You are on page 1of 10

CURRICULUM VITAE

Mechanical Engineer Services Engineer)


Cell No: PAK 00923345707137 KSA 00966560488960

BABAR ABBASI

(Piping and Plant

babarabbasi45@yahoo.com
Dammam Kingdom of Saudi Arabia

OBJECTIVE
To find a progressive, challenging & responsible position in the field of Piping Fabrication, Structure Fabrication and Plant Services Engineer use My skills & capabilities. And help to develop my career.

QUALIFICATION B.tech in mechanical Engineering


Islamabad campus Pakistan. Result waiting.

Preston university

Diploma of Mechanical Engineering


Education Peshawar Pakistan .

Board of Technical Hazara University

Bachelor Degree
Mansehra, Pakistan

PROFESSIONAL EXPERIENCE:

02 Years in KUWAIT
Fabrication/construction of piping, Erection, Installation Pre commissioning, Hydrotesting, Air flushing and hydro Jetting.

03 Years in SAUDI ARABIA

Fabrication/construction of piping Prefabrication, Erection, Pre commissioning, Hydrotesting, Air flushing and Shutdown plant Services activities Equipment (Drums, Collums, Furnace heater, Vessel, Heat Exchanger with all Equipment Hydro jetting and Hydro testing and related maintenance.

06 Years in PAKISTAN

Construction of plant, piping fabrication, Structural Fabrication, installation, , H.beam, I Beam, Angle bar, U.channel and Plates.

1.

CLIENT: PROJECT: SPONSER: August2012 to Till Date Position

ASCO (ARAB STEEL) plant constraction (piping work) MAZAYA AL AMAL CO.

Piping Engineer

Responsibilities:
Supervise all activates of piping, prefabrication, erection, installation,pre commissioing,hydrotestingand air flushing. Supervising of control the team, lead the team and also achieve the target on the time with good quality of work as per drawing. Cooperating with HSE department during the work to fulfill the safety requirement and to instruct the Fabrication team to follow the HSE instruction. Coordinating with planning teams for Progress monitoring. Follow up with the supporting departments for the execution of projects on time including Organized and report progress in meetings with clients and planning team.

Attend the progress and planning meeting for daily progress and Interact with the clients engineers for the modification as required at site. Monitored the work Progress and given the daily progress report to planning department.

CLIENT: ARAMCO STRUCTURAL & PIPING WORK SPONSER: AL AMAL CO. Fab2012 to August2012. Position: Engineer Responsibilities:
flushing.

2.

SAUDI PROJECT: MAZAYA

piping

Supervise all activates of piping, prefabrication, erection, installation,pre commissioing,hydrotestingand air

Supervising of control the team, lead the team and also achieve the target on time with good quality as per drawing. Coordinating with all people who belong the operation. Supervising the Fabrication, Erection of supports. Coordinating with planning teams for Progress monitoring. Check the quality of work as per drawing. Follow up with the supporting departments for the execution of projects on time including

Supervised the fabrication work according to HSE percussion and policy.

3. CLIENT: (RASTANURA OIL REFINERY) SHUTDOWN PLANT 71, 25 Vessels, Heat Exchanger Heater) SPONSER: INDUTREAL SERVICES K.S.A
May2011 to Sep2011

SAUDI ARAMCO (Drums, Columns, & Furnace AL-BARRAK

Position Plant Services Engineer Responsibilities:

Piping and

Supervising of control the team, lead the team and also achieve the target within time. Coordinating with all people who belong the operation. Supervising blinding and de blinding of drums & columns. Supervising the hydro getting and cleaning jobs activities. Supervising the Hydro testing of heat exchanger. Supervising the repair as per inspection recommendation. Coordinating with planning teams for Progress monitoring. Follow up with the supporting departments for the execution of projects on time including arrangement of PTW (Permit to Work) Cooperating with HSE department during the work to fulfill the safety requirement and to instruct the Fabrication team to follow the HSE instruction.

4.

CLIENT (RASTANURA OIL REFINERY) SHUTDOWN PLANT 448 Heat Exchanger, Heater) SPONSER; INDUTREAL SERVICES K.S.A
April2010 to May 2010

SAUDI ARAMCO (Drums, Columns, Furnace AL-BARRAK Piping and Plant

Position Services Engineer Responsibilities:

Supervising of control the team, lead the team and also achieve the target within time. Coordinating with all people who belong the operation. Supervising blinding and de blinding of drums & columns. Supervising the hydro getting and cleaning jobs activities. Supervising the Hydro testing of super heater. Supervising the repair as per inspection recommendation. Supervision of blasting of pipe. Coordinating with planning teams for Progress monitoring. Follow up with the supporting departments for the execution of projects on time including arrangement of PTW (Permit to Work) Cooperating with HSE department during the work to fulfill the safety requirement and to instruct the Fabrication team to follow the HSE instruction.

5.

