You are on page 1of 54

MINISTRY OF RAILWAYS ROAD OVER BRIDGES IN BIHAR TENDER DOCUMENTS FOR ConstructionofRoadoverBridgebothrailwayspanandadjacentapproachesspanincludingRei nforcedEarthwall/RetainingwallinlieuofLCNo:22(SPL)atKm.

264/1atNarakatiaganjyardo nBaruni-GorakpurRoute in Samastipur Division of East Central Railway. Package - ROB-II Tender No: IRCON/2049/ROB-II-BIHAR/TENDER/2013/16 ( PART-II) FINANCIAL BID MAY , 2013 IRCON INTERNATIONAL LIMITED (A Govt. of India Undertaking) C-4,DISTRICT CENTRE,SAKET,NEW DELHI-110017

GUIDELINES FOR FILLING UP THE BILL OF QUANTITIES 1 ThebillofquantitiesshallbereadinconjunctionwiththeInstructionstoTenderers,Append ixtotender,GeneralconditionsofContract,SpecialConditionsofContract,ParticularTec hnicalSpecifications,GeneralTechnicalSpecifications,Drawingsand other documents forming part of the tender documents. 2 Generaldirectionsanddescriptionsofworkandmaterialsarenotnecessarilyrepeatednorsu mmarizedintheBillofQuantities.Referencestotherelevantsectionsofthecontractdocume ntationshallbemadebeforequotingratesintheBillof Quantities. 3 ThequantitiesgivenintheBillofQuantitiesareestimatedandprovisional,andaregiventop rovideacommonbasisforbidding.Thebasisofpaymentwillbetheactualquantitiesofworkord eredandcarriedout,asmeasuredbytheContractorandVerifiedbytheEngineerandvaluedatth eacceptedrates,whereapplicable,andotherwiseatsuchratesandpricesasthe Engineer ma y fix within the terms of the Contract. 4 TheratesandpricestenderedinthepricedBillofQuantitiesshall,exceptinsofarasitisoth erwiseprovidedundertheContract,includeallConstructionalPlant,labour,supervision, materials,transportation,erection,maintenance,insurance, profit, taxes and duties, together with general risks, liabilities and obligatio ns set out or implied in the Contract. 5 SingleRatesshallbeQuotedbythetenderersinfiguresandwords,intermsofpercentageAbove /atPar/BelowthepricedBill of Quantities for Part I & Part II together. BILL OF QUANTITIES Sub.:TenderforconstructionofRoadoverBridgebothrailwayspanandadjacentapproachspan includingReinforcedEarthwall/RetainingwallinlieuofLC-22(SPL)atKm264/1atNarakatia ganjyard`onBarauni-GorakhpurRouteinSamastipurDivisionofE C Railway , Bihar. ABSTRACT OF COST SCHEDULED ITEMS (A.1 to A.3) DESCRIPTION AMOUNT (in Rs) "A" RAILWAY PORTION (ABOVE EXISTING & FUTURE TRACKS) EXCLUDING 95,900,424 SCHEDULED ITEMS (B.1 to B.6) "B"

APPROACH PORTION (EXCLUDING RAILWAY PORTION) 537,184,944 GRAND TOTAL (SCHEDULE "A" + "B") Rs 633,085,368

I/Weoffertherates* ..%( %age)above/atpar/below(strikeoutwhichisnot ap otal Bill of Quantities (i.e. Schedule ("A" +"B") together)

TOTAL QUOTED COST : * %age rates to be quoted in both figures and words. Stamp and Signature of the Tenderer

BILL OF QUANTITIES Sub.:TenderforconstructionofRoadoverBridgebothrailwayspanandadjacentapproachspan includingReinforcedEarthwall/RetainingwallinlieuofLC-22(SPL)atKm264/1atNarakatia ganjonBarauni-GorakhpurRouteinSamastipurDivisionofECRailway, Bihar. SCHEDULE "A": - RAILWAY PORTION (ABOVE EXISTING & FUTURE TRACKS) EXCLUDING SN DESCRIPTION OF ITEMS UNIT QTY RATE AMOUNT (in Rs) A-1 FOUNDATION A.1.1 Providingandinstallingboredcast-in-situverticalpilesof1000mmdiameterinM-35gradeo fReinforcedCementconcreteusingOrdinaryPortlandCementofgrade53allcomplete(includi ngcostofallmaterialslabouretcexceptreinforcementsteel,whichwillbepaidasperitemA1 .4), as per specifications A.1.1.1 In all types of soil except hard rock. i) 1000mm dia piles. Meter 2000.00 10,883.00 21,766,000.00 A.1.1.2 EmptyboringfromworkingplatformtocutofflevelincludingprovisionofTemporaryguidecas ingifnecessaryatcontractor sowncostandextracuttngandtaking away the same after the casting of pile. i) 1000mm dia piles. Meter 160.00 Piles & Pilecaps

652.00 104,320.00 A.1.1.3 Manufacturing,bending,weldingsupplyinganddrivinginposition6mmthickM.S.Liner(perm anent)includingthecostofM.S.Plate.Rateincludescostofalllabourandmaterials. i) 1000mm mm dia piles. MT 36.00 59,926.00 2,157,336.00 Note:ThisitemA1.1.3shallbeoperatedonlywheretheMSLinersarerequiredaspersitecondit ion,tobeleftpermanentlyinthework.Paymentwillbemadefromthecut off level to bottom of Liner.

A)The scope of work in the above items include: 1)Thecostofallinitiallayoutofpilesandsettingout, initial excavation, if any. 2)Thecostofboringthroughalltypesofsoils/existingroad/pavement,removalofallobstru ctionlikeboulders, oldfoundationconcretebychiselingoranyothermethodasapprovedbytheEngineer-in-Charg e.Ifaboreisabandonedforanyreasonnopaymentshallbemadeforsuchincompleteboringandsh iftingoftheequipment's. Thecostoffillingupoftheemptybore,ifrequired.willbeborne by contractor 3)Thecostofpreparation,circulationandhandlingofbentonite slurry is included in t his rate. 4)Thecostofdisposalofallspoils,bentonitewastetokeepthe work area neat. 5)Thecostofprovidingtemporarylineranditswithdrawal,ifrequiredbelowadjoininggroun dlevel(irrespectiveoftheR.L.oftheadjoininggroundlevel)forvertical piles. 6)Thecostofprovidingandmixingallingredientsofcementconcrete(exceptreinforcements teel)includingadmixtures,withbatchingplant,transportation, placementofconcretebytremiepipefortherequiredlengthsofpileincludingprovidingcove rblocks,stiffeners, handling bars etc. for safe handling of reinforcement cage. 7)Thecostofbreakingofpileheadnotearlierthan3daysafterconcretingandtoremovespoilc oncretetobringthepileheadtothesocketinglevelincluingcleaningandarrangingtheexten dedreinforcementbarsasperdrawings. 8)Thecostofworkingforallleads,lifts,pumping/bailingout of water, labour, materia l and equipment etc. 9)Thecostofmobilizingtosite,installationatdifferentlocationstransferring/dismant ling,shifting,reinstallingandremovalfromsiteofthepilingrigsand/orotherequipment'

sandallaccessoriesincludingworkingplatforms.

10)Thecostofidentification,protectionandmaintenanceofexistingservices,ifany,whic hintheopinionofEngineer-in-chargearelikelytobeaffectedbypilingoperationincl.temp oraryshiftingofsuchservicestofacilitatepilingjobshallalsohavetobedone,ifsorequir edbytheEngineer-in-ChargeandthecostforthesameasassessedbytheEngineer-in-Chargesh allbereimbursable. 11)ThecontractorhastobemadebaricaddingwithG.I. Sheet/steelsheetwithverticalpostbysuitablesectionofsteelangle/pipeatminimumheigh tof1.5mfromtheexistingroadlevelduringtheexecutionofthework.Thecontractorhastobem anagethealltrafficsafetyrequirements during the execution period. 12)Thecostofallincidentals,labour,material,equipmentandworksrequiredtoexecutethe job.Theitemalsoincludesanyotherincidentalexpendituresforcompletingthe job as per the direction of the engineer-in-charge. 13)Theitemincludesthecostoftestingofallthematerialsinvolvedintheexecutionoftheit emasperQAP. 14)Temperorydiversionroadifanyconstructedshallbepaid seperately as per Non sched uled items. B) Mode of Measurement : 1)Lengthofpileshallbemeasuredfromcutoffleveltothetipofthepilecorrecttoacmincasew herethepileisterminated. 2)Reinforcementsteelshallbemeasured&paidseparately under relevant schedule item A 1.4. A.1.2 Load test of piles A.1.2.1 InitialverticalLoadtestingoftestpilesasperthespecificationsdulysupplementedwithI S:2911(PartIV) with latest amendments thereto all complete. . i) 1000 mm dia piles. Nos. 2.00 306,690.00 613,380.00 A1.2.2 HorizontalLoadtestingoftestpilesasperthespecificationsdulysupplementedwithIS:291 1(PartIV) with latest amendments thereto all complete. Nos. 2.00

101,687.07 203,374.14 i) 1000 mm dia piles. A)The scope of work in the item includes: 1)Thecostofmakingofpileheadreadyfortestingatthedesired level. 2)Thecostofmobilizing,fabrication/makingoftestsetup,itsdismantling,removalandmak inggood,ifany, after the test is over. 3)Thecostofsupplyingalllabour,materials,equipment, instrumentationetc.includingitstransportationcomplete. 4)ThecostofRecordingandpresentationofdataasrequiredbytheEngineer-in-Charge.(Refe rAppendixDIS: 2911 (Part I/Sec I) for sample Data Sheet). 5)Thecostofsupporting/reactionarrangement(includingreactionpiles,ifany)fortheken tledgeload(kentledge load shall be 1.25 times the test load). 6) No working pile shall be used as a reaction pile. B) Mode of Measurement : 1)Measurementshallbemadeforeachcompletesetoftesting and reporting. 2) Initial test piles also shall be measured for payment like normal piles. A.1.2.3 RoutineverticaltestingofworkingpilesasperthespecificationsdulysupplementedwithIS :2911(PartIV) with latest amendments thereto all complete. i) 1000mm dia piles. Nos. 2.00 113,000.00 226,000.00 A)The scope of work in the item includes: 1)Thecostofmakingofpileheadreadyfortestingatthedesired level. 2)Thecostofmobilizing,fabrication/makingoftestsetup,itsdismantling,removalandmak inggood,ifany, after the test is over. http://t1.gstatic.com/images?q=tbn:ANd9GcRLDO4ko-3OI6BCTzjfIln9gJ4jVmRkxAD53UzQs wCwoRopegZgQg http://t1.gstatic.com/images?q=tbn:ANd9GcRLDO4ko-3OI6BCTzjfIln9gJ4jVmRkxAD53UzQs

wCwoRopegZgQg

3)Thecostofsupplyingalllabour,materials,equipment, instrumentationetc.includingitstransportationcomplete. 4)ThecostofRecordingandpresentationofdataasrequiredbytheEngineer-in-Charge.(Refe rAppendixDIS: 2911 (Part I/Sec I) for sample Data Sheet). 5)Thecostofsupporting/reactionarrangement(includingreactionpiles,ifany)fortheken tledgeload(kentledge load shall be 1.25 times the test load). 6) No working pile shall be used as a reaction pile. B) Mode of Measurement : 1)Measurementshallbemadeforeachcompletesetoftesting and reporting. Mode of Measurement: Measurementshallbemadeforeachsuccessfullycomplete set of testing and reporting p er pile. A.1.3 Pile cap A.1.3.1 Earthworkinexcavationforcastingpilecapinalltypeofsoils,weatheredrock,existingfoo tings,removalofboulders,concrete,ballast,stoneetcincludingprotectingtheexcavated sides,ifrequired,tillconcreting,bailingoutwatertokeeptheareacleananddryduringpla cementofreinforcementandconcretetilltheconcretesetsfinally. Theitemincludesthecostofdisposalofallspoils, dismantledmaterials,surplusearthforallleadsandlifts, andtokeeptheworkareaneatandtidyduringtheworkandthereafter.Paymentshallbemadebase donapprovedplandimensionsforPCCbelowpilecap.Thecostofbackfillingaroundthepilecap andrestorationofroad,ifrequired shall be included. CUM 1,092.00 41.00 44,772.00 A.1.3.2 ProvidingandlayingplaincementconcreteM15(aggregate20mmnominalsize)underthepileca p/ foundationsandbelowapproachslab.Therateshallincludethecostofalllabour,materialet ccompletejobincludingbailingoutwatertokeeptheareadryasperinstructionofEngineerin charge.Paymentshallbemadebased on approved plan dimensions for PCC. CUM 77.00 6,646.00

511,742.00 A.1.3.3 Providingandlayingreinforcedcementconcreteforconstructionofpilecapsandfoundation sinM-35gradeconcreteusingOrdinaryPortlandCementofgrade53, appropriatesand,aggregate,water,admixturesinsuitableproportionsasperapprovedmixd esign(proposedbycontractor),asperapproveddrawingssuppliedbytheEngineer-in-charge ,includingalltypesofshuttering,centering,necessarytools,plants,machinery, andallrelatedoperationsasrequiredtocompletetheworkwithallleads,liftsanddepthstru etoline,levelandpositionallcomplete(excludingthecostofreinforcementsteel, which will be paid as per item number A 1.4). CUM 706.00 8,856.00 6,252,336.00 A)The scope of work in the item includes. 1)Thecostofallinitiallayoutandsettingoutworkincluding identification of existing services, if any. 2)Thecostofallpumping/Bailingoutofwater,includingits labour, material and equipm ent's. 3)Thecostofprovidingcenteringandshutteringincludingitserection,dismantlingandrem ovalofformworkincludingallleadsandliftswithallrequiredtoolsandplants to the requ ired line and level.. 4)Thecostofprovidingandmixingallingredients(exceptreinforcementsteel)includingad mixturesetc.,withbatchingplant,transportation,placement,finishingandcuring of co ncrete.

5)Thecostofmaintenanceandprotectionofexistingservices,ifanywhichintheopinionofEn gineer-in-chargearelikelytobeaffectedbyanyrelatedactivitiesincludingtemporaryshi ftingofsuchservicestofacilitateconstructionofpilecapworksallalsohavetobedone,ifs orequiredbytheEngineer-in-charge,andthecostforthesameasassessedbytheEngineer-inChargeshallbereimbursable. 6)Thecostofinstallationofanyfixtureintothepilecap(cost of only fixture to be pai d separately). 7)ThecontractorhastobemadebaricaddingwithG.I. Sheet/steelsheetwithverticalpostbysuitablesectionofsteelangle/pipeatminimumheigh tof1.5mfromtheexistingroadlevelduringtheexecutionofthework.Thecontractorhastobem angethealltrafficsafetyrequirements during the execution period. 8)Thecostoftestingofallthematerialsinvolvedintheexecution of items as per QAP. 9)Thecostofallincidentallabour,materials,equipmentandworksrequiredtoexecutethejo basperdirectionsofengineer-in-charge. B) Mode of Measurement: 1)Measurementsshallbemadeforthefinishedvolumeofreinforcedcementconcreterestricte dtovolumeasperapproveddrawing(excludingcostofreinforcementsteelonly).Quantityofc oncreteofpiles,whichhasgoneintothepilecapsshallbededucted.Reinforcementshallbeme asured & paid separately as per item A 1.4. A 1.4 Reinforcement:Supply,cutting,bending,withallleads, liftsanddepths,fixinginpositionreinforcementofanydiameter,HYSDorTMTasperrelevant BISspecificationanddrawinginallRCC/PSCworksofthisscheduleA-1. Therateshallincludecostofallmaterialincludinglaps, tyingwire,bindingwire,coverblock,provisionofstools, chairs,spacerbars,supportbars,labour,transportation, storingandallotherincidentalcharges,tools&plantsetccomplete.Paymentshallbemadeas pertheoreticalrequirementandnowastageshallbepaid.Rateshallinclude all costs. MT 249.00 57,379.00 14,287,371.00 SUB TOTAL - A-1 46,166,631.14 A-2 SUBSTRUCTURE A.2.1 Providingandlayingreinforcedcementconcreteforconstructionofpiers,piercaps,abutme nt,abutmentcaps,anddirtwallinM-35gradeconcreteusingOrdinaryPortlandCementofgrade 53,appropriatesand, aggregate,water,admixturesinsuitableproportionsasperapprovedmixdesign(proposedby Piers, Abutments and bearings

contractor),asperapproveddrawingssuppliedbytheEngineer-in-charge, includingalltypesofshuttering,staging,centeringscaffolding,necessarytools,plants ,machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads,liftsa nddepthstruetoline,levelandpositionallcomplete(excludingthecostofreinforcementst eel, which will be paid as per item number A 2.5). CUM 623.00 9,615.00 5,990,145.00 A) The scope of work in the item includes 1)Thecostofallincidentalworkrequiredincludingproviding,placementandremoval,shift ingofshuttering, cleaning,oiling&maintenance,erection&removalofstaging,scaffoldingandformlineretc ,forpiers,piercaps, bearing pedestals and other works as stated in other parts of the tender document. 2)Thecostofcastingofamockpieratcastingyardtruetoline,levelandshapeasperthedirect ionoftheEngineerin-Charge.

3)Thecostofcastingofpier,piercaps,abutment, abutmentcapsetc.includingprovidingandmixingallingredientsandadmixturesetc.inBatc hingplant, transportation,placement,compaction,finishingandcuring,placinginpositioninsertsw ithpier/pedestalsasperspecificationandthedirectionoftheEngineer-incharge. 4)Thecostofdisposalofallspoilsandtokeeptheworkarea neat and tidy during the work and thereafter. 5)ThecostofBarricadingandallsafetyrequirementsasmentioned elsewhere in the tende r document. 6)Installationofanyfixturesintopier/piercapetc(costofonlyfixtures if any, to be paid separately). 7)Thecostofallincidentals,labour,material,equipmentandworksrequiredfortheexecuti onsofthejobasperthe direction of Engineer-in-charge. 8)Thecostoftestingallmaterialsinvolvedintheexecution of the item as per QAP. 9)Thecostofworkingforallleads,lifts,pumping/bailingout water, labour`, material and equipment etc. B) Mode of Measurement : 1)Measurementshallbemadeforthefinishedvolumeofconcreteonlyandwillberestrictedtot hedimensionsshown in the approved drawings. 2)Reinforcementsteelshallbemeasured&paidseparately as per item A 2.5. A.2.2 ProvidingandlayingreinforcedcementconcreteforconstructionofbearingpedestalinM-40 gradeconcreteusingOrdinaryPortlandCementofgrade53,appropriatesand,aggregate,wate r,admixturesinsuitableproportionsasperapprovedmixdesign(proposedbycontractor),in culdingplacing&fixingofBearingsinpositionasperdrawings(Bearingsshallbesuppliedby IRCONfreeofCostatitsstoreatPatnaorelsewherinBihar,thecontractorhastotransportthe sametotheworksitefromIRCONsStoreatitsowncost)theasperapproveddrawingssuppliedbyt heEngineer-in-charge, includingalltypesofshuttering,staging,centeringscaffolding,necessarytools,plants ,machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads,liftsa nddepthstruetoline,levelandpositionallcomplete(excludingthecostofreinforcementst eel, which will be paid as per item number A 2.5). CUM 50.00 9,831.00 491,550.00 A) The scope of work in the item includes 1)Scopeofworkinthisincludethescopeofworkasmentionedinitemno.2.1aboveexceptclause (2)ofA.2.1.(A) above.

