
28,000.00
57,500.00
26,000.00
56,000.00
24,000.00
55,000.00
22,500.00
53,500.00
21,000.00
52,500.00
19,750.00
51,500.00
18,500.00
50,500.00
17,000.00
50,000.00
16,000.00
49,000.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.2_Harispattuwa.xlsx
Dia (mm)
Type
100
150
200
250
300
350
400
450
500
600
700
800
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
Qty (m)
1,750
1,300
5,300
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Supplying
Rate (Rs)
3,025
4,417
5,720
7,368
8,939
11,416
13,886
16,741
19,674
26,231
34,187
41,590
Amount (Rs)
7,729,769
7,435,731
39,049,038
54
Rate to include
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
Annex 7.1.2.3
Page 1
Harispattuwa
Dia (mm)
Type
100
150
200
250
300
350
400
450
500
600
700
800
Total for 2012
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Qty (m)
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
1,750
1,300
5,300
Laying
Rate (Rs)
4,304
4,526
5,499
5,658
5,993
8,841
10,680
11,273
12,252
15,904
18,629
22,358
Amount (Rs)
7,920,695
7,148,609
29,987,876
45
Rate to include
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.2_Harispattuwa.xlsx
Annex 7.1.2.4
Page 2
Harispattuwa
Divisional
Secretary
Area
Harispattuwa
SR
Demand
Avg.
Served
density
Demand
Area
3
2
for 2035
(m /km 63mm
(km2)
3
PVC
/day)
(m /day)
TOTAL
110mm 160mm 225mm PIPE
Phase II
PVC
PVC
PVC LENGT stage I
H (m)
Madadeniya
2607
9.69
269
8,823
4,706
1,176
2,941
2,353
20,000
Barigama
1861
6.17
302
7,067
3,769
942
2,356
1,885
16,019
Yahalathanne
709
2.74
259
5,385
2,872
718
1,795
1,436
12,206
Bogahakanda
Kurudugahamada
560
1.91
293
4,253
2,268
567
1,418
1,134
9,641
1959
4.59
427
14,878
7,935
1,984
4,959
3,968
33,725
7696
25
40,407
21,550
5,388
13,469
10,775
91,589
Uduwawala
TOTAL COST
Projected
Demand/P
Phase II ipe Length TOTAL
3
stage II (m /Km) COST (Rs)
20,000
16,019
12,206
9,641
33,725
25,659
65,930
130
25,009,843
116
20,031,427
58
15,263,065
58
12,055,453
58
42,172,558
114,532,346
Phase II
stage 1
Phase II
stage 11
REMARKS
25,009,843
50%
considered
20,031,427
15,263,065
Kahalla
12,055,453
114,532,346
##########
42,172,558
32,086,880
82,445,466
PVC
TYPE
1000
(Rs/m)
339
928
1,185
1,990
4,422
5,309 Note:
8,925 Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
Annex 7.1.2.5
Page 2
Harispattuwa
Divisional
Secretary
Area
SR
Harispattuwa Madadeniya
Deman
Avg.
d
Served
Demand
Area density
for 2035
63mm
(km2) (m3/km
PVC
(m3/day)
2
/day)
Projected
Demand/
TOTAL
Pipe
90mm 110mm 160mm 225mm
PIPE
Phase II Phase II Length
PVC
PVC
PVC
PVC LENGTH stage I stage II
(m3/Km)
9.69
269
10,196
5,438
1,359
3,399
2,719
23,111
1861
6.17
302
7,067
3,769
942
2,356
1,885
16,019
Yahalathanne
709
2.74
259
5,385
2,872
718
1,795
1,436
12,206
Bogahakanda
Kurudugahama
560
1.00
560
4,253
2,268
567
1,418
1,134
9,641
1959
4.59
427
14,878
7,935
1,984
4,959
3,968
33,725
7696
24
41,780
22,282
5,571
13,927
11,141
94,701
Uduwawala
TOTAL COST
TOTAL
COST (Rs)
(m)
2607
Barigama
23,111
16,019
12,206
9,641
33,725
25,659
69,041
113
84,010,500
116
58,229,041
58
44,367,964
58
35,043,808
58
122,590,748
344,242,061
TOTAL COST
Phase II stage
OF DS AREA
1
(Rs)
Phase II
stage 11
REMARKS
84,010,500
50%
considered
58,229,041
44,367,964
Kahalla
35,043,808
344,242,061
344,242,061
122,590,748
93,272,849
250,969,212
PVC
TYPE
1000
(Rs/m)
2,436
3,848
4,135
5,070
5,662
5,739 Note:
7,048 Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
Annex 7.1.2.6
Page 1
Harispattuwa
PUMPS - M & E Cost
PUMP
PUMP STATION
A4 Pump B
G
H
I
TYPE OF
PUMP
Pump
Capacity
(kW)
IB
IB
IB
B
85
17
12
10
Total
No. of
Pumps
17,177.27
42,206.44
Capacity>75kW
60,000.00
52,185.87
Capacity>75kW
15,000.00
Minimum
1,500,000
2
3
2
2
9
Pump
Pump
s on
Capacit
duty y (kW)
1
2
1
1
5
170
51
24
20
COST (Rs)
M & E Cost
Mechanical
Electrical
CEB Cost
Work
Work
10,200,000
8,871,598
2,550,000
4,590,000
2,661,479
765,000
2,160,000
1,252,461
360,000
1,800,000
1,043,717
300,000
Total M & E Cost (Rs)
Total M & E
Cost
21,621,598
8,016,479
3,772,461
3,143,717
36,554,256
Sierra
Sierra
Capacity<75kW
90,000.00 NWS&DB
NWS&DB
Capacity<75kW
20,000.00 CEB/NWS&DB/Ph i/St II
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
Annex 7.1.2.7
Page 1
Harispattuwa
PUMPS - Civil Cost
PUMP
PUMP STATION
A4 Pump G To Barigama
H To Kurundugahamada
I Barigama
Total
Unit Cost (Rs/kW)
Site Work
Structural Work
Mechanical Work
Electrical Work
CEB Cost
TYPE OF
PUMP
Total
Pump
No. of Pumps Pump
Capacit
Pumps on duty Capacit
y (kW)
y (kW)
IB
IB
B
17,177.27
42,206.44
Capacity>75kW
113,852.18
82,185.87
15,411.37
17
12
10
3
3
2
2
2
1
1
51
24
20
COST (Rs)
Civil Cost
Structural
Site Work
Work
876,041
2,152,528
412,254
1,012,955
343,545
844,129
Total Civil Cost (Rs)
Total Civil
Cost
3,028,569
1,425,209
1,187,674
5,641,452
Sierra
Sierra
Capacity<75kW
202,700.36 Maga
Maga
Maga
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
Annex 7.1.2.8.1
Page 1
Harispattuwa
Length (km)
RDA
PRDA
PS
25%
25%
50%
Area (m )
RDA
PRDA
PS
25%
25%
50%
1,253
1,253
2,505
5,010
2
3,000
2,600
1,380
10.5
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
Annex 7.1.2.8.2
Page 1
2
Area (m )
Total Road
Reinstatement cost
(MRs)
Length (km)
RDA (5%)
92
1,940
PRDA (15%)
5,819
PS (80%)
31,033
RDA
PRDA
3,000
PS
2,600
TOTAL
1,380
64
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
Name
Access
Capacity Road
(m3)
Length
(m)
Rate
(Rs/mtr)
Cost (Rs)
Barigama
650
50
Yahalathanne
300
100
Bogahakanda Kurudugahamada
100
50
1,575,000
Uduwawala
700
50
1,575,000
250
7.88
1,575,000
31,500.00
3,150,000
Name
Total
Total
Access
Pump
Pump
Road
Capacity Capacit
Length (m)
(kW)
y (kW)
Rate
(Rs/mtr)
Cost (Rs)
To Barigama
75
75
15
To Kurundugahamada
14
14
15
Barigama
20
20
15
472,500
45
1.42
Total
472,500
31,500.00
472,500
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.2_Harispattuwa.xlsx
Annex 7.1.2.10
Page 1
Harispattuwa
Surveying
Description
Soil investigation
Unit
Qty
Rate
Amount (Rs)
Description
Total Transmission
km
30,000.00
250,500.00
Total Distribution
km
92
30,000.00
2,747,677.24
Service Reservoirs
Nos
50,000.00
Nos
500,000.00
2,000,000.00
2,200,000.00
Pump stations
Nos
50,000.00
Nos
500,000.00
1,500,000.00
1,650,000.00
Unit
Qty
Rate
Amount (Rs)
6,848,177.24
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
SELECTION OF PRIORITY AREAS OF KANDY NORTH WATER SUPPLY PROJECT (Consider only KNWSP new SR areas, Refer Map 1)
Criteria for selection of priority areas
Harispattuwa
Pathadumbara
Pujapitiya
Akurana
Galagedara
Kandy Four
Gravets
Once a week
12 hours only
Quality issues
Social impact due to other
national level protests
Incremental cost vs incremental
benefit
No alternative sources
Isolated pockets without service
but surrounding area already
served with highest level
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.2_Harispattuwa.xlsx
ITEMS
UNIT
QTY
Annex 7.1.3
AMOUNT 2012
(Rs.Mn)
REFERENCE
Nos
48
Annex 7.1.3.1
km
24.1
164
Annex 7.1.3.2
km
24.1
143
Annex 7.1.3.3
km
85
106
Annex 7.1.3.4
km
85
309
Annex 7.1.3.5
Nos
11
76
Annex 7.1.3.6
Nos
21
Annex 7.1.3.7
Road Reinstatement
10
11
Annex 7.1.3.8
km
24.1
32
km
85
59
Access Roads
Annex 7.1.3.9
Item
12
Item
Annex 7.1.3.10
Total Transmission
Item
0.7
Total Distribution
Item
2.6
Service Reservoirs
Item
2.8
Pump stations
Item
1.7
Preliminaries
Item
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
98
1,077
Allow
129
Item
11
Custom duty
Item
86
SUB TOTAL - 02
1,303
Allow
108
Allow
108
TOTAL AMOUNT
1,518
Note :
