You are on page 1of 73

Handbook for Gel-VRLA-Batteries Part 2: Installation, Commissioning and Operation

Sonnenschein A 400 Sonnenschein A 500 Sonnenschein A 600 Sonnenschein A 700 ./. Sonnenschein SOLAR Sonnenschein SOLAR BLOCK Sonnenschein A 600 SOLAR

Industrial Energy, Technical Support

- 1-

Rev. 5, December 2003

CONTENT Handbook for Gel-VRLA-Batteries Part 2: Installation, Commissioning and Operation 1. Delivery / Reception 2. Safety 3. Storage 3.1 Preconditions 3.2 Storage Conditions 3.3 Storage Time 3.4 Measures for Battery Storage 4. Installation 4.1 Battery Rooms, Ventilation and General Requirements 4.2 Preliminary Steps 4.3 Actual Assembly 4.4 Parallel Arrangements 5. Commissioning 6. Operation 6.1 Float Voltage and Float Current 6.2 Charging Conditions 6.3 Efficiency of Re-Charging 6.4 Equalizing Charge 6.5 Discharge 6.6 Cyclical Application 6.6.1 General Items 6.6.2 Special Considerations about Gel-Solar Batteries 6.7 Internal Resistance R i 6.8 Influence of Temperature 6.9 Inspections and Maintenance 6.9.1 General Items and Checks acc. to Operating instructions 6.9.2 Battery Testers and Battery Monitoring
Industrial Energy, Technical Support - 2-

Page 5 6 7 7 8 8 10 12 12 12 13 14 15 16 16 21 23 25 26 27 27 31 34 35 39 39 40

Rev. 5, December 2003

7. Recycling 8. List of References Appendix A 1 Battery Rooms, Ventilation, Installations A 2 Charging Time vs. Voltage and Current A 3 Instructions Installation Instruction Operating Instruction Stationary valve regulated lead acid batteries Operating InstructionSOLAR, SOLAR BLOCK, A 600 S OLAR

42 42

44 50 page 56 following

Industrial Energy, Technical Support

- 3-

Rev. 5, December 2003

DESIGN OF A Gel VALVE-REGULATED LEAD ACID CELL (TYPE OPzV)

(Gel = with gelled electrolyte, is not visible in the picture below. Other details are symbolical.)

Industrial Energy, Technical Support

- 4-

Rev. 5, December 2003

1. DELIVERY / RECEPTION
EXIDE Technologies valve regulated batteries are delivered from our factories, logistic centers or via our distributors. The delivery items can be identified either by the number and type of cells / monoblocs or by referring to a battery drawing. Check the package or pallet for integrity. Do not stack one pallet above the other. Keep handling instructions stated on the packages. During transportation take all precaution to avoid breaking those products which are considered to be fragile and have been identified as such. If any damage is observed during unloading the goods, the carrier should be notified within 48 hours. Parcels are insured up to the delivery address written on the order. Damage coverage depends on the sales contract.

Industrial Energy, Technical Support

- 5-

Rev. 5, December 2003

2. SAFETY
For any operation on the batteries, from storage to recycling, the following safety rules should be observed: Do not smoke. Use tools with insulated handles to tighten connections. Check that the connections between the cells / monoblocs are fitted correctly. Never place tools on the batteries (metal tools are particularly dangerous). Never lift the cells / monoblocs at the terminals. Never use a synthetic cloth or sponge to clean the cells / monoblocs. Use water (wet cloth) without additives. Avoid shocks. Even when disconnected, a battery remains charged. Always wear insulating gloves and glasses. Read the Installation Instruction and Operating Instruction carefully. See Appendix A 3 for more information.

A500, < 25 Ah only

Industrial Energy, Technical Support

- 6-

Rev. 5, December 2003

3. STORAGE
In the users interest the storage period should be as short as possible. 3.1 Preconditions

The storage location should provide the following functions: Shelter the cells / monoblocs from harsh weather and risk of flooding. Protect the batteries against any overheating risk induced by direct exposure to the sun radiation or by their amplification through glass walls. Protect the batteries from any risk of electric shock resulting from shortcircuiting by a conductive object or from a building up of conductive dust. Avoid any risk of mechanical shock caused by dropping objects onto the cell / monobloc or by dropping the cell / monobloc itself. Avoid contamination of the lids by dust etc.

Industrial Energy, Technical Support

- 7-

Rev. 5, December 2003

3.2

Storage Conditions

The temperature has an impact on the self-discharge rate (see fig. 1 and 2). Hence, it is important to store the batteries in a fully charged condition in a cool but frost-free room. Storage on a pallet wrapped in plastic material is authorized. It is not recommended however in rooms where the temperature fluctuates significantly, or if high relative humidity can cause condensation under the plastic cover. With time, this condensation can cause a whitish hydration on the poles and lead to high self-discharge by leakage current. This hydration has no affect on the battery operation or service life if no corrosion occurs. It is forbidden to stack one pallet above the other. Avoid storing unpacked cells / monoblocs on sharp-edged supports. It is recommended to have the same storage conditions within a batch, pallet or room.

3.3

Storage Time

The maximum storage time at 20 C is 24 months for standard Gel-batteries (fig. 1) and 17 months for Gel-solar batteries (fig. 2). The shorter storage time of solar-batteries is due to a small amount of phosphoric acid added to the electrolyte. Phosphoric acid increases the number of cycles but increases the self-discharge rate slightly. Higher temperatures cause higher self-discharge and shorter storage time between recharging operations.

Industrial Energy, Technical Support

- 8-

Rev. 5, December 2003

100 90 80 10 C 70

Capacity [%]

60 40 C 50 40 30 20 10 0 0 2 4 6 8 10 12 14 16 18 20 22 24 30 C 20 C

Storage time [Months]

Fig. 1: Self-Discharge vs. Temperature (standard Gel-batteries)


100 90 80 70

Capacity [%]

60 40 C 50 40 30 20 10 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 30 C 20 C

Storage time [Months]

Fig. 2: Self-Discharge vs. Temperature (Gel-solar batteries)

Industrial Energy, Technical Support

- 9-

Rev. 5, December 2003

3.4

Measures for Battery Storage

The storage area and ambient, respectively, must be clean and well maintained. Appropriate inventory turnover based on a FIFO-method (First In First Out) will result in a higher operating quality of the products. If the battery casings must be cleaned (prior to their installation) never use solvents or abrasives. Use water (wet cloth) without additives. For extended storage periods it is recommended to check the opencircuit voltage in the following intervals: storage at 20 C: after a storage period of 12 months, then every 3 months afterwards storage at 30 C: after a storage period of 6 months, then every 2 months afterwards. Trickle charging *) should be considered necessary when the measured open circuit voltage (OCV) is < 2.07 Vpc. *) Trickle charging means continuous charge at a low rate, approximately equivalent to the
internal losses of the battery and suitable to maintain the battery in a fully charged state. It can be carried out either by IU-charging (= float charging) or I-charging (constant current) with limited current.

Industrial Energy, Technical Support

- 10-

Rev. 5, December 2003

Trickle charging mode in storage Constant current- constant voltage (IU-) charging (15 to 35 C) Max. voltage Min. voltage [Vpc] [Vpc] 2.40 2.25 2.30 *) Max. current [A] 3.5 * I10 Charging time [h] at max. voltage 48

*) SOLAR, SOLAR BLOCK Depending on the chargers the charging time shall be extended by 24 hours for every 0.04 V less than the maximum voltage, in which 2.25 Vpc (2.30 Vpc respectively) is still the minimum voltage. Constant current (I-) charging (15 to 30 C) Measured OCV [Vpc] 2.05 2.06 2.07 Current Charging time [A] [h] 0.5 * I10 14 0.5 * I10 13 0.5 * I10 12

For temperatures below 15 C it is recommended to charge the battery 20 hours.

Industrial Energy, Technical Support

- 11-

Rev. 5, December 2003

4. INSTALLATION
4.1 Battery Rooms, Ventilation and General Requirements

General rules and guidelines about battery rooms, their ventilation and electrical requirements regarding installations are mentioned in Appendix A 1. For more information see also Installation Instruction (Appendix A 3). 4.2 Preliminary Steps

Check each cell / monobloc separately by measuring the open circuit voltage. 2 Volt cell: 6 Volt monobloc: 12 Volt monobloc: U 2.07 V U 6.21 V U 12.42 V

Check that the battery racks are stable and horizontal. For the shelf assemblies with 4 levels of 2 rows or 5 levels of 3 rows, the assembly should be anchored with the building. If EXIDE Technologies has supplied drawings for the installations, the cells / monoblocs should be installed accordingly. Precautions must be taken if batteries are being installed in metallic cabinets or on racks. Keep an air safety distance of at least 10 mm between insulated cables and electrically conductive parts, or use additional insulation for cell / monobloc connectors. The racks or cabinets should provide adequate ventilation above and below to allow the heat produced by the batteries and their charging system to escape. The distance between cells or monoblocs shall be approx. 10 mm, at least 5 mm. See appendix A 1 and standard EN 50 2727-2 (/1/) especially for battery room ventilation requirements. The use of metal clamps on the cells / monoblocs is not recommended. A system made of insulating material should be used.

Industrial Energy, Technical Support

- 12-

Rev. 5, December 2003

The grounding of racks or cabinets should be carried out in accordance with the technical rules relevant to the country of installation. Standards referring to installation, cabinets, equipment or battery rooms are: EN 50 091-I (/2/), IEC 896-2 (/3/) (draft IEC 60896-21 (/4/)) and EN 50272-2 (/1/). 4.3 Actual Assembly

For assembly operations: Use insulated tools. It is recommended to protect yourself by wearing insulating gloves, protection glasses and to remove any metal objects such as watches or any other items of jewelry, especially in the case of installation in a cabinet (see also the paragraph relating to safety). Moderately lubricate the inserts and connections using silicone grease. The use of a petroleum-based lubricant is not recommended The connections should be tightened by means of a torque wrench, set to the following: A connections: G5/M5 connections: G6/M6 connections: M8 male connections: M8 female and M 10 connections: 8 1 Nm 5 1 Nm 6 1 Nm 8 1 Nm 20 1 Nm

Check the overall battery voltage. It should comply with the number of series connected cells / monoblocs. The open circuit voltage (OCV) of individual cells must not vary from each other by more than 0.02 V. With regard to monobloc batteries, the maximum deviations of OCV are as follows: 4 V monoblocs: 6 V monoblocs: 12 V monoblocs: 0.03 V per bloc 0.04 V per bloc 0.05 V per bloc

Batteries with a nominal voltage > 75 V require an EC conformity declaration in acc. with the low voltage directive (73/23/EEC), which confirms that the CE marking is applied to the battery. The company
Industrial Energy, Technical Support - 13Rev. 5, December 2003

installing the battery is responsible for the declaration and applying the CE marking. For more information, see /5/. 4.4 Parallel Arrangements

The most battery manufacturers, standards and guidelines recommend a maximum of 4 strings in parallel. It is possible to have more strings in parallel without reducing the life of the battery or getting problems with the battery. Preconditions and features for 2 up to 10 strings in parallel: General: The same voltage drops must be realized from each string to the end connector regardless if a string consists of one unit (single cell / monobloc) or several units. This can be achieved by proper choice of cable lengths, cable diameters and arrangement (for instance, by crosswise configuration). The connector cables for positive and negative terminals of each battery string must have the same length. The minimum cable size for the end connectors of a string is 25 mm/100 Ah string capacity. The end-connector cables must be placed on a copper bar with at least 100 mm/100 Ah string capacity with the lowest possible distance. It is a must to have a circuit breaker for each string or every two strings. The strings must have all the same number of cells and temperature If these requirements are fulfilled paralleling of up to 10 strings is possible. All battery performance data have to be applied to the end terminal of each string. By using the parallel strings the reliability of the system is increased due to the redundancy. Neither the lifetime nor the reliability will be reduced. Parallel connection of strings with different capacities as well as different age is possible. The current during both, discharge and re-charging, will be split acc. to the capacity or age, respectively. For more information, see /6/.

Industrial Energy, Technical Support

- 14-

Rev. 5, December 2003

Also, the type of lead-acid batteries may differ as long as the requested charging voltage (Vpc) per string is fulfilled. Always connect the individual series strings first and check that the different strings are at the same potential before connecting them together.

5. COMMISSIONING
For float charge applications, commissioning after a storage period or assembly in accordance with the conditions specified above, commissioning consists merely of connecting the battery to its charging system. The charge voltage should be adjusted in accordance with the specifications as described in chapter 6.1. The safety systems: Fuses, circuit breakers and insulation monitoring shall be all tested independently. If a capacity test is requested, for instance, for an acceptance test on site: In order to make sure the battery is fully charged the following IU-charge methods can be applied: Option 1: Option 2: Float charge 72 hours. 2.40 Vpc 16 hours (max. 48 hours) followed by float charge 8 hours.

The current available to the battery should be between 10 A/100 Ah and 35 A/100Ah of the nominal capacity.