B) Mode of Measurement :

1)Measurementshallbemadeforthefinishedvolumeofconcreteandwillberestrictedtothequ antityasperapproveddrawings.Reinforcementsteelshallbemeasured & paid separately as per item A 2.5.

A.2.3 PaintingbelowGL:Providinganticorrosivetreatmenttothepartsofsubstructureincontact withearthuptoGLwithonecoatofprimerandtwocoatsofAnticorrosiveCoaTarEpoxyPaintbelo wthegroundlevelonPilecaps, Piers,abutmentsetcwithalllabourmaterialtoolsandplants complete job. SQM 870.00 39.00 33,930.00 A.2.4 Paintingoverexposedsurfaces:PaintingthesurfaceswithAnticarbonation/Anticorrosive AcrylicPaintabovethegroundlevelonPiers,piercaps,etc.withalllabourmaterialtoolsan dplantscompletejobincludingsurfacepreparation at joints in approved colour. SQM 1,414.00 132.00 186,648.00

A.2.5 Reinforcement:Supply,cutting,Bending,fixinginpositionreinforcementofanydiameter, HYSDorTMTasperrelevantBISspecificationanddrawinginallRCC/PSCworksofthisscheduleA -2.Therateshallincludecostofallmaterialincludingtyingwire,labour,transportation, storingandallotherincidentalcharges,tools&plantsetc.Paymentshallbemadeaspertheor eticalrequirementand no wastage shall be paid. Rate shall include all costs. MT 188.00 58,455.00 10,989,540.00 SUB TOTAL - A-2 17,691,813.00 A-3 SUPERSTRUCTURE ProvidingandlayingreinforcedcementconcreteforconstructionofprecastPrestressedsup erstructuregirders/prestressedsolidslab/diaphragminpositionin M-45gradeconcreteusingOrdinaryPortlandCementofgrade53,appropriatesand,aggregate, water,admixturesinsuitableproportionsasperapprovedmixdesign(proposedbycontractor ),asperapproveddrawingssuppliedbytheEngineer-in-charge,includingalltypesofshutte ring,staging,centeringscaffolding,necessarytools, plants,machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads, liftsanddepthstruetoline,levelandpositionallcomplete(excludingthecostofreinforce mentsteel&HTSteel,whichwillbepaidasper relevent items respectively). CUM 1,021.00 10,548.00 10,769,508.00 A.3.1.1 A) The scope of work in the item includes 1)The cost of initial layout ensuring correct levels. 2)Thecostofallincidentalworksrequiredincludingprovidingcastingyard,castingbed,pr oviding,placementandremovalorshiftingofshuttering,staging,scaffoldingetc.andothe rworksasstatedinotherpartsofthetenderdocuments. 3)The cost of design of the job mix. 4)Thecostofprovidingandmixingallingredientsincludingadmixturesetc.withbatchingpl ant, transportation,placement,compaction,steamcuringandfinishingetc.,whichshallalsoin volvepreparationofsurface,placinginpositionwithanchoragesasperspecificationandth edirectionoftheEngineerincharge,

complete job. 5)Theitemincludesthecostofdisposalofallspoilsandtokeeptheworkareaneatandtidyduri ngtheworkandthere after. 6)Theitemincludesthecostofbarricadingandallsafetymeasuresincludingmanagementoftr afficasdesiredbytheEngineer-in-Chargeandasspecifiedelsewhereinthetender document . 7)Theitemincludesthecostoffoundationpreparationforstagingofsolidslabstagingandma kingcastingbedto take care of loads and settlements. 8)Thecostofallincidentals,labour,material,equipmentandworksrequiredfortheexecuti onsofthejobasperthe direction of Engineer-in-charge. 9)Thecostoftestingallmaterialsinvolvedintheexecution of the item as per QAP. 10)Thecostofworkingforallleads,lifts,pumping/ bailing out water, labour, material and equipment etc. B) Mode of Measurement : 1)Measurementshallbemadeforthevolumeoffinishedconcreteonlyandwillberestrictedtot hequantitiesasperthedimensionsshownintheapproveddawings.The reinforcementsteelshallbemeasured&paidseparatelywhich will be paid as per releve nt item .

A.3.1.2 Launching(byCrane),SideShifting&placing,temporaryrestrainingofprecastgirderinpos itiontruetolineandlevelincludingpulling,pushing,lateralshifting,loading, unloading,completeinallrespectasperdrg& specificationobservingallsafetymeasure,obtainingblockoftrainmovement/roadtraffic movementfromappropriateauthority,providingsuitablediversionifrequiredetccomplete job.Rateshallincludecostofalllabour ,lead, lift ascent, decent, crossing of trac ks. CUM 1,021.00 3,500.00 3,573,500.00 A.3.1.3 Supplying,makingintocablesandfixinginpositionH.T. steelcablesmadefromhightensilelowrelaxationstrands(anydia)inPSCgirderincludingcu ttingmakingintocableswithnecessaryspacersencasinginHDPEsheathingplacingofcableas perdrawingprovisionofanchrage'sendblocksstressing,cuttingblocking, groutingetccompletejob.PaymentshallbemadefortheweightofHTSwireconsumedfromendtoe nd.Howeverrateshallincludecostofallprestressingmaterial,toolsforstressing,grouti ngetc.Nothingextrashallbepaidforjacking length. MT 73.00 85,388.59 6,233,366.82 A.3.2 Providingandlayingreinforcedcementconcreteforconstructionofdeckslabs,diaphragms, crossbeams, cantileverfootpath/slabetcinM-45gradeconcreteusingOrdinaryPortlandCementofgrade5 3,appropriatesand, aggregate,water,admixturesinsuitableproportionsasperapprovedmixdesign(proposedby contractor),asperapproveddrawingssuppliedbytheEngineer-in-charge, includingalltypesofshuttering,staging,centeringscaffolding,necessarytools,plants ,machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads,liftsa nddepthstruetoline,levelandpositionallcomplete(excludingthecostofreinforcementst eel, which will be paid as per relevent item ). CUM 438.00 11,328.00 4,961,664.00 A.3.3

Crashbarrier:Providing&layingreinforcedcementconcretefortheconstructionofcrashba rrierincludingsupplying&fixingofthe65NBGIpipesteelrailing, providing150mmdiaPVCPipealongwith12diamesharounditasdetailedinthesketchenclosedi ntenderdocumentinM-40gradeconcreteusing53gradecementandappropriatesand,aggregate ,water,admixturesinsuitableproportionsasperapprovedmixdesign(proposedbycontracto r),asperapproveddrawingssuppliedbyEngineerincharge,includingalltypesofshuttering ,scaffoldings/staging,necessarytools,plants, machineryandallrelatedoperationsasrequiredtocompletetheworkwithalllead,lifts,dep ths,truetoline, levelandpositionbutexcludingthecostofreinforcementsteel(whichshallbepaidasperrel evantitemunderthisschedule)allcomplete.Theitemincludessupplying, fabricatingandfixingMetallicrailingontopoftheconcrete crash barriers, conforming to IS standards. RM 434.00 4,822.00 2,092,748.00 A) The scope of work in the item includes 1)Theitemincludesthecostofpreparationandsubmissionofdetailedshopdrawings,fabrica tion,castingfixtures,placingandfixinginpositionusingrequiredfasteners and pickli ng. 2)Theitemincludesthecostoftwocoatsofpaintingalongwithonecoatofanticorrosiveprime rforsteelportiononly. 3)Theitemincludesthecostoftestingofallthematerialsinvolved in the execution of t he item as per QAP. 4)Theitemincludesallotherincidentalexpenditureforcompletingthejobsasperthedirect ionsofEngineer-incharge. B) Mode of Measurement : 1)ThemeasurementsshallbemadeinRunningMetersof the completed railing.