# 2nd Filter unit construction is required to implement the Pujapitiya proposal upto year 2020.
# Total cost estimate for WTP & Intake improvements are 1,500 MRs.
# Rates based on NWS&DB 2012 Rate book
# Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.3_Pujapitiya.xlsx
Annex 7.1.3.1
Page 1
Pujapitiya
Sub No
Reservoir Description
Capacity (m3)
Cost per
m3 / (Rs)
(Note-1)
Total Cost
(M.Rs)
1
2
Galhinna
300
33,000
9.90
Godahena
250
36,000
9.00
3
4
Poojapitiya 02
250
36,000
9.00
Poojapitiya 01
300
33,000
9.90
Bokkawala
300
33,000
9.90
48
Notes
3
1 Cost per m is taken from Table 02
2 Rates based on NWS&DB 2012 Rate Book
3
Civil Cost (Rs/m )
For Ground Reservoirs
For Water Towers
64,000.00
90,000.00
52,500.00
79,000.00
45,000.00
72,000.00
40,500.00
67,500.00
36,000.00
64,000.00
33,000.00
61,500.00
30,500.00
58,500.00
28,000.00
57,500.00
26,000.00
56,000.00
24,000.00
55,000.00
22,500.00
53,500.00
21,000.00
52,500.00
19,750.00
51,500.00
18,500.00
50,500.00
17,000.00
50,000.00
16,000.00
49,000.00
Annex 7.1.3_Pujapitiya.xlsx
Annex 7.1.3.2
Page 1
Pujapitiya
Dia (mm)
Type
100
150
200
250
300
350
400
450
500
600
700
800
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
Qty (m)
7,460
7,850
3,400
400
5,000
24,110
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Supplying
Rate (Rs)
3,025
4,417
5,720
7,368
8,939
11,416
13,886
16,741
19,674
26,231
34,187
41,590
Amount (Rs)
32,950,902
44,900,375
25,050,326
3,575,776
57,081,015
164
Rate
ate to include
c ude
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex
7\Annex 7.1.3_Pujapitiya.xlsx
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Qty (m)
7,460
7,850
3,400
400
5,000
24
Annex 7.1.3.3
Page 1
Laying
Rate (Rs) Amount (Rs)
4,304
4,526
33,764,792
5,499
43,166,598
5,658
19,237,505
5,993
2,397,380
8,841
44,206,265
10,680
11,273
12,252
15,904
18,629
22,358
143
Rate to include
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
Annex 7.1.3_Pujapitiya.xlsx
Annex 7.1.3.4
Page 2
Pujapitiya
PIPE LENGTHS (m)
Divisional
Secretary
Area
SR
Avg.
Demand
for 2035
(m3/day)
Pujappitiya
Ankumbura
538
2.73
197
2,043
1,090
272
681
Galhinna
1437
5.23
275
10,914
5,821
1,455
3,638
2,910
24,738
58
30,935,154
Godahena
898
6.87
131
6,820
3,637
909
2,273
1,819
15,459
58
19,331,780
Poojapitiya 02
736
4.67
158
5,590
2,981
745
1,863
1,491
12,670
58
15,844,310
Poojapitiya 01
1017
4.20
242
7,724
4,119
1,030
2,575
2,060
17,508
58
21,893,564
Bokkawala
1173
8.65
136
4,454
2,376
594
1,485
1,188
10,097
116
12,625,934
TOTAL COST
5799
32
37,546
20,024
5,006
12,515
10,012
85,103
Served
Area
(km2)
Demand
density
(m3/km2/da
y)
63mm
PVC
90mm
PVC
110mm
PVC
160mm
PVC
Projected
TOTAL Demand/P
TOTAL COST
REMARKS
225mm
PIPE
ipe Length
(Rs)
PVC
LENGTH (m3/Km)
(m)
50%
545
4,631
116
5,790,923
considered
50%
considered
106,421,666
PVC
TYPE
1000
(Rs/m)
339
928
1,185
1,990
4,422
5,309 Note:
8,925 Rates based on NWS&DB 2012 Rate Book
Annex 7.1.3_Pujapitiya.xlsx
Annex 7.1.3.5
Page 2
Pujapitiya
Divisional
Secretary Area
SR
Avg.
Demand
for 2035
(m3/day)
Served
Area
(km2)
Demand
density
(m3/km2/d
ay)
COST OF
90mm
PVC
110mm
PVC
160mm
PVC
225mm
PVC
Projected
SUPPLYING &
Demand/
TOTAL
Pipe
REMARKS
PIPE
Length TOTAL COST
(Rs)
LENGTH (m3/Km)
(m)
Pujappitiya
Ankumbura
538
2.73
197
2,043
1,090
272
681
545
4,631
116
16,833,543
Galhinna
1437
5.23
275
10,914
5,821
1,455
3,638
2,910
24,738
58
89,924,913
Godahena
898
6.87
131
6,820
3,637
909
2,273
1,819
15,459
58
56,195,249
Poojapitiya 02
736
4.67
158
5,590
2,981
745
1,863
1,491
12,670
58
46,057,576
Poojapitiya 01
1017
4.20
242
7,724
4,119
1,030
2,575
2,060
17,508
58
63,642,058
Bokkawala
1173
8.65
136
4,454
2,376
594
1,485
1,188
10,097
116
36,702,131
TOTAL COST
5799
32
37,546
20,024
5,006
12,515
10,012
85,103
50%
considered
50%
considered
309,355,469
PVC
TYPE
1000
(Rs/m)
2,436
3,848
4,135
5,070
5,662
5,739 Note:
7,048 Rates based on NWS&DB 2012 Rate Book
Annex 7.1.3_Pujapitiya.xlsx
Annex 7.1.3.6
Page 1
PUMP STATION
B
C
A4 Pump D
E
To Medawala
Medawala
To Godahena
To Galhinna
TYPE
OF
PUMP
Pump
Capacity
(kW)
IB
B
IB
IB
75
60
35
25
Pump Total
No. of
Pump
s on
Capacit
Pumps
duty y (kW)
2
3
3
3
11
17,177.27
42,206.44
Capacity>75kW
60,000.00
52,185.87
Capacity>75kW
15,000.00
Minimum
1,500,000
1
2
2
2
150
180
105
75
Mechanical
Work
9,000,000
16,200,000
9,450,000
6,750,000
COST (Rs)
M & E Cost
Electrical
CEB Cost
Work
7,827,881
2,250,000
9,393,457
2,700,000
5,479,516
1,575,000
3,913,940
1,125,000
Total M & E
Cost
19,077,881
28,293,457
16,504,516
11,788,940
75,664,794
Sierra
Sierra
Capacity<75kW
90,000.00 NWS&DB
NWS&DB
Capacity<75kW
20,000.00 CEB/NWS&DB/Ph i/St II
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.3_Pujapitiya.xlsx
Annex 7.1.3.7
Page 1
PUMP STATION
C Madadeniya
D To Godahena
E To Galhinna
Total
TYPE OF
PUMP
COST (Rs)
Civil Cost
Structural
Total Civil Cost
Work
3,091,909
7,597,159
10,689,068
1,803,613
4,431,676
6,235,290
1,288,295
3,165,483
4,453,778
Total Civil Cost (Rs)
21,378,136
Total
Pump
No. of Pumps Pump
Capacity
Pumps on duty Capacit
(kW)
y (kW) Site Work
B
IB
IB
17,177.27
42,206.44
Capacity>75kW
113,852.18
82,185.87
15,411.37
60
35
25
3
3
3
3
2
2
2
180
105
75
Sierra
Sierra
Capacity<75kW
202,700.36 Maga
Maga
Maga
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.3_Pujapitiya.xlsx
Annex 7.1.3.8.1
Page 1
Pujapitiya
RDA
PRDA
PS
PRDA
PS
25%
25%
50%
3,804
3,804
7,608
Area (m2)
Length (km)
24
RDA
25%
25%
50%
12
15,216
RDA
3,000
PRDA
2,600
PS
1,380
Road
Reinstate
ment cost
(MRs.)
32
Annex 7.1.3_Pujapitiya.xlsx
Annex 7.1.3.8.2
Page 1
Pujapitiya
Area (m2)
Length (km)
RDA (5%)
85
1,802
PRDA (15%)
5,407
PS (80%)
RDA
28,835
3,000
PRDA
2,600
PS
1,380
Total Road
Reinstatement
cost (MRs)
TOTAL
59
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.3_Pujapitiya.xlsx
Reservoir Name
Access
Capac
Road
ity
Rate (Rs/mtr)
Length
(m3)
(m)
Cost (Rs)
Galhinna
300
50
1,575,000
Godahena
300
100
3,150,000
Poojapitiya 02
300
100
Poojapitiya 01
400
75
2,362,500
Bokkawala
300
50
1,575,000
375
12
31,500.00
3,150,000
Annex 7.1.3.9
Total Access
Pump Road Rate (Rs/mtr)
Capac Length
Cost (Rs)
Madadeniya
240
15
472,500
To Godahena
135
15
To Galhinna
105
15
472,500
45
31,500.00
472,500
Annex 7.1.3.10
Page 1
Pujapitiya
Soil investigation
Surveying
Description
Unit
Qty
Rate
Amount (Rs)
Description
Total Transmission
km
24
30,000.00
723,300.00
Total Distribution
km
85
30,000.00
2,553,098.73
Service Reservoirs
Nos
50,000.00
Nos
500,000.00
2,500,000.00
2,750,000.00
Pump stations
Nos
50,000.00
Nos
500,000.00
1,500,000.00
1,650,000.00
Unit
Qty
Rate
Amount (Rs)
7,676,398.73
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.3_Pujapitiya.xlsx
ITEMS
UNIT
QTY
Annex 7.1.4
AMOUNT 2012
(Rs.Mn)
REFERENCE
Nos
10
99
Annex 7.1.4.1
km
22.4
150
Annex 7.1.4.2
km
22.4
127
Annex 7.1.4.3
km
185
232
Annex 7.1.4.4
km
185
674
Annex 7.1.4.5
Nos
13
47
Annex 7.1.4.6
Nos
18
Annex 7.1.4.7
Road Reinstatement
10
11
Annex 7.1.4.8
km
22.4
29
km
185
129
Access Roads
Annex 7.1.4.9
Item
66
Item
Annex 7.1.4.10
Total Transmission
Item
0.7
Total Distribution
Item
5.6
Service Reservoirs
Item
5.5
Pump stations
Item
2.2
Preliminaries
Item
159
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
1,746
Allow
210
Item
17
Custom duty
Item
140
SUB TOTAL - 02
2,113
Allow
175
Allow
175
TOTAL AMOUNT
2,462
Note :
# 2nd Filter unit construction is required to implement the Pathadumbara proposal upto year 2020.
# Total cost estimate for WTP & Intake improvements are 1,500 MRs.
# Rates based on NWS&DB 2012 Rate book
# Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.4_Pathadumbara.xlsx
Annex 7.1.4.1
Page 1
Pathadumbara
Sub No
Reservoir Description
Capacity (m3)
Cost per m3
/ (Rs)
(Note-1)
Total
Cost
(M.Rs)
10.7
250
30,500
36,000
300
33,000
9.9
400
28,000
11.2
Pitiyegedara
350
30,500
10.7
Udathalawinna
250
36,000
9.0
Wattegama
650
19,750
12.8
500
24,000
12.0
Jambugahapitiya
Napana-Feed from Polgolla
100
52,500
5.3
10
200
40,500
8.1
10
Doragamuwa
350
2
3
Moragaskotuwa
Pihilladeniya-Feed from Polgolla
9.0
99
Notes
3
1 Cost per m is taken from Table 02
2 Rates based on NWS&DB 2012 Rate Book
3
Civil Cost (Rs/m )
For Water
Towers
90,000.00
79,000.00
72,000.00
67,500.00
64,000.00
61,500.00
58,500.00
57,500.00
56,000.00
55,000.00
53,500.00
52,500.00
51,500.00
50,500.00
50,000.00
49,000.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.4_Pathadumbara.xlsx
Annex 7.1.4.2
Page 1
Pathadumbara
Dia (mm)
Type
100
150
200
250
300
350
400
450
500
600
700
800
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
Qty (m)
6,000
8,700
1,200
5,100
1,400
22,400
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Supplying
Rate (Rs)
3,025
4,417
5,720
7,368
8,939
11,416
13,886
16,741
19,674
26,231
34,187
41,590
Amount
(Rs)
26,502,066
49,762,199
8,841,292
45,591,149
19,439,932
150
Rate
ate to include
c ude
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.3
Page 1
Pathadumbara
Dia
(mm)
Type
100
150
200
250
300
350
400
450
500
600
700
800
Total for 2012
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
Qty (m)
6,000
8,700
1,200
5,100
1,400
22,400
Laying
Rate (Rs)
4,304
4,526
5,499
5,658
5,993
8,841
10,680
11,273
12,252
15,904
18,629
22,358
Amount (Rs)
27,156,669
47,840,689
6,789,708
30,566,591
14,952,124
127
Rate to include
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.4
Page 2
Pathadumbara
Divisional
Secretary Area
Pathadumbara
SR
Doragamuwa
Avg.
Demand
for 2035
(m3/day)
Served
Area
(km2)
Demand
density
(m3/km2/da
y)
90mm
PVC
110mm
PVC
160mm
PVC
225mm
PVC
TOTAL
Projected
TOTAL Demand/P COST OF
ipe Length SUPPLYING REMARKS
PIPE
LENGTH (m3/Km)
(Rs)
(m)
1035
3.32
312
7,861
4,192
1,048
2,620
2,096
17,818
58
22,281,061
861
2.26
381
6,539
3,488
872
2,180
1,744
14,822
58
18,535,259
Pihilladeniya
1289
3.84
336
4,895
2,611
653
1,632
1,305
11,095
116
Bangalawatta
2080
3.13
666
15,797
8,425
2,106
5,266
4,213
35,808
58
Pitiyegedara
1169
4.52
259
4,439
2,368
592
1,480
1,184
10,062
116
12,582,879
725
1.63
445
5,506
2,937
734
1,835
1,468
12,481
58
15,607,506
Wattegama
2898
8.79
330
22,010
11,739
2,935
7,337
5,869
49,890
58
62,386,970
Jambugahapitiya
1729
6.18
280
13,132
7,004
1,751
4,377
3,502
29,765
58
37,221,212
432
1.56
277
1,641
875
219
547
437
3,718
116
4,649,961
12218
35
81,820
43,637
10,909
27,273
21,819
185,459
Moragahakotuwa
Udathalawinna
Napana
TOTAL COST
50%
considered
50%
44,777,397
considered
13,874,535
50%
considered
231,916,780
PVC
TYPE
1000
(Rs/m)
339
928
1,185
1,990
4,422
5,309 Note:
8,925 Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.5
Page 2
Pathadumbara
Divisional
Secretary Area
SR
Avg.
Demand
for 2035
(m3/day)
Served
Area
(km2)
Demand
density
(m3/km2/d
ay)
90mm
PVC
110mm
PVC
160mm
PVC
225mm
PVC
Projected
LAYING (Rs)
Demand/
TOTAL
Pipe
TOTAL COST REMARKS
PIPE
TOTAL COST
Length
OF DS AREA
LENGTH
(Rs)
(m3/Km)
(Rs)
(m)
Pathadumbara
Doragamuwa
1035
3.32
312
7,861
4,192
1,048
2,620
2,096
17,818
58
64,768,466
861
2.26
381
6,539
3,488
872
2,180
1,744
14,822
58
53,879,854
Pihilladeniya
1289
3.84
336
4,895
2,611
653
1,632
1,305
11,095
116
40,331,668
Bangalawatta
2080
3.13
666
15,797
8,425
2,106
5,266
4,213
35,808
58
130,162,714
Pitiyegedara
1169
4.52
259
4,439
2,368
592
1,480
1,184
10,062
116
36,576,974
725
11.63
63
445
55,506
506
22,937
937
734
11,835
835
11,468
468
12
12,481
481
58
45
45,369,215
369 215
Wattegama
2898
8.79
330
22,010
11,739
2,935
7,337
5,869
49,890
58
181,351,704
Jambugahapitiya
1729
6.18
280
13,132
7,004
1,751
4,377
3,502
29,765
58
108,197,756
432
1.56
277
1,641
875
219
547
437
3,718
116
13,516,897
12218
35
81,820
43,637
10,909
27,273
21,819
185,459
Moragahakotuwa
Ud th l i
Udathalawinna
Napana
TOTAL COST
674,155,249
50%
considered
50%
considered
674,155,249
50%
considered
674,155,249
PVC
TYPE
1000
(Rs/m)
2,436
3,848
4,135
5,070
5,662
5,739 Note:
7,048 Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.6
Page 1
PUMP STATION
A3 Pump X
Y
Z
P
To Moragahakotuwa
To Udathalawinna/Wattegama
To Jambugahapitiya
Doragamuwa
Total Cost (Rs)
TYPE
OF
PUMP
Pump
Capacity
(kW)
IB
IB
IB
B
4
42
33
7
Total
No. of
Pumps
3
4
3
3
13
17,177.27
42,206.44
Capacity>75kW
60,000.00
52,185.87
Capacity>75kW
15,000.00
Minimum
1,500,000
Pump
Pump
s on
Capacit
duty y (kW)
2
3
2
2
9
12
168
99
21
COST (Rs)
M & E Cost
Mechanical
Electrical
CEB Cost
Work
Work
1,080,000
626,230
180,000
15,120,000
8,767,226
2,520,000
8,910,000
5,166,401
1,485,000
1,890,000
1,095,903
315,000
Total M & E Cost (Rs)
Total M & E
Cost
1,886,230
26,407,226
15,561,401
3,300,903
47,155,761
Sierra
Sierra
Capacity<75kW
90,000.00 NWS&DB
NWS&DB
Capacity<75kW
20,000.00 CEB/NWS&DB/Ph i/St II
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.7
Page 1
PUMP STATION
A3 Pump X
Y
Z
P
To Moragahakotuwa
To Udathalawinna/Wattegama
To Jambugahapitiya
Doragamuwa
Total
TYPE OF
PUMP
Total
Pump
No. of Pumps Pump
Capacit
Pumps on duty Capacit
y (kW)
y (kW)
IB
IB
IB
B
17,177.27
42,206.44
Capacity>75kW
113,852.18
82,185.87
15,411.37
4
42
33
7
4
3
4
3
3
2
3
2
2
12
168
99
21
COST (Rs)
Civil Cost
Structural
Site Work
Total Civil Cost
Work
206,127
506,477
712,605
2,885,781
7,090,682
9,976,463
1,700,550
4,178,438
5,878,987
360,723
886,335
1,247,058
Total Civil Cost (Rs)
17,815,113
Sierra
Sierra
Capacity<75kW
202,700.36 Maga
Maga
Maga
Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.8.1
Page 1
Pathadumbara
Length (km)
RDA
PRDA
PS
RDA
PRDA
PS
25%
25%
50%
3,465
3,465
6,930
Area (m )
25%
25%
50%
11
RDA
PRDA
PS
Road
Reinstatemen
t cost (MRs.)
