1 2 3 4 5
6 7 8 9
Action Plan for Implementing the Strategy(2009-2022) for Water Sector Water Demand
Projects Rehabilitation and Expansion Projects Middle Governorates
Rehabilitation of Zarqa networks (Japanese grant for Zarka water networks) JICA (Phase II) Dhiban district network rehabilitation Rehabilitation and restructuring of Russifa area/ Phase (I) Rehabilitation and restructuring of Russifa area/ Phase (II)
5672 days 4179 days 4179 days 3919 days 1740 days
1000 days 365 days 520 days 980 days
10
11
Northern Governorates
Rehabilitation and improvement of water networks Northern Governorates
365 days
365 days
12
13 14
Southern Governorates
Rehabilitation and expansion of the water facilities in Southern Governorates (Tafeileh & Ma'an) Phase I Rehabilitation and expansion of water facilities of Ma'an and Tafilah Governorates Phase 2
1300 days
1300 days 784 days
15
16 17 18 19
All Governorates
Rehabilitation and expansion of the water networks in south & middle Jordan Valley Poverty reduction projects and royal grants housing project Improvement, rehabilitation & expansion of water network and transmission mains in various areas (Al Husun, Houarah, Theiban, and Dhleil) Improvement, rehabilitation & expansion of water network and transmission mains in various areas in the kingdom
3394 days
1050 days 1565 days 1570 days 1850 days
20 21
22 23 24 25 26 27 28 29 30 31 32 33
34
35 36 37 38
Quality Projects
De-Nitrification unit for Tadj wells UV units for Zai Treatment Plant Effluent water Improving Abu-Zhegan raw water conveyance system Construct a centralized lab for drinking water and wastewater
784 days
263 days 390 days 263 days 784 days
39 40
41 42 43
44
45 46 47 48 49 50 51 52 53 54 55 56
1568 days
1306 days 784 days 1045 days 524 days 1045 days 1306 days 264 days 524 days 264 days 264 days 264 days 264 days
57
58 59
1568 days
1306 days 1306 days
Task Split
Progress Milestone
Split
ID
60 61 62 63 64 65 66
Task Name
New reservoir for Zara Mee'n Meter replacement and upgrade Strengthen DZ management practices - technical and commercial Denitrification unit at Tadj Station Ultra filtration unit at Wadi Seer treatment plant Optimize capacity of water treatment plants Reduce commercial water losses
Duration
524 days 1306 days 1306 days 264 days 264 days 264 days 784 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
67 68
69 70
71
72 73 74 75 76 77 78 79 80 81 82
Northern Governorates
Continue the Water Loss Reduction in Irbid and Jerash (current programme) Contract WLRP-C4 (funded from RRF) Rehabilitation of Water Supply Networks, Jerash ROU WLRP in northern governorates (future programme I) including pressure management WLRP in northern governorates (future programme II) including pressure management WLRP in northern governorates (future programme III) including pressure management Irbid house connection replacement programme Jerash house connection replacement programme Ajloun house connection replacement programme Mafraq house connection replacement programme Domestic meter replacement programme (RRF funded - Class B meters)
3747 days
615 days 805 days 521 days 1042 days 1303 days 1303 days 1955 days 1955 days 1955 days 1955 days 520 days
83
84 85 86
Southern Governorates
Water Loss Reduction in Karak (I) WLRP / Karak/stage (II) WLRP for remaining areas of the Kingdom
1465 days
422 days 1043 days 1565 days
87 88 89 90
91 92 93 94 95 96 97 98
Programmes Awareness Increase public awareness of their role in Water scarcity challenges and the importance of conserving our limited wa Role of citizens in facing the challenges by conservation means and material
450 lecturers yearly / 10 for each Education Department 5 for each sub governorates every year, to cover the period (2009-2022) Print and distribute 300,000 copies of awareness books, pamphlets, brochures, and posters each year TV. Radio programs (spots, Dialogue, statement on screen documentary films, religion, culture, youth, and other programs Promote and Expand using of Water conservation Technology for All sector; Agriculture , Industrial and Domestic (Work shop on Water Saving Devices/specificatio Promoting and Enhancing the techniques of Water Harvesting and Water Reuse in all Sectors implementation Harvest and Reuse Projects in each Governorates (mosques, schools, social associations, and etc...) Create awareness among the Jordanian decision makers Enhance collaboration among all concerned ministries
99
100 101 102
Work with the Ministry of Education to introduce water awareness programs in the form of events and curricula at a
Adding water issues in high schools curricula Organize events at high schools Invite the water users associations to participate with the government in setting implementing protection zones for surface and ground water
3654 days
3654 days 3654 days 700 days
103
104 105 106 107
1564 days
250 days 700 days 700 days 1564 days
108
109 110
1045 days
1045 days 500 days
111 112
113 114 115 116 117 118
Task Split
Progress Milestone
Split
ID
119 120 121 122 123 124 125 126
Task Name
Jerash domestic meter replacement programme (Class C meters) Ajloun domestic meter replacement programme (Class C meters) Mafraq domestic meter replacement programme (Class C meters) Encourage farmers to invest in new technology and provide better management when the incentive structure requires the investment Provide training and awareness on how to use the technology properly (new meter reading systems, electronic data acquisition, management and maintenance of of drip irrigat Assessing the provision of soft loans or grants to the local fixtures industry; to industries, agriculture, municipalities, and homes for implementation of technologies and approac More appropriate use of technology (Expanding the use of treated wastewater, Brackish water desalination programs, Replenish aquifers by the treated wastewater, etc) Implementation of a plan to tackle large user governmental sites ( military, the civil defense, intelligence services, military hospitals, royal palaces etc.)
