EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-160 11 June 2013 10 June 2013 08.00-24.00


21.00 S 22.00 S 23.00 S

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00 S

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Fit-up and welding Hopper Reactor Install Ring Spray Nozzle 03X002 Repair Reducer 84" x 66" Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Demolition Foundation Pump 03P005A/B Install Grating & Handrail Trim Cooler Mark Cut Mix Sump Reactor 03R001 Cutting & Remove Expansion Joint 42" Cutting & Remove Expansion Joint 84" Levering Pump For 03P030A Fit-Up & Welding Support Reactor 03R001 Install Formwork Pump For 05P015A/B Finishing Box Out For Install Damper Area Shop Shop Shop Shop Shop 03A 03A 03B 03B 03B 03B 03B 05 OSBL Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set Set Set Set Set Set Set Set Set Q'ty 8 16 12 Q'ty 1 1 1 1 1 2 1 1 1 1 1 4 2 8 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fit-up and welding Hopper Reactor Install Ring Spray Nozzle 03X002 Repair Reducer 84" x 66" Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Demolition Foundation Pump 03P005A/B Install Grating & Handrail Trim Cooler Mark Cut Mix Sump Reactor 03R001 Cutting & Remove Expansion Joint 42" Cutting & Remove Expansion Joint 84" Grouting Pump For 03P030A Preparation Support Reactor 03R001 Grouting Pump For 05P015A/B Finishing Box Out For Install Damper Area Shop Shop Shop Shop Shop 03A 03A 03B 03B 03B 03B 03B 05 OSBL Unit Set Set Set Set Set Set Set Set Set Set Set Set Set Set Q'ty 1 1 1 1 1 2 1 1 1 1 1 4 2 8 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Activities (Tomorrow) Fit-up and welding Hopper Reactor Repair Reducer 84" x 66" Welding Plug Handrail For Reactor Install Grating & Handrail Trim Cooler Install Grating & Handrail Trim Cooler Install Structure Reactor 03R003 Cutting Mix Sump Reactor 03R001 Cutting & Remove Expansion Joint 42" Cutting & Remove Expansion Joint 84" Preparation Support Reactor 03R001 Levering Equipment For 04E014 Area Shop Shop Shop 03A 03A 03B 03B 03B 03B 03B 04 Unit Set Set Set Set Set Set Set Set Set Set Set Set Set Q'ty 1 1 1 1 2 1 1 1 1 1 1 4 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 9 13 41 22 11 3 7 5 12 3 3 7 3 3 72 104 328 176 88 24 56 40 96 24 24 56 24 24 3 3 7 3 3 2 2 41 22 11 2 7 5 14 14 287 110 33 14 35 35 21 15 49 21 21 9 13 41 22 11 3 7 5 12 3 3 7 3 3 162 86 118 615 286 121 38 91 75 96 45 39 105 45 45 2,049 Description 2 3 2 4 Indirect 1 1 3 2 1 1 8 8 24 16 8 8 16 24 16 32 3 2 2 1 2 1 1 7 14 7 7 14 14 21 1 1 3 2 1 1 2 3 2 4 8 15 38 23 15 8 30 38 16 53 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 4 2 No. 7 8 9 Crane 100T. Crane 50T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 9 14 39 25 15 3 19 5 6 2 3 7 14 3 72 112 312 200 120 24 152 40 48 16 24 56 112 24 9 14 39 25 15 3 19 5 6 2 3 7 14 3 185 Unit ea ea ea 1 72 112 312 200 120 24 152 40 48 16 24 56 112 24 1,480 Q'ty 2 3 2 4 Indirect 1 1 4 2 1 1 8 8 32 16 8 8 16 24 16 32 1 1 4 2 1 1 2 3 2 4 8 8 32 16 8 8 16 24 16 32

EQUIPMENT AND MACHINERY REPORT

Welding Plug Handrail For Trim Cooler Shop Demolition Foundation Pump 03P005A/B 03A

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /