No 1 2 3 4 5 6
RCC Member Column footings Grade beams Plinth beams Columns Lintel beam Sunshades
Size of reinforcement required 10mm or 12mm 12mm, 16mm 85% Stirrups 6mm or 8mm 15% 8mm diameter 85%, Stirrups 6mm 15% 16mm, 20mm and 25mm 90% Ties 6mm or 8mm 10% 12mm, 16mm dia 85% Stirrups 6 mm or 8mm 15% 8mm dia 75% Distributer 6mm 25% 10mm dia 80% Distributor bars 6mm or 8mm 20% 12 or 16mm dia 80% Distributor 8mm dia 15% 8mm dia 70% Distributor 6mm 30% 8mm dia 100% 10 12mm dia 100% 20mm, 16mm, 12mm 80 85% Stirrups 8mm 15 20%
125
8 9
Staircase waist slab Roof slab (a) One way slab (b) Two way slab (c) Square slab 4m to 6m size
150
80 100 150
10
250
LABOUR REQUIREMENT FOR VARIOUS BUILDING WORKS: The table below shows the recommended labour requirement for various civil engineering/building/construction works:
S.No. 1)
Description of work Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge) Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge) Returning, filling and rammingof excavated earth in
Unit M3
Remarks _ _ _ _
2)
M3
Mate Labour
3)
M3
Mate
0.02
layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50m 4) Concrete : Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate) M3
_ _ _ _ _ _
5)
M3
_ _ _ _ _ _
vibrator 6) Reinforced cement concrete in situ in foundations, footings, bases for columns, etc excluding form work and reinforcement M3 mason Labour bhisti mixer operator mixer 0.07 vibrator 7) Reinforced cement concrete in situ in suspended floors/roofs excluding form work, and reinforcement. M3 mason Labour bhisti mixer operator 0.24 2.50 0.90 0.07 _ _ _ _ 0.17 2.00 0.90 0.07 0.07 The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.
mixer vibrator 8) Mortars : Mixing by hand, cement mortar of any mix/proportions M3 Labour Bhisti
_ _ Labour required will be approximately same for different mix proportions. The constants include labour involved in scaffolding.
9)
Brick work (straight walls) : Brick work in walls exceeding one brick thick, in cement / lime mortar
M3
10)
M2
The constants could be adopted for brick work with any mix or mortar. _ _ _ _ _ _ _ _
11)
Formwork : a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork : 1) rectangular column and walls 2) suspended floors/roofs 3) sides and soffits of beam
M3 M2 M2
12)
Quintal Bar bender Reinforcement: Bar reinforcement including cutting to length, hooked ends, Labour cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete Plastering and pointing : a) 15mm thick cement plaster to ceiling including mixing of M2 M2 M2 mason
13)
0.08
mortar. b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar.
0.10 0.10 0.06 0.10 0.10 0.10 0.15 0.10 0.10 0.10 0.01
_ _ _ _ _ _ _ _ _ _ _
14)
Damping proof course : a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing.
M3