Duration
3389 days 3389 days 3389 days 3650 days 3650 days 100 days 3650 days 261 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
127 128
129 130 131 132 133
Technology Project
New meter reading systems for all urban settings Electronic data acquisition for management of infrastructure components Software for technical, financial and economical processes to generate information for decision-makers Training and awareness on how to use the technology properly SCADA system (Northern, Middle, and Southern Governorates)
134
135 136 137 138
Facilitate adoption of new innovative and proven technology to produce, distribute, and use/ reuse water more efficien
Facilitate access to capital Introduce higher water delivery fees Encourage farmers to invest in new technology and provide better management when the incentive structure requires the investment Assessing the provision of soft loans or grants to the local fixtures industry; to industries, agriculture, municipalities, and homes for implementation of technologies and app
1050 days
1050 days 520 days 500 days 500 days
144
145 146 147 148 149 150 151 152
3650 days
85 days 109 days 3650 days 3650 days 3650 days 380 days 3650 days 2500 days
153 154
155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170
Water Supply
Pre Water Source Programme
Monitoring basin safe yield project Rainfall related studies program Mitigation and adaptation of the impact in climate change program Gray water utilization program studies Water harvesting and artificial recharge study program Reduction of evaporation from surface water resources program Watershed management and protection for the main basins in the Kingdom and evaluation program Investigation and evaluation of brackish water in the Kingdom program Evaluation of the amount of underground seepage water to Dead Sea project Evaluation of fresh springs and submarine water in Aqaba Gulf study program Deep aquifer exploration and monitoring program Surface water monitoring and enhancing program Implementation of telemetric system and monitoring project Shared aquifer and transboundries water Enforce buildings codes to use grey water storm water storage and water saving fixtures Replenish the aquifers by treated wastewater
171 172
173 174 175 176
177
3562 days
Split
ID
178
Task Name
Jordan River Storage Peace Treaty
Duration
3562 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
179
180 181 182 183 184 185 186 187 188
Source projects
Digging of new wells and improvement existing - new sources all governorates Digging of new wells and improvement existing (Middle Gov) Digging of new wells in northern governorates Rehabilitation of existing wells northern governorates Development of Mandah wells 2 & 4 northern governorates Rehabilitation of existing wells (all Kingdom) Desalination of Hisban brackish water Brackish water desalination programs Water harvesting every year, to cover the period (2009-2022)
3744 days
1560 days 1827 days 520 days 3650 days 196 days 3650 days 780 days 1050 days 261 days
189
190 191 192 193
Dam projects
Construction of Kufranjeh dam / Ajloun Construction of Ibn Hammad dam / Karak Construction of Khalid Ben Al Walid dam / Yarmouk Wadi Al-Halq
2653 days
760 days 783 days 781 days 782 days
194
195 196 197 198 199 200 201 202 203 204
2133 days
523 days 390 days 413 days 413 days 414 days 521 days 522 days 217 days 216 days 347 days
205
206
3898 days
261 days
207
208
Procurement of pipes
Procurement of pipes every year, to cover the period (2009-2022)
261 days
261 days
209
210 211 212 213 214
Middle Governorates
Improvement of the water supply system of Aein-Elbasha area Improvement of the water supply system for Salt district Improvement of the water supply system in Dead Sea Improvement of the Water Supply System for Zarqa District Phase III Zarqa governorate water system restructuring and rehabilitation
1646 days
436 days 456 days 401 days 1050 days 1368 days
215
216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236
Northern Governorates
Zquaeq project Kufr Assad source development Oyoon Al-Hammam well No 5 Al-Karem well & Qneya WTP development South West villages improvements, Mafraq Zneiah WTP & well development Rehabilitation of pumping stations Wadi Arab pumping stations refurbishment Improvement & expansion of water network and transmission mains in Zarqa- Russifa-Awajan Rehabilitation and expansion of water facilities in Central Governorates Rehabilitation of pumping stations Wadi Arab pumping stations refurbishment Houfa-Zatari transmission system Al-Wihdah dam water supply project Um El-Lulu transmission system Water supply of Mukhaiba wells to Irbid Water transmission to free zone of Mafraq Improvement of transmission mains in Northern Governorates Construction of the conveyance water pipeline from Faisal Arboretum well to Jerash Construction of the conveyance water pipeline from Zabda to BaniKananeh Within the water sector, main trunk lines to be executed for supply of all southern governorates from Disi project by the year 2016