A.3.4 Paintingoverexposedsurfaces:PaintingtheexposedsurfacesofsuperstructurewithAntica rbonation/ AnticorrosiveAcrylicPaintwithalllabourmaterialtoolsandplantscompletejobincluding surfacepreparationatjoints in approved colour. SQM 434.00 132.00 57,288.00 A.3.5 ProvidingandinstallingSinglestripsealexpansionjointsasperClause2607ofMORTHspecif icationsforRoadandBridgeWorks(FourthRevision)2001supplementedwithmanufacturer srec ommendations.Entireinstallationistobecarriedoutstrictlyinthepresenceofmanufactur er'srepresentativeonly,atalltimes.Thesealoftheexpansionjointshallbesuchasnottope rmitanydustcollectionatall times. (i) with a total allowable movement upto 140 mm RM 96.00 7,508.00 720,768.00 A) The scope of work in the item includes: 1)Costofallmaterials,labour,equipmentandotherincidentalchargesforexecutionofthis item.Supervisionduring installation by the manufacturer is also included. 2)Installation&fixingofexpansionjointsaspermanufacturersspecificationsanddesign/ drawingapprovedbytheengineer-in-chargeincludingchippingofconcrete,cleaningofconc reteandreinforcementbars, leveling, necessary shuttering, pre-setting, welding etc. 3)Itemtoincludenecessaryprovisionandfillingofrecessfor the expansion joints at n o extra cost. 4)Theitemincludesthecostoftestingofallthematerialsinvolvedintheexecutionoftheite masperQAPandtestingofcompletedandinstalledjointsapertheacceptance criteria of MO RTH. B) Mode of Measurement : 1)Theexpansionjointsshallbemeasuredinrunningmeters.Thelengthpayableistheactualle ngthprovidedatsiteincludingverticalpartsofkerbs/crashbarriers, footpath etc. A.3.6 DrainageSystem:ProvidingandlayingG.Idrainpipes,

spouts,GIsteelgratingsoverformedholesindeckslab, fixing100mmdiaG.Irunnerpipesand100mmdiaGIdowntakepipesofapprovedqualityateverypi eretc.asperapproveddrawingsincludingbends,collars,clamps, fasteners, threading etc., complete. a) 100 mm dia water spout with GI grating. Nos. 73.00 910.00 66,430.00 b) 100 mm dia P.V.C runner pipes / downtake pipes. M 599.00 1,212.00 725,988.00 A)The scope of work in the item includes: 1)Theproviding,placing,joiningandfixingthedrainagepipeswithallnecessaryfittings, toolsandtackles, bends,clamps,screwsetc.,completeaspertheapproveddrawing. 2)Thecostofworkstomaketapingallpointstobeleakproof,testedetc.includingallcoupler s,materials, manpowerandtoolandtackleetc.completeasperthedirection of Engineer-in-charge. B) Mode of Measurement : 1)Themeasurementshallbemadeinnumbersforthedrainageportsuppliedandinstalledatsite .ThepaymentforthepipeswillbemadeinRunningmeters.Thequantitywillberestrictedtothe lengthasshownintheapproved drawings. A 3.7 Reinforcement:Supply,cutting,Bending,fixinginpositionreinforcementofanydiameter, HYSDorTMTasperrelevantBISspecificationanddrawinginallRCC/PSCworksofthisscheduleA -3.Therateshallincludecostofallmaterialincludingtyingwire,labour,transportation, storingandallotherincidentalcharges,tools&plantsetc.Paymentshallbemadeaspertheor eticalrequirementand no wastage shall be paid. Rate shall include all costs. MT 145.00 59,064.00 8,564,280.00 SUB TOTAL - A-3 17,189,166.00

A.4 STAIRCASE IN RAILWAY SPAN

A.4.1 Earthworkinexcavationforcastingfoundationofstaircaseinalltypeofsoils,weatheredro ck,existingfootings, removalofboulders,concrete,ballast,stoneetcincludingprotectingtheexcavatedsides, ifrequired,tillconcreting, bailingoutwatertokeeptheareacleananddryduringplacementofreinforcementandconcrete tilltheconcretesetsfinally.Theitemincludesthecostofdisposalofallspoils,dismantle dmaterials,surplusearthforallleadsandlifts,andtokeeptheworkareaneatandtidyduring theworkandthereafter.PaymentshallbemadebasedonapprovedplandimensionsforPCCbelowp ilecap/foundation.Thecostofbackfillingaroundthepilecap/foundationandrestorationo froad,ifrequiredshallbe included. CUM 875.00 54.00 47250 A.4.2 ProvidingandlayingplaincementconcreteM15(aggregate20mmnominalsize)underfoundatio ns.Therateshallincludethecostofalllabour,materialetccompletejobincludingbailingo utwatertokeeptheareadryasperinstructionofEngineerincharger.Paymentshallbemadebas edonapprovedplandimensionsforPCC. CUM 58.00 6,912.00 400896 A.4.3 ProvidingandlayingreinforcedcementconcreteforconstructionofstaircaseinM-35gradec oncreteusingOrdinaryPortlandCementofgrade43or53,appropriatesand,aggregate,water, admixturesinsuitableproportionsasperapprovedmixdesign(proposedbycontractor),aspe rapproveddrawingssuppliedbytheEngineer-in-charge,includingalltypesofshuttering, centering,necessarytools,plants,machinery,andallrelatedoperationsasrequiredtocom pletetheworkwithallleads,liftsanddepthstruetoline,levelandpositionallcomplete(ex cludingthecostofreinforcementsteel, which will be paid as per item number A 4.4). CUM 448.00 8,787.00 3936576 A 4.4 Reinforcement:Supply,cutting,bending,withallleads, liftsanddepths,fixinginpositionreinforcementofanydiameter,HYSDorTMTasperrelevant

BISspecificationanddrawinginallRCC/PSCworksofthisscheduleA-4. Therateshallincludecostofallmaterialincludingtyingwire,bindingwire,coverblock,pr ovisionofstools,chairs, spacerbars,supportbars,labour,transportation,storingandallotherincidentalcharges ,tools&plantsetccomplete.Paymentshallbemadeaspertheoreticalrequirementandnowasta geshallbepaid.Rateshallinclude all costs. MT 54.00 58,455.00 3156570 A.4.5 Supplyingandfixingnon-skidtiles/chequeredtiles(25mmthick)onthestepsofstaircaseas perdrawingsand specification complete as directed by engineer SQM 568.00 903.00 512904.00 Total of A-4 schedule = 8,054,196.00

A-5 FOOT OVER BRIDGE A.5.1 Earthworkinexcavationforcastingfoundationofstaircaseinalltypeofsoils,weatheredro ck,existingfootings, removalofboulders,concrete,ballast,stoneetcincludingprotectingtheexcavatedsides, ifrequired,tillconcreting, bailingoutwatertokeeptheareacleananddryduringplacementofreinforcementandconcrete tilltheconcretesetsfinally.Theitemincludesthecostofdisposalofallspoils,dismantle dmaterials,surplusearthforallleadsandlifts,andtokeeptheworkareaneatandtidyduring theworkandthereafter.PaymentshallbemadebasedonapprovedplandimensionsforPCCbelowp ilecap/foundation.Thecostofbackfillingaroundthepilecap/foundationandrestorationo froad,ifrequiredshallbe included. CUM 660 54.00 35640 A.5.2 ProvidingandlayingplaincementconcreteM15(aggregate20mmnominalsize)underfoundatio ns.Therateshallincludethecostofalllabour,materialetccompletejobincludingbailingo utwatertokeeptheareadryasperinstructionofEngineerincharger.Paymentshallbemadebas edonapprovedplandimensionsforPCC. CUM 40 6,912.00 276480 A.5.3 ProvidingandlayingreinforcedcementconcreteforconstructionofstaircaseinM-35gradec oncreteusingOrdinaryPortlandCementofgrade43or53,appropriatesand,aggregate,water, admixturesinsuitableproportionsasperapprovedmixdesign(proposedbycontractor),aspe rapproveddrawingssuppliedbytheEngineer-in-charge,includingalltypesofshuttering, centering,necessarytools,plants,machinery,andallrelatedoperationsasrequiredtocom pletetheworkwithallleads,liftsanddepthstruetoline,levelandpositionallcomplete(ex cludingthecostofreinforcementsteel, which will be paid as per item number A.5.4. CUM 341 8,787.00 2996367

A 5.4 Reinforcement:Supply,cutting,bending,withallleads, liftsanddepths,fixinginpositionreinforcementofanydiameter,HYSDorTMTasperrelevant BISspecificationanddrawinginallRCC/PSCworksofthisscheduleA-5. Therateshallincludecostofallmaterialincludingtyingwire,bindingwire,coverblock,pr ovisionofstools,chairs, spacerbars,supportbars,labour,transportation,storingandallotherincidentalcharges ,tools&plantsetccomplete.Paymentshallbemadeaspertheoreticalrequirementandnowasta geshallbepaid.Rateshallinclude all costs. MT 45 58,455.00 2630475 A.5.5 Supplyingandfixingnon-skidtiles/chequeredtiles(25mm)onthestepsofstaircaseasperdr awingsandspecification complete as directed by engineer SQM 952 903.00 859656 Total of A-5 Schedule = 6,798,618.00 TOTAL SCHEDULE A1+A2+A3+A4+A5

(RS) 95,900,424.14

BILL OF QUANTITIES Sub.:TenderforconstructionofRoadoverBridgebothrailwayspanandadjacentapproachspan includingReinforcedEarthwall/RetainingwallinlieuofLC-22/SPLatKm264/1atNarakatiag anjyardSectiononBarauni-GorakhpurRouteinSamastipurDivisionofECRailway , Bihar. SCHEDULE "B": - APPROACH PORTION (EXCLUDING RAILWAY PORTION) SN DESCRIPTION OF ITEMS UNIT QTY RATE AMOUNT (in Rs) B-.1 FOUNDATION B.1.1 Providingandinstallingboredcast-in-situverticalpilesof1000mmdiameterinM35gradeof ReinforcedCementconcreteusingOrdinaryPortlandCementofgrade53allcomplete(includin gcostofallmaterialslabouretcexceptreinforcementsteel,whichwillbepaidasperitemB.1 .4),asper specifications B.1.1.1 In all types of soil except hard rock. i) 1000mm dia piles. Meter 5475.00 10,883.00 59,584,425.00 B.1.1.2 EmptyboringfromworkingplatformtocutofflevelincludingprovisionofTemporaryguidecas ingifnecessaryatcontractor sowncostandextracuttngandtakingawaythesame after the ca sting of pile. i) 1000 mm dia piles. Meter 438.00 652.00 Piles & Pilecaps

285,576.00 B.1.1.3 Manufacturing,bending,weldingsupplyinganddrivinginposition6mmthickM.S.Liner(perm anent)includingthecostofM.S.Plate.Rateincludescostofalllabourandmaterials. i) 1000mm dia piles. MT 98.00 59,926.00 5,872,748.00 Note:ThisitemB.1.1.3shallbeoperatedonlywheretheMSLinersarerequiredaspersitecondi tion,tobeleftpermanentlyinthework.Paymentwillbemadefromthecutoff level to bottom of Liner.

