Metric Budget at Completion Actual Cost Earned Value Planned Value Cost Variance
Abbrev. Description BAC Baseline cost for 100% of project. Total costs actually incurred so far. AC Amount of budget earned so far based on physical work accomplished, without reference to actual costs. EV The budget for the physical work scheduled to be completed by the end of the time period. PV Measure of cost overrun. The difference between the budget for the work actually done so far and the actual costs so far. CV Cost efficiency ratio. A CPI of 1.00 means that the costs so far are exactly the same as the budget for work actually done so far. CPI Measure of schedule slippage. The difference between the budget for the work actually done so far and the budgeted cost of work scheduled. SV The schedule efficiency ratio. An SPI of 1.0 means that the project is exactly on schedule. SPI ETC The expected additional cost to complete.
Formula/Value N/A N/A N/A N/A Earned ValueActual Cost EVAC Earned Value/ Actual Cost EV/AC Earned ValuePlanned Value EVPV Earned Value/Planned Value EV/PV Estimate at CompletionActual Cost EACAC Budget at Completion/Cost Performance Index BAC/CPI Budget at CompletionEstimate at Completion BACEAC (Cost Performance Index+Schedule Performance Index)/2 (CPI+SPI)/2 >1.0 >0.85 >0.65 <0.65
Estimate at Completion
EAC
Variance at Completion
VAC
Status
Average of CPI & SPI. GREEN = On track YELLOW = Slightly behind schedule or budget RED = Needs immediate attention BLACK = Killed or Restore
Page 1 of 4
Source Data
Page 2 of 4
Trend Analysis
$200 $0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Period
Budget at Completion (BAC) Earned Value (EV) Actual Cost (AC) Planned Value (PV)
Performance Index
1.10
1.00 0.90 Efficiency 0.80 0.70 0.60 0.50 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Period
Cost Performance Index (CPI) Schedule Performance Index (SPI)
Page 3 of 4
Trend Analysis
Variance Analysis
$50 $0 ($50) ($100) $ (000) ($150) ($200) ($250) ($300) ($350) ($400) ($450) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Period
Cost Variance (CV) Schedule Variance (SV) Variance at Completion (VAC)
Estimate at Completion
$1,800
$1,700
$1,600
$1,500 $(000)
$1,400
$1,300
$1,200 $1,100 $1,000
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Period