22.4
13,860
3,000.00
2,600.00
1,380.00
29
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.8.2
Page 1
Pathadumbara
Area (m2)
Length (km)
RDA (5%)
185
3,927
PRDA (15%)
11,782
PS (80%)
62,838
RDA
3,000
PRDA
2,600
PS
1,380
Total Road
Reinstatement
cost (MRs)
TOTAL
129
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.4_Pathadumbara.xlsx
Annex 7.1.4.9
Capacity
(m3)
450
Access Road
Length (m)
900
Rate (Rs/mtr)
Cost (Rs)
28,350,000
Moragaskotuwa
450
600
18,900,000
Pihilladeniya
300
50
1,575,000
Bangalawatta
300
50
1,575,000
Pitiyegedara
550
50
Udathalawinna
350
200
6,300,000
Wattegama
800
50
1,575,000
Jambugahapitiya
750
100
3,150,000
Napana
200
50
1,575,000
10 Polgolla
350
50
1,575,000
10
2,100
66
31,500.00
1,575,000
Annex 7.1.4.9
Total
Pump
Total Pump
Access Road
Capacity Capacity (kW) Length (m)
(kW)
15
18
18
15
200
200
15
165
165
15
30
30
4
4
60
Rate
(Rs/mtr)
31,500.00
Cost (Rs)
472,500
472,500
472,500
472,500
1.9
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.4_Pathadumbara.xlsx
Annex 7.1.4.10
Page 1
Pathadumbara
Soil investigation
Surveying
Description
Unit
Qty
Rate
Amount (Rs)
Description
Total Transmission
km
22
30,000.00
672,000.00
Total Distribution
km
185
30,000.00
5,563,777.22
Service Reservoirs
Nos
10
50,000.00
Nos
10
500,000.00
5,000,000.00
5,500,000.00
Pump stations
Nos
50,000.00
Nos
500,000.00
2,000,000.00
2,200,000.00
Unit
Qty
Rate
Amount (Rs)
13,935,777.22
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.4_Pathadumbara.xlsx
ITEMS
UNIT
QTY
Annex 7.1.5
AMOUNT
2012(Rs.Mn)
REFERENCE
Nos
51
Annex 7.1.5.1
km
24.5
125
Annex 7.1.5.2
km
24.5
122
Annex 7.1.5.3
km
45
39
Annex 7.1.5.4
km
45
136
Annex 7.1.5.5
Nos
13
46
Annex 7.1.5.6
Nos
17
Annex 7.1.5.7
Road Reinstatement
10
11
Annex 7.1.5.8
km
24.5
31
km
45
26
Access Roads
Annex 7.1.5.9
Item
49
Item
Annex 7.1.5.10
Total Transmission
Item
0.7
Total Distribution
Item
1.3
Service Reservoirs
Item
3.9
Pump stations
Item
2.8
Preliminaries
Item
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
65
717
Allow
86
Item
Custom duty
Item
57
SUB TOTAL - 02
867
Allow
72
Allow
72
TOTAL AMOUNT
1,011
Note :
# 2nd Filter unit construction is required to implement the Akurana proposal upto year 2020.
# Total cost estimate for WTP & Intake improvements are 1,500 MRs.
# Rates based on NWS&DB 2012 Rate book
# Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.5_Akurana.xlsx
Reservoir Name
Annex 7.1.5.1
Page 1
Capacity (m3)
Cost per m3
/ (Rs)
Total Cost
(M.Rs)
Rambuke Ela
100
52,500
5.25
Vilana Udagama
100
52,500
5.25
Dunuwila
200
40,500
8.10
Balakaduwa
100
52,500
5.25
Heepitiya
150
45,000
6.75
Dippitiya
250
36,000
9.00
Akurana
400
28,000
11.20
51
Notes
3
1 Cost per m is taken from Table 02
2 Rates based on NWS&DB 2012 Rate Book
3
Civil Cost (Rs/m )
For Ground Reservoirs
For Water Towers
64,000.00
90,000.00
52,500.00
79,000.00
45,000.00
72,000.00
40,500.00
67,500.00
36,000.00
64,000.00
33,000.00
61,500.00
30,500.00
58,500.00
28,000.00
57,500.00
26,000.00
56,000.00
24,000.00
55,000.00
22,500.00
53,500.00
21,000.00
52,500.00
19,750.00
51,500.00
18,500.00
50,500.00
17,000.00
50,000.00
16,000.00
49,000.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.5_Akurana.xlsx
Type
100
150
200
250
300
350
400
450
500
600
700
800
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
Qty (m)
4,600
9,000
7,600
1,300
2,000
25
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Supplying
Rate (Rs)
Annex 7.1.5.2
Page 1
Amount
(Rs)
3,025 13,914,255
4,417 39,753,099
5,720 43,470,427
7,368
9,578,066
8,939 17,878,882
11,416
13,886
16,741
19,674
26,231
34,187
41,590
125
Rate to include
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
Annex 7.1.5_Akurana.xlsx
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Type
Qty (m)
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
4,600
9,000
7,600
1,300
2,000
25
Annex 7.1.5.3
Page 1
Laying
Amount (Rs)
Rate (Rs)
4,304
19,799,324
4,526
40,735,004
5,499
41,791,866
5,658
7,355,517
5,993
11,986,899
8,841
10,680
11,273
12,252
15,904
18,629
22,358
122
Rate to include
Excavation upto 2m
5% Rock excavation
25% shoring
h i
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
SR
Rambuke Ela
Vilana Udagama
Dunuwala
Balakaduwa
Heepitiya
Dippitiya
Akurana
Alawatugoda (Vilana,
TOTAL COST
Avg.
Demand
for 2035
(m3/day)
261
364
663
177
462
904
1607
985
5423
Annex 7.1.5.4
Page 2
Served
Area
(km2)
1.21
2.84
2.20
1.29
1.32
3.20
2.32
3.20
18
Demand
density
(m3/km2/
day)
216
128
301
137
350
283
693
308
90mm
PVC
261
364
663
177
462
904
402
493
3,725
110mm
PVC
261
364
663
177
462
904
402
493
3,725
160mm
PVC
131
182
332
89
231
452
201
246
1,863
PVC
TYPE
1000
(Rs/m)
339
928
1,185
1,990
4,422
5,309 Note:
8,925 Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
SR
Rambuke Ela
Vilana Udagama
Dunuwala
Balakaduwa
Heepitiya
Dippitiya
Akurana
Alawatugoda (Vilana,Owissa)
TOTAL COST
Avg.
Demand
for 2035
(m3/day)
261
364
663
177
462
904
1607
985
5423
Annex 7.1.5.5
Page 2
Demand
Served
density
Area
(m3/km2/d
(km2)
ay)
1.21
2.84
2.20
1.29
1.32
3.20
2.32
3.20
18
216
128
301
137
350
283
693
308
90mm
PVC
261
364
663
177
462
904
402
493
3,725
3 725
110mm
PVC
160mm
PVC
280mm
PVC
261
364
663
177
462
904
402
493
3,725
3 725
131
182
332
89
231
452
201
246
1,863
1 863
218
303
553
148
385
753
335
410
3,104
3 104
Projected
Demand/
TOTAL
Pipe
PIPE
Length
LENGTH (m3/Km)
(m)
3,132
4,368
7,956
2,124
5,544
10,848
4,821
5,910
44,703
44 703
83
83
83
83
83
83
333
167
COST OF
LAYING (Rs)
REMARKS
9,503,663
13,254,150
24,141,488
6,445,013
16,822,575
Akurana
32,916,900
14,628,722 25% considered
17,933,156 50% considered
135,645,666
135 645 666
PVC
TYPE
1000
(Rs/m)
2,436
3,848
4,135
5,070
5,662
5,739 Note:
7,048 Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
Annex 7.1.5.6
Page 1
Akurana
PUMP
PUMP STATION
A3 PumpE 2 Kahawatta
R To Dippitiya
S Vilana Udagama
T Kurugoda
U Heepitiya
Unit Cost (Rs/kW)
Site Work
Structural Work
Mechanical Work
Electrical Work
CEB Cost
Total
Pump No. of
Pump
Pumps
TYPE OF
Capaci
Capacity Pump
DS Area
Mechanical
on duty ty
PUMP
s
(kW)
Work
(kW)
Akurana
Akurana
Akurana
Akurana
Akurana
Total Cost (Rs)
B
IB
B
B
B
17,177.27
42,206.44
Capacity>75kW
60,000.00
52,185.87
Capacity>75kW
15,000.00
Minimum
1,500,000
44
25
7
20
5
3
3
2
3
2
13
2
2
1
2
1
132
75
14
60
10
COST (Rs)
M & E Cost
Electrical
Work
11,880,000
6,750,000
1,260,000
5,400,000
900,000
6,888,535
3,913,940
730,602
3,131,152
521,859
CEB Cost
1,980,000
1,125,000
210,000
900,000
150,000
Total M & E
Cost
20,748,535
11,788,940
2,200,602
9,431,152
1,571,859
45,741,088
Sierra
Sierra
Capacity<75kW
90,000.00 NWS&DB
NWS&DB
Capacity<75kW
20,000.00 CEB/NWS&DB/Ph i/St II
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
Annex 7.1.5.7
Page 1
Akurana
PUMP
PUMP STATION
A3 Pump E 2 Kahawatta
R To Dippitiya
S Vilana Udagama
T Kurugoda
U Heepitiya
Total Cost (Rs)
Unit Cost (Rs/kW)
Site Work
Structural Work
Mechanical Work
Electrical Work
CEB Cost
TYPE OF
PUMP
Total
Pump
No. of Pumps Pump
Capacity
Pumps on duty Capacit
(kW)
y (kW)
B
IB
B
B
B
44
25
7
20
5
5
17,177.27
42,206.44
Capacity>75kW
113,852.18
82,185.87
15,411.37
3
3
2
3
2
2
2
1
2
1
132
75
14
60
10
Site Work
2,267,400
1,288,295
240,482
1,030,636
171,773
COST (Rs)
Civil Cost
Structural
Total Civil Cost
Work
5,571,250
7,838,650
3,165,483
4,453,778
590,890
831,372
2,532,386
3,563,023
422,064
593,837
17,280,660
Sierra
Sierra
Capacity<75kW
202,700.36 Maga
Maga
Maga
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
PRDA
PS
RDA
PRDA
PS
25%
25%
50%
3,675
3,675
7,350
2
Area (m )
Length (km)
24.50
Annex 7.1.5.8.1
Page 1
25%
25%
50%
12
14,700
ROAD REINSTATEMENT
2
RATE (Rs./m )
RDA
3000
PRDA
2600
PS
1380
Road
Reinstate
ment cost
(MRs.)
31
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
Annex 7.1.5.8.2
Page 1
Area (m2)
Length (km)
RDA (5%)
45
801
PRDA (15%)
2,403
PS (80%)
RDA
12,815
3,000
PRDA
2,600
PS
1,380
Total Road
Reinstateme
nt cost
(MRs)
26
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
Annex 7.1.5.9
Akurana
Sub
No
Reservoir Name
Capac
Access Road
ity
Length (m)
(m3)
200
250
Rate
(Rs/mtr)
Cost (Rs)
Rambuke Ela
Vilana Udagama
250
200
6,300,000
Dunuwila
350
150
4,725,000
Balakaduwa
150
200
Heepitiya
250
200
6,300,000
Dippitiya
400
500
15,750,000
Akurana
500
50
1,575,000
1,550
49
7,875,000
31,500.00
6,300,000
Total
Total Pump
Access
Pump
Capacity
Road
Capac
(kW)
Length (m)
ity
15
120
120
15
105
105
15
20
20
15
75
75
15
12
12
5
5
75
Rate
(Rs/mtr)
31,500.00
Cost (Rs)
472,500
472,500
472,500
472,500
472,500
2.4
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.5_Akurana.xlsx
Annex 7.1.5.10
Page 1
Pathadumbara
Soil investigation
Surveying
Description
Unit
Qty
Rate
Amount (Rs)
Description
Total Transmission
km
25
30,000.00
735,000.00
Total Distribution
km
45
30,000.00
1,341,090.00
Service Reservoirs
Nos
50,000.00
Nos
500,000.00
3,500,000.00
3,850,000.00
Pump stations
Nos
50,000.00
Nos
500,000.00
2,500,000.00
2,750,000.00
Unit
Qty
Rate
Amount (Rs)
8,676,090.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.5_Akurana.xlsx
ITEMS
UNIT
QTY
AMOUNT 2012
(Rs.Mn)
Annex 7.1.6
REFERENCE
Nos
21
Annex 7.1.6.1
km
6.3
53
Annex 7.1.6.2
km
6.3
43
Annex 7.1.6.3
km
Annex 7.1.6.4
km
10
Annex 7.1.6.5
Nos
Annex 7.1.6.6
Nos
Annex 7.1.6.7
Road Reinstatement
10
11
Annex 7.1.6.8
km
6.3
km
Access Roads
Annex 7.1.6.9
Item
Item
Annex 7.1.6.10
Total Transmission
Item
0.2
Total Distribution
Item
0.1
Service Reservoirs
Item
1.7
Pump stations
Item
1.1
Preliminaries
Item
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
16
171
Allow
21
Item
Custom duty
Item
14
SUB TOTAL - 02
207
Allow
17
Allow
17
TOTAL AMOUNT
242
Note :
# 2nd Filter unit construction is required to implement the Kandy Four Gravets proposal upto year 2020.
# Total cost estimate for WTP & Intake improvements are 1,500 MRs.
# Rates based on NWS&DB 2012 Rate book
# Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.1.6_KFG.xlsx
Annex 7.1.6.1
Page 1
Reservoir Description
Capacity (m3)
Radagaspanawatta
50
Thalwatte
Total cost of reservoirs
Cost per
m3 / (Rs)
Total Cost
(M.Rs)
200
64,000
40,500
8.10
300
33,000
9.90
3.20
21
Notes
3
1 Cost per m is taken from Table 02
2 Rates based on NWS&DB 2012 Rate Book
3
Civil Cost (Rs/m )
For Ground Reservoirs
For Water Towers
64,000.00
90,000.00
52,500.00
79,000.00
45,000.00
72,000.00
40,500.00
67,500.00
36,000.00
64,000.00
33,000.00
61,500.00
30,500.00
58,500.00
28,000.00
57,500.00
26,000.00
56,000.00
24,000.00
55,000.00
22,500.00
53,500.00
21,000.00
52,500.00
19,750.00
51,500.00
18,500.00
50,500.00
17,000.00
50,000.00
16,000.00
49,000.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.2
Page 1
Type
100
150
200
250
300
350
400
450
500
600
700
800
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
Qty (m)
1,000
2,000
1,285
2,020
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Supplying
Amount (Rs)
Rate (Rs)
3,025
4,417
5,720
7,368
8,939
11,416
13,886
16,741
19,674
26,231
34,187
41,590
3,024,838
8,834,022
7,349,934
33,815,992
53
Rate to include
Excavation upto 2m
5% Rock excavation
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.3
Page 1
Type
100
150
200
250
300
350
400
450
500
600
700
800
Total for 2012
Note :
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
Qty (m)
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
DI
1,000
2,000
1,285
2,020
Laying
Rate (Rs)
4,304
4,526
5,499
5,658
5,993
8,841
10,680
11,273
12,252
15,904
18,629
22,358
Amount (Rs)
4,304,201
9,052,223
7,066,125
22,770,991
43
Rate to include
Excavation upto 2m
5% R
Rock
k excavation
ti
25% shoring
Disposal of excavated material upto 10km
Granular bedding
Sand filling
Soil filling with imported material
15 Thrust blocks per 500m
3 valve chamber for 500m in DI lines and 2 valve chambers per 1km PVC line
5 Trial pit for 500m
Pressure testing
Temporary reinstatement
Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.4
Page 2
KFG
SR
Avg.
Demand
for 2030
(m3/day)
Served
Area
(km2)
Demand
density
(m3/km2/da
y)
Radagaspanawatta
Hantana (Call Link)
TOTAL COST
Projected
COST OF
TOTAL Demand/P
SUPPLYING
ipe Length
PIPE
(Rs)
LENGTH (m3/Km)
(m)
2,000
2,000
2,000
4,000
4,000
REMARKS
678 000
678,000
Allow (to
connect existing
678,000
system)
1,356,000
PVC
TYPE
1000
(Rs/m)
339
928
1,185
1,990
4,422
5,309 Note:
8,925 Rates based on NWS&DB 2012 Rate Book
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.5
Page 2
Divisional
Secretary Area
KFG
SR
Avg.
Demand
for 2030
(m3/day)
Served
Area
(km2)
Demand
density
(m3/km2/d
ay)
63mm
PVC
TOTAL
Pipe
PIPE
Length
LENGTH (m3/Km)
(m)
FOR LAYING
(Rs)
REMARKS
Radagaspanawatta
2,000
2,000
4,872,000
2,000
2,000
Allow (to
4,872,000 connect existing
system)
4,000
4,000
TOTAL COST
9,744,000
PVC
TYPE
1000
(Rs/m)
2,436
3,848
4,135
5,070
5,662
5,739 Note:
7 048 Rates based on NWS&DB 2012 Rate Book
7,048
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.6
Page 1
PUMP
PUMP STATION
DS
AREA
Pump No. of
Total Pump
Pumps
TYPE OF
Capacity
Capacity Pump
Mechanical
on duty
PUMP
(kW)
s
(kW)
Work
COST (Rs)
M & E Cost
Electrical
Work
CEB Cost
Total M & E
Cost
KFG
12
1,080,000
626,230
1,500,000
3,206,230
R3 Pump K To Radagaspanawatta
KFG
IB
10
900,000
521,859
1,500,000
2,921,859
Total
Unit Cost (Rs/kW)
Site Work
Structural Work
Mechanical Work
Electrical Work
CEB Cost
17,177.27
42,206.44
Capacity>75kW
60,000.00
52,185.87
Capacity>75kW
15,000.00
Minimum
1,500,000
6,128,089
Sierra
Sierra
Capacity<75kW
90,000.00 NWS&DB
NWS&DB
Capacity<75kW
20,000.00 CEB/NWS&DB/Ph i/St II
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.7
Page 1
R2 Pump
PUMP STATION
J Hanthana Low
R3 Pump K To Radagaspanawatta
TYPE OF
PUMP
COST (Rs)
Total
Pump
Civil Cost
No. of Pumps Pump
Capacit
Structural Total Civil
Pumps on duty Capacit
Site Work
y (kW)
y (kW)
Work
Cost
12
206,127
506,477
712,605
IB
10
171,773
422,064
593,837
Total
Unit Cost (Rs/kW)
Site Work
Structural Work
Mechanical Work
Electrical Work
CEB Cost
17,177.27
42,206.44
Capacity>75kW
113,852.18
82,185.87
15,411.37
1,306,442
Sierra
Sierra
Capacity<75kW
202,700.36 Maga
Maga
Maga
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.8.1
Page 1
RDA
PRDA
PS
PRDA
PS
25%
25%
50%
1,097
1,097
2,195
Area (m2)
Length (km)
RDA
25%
25%
50%
4,389
ROAD REINSTATEMENT
Road
RATE (Rs./m2)
Reinstateme
nt cost
(MRs.)