A)The scope of work in the above items include: 1)Thecostofallinitiallayoutofpilesandsettingout,initialexcavation, if any. 2)Thecostofboringthroughalltypesofsoils/existingroad/pavement,removalofallobstru ctionlikeboulders,oldfoundationconcretebychiselingoranyothermethodasapprovedbyth eEngineer-in-Charge.Ifaboreisabandonedforanyreasonnopaymentshallbemadeforsuchinc ompleteboringandshiftingoftheequipment's.Thecostoffillingupoftheemptybore,ifrequ ired.willbebornebycontractor 3)Thecostofpreparation,circulationandhandlingofbentonite slurry is included in t his rate. 4)Thecostofdisposalofallspoils,bentonitewastetokeepthe work area neat. 5)Thecostofprovidingtemporarylineranditswithdrawal,ifrequiredbelowadjoininggroun dlevel(irrespectiveoftheR.L. of the adjoining ground level) for vertical piles. 6)Thecostofprovidingandmixingallingredientsofcementconcrete(exceptreinforcements teel)includingadmixtures, withbatchingplant,transportation,placementofconcretebytremiepipefortherequiredle ngthsofpileincludingprovidingcoverblocks,stiffeners,handlingbarsetc.forsafehandl ing of reinforcement cage. 7)Thecostofbreakingofpileheadnotearlierthan3daysafter concreting and to remove s poil concrete to bring the pile headtothesocketinglevelincludingcleaningandarrangingthe extended reinforcement b ars as per drawings. 8)Thecostofworkingforallleads,lifts,pumping/bailingout of water, labour, materia l and equipment etc. 9)Thecostofmobilizingtosite,installationatdifferentlocationstransferring/dismant ling,shifting,reinstallingandremovalfromsiteofthepilingrigsand/orotherequipment' s and all accessories including working platforms.

10)Thecostofidentification,protectionandmaintenanceofexistingservices,ifany,whic hintheopinionofEngineer-inchargearelikelytobeaffectedbypilingoperationincl. temporaryshiftingofsuchservicestofacilitatepilingjobshallalsohavetobedone,ifsore quiredbytheEngineer-inChargeandthecostforthesameasassessedbytheEngineer-in-Charge shall be reimbursabl e. 11)ThecontractorhastobemadebaricaddingwithG.I. Sheet/steelsheetwithverticalpostbysuitablesectionofsteelangle/pipeatminimumheigh tof1.5mfromtheexistingroadlevelduringtheexecutionofthework.Thecontractorhastobem angethealltrafficsafetyrequirements during the execution period. 12)Thecostofallincidentals,labour,material,equipmentandworksrequiredtoexecutethe job.Theitemalsoincludesanyotherincidentalexpendituresforcompletingthe job as per the direction of the engineer-in-charge. 13)Theitemincludesthecostoftestingofallthematerialsinvolved in the execution of the item as per QAP. 14)Temperorydiversionroadifanyconstructedshallbepaid seperately as per Non sched uled items. B) Mode of Measurement : 1)Lengthofpileshallbemeasuredfromcutoffleveltothetipofthepilecorrecttoacmincasew herethepileisterminated.Therocklevelshallbedeterminedaspercriteriamentionedelsew hereinthetenderdocumentforpaymentofboring through rock. 2)Reinforcementsteelshallbemeasured&paidseparatelyunder relevant schedule item B 1.4. B.1.2 Load test of piles B.1.2.1 InitialverticalLoadtestingoftestpilesasperthespecificationsdulysupplementedwithI S:2911(PartIV)withlatest amendments thereto all complete. . i) 1000 mm dia piles. Nos. 3.00 306,690.00 920,070.00 B 1.2.2 HorizontalLoadtestingoftestpilesasperthespecificationsdulysupplementedwithIS:291 1(PartIV)withlatestamendments thereto all complete. Nos. 3.00

101,687.07 305,061.21 i) 1000 mm dia piles. A)The scope of work in the item includes: 1)Thecostofmakingofpileheadreadyfortestingatthedesired level. 2)Thecostofmobilizing,fabrication/makingoftestsetup, itsdismantling,removalandmakinggood,ifany,afterthetest is over. 3)Thecostofsupplyingalllabour,materials,equipment, instrumentation etc. including its transportation complete. 4)ThecostofRecordingandpresentationofdataasrequiredbytheEngineer-in-Charge.(Refe rAppendixDIS:2911(PartI/Sec I) for sample Data Sheet). 5)Thecostofsupporting/reactionarrangement(includingreactionpiles,ifany)fortheken tledgeload(kentledgeloadshall be 1.25 times the test load). 6) No working pile shall be used as a reaction pile. B) Mode of Measurement : 1)Measurementshallbemadeforeachcompletesetoftesting and reporting. 2)Initialtestpilesalsoshallbemeasuredforpaymentlikenormal piles. B.1.2.3 RoutineverticaltestingofworkingpilesasperthespecificationsdulysupplementedwithIS :2911(PartIV)withlatest amendments thereto all complete. i) 1000 mm dia piles. Nos. 3.00 113,000.00 339,000.00 A)The scope of work in the item includes: 1)Thecostofmakingofpileheadreadyfortestingatthedesired level. 2)Thecostofmobilizing,fabrication/makingoftestsetup, itsdismantling,removalandmakinggood,ifany,afterthetest is over. 3)Thecostofsupplyingalllabour,materials,equipment, instrumentation etc. including its transportation complete. http://t1.gstatic.com/images?q=tbn:ANd9GcRLDO4ko-3OI6BCTzjfIln9gJ4jVmRkxAD53UzQs wCwoRopegZgQg http://t1.gstatic.com/images?q=tbn:ANd9GcRLDO4ko-3OI6BCTzjfIln9gJ4jVmRkxAD53UzQs wCwoRopegZgQg

4)ThecostofRecordingandpresentationofdataasrequiredbytheEngineer-in-Charge.(Refe rAppendixDIS:2911(PartI/Sec I) for sample Data Sheet). 5)Thecostofsupporting/reactionarrangement(includingreactionpiles,ifany)fortheken tledgeload(kentledgeloadshall be 1.25 times the test load). 6) No working pile shall be used as a reaction pile. B) Mode of Measurement : 1)Measurementshallbemadeforeachcompletesetoftesting and reporting. B.1.3 Pile cap B.1.3.1 Earthworkinexcavationforcastingpilecapinalltypeofsoils,weatheredrock,existingfoo tings,removalofboulders, concrete,ballast,stoneetcincludingprotectingtheexcavatedsides,ifrequired,tillcon creting,bailingoutwatertokeeptheareacleananddryduringplacementofreinforcementand concretetilltheconcretesetsfinally.Theitemincludesthecostofdisposalofallspoils,d ismantledmaterials,surplusearthforallleadsandlifts,andtokeeptheworkareaneatandti dyduringtheworkandthereafter. PaymentshallbemadebasedonapprovedplandimensionsforPCCbelowpilecap.Thecostofbackf illingaroundthepilecap and restoration of road, if required shall be included. CUM 3,048.00 41.00 124,968.00 B.1.3.2 ProvidingandlayingplaincementconcreteM15(aggregate20mmnominalsize)underthepileca p/foundationsandbelowapproachslab.Therateshallincludethecostofalllabour,material etccompletejobincludingbailingoutwatertokeeptheareadryasperinstructionofEngineer incharger.Paymentshallbemadebasedonapprovedplandimensions for PCC. CUM 142.00 6,646.00 943,732.00 B.1.3.3 Providingandlayingreinforcedcementconcreteforconstructionofpilecapsandfoundation sinM-35gradeconcreteusingOrdinaryPortlandCementofgrade53, appropriatesand,aggregate,water,admixturesinsuitableproportionsasperapprovedmixd esign(proposedbycontractor),asperapproveddrawingssuppliedbytheEngineer-in-charge ,includingalltypesofshuttering, centering,necessarytools,plants,machinery,andallrelatedoperationsasrequiredtocom

pletetheworkwithallleads,liftsanddepthstruetoline,levelandpositionallcomplete(ex cludingthecostofreinforcementsteel,whichwill be paid as per item number B.1.4). CUM 2,004.00 8,856.00 17,747,424.00 A)The scope of work in the item includes. 1)Thecostofallinitiallayoutandsettingoutworkincludingidentification of existing services, if any. 2)Thecostofallpumping/Bailingoutofwater,includingitslabour, material and equipme nt's. 3)Thecostofprovidingcenteringandshutteringincludingitserection,dismantlingandrem ovalofformworkincludingallleadsandliftswithallrequiredtoolsandplantstotherequire d line and level.. 4)Thecostofprovidingandmixingallingredients(exceptreinforcementsteel)includingad mixturesetc.,withbatchingplant,transportation,placement,finishingandcuringofconc rete. 5)Thecostofmaintenanceandprotectionofexistingservices, ifanywhichintheopinionofEngineer-in-chargearelikelytobeaffectedbyanyrelatedactiv itiesincludingtemporaryshiftingofsuchservicestofacilitateconstructionofpilecapwo rksallalsohavetobedone,ifsorequiredbytheEngineer-in-charge,andthecostforthesamea sassessedbythe Engineer-in-Charge shall be reimbursable. 6)Thecostofinstallationofanyfixtureintothepilecap(costof only fixture to be paid separately).

