Stphane St-Pierre, Grand Inga Project (AECOM) Hydro 2013 Addis Ababa Grand Inga Feasibility Study Hydro 2013 Addis Ababa, April 2013 16, 17, 18 April 2013
For 60 years, in spite of the potential of the site, all previous schemes required considerable pre-investments in large civil works, making the first MW expensive. It was found that the minimum economically feasible size was 7000 MW. In 2011, Aecom-EDF was mandated by SNEL, with the funding of ADB, to optimize the Grand Inga site, considering the proposed Inga 3 project.
Site Inga
Dbit module: 41,000 m3/s Chute = 100 m
Inga 3
Inga 3 et 4
Inga 3, 4 and 5
Inga 3, 4, 5 et 6
Inga 7
Inga 3 8
canal de transfert @
6,600 m3/s
Centrale @ 4,800 MW
barrage Bundi
INGA 3-LH
Site specific initial conditions very favourable Hydrology greater than the needs Negative Impacts identified are of low intensity and manageable Potential Social and Economic Positive Impacts