3898 days
179 days 345 days 333 days 130 days 150 days 150 days 3650 days 261 days 500 days 1305 days 3650 days 590 days 1045 days 1045 days 782 days 700 days 783 days 1567 days 750 days 783 days 782 days
Task Split
Progress Milestone
Split
ID
Task Name
Duration
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
237 238
239 240 241 242
243
244 245 246 247 248 249 250 251 252
Planning
Prepare and continuously update a Balancing and Allocations Plan Further encourage the application of applied research activities Pursue the development and continuous updating of National Master Plan applying the principle of long-term sustainability of sustainable management plans Improve the efficiency of water distribution through improved planning and strengthened technical, managerial, and financial capability of concerned departments Establish a critical path for the allocation of each new source of water Give first priority to allocation of the basic human needs, and as such, first priority is given to the allocation of a modest share of 100 liters per capita per day to domestic water Continuously update our national water data bank Formulate a long-term plan for the exploitation of the resources, and a revolving five years plan shall be extracted from it and updated as necessary Revise the developed resources including resources mobilized for the irrigated agriculture in the JV and other established uses for confirmation of water allocations according to the long-term sustainable amounts as defined in Water Resources Manage. Plan
3600 days
1580 days 3600 days 3600 days 3600 days 400 days 550 days 3600 days 282 days 282 days
253
254
3654 days
130 days
255
256 257 258 259 260 261 262
Adopt an effective monitoring program to ensure that these standards are achieved. Such a program requires that analytical methodology, equipped laboratories and qualified personnel be provided
Zone one Protection Programme Coverage: Monitoring programs that cover at a minimum the requirements of the drinking water and wastewater national standards every year, to cover the period (2009-2 Capability: well equipped labs that cover at a minimum the tests required in the drinking water and wastewater national standards Credibility: Results issued by the labs are accurate, timely and credible Competence: Staff of the laboratories are competent to perform the required tasks. Readiness: The labs are always ready to carry the required tasks any time. Implement a comprehensive monitoring and assessment programme for surface water, and establishing an integrated development and conservation programme to increase the potential of surface water development in Jordan Monitor and rate performance efficiency of the water and wastewater systems and the management thereof every year, to cover the period (2009-2022)
3654 days
3654 days 260 days 260 days 260 days 260 days 260 days 260 days
263
260 days
264
265 266 267
1825 days
261 days 260 days 261 days
268
269 270 271 272
710 days
390 days 320 days 260 days 390 days
273
274 275 276 277
Rehabilitate springs and wells as well as the existing water supply infrastructure in order to better protect the water so
Jerash source protection works Survey and monitor all water resources for water quality, and ensure that water quality standards are consistently being met on yearly basis to cover the period (2009-2022) Give particular attention needs to be focused on adopting and enforcing effluent and sludge standards for municipal and industrial wastewater treatment plants and for discharg Ensure that all our projects have Environmental Impact Assessments studies (during the planning and design stage) and Environmental Management Plan (during the construc
259 days
259 days 261 days 261 days 360 days
278
279 280 281 282 283 284
Health standards
Enhance and sustain the setting of national health standards in regards of municipal water supply and wastewater Focus on public health and the health of workers (in the programs of reuse of treated wastewater). Maintain Laboratories for controls and properly equipped. Focus on public health and the health of workers in the programs of reuse of treated wastewater Re-evaluate water quality standards or guideline values adopted from WHO and EPA to suite local conditions Commitment and coordination between many agencies and at many levels within the government to enforce standards.