Industrial Energy, Technical Support

- 15-

Rev. 5, December 2003

6. OPERATION
6.1 Float Voltage and Float Current

A temperature related adjustment of the charge voltage within the operating temperature of 15 C to 35 C is not necessary. If the operating temperature is permanently outside this range, the charge voltage has to be adjusted as shown in figures 3, 4 and 5. Gel-solar batteries: See also chapter 6.6.2 The float charge voltage should be set as follows. Hereby, the Volts per cell multiplied by the number of cells must be measured at the end terminals of the battery: 2.25 Vpc for A600, A 600 SOLAR and A700 2.27 Vpc for A400 2.30 Vpc for A500, SOLAR and SOLAR BLOCK All charging (float, boost) must be carried out according to an IUcharacteristic with limit values: I-constant: 2%; U-constant: 1%. These limits describes the tolerance of rectifiers used. The charge voltage shall be set or corrected, respectively, to the values mentioned above. In the case of installation in cabinets or in trays, the representative ambient temperature measurement is achieved at a height of 1/3. The sensor should be placed in the center of this level. The location of battery temperature sensors depends on the probes. The measurement shall be carried out either at the negative terminals (pointed metallic probes or probes with loop-shape) or on the plastic housing (flat probes to be placed on top or on one side in the center). Depending on the electrical equipment (e.g. rectifier, inverter), its specification and charging characteristics alternating currents flow through the battery superimposing onto the direct current during charge operation. Alternating currents and the reaction from the loads may lead to an additional temperature increase of the battery and strain the electrodes, which can shorten the battery life.
Industrial Energy, Technical Support - 16Rev. 5, December 2003

When recharging up to 2.4 Vpc the actual value of the alternating current is occasionally permitted up to 10 A (RMS)/ 100 Ah nominal capacity. In a fully charged state during float charge or standby parallel operation the actual value of the alternating current must not exceed 5 A (RMS)/ 100 Ah nominal capacity.

2,50

2,45 max. 2.40 Vpc for max. 48 h 2,40

Voltage [Vpc]

2,35

Boost/Equalizing for max. 48 h

2,30 Float

2,25

2,20

2,15

2,10 -20 -10 0 10 20 30 40 50 Temperature [ C]

Fig. 3: A 400, Charging Voltage vs. Temperature

Industrial Energy, Technical Support

- 17-

Rev. 5, December 2003

2,55

2,50 max. 2.45 Vpc for max. 48 h 2,45

Voltage [Vpc]

2,40 Boost/Equalizing for max. 48 h 2,35

2,30 Float 2,25

2,20

2,15 -20 -10 0 10 20 30 40 50 Temperature [ C]

Fig. 4: A 500, Charging Voltage vs. Temperature


2,5

2,45 max. 2.40 Vpc for max. 48 h 2,4

Voltage [Vpc]

2,35 Boost/Equalizing for max. 48 h 2,3

2,25 Float 2,2

2,15

2,1 -20 -10 0 10 20 30 40 50 Temperature [ C]

Fig. 5: A 600 and A 700, Charging Voltage vs. Temperature

Industrial Energy, Technical Support

- 18-

Rev. 5, December 2003

Float Voltage Deviation The individual cell or bloc float voltages may deviate within a string from the average value set as shown in figures 6, 7 and 8. Theses figures are representative as the variations and limits depends on the battery type and number of cells per monobloc. The following table gives an overview about all the battery types and their variations from the average value under float charge conditions. The Typical Decrease and Typical Increase is always equivalent to the progress shown in fig. 6 to 8. 2V 4V 6V 8V 12V --+0.35/-0.17 -+0.49/-0.24 +0.2/-0.1 +0.28/-0.14 +0.35/-0.17 +0.40/-0.20 +0.49/-0.24 +0.2/-0.1 -+0.35/-0.17 -+0.49/-0.24 -+0.28/-0.14 +0.35/-0.17 ---

A400 A500 A600 A700

This deviation is even stronger after the installation and within the first two or three years of operation. It is due to different initial states of recombination and polarization within the cells. It is a normal effect and well described in /7/.
2,55 Alarm 2,50 Watch 2,45 2,40 Cell Voltage [V] Typical Decrease 2,35 2,30 2,25 2,20 Typical Increase 2,15 2,10 2,05 0 0,5 1 1,5 2 2,5 Years in Service 3 3,5 4 4,5 5 Watch Alarm Normal

Fig. 6: Float Voltage Deviation in A 600 Batteries

Industrial Energy, Technical Support

- 19-

Rev. 5, December 2003

7,30
Alarm

7,20
Watch

7,10
Typical Decrease

Bloc voltage [V]

7,00

6,90
Normal

6,80

6,70
Watch Typical Increase

6,60
Alarm

6,50 0 0,5 1 1,5 2 2,5 Years in Service 3 3,5 4 4,5 5

Fig. 7: Float Voltage Deviation in A 400 Batteries (6V-blocs)


14,30 14,20
Watch Alarm

14,10 14,00
Typical Decrease

Bloc voltage [V]

13,90 13,80 13,70


Normal

13,60 13,50 13,40


Watch Typical Increase

13,30
Alarm

13,20 0 0,5 1 1,5 2 2,5 Years in Service 3 3,5 4 4,5 5

Fig. 8: Float Voltage Deviation in A 400 Batteries (12V-blocs)


Industrial Energy, Technical Support - 20Rev. 5, December 2003

6.2

Charging Conditions

The constant current constant voltage (IU) charging mode is the most appropriate to achieve a very long service life to VRLA batteries. The following diagrams below give informative values of time required to recharge a battery under float voltage or enhanced voltage (Boost charge) up to 2.40 Vpc (at 20 C) depending on depth of discharge (DOD) and initial current. Charging Gel-solar batteries: See chapter 6.6.2. How to interpret the diagrams: At voltages higher than the float charge voltage, an automatic switch down to the lower float voltage level follows after having reached the initial U-constant level. Example: IU-charging with 2.40 Vpc. If the voltage has reached 2.40 Vpc, the voltage will be switched down to 2.25 Vpc. Parameters: Charge voltage 2.25, 2.3 and 2.4 Vpc Charging current 0.5, 1.0, 1.5 and 2.0 * I 10 Depth of discharge (DOD) 25, 50, 75 and 100% C 10 Different DODs obtained by different discharge rates: 25%: 50%: 75%: 100%: 10 minutes 1 hour 3 hours 10 hours

Higher currents will not lead to relevant gain of recharging time. Lower currents will prolong the recharging time significantly. For how to use the charts see fig. 9 and 10 as examples. Further graphs are shown in Appendix A 2. Fig. 9: 2.25 Vpc, 1 * I 10. A battery discharged to 50% DOD would be rechargeable to 80 % available capacity within 4 hours. A full re-charge would need a little bit more than 24 hours. Fig. 10: 2.40 Vpc, 1 * I10. The same battery discharged to 50% DOD would be recharged to 80% within 3.7 hours but full re-charged within 20 hours.
Industrial Energy, Technical Support - 21Rev. 5, December 2003

100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 9: Re-charging at 2.25 Vpc, 1 * I 10

100

90

80

Available Capacity [%C10]

70

60

50

40

25% DOD 50% DOD 75% DOD 100% DOD

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 10: Re-charging at 2.40 Vpc, 1 * I 10


Industrial Energy, Technical Support - 22Rev. 5, December 2003

6.3

Efficiency of Re-Charging

Ah-Efficiency Discharged Ah Definition: Ah-Efficiency = Re-charged Ah Reciprocal value = Charge coefficient (re-charged Ah/discharged Ah) Normal charge coefficients (pre-set charging time, for instance, 24 hours): 1.05 (discharge rate 10 hours) 1.10 (discharge rate 1 hour) 1.20 (discharge rate 10 minutes) Ah-efficiency = 1/1.05 1/1.20 = 95%83% Explanations: The necessary charge coefficient increases with increasing discharge rate (as the depth of discharge (DOD) decreases). Thus, because ohmic losses, heat generation by recombination etc. are relatively same for a given charging time. Wh-Efficiency In addition to item Ah-Efficiency, average voltages during discharge and re-charging to be taken into account. Discharged Ah * Average Voltage Discharge Definition: Wh-Efficiency = Re-charged Ah * Average Voltage Recharge Example: Discharge: Battery C 10 = 100 Ah 10h discharge, rate: I 10 discharged: C10 = 100 Ah (100% DOD) Average voltage during C10-discharge: 2.0 Vpc (estimated)

Industrial Energy, Technical Support

- 23-

Rev. 5, December 2003

Recharging:

IU-Charging 2.25 Vpc, 1*I10,

Expected re-charging time (incl. charge coefficient 1.05): 32 hours Estimate for average voltage during re-charging: The voltage increases from 2.1 Vpc to 2.25 Vpc during 9 hours average 2.17 Vpc. The voltage is constant at 2.25 Vpc for (32-9) hours = 23 hours. Estimated average voltage during 32 hours: 2.23 Vpc 100Ah * 2.0 Vpc Wh-efficiency = 105 Ah * 2.23 Vpc = 0.854 = 85 %

Industrial Energy, Technical Support

- 24-

Rev. 5, December 2003

6.4

Equalizing Charge

Because it is possible to exceed the permitted load voltages, appropriate measures must be taken, e.g. switch off the load. Equalizing charges are required after deep discharges and/or inadequate charges or if the individual cell or bloc voltages are outside the specified range as shown in fig. 6, 7 and 8. They have to be carried out as follows: Up to 48 hours at max. 2.40 Vpc. The charge current must not exceed 35 A/100 Ah nominal capacity. The cell / bloc temperature must never exceed 45C. If it does, stop charging or switch down to float charge to allow the temperature to decrease. Gel-solar batteries with system voltages 48 V Every one to three months: Method 1: IUI I-phase = up to voltage acc. to fig.17 (chapter 6.6.2) at 20C. U-phase = until switching at a current of 1.2 A/100Ah to the second Iphase. I-phase = 1.2 A/100Ah for 4 hours. Method 2: IUI pulse I-phase = up to voltage acc. to fig. 17 (chapter 6.6.2) at 20C U-phase = until switching at a current of 1.2 A/100 Ah to the second I-phase (pulsed) I-phase = charging of 2 A/100 Ah for 4-6 hours where the pulses are 15 min. 2 A/100 Ah and 15 min. 0 A/100 Ah.

Industrial Energy, Technical Support

- 25-

Rev. 5, December 2003

6.5

Discharge

Even if Gel-VRLA-batteries are deep-discharge resistant their service life can be affected by too many and successive deep discharges. Therefore Discharge must not be continued below the final discharge voltage recommended for the discharge time. Deeper discharges must not be carried out unless specifically agreed with EXIDE Technologies. Recharge immediately following complete or partial discharge. Capacity tests should be carried out acc. to IEC 896-2 (/3/) and draft IEC 60896-21 (/4/), respectively.

What about the weakest unit during a capacity test ? One has to look at single cells and blocs from different point of view. Statistics must be included when talking about blocs.

The weakest single cell can drop down to


(Uf = final voltage, Umin = minimum voltage)

Umin = Final voltage Uf [Vpc] - 0.2 V Example: Battery final voltage Uf = 1.75 Vpc

Weakest cell can have Umin = Uf - 0.2V = 1.55 V The weakest bloc can drop to Umin/bloc = final voltage (Uf * n/bloc) - (n * 0.2 Vpc)
( n = number of cells per bloc)

Industrial Energy, Technical Support

- 26-

Rev. 5, December 2003

Example:

Battery final voltage Uf = 1.75 Vpc

Weakest bloc can have Umin = Uf - n * 0.2V 12 V-bloc: Uf = 1.75 V * 6 = 10.5 V 6 V-bloc: Uf = 1.75 V * 3 = 5.25 V a 12 V-bloc can have 10.01 V a 6 V-bloc can have 4.90 V

6.6

Cyclical Application

6.6.1 General items Gel-batteries can be used also in discharge-charging-mode (a cycle consists of a discharge and a re-charging). Gel-solar batteries are optimized for cyclical application (additive to electrolyte: phosphoric acid, - increases the number of cycles). The following numbers of cycles are specified acc. to IEC 896-2 (/3/)*): A 500: 600 cycles A 400: 600 cycles A 700: 700 cycles A 600: 1200 cycles SOLAR: 800 cycles SOLAR BLOCK: 1200 cycles A 600 SOLAR: 1600 cycles *) Discharge conditions acc. to IEC 896-2: 20 C, discharge for 3 h at a current of I = 2.0 * I10 .
This is equivalent to a depth of discharge (DOD) of 60% C10.

The possible numbers of cycles depends on different parameters, i.e. sufficient re-charging, depth of discharge (DOD) and temperature.

Industrial Energy, Technical Support

- 27-

Rev. 5, December 2003

Deeper discharge (higher DOD) results in lower number of cycles because the active mass is much more stressed and stronger re-charging necessary (corrosion !). Therefore, lower DODs results in higher numbers of cycles. See figures 11 to 16 for details (fig. 14 to 16 with other correlation to IEC 896-2 on x-axis). The correlation between DOD and number of cycles is not always exact proportional. It depends also on the ratio amount of active material versus amount of electrolyte. With regard to influence of temperature on number of cycles the same rules shall be used as for influence on service life (see chapter 6.8). Note: The cycle life (calculated number of years with a specified daily DOD) can never exceed the service life! Cycle life is rather less than the service life due to non-expectable influences.