RDA
PRDA
PS
3000
2600
1380
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.8.2
Page 1
Length (km)
RDA (5%)
60
PRDA (15%)
180
PS (80%)
960
RDA
3,000
PRDA
2,600
PS
1,380
Total Road
Reinstateme
nt cost
(MRs)
2.0
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.9
Reservoir Name
Access
Capac
Road
ity
Length
(m3)
(m)
Rate
(Rs/mtr)
Cost (Rs)
Radagaspanawatta
50
50
200
50
Thalwatte
300
50
1,575,000
150
1,575,000
31,500.00
1,575,000
Annex 7.1.6.9
Total Total
Access
Pump Pump
Road
Capac Capacity
Length (m)
ity
(kW)
15
12
12
15
10
10
Rate
(Rs/mtr)
31,500.00
Cost (Rs)
472,500
472,500
945,000
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.6.10
Page 1
Soil investigation
Surveying
Description
Unit
Qty
Rate
Amount (Rs)
Description
Total Transmission
km
30,000.00
189,150.00
Total Distribution
km
30,000.00
120,000.00
Service Reservoirs
Nos
50,000.00
Nos
500,000.00
1,500,000.00
1,650,000.00
Pump stations
Nos
50,000.00
Nos
500,000.00
1,000,000.00
1,100,000.00
Unit
Qty
Rate
Amount (Rs)
3,059,150.00
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.6_KFG.xlsx
Annex 7.1.7
TENTATIVE COST ESTIMATE FOR THE KNWSP - NRW, STAFF QUARTERS, NEW
MANAGER O&M OFFICE
ITEM NO
ITEMS
UNIT
QTY
AMOUNT
2012 (Rs.Mn)
Item
324
Item
1,000
Item
32
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
Annex 7.1.7.1
1,356
Allow
163
Item
14
Custom duty
Item
108
SUB TOTAL - 02
1,641
Allow
136
Allow
136
TOTAL AMOUNT
REFERENCE
1,912
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.7_NRW
& Qts.xlsx
Annex 7.1.7.1
Page 1
Cost per Engineering Assistants Quarters (03 Units) - As per 2011 rates
Rs.
38,893,803.28
Rs.
12,964,601.09
Rs.
324,115,027.29
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.1.7_NRW & Qts.xlsx
ITEM NO
01
02
03
ITEMS
Table 7.1
AMOUNT 2012
(Rs.Mn)
UNIT
QTY
Item
505
Item
Item
Item
Item
1
1
1
1
3
12
16
9
Item
1
320
64
26
103
249
1
216
53
174
23
40
257
546
480
493
1,473
211
Item
Item
Item
Item
Item
Item
Item
Item
05
Item
06
km
07
km
08
km
09
km
10
Nos
1
1
1
1
1
1
1
1
29
86
86
411
411
50
11
12
13
Nos
Nos
17
1
63
324
km
km
86
411
111
280
Item
Item
Item
Item
1
1
1
1
139
8
1,000
32
6,912
14
15
16
Allow
829
Item
Item
553
SUB TOTAL - 02
69
8,364
Allow
691
Allow
691
SUB TOTAL - 03
Allow for the VAT.(12% of sub total 03)
TOTAL AMOUNT
9,746
Allow
1,170
10,916
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
ITEM
NO
ITEMS
Table 7.1
UNIT
AMOUNT 2012
(Rs.Mn)
Reference
01
Item
1,043
Annex 7.1.1
02
Item
803
Annex 7.1.2
03
Item
1,077
Annex 7.1.3
04
Item
1,746
Annex 7.1.4
05
Item
717
Annex 7.1.5
06
Item
171
Annex 7.1.6
07
1,356
Annex 7.1.7
SUB TOTAL - 01
6,912
Allow
829
Item
69
Custom duty
Item
553
SUB TOTAL - 02
8,364
Allow
691
Allow
691
SUB TOTAL - 03
TOTAL AMOUNT
9,746
Allow
1,170
10,916
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
Investment Production/
(MRs) Demand (m 3)
64
26
19
18
126
103
249
1
216
53
174
23
40
95
200
191
1,345
50,000
2,100
26,900
1,518
1,436
898
736
1,017
1,174
537
5,798
261,800
1,132
2,966
1,128
400
3,126
7,620
148,600
1,011
261
364
663
177
462
904
1,607
985
5,423
186,400
2,408
1,035
861
1,169
725
2,898
1,729
8,417
286,100
60,000
Incremental
Cost
(Rs./m 3)
300
885
995
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
242
2,180
111,000
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
ITEMS
Annex 7.1.1
UNIT
QTY
Item
64
Annex 7.1.1.1
320
26
Annex 7.1.1.2
Intake
1
Item
103
Annex 7.1.1.3
- Filtration Unit
Item
249
Annex 7.1.1.4
Item
Annex 7.1.1.5
Item
216
Annex 7.1.1.6
- Chemical Building
Item
53
Annex 7.1.1.7
Item
174
Annex 7.1.1.8
Item
23
Annex 7.1.1.9
10
Item
40
Annex 7.1.1.10
11
Item
95
Annex 7.1.1.11
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
1,043
Allow
125
Item
10
Custom duty
Item
83
SUB TOTAL - 02
1,262
Allow
104
Allow
104
TOTAL AMOUNT
1,470
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
ITEM NO
ITEMS
UNIT
QTY
AMOUNT
2012
(Rs.Mn)
Nos
39
km
8.4
54
km
8.4
45
km
92
115
km
92
344
Nos
37
Nos
Road Reinstatement
- For transmission lines
km
8.4
10
km
92
64
Item
Item
1.4
Total Transmission
Item
0.3
Total Distribution
Item
2.7
Service Reservoirs
Item
2.2
Pump stations
Item
1.7
Preliminaries
Item
73
10
11
Access Roads
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles, training,
power supply, catchment protection
803
Allow
96
Item
Custom duty
Item
64
SUB TOTAL - 02
971
Allow
80
Allow
80
TOTAL AMOUNT
1,132
Note :
#
#
#
#
2nd Filter unit construction is required to implement the Harispattuwa proposal upto year 2020.
Total cost estimate for WTP & Intake improvements are 1,500 MRs.
Rates based on NWS&DB 2012 Rate book
Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
Annex 7.1.2
REFERENCE
Annex 7.1.2.1
Annex 7.1.2.2
Annex 7.1.2.3
Annex 7.1.2.4
Annex 7.1.2.5
Annex 7.1.2.6
Annex 7.1.2.7
Annex 7.1.2.8
Annex 7.1.2.9
Annex 7.1.2.10
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
ITEM NO
ITEMS
UNIT
QTY
AMOUNT
2012
(Rs.Mn)
Nos
48
km
24.1
164
km
24.1
143
km
85
106
km
85
309
Nos
11
76
Nos
21
Road Reinstatement
- For transmission lines
km
24.1
32
km
85
59
Item
12
Item
Total Transmission
Item
0.7
Total Distribution
Item
2.6
Service Reservoirs
Item
2.8
Pump stations
Item
1.7
Preliminaries
Item
10
11
Access Roads
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles, training,
l
t h
t
t ti
Provisional sum for Land acquisition
Custom duty
98
1,077
Allow
129
Item
11
Item
86
SUB TOTAL - 02
1,303
Allow
108
Allow
108
TOTAL AMOUNT
1,518
Note :
#
#
#
#
2nd Filter unit construction is required to implement the Pujapitiya proposal upto year 2020.
Total cost estimate for WTP & Intake improvements are 1,500 MRs.
Rates based on NWS&DB 2012 Rate book
Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
Annex 7.1.3
REFERENCE
Annex 7.1.3.1
Annex 7.1.3.2
Annex 7.1.3.3
Annex 7.1.3.4
Annex 7.1.3.5
Annex 7.1.3.6
Annex 7.1.3.7
Annex 7.1.3.8
Annex 7.1.3.9
Annex 7.1.3.10
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
ITEMS
UNIT
QTY
AMOUNT 2012
(Rs.Mn)
Nos
10
99
km
22.4
150
km
22.4
127
km
185
232
km
185
674
Nos
13
47
Nos
18
Road Reinstatement
- For transmission lines
km
22.4
29
km
185
129
Item
66
Item
Total Transmission
Item
0.7
Total Distribution
Item
5.6
Service Reservoirs
Item
5.5
Pump stations
Item
2.2
Preliminaries
Item
159
10
11
Access Roads
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles, training,
l
h
i
Provisional sum for Land acquisition
Custom duty
1,746
Allow
210
Item
17
Item
SUB TOTAL - 02
Allow for 10% contingencies. (10% of sub total 01)
Allow
140
2,113
175
Allow
175
TOTAL AMOUNT
2,462
Note :
#
#
#
#
2nd Filter unit construction is required to implement the Pathadumbara proposal upto year 2020.
Total cost estimate for WTP & Intake improvements are 1,500 MRs.
Rates based on NWS&DB 2012 Rate book
Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.xlsx
Annex 7.1.4
REFERENCE
Annex 7.1.4.1
Annex 7.1.4.2
Annex 7.1.4.3
Annex 7.1.4.4
Annex 7.1.4.5
Annex 7.1.4.6
Annex 7.1.4.7
Annex 7.1.4.8
Annex 7.1.4.9
Annex 7.1.4.10
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex
7.xlsx
ITEMS
UNIT
QTY
AMOUNT
2012
(Rs.Mn)
Nos
51
km
24.5
125
km
24.5
122
km
45
39
km
45
136
Nos
13
46
Nos
17
Road Reinstatement
- For transmission lines
km
24.5
31
km
45
26
Item
49
Item
Total Transmission
Item
0.7
Total Distribution
Item
1.3
Service Reservoirs
Item
3.9
Pump stations
Item
2.8
Preliminaries
Item
10
11
Access Roads
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles, training,
power supply catchment protection
Provisional sum for Land acquisition
Custom duty
65
717
Allow
86
Item
Item
57
SUB TOTAL - 02
867
Allow
72
Allow
72
TOTAL AMOUNT
1,011
Note :
# 2nd Filter unit construction is required to implement the Akurana proposal upto year 2020.
# Total cost estimate for WTP & Intake improvements are 1,500 MRs.
# Rates based on NWS&DB 2012 Rate book
# Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
Annex 7.1.5
REFERENCE
Annex 7.1.5.1
Annex 7.1.5.2
Annex 7.1.5.3
Annex 7.1.5.4
Annex 7.1.5.5
Annex 7.1.5.6
Annex 7.1.5.7
Annex 7.1.5.8
Annex 7.1.5.9
Annex 7.1.5.10
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
TENTATIVE COST ESTIMATE FOR THE KNWSP - KANDY FOUR GRAVETS AREA
ITEM NO
ITEMS
UNIT
QTY
AMOUNT
2012 (Rs.Mn)
Nos
21
km
6.3
53
km
6.3
43
km
km
10
Nos
Nos
Road Reinstatement
- For transmission lines
km
6.3
km
Item
Item
Total Transmission
Item
0.2
Total Distribution
Item
0.1
Service Reservoirs
Item
1.7
Pump stations
Item
1.1
Preliminaries
Item
10
11
Access Roads
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles, training,
l
h
i
Provisional sum for Land acquisition
Custom duty
16
171
Allow
21
Item
Item
14
SUB TOTAL - 02
207
Allow
17
Allow
17
TOTAL AMOUNT
242
Note :