1825 days
521 days 781 days 1825 days 261 days 261 days 261 days
285
286 287 288
Surface Water
Develop and invest in facilities of the country's remaining limited surface water potential (Up to 475 MCM) to contribute to meeting rapidly increasing demands for all categories of water use in the country. Implement a comprehensive monitoring and assessment program for surface water quantity, quality, and uses, Establishing an integrated development and conservation program to increase the potential of surface water development in Jordan
3654 days
781 days 306 days 390 days
289
290 291 292
3654 days
3654 days 3654 days 3654 days Split
ID
293 294 295
Task Name
Protecting surface, water supplies from pollution Scheduling a plan to enhance the storage by removing sediments that accumulated over the years Scheduling a plan to enhance the storage by removing sediments that accumulated over the years on yearly basis, to cover the period (2009-2022)
Duration
500 days 260 days 260 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
296
297 298 299 300
3654 days
3654 days 3654 days 3654 days 3654 days
301
302
Groundwater
Implement a program that sets out legal and financial measures aimed at controlling and gradually reducing groundwater withdrawals with the final objective of maintaining the safe yield of aquifers. Continue to take measures to protect the groundwater resources from all sources of pollution
3654 days
3654 days
303
3654 days
304
305 306 307 308 309
Establish an integrated program to assess the availability and exploitability of all resources at rates that can be sustai
Checked, controlled, and reduced the mining of renewable, groundwater aquifers to sustainable extraction rates Continue to pursue planned and controlled groundwater mining from promising, extensive fossil aquifers as an option to secure incremental supplies for municipal and indu The groundwater use will take place conjunctively with surface water in places where such joint use has the potential for increasing the available supply Improvement and centralization of groundwater data collection, analysis and monitoring Strengthening of the enforcement of groundwater legislation and regulations
3654 days
3654 days 3654 days 3654 days 3654 days 3654 days
310
311 312 313
3654 days
3654 days 3654 days 3654 days
314 315
316 317 318 319
Wastewater Ensure that appropriate wastewater collecting systems and treatment facilities are provided for all sources of wastewater, wherever feasible
The Ministry will set the plans to reduce the Non-Revenue water to 25% by 2022 Plan more wastewater projects Ensure that wastewater is not managed as "waste" but is collected, treated, managed, and used in an efficient and optimized manner Ensure that treated effluent complies with recently established national standards (JS893-1995) and that all treatment is to a quality appropriate for use in agricultural activities and other non-domestic purposes, including groundwater recharge Adopt appropriate wastewater treatment technologies with due consideration to sustainability, economy in energy consumption, and quality assurance of the effluent Blending of the treated effluent with fresher water for suitable reuse Develop a wastewater master plan, which will establish targets for providing wastewater collection systems and treatment facilities to non served areas throughout the country Move, through restructuring, towards establishing the institutional capability for monitoring, regulating and enforcing wastewater regulations Oblige Industries to recycle part of their wastewater and to treat the rest to acceptable standards before it is discharged into the sewer systems or elsewhere Give due consideration to environmental issues and contamination of groundwater aquifers in the development of wastewater reuse systems Standards will be set for the construction and management of septic tanks where it is not feasible to have sewerage collection systems and treatment facilities Develop and strengthen the reuse unit with well qualified staff to be responsible for the planning, design, construction and management of reuse of treated effluent
3654 days 3654 days 3654 days 3654 days 3654 days 3654 days 3654 days 3654 days
328
329 330 331 332 333 334 335 336 337 338 339
Service Levels
Monitor and rate performance efficiency of the water and wastewater systems and the management thereof Introduce improvements on performance with due consideration to resource economics Maintaining water quality in the networks to be within the standards Frequency of summer water supply Frequency of winter water supply Response time for repair of network leakages, pressure loss, and sewer blockage Reduction in waiting times for water and wastewater connections Reduction in waiting times for the resolution of customer complaints Establish critical path for the allocation of each new source of water Give priority to the allocation of a modest share of 100 liters per capita per day to domestic water supplies (human needs) Water Monitoring Control Centre (Central Laboratories)
3650 days
3650 days 770 days 3650 days 3650 days 3650 days 3650 days 3650 days 3650 days 261 days 260 days 380 days
340 341
342 343 344
345
346 347 348
Tap the full potential of surface water and ground water to the extent permissible by economic feasibility, and by socia
Conducted Investigation of deep aquifers to support development planning Consider interactive use of ground and surface water, with different qualities Conduct a periodic assessment of the available and potential resources
3650 days
520 days 520 days 3650 days
349
Enlist Marginal quality water and brackish water sources to support irrigated agriculture
Task Split Progress Milestone Summary Project Summary External Tasks External MileTask Page 6
3650 days
Split
ID
350
Task Name
Desalination of marginal quality water, brackish water sources and sea water to produce additional water for municipal, industrial and commercial consumption
Duration
3650 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
351
352 353 354 355 356
1040 days
260 days 260 days 520 days 520 days 520 days
357
358 359 360 361 362 363 364 365 366
Resource Management