100 90 80 70

IEC 896-2 cycle test: 600 cycles at 60% DOD

DOD [% C10]

60 50 40 30 20 10 0 300

400

500

600

700

800

900

1000

1100 1200

1300 1400 1500

1600

1700

1800

1900

Number of Cycles

Fig. 11: A 500, A 400; Number of Cycles vs. Depth of Discharge (DOD)

Industrial Energy, Technical Support

- 28-

Rev. 5, December 2003

100 90 80 70

IEC 896-2 cycle test: 700 cycles at 60% DOD

DOD [% C10]

60 50 40 30 20 10 0 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200

Number of Cycles

Fig. 12: A 700; Number of Cycles vs. Depth of Discharge (DOD)


100 90 80 70

IEC 896-2 cycle test: 1200 cycles at 60% DOD

DOD [% C10]

60 50 40 30 20 10 0 500 1000 1500 2000 2500 3000 3500 4000

Number of Cycles

Fig. 13: A 600, Number of Cycles vs. Depth of Discharge (DOD)

Industrial Energy, Technical Support

- 29-

Rev. 5, December 2003

100

Discharged Capacity [% (acc. to IEC 896-2)]

90

80

70

60

50

40

30

20

10 500 1000 1500 2000 2500 3000 3500 4000 4500

Number of cycles

Fig. 14: SOLAR, Number of Cycles vs. Depth of Discharge (DOD)

100

Discharged Capacity [% (acc. to IEC 896-2)]

90

80

70

60

50

40

30

20

10 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000

Number of cycles

Fig. 15: SOLAR BLOCK, Number of Cycles vs. Depth of Discharge (DOD)
Industrial Energy, Technical Support - 30Rev. 5, December 2003

100

Discharged Capacity [% (acc. to IEC 896-2)]

90

80

70

60

50

40

30

20 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500

Number of cycles

Fig. 16: A 600 SOLAR, Number of Cycles vs. Depth of Discharge (DOD)

6.6.2 Special Considerations about Gel-Solar Batteries Charge Controller Designed to control over-charging Designed to prevent deep discharge Optional temperature correction (a must for VRLA batteries) Critical to battery life (i.e. voltage settings)

Battery Sizing: General considerations Minimize voltage drop Use oversized cables Locate battery and load close to PV panel Choose a large enough battery to store all available PV current Ventilate or keep battery cool, respectively, to minimize storage losses and to minimize loss of life Is a Diesel generator available for boost charge ?
Industrial Energy, Technical Support - 31Rev. 5, December 2003

Battery Sizing: Details Hours/days of battery reserve requested? Final discharge voltage of the battery? Load/profile: Momentary, running, parasitic current? Ambient temperature: maximum, minimum, average? Charging: voltage, available current, time? Balance of withdrawn and returned Ampere-hours? Optimum daily discharge: 30% of C 10, typically 2 to 20 % C 10 Battery Sizing: Guideline Standard IEEE P1013/D3, April 1997 (/8/) inclusive worksheet and example Battery Sizing: Summary System must be well designed. Feel safe ! System must fulfill the expectations throughout the year! Right design of panel, charge controller and battery! Load and sun light must be in equilibrium (how many hours/days in summer/winter ?) Automotive batteries are not suitable for use in professional solar systems The whole System with as less as possible maintenance, especially in rural areas Temperature Difference The battery installation shall be made such that temperature differences between individual cells/blocs do not exceed 3 degree Celsius (Kelvin). Charging The charging of Gel-solar batteries shall be carried out acc. to fig. 17. A temperature related adjustment of the charge voltage within the operating temperature of 15 C to 35 C is not necessary. If the operating temperature is permanently outside this range, the charge voltage has to be adjusted as shown in fig. 17.

Industrial Energy, Technical Support

- 32-

Rev. 5, December 2003

Solar batteries have also to be operated at States-of-Charge (SOC) less than 100% due to seasonal and other conditions, for instance (acc. IEC 61427, /9/): Summer: 80 to 100% SOC, Winter: down to 20% SOC. Therefore, equalizing charges should be given every 3 to 12 months depending on the actual SOC values over a longer period.
2,60 2,55 2,50 2,45

B A C

Charge voltage [Vpc]

2,40 2,35 2,30 2,25 2,20 2,15 2,10 -20 -10 0 10 20

30

40

50

Temperature [ C]

Fig. 17: Charging of Gel-solar batteries depending on charge mode and temperature 1) 2) 3) With switch regulator (two-step controller): Charge on curve B (max. charge voltage) for max. 2hrs per day, then switch over to continuous charge - Curve C Standard charge (without switching) - Curve A Boost charge (Equalizing charge with external generator): Charge on curve B for max. 5hrs per month, then switch over to curve C.

Industrial Energy, Technical Support

- 33-

Rev. 5, December 2003

6.7

Internal Resistance Ri

The internal resistance R i is determined acc. to IEC 896-2 (/3/). It is an important parameter when computing the size of batteries. A remarkable voltage drop at the beginning of a discharge, especially at high discharge rates equal and less than 1 hour, must be taken into account. The internal resistance R i varies with depth of discharge (DOD) as well temperature, as shown in fig. 18 below. Hereby, the R i-value at 0% DOD (fully charged) and 20 C, respectively, is the base line (R i-factor = 1).

2.2

2 - 20 C 0 C 20 C 40 C

1.8

Ri-Factor

1.6

1.4

1.2

0.8 0 10 20 30 40 50 60 70 80 90 100

DOD [% C nominal]

Fig. 18: Internal Resistance R i vs. Depth of Discharge (DOD) and Temperature

Industrial Energy, Technical Support

- 34-

Rev. 5, December 2003

6.8

Influence of Temperature

Nominal temperature is 20 C and the optimal temperature regarding capacity and lifetime (= service life). Higher temperatures reduce the lifetime and number of cycles. Lower temperatures reduce the available capacity and prolong the re-charge time. Expected service life at 20 C and with occasional discharges: A 500: 6 years A 400: 10 years A 700: 12 years A 600: 15 to 18 years SOLAR: SOLAR BLOCK: A 600 SOLAR: 5 to 6 years 7 to 8 years 12 to 15 years

Even if Gel-solar batteries are not optimized for standby application, they can be used for that too. The achievable service life is shorter than for standard Gel-batteries with equivalent design because phosphoric acid is added in order to increase the number of cycles. Phosphoric acid increases the corrosion rate and the self-discharge rate slightly. Gel-batteries are designed to be operated within a wide temperature range 40 C and +55 C. Below approx. 15 C, there is a risk of freezing in depending on the depth of discharge. On the other hand it is possible to use the batteries at lower temperatures, under specific conditions (contact your EXIDE Technologies representative). The battery temperature affects the available capacity, as shown in fig. 19 and 20. High temperatures affect batteries service life acc. to a common rule of thumb (law of Arrhenius): The corrosion rate is doubled per 10 C. Therefore, the lifetime will be halved per 10 C increase. Example: 15 years at 20 C becomes reduced to 7.5 years at 30 C

Industrial Energy, Technical Support

- 35-

Rev. 5, December 2003

This is even valid for all batteries with positive grid plate design (A 400, A 500 and A 700; to be applied to SOLAR and SOLAR BLOCK too regarding influence on number of cycles). There is one exception where the influence doesnt follow the law of Arrhenius, - thats for A 600 with positive tubular plates (to be applied to A 600 SOLAR too regarding influence on number of cycles). The influence of temperature is less than for other batteries. In fact, an increase of 10 C will cause a life reduction of about 30% only. Reasons: 1. 2. 3. Casting of the positive spine frame on high-pressure die-casting machines. Hereby, the injection pressure is 100 bar. That assures a very fine grain structure high resistant to the corrosion process. The active material, but also the corrosion layer is under high pressure by the gauntlets avoiding a growth of corrosion layer as fast as in positive grid plate designs. The spines are covered by an approx. 3 mm layer of active material. Therefore, the spines are not stressed by conversion of active material and electrolyte as much as in grid plates. The conversion occurs mainly in the outer parts of the tubular plates.

For more details see figures 21 and 22.

Industrial Energy, Technical Support

- 36-

Rev. 5, December 2003

110 105 100 95 90 85

Available capacity [%]

80 75 70 65 60 55 50 45 40 35 30 -20 -15 -10 -5 0 5 10 15 20 25 30


Freezing Area

C10 C5 C1

Guide values

Bloc temperature [ C]

Fig. 19: A 400, A 500, SOLAR, SOLAR BLOCK: Capacity (% rated capacity) vs. Temperature
110 105 100 95 90

Available capacity [%]

85 80 75 Freezing 70 Area 65 60 55 50 45 40 35 30 -20 -15 -10 -5 0 5 10 15 20 25 30

Guide values
C10 C5 C3 C1

Cell temperature [ C]

Fig. 20: A 600, A 600 SOLAR, A 700: Capacity (% rated capacity) vs. Temperature

Industrial Energy, Technical Support

- 37-

Rev. 5, December 2003

12

10

Service life [Years]

0 20 25 30 35 40 45 50

Temperature [ C]

Fig. 21: A 400, Service Life vs. Temperature (following law of Arrhenius). Equivalent graphs can be established for A 500 and A 700 based on 6 and 12 years, respectively, at 20 C. The equivalents for SOLAR and SOLAR BLOCK regarding number of cycles (years at 20 C = 100% number of cycles.
20

Actual test results "Arrhenius"


15

Service life [Years]

10

0 20 25 30 35 40 45 50

Temperature [ C]

Fig. 22: A 600, Service Life vs. Temperature. A 600 follows the blue curve. The equivalent for A 600 SOLAR regarding number of cycles (15 years at 20 C = 100% number of cycles).
Industrial Energy, Technical Support - 38Rev. 5, December 2003

6.9

Inspections and Maintenance

6.9.1 General Items and Checks acc. to Operating Instructions Periodic inspections and maintenance are necessary regarding: charge voltage and current settings, the discharge conditions, the temperature levels, the storage conditions, the cleanliness of the battery and equipment and other conditions relevant to safety issues and batterys service life (battery room ventilation, for example).

Periodic discharges can be used to assess the available operating endurance, to detect faulty cells / monoblocs and aging symptoms of the battery, in order to consider battery replacement in due time. VRLA-batteries do not require topping-up water. Thats the reason why they were called maintenance-free. Pressure valves are used for sealing and cannot be opened without destruction. Therefore, they are defined as Valve-Regulated lead-acid batteries (VRLA-batteries). Even if VRLA-batteries are called maintenance-free sometimes, they need control (see Operating Instructions for details): Keep the battery clean and dry to avoid leakage currents. Plastic parts of the battery, especially containers, must be cleaned with pure water without additives. At least every 6 months measure and record: Battery voltage Voltage of several cells / blocs (approx. 20%) Surface temperature of several cells / blocs Battery- room temperature

If the cell / bloc voltages differ from the average float charge voltage by more than a specified +/- tolerance as stated in fig. 6 to 8 or if the surface temperature difference between cells / blocs exceeds 5 K, the service agent should be contacted.

Industrial Energy, Technical Support

- 39-

Rev. 5, December 2003

In addition, annual measurement and recording: - Voltage of all cells / blocs - Surface temperature of all cells / blocs - Battery- room temperature Annual visual checks: - Screw connections - Screw connections without locking devices have to be checked for tightness. - Battery installation and arrangement - Ventilation 6.9.2 Battery Testers and Battery Monitoring Sometimes, other methods than capacity tests, are offered for checking the state-of-health, state-of-charge or capacity of batteries. This equipment is based on any of the following ohmic methods: conductance, impedance, DC-resistance. So-called Battery Testers are portable. Any of ohmic methods as mentioned above can be included in Battery Monitoring Systems. Hereby, Monitoring means the system works on-line and is permanently connected to the battery. Either Battery Testers or Monitoring System, the above mentioned ohmic methods can be used in order to follow up trending of data. But, they can never replace a standardized capacity test. Thus, because none of the above mentioned methods can supply absolute results. In fact, the results of measurements depend on the concrete method (frequency, amplitude etc.), the operator (Battery Testers!) and other parameters, i.e. temperature and location of probes on the cells or monoblocs. For more information, see also /10/ and /11/.

The following guideline can be used for interpretation of impedance / conductance / resistance measurements:

Industrial Energy, Technical Support

- 40-

Rev. 5, December 2003

If impedance or conductance measurements are used for VRLA batteries it is recommended to install the battery and keep it for at least two days on float charge. After the two days and a maximum of seven days the first readings should be taken. These readings represent the initial impedance/conductance values for the blocs or cells. It is then recommended to take impedance/conductance readings every 6 or 12 months. If the application is considered as very critical in terms of reliability of power supply the readings can be taken more often. The interpretation of impedance/conductance values can not end with a conclusion of full capacity, low capacity or no capacity. Therefore the following recommendations can be made: 1. If impedance/conductance values of blocs or cells change more than 35 % to negative direction*), compared to the initial value, a boost charge for 12 hours followed by 2 days on float charge is recommended firstly. The measurement must be repeated. If the values are not decreasing below the 35 % criteria, a capacity test should be carried out for the battery. 2. If impedance/conductance values of blocs or cells measured have a negative deviation*) of more than 35 %, compared to the average value (per battery), a boost charge for 12 hours followed by 2 days on float charge is recommended firstly. The measurement must be repeated. If the values are not decreasing below the 35 % criteria, a capacity test should be carried out for the battery. 3. If no initial values are measured for a battery method 2 can be applied only. *) impedance to higher values and conductance to lower values All impedance/conductance measurements can be compared to each other only if the temperature does not differ more than +/- 2 C. For positive (impedance lower or conductance higher) deviations no activity is needed (unless it complies with low DC float voltage) because this changing is related to the normal capacity increase of batteries put in float charge operation. If a bloc or cell is changed based on impedance/conductance measurement and returned to the manufacturer for investigation we strongly recommend to write the measured value with permanent ink on the bloc or cell.