CLIENT: (RASTANURA OIL REFINERY) ROJECT: SUPPORT (22 TO 42 DIA) SPONSER: SERVICES PLANT:
Nov2010 to Feb 2011

SAUDI ARAMCO REMOVE & REINSTALL PIPE AL-BARRAK INDUTREAL 53, 57, J37 & 447 Piping & Structure

Position Engineer

Responsibilities
Supervising of control the team, lead the team and also achieve the target within time. Coordinating with all people who belong the operation. Removal and reinstall pipe support 22 up to 42 dia pipe. Supervising the Fabrication and Erection of Pipe supports. Supervision of blasting and painting of pipe supports. Coordinating with planning teams for Progress monitoring.

6.

CLIENT; (RASTANURA OIL REFINERY) SHUTDOWN REINSTALL FLARE & SPONSER; SERVICES
Jan 2011 to Feb 2011

SAUDI ARAMCO PLANT 57(REMOVAL AND RELATED PIPING) AL-BARRAK INDUTREAL

Position Responsibilities:

Piping Engineer

Supervising of control the team, lead the team and also achieve the target within time. Supervising of line verification, prefabrication, Line replacement and installation of pipe. Coordinating with all people who belong the operation. Removal of flare and burners for repairing. Supervision during repair of flare tip refectory. After repair and inspection install burners and flare. Follow up with the supporting departments for the execution of projects on time Including arrangement of PTW (Permit to Work) at the site

7.

CLIENT; PLANT) ROJECT; Area) SPONSER; SERVICES


Sep2010 to Nov 2010

PETROKEMYA (SABIQ SHUTDOWN (VCM, PVC AL-BARRAK INDUSTRIAL

Position Responsibilities:

Piping Engineer

Supervising of control the team, lead the team and also achieve the target within time. Coordinating with all people who belong the operation. Supervising of line verification, prefabrication, Line replacement and installation

8.

CLIENT; COMPANY) ROJECT; PROJECT SPONSER; Position

KOC (KUWAIT OIL KUWAIT OIL COMPANY OIL AND GAS COMPANY Piping Engineer

July 2009 TO April 2010

Responsibilities:
Supervising of control the team, lead the team and also achieve the target within time with good quality. Coordinating with planning teams for Progress monitoring. Supervision of pre fabrication, erection jobs activities. Coordinating with all people who belong the operation. Supervision of hydretesting. Follow up with the supporting departments for the execution of projects on time including arrangement of PTW (Permit to Work) Cooperating with HSE department during the work to fulfill the safety requirement and to instruct the Fabrication team to follow the HSE instruction.

9.

CLIENT: ROJECT: (KUWAIT). SPONSER:


July2008 to June 2009

EQUIT (KUWAIT) AROMATIC PROJECT NATIONAL KHARAFI Co. Piping Engineer

Position Responsibilities:

Supervising of control the team, lead the team and also achieve the target within time with good quality. Supervising erection fabrication and structure jobs activities. Supervising Pre commission jobs activities. Supervising of hydro testing, air blowing. Coordinating with all people who belong the operation. Coordinating with planning teams for Progress monitoring and preparing of BOM & BOQ after drawing studying clients for the materials, approved drawing and work scope related activities. Supervision of fabrication & erection of heavy fuel oil pipe lines as per work scope.

10.

CLIENT: ROJECT: PROJECT SPONSER:


JUNE 2007 TO MAY 2008

PAEC (PAKISTAN) MINE DEVELOPMENT PAEC Pakistan. Piping & Structure

Position Engineer Responsibilities:

Supervise the all activity of piping & structure and also Bending & hydro testing.

11.

CLIENT: ROJECT; CONTRUCTION OF PLANT. SPONSER; CONTRUCTOR


Jan 2005 TO May 2007

PACKAGES LTD. MECHANICAL SOBER ENGINEERING

Position Responsibilities:

Piping Engineer

Supervise the all activity of piping & structure and also Bending & hydrotesting.

12.

CLIENT: FACTORY
ROJECT:

ASKARI CEMENT
MECHANICAL PIPING CONTRUCTION

SPONSER:
June 2002 TO Dec 2004

EKL LTD PAKISTAN.

Position Engineer Responsibilities:

Piping & Structure

Supervise the all activity of piping, structure and also & hydro testing.

13. CLIENT:
ROJECT:

KOHINOOR DYING LTD


Construction of piping

SPONSER: CONTRUCTOR
JULY2001 TO June 2002.

ASIAN ENGINEERING

Position Engineer Responsibilities:

Trinee Piping

Supervise the all activity of piping, structure and & hydrotesting work.

Computer skills:
Microsoft Office Word 2007. Microsoft Office Excel 2007. Microsoft Office Power Point 2007. Auto Cad 2001. Name Father Name DOB Marital status Religion Nationality Passport # Babar Abbasi Abdur rehman Abbasi 07 May 1980 Single Islam Pakistani BC1017811

10

You might also like