Revise the previously developed resources including resources mobilized for the irrigated agriculture in the Jordan Valley and other established uses for confirmation of water allocations Check, control and reduce to sustainable extraction rates Adopt a dual approach of demand management and supply management Adopt Tools of advanced technology to enhance the resource management capabilities Instate and update a dynamic regime of demand and supply Start to measure the cost of production of future industrial, commercial, tourism and agricultural projects in terms of their requirements of units of water flow Interactively use multiple resources targeting to maximize the usable flows, and maximize the net benefit from the use of unit flow of water Give the human resources development an advanced rank in the priority scale Give attention to the Management of wastewater to avoid degrading the quality of the effluent of wastewater treatment plants destined for reuse
3650 days
261 days 1000 days 520 days 3650 days 3650 days 3650 days 3650 days 3650 days 3650 days
367 368
369 370 371 372 373 374
Private Sector Participation Expand the The role of the private sector
Consider and adopt Management Contracts, concessions and other forms of private sector participation in water utilities Encourage and expand the private sector role in irrigated agriculture Revise tariffs on the basis of recovery of the cost of utilities and the provision of services to attract PSP Link cost recovery to the average per capita share of the GDP and its level in domestic water and to the cost of living and the family basket of consumption Make profitable undertakings in industry, tourism, commerce and agriculture to pay the fair water cost Depend on concessionary loans, private borrowing and BOT arrangements for project financing
Institutional Reform
Legislation Develop and enforce the Water Law Undertake institutional changes within WAJ
Separate Wholesale Operations (National Infrastructure) and Retail Operations (Service Delivery) Establish cost centers and business plans for the bulk and retail operations Establish management contracts with private sector utilities for the delivery of retail water Develop new bulk supply projects through private sector mechanisms Privatize or contracting out some existing functions
384
385 386 387 388 389 390 391 392 393
522 days
150 days 150 days 261 days 261 days 261 days 261 days 261 days 261 days 261 days
394
395
3650 days
260 days
396
397 398 399
3650 days
520 days 520 days 3650 days
400
401 402 403 404 405 406 407 408
783 days
260 days 260 days 261 days 261 days 80 days 261 days 261 days 261 days Split
ID
409 410 411 412 413 414 415
Task Name
Restructuring of the laws pertaining to the sale of land in the valley to allow for the sale of property in order to allow agriculture farm units to be consolidated up to 250 dun Adopt and enforce draft building and plumbing codes for buildings (including high rise high density buildings) that set maximum water flow limits and minimum quality sta Modify policy and regulation to permit water allocation among users in Jordan by considering return per cubic meter used while ensuring satisfaction of basic domestic wat Develop a law to permit the formation of groundwater basin water users associations Modification of policy and implementing regulations (incentive structure) to encourage the use of innovative approaches to harvesting of water from rainfall Consolidation of regulatory functions scattered across several ministries and offices, and separation of regulation from operational functions Set a new policy and implementing regulation requiring certification of water and wastewater treatment plant operations and maintenance staff, to become trained technicia
Duration
261 days 520 days 520 days 520 days 520 days 520 days 520 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
416
417 418
Commercial Practices
Operate Organization producing distributing and treating water using best commercial practices within a regulated water market Adjusting Water tariff to cover the O&M costs
1050 days
1050 days 260 days
419
420 421 422 423 424
Water demand for agriculture not to exceed that of municipal, tourism and industrial combined
Reduction of Water Demand for Agriculture from 1093 MCM to 983 MCM (from 71% to 61%) Increase Municipal Water Demand from 367 MCM to 493.4 MCM Increase industrial Water Demand from 59.3 MCM to 120 MCM (from 4% to 7%) Increase touristic water demand to 20 MCM (1%) Increase water supply from 1029 MCM to 1296 MCM
1050 days
1050 days 1050 days 1050 days 1050 days 1050 days
425
426 427 428 429
654 days
130 days 261 days 130 days 160 days
430
431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446
3722 days
3150 days 3307 days 174 days 3522 days 261 days 300 days 300 days 260 days 261 days 520 days 261 days 261 days 261 days 261 days 261 days 261 days
447
448 449 450 451
Capacity Building
Upgrading logistics program Upgrading existing facilities Upgrading field vehicles Improvement of safety in field
3912 days
780 days 780 days 780 days 780 days
452
453 454 455 456 457 458 459 460
773 days
131 days 512 days 512 days 261 days 261 days 261 days 261 days 261 days
461
462 463 464 465 466 467
1568 days
784 days 784 days 784 days 784 days 1306 days 1306 days
Task Split
Progress Milestone
Split
ID
468 469 470 471 472 473 474 475 476 477 478 479 480 481
Task Name
Develop meter management and meter testing program Build a protected location for archives and digital archive Create internal audit and control function Develop new finance & accounting system Implement a human resources management system Introduce financial planning and company financial awareness Upgrade GIS application system General improvements for building, furniture and branding Upgrade the capability of the Facilities Maintenance Unit Develop human resource support systems Decentralization of CS and Operations Develop a contingencies and emergency plan Evaluate outsourcing options Analyze improvements to X7 billing system INITIATIVE 4: BUILDING PLANNING AND TECHNICAL CAPABILITY Water and wastewater master plans and hydraulic model (USAID funded) Introduce preventive maintenance practices in sewer department Obtain laboratory accreditation and analyze consolidation of labs Create an industrial wastewater section Improve the Customer Care Complaint Center (CCCC) Increase capabilities of Technical Services Directorate Develop energy saving program INITIATIVE 5: IMPROVING WORKING RELATIONSHIP WITH GAM Reduce illegal storm water connections Develop a memorandum of understanding with GAM INITIATIVE 6:BP Projects ENHANCING MIYAHUNA'S CAPABILITIES Construct new headquarters Improve office to field communications and GPS/GIS tracking Update and expand GIS data system Improve material specifications Improve corrective maintenance practices in sewer department Train Staff , number of staff optimized and conflicts of interests eliminated. Set regulations requiring certification of water and wastewater treatment plant operations and maintenance staff, to become trained technicians Give the human resources development an advanced rank the priority scale Set up a National Water Training Center Continually appraise human resources performance to upgrade capabilities and sustain excellence Introduce incentives for excellence in compliance with the needs for dedication