Industrial Energy, Technical Support

- 41-

Rev. 5, December 2003

7. RECYCLING
Lead-acid batteries are recyclable products. Recognizing the need to be involved in the whole lifecycle of a battery and to protect the environment, EXIDE Technologies factories recycle used lead. Contact your EXIDE Technologies representative who will advise you on this matter.

8. LIST OF REFERENCES
/1/ European standard EN 50272-2 Safety requirements for secondary batteries and battery installations, Part 2: Stationary batteries, June 2001 European standard EN 50091-1 Uninterruptible power systems (UPS); Part 1: General and safety requirements, 1993 International standard IEC 896-2 Stationary lead-acid batteries General requirements and methods of test - Part 2: Valve regulated types International standard (Draft, second edition 2002) IEC 60896-21 Stationary Lead-Acid Batteries, Part 2: Valve Regulated Types, Section 1: Functional characteristics and methods of test Council Directive of 19 February 1973 on the harmonization of laws of member of states relating to electrical equipment designed for use within certain voltage limits (73/23/EEC) (so-called Low Voltage Directive), amended in 1993 by the Directive 93/68/EEC, the socalled CE marking Directive B. A. Cole, R. J. Schmitt, J. Szymborski (GNB Technologies): Operational Characteristics of VRLA Batteries Configured in Parallel Strings, proceedings INTELEC 1998 F. Kramm, Dr. H. Niepraschk (Akkumulatorfabrik Sonnenschein GmbH): Phenomena of Recombination and Polarization for VRLA Batteries in Gel Technology, proceedings INTELEC 1999 International Standard IEEE P1013/D3: IEEE Recommended Practice for Sizing Lead-Acid Batteries for Photovoltaic (PV) Systems, draft April 1997
- 42Rev. 5, December 2003

/2/ /3/

/4/

/5/

/6/

/7/

/8/

Industrial Energy, Technical Support

/9/

International standard IEC 61427 Secondary Cells and Batteries for Solar Photovoltaic Energy Systems, - General Requirements and Methods of Test, draft (IEC 21/548/CD: 2001)

/10/ B. A. Cole, R. J. Schmitt (GNB Technologies): A Guideline for the Interpretation of Battery Diagnostic Readings in the Real World, Battconn 99 /11/ PPT-Presentation Monitoring (Exide Technologies, GCS), October 2002

Important Notice: The manufacturer of batteries EXIDE Technologies does not take over responsibility for any loyalties resulting from this paper or resulting from changes in the mentioned standards, neither for any different national standards which may exist and has to be followed by the installer, planner or architect. EXIDE Technologies Network Power Im Thiergarten 63654 Bdingen (Hessen) Phone: + 49 60 42 81 70 Fax: + 49 60 42 81 233 www.exide.com
Industrial Energy, Technical Support - 43-

State: Dec. 2003


Rev. 5, December 2003

Appendix A 1 Battery Rooms, Ventilation, Installations


General: This is a guideline only and consists of excerpts from national and international standards and guidelines. See EN 50 272-2 and equivalent national standards (for instance, DIN VDE 0510-1) for further and more detailed information. Also, follow up Operating Instructions and Installation Instructions.

1. Temperature
The battery room temperature should be between + 5 C and + 30 C. Optimal temperature is the nominal temperature 20 C (or 25 C, respectively, for American products). The maximum temperature difference between cells or blocs, respectively, within a string must not exceed 5 degree C (Kelvin, K).

2. Room Dimensions and Floors


Battery rooms height shall be at least 2 m above the operating floors. Floors shall be reasonable level and able to support the battery weight. The floor surface must be electrolyte resistant for usage of vented batteries. This precaution is not necessary for valve regulated batteries. Notice: Electrolyte resistant floor surface is not necessary in case of vented batteries, if they are placed in trays. Those trays must hold at least the amount of electrolyte of one cell or block.

From EN 50 272-2: The floor area for a person standing within arms reach of the battery (see note 2) shall be electrostatic dissipative in order to prevent electrostatic charge generation. The resistance to a groundable point measured according to IEC 61340-4-1 shall be less than 10 M . Conversely the floor must offer sufficient resistance R for personnel safety. Therefore the resistance of the floor to a groundable point when measured in accordance with IEC 61340-4-1 shall be for battery nominal voltage 500 V: 50 k R 10 M for battery nominal voltage > 500 V: 100 k R 10 M
NOTE 1 To make the first part of the requirement effective, the personnel shall wear antistatic footwear when carrying out maintenance work on the battery. The footwear shall comply with EN 345. NOTE 2 Arms reach: 1.25 m distance. (For definition of arms reach see HD 384.4.41.)

Industrial Energy, Technical Support

- 44-

Rev. 5, December 2003

Room inlets and outlets: The way of air circulation should be as shown below. A minimum distance between inlet and outlet of 2 m is requested acc. to EN 50 272-2, if inlet and outlet are located on the same wall.

3. Ventilation
Battery rooms must be vented acc. to EN 50 272-2 in order to dilute gas (hydrogen and oxygen) evolved with charging and discharging and to avoid explosions. Therefore, the electrical installation must not be EX protected. It must be designed for wet room conditions. Do not install batteries in airtight enclosures. Spark generating parts must have a safety distance to cell or bloc openings (respectively valves) as specified in EN 50272-2. Heaters with naked flame or glowing parts or devices are forbidden. Heaters temperature must not exceed 300 C. Hand lamps are only allowed with switches and protective glass according to protection class II and protection class IP 54.

3.1. Ventilation requirements


From EN 50 272-2: The minimum air flow rate for ventilation of a battery location or compartment shall be calculated by the following formula: Q = 0.05 n Igas Crt 10-3 [m3/h] With n Igas Crt = = = number of cells Ifloat or boost [mA/Ah] relevant for calculation (see Table 1) capacity C10 for lead acid cells (Ah), Uf = 1.80 V/cell at 20 C...

Industrial Energy, Technical Support

- 45-

Rev. 5, December 2003

The following table states the values for Igas to be used: Operation Float charging Boost charging Vented cells (Sb < 3%) 5 20 VRLA cells 1 8

Table 1: Igas acc. to EN 50 272-2 for IU- and U-charging depending on operation and lead acid battery type (up to 40 C operating temperature) The gas producing current Igas can be reduced to 50 % of the values for vented cells in case of use of recombination vent plugs (catalyst). With natural ventilation (air convection) the minimum inlet and outlet area is calculated as follows:

A 28 x Q [cm]
(Air convection speed 0.1 m/s)

Example 1: Given: 220 V battery, 110 cells, C10 = 400 Ah, vented type, Antimony (Sb) < 3 % (LA) in Float service Calculation of fresh air necessary: Q = 0.05 n Igas Crt 10-3 [m 3/h] With n = Igas = Crt = Q = 11 m3/h Example 2: Same battery as in example 1, but VRLA-type. Igas = 1 to be used (instead of 5). Q = 2.2 m3/h A 62 cm2 Note: A calculation program is available on request. 110 5 400 (see table 1)

A 308 cm2

Industrial Energy, Technical Support

- 46-

Rev. 5, December 2003

3.2 Close vicinity to the battery


From EN 50 272: In the close vicinity of the battery the dilution of explosive gases is not always secured. Therefore a safety distance extending through air must be observed within which sparking or glowing devices (max. surface temperature 300 C) are prohibited. The dispersion of explosive gas depends on the gas release rate and the ventilation close to the source of release. For calculation of the safety distance d from the source of release the following formula applies assuming a hemispherical dispersal of gas... NOTE The required safety distance d can be achieved by the use of a partition wall between battery and sparking device. Where batteries form an integral part of a power supply system, e.g. in a UPS system the safety distance d may be reduced according to the equipment manufacturers safety calculations or measurements. The level of air ventilation rate must ensure that a risk of explosion does not exist by keeping the hydrogen content in air below 1%vol plus a safety margin at the potential ignition source. Taking into account the number of cells results in the following formula for the safety distance d:
d = 28.8 3 N 3 Igas 3 Crt [mm ] *)
*) Depending on the source of gas release the number of cells per monobloc battery (N) or vent openings per cell involved (1/N) must be taken into consideration, i. e. by the factor
3

N , respectively

1/N ...

Example 3: Cell, vented type, one vent, 100 Ah. Float charge Safety distance d = 28.8 1 1.71 4.64 = 228.5 mm Example 4: 12V-monobloc, six cells, one opening in the top cover, vented type, 100 Ah, Float charge Igas = 5 (acc. to table 1).
3

Igas = 5 (acc. to table 1). 230 mm

= 1.82, because six cells 420 mm

Safety distance d = 28.8 1.82 1.71 4.64 = 415.8 mm Example 5: Cell, VRLA-type, one vent, 100 Ah. Float charge Safety distance d = 28.8 1 1 4.64 = 133.6 mm

Igas = 1 (acc. to table 1). 135 mm

Industrial Energy, Technical Support

- 47-

Rev. 5, December 2003

Example 6: Cell, vented type, one vent, 1500 Ah. Boost charge Safety distance d = 28.8 1 2.71 11.45 = 893.6 mm Example 7: Cell, vented type, three vents, 3000 Ah. Boost charge
3

Igas = 20 (acc. to table 1) 895 mm

Igas = 20 (acc. to table 1)

1/N =

0.69 because three vents per cell

Safety distance d = 28.8 0.69 2.71 14.42 = 776.6 mm 780 mm

4. Electrical Requirements (protection, insulation, resistance etc.)


To prevent a build-up of static electricity when handling batteries, clothing/materials, safety boots and gloves are required to have - a surface resistance of 108 , and - an insulation resistance of 105 From EN 50 272-2: The minimum insulation resistance between the batterys circuit and other local conductive parts should be greater than 100 per Volt (of battery nominal voltage) corresponding to a leakage current < 10 mA NOTE: The battery system should be isolated from the fixed installation before this test is carried out. Before carrying out any test check for hazardous voltage between the battery and the associated rack or enclosure. In case of battery systems with > DC 120 V nominal voltage battery racks or cabinets made from metal shall either be connected to the protective conductor (grounding) or insulated from the battery and the place of installation (chapter 5.2 in EN 50272-2). This insulation must withstand 4000 V AC for one minute. NOTE: Protection against both direct and indirect contact shall only be used for battery installations with nominal voltages up to DC 120 V. In these cases the requirements for metal battery stands and cabinets specified in chapter 5.2 of EN 50272-2 do not apply. Touch protection must be provided for all active parts at voltages > 60 V DC with insulation, covers or shrouds and distance. NOTE: Breakers are not necessary in case of small load power ( 30 W) if the nominal voltage does not exceed 12 V. Precautions must be taken to avoid fires in case of failures. Insulation is necessary or a distance of at least 10 mm for 24 V potential difference to avoid parasitic currents (fire protection !).

Industrial Energy, Technical Support

- 48-

Rev. 5, December 2003

5. Installation (racks, cabinets)


Batteries shall be installed in clean, dry locations. Batteries must be secured against dropping items and dirt. The course width between battery rows is equal to 1.5 times the cell depth (replacement) but minimum 600 mm (acc. to EN 50 272-2). The minimum distance for > 120 V between active parts is 1.5 m or insulation, insulated cover etc. The recommended minimum distance between cells or blocs (of VRLA type) is 10 mm. At least 5mm are requested acc. to EN 50272-2 (at the largest dimension). Thus, in order to allow heat dissipation. Racks and cabinets shall have a distance of at least 100 mm to the wall for a better placement of connections and better access for cleaning. Batteries must be easy assessable and must allow service with normal insulated tools (EN 50272-2). CE symbol : Any battery with a nominal voltage greater than 75 V requires an EC declaration of conformity in accordance with the low-voltage directive with the proper CE symbol for the battery. The installer of the battery system is responsible for the issue of the declaration and attachment of the CE symbol.

Important Notice: The manufacturer of batteries EXIDE Technologies do not take over responsibility for any loyalties resulting from this paper or resulting from changes in the mentioned standards, neither for any different national standards which may exist and has to be followed by the installer, planner or architect.

