Grand Inga Development Project Production and Associated Transmission Lines

GRAND INGA FEASIBILITY STUDY

Presented by: Co-Director

Stphane St-Pierre, Grand Inga Project (AECOM) Hydro 2013 Addis Ababa Grand Inga Feasibility Study Hydro 2013 Addis Ababa, April 2013 16, 17, 18 April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Grand Inga Too big to be constructed ?

For 60 years, in spite of the potential of the site, all previous schemes required considerable pre-investments in large civil works, making the first MW expensive. It was found that the minimum economically feasible size was 7000 MW. In 2011, Aecom-EDF was mandated by SNEL, with the funding of ADB, to optimize the Grand Inga site, considering the proposed Inga 3 project.

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Grand Inga 2013 Feasibility Study : Main Results


A new approach has been proposed, making the development of the Grand Inga economically feasible in the very short term: Innovative, flexible and economical staging identified Each phase as small as 2,000 MW at competitive costs Phase size can be adjusted to adapt to planned demand and export opportunities

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Grand Inga 2013 Feasibility Study : Main Results


Inga 3 replaced by a simpler Grand Inga first phase at low head with no closure of the Congo River and no tunnels, using an open channel Integrating the final development of Grand Inga when river dam is built in the future Turbine-generators designed to operate at low and high head Bundi Dam and intake structures designed to be raised in the future

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Site Inga
Dbit module: 41,000 m3/s Chute = 100 m

Inga 1 (350 MW) Inga 2 (1 424 MW)


Grand Inga Feasibility Study Hydro 2013 Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3 basse chute


canal de transfert barrage de la Bundi Centrale Inga 3 P max : 4800 MW Q max : 6600 m3/s

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3 basse chute


remplissage du rservoir Niveau deau amont : 145 - 170m

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3 haute chute


Barrage sur le fleuve Congo vacuateurs de crues Rehaussement du barrage Bundi chute +50% Pas de nouvelle centrale P Inga 3 HC : jusqu 7800 MW

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3 haute chute


Remplissage du rservoir Niveau deau amont : 202 205 m

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3 et 4

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3, 4 and 5

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3, 4, 5 et 6

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 7

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Inga 3 8

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

canal de transfert @
6,600 m3/s

Inga 3 basse chute

Centrale @ 4,800 MW
barrage Bundi

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Progressive Development of Grand Inga

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Grand Inga New, small, economical multi-stage development scheme


Main benefits:
To finally and rapidly start Grand Inga development Flexibility to adapt to DRC and export demand patterns Provide optimized generation costs at each stage by levelling investments over time Allow multiple public / private operators to share the site

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

INGA 3-LH: IMPACTS ON LAND USE


Very low footprint on land: <19 km; <0.5 ha/MW Favourable Land Use: 100% of the installations within SNEL concession Few forest (2.6 km) and cultivated zone (1.8 km) Biodiversity without particular or exceptional character No habitation affected No involuntary population displacement No infrastructure destruction

IMPACTS ON LAND USE VERY LIMITED


Grand Inga Feasibility Study Hydro 2013 Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

Number of inhabitants to relocate/MW

INGA 3-LH

Occupied Hectares /MW

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013

REPUBLIQUE DEMOCRATIQUE DU CONGO


MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

INGA 3-LH: EIES CONCLUSIONS

Site specific initial conditions very favourable Hydrology greater than the needs Negative Impacts identified are of low intensity and manageable Potential Social and Economic Positive Impacts

Grand Inga Feasibility Study Hydro 2013

Addis Ababa, April 2013