# 2nd Filter unit construction is required to implement the Kandy Four Gravets proposal upto year 2020.
# Total cost estimate for WTP & Intake improvements are 1,500 MRs.
# Rates based on NWS&DB 2012 Rate book
# Annual inflation considered as 5%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
Annex 7.1.6
REFERENCE
Annex 7.1.6.1
Annex 7.1.6.2
Annex 7.1.6.3
Annex 7.1.6.4
Annex 7.1.6.5
Annex 7.1.6.6
Annex 7.1.6.7
Annex 7.1.6.8
Annex 7.1.6.9
Annex 7.1.6.10
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
TENTATIVE COST ESTIMATE FOR THE KNWSP - NRW, STAFF QUARTERS, NEW
MANAGER O&M OFFICE
ITEM NO
ITEMS
UNIT
QTY
AMOUNT
2012 (Rs.Mn)
Item
324
Item
1,000
Item
32
SUB TOTAL - 01
Allow for Administration & Consultancy services, vehicles,
training, power supply, catchment protection
1,356
Allow
163
Item
14
Custom duty
Item
108
SUB TOTAL - 02
1,641
Allow
136
Allow
136
TOTAL AMOUNT
1,912
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
DESCRIPTION
Annex 7.2.1.2
INCOME
TOTAL PRODUCTION
INCOME PER m3
(Rs)
(m3)
(Rs)
2010
2009
2008
147,730,717.00
112,041,593.00
70,769,614.00
New Connections
19,794,256.00
15,812,124.00
15,716,253.00
Other Revenues
5,109,145.00
10,863,927.00
172,634,118.00
138,717,644.00
2010
77,681,000.00
77,681,000.00
INCOME
(Rs)
2009
72,286,000.00
72,286,000.00
Billing
Total
2010
2010
2009
2008
Avg
19.81
16.31
10.03
15.39
2.65
2.30
2.23
2.39
8,470,601.00
0.69
1.58
1.20
1.16
94,956,468.00
23.16
20.19
13.46
18.94
2010
INCOME PER m3
(Rs)
2009
2008
7,455,509
2009
6,869,128
2008
7,055,277
INCOME
DESCRIPTION
Water Sale to KMC
Total
2008
44,944,000.00
44,944,000.00
TOTAL PRODUCTION
(m3)
2010
2009
2008
4,259
4,196
4,160
18,239.26
17,227.36
10,803.85
18,239.26
17,227.36
10,803.85
Avg
15,423.49
15,423.49
Annex 7.xlsx
DESCRIPTION
Annex 7.2.2.2
O & M COST
TOTAL PRODUCTION
COST PER m3
(Rs)
(m3)
(Rs)
2010
2009
2008
59,557,252.00
47,438,733.00
Energy Cost
87,352,505.00
Chemicals Cost
Repairs and Maintenanace Cost of
Transmission and Distribution
Establishment Cost (Subsistence, Vehicle
running, Hired vehicles, Telephone, etc.)
Total
2010
2010
2009
2008
Avg
43,339,368.00
5.11
4.29
4.05
4.48
85,441,164.00
79,061,588.00
7.50
7.72
7.39
7.53
8,454,822.00
8,507,723.00
8,345,701.00
0.73
0.77
0.78
0.76
5,600,582.00
5,594,819.00
5,801,443.00
0.48
0.51
0.54
0.51
11,226,050.00
13,508,897.00
9,553,383.00
0.96
1.22
0.89
1.03
14.78
14.50
13.65
14.31
11,653,009
2009
11,066,628
2008
10,705,277
Annex 7.xlsx
Table 7.2
Phase I Stage I
2006
2007
30,500
31,000
11.13
11.32
10,000
10,500
Description
1 Water Production at WTP Katugastota m3/d
2 Total Water Production MCM/year
3 Water sale to KMC m3/d
4 Amount of water sale to NWSDB consumers m3/d [(1-3)*(1-Non Revenue*)]
5a No. of Connections [(4) / 0.6]
5b New Connections
6 Billing Quantity; m3/d (KMC) MCM Per Year [(3)*365/106]
13,325
11,635
1,446
3.65
13,325
16,413
4,778
3.83
2008
31,500
11.50
11,000
2009
32,000
11.68
11,500
13,325
18,166
1,753
4.02
13,325
19,239
1,073
4.20
Phase I Stage II
2010
2011
32,500
33,000
11.86
12.05
12,000
12,500
13,325
20,595
1,356
4.38
13,325
21,255
660
4.56
2012
39,000
14.24
16,500
Phase II
2013
39,500
14.42
16,500
2014
40,000
14.60
16,500
2015
41,000
14.97
17,000
2016
41,500
15.15
17,500
2017
42,000
15.33
17,500
2018
45,000
16.43
18,000
2019
50,000
18.25
18,500
2020
55,000
20.08
19,000
2021
60,000
21.90
19,500
2022
65,000
23.73
20,000
2023
66,000
24.09
20,000
15,750
26,250
4,995
6.02
16,100
26,833
583
6.02
16,450
27,417
583
6.02
16,800
28,000
583
6.21
16,800
28,000
6.39
17,150
28,583
583
6.39
18,900
31,500
2,917
6.57
22,050
36,750
5,250
6.75
25,200
42,000
5,250
6.94
28,350
47,250
5,250
7.12
31,500
52,500
5,250
7.30
32,200
53,667
1,167
7.30
4.52
4.52
4.52
4.52
4.52
4.52
5.35
5.47
5.58
5.70
5.70
5.82
6.42
7.48
8.55
9.62
10.69
10.93
0.34
8.51
58
109
13
32
211
0.34
8.70
61
109
13
105
288
0.34
8.88
64
109
13
39
224
0.34
9.06
67
109
13
24
212
0.34
9.24
70
109
13
30
221
0.34
9.43
73
109
13
15
209
0.40
11.77
96
128
15
110
349
0.41
11.90
96
131
15
13
256
0.42
12.03
96
168
19
13
296
0.43
12.34
124
171
20
13
328
0.43
12.52
128
171
20
0
319
0.44
12.65
128
175
20
13
335
0.48
13.47
131
192
22
64
410
0.56
14.80
135
281
33
116
564
0.64
16.13
173
321
37
144
676
0.72
17.47
178
361
42
144
725
0.80
18.80
183
401
47
144
774
0.82
19.05
183
410
48
32
672
24.83
33.07
25.22
23.39
23.92
22.14
29.69
21.48
24.62
26.58
25.46
26.53
30.47
38.09
41.89
41.51
41.20
35.27
52.5
9.0
77.0
6.7
7.5
4.9
9.9
18.0
7.0
54.4
9.2
79.8
6.9
7.7
5.1
10.3
60.6
9.8
56.4
9.4
82.8
7.0
8.0
5.3
10.6
22.7
10.9
58.5
9.6
85.8
7.1
8.3
5.5
11.0
14.2
11.5
60.6
9.8
88.9
7.3
8.6
5.7
11.4
18.3
12.4
62.8
10.0
92.1
7.4
8.9
5.9
11.8
9.1
12.8
75.7
12.0
111.0
9.0
10.7
7.1
14.3
70.1
15.8
123
123
78.2
12.6
114.7
9.3
11.1
7.4
14.7
8.3
16.1
123
123
80.8
13.1
118.5
9.7
11.5
7.6
15.2
8.5
16.5
123
123
84.4
13.6
123.9
10.2
12.0
7.9
15.9
8.7
18.5
123
123
90.0
14.5
132.0
10.8
12.8
8.5
17.0
9.0
18.9
123
74
197
98.4
16.3
144.3
12.1
14.0
9.2
18.5
46.1
20.8
123
74
197
111.5
19.4
163.5
14.4
15.8
10.5
21.0
84.6
24.3
123
74
197
125.1
53.7
183.4
16.8
17.8
11.8
23.6
86.3
30.5
123
74
197
139.2
61.6
204.1
19.3
19.8
13.1
26.2
88.0
34.3
244
244
213
213
212
212
223
223
221
221
326
326
272
395
281
404
295
418
313
436
380
576
465
662
549
746
606
802
123
74
197
153.8
69.8
225.6
21.9
21.8
14.5
29.0
89.8
38.1
12.70
677
874
123
74
197
159.3
72.8
233.6
22.8
22.6
15.0
30.0
20.3
39.0
192
192
123
123
87.2
13.9
127.9
10.4
12.4
8.2
16.4
18.5
31.75
327
449
19
44
11
(2)
(12)
24
(140)
(108)
(90)
(131)
(101)
(166)
(98)
(70)
(77)
(99)
(140)
21.56
18.54
18.12
18.80
18.33
22.88
18.90
19.27
19.72
21.56
20.44
23.11
25.47
27.34
27.65
28.53
25.54
Refer
Annex
7.2.1
Refer
Annex
7.2.2
10.2%
7,086.14
7,034.15
10%
17.29
Year of
Semi-annual
Constructio
instalment
n Complete
Value of semi-annual Instalment for capital Recovery (MRs) Stage I
Value of semi-annual Instalment for capital Recovery (MRs) Stage II
Value of semi-annual Instalment for capital Recovery (MRs) Phase II
Income
Sale price to KMC Rs.
Sale price to other consumers - Domestic Rs.
Sale price to other consumers - Non Domestic Rs.