Industrial Energy, Technical Support

- 49-

Rev. 5, December 2003

Appendix A 2: Charging Time vs. Voltage and Current (see also fig. 9, 10)
100

90

80

Available Capacity [%C10]

70

60

25% DOD
50

50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 23: Re-charging at 2.25 Vpc and 0.5 * I 10


100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time[Hours]

Fig. 24: Re-charging at 2.25 Vpc and 1.5 * I 10


Industrial Energy, Technical Support - 50Rev. 5, December 2003

100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 25: Re-charging at 2.25 Vpc and 2 * I10


100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 26: Re-charging at 2.30 Vpc and 0.5 * I 10


Industrial Energy, Technical Support - 51Rev. 5, December 2003

100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 27: Re-charging at 2.30 Vpc and 1 * I10


100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 28: Re- charging at 2.30 Vpc and 1.5 * I 10

Industrial Energy, Technical Support

- 52-

Rev. 5, December 2003

100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 29: Re-charging at 2.30 Vpc and 2 * I10


100

90

80

Available Capacity [%C10]

70

60

50

40

25% DOD 50% DOD 75% DOD 100% DOD

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 30: Re-charging at 2.40 Vpc and 0.5 * I 10


Industrial Energy, Technical Support - 53Rev. 5, December 2003

100

90

80

Available Capacity [%C10]

70

60

50

25% DOD 50% DOD 75% DOD 100% DOD

40

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 31: Re-charging at 2.40 Vpc and 1.5 * I 10


100

90

80

Available Capacity [%C10]

70

60

50

40

25% DOD 50% DOD 75% DOD 100% DOD

30

20

10

0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Charging Time [Hours]

Fig. 32: Re-charging at 2.40 Vpc and 2 * I10

Industrial Energy, Technical Support

- 54-

Rev. 5, December 2003

Important Notice: The manufacturer of batteries EXIDE Technologies do not take over responsibility for any loyalties resulting from this paper or resulting from changes in the mentioned standards, neither for any different national standards which may exist and has to be followed by the installer, planner or architect. EXIDE Technologies Network Power Im Thiergarten 63654 Bdingen (Hessen) Phone: + 49 60 42 81 70 Fax: + 49 60 42 81 233 www.exide.com
Industrial Energy, Technical Support - 55-

State: Dec. 2003


Rev. 5, December 2003

APPENDIX 3: Instructions Installation Instruction Operating Instruction-Stationary valve regulated lead acid batteries Operating InstructionSOLAR, SOLAR BLOCK, A 600 SOLAR

Industrial Energy, Technical Support

- 56-

Rev. 5, December 2003

Installation instruction
35 0 35340 10

for stationary lead acid batteries


(Batteries / Stands / Cabinets)

Observe these instructions and keep them located nearby the battery for future reference. Work on the battery should only be carried out by qualified personnel. Do not smoke. Do not use any naked flame or other sources of ignition. Risc of explosion and fire. While working on batteries wear protective eye-glasses and clothing. Observe the accident prevention rules as well as EN 50 272-2, DIN VDE 0510, VDE 0105 Part 1. An acid splash on the skin or in the eyes must be flushed with plenty of clean water immediately. Then seek medical assistance. Spillages on clothing should be rinsed out with water. Explosion and fire hazard, avoid shortcircuits. Caution! Metal parts of the battery are always alive, therefore do not place items or tools on the battery. Electrolyte is very corrosive. In normal working conditions the contact with the electrolyte is impossible. If the cell or monobloc container is damaged do not touch the exposed electrolyte because it is corrosive. Cells and monoblocs are heavy. Always use suitable handling equipment for transportation. Handle with care because cells and monoblocs are sensitive to mechanical shock. Dangerous electric voltage!

2.

Stands

2.1 Locate the stands/racks within the battery room in accordance with the installation plan. If an installation plan does not exist, observe the following minimum distances: From the wall: 100 mm all around, with regard to cells or monoblocs, or 50 mm, concerning of the stands. At a nominal voltage or partial voltage >120 V: 1.5 metres between non-insulated leads or connectors and grounded parts (e.g. water pipes) and/or between the battery terminals. During the installation of the batteries, ensure that EN 50 272-2 part 2 is observed (e.g. by covering electrically conductive parts with insulating mats). Width of aisles: 1.5 x cell width (built-in depth), but not less than 500 mm. 2.2 Balance battery stands horizontally, using the balance parts supplied, or adjustable insulators. The distances of the base rails must correspond to the dimensions of the cells or monobloc batteries. Check the stands for stability and all screwed and clamped joints for firm connection. Earth (ground) the stand or parts of the stand, if required. Screwed joints must be protected against corrosion. 2.3 Check cells or monobloc batteries for perfect condition (visual check, polarity). 2.4 Place cells or monobloc batteries on the stand one after another, ensuring correct polarity. For large cells it is useful to start installing the cells in the middle of the stand: Align cells or monobloc batteries parallel to each other. Distance between cells or monobloc batteries approx. 10 mm, at least 5 mm. If necessary, clean the contacting surfaces of the terminals and connectors. Place and screw intercell or monobloc connectors, using an insulated torque wrench (for correct torque value refer to battery operating instructions). If applicable, observe special instructions with regard to the intercell connectors (e.g. welded connectors). Place the series, step or tier connectors supplied and screw them together, observing the given torque values. Avoid short circuits! Use leads of at least 3 kV breakdown voltage or keep an air distance of approx. 10 mm between the leads and electrically conductive parts, or apply additional insulation to the connectors. Avoid applying any mechanical force on the cell/battery poles. If applicable, remove transport plugs and replace by operational plugs. Check electrolyte level. (Observe operating instructions / commissioning instructions).

1.
1.1

Installation preconditions and preparations

1.5 Carry out open circuit voltage measurements on the individual cells or monobloc batteries. At the same time, ensure that they are connected in the correct polarity. As for unfilled and charged batteries, these measurements can only be taken after commissioning. The open-circuit voltages for fully charged cells at an electrolyte temperature of 20 C are as follows: OPzS-cells OPzS-monobloc batt. OCSM-cells GroE-cells OGi-monobloc batteries OGi-cells OGiV-monobloc batt. Other OGiV-monobloc batteries OPzV-cells OPzV-monobloc batt. DIN 40736 DIN 40737 2.08 0.01 [Vpc] 2.08 0.01 [Vpc] 2.10 0.01 [Vpc] DIN 40738 2.06 0.01 [Vpc] 2.10 0.01 [Vpc] 2.10 0.01 [Vpc] DIN 40741, part 1 2.10 0.01 [Vpc] Depending on construction 2.082.14* [Vpc] DIN 40742 (draft) 2.082.14* [Vpc] DIN 40744 (draft) 2.082.14* [Vpc]

Prior to commencing installation, ensure that the battery room is clean and dry and that it has a lockable door. The battery room must meet the requirements in accordance with EN 50 272-2 and be marked as such. Pay attention to the following aspects: Load bearing capacity and nature of the floor (transport paths and battery room) Electrolytic resistance of the area where the battery is to be installed Ventilation To ensure trouble free installation, coordination should be made with other personnel working in the same area. 1.2 Check delivery for complete and undamaged components. If necessary, clean all parts prior to installation. 1.3 Follow instructions in the documentation supplied (e.g. installation drawings for battery, stand, cabinet). 1.4 Prior to removing old batteries always ensure that all of the leads have been disconnected (load-break switches, fuses, insulations). This must be carried out only by personnel authorised to perform circuit operations. WARNING: Do not carry out any unauthorised circuit operation!

* according to manufacturers information The open-circuit voltage of the individual cells must not vary from each other by more than 0.02 V. With regard to monobloc batteries, the maximum deviations of the open-circuit voltage are as follows: 4 V monobloc batteries 6 V monobloc batteries 12 V monobloc batteries 0.03 V/bloc 0.04 V/bloc 0.05 V/bloc

Higher temperatures cause the open-circuit voltage to be lower, whereas lower temperatures cause it to be higher. At a deviation of 15 K from the nominal temperature, the open circuit-voltage changes by 0.01 Vpc. If the deviation is any higher, contact the supplier.

Measure total voltage (nominal voltage: sum of open circuit voltages of the individual cells or monobloc batteries). If necessary sequentially number the cells or monobloc batteries in a visible place between the positive terminal of the battery and the negative terminal of the battery. Apply polarity signs for the battery leads. Attach safety marking, type lable and operating instructions in a visible place. If necessary, fit insulating covers for cell / monobloc connectors and terminals.

3.
3.1

Cabinets

4.

CE marking

Cabinets with built-in battery: Install the battery cabinet at the location assigned, observing the accident prevention rules. Leave additional space from the wall for possible or planned cable entries. If applicable, remove transport protection from the built-in cells or monobloc batteries. Check cells or monobloc batteries for correct positioning and for any mechanical damage. 3.2 Cabinets with separately delivered cells or monobloc batteries: Only filled and charged cells and/or monobloc batteries (vented or sealed) are built into cabinets. Assemble cabinet, place and align at the assigned location (observe the accident prevention rules). Place cells or monobloc batteries in the cabinet, in accordance with the installation plan and the defined distances, connect electrically and apply markings (see point 2.4).

From 1 January 1997, batteries with a nominal voltage from 75 V onwards require an EC conformity declaration in accordance with the low voltage directive (73/23/EWG), which entails that the CE marking is applied to the battery. The company installing the battery is responsible for supplying the declaration and applying the CE marking. WARNING: Prior to connecting the battery to the charger, ensure that all installation work has been duly completed.

EXIDE Technologies Network Power Im Thiergarten 63654 Bdingen Germany Phone: +49 (0) 60 42 / 81 70 Fax: +49 (0) 60 42 / 81 233 www.exide.com issued: April 2002

Operating Instruction Stationary valve regulated lead acid batteries


Nominal data: Nominal voltage UN : 2.0V x number of cells Nominal capacity CN = C10; C20 : 10 h ; 20 h discharge (see type plate on cells/blocs and technical data in these instructions) Nominal discharge current IN=I10; I20 : CN / 10 h; CN / 20h Final discharge voltage Uf : see technical data in these instructions Nominal temperature TN : 20C ; 25C Assembly and CE marking by: ____________________EXIDE Technologies order no.:__________________________date:____________ Commissioned by: ________________________________________________________________________________date:____________ Security signs attached by:__________________________________________________________________________date:____________ Observe these instructions and keep them located nearby the battery for future reference. Work on the battery should only be carried out by qualified personnel. Do not smoke. Do not use any naked flame or other sources of ignition. Risk of explosion and fire. While working on batteries wear protective eye-glasses and clothing. Observe the accident prevention rules as well as EN 50272-2, DIN VDE 0510, VDE 0105 Part 1. Any acid splashes on the skin or in the eyes must be flushed with plenty of water immediately. Then seek medical assistance. Spillages on clothing should be rinsed out with water. Explosion and fire hazard, avoid short circuits. 1. Start Up Check all cells/blocs for mechanical damage, correct polarity and firmly seated connectors. Torques as shown in table 1 apply for screw connectors. Before installation the supplied rubber covers should be fitted to both ends of the connector cables (pole covers). Control of insulation resistance: New batteries: > 1M Used batteries: > 100 /Volt Connect the battery with the correct polarity to the charger (pos. pole to pos. terminal). The charger must not be switched on during this process, and the load must not be connected. Switch on charger and start charging following instruction no. 2.2. 2. Operation For the installation and operation of stationary batteries DIN VDE 0510 part1 (draft) and EN 50 272-2 is mandatory. Battery installation should be made such that temperature differences between individual units do not exceed 3 degrees Celsius/Kelvin. 2.1 Discharge Discharge must not be continued below the voltage recommended for the discharge time. Deeper discharges must not be carried out unless specifically agreed with the manufacturer. Recharge immediately following complete or partial discharge. 2.2 Charging All charging must be carried out according to DIN 41773 (IU-characteristic with limit values: I-constant: 2%; U-constant: 1%). Depending on the charging equipment, specification and characteristics alternating currents flow through the battery. Alternating currents and the reaction from the loads may lead to an additional temperature increase of the battery, and strain the electrodes with possible damages (see 2.5) which can shorten the battery life. Depending on the installation charging (acc. to DIN VDE 0510 part 1, draft) may be carried out in following operations. a.) Standby Parallel Operation Here, the load, battery and battery charger are continuously in parallel. Thereby, the charging voltage is the operation voltage and at the same time the battery installation voltage. With the standby parallel operation, the battery charger is capable, at any time, of supplying the maximum load current and the battery charging current. The battery only supplies current when the battery charger fails. The charging voltage should be set acc. to table 2 measured at the end terminals of the battery.

Electrolyte is very corrosive. In normal working conditions the contact with electrolyte is impossible. If the cell or monobloc container is damaged do not touch the exposed electrolyte because it is corrosive. Cells and monoblocs are heavy. Always use suitable handling equipment for transportation. Handle with care because cells/monoblocs are sensitive to mechanical shock. Caution! Metal parts of the battery are always alive, therefore do not place items or tools on the battery Keep children away from batteries.