7)ThecontractorhastobemadebaricaddingwithG.I.Sheet/steelsheetwithverticalpostbys uitablesectionofsteelangle/pipeatminimumheightof1.5mfromtheexistingroadlevelduri ngtheexecutionofthework.Thecontractorhastobemangethealltrafficsafetyrequirements duringthe execution period. 8)Thecostoftestingofallthematerialsinvolvedintheexecution of items as per QAP. 9)Thecostofallincidentallabour,materials,equipmentandworksrequiredtoexecutethejo basperdirectionsofengineer-in-charge. B) Mode of Measurement: 1)Measurementsshallbemadeforthefinishedvolumeofreinforcedcementconcreterestricte dtovolumeasperapproveddrawing(excludingcostofreinforcementsteelonly).Quantityofc oncreteofpiles,whichhasgoneintothepilecapsshallbededucted.Reinforcementshallbeme asured & paid separately as per item B.1.4. B.1.4 Reinforcement:Supply,cutting,bending,withallleads,liftsanddepths,fixinginpositio nreinforcementofanydiameter, HYSDorTMTasperrelevantBISspecificationanddrawinginallRCC/PSCworksofthisscheduleB -.1.Therateshallincludecostofallmaterialincludinglaps,tyingwire,bindingwire,cove rblock,provisionofstools,chairs,spacerbars, supportbars,labour,transportation,storingandallotherincidentalcharges,tools&plan tsetccomplete.Paymentshallbemadeaspertheoreticalrequirementandnowastageshall be paid. Rate shall include all costs. MT 731.00 57,379.00 41,944,049.00 SUB TOTAL - B-1 128,067,053.21 B-2 SUBSTRUCTURE B.2.1 Providingandlayingreinforcedcementconcreteforconstructionofpiers,piercaps,abutme nt,abutmentcaps, anddirtwallinM-35gradeconcreteusingOrdinaryPortlandCementofgrade53,appropriatesa nd,aggregate,water, admixturesinsuitableproportionsasperapprovedmixdesign(proposedbycontractor),aspe rapproveddrawingssuppliedbytheEngineer-in-charge,includingalltypesofshuttering,s taging,centeringscaffolding,necessarytools, plants,machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads, liftsanddepthstruetoline, levelandpositionallcomplete(excludingthecostofreinforcementsteel,whichwillbepaid asperitemnumberB.2.5). CUM Piers, Abutments and bearings

1,665.00 9,615.00 16,008,975.00 A) The scope of work in the item includes 1)Thecostofallincidentalworkrequiredincludingproviding,placementandremoval,shift ingofshuttering, cleaning,oiling&maintenance,erection&removalofstaging,scaffoldingandformlineretc ,forpiers,piercaps, bearingpedestalsandotherworksasstatedinotherpartsofthe tender document. 2)Thecostofcastingofamockpieratcastingyardtruetoline,levelandshapeasperthedirect ionoftheEngineer-inCharge. 3)Thecostofcastingofpier,piercaps,abutment,abutmentcapsetc.includingprovidingand mixingallingredientsandadmixturesetc.inBatchingplant,transportation, placement,compaction,finishingandcuring,placinginpositioninsertswithpier/pedesta lsasperspecificationandthe direction of the Engineer-in-charge. 4)ThecostofdisposalofallspoilsandtokeeptheworkareBneat and tidy during the work and thereafter. 5)ThecostofBarricadingandallsafetyrequirementsasmentioned elsewhere in the tende r document. 6)Installationofanyfixturesintopier/piercapetc(costofonly fixtures if any, to be paid separately). 7)Thecostofallincidentals,labour,material,equipmentandworksrequiredfortheexecuti onsofthejobasperthedirection of Engineer-in-charge.

8)Thecostoftestingallmaterialsinvolvedintheexecutionofthe item as per QAP. 9)Thecostofworkingforallleads,lifts,pumping/bailingout water, labour`, material and equipment etc. B) Mode of Measurement : 1)Measurementshallbemadeforthefinishedvolumeofconcreteonlyandwillberestrictedtot hedimensionsshownin the approved drawings. 2)Reinforcementsteelshallbemeasured&paidseparately as per item B.2.5. B.2.2 ProvidingandlayingreinforcedcementconcreteforconstructionofbearingpedestalinM-40 gradeconcreteusingOrdinaryPortlandCementofgrade53,appropriatesand,aggregate,wate r,admixturesinsuitableproportionsasperapprovedmixdesign(proposedbycontractor), inculdingplacing&fixingofBearingsinpositionasperdrawings(Bearingsshallbesupplied byIRCONfreeofCostatitsstoreatPatnaorelsewherinBihar,thecontractorhastotransportt hesametotheworksitefromIRCONsStoreatitsowncost)theasperapproveddrawingssuppliedb ytheEngineer-in-charge,includingalltypesofshuttering, staging,centeringscaffolding,necessarytools,plants, machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads,liftsan ddepthstruetoline, levelandpositionallcomplete(excludingthecostofreinforcementsteel,whichwillbepaid asperitemnumberA2.5). CUM 85.00 9,831.00 835,635.00 A) The scope of work in the item includes

1)Scopeofworkinthisincludethescopeofworkasmentionedinitemno.2.1aboveexceptclause (2)of(B.2.1.A) above.

B) Mode of Measurement :

1)Measurementshallbemadeforthefinishedvolumeofconcreteandwillberestrictedtothequ antityasperapproveddrawings.Reinforcementsteelshallbemeasured& paid separately a s per item B.2.5.

B.2.3 PaintingbelowGL:Providinganticorrosivetreatmenttothepartsofsubstructureincontact withearthuptoGLwithonecoatofprimerandtwocoatsofAnticorrosiveCoaTarEpoxyPaintbelo wthegroundlevelonPilecaps,Piers,abutmentsetc with all labour material tools and plants complete job. SQM 2,634.00 39.00 102,726.00 B.2.4 Paintingoverexposedsurfaces:PaintingthesurfaceswithAnticarbonation/Anticorrosive AcrylicPaintabovethegroundlevelonPiers,piercaps,etc.withalllabourmaterialtoolsan dplantscompletejobincludingsurfacepreparationat joints in approved colour. SQM 3,461.00 132.00 456,852.00 B.2.5 Reinforcement:Supply,cutting,Bending,fixinginpositionreinforcementofanydiameter, HYSDorTMTasperrelevantBISspecificationanddrawinginallRCC/PSCworksofthisscheduleB -2.Therateshallincludecostofallmaterialincludingtyingwire,labour,transportation, storingandallotherincidentalcharges,tools&plantsetc.Paymentshallbemadeaspertheor eticalrequirementandnowastageshallbepaid. Rate shall include all costs. MT 483.00 58,455.00 28,233,765.00 SUB TOTAL - B-2 45,637,953.00 B-3 SUPERSTRUCTURE B - 3.1 P S C Girders:

ProvidingandlayingreinforcedcementconcreteforconstructionofprecastPrestressedsup erstructuregirders/prestressedsolidslab/diaphragminpositioninM-45gradeconcreteus ingOrdinaryPortlandCementofgrade53, appropriatesand,aggregate,water,admixturesinsuitableproportionsasperapprovedmixd esign(proposedbycontractor),asperapproveddrawingssuppliedbytheEngineer-in-charge ,includingalltypesofshuttering, staging,centeringscaffolding,necessarytools,plants, machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads,liftsan ddepthstruetoline, levelandpositionallcomplete(excludingthecostofreinforcementsteel&HTSteel,whichwi llbepaidasperrelevent items respectively). CUM 5,285.00 10,548.00 55,746,180.00 B.3.1.1 A) The scope of work in the item includes 1)The cost of initial layout ensuring correct levels. 2)Thecostofallincidentalworksrequiredincludingprovidingcastingyard,castingbed,pr oviding,placementandremovalorshiftingofshuttering,staging,scaffoldingetc. andotherworksasstatedinotherpartsofthetenderdocuments. 3)The cost of design of the job mix. 4)Thecostofprovidingandmixingallingredientsincludingadmixturesetc.withbatchingpl ant,transportation, placement,compaction,steamcuringandfinishingetc., whichshallalsoinvolvepreparationofsurface,placinginpositionwithanchoragesaspersp ecificationandthedirection of the Engineer in charge, complete job. 5)Theitemincludesthecostofdisposalofallspoilsandtokeeptheworkareaneatandtidyduri ngtheworkandthereafter. 6)Theitemincludesthecostofbarricadingandallsafetymeasuresincludingmanagementoftr afficasdesiredbytheEngineer-in-Chargeandasspecifiedelsewhereinthetenderdocument. 7)Theitemincludesthecostoffoundationpreparationforstagingofsolidslabstagingandma kingcastingbedtotakecare of loads and settlements. 8)Thecostofallincidentals,labour,material,equipmentandworksrequiredfortheexecuti onsofthejobasperthedirection of Engineer-in-charge. 9)Thecostoftestingallmaterialsinvolvedintheexecutionof the item as per QAP. 10)Thecostofworkingforallleads,lifts,pumping/bailingout water, labour, material and equipment etc. B) Mode of Measurement : 1)Measurementshallbemadeforthevolumeoffinishedconcreteonlyandwillberestrictedtot hequantitiesasperthedimensionsshownintheapproveddawings.The

reinforcementsteelshallbemeasured&paidseparatelywhich will be paid as per releve nt item .