Duration
1045 days 526 days 1306 days 1306 days 526 days 1306 days 784 days 526 days 1306 days 784 days 263 days 261 days 261 days 261 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
482
483 484 485 486 487 488 489
1568 days
784 days 1306 days 1306 days 1306 days 784 days 1306 days 1306 days
490
491 492
1306 days
1306 days 263 days
493
494 495 496 497 498 499 500 501 502 503 504
1306 days
1045 days 1306 days 1306 days 263 days 1306 days 380 days 380 days 380 days 380 days 3650 days 3650 days
505
506
Public Awareness
Educated the public through various means about the value of water for them and the well being of the country for the sustainability of life, and for the economic and social development. (progress should be within the initiatives of demand) Defined and assigned roles in water conservation to be played by the different sectors of society Disseminate facts about water in Jordan including cost incurred to provide the service, and the mounting pressure of population on the water resources Promote the Introduction, adoption and use of water saving and recycling systems and devices Adopt economic measures to reinforce public awareness Develop public awareness program to run in line with the program of Water Demand
3650 days
3650 days
3650 days 3650 days 3650 days 770 days 770 days
512
513
4439 days
3655 days
514
515 516 517 518 519 520 521 522 523 524
4439 days
3655 days 3655 days 780 days 1566 days 320 days 780 days 780 days 979 days 261 days 783 days
525
Commercial Practices (Operate organization producing distributing and treating water using best commercial practices w
Task Split Progress Milestone Summary Project Summary External Tasks External MileTask Page 9
3655 days
Split
ID
526 527 528 529 530 531 532 533 534
Task Name
Saving water from adopting more business-like approaches to water resources management Reduce GOJ cost subsidies Focus on customer service, providing a quality product that is properly valued and paid for by customers Reduce losses within Jordan's water distribution systems drastically and quickly (up to 50% in some areas) ( in line with international best practices). Reductions in man-power required per unit of water delivered to customers. Increases in revenue from outsourcing billing, collection and customer service to private companies Integration of technology into operations and management Introduction of innovative approaches to reducing water demand, thereby increasing water supply Encourage and expand the private sector role in the distribution of retail water, wastewater, treated effluent and irrigated water
Duration
3655 days 3655 days 3655 days 3655 days 3655 days 3655 days 3655 days 3655 days 3655 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
535
536 537 538 539 540 541 542 543 544 545 546
3650 days
770 days 770 days 3650 days 770 days 770 days 3650 days 1035 days 770 days 770 days 770 days 770 days
547
548 549
520 days
520 days 520 days
550 551
552 553 554 555 556 557 558 559 560 561 562 563 564
Irrigation Water
Projects
Construction of Zarqa Irrigation Carrier III (ZCIII) Deir Alla to P.S. 28 / Balqa-Irbid Installation of Zarqa Basin Irrigation Networks Installation of Irrigation networks at Al Qarn/Slaikhat Pumping Mujib water to Hisban - Kafrein Wadi Mujib Protection Works Water resources management in irrigated agriculture Consolidation of operation, monitoring & control of JVA irrigation water systems (using SCADA) Extension of Irrigation Optimization in the Jordan Valley Rehabilitation of Fram Roads Electrical Power Station at Dead Sea Shore Water Pipe for Hotels area at Dead Sea Shore Rehabilitation of the Damieh irrigation project Management and maintenance of of drip irrigation systems
Actions Reduce the annual water for irrigation water (Demand and Supply) Reduce Demand from 71% (2007) to 60% of the total water demand by 2022 Irrigated Areas
No expansion of irrigated areas/ reduction of groundwater abstractions for irrigation purposes Applying the Decision that is being taken to limit the irrigated area in the Jordan Valley by 427,000 Dunums which represent the current situation & immediate plans in Ban Summer Crops in order to preserve scarce water resources (in drought years) (Amount of water saved 15MCM/yr) A reduction of irrigation water for summer time through a water rationing program Amount of water saved 15 MCM/yr Rent lands from farmers in order to prevent them from planting any crops (Amount of water saved 15 MCM/yr) Study the feasibility of irrigated agriculture under current and future conditions Establish in cooperation with the Ministry of Agriculture to reduce agriculture in the highland in the long-term in order to reduce water consumption for irrigation increase the tariff
577
578 579
Reduce Supply from 64% (2007) to 47% of the total water supply by 2022
Groundwater allocations for all purposes in the uplands shall be based on groundwater sustainability principles Limit the use of brackish water in order to minimize soil salinity and conserve the brackish water for other uses
3650 days
770 days 3650 days
580
581
3650 days
770 days
Task Split
Progress Milestone
Split
ID
582 583 584 585 586
Task Name
Establish a strict monitoring and control system to prevent illegal or over-exploitation of water wells. rigorously enforce bylaw 85/2002 (16) Implementation of new ground water monitoring by-law Monitor abstraction from all groundwater wells periodically to assure conformity with the provisions of the abstraction permits. Equipping private wells with water meters Extend testing services to farmers in cases where salinity and chemical contents reach detrimental levels
Duration
770 days 770 days 3650 days 770 days 770 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
587
588 589 590 591 592 593 594 595 596 597 598 599
2873 days
261 days 261 days 261 days 305 days 261 days 261 days 522 days 262 days 260 days 260 days 365 days 365 days
600
601
3650 days
3650 days
602 603
Study for the use of Jordan River floods to be stored at Karama dam Recovery of Operation and Maintenance cost of irrigation water is achieved.