Non-compliance with operating instructions, repairs made with other than original parts, or repairs made without authorization (e. g. opening of valves) render the w arranty void. Disposal of Batteries Batteries marked with the recycling symbol should be processed via a recognized recycling agency. By agreement, they might be returned to the manufacturer. Batteries must not be mixed with domestic or industrial waste. Stationary valve regulated lead acid batteries do not require topping-up water. Pressure valves are used for sealing and cannot be opened without destruction. Type Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 10-32x0.425 -6 Nm ----G-M5 5 Nm 5 Nm --G-M5 ----5 Nm -M5 ---6 Nm M6 6 Nm 11 Nm 6 Nm 11 Nm 6 Nm 6 Nm G- M6 6 Nm 6 Nm --M8 8 Nm -8 Nm -8 Nm 8 Nm A / M8 8 Nm 8 Nm --M12 25 Nm -----M8 --20 Nm 20 Nm

------F-M10 20 Nm ----

A400 A500 A600 A700

All torques apply with a tolerance of 1 Nm Table 1: Terminal torque

Float Voltage Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700 2.27 Vpc 2.27 Vpc 2.27 Vpc 2.27 Vpc 2.27 Vpc 2.27 Vpc 2.27 Vpc 2.30 Vpc 2.25 Vpc 2.25 Vpc

Nominal Temp. 20C 25C 25C 25C 20C 20C 20C 20C 20C 20C

c.) Switch-mode operation When charging, the battery is separated from the load. The charge voltage of the battery must be set acc. to table 5 (max. values). The charging process must be monitored. If the charge current reduces to less than 1.5A/100Ah with the values given in table 5 the mode switches to float charge acc. to item 2.3 (switches after reaching value acc to table 5). Max. switch-mode voltage 2.35 Vpc 2.40 Vpc 2.35 Vpc 2.40 Vpc 2.35 Vpc 2.35 Vpc 2.35 Vpc 2.45 Vpc 2.35 Vpc 2.35 Vpc Nominal Temp. 20C 25C 25C 25C 20C 20C 20C 20C 20C 20C

2.6 Charging currents The charging currents are not limited during standby parallel operation or buffer operation without recharging stage. The charging current should range between the values given in table 7 (guide values).

Charging current Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700 10 to 30 A per 100Ah 10 to 35 A per 100Ah 10 to 30 A per 100Ah 10 to 35 A per 100Ah 10 to 30 A per 100Ah 10 to 30 A per 100Ah 10 to 35 A per 100Ah 10 to 35 A per 100Ah 10 to 35 A per 100Ah 10 to 35 A per 100Ah

Table 2: Float voltage To reduce the charging time a boost charging stage can be applied in which the charging voltage acc. to table 3 can be adjusted (standby-parallel operation with boost recharging stage).

Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700

Table 5: Switch-mode operation charge voltage (max. values)

Table 7: Charging currents

Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700

Voltage on boost charge stage 2.33-2.40 Vpc 2.33-2.40 Vpc 2.33-2.40 Vpc 2.33-2.40 Vpc 2.33-2.40 Vpc 2.33-2.40 Vpc 2.33-2.40 Vpc 2.35-2.45 Vpc 2.33-2.40 Vpc 2.33-2.40 Vpc

Nominal Temp. 20C 25C 25C 25C 20C 20C 20C 20C 20C 20C

d.) Battery operation (charge-/discharge operation) The load is only supplied by the battery. The charging process depends on the application and must be carried out in accordance with the recommendations of the battery-manufacturer.

Table 3: Voltage on boost charging stage Automatic change over to charging voltage acc. to table 2 should be applied.

2.3 Maintaining the full charge (float charge) Devices complying with the stipulations under DIN 41773 must be used. They are to be set so that the average cell voltage is acc. to table 2.

2.7 Temperature The recommended operation temperature range for lead acid batteries is 10C to 30C (best: nominal temperature 5K). Higher temperatures will seriously reduce service life. Lower temperatures reduce the available capacity. The absolute maximum temperature is 55C and should not exceed 45C in service. All technical data refer to a nominal temperature of 20C and 25C respectively.

b.) Buffer operation With buffer operation the battery charger is not able to supply the maximum load current at all times. The load current intermittently exceeds the nominal current of the battery charger. During this period the battery supplies power. This results in the battery not fully charged at all times. Therefore, depending on the load the charge voltage must be set acc. to table 4. This has to be carried out in accordance with the manufacturers instructions.

2.4 Equalizing charge Because it is possible to exceed the permitted load voltages, appropriate measures must be taken, e.g. switch off the load. Equalizing charges are required after deep discharges and/or inadequate charges. They have to be carried out acc. to table 6 for up to 48 hours as follows: The cells / bloc temperature must never exceed 45C. If it does, stop charging or revert to float charge to allow the temperature to drop. Max. equalizing charge voltage 2.40 Vpc 2.40 Vpc 2.40 Vpc 2.40 Vpc 2.40 Vpc 2.40 Vpc 2.40 Vpc 2.45 Vpc 2.40 Vpc 2.40 Vpc Max. charge current 20A/100Ah 35A/100Ah 20A/100Ah 35A/100Ah 20A/100Ah 20A/100Ah 35A/100Ah 35A/100Ah 35A/100Ah 35A/100Ah

2.8 Temperature related charge voltage The temperature correction factor has to be applied acc. to the following figures. A temperature related adjustment of the charge voltage must not be applied within a specified temperature range (see table 8). If the operation temperature is constantly outside this range, the charge voltage has to be adjusted.

Voltage in buffer operation Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700 2.27 Vpc 2.29-2.33 Vpc 2.30 Vpc 2.29-2.33 Vpc 2.27 Vpc 2.27 Vpc 2.27 Vpc 2.30-2.35 Vpc 2.27-2.30 Vpc 2.27-2.30 Vpc

Nominal temp. 20C 25C 25C 25C 20C 20C 20C 20C 20C 20C

Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700

Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700

No temp. correction to be applied ------------15C to 35C 15C to 35C 15C to 35C 15C to 35C

Table 6: Equalizing charge voltage (max. values) 2.5 Alternating currents When recharging up to 2.40 Vpc under operation modes 2.2 the actual value of the alternating current is occasionally permitted to reach 10A (RMS) /100Ah nominal capacity. In a fully charged state during float charge or standby parallel operation the actual value of the alternating current must not exceed 5 A (RMS) /100 Ah nominal capacity.

Table 8: No Temperature correction

Table 4: Charge voltage in buffer operation

2,45

2,40

Voltage [Vpc]

2,35 Maximum value

2,30 Nominal Value

Float
2,25

2,20 0 5 10 15 20 25 30 35 40 Temperature [C] The charging voltage should be set to the nominal value, the maximum value must not be exceeded

Fig. 1: Marathon L, Sprinter P and Powerfit S; Charging Voltage vs. Temperature

2,45

2,40

2,35

Voltage [Vpc]

Float
2,30

2,25

2,20

2,15 -20 -10 0 10 20 30 40 50

Temperature [C]

Fig. 2: Marathon M, Sprinter S; Charging Voltage vs. Temperature

2,50

2,45 max. 2.40 Vpc for max. 48 h 2,40

2,35 Voltage [Vpc]

Boost/Equalizing for max. 48 h

2,30

2,25

Float

2,20

2,15

2,10 -20

-10

10

20

30

40

50

Temperature [ C]

Fig. 3: A 400; Charging Voltage vs. Temperature

2,55

2,50 max. 2.45 Vpc for max. 48 h 2,45

2,40 Voltage [Vpc] Boost/Equalizing for max. 48 h 2,35

2,30 Float 2,25

2,20

2,15 -20 -10 0 10 20 30 40 50 Temperature [ C]

Fig. 4: A 500; Charging Voltage vs. Temperature

2,5

2,45 max. 2.40 Vpc for max. 48 h 2,4

2,35 Voltage [Vpc] Boost/Equalizing for max. 48 h 2,3

2,25 Float 2,2

2,15

2,1 -20

-10

10

20

30

40

50

Temperature [ C]

Fig. 5: A 600, A 700; Charging Voltage vs. Temperature

2.9 Electrolyte The electrolyte is diluted sulphuric acid and fixed in a glass mat for AGM products or in a gel for Sonnenschein products. 3. Battery maintenance and control Keep the battery clean and dry to avoid creeping currents. Plastic parts of the battery, especially containers, must be cleaned with pure water without additives. At least every 6 month measure and record: - Battery voltage - Voltage of several cells/blocs - Surface temperature of several cells/blocs - Battery-room temperature If the cell voltage differs from the average float charge voltage by more than the values in given in table 9, or if the surface temperature difference between cells / monoblocs exceeds 5K, the service agent should be contacted. Annual measurement and recording: - Voltage of all cells / blocs - Surface temperature of all cells/blocs - Battery-room temperature - Insulation-resistance acc. to DIN 43539 part1 Annual visual check: - Screw -connections - Screw -connections without locking devices have to be checked for tightness - Battery installation and arrangement - Ventilation 4. Tests Tests have to be carried out according to IEC 896-2, DIN 43539 part 1 and 100 (draft). Special instructions like DIN VDE 0107 and DIN VDE 0108 have to be observed. Capacity test Capacity test (for instance, acceptance test on site): In order to make sure the battery is fully charged, the following IU-charge methods can be applied. For different types see table 10 The current available to the battery must be between 10A /100Ah and 35A/ 100Ah of the nominal capacity.

6. Storage and taking out of operation To store or decommission cells/blocs for a longer period of time they should be fully charged and stored in a dry frost-free room. To avoid damage the following chargingmethods can be chosen: 1. Annual equalizing-charge acc. to 2.4. in average ambient temperatures of more than 20C shorter intervals may be necessary. 2. Float charging as detailed in 2.3.

7. Transport Cells and blocs must be transported in an upright position. Batteries without any visible damage are not defined as dangerous goods under the regulations for transport of dangerous goods by road (ADR) or by railway (RID). They must be protected against short circuits, slipping, upsetting or damaging. Cells/blocs may be suitable stacked and secured on pallets (ADR and RID, special provision 598). It is prohibited to staple pallets. No dangerous traces of acid shall be found on the exteriors of the packing unit. Cells/blocs whose containers leak or are damaged must be packed and transported as class 8 dangerous goods under UN no. 2794.

Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 A600 A700

2V +0.2/-0.1 ------+0.2/-0.1 +0.2/-0.1 --

4V -------+0.28/-0.14 -+0.28/-0.14

6V 8V 12V +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 +0.40/-0.20 +0.49/-0.24 +0.35/-0.17 -+0.49/-0.24 +0.35/-0.17 ---

Table 9: Criteria for voltage measurements

Option 1 Marathon L Marathon M Sprinter P Sprinter S Powerfit S300 Powerfit S500 A400 A500 2.27 Vpc 48 hours 2.27 Vpc 48 hours 2.27 Vpc 48 hours 2.27 Vpc 48 hours 2.27 Vpc 48 hours 2.27 Vpc 48 hours 2.27 Vpc 48 hours 2.30 Vpc 48 hours 2.25 Vpc 72 hours 2.25 Vpc 48 hours

Option2 2.40 Vpc 16 h (max. 48h) followed by 2.27 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.27 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.27 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.27 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.27 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.27 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.27 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.30 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.25 Vpc 8h 2.40 Vpc 16 h (max. 48h) followed by 2.25 Vpc 8h

5. Faults Call the service agents immediately if faults in the battery or the charging unit are found. Recorded data as described in item 3. must be made available to the service agent. It is recommended that a service contract is taken out with our agent.

A600 A700

Table 10: Preparation for capacity test

8. Central degassing 8.1 General items The ventilation of battery rooms and cabinets, respectively, must be carried out acc. to EN 50272-2 always. Battery rooms are to be considered as safe from explosions, when by natural or technical ventilation the concentration of hydrogen is kept below 4% in air. This standard contains also notes and calculations regarding safety distance of battery openings (valves) to potential sources of sparks. Central degassing is a possibility for the equipment manufacturer to draw off gas. Its purpose is to reduce or to delay, respectively, the accumulation of hydrogen in the ambient of the batteries by conducting hydrogen releasing the vents through a tube system to the outside. On such a way it is also possible to the equipment manufacturer to reduce the safety distance to potential sources of ignition. Even if the gas releasing the vents will be conducted through the tube system outside, hydrogen (H2) diffuses also through the battery container and through the tube wall. The following calculation shows when the critical limit of 4% H 2 can be achieved using central degassing in a hermetic closed room (e.g. battery cabinet). Only bloc batteries equipped by a tube junction for central degassing must be used for this application. The installation of the central degassing must be carried out in acc. with the equivalent installation instructions. During each battery service also the central degassing must be checked (tightness of tubes, laying in the direction of the electrical circuit, drawing off the end of the tube to the outside). 8.2 Accumulation of hydrogen up to 4% in air The following calculations are based on measurements and are related to cabinets. The following equation was determined for calculating the numbers of days for achieving the critical gas mixture: k/Bloc * c1 * c2 x = c3 with: x= k/Bloc = c1 = c2 = c3 = Days up to achieving 4% H2 in air Constant per specific bloc battery type acc. to table11 Coefficient for actual free volume inside the cabinet acc. to table 12 Coefficient for actual battery temperature acc. to table 2 Coefficient for actual numbers of blocs in total