B.3.1.2 Launching(byCrane),SideShifting&placing,temporaryrestrainingofprecastgirderinpos itiontruetolineandlevelincludingpulling,pushing,lateralshifting,loading, unloading,completeinallrespectasperdrg&specificationobservingallsafetymeasure,ob tainingblockoftrainmovement/roadtrafficmovementfromappropriateauthority,providin gsuitablediversionifrequiredetccomplete job. Rate shall include cost of all labo ur ,lead, lift CUM 5,285.00 3,500.00 18,497,500.00 B.3.1.3 Supplying,makingintocablesandfixinginpositionH.T. steelcablesmadefromhightensilelowrelaxationstrands(anydia)inPSCgirderincludingcu ttingmakingintocableswithnecessaryspacersencasinginHDPEsheathingplacingofcableas perdrawingprovisionofanchrage'sendblocksstressing,cuttingblocking,groutingetccom pletejob. PaymentshallbemadefortheweightofHTSwireconsumedfromendtoend.Howeverrateshallincl udecostofallprestressingmaterial,toolsforstressing,groutingetc. Nothing extra shall be paid for jacking length. MT 376.00 85,388.59 32,106,108.54

B.3.2 Providingandlayingreinforcedcementconcreteforconstructionofdeckslabs,diaphragms, crossbeams, cantileverfootpath/slab/RCCsolidslabetcinM-45gradeconcreteusingOrdinaryPortlandC ementofgrade53, appropriatesand,aggregate,water,admixturesinsuitableproportionsasperapprovedmixd esign(proposedbycontractor),asperapproveddrawingssuppliedbytheEngineer-in-charge ,includingalltypesofshuttering, staging,centeringscaffolding,necessarytools,plants, machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads,liftsan ddepthstruetoline, levelandpositionallcomplete(excludingthecostofreinforcement steel, which will be paid as per relevent item ). CUM 1,251.00 11,328.00 14,171,328.00 B.3.3 Crashbarrier:Providing&layingreinforcedcementconcretefortheconstructionofcrashba rrierincludingsupplying& fixingofthe65NBGIpipesteelrailing,providing150mmdiaPVCPipealongwith12diamesharou nditasdetailedinthesketchenclosedintenderdocumentinM-40gradeconcreteusing53grade cementandappropriatesand, aggregate,water,admixturesinsuitableproportionsasperapprovedmixdesign(proposedby contractor),asperapproveddrawingssuppliedbyEngineerincharge,includingalltypesofs huttering,scaffoldings/staging,necessarytools, plants,machineryandallrelatedoperationsasrequiredtocompletetheworkwithalllead,li fts,depths,truetoline, levelandpositionbutexcludingthecostofreinforcementsteel(whichshallbepaidasperrel evantitemunderthisschedule)allcomplete.Theitemincludessupplying, fabricatingandfixingMetallicrailingontopoftheconcretecrash barriers, conforming to IS standards. RM 2,586.00 4,822.00 12,469,692.00 A) The scope of work in the item includes 1)Theitemincludesthecostofpreparationandsubmissionofdetailedshopdrawings,fabrica tion,castingfixtures, placingandfixinginpositionusingrequiredfastenersandpickling. 2)Theitemincludesthecostofpaintingalongwithonecoatof anticorrosive primer. 3)Theitemincludesthecostoftestingofallthematerialsinvolved in the execution of t he item as per QAP.

4)Theitemincludesallotherincidentalexpenditureforcompletingthejobsasperthedirect ionsofEngineer-incharge. B) Mode of Measurement : 1)ThemeasurementsshallbemadeinRunningMetersofthe completed railing. B.3.4 Paintingoverexposedsurfaces:PaintingtheexposedsurfacesofsuperstructurewithAntica rbonation/ AnticorrosiveAcrylicPaintwithalllabourmaterialtoolsandplantscompletejobincluding surfacepreparationatjointsinapproved colour. SQM 29,665.00 132.00 3,915,780.00 B.3.5 ProvidingandinstallingSinglestripsealexpansionjointsasperClause2607ofMORTHspecif icationsforRoadandBridgeWorks(FourthRevision)2001supplementedwithmanufacturer srec ommendations.Entireinstallationistobecarriedoutstrictlyinthepresenceofmanufactur er'srepresentativeonly,atalltimes.Thesealoftheexpansionjointshallbesuchasnottope rmitanydustcollectionatalltimes. (i) with a total allowable movement upto 140 mm RM 142.00 7,505.00 1,065,710.00 A) The scope of work in the item includes: 1)Costofallmaterials,labour,equipmentandotherincidentalchargesforexecutionofthis item.Supervisionduring installation by the manufacturer is also included. 2)Installation&fixingofexpansionjointsaspermanufacturersspecificationsanddesign/ drawingapprovedbytheengineer-in-chargeincludingchippingofconcrete, cleaningofconcreteandreinforcementbars,leveling, necessary shuttering, pre-setting, welding etc.

3)Itemtoincludenecessaryprovisionandfillingofrecessforthe expansion joints at no extra cost. 4)Theitemincludesthecostoftestingofallthematerialsinvolvedintheexecutionoftheite masperQAPandtestingofcompletedandinstalledjointsapertheacceptancecriteria of MOR TH. B) Mode of Measurement : 1)Theexpansionjointsshallbemeasuredinrunningmeters.Thelengthpayableistheactualle ngthprovidedatsiteincludingverticalpartsofkerbs/crashbarriers, footpath etc. B.3.6 DrainageSystem:ProvidingandlayingG.Idrainpipes, spouts,GIsteelgratingsoverformedholesindeckslab, fixing100mmdiaG.Irunnerpipesand100mmdiaGIdowntakepipesofapprovedqualityateverypi eretc.asperapproveddrawingsincludingbends,collars,clamps, fasteners, threading etc., complete. a) 100 mm dia water spout with GI grating. Nos. 168.00 910.00 152,880.00 b) 100 mm dia G.I runner pipes / downtake pipes. M 1,782.00 1,212.00 2,159,784.00 A)The scope of work in the item includes: 1)Theproviding,placing,joiningandfixingthedrainagepipeswithallnecessaryfittings, toolsandtackles, bends,clamps,screwsetc.,completeaspertheapproveddrawing. 2)Thecostofworkstomaketapingallpointstobeleakproof,testedetc.includingallcoupler s,materials,manpowerandtoolandtackleetc.completeasperthedirectionofEngineer-in-c harge. B) Mode of Measurement : 1)Themeasurementshallbemadeinnumbersforthedrainageportsuppliedandinstalledatsite .ThepaymentforthepipeswillbemadeinRunningmeters.Thequantitywillberestrictedtothe lengthasshownintheapproveddrawings. B 3.7

Reinforcement:Supply,cutting,Bending,fixinginpositionreinforcementofanydiameter, HYSDorTMTasperrelevantBISspecificationanddrawinginallRCC/PSCworksofthisscheduleB -3.Therateshallincludecostofallmaterialincludingtyingwire,labour,transportation, storingandallotherincidentalcharges,tools&plantsetc.Paymentshallbemadeaspertheor eticalrequirementandnowastageshallbepaid. Rate shall include all costs. MT 1,815.00 59,064.00 107,201,160.00 SUB TOTAL - B-3 247,486,122.54 B 4 APPROACH RAMP RE / RETAINING WALL, ROAD ETC B 4.1 Constructionofreinforcedearthretainingwallsandloadbearingpureabutmentswithplainf inishedconcretefaciapanelsinM-35gradeconcreteabove18cmthickincludinggeo-syntheti cmaterialsandallfasteners,andallaccessoriesandconsumablescompletejobasperdrgands pecifications. The scope shall includes ground improvement if required. SQM 3,101.00 4,350.00 13,489,350.00 B.4.2 EarthworkincludingexavationforREwallofrequireddimensionandfillingbySone/KieulSan dandcompactioninlayersinreinforcedearthworkscompleteasperspecificationsanddrawin g.Thefillingmaterialsshallconforming to the section of 3103 of MORTH specificati on. CUM 13,996.00 1,151.00 16,109,396.00 B.4.3 Constructionofsuitabledrainagesystemforreinforcedearthworks.Providingfiltermedia behindfaciapanel/abutmentasperapproveddrawingandtechnicalspecificationscomplete. CUM