604
605 606 607 608 609 610 611
All treated wastewater effluent is used for irrigation and other non-potable uses (Use of Marginal Water (brackish, treated
Wadi Dharab dam and conveyance of Northern WWTPs to dam Conveyor from King Talal Dam to Northern Ghore Expand Irrigation system from Wadi Dharab and King Talal Dam to Northern Ghore Preparation of guidelines to help farmers use brackish water for irrigation according to water salinity, soil salinity and crop type through the Brackish Water Project Use all wastewater effluent for irrigation ensuring that health standards for farm workers as well as consumers are reinforced Use efficient rainfall harvesting methods for use in irrigation Substitute fresh water with marginal water, wherever possible
3650 days
1250 days 1250 days 1250 days 365 days 3650 days 3650 days 365 days
612
613 614 615 616
Retail irrigation water is handled by the private sector and/or handled by empowered farmers associations
Introduce appropriate legislation to gradually phase-out of the business of irrigation water distribution, and transfer it to farmers and Farmers Associations Establish a strict monitoring system and reinforce it rigorously in order to prevent illegal and/or over-exploitation of water wells Improve the efficiency of bulk irrigation operations, forecasts and scheduling of irrigation services JVA will provide bulk water at one point for a certain group of farmers on bulk delivery basis.
3650 days
1250 days 3650 days 3650 days 1250 days
Wastewater
Projects Northern Governorates
Greater Irbid sewer network ( Wadi Shalalh) Wadi Shallala TP/ IrbidII Design , construct and expand Mafraq treatment plant with WW networks project Design , construct and expand Mafraq treatment plant with WW networks project and water reused Study, design and supervision for Jerash sewer network Expanding Jerash treatment plant project West Jerash sewer network and wastewater project Study, design and supervision for Jerash (W. SHED) project Design, construct and expand, and rehabilitation of Kufranjeh treatment plant with WW networks project and water reused Study, and design for Berqesh municipality (Jedeta, Kufer Rakeb, Kufer Abeel, Kufer Awan, and Beit Edis) sewer network project Design WWTP North Shouna project Wastewater reuse project at North Jordan Valley Coverage of remaining areas
633
634 635 636 637 638 639
Middle Governorates
Rehabilitation, replacement, and upgrading the backfilled sewer lines under Wadis Optimization of the existing sewer system and activation of preventive maintenance Upsizing and upgrading of main existing sewer lines (collection system) Expansion for existing wastewater treatment plants Implement program of sewer network recovery Rehabilitation of main sewer pipeline in Amman area Task Split Progress Milestone Summary Project Summary External Tasks External MileTask Page 11
2751 days
784 days 784 days 1307 days 784 days 1045 days 1250 days Split
ID
640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660
Task Name
Transmission effluent from Abu Nuseir to Beerain area Study, design and supervision for Jiza sewer network Design Box Culvert construction project ( Egg Shape) from Ain Gazail to Wadi Zarqa Treatment Plant South Amman WW Network project South Amman WWTP II Talbeya and Jeza camp wastewater project Study, design and supervision for Naour Project, TP and sewer network Rehabilitation of West Zarqa WWTP Study, design and supervision for Wadi Zarqa TP and sewer network Study, design to rehabilitate Zarqa wastewater networks projects ( Zarqa, Rusifa, and Yajouz ) Wastewater reuse project at Kerbit Assmara WWTP Executing conveying wastewater lines in Amman project Study, and design for Ain Gazal WWTP received by tankers Hydraulic study and design to rehabilitate Zarqa wastewater networks projects Azraq sewer network project Study, design and supervision for West Salt project, TP and sewer network North west Balqa WWTP South Shuna Expansion of Zarqa governorate wastewater treatment capacity Zarqa governorate WW system reinforcement and expansion Construction of a conveyor pipeline for King Tala dam to irrigate Northern Jordan Valley
Duration
770 days 524 days 1075 days 1095 days 1250 days 1095 days 1095 days 1250 days 1095 days 1304 days 365 days 1306 days 1031 days 1460 days 1021 days 1095 days 1250 days 1250 days 1567 days 1567 days 1567 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
661
662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677
Southern Governorates
Operation of Wadi Musa and Petra WWTP Design sewer network for Wadi Musa project Design, construct and expand Karak TP with WW network project and water reused Design sewer network for Maan project Study, design and supervision for Mansoura WWTP project New sewerage systems for various areas in Ma'an Governorate and Shobak Rehabilitation and extension of Ma'an TP Study and design sewer network for Tafila Esse, Reem, and Perness WWTP Design, construct and supervision for Tafila WWTP expansion New sewerage systems for various areas in Tafila Governorate Tafilla WWT system Rehabilitation and extension of Karak wastewater treatment plant including serve new six areas with sewerage network Study, design and supervision for Mzara, Muta, and Adnanieh TP project and sewer network Study, design and expansion for Lajjoun WWTP Aqaba wastewater system Aqaba South Coast
2489 days