New Connections & Other revenues
Cost of O & M after full implementation of Project
3
Personal Expenses for headworks,Intake,WTP,Pumping stations per annum (Rs/m
) - Plant
3
) - SR to customers
Personal Expenses for headworks,Intake,WTP,Pumping stations per annum (Rs/m
doorstep
Energy Cost - Plant (Rs/m3)
Energy Cost - Intermediate pump houses (Rs/m3)
Chemicals Cost (Rs/m3)
3
Repairs and Maintenanace Cost of Transmission Distribution and Reservoir (Rs/m
)
Establishment Cost (Rs/m3)
Extension & New connection Cost (Rs/connection)
Over Head for personal (Head office /RSC/Manager O&M) Rs/Connection/month
Repair and maintenance cost per annum -phase II MRs
Note :
Personal expenses includes Perm/casual salaries, overtime, EPF/ETF, medical expenses
Energy cost includes utility & electricity costs
Chemical cost includes chemical, chlorine, Alum, Lime, Bleaching powder & all other chemical costs
Repair & maintenance cost includes extension cost, new connection cost, defective meter cost, E&M cost
Establishment cost includes cost of vehicles, hired vehicles, telephone, security, rent etc.
Domestic - 93% & Non Domestic - 7%
615
812
123
74
161
Grace
Period
2007
2012
2018
6
6
6
For stage I
For stage II
Loan MRs
(As per
No. of
Repay
Repayment
subsidary
installme
Completion agreement Start
nts
15% of
Capit
2013
2018
2024
20
20
20
2033
2038
2044
1205
631
1369
Interest
Rate
Note :
It is assumed 15% of the total loan will be repaid by NWSDB within 20 years period after 6
year Grace period.
Interest rate - 10%
8%
10%
10%
16.00
24.00
37.00
22,000.00
For Phase II
5.11
1.86
2.09
5.83
7.50
1.50
0.73
0.48
0.96
13,750
50.00
19 of 21
25%
2%
25%
10%
30%
30%
25%
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
Table 7.2
2024
67,000
24.46
20,500
2025
68,000
24.82
21,000
2026
69,000
25.19
21,500
2027
70,000
25.55
22,000
2028
71,000
25.92
22,500
2029
72,000
26.28
23,000
2030
72,000
26.28
23,000
2031
72,500
26.46
23,500
2032
73,000
26.65
24,000
2033
73,500
26.83
24,500
2034
74,000
27.01
25,000
2035
75,000
27.38
25,500
2036
75,500
27.56
25,500
2037
76,000
27.74
26,000
2038
76,500
27.92
26,000
2039
77,000
28.11
26,500
2040
77,500
28.29
26,500
2041
78,000
28.47
27,000
2042
78,500
28.65
27,000
2043
79,000
28.84
27,000
2044
79,500
29.02
27,000
2045
80,000
29.20
27,500
2046
80,500
29.38
27,500
2047
81,000
29.57
27,500
2048
81,500
29.75
28,000
32,550
54,250
583
7.48
32,900
54,833
583
7.67
35,625
59,375
4,542
7.85
36,000
60,000
625
8.03
36,375
60,625
625
8.21
36,750
61,250
625
8.40
36,750
61,250
8.40
36,750
61,250
8.58
36,750
61,250
8.76
36,750
61,250
8.94
36,750
61,250
9.13
37,125
61,875
625
9.31
37,500
62,500
625
9.31
37,500
62,500
9.49
37,875
63,125
625
9.49
37,875
63,125
9.67
38,250
63,750
625
9.67
38,250
63,750
9.86
38,625
64,375
625
9.86
39,000
65,000
625
9.86
39,375
65,625
625
9.86
39,375
65,625
10.04
39,750
66,250
625
10.04
40,125
66,875
625
10.04
40,125
66,875
10.22
11.05
11.17
12.09
12.22
12.35
12.47
12.47
12.47
12.47
12.47
12.47
12.60
12.73
12.73
12.86
12.86
12.98
12.98
13.11
13.24
13.37
13.37
13.49
13.62
13.62
0.83
19.36
187
518
60
16
781
0.84
19.67
240
523
61
16
840
0.91
20.85
245
567
66
125
1,003
0.92
21.17
251
573
66
17
907
0.93
21.49
257
579
67
17
920
0.94
21.81
262
731
85
17
1,095
0.94
21.81
328
731
85
0
1,144
0.94
21.99
335
731
85
0
1,151
0.94
22.17
342
731
85
0
1,158
0.94
22.36
349
731
85
0
1,165
0.94
22.54
356
914
106
0
1,376
0.95
22.86
454
923
107
21
1,506
0.96
23.00
454
932
108
21
1,516
0.96
23.18
463
932
108
0
1,504
0.97
23.31
463
942
109
21
1,536
0.97
23.50
472
1,177
137
0
1,786
0.98
23.63
590
1,189
138
27
1,944
0.98
23.82
602
1,189
138
0
1,928
0.99
23.95
602
1,200
139
27
1,968
1.00
24.09
602
1,212
141
27
1,981
1.01
24.23
602
1,530
177
27
2,335
1.01
24.41
766
1,530
177
0
2,473
1.02
24.55
766
1,544
179
27
2,516
1.03
24.68
766
1,559
181
27
2,532
1.03
24.87
780
1,559
181
0
2,519
40.34
42.69
48.09
42.86
42.80
50.22
52.44
52.33
52.22
52.11
61.06
65.89
65.95
64.89
65.87
76.01
82.25
80.96
82.16
82.23
96.40
101.31
102.50
102.59
101.32
123
74
161
358
164.9
75.0
241.9
23.5
23.4
15.5
31.1
10.4
39.4
123
74
161
358
170.7
77.3
250.4
24.2
24.2
16.1
32.2
10.6
43.8
123
74
161
358
182.8
88.0
268.2
27.6
26.0
17.2
34.5
11.8
47.9
123
74
161
358
199.6
95.4
292.7
29.9
28.3
18.8
37.6
53.8
123
74
161
358
205.0
97.3
300.7
30.5
29.1
19.3
38.6
53.8
74
161
235
222.0
103.2
325.7
32.3
31.5
20.9
41.9
53.8
74
161
235
229.5
106.4
336.7
33.3
32.6
21.6
43.3
13.8
59.8
161
161
261.9
121.0
384.1
37.9
37.2
24.6
49.4
15.3
67.8
161
161
268.8
123.4
394.3
38.7
38.2
25.3
50.7
67.8
161
161
283.3
130.9
415.5
41.0
40.2
26.6
53.4
16.2
69.1
290.8
134.8
426.5
42.2
41.3
27.3
54.8
16.5
69.8
298.5
137.5
437.7
43.1
42.4
28.1
56.3
76.7
774
1,132
812
1,047
831
1,066
877
1,112
907
1,142
945
1,106
953
1,114
999
1,160
1,007
1,168
1,076
1,237
1,104
1,104
1,120
1,120
306.3
141.6
449.3
44.4
43.5
28.8
57.7
17.2
77.5
197.51
1,364
1,364
314.4
145.8
461.1
45.7
44.6
29.6
59.3
17.5
78.2
756
1,114
161
161
276.0
127.1
404.8
39.8
39.2
26.0
52.0
15.9
68.4
20.19
1,069
1,230
161
161
248.5
115.2
364.4
36.1
35.3
23.4
46.8
14.7
61.0
161
161
255.1
117.5
374.1
36.8
36.2
24.0
48.1
61.0
750
1,107
74
161
235
235.7
109.6
345.7
34.3
33.5
22.2
44.4
14.1
60.4
47.55
947
1,182
74
161
235
242.0
111.8
354.9
35.0
34.4
22.8
45.6
60.4
704
1,062
123
74
161
358
210.5
99.2
308.8
31.1
29.9
19.8
39.7
53.8
206.13
999
1,357
74
161
235
216.2
101.2
317.1
31.7
30.7
20.3
40.8
53.8
650
1,007
123
74
161
358
189.2
90.7
277.5
28.4
26.9
17.8
35.7
12.0
48.4
20.00
747
1,104
123
74
161
358
195.7
93.5
287.0
29.3
27.8
18.4
36.9
12.3
48.9
625
983
123
74
161
358
176.7
85.4
259.2
26.8
25.1
16.6
33.3
84.0
47.4
182.14
937
1,294
1,196
1,196
322.7
148.7
473.3
46.6
45.8
30.3
60.8
78.2
28.75
1,235
1,235
(202)
(167)
(292)
(154)
(184)
(12)
30
19
(199)
118
310
394
334
362
430
672
784
760
738
744
1,231
1,353
1,152
1,336
1,284
25.56
26.17
37.19
27.55
28.81
28.53
28.77
29.26
37.49
30.26
30.78
32.04
34.38
32.69
33.85
33.90
35.32
35.38
37.32
37.33
38.05
38.37
46.42
40.46
41.52
20 of 21
C:\Documents and Settings\Administrator\Desktop\Feasibility Reports ~PDF Format\Kandy North Water Supply Project Report-22.09.2012\Annex 7\Annex 7.xlsx
2050
82,500
30.11
28,000
2051
83,000
30.30
28,000
2052
83,500
30.48
28,500
40,500
67,500
625
10.22
40,875
68,125
625
10.22
41,250
68,750
625
10.22
41,250
68,750
10.40
13.75
13.88
14.00
14.00
1.03
25.00
780
1,967
228
27
3,001
1.04
25.14
975
1,985
230
34
3,223
1.05
25.28
975
2,003
232
34
3,244
1.05
25.46
992
2,003
232
0
3,228
120.04
128.22
128.33
126.78
331.1
153.1
485.7
48.0
47.0
31.1
62.4
18.2
78.9
339.8
157.6
498.4
49.4
48.2
32.0
64.1
18.6
87.6
348.7
162.3
511.5
50.8
49.5
32.8
65.7
19.0
88.4
1,256
1,256
1,296
1,296
1,329
1,329
357.8
165.5
524.8
51.9
50.8
33.6
67.4
88.4
240.63
1,581
1,581
1,746
1,928
1,915
1,647
41.95
43.03
43.86
51.87
Table 7.2
21 of 21