Therefore, it is possible to calculate using the tables 11 and 12 after how many days the 4% H2-limit can be achieved in the cabinet for the mentioned battery types, different configurations and conditions. Calculation example: 48 V-battery (e.g. Telecom) 4 * M12V155FT Free air volume 70% Battery temperature 20 C k/Bloc * c1 * c2 x = = 168 days c3 The 168 days are reduced to 99 days only at 30 C because c2 = 0.59. V free [%] 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 c1 0.13 0.19 0.26 0.32 0.38 0.45 0.51 0.58 0.64 0.70 0.77 0.83 0.90 0.96 1.02 1.09 1.15 T [ C] 25 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 55 c2 1 0.91 0.73 0.59 0.48 0.40 0.34 0.29 0.25 0.21 0.18 0.16 0.14 0.12 0.11 0.10 0.09 c3 = 4 k = 750 c1= 0.9 c2 = 1

Battery bloc type M12V45 M12V90FT M12V105FT M12V125FT M12V155FT M6V200 S12V500 A 412/26 FT A 412/37 FT A 412/48 FT A 412/85 FT A 412/110 FT A 412/85 F10

Nominal voltage [V] 12 12 12 12 12 6 12 12 12 12 12 12 12

C10 [Ah], 1.80 Vpc, 20 C 45 85 100 121 150 200 130 26 37 48 85 110 85

Constant k 1842 1324 1107 930 750 873 648 2999 2107 1624 1048 810 786

Table 11: Constant k for different bloc battery types having central degassing

Table 12: Coefficients for free air volume (c1) and temperature (c2)

8.3 Special conditions and instructions The free air volume inside the cabinet has to be determined by the user. The batteries must be monitored regarding temperature. Exceeding the limit of 55 C is not allowed. Malfunctions of equipment and (or) batteries may lead to a faster accumulation of H 2 and, therefore, time reduction. In such a case, the above mentioned calculation methods cannot be applied anymore. Discharge and re-charging at float voltage level can be carried out as much as necessary during the time (days) determined. It is allowed to carry out monthly boost or equalizing charging for maximum 12 hours only and at the maximum allowed voltage level specified for the battery. For all applications in addition to this, e.g. buffer or cyclical operations, consultation with EXIDE Technologies is necessary. The time (days) is valid for temperature compensated charge voltages acc. to the operating instructions and take into account aging effects of the battery (increasing residual charge current).

9. Technical Data The following tables contain values of either capacities (Cn) or discharge rates (constant current or constant power) at different discharge times (tn) and to different final voltages (Uf). All technical data refer to either 20 C or 25 C (depends on battery type). 9.1 AGM 9.1.1. Powerfit S Discharge time tn Capacity Cn [Ah] Capacity in % of the nominal capacity C20 Uf in Volt per cell 10 min C1/6 40 % 30 min C1/2 50 % 1h C1 55 % 3h C3 80 % 5h C5 83 % 10 h C10 86 % 20 h C20 100 %

1.60

1.70

1.74

1.78

1.79

1.80

1.75

Example: C3 (S 512/25) = 80 % * 25 Ah = 20 Ah All technical data refer to 20 C. 9.1.2. Sprinter P Type P12V570 P12V600 P12V875 P12V1220 P12V1575 P12V2130 P 6V1700 P 6V2030 Nominal voltage [V] 12 12 12 12 12 12 6 6 15 min.-power, Uf = 1.60 V per cell [W] 570 600 875 1220 1575 2130 1700 2030 Capacity C10, Uf = 1.80 V per cell [Ah] 21 24 41 51 61 86 122 178

The battery is especially designed for high rate discharges. Further details depending on the discharge time and cut off voltage must be taken from the actual product brochure. All technical data refer to 25 C. 9.1.3 Sprinter S Type Nominal voltage [V] 12 12 12 12 12 12 6 C10 [Ah] Uf = 1.80 V per cell 24 40 70 69 87 131 175 Constant power [Watt per cell] Uf = 1.67 V per cell 5 min 10 min 15 min 30 min 60 min 90 min 242 323 543 654 723 864 1446 151 215 365 415 484 615 970 117 167 285 306 373 505 746 72 102 169 180 230 310 458 41 58 96 105 131 176 262 29 41 69 76 92 126 184

S12V120(F) S12V170(F) S12V285(F) S12V300(F) S12V370(F) S12V500(F) S6V740(F)

All technical data refer to 25C.

9.1.4 Marathon L Discharge time tn Capacity Cn [Ah] L12V15 L12V24 L12V32 L12V42 L12V55 L12V80 L6V110 L6V160 L2V220 L2V270 L2V320 L2V375 L2V425 L2V470 L2V520 L2V575 Uf [V] (2 V cell) Uf [V] (6 V bloc) Uf [V] (12 V bloc) 10 min C1/6 6.5 10.7 14.1 19.6 21.6 30.3 48.5 66.6 87.1 104.1 130.7 152.4 160.9 186.6 204.1 220.8 1.60 4.80 9.60 30 min C1/2 8.1 13.3 17.7 25.0 28.2 40.0 62.0 89.5 120.5 148.5 180.5 212.0 234.0 264.0 290.0 317.5 1.70 5.10 10.20 1h C1 9.5 15.1 20.5 28.5 34.5 48.8 73.5 105.0 141.0 162.0 214.0 250.0 274.0 305.0 337.0 372.0 1.74 5.22 10.44 3h C3 12.3 20.4 27.3 37.2 42.9 61.5 98.4 126.3 178.2 218.4 261.0 306.0 345.0 382.2 423.0 468.0 1.78 5.34 10.68 5h C5 12.5 21.0 29.5 38.5 48.0 69.0 104.0 142.0 194.0 238.0 283.5 332.5 375.0 419.5 466.5 516.0 1.79 5.37 10.74 10 h C10 14.0 23.0 31.5 42.0 55.0 80.0 112.0 162.0 220.0 270.0 320.0 375.0 425.0 470.0 520.0 575.0 1.80 5.40 10.80

All technical data refer to 20C. 9.1.5 Marathon M Type Nominal voltage [V] 12 12 12 12 12 6 12 12 12 12 C8 [Ah] 1.75 V per cell 28 40 46 72 90 190 90 104 125 155 Constant current discharge [A]. Uf = 1.75 V per cell 0.5 h 1h 1.5 h 3h 5h 10 h 36.9 51.3 57.8 90.8 107.0 246.0 109.0 118.4 145.3 179.4 21.2 30.5 33.2 51.6 65.7 144.9 64.8 71.8 90.4 105.8 15.1 21.5 24.0 36.8 46.6 102.0 46.4 51.6 65.3 77.7 8.4 11.9 13.5 20.6 25.9 56.0 25.3 29.2 38.1 44.4 5.5 7.6 8.7 13.4 16.7 35.9 16.3 19.2 24.0 28.8 2.9 4.1 4.7 7.4 9.2 19.5 8.8 10.6 12.7 15.7

M12V30T M12V40(F) M12V45F M12V70(F) M12V90(F) M6V190(F) M12V90FT M12V105FT M12V125FT M12V155FT

All technical data refer to 25C.

9.2. GEL 9.2.1 A 400 Discharge time tn Capacity Cn [Ah] A406/165 A412/5.5 A412/8.5 A412/12.0 A412/20.0 A412/32.0 A412/50.0 A412/65.0 A412/85.0 A412/90.0 A412/100.0 A412/120.0 A412/180.0 A412/26.0 19 A412/37.0 A412/48.0 A412/85.0 23 A412/110.0 Uf [V] (6 V bloc) Uf [V] (12 V bloc) 10 min C1/6 52.98 1.83 2.67 3.67 6.50 11.25 15.95 19.38 27.70 24.23 30.52 38.08 53.03 9.00 12.20 17.00 27.00 35.00 4.8 9.6 30 min C1/2 80.10 2.80 3.85 5.50 39.10 16.55 24.00 28.95 42.65 37.50 45.65 55.90 79.25 13.00 17.00 25.00 40.00 52.00 4.8 9.6 1h C1 95.1 3.4 4.7 6.8 11.5 20 29.4 41.7 52.2 43.7 53.3 70.6 95.8 16.00 21.00 30.00 51.00 66.00 4.95 9.9 3h C3 132.0 4.5 6.3 9.0 15.0 26.7 40.8 51.9 68.4 58.8 72.3 87.9 138.0 21.00 29.00 40.00 68.00 88.00 5.1 10.2 5h C5 143.5 5.0 7.0 10.5 16.5 29.0 44.5 57.5 74.5 66.0 85.0 98.0 152.0 23.00 31.00 43.00 75.00 97.00 5.1 10.2 10 h C10 165.0 5.5 8.5 12.0 20.0 32.0 50.0 65.0 85.0 90.0 100.0 120.0 180.0 26.00 37.00 48.00 85.00 110.00 5.4 10.8

All technical data refer to 20 C.

9.2.2 A 500

Discharge time tn Capacity Cn A502/10.0 A504/3.5 A506/1.2 A506/3.5 A506/4.2 A506/6.5 A506/10.0 A508/3.5 A512/1.2 A512/2.0 A512/3.5 A512/6.5 A512/10.0 A512/16.0 A512/25.0 A512/30.0 A512/40.0 A512/55.0 A512/60.0 A512/65.0 A512/85.0 A512/115.0 A512/120.0 A512/140.0 A512/200.0 Uf [V] (2 V cell) Uf [V] (4 V bloc) Uf [V] (6 V bloc) Uf [V] (8 V bloc) Uf [V] (12 V bloc)

10 min C1/6 4.8 1.4 0.5 1.4 1.1 2.6 4.8 1.4 0.5 0.8 1.4 2.6 4.8 7.0 7.8 11.4 14.1 19.3 22.2 22.6 33.1 37.8 44.5 50.5 68.5 1.6 3.2 4.8 6.4 9.6

30 min C1/2 6.4 1.95 0.67 1.95 1.75 3.5 6.4 1.95 0.67 0.11 1.95 3.8 6.4 9.0 11.45 16.3 19.5 27.5 31.0 33.8 47.5 58.5 62.0 71.5 101 1.6 3.2 4.8 6.4 9.6

1h C1 7.1 2.3 0.8 2.3 2.5 4.0 7.1 2.3 0.8 1.5 2.3 4.0 7.1 10.6 14.4 20.1 24.0 35.7 37.1 41.0 59.0 67.0 74.0 85.4 120.0 1.65 3.3 4.95 6.6 9.9

3h C3 9.0 3.0 1.05 3.0 3.8 4.8 9.0 3.0 1.05 1.8 3.0 4.8 9.0 13.8 18.6 24.6 28.5 43.0 48.6 53.7 69.0 84.0 89.7 105.3 151.8 1.70 3.4 5.1 6.8 10.2

5h C5 9.5 3.15 1.1 3.15 3.95 5.5 9.5 3.15 1.1 1.85 3.15 5.5 9.5 14.5 20.5 26.5 34.0 46.5 52.0 58.5 75.5 95.0 96.0 113.0 164.0 1.70 3.4 5.1 6.8 10.2

10 h C10 10.0 3.3 1.0 3.3 4.0 6.3 10.0 3.3 1.0 1.9 3.3 6.3 10.0 15.0 22.0 27.0 36.0 50.0 56.0 62.0 80.0 104.0 102.0 119.0 173.0 1.80 3.6 5.4 7.2 10.8

20 h C20 10.0 3.5 1.2 3.5 4.2 6.5 10.0 3.5 1.2 2.0 3.5 6.5 10.0 16.0 25.0 30.0 40.0 55.0 60.0 65.0 85.0 115.0 120.0 140.0 200.0 1.75 3.5 5.25 7.0 10.5

All technical data refer to 20 C. 9.2.3 A 600 The nominal voltage, the number of cells, the nominal capacity (C10 = CN) and the battery type are described on the cell label. Other capacities (Cn) at different discharge currents (In) and discharge times (tn) can be calculated with the help of the following example and table below. Example: Calculation of the 5h discharge data: Type plate on cell: 6 OPzV 600 Code : with single cells the nominal voltage is not shown 6 = n = Number of positive plates (pI) OPzV = Type = Stationary/tubular/valve regulated 600 = nominal capacity in Ah(C10), capacity of discharge with 10 h-current (I10) for a time of 10 h (t10) Calculation of the plate type: C10/n = 600 Ah/ 6 pl = 100 Ah/pl Calculation of the 5h capacity (C5) of the battery: C5 = (C5/pl) x n = 86Ah/pl x 6 = 516 Ah Calculation of the 5h discharge current (I5): I5 = C5/t5 = 516Ah/ 5h = 103.2 A Calculation of the final discharge voltage (Uf): The final discharge cell voltage Uf (1.77 V) at a discharge time of tn = 5 h is listed in the table.

Stationary lead acid batteries OPzV (DIN 40742) with pos. tubular plates and neg. grid plates Discharge time tn Capacity [Ah]/plate at tn 50 Ah 70 Ah 100 Ah * 125 Ah Uf in Volt per cell * 1h C1 26.5 37.0 52.0 62.0 1.67 3h C3 37.5 52.5 75.0 93.0 1.75 5 h* C5 43.0 60.0 86.0 105.0 1.77 10 h C10 50.0 70.0 100.0 125.0 1.80

* Values for calculation examples

All technical data refer to 20 C.