1825 days 1044 days 1320 days 784 days 365 days 522 days 1250 days 539 days 720 days 522 days 1250 days 523 days 1095 days 720 days 1250 days 1250 days
678
679 680 681 682
All Governorates
Coverage of the remaining areas Remove polluted areas project Extension and rehabilitation of main sewer pipeline throughout Jordan Economic and Special Zones WWT systems
4150 days
3650 days 1403 days 2000 days 770 days
683 684
685 686 687 688 689 690 691 692 693 694 695 696 697
698
Provide adequate wastewater collection and treatment facilities for all the major cities and towns in Jordan
Task Split Progress Milestone Summary Project Summary External Tasks External MileTask Page 12
3650 days
Split
ID
699 700 701
Task Name
Upgrade a wastewater master plan, which will establish targets for providing wastewater collection systems and treatment facilities to non served areas throughout the country Maintain and upgrade where necessary existing levels of wastewater services to enhance public health and the environment Adopt appropriate wastewater treatment technologies with due consideration to sustainability, economy in energy consumption, and quality assurance of the effluent. Consider
Duration
3650 days 3650 days 261 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
702
703 704 705 706
Establish innovative approaches to wastewater treatment for the small municipal systems
Small communities Treatment Plants Moutah and Adnaneyah WWTP Ensure that appropriate wastewater collecting systems and treatment facilities are provided for all sources of wastewater, wherever feasible Rehabilitate the sewerage pipes which are over 10 years old by methods, such as CCTV
1250 days
1250 days 1250 days 1250 days 1250 days
707
708 709 710 711 712 713 714
Protect the environment and public health in the areas affected by the proposed wastewater systems from contamination
Study and standardize design and performance specifications of wastewater treatment plants Construct wastewater collection and treatment systems taking into consideration the need to protect groundwater and surface water resources from pollution by wastewater. Move Septic tankers duping spot from Ain Ghazal and construction of the box culvert Watershed Management Move Amman Salutary (Greater Amman Municipality Work) Move, through restructuring, towards establishing the institutional capability for monitoring, regulating and enforcing wastewater regulations Ensure that new high-rise buildings use grey water for internal non drinking purposes
3650 days
3650 days 770 days 770 days 3650 days 770 days 3650 days 3650 days
715
716 717 718
Public Awareness
Create awareness of the public through various means about the risks associated with the exposure to untreated wastewater and the value of treated effluents for the different Design and conduct programs on public and farmer's awareness to promote the reuse of treated wastewater, methods of irrigation, and handling of produce Inform the public of the use of treated wastewater for aquifer recharge as is done in other countries
3650 days
3650 days 770 days 3650 days
731
732 733 734 735
2718 days
1930 days 782 days 1175 days 1827 days
736 737
738 739 740
741
742 743 744 745 746 747 748
Reuse of treated wastewater whenever possible (Wastewater treated effluent a source of irrigation)
Introduce a comprehensive risk management system to monitor the reuse of treated wastewater Introduce standards strictly controlled the reuse of WW in agriculture Fully use of the wastewater treated effluent for irrigation to replace fresh water Conduct studies, design, and implement projects to store the excess treated wastewater in surface reservoirs or in underground reservoirs Develop and strengthen the reuse of effluent for irrigation unit at WAJ reuse of the effluent Develop and strengthen the reuse unit with well qualified staff to be responsible for the planning, design, construction, and management of reuse of treated effluent Construction of desalination plant at King Talal dam after the rehabilitation of As-Samra treatment plant in order to reduce water salinity
2347 days
261 days 261 days 1565 days 770 days 1556 days 1565 days 365 days
749
750
1565 days
1565 days
751
752 753 754 755
Brackish water
Assess the potential of brackish water resources in terms of sound technical, economic, and environmental feasibility in all groundwater basins in the Kingdom Conduct research and studies on desalination and on optimization of brackish water use in agriculture and industry Carefully study the quality, quantity, and location of brackish water in order to assess its potential for utilization Allocation of brackish water, either desalinated or in its natural condition, to its best uses in order to provide additional water supply and to ensure water productivity and sustain
784 days
131 days 261 days 261 days 261 days
Task Split
Progress Milestone
Split
ID
756 757 758
Task Name
List brackish water, along with seawater, for desalination to produce additional water for municipal, industrial, and commercial consumption Encouraged international cooperation for the promotion of research, development, and exchange of information as well as training in the field of desalination and other non-con Introduce technology transfer and the findings of advanced research in genetic engineering to the extent possible
Duration
131 days 131 days 261 days
'02
'04
'06
'08
'10
'12
'14
'16
'18
'20
'22
'24
'26
759
3650 days
Task Split
Progress Milestone
Split