931.00 3,286.00 3,059,266.00

B.4.4 Earthworkinexcavationforcastingfoundationofretainingwallsinalltypeofsoils,weathe redrock,existingfootings, removalofboulders,concrete,ballast,stoneetcincludingprotectingtheexcavatedsides, ifrequired,tillconcreting, bailingoutwatertokeeptheareacleananddryduringplacementofreinforcementandconcrete tilltheconcretesetsfinally.Theitemincludesthecostofdisposalofallspoils,dismantle dmaterials,surplusearthforallleadsandlifts,andtokeeptheworkareaneatandtidyduring theworkandthereafter.PaymentshallbemadebasedonapprovedplandimensionsforPCCbelowf oundations.Thecostofbackfillingaroundthepilecapandrestorationofroad, if required shall be included. CUM 612.00 54.00 33,048.00 B.4.5 ProvidingandlayingplaincementconcreteM15(aggregate20mmnominalsize)underretaining wall&frictionslab.Therateshallincludethecostofalllabour,materialetccompletejob.P aymentshallbemadebasedonapprovedplandimensions for PCC. CUM 550.00 6,912.00 3,801,600.00 B.4.6 ProvidingandlayingreinforcedcementconcreteforconstructionoffrictionslabinM-35gra deconcreteusingOrdinaryPortlandCementofgrade53,appropriatesand, aggregate,water,admixturesinsuitableproportionsasperapprovedmixdesign(proposedby contractor),asperapproveddrawingssuppliedbytheEngineer-in-charge, includingalltypesofshuttering,centering,necessarytools, plants,machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads, liftsanddepthstruetoline, levelandpositionallcomplete(excludingthecostofreinforcement steel, which will be paid as per relevent item. CUM 856.80 8,787.00 7,528,701.60 B.4.7 ProvidingandlayingreinforcedcementconcreteforconstructionofretainingwallsinM-35g radeconcreteusingOrdinaryPortlandCementofgrade53,appropriatesand,

aggregate,water,admixturesinsuitableproportionsasperapprovedmixdesign(proposedby contractor),asperapproveddrawingssuppliedbytheEngineer-in-charge, includingalltypesofshuttering,centering,necessarytools, plants,machinery,andallrelatedoperationsasrequiredtocompletetheworkwithallleads, liftsanddepthstruetoline, levelandpositionallcomplete(excludingthecostofreinforcementsteel,whichwillbepaid asperitemnumberB.4.8). CUM 157.00 8,997.00 1,412,529.00 A)The scope of work in the item includes. 1)Thecostofallinitiallayoutandsettingoutworkincludingidentification of existing services, if any. 2)Thecostofallpumping/bailingoutofwater,includingitslabour, material and equipme nt's. 3)Thecostofprovidingcenteringandshutteringincludingitserection,dismantlingandrem ovalofformworkincludingallleadsandliftswithallrequiredtoolsandplantstotherequire d line and level.. 4)Thecostofprovidingandmixingallingredients(exceptreinforcementsteel)includingad mixturesetc.,withBatchingplant,transportation,placement,finishingandcuringofconc rete. 5)Thecostofmaintenanceandprotectionofexistingservices, ifanywhichintheopinionofEngineer-in-chargearelikelytobeaffectedbyanyrelatedactiv itiesincludingtemporaryshiftingofsuchservicestofacilitateconstructionofretaining walshallalsohavetobedone,ifsorequiredbytheEngineer-in-charge,andthecostforthesam easassessedbythe Engineer-in-Charge shall be reimbursable. 7)Thecostofbarricadingandallsafetyrequirementsasspecified elsewhere in the tende r document. 8)Thecostoftestingofallthematerialsinvolvedintheexecution of items as per QAP. 9)Thecostofallincidentallabour,materials,equipmentandworksrequiredtoexecutethejo basperdirectionsofengineer-in-charge. B) Mode of Measurement :

1)Measurementsshallbemadeforthefinishedvolumeofreinforcedcementconcreterestricte dtovolumeasperapproveddrawing(excludingcostofreinforcementsteelonly).Quantityofc oncreteofpiles,whichhasgoneintothepilecapsshallbededucted.Reinforcementshallbeme asured & paid separately as per relevent item B.4.8 Reinforcement:Supply,cutting,bending,withallleads,liftsanddepths,fixinginpositio nreinforcementofanydiameter, HYSDorTMTasperrelevantBISspecificationanddrawinginallRCC/PSCworksofthisscheduleB -4.Therateshallincludecostofallmaterialincludingtyingwire,bindingwire, coverblock,provisionofstools,chairs,spacerbars,supportbars,labour,transportation ,storingandallotherincidentalcharges,tools&plantsetccomplete.Paymentshallbemadea spertheoreticalrequirementandnowastageshallbepaid. Rate shall include all costs. MT 191.00 57,379.00 10,959,389.00 TOTAL SCHEDULE B 4 56,393,279.60 B-5 SERVICE ROAD WORKS / WIDENING B.5.1 Earth work in excavation for casting service roads in all types ofsoils,weatheredrock,exisitingfootings,removalofboulders,concrete,ballast,stone etcincludingprotectingthetheexcavatedsides,ifrequired,tillconcreting,bailingoutw atertokeeptheareacleananddryduringplacementofreinforcementandconcretetilltheconc retesetsfinally.Theitemincludesthecostofdisposalofallspoils,dismentalmaterials,s urplusearthforallleadsandlifts,andtokeeptheworkareaneatandtidyduringtheworkandth earafter. paymentshallbemadebasedonapprovedplandimensionsforPCCbelowfoundations.Thecostofb ackfillingaroundthepile cap and restoration of road , if required shall be inclu ded CUM 12,752.00 41.00 522,832.00 B.5.2 Providinggrannularsubbaseasperdrawingandspecificationmentoinedintherelevantclaus eoftheMORTHspecifications. Cum

1,087.00 3,843.00 4,177,341.00 B.5.3 ProvidingandlayingplaincementconcreteM15(aggeregate20mmnominalsize)underservicer oadPQconcreteandDrain.Therateshallincludethecostofalllabour,materialetccompletej obincludingbaillingoutwatertokeeptheareadryasperinstructionofEngineerincharge,pa ymentshallbe made based on approved plan dimensions of PCC CUM 1,336.00 6,646.00 8,879,056.00 B.5.4 ProvidingandlayingreinforcedcementconcreteforconstructionofserviceroadsinM-35gra deconcreteusingordinaryportlandcementofgrade53,appropriatesand, aggregate,water,admixtureinsuitableproportionsasperapprovedmixdesign(proposedbyc ontractor)asperapproveddrawingsuppliebytheEngineer-in-charge, includingalltypesofshuttering,staging,centeringscaffolding,necessarytools,plants ,machinary,dowelbar, fillermaterrials,jointseparartionandallrelatedopretionasrequiredtocompletethewor kwithallleads,liftsanddepthstruetoline,levelandpositionallcomplete(excludingthec ostofreinforcementsteel,whichwillbepaidasperitemnoB.5.5).Theworkhastobeexecutedu nderrelevantspecificationslaidbytheMORTH.Thefinishedvolumeofconcreteasperdrawing willbemeasuredforthepaymentpurpose. CUM 2,174.00 8,856.00 19,252,944.00 B.5.5 Reinforcement:Supply,cutting,bending,withallleads,liftsanddepths,fixinginpositio nreinforcementofanydiameter, HYSDorTMTasperrelevantBISspecificationanddrawinginallRCC/PSCworksofthisscheduleB -5.Therateshallincludecostofallmaterialincludingtyingwire,bindingwire, coverblock,provisionofstools,chairs,spacerbars,supportbars,labour,transportation ,storingandallotherincidentalcharges,tools&plantsetccomplete.Paymentshallbemadea spertheoreticalrequirementandnowastageshallbepaid. Rate shall include all costs. MT 188.00 57,379.00

10,787,252.00 B.5.6 Providing150mmGIpipebelowserviceroadsfortelephonecable crossing and other utilit y lines. RM 360.00 1,200.00 432,000.00

B.5.7 Earthworkinfillingattheretainingwallportionorotherlocationlikepondfillingwithcon tractorsearthofapprovedqualityandspecificationotainedfromoutsiderailwaylandwitha lllead,lift,aspersiteconditionincludingmechanicalcompactionbyvibratoryrollerinla yerssuchthatthethicknessofcompactedearthdoesnotexceed150mmaperthedirectionofEngi neeratsitewithallcontractorstools/plants,equipments,laboursetc.tocompletethework in all respect. Cum 38,979.00 170.00 6,626,430.00 B.5.8 Providingandlaying/castinginplacereinforcedconcreteinM-35Gradedrainof1.5mx1.0mwi th50mmthickPCCbeddingwithexcavation150mmmorethanthefootingofPCCbeddinglayer.Exca vation,PCC&Reinforcementispayable under item No B 5.1, B 5.3 & B 5.5 respectivel y Cum 1,139.00 6,255.40 7,124,900.60 SUB TOTAL - B-5 57,802,755.60 B-6 SAFETY PROVISIONS B.6.1 Supply,Fabrication&ProvidingatsitethebarricatingBoardsasperthedirectionoftheEngi neer-in-chargeanddrawingapprovedbyEngineer-in-chargeincludingpaintin, writing,maintainingduringthecourseofexecutionoftheworkalongtheworksite(theqtyofb arricatingboardtobedecided by the Engineer-in-charge) MT 30.00 59,926.00 1,797,780.00 SUB TOTAL - B-6 1,797,780.00

TOTAL SCHEDULE B 1+B 2+B 3+B 4+ B 5 + B6 537,184,943.95