9.2.4 A 700 Discharge time tn Capacity Cn [Ah] A706/21 A706/42 A706/63 A706/84 A706/105 A706/126 A706/140 A706/175 A706/210 A704/245 A704/280 Uf [V] (4 V bloc) Uf [V] (6 V bloc) 10 min C1/6 7.1 14.2 21.3 28.3 35.4 42.5 42.3 52.9 63.5 74.1 84.6 3.2 4.8 30 min C1/2 10.3 20.5 30.8 41.0 51.3 61.5 69.5 86.9 104.3 121.7 139.0 3.2 4.8 1h C1 12.2 24.4 36.6 48.8 61.0 73.2 85.3 106.6 128.0 149.3 170.6 3.3 4.95 3h C3 16.5 33.0 49.5 66.0 82.8 99.3 117.0 146.4 175.5 204.9 234.0 3.4 5.1 5h C5 19.0 38.0 57.0 76.5 95.5 114.5 131.0 163.5 196.0 229.0 261.5 3.4 5.1 10 h C10 21.0 42.0 63.0 84.0 105.0 126.0 140.0 175.0 210.0 245.0 280.0 3.6 5.4

All technical data refer to 20 C.

Deutsche EXIDE GmbH Im Thiergarten 63654 Bdingen - Germany Tel.: +49 (0) 60 42 / 81 544 Fax: +49 (0) 60 42 / 81 398 www.networkpower.exide.com

State: December 2003

35 0 33200 10

Sonnenschein SOLAR, SOLAR BLOCK, A 600 SOLAR Operating Instruction 33200 Stationary valve regulated lead acid batteries
Nominal data Nominal voltage UN Nominal capacity CN = C100 Nominal discharge current IN = I100 Final discharge voltage Uf Nominal temperature TN Assembly by: Commissioned by: Security signs attached by: : : : : : 2.0 V x number of cells 100h discharge (see type plate on cells/blocs and technical data in these instructions) I100 = C100 / 100h see technical data in these instructions 20C EXIDE Technologies order no.: date: date: date: 2.1 Discharge Discharge must not be continued below the voltage recommended for the discharge time. Deeper discharges must not be carried out unless specifically agreed with the manufacturer. Recharge immediately following complete or partial discharge. 2.2 Charging All charging must be carried out acc. to DIN 41773 (IU-characteristic). Recommended charge voltages for cyclical application: See fig. 1 and item 2.8. According to the charging equipment, specification and characteristics alternating currents flow through the battery superimposing onto the direct current during charge operation. Alternating currents and the reaction from the loads may lead to an additional temperature increase of the battery, and strain the electrodes with possible damages (see 2.5), which can shorten the battery life. 2.3 Maintaining the full charge (float charge) Devices complying with the stipulations under DIN 41773 must be used. They are to be set so that the average cell voltage is as follows (within temperature range 15 to 35 C): SOLAR, SOLAR BLOCK: 2.30 Vpc 1% A 600 SOLAR: 2.25 Vpc 1% 2.4 Equalizing charge Because it is possible to exceed the permitted load voltages, appropriate measures must be taken, e.g. switch off the load. Equalizing charges are required after deep discharges and/or inadequate charges. They have to be carried out as follows: Up to 48 hours at max. 2.40 Vpc. The charge current must not exceed 35 A/100 Ah nominal capacity. The cell/bloc temperature must never exceed 45C. If it does, stop charging or revert to float charge to allow the temperature to drop. For system voltages 48 V every one to three months: Method 1: IUI I-phase = up to voltage acc. to fig.1 at 20C U-phase = until switching at a current of 1.2 A/100Ah to the second I-phase I-phase = 1.2 A/100Ah for 4 hours Method 2: IUI pulse I-phase = up to voltage acc. to fig. 1 at 20C U-phase = until switching at a current of 1.2 A/100 Ah to the second I-phase (pulsed) I-phase = charging of 2 A/100 Ah for 4-6 hours where the pulses are 15 min. 2 A/100 Ah and 15 min. 0 A/100 Ah.

Observe these Instructions and keep them located near the battery for future reference. Work on the battery should be carried out by qualified personnel only. Do not smoke. Do not use any naked flame or other sources of ignition. Risk of explosion and fire. While working on batteries wear protective eye-glasses and clothing. Observe the accident prevention rules as well as EN 50 272-2, DIN VDE 0510, VDE 0105 Part 1. Any acid splashes on the skin or in the eyes must be flushed with plenty of clean water immediately. Then seek for medical assistance. Spillages on clothing should be rinsed out of water! Explosion and fire hazard, avoid short circuits. Electrolyte is very corrosive. In normal working conditions the contact with the electolyte is impossible. If the cell/bloc container is damaged do not touch the exposed electrolyte because it is corrosive. Cells are heavy! Always use suitable handling equipment for transportation! Handle with care because cells are sensitive to mechanical shock.

Caution! Metal parts of the battery are always alive, therefore do not place items or tools on the battery.

Non-compilance with operating instructions, repairs made with other than original parts, or repairs made without authorization (e. g. opening of valves) render the warranty void.

Disposal of Batteries
Pb

Batteries marked with the recycling symbol should be processed via a recognised recycling agency. By agreement, they may be returned to the manufacturer. Batteries must not be mixed with domestic or industrial waste.

Stationary valve regulated lead acid batteries do not require topping-up water. Pressure valves are used for sealing and can not be opened without destruction. 1. Start Up Check all cells/blocs for mechanical damage, correct polarity and firmly seated connectors. Apply the following torques for screw connectors:

Control of insulation resistance: New batteries: > 1M Used batteries: > 100 /Volt. Connect the battery with the correct polarity to the charger (pos. pole to pos. terminal). The charger must not be switched on during this process, and the load must not be connected. Switch on charger and start charging following item 2.2. 2. Operation For the installation and operation of stationary batteries DIN VDE 0510, part 1 (draft) and EN 50 272-2 is mandatory. Battery installation should be made such that temperature differences between individual cells/ blocs do not exceed 3 degrees Celsius (Kelvin).

G5 5 1 Nm

G6 6 1 Nm

A 8 1 Nm

M8 20 1 Nm

Rubber covers shall be fitted to both ends of the connector cables (pole covers) before installation.

1. Maximum storage time is 17 months at 20 C. Equalizing charges will be required at higher temperatures, for instance, after 8.5 months at 30 C. 2. Float charging as detailed in 2.3. 7. Transport Cells/bloc batteries must be transported in an upright position. Batteries without any visible damage are not defined as dangerous goods under the regulations for transport of dangerous goods by road (ADR) or by railway (RID). They must be protected against short circuits, slipping, upsetting or damaging. Cells/bloc batteries may be suitable stacked and secured on pallets (ADR and RID, special provision 598). It is prohibited to staple pallets. No dangerous traces of acid shall be found on the exteriors of the packing unit. Cells/bloc batteries whose containers leak or are damaged must be packed and transported as class 8 dangerous goods under UN no. 2794.

Fig. 1: Charge voltage vs. temperature for solar mode. Charge modes: 1) With switch regulator (two-step controller): Charge on curve B (max. charge voltage) for max. 2hrs per day, then switch over to continuous charge Curve C 2) Standard charge (without switching) Curve A 3) Boost charge (Equalizing charge with external generator): Charge on curve B for max. 5hrs per month, then switch over to curve C.

2.5 Alternating currents When recharging acc. to fig.1 the actual value of the alternating current is occasionally permitted to reach 10 A (RMS)/ 100 Ah nominal capacity. In a fully charged state during float charge the actual value of the alternating current must not exceed 5 A (RMS)/ 100 Ah nominal capacity. 2.6 Charging currents The charging current should range between 10 A to 35 A / 100Ah nominal capacity (guide values). 2.7 Temperature The recommended operation temperature range for lead acid batteries is 10 C to 30 C (best 20 C 5 K). Higher temperatures will seriously reduce service life. Lower temperatures reduce the available capacity. The absolute maximum temperature is 55 C and should not exceed 45 C in service. 2.8 Temperature-related charge voltage A temperature related adjustment of the charge voltage within the operating temperature of 15 C to 35 C is not necessary. If the operating temperature is constantly outside this range, the charge voltage has to be adjusted (see fig.1). 2.9 Electrolyte The electrolyte is diluted sulphuric acid and fixed in a gel. 3. Battery maintenance and control Keep the battery clean and dry to avoid leakage currents. Plastic parts of the battery, especially containers, must be cleaned with pure water without additives. At least every 6 months measure and record: Battery voltage Voltage of several blocs/cells Surface temperature of several blocs/cells Battery-room temperature

Type 2 V cells 6 V blocs 12 V-blocs

Upper value +0.2 +0.35 +0.48

Lower value -0.1 -0.17 -0.24

In addition, annual measurements and recording: Voltage of all blocs/cells Surface temperature of all blocs/cells Battery-room temperature Annual visual checks: Screw connections Screw connections without locking device have to be checked for tightness. Battery installation and arrangement Ventilation 4. Tests Tests have to be carried out according to IEC 896-2, DIN 43539 part 1 and 100 (draft). Special instructions like DIN VDE 0107 and DIN VDE 0108 have to be observed. Capacity test, for instance, acceptance test on site: In order to make sure the battery is fully charged the following IU-charge methods must be applied: Option 1: float charge (see item 2.3), 72 hours. Option 2: 2.40 Vpc, 16 hours (max. 48 hours) followed by float charge (see item 2.3), 8 hours. The current available to the battery must be between 10 A/100 Ah and 35 A/100Ah of the nominal capacity 5. Faults Call the service agents immediately if faults in the battery or the charging unit are found. Recorded data as described in item 3. must be made available to the service agent. It is recommended that a service contract is taken out with your agent. 6. Storage and taking out of operation To store or decommission cells for a longer Period of time they should be fully charged and stored in a dry and cold but frost-free room, away from direct sun light. To avoid damage the following charging methods can be chosen:

If the bloc/cell voltages differ from the average float charge voltage by values more than specified in the following table or if the surface temperature difference between blocs/cells exceeds 5 K, the service agent should be contacted.

8. Technical data: Capacities at different discharge times and final discharge voltage. All technical data refer to 20 C. 8.1 Sonnenschein SOLAR Discharge time Capacity S 12 / 6.6 S S 12 / 17 G5 S 12 / 27 G5 S 12 / 32 G6 S 12 / 41 A S 12 / 60 A S 12 / 85 A S 12 / 90 A S 12 / 130 A S 12 / 230 A Uf (cell) 8.2 Sonnenschein SOLAR BLOCK Discharge time Capacity SB 12 / 60 SB 12 / 75 SB 12 / 100 SB 12 / 130 SB 12 / 185 SB 06 / 200 SB 06 / 330 Uf (cell) 8.3 Sonnenschein A 600 SOLAR Discharge time Capacity 4 OPzV 240 5 OPzV 300 6 OPzV 360 5 OPzV 400 6 OPzV 500 7 OPzV 600 6 OPzV 720 8 OPzV 960 10 OPzV 1200 12 OPzV 1400 12 OpzV 1700 16 OPzV 2300 20 OPzV 2900 24 OPzV 3500 Uf (cell) 1h C1 [Ah] 108 135 162 180 225 270 324 432 540 630 765 1035 1305 1575 1.67 Vpc 3h C3 [Ah] 151 189 227 252 315 378 454 605 756 882 1071 1449 1827 2205 1.75 Vpc 5h C5 [Ah] 175 219 263 292 365 438 526 701 876 1022 1241 1679 2117 2555 1.77 Vpc 10 h C10 [Ah] 200 250 300 350 420 490 600 800 1000 1200 1500 2000 2500 3000 1.80 Vpc 100 h C100 [Ah] 240 300 360 400 500 600 720 960 1200 1400 1700 2300 2900 3500 1.85 Vpc 1h C1 [Ah] 34 48 57 78 103 104 150 1.7 Vpc 5h C5 [Ah] 45 60 84 101 150 153 235 1.7 Vpc 10 h C10 [Ah] 52 66 89 105 155 162 260 1.7 Vpc 20 h C20 [Ah] 56 70 90 116 165 180 280 1.75 Vpc 100 h C100 [Ah] 60 75 100 130 185 200 330 1.80 Vpc 1h C1 [Ah] 2.9 9.3 15 16.9 21 30 55 50.5 66 120 1.7 V/Z 5h C5 [Ah] 4.6 12.6 22.1 24.4 30.6 42.5 68.5 72 93.5 170 1.7 Vpc 10 h C10 [Ah] 5.1 14.3 23.5 27 34 47.5 74 78 104.5 190 1.7 Vpc 20 h C20 [Ah] 5.7 15 24 28 38 50 76 84 110 200 1.75 Vpc 100 h C100 [Ah] 6.6 17 27 32 41 60 85 90 130 230 1.80 Vpc

Competence Center: Deutsche EXIDE GmbH Im Thiergarten 63654 Bdingen Germany Tel.: +49 (0) 180 / 23 94 336 Fax: +49 (0) 60 42 / 81 360 www.networkpower.exide.com

Service: Deutsche EXIDE GmbH Odertal 35 37431 Bad Lauterberg Germany Tel.: +49 (0) 180 / 23 94 338 Fax: +49 (0) 180 / 23 94 339

State: October 2003

NXSSOOE00000000 Hellersche Druckerei Printed in Germany Subject to change