ANALYSIS OF GRADE OF CONCRETE TESTING RESULTS

PROJECT : 330 MW Srinagar HEP

DATE
BATCHING
PLANT

160 A CP

M25 A40

Total Nos. of 28
Nos. of Results above
CHARACTERISTI
% of Results above
Days results as on Characteristic
C STRENGTH
Characteristic Strength
date
Strength
316
25
937.00
892.00
95.20%

M25 A20

344

25

1014.00

958.00

94.48%

M25 A20

330

25

11.00

11.00

100.00%

M15 A80

210

15

42.00

42.00

100.00%

M15 A40

262

15

50.00

50.00

100.00%

M25 A40

338

25

448.00

420.00

93.75%

M20 A40

280

20

21.00

17.00

80.95%

M20 A20

285

20

88.00

86.00

97.73%

M20 A40

262

20

8.00

7.00

87.50%

M20 A40

273

20

9.00

9.00

100.00%

M20 A20

288

20

13.00

13.00

100.00%

M20 A20

311

20

10.00

10.00

100.00%

M30 A20

358

30

4.00

4.00

100.00%

M30 A20

379

30

10.00

10.00

100.00%

M30 A20

366

30

3.00

3.00

100.00%

M15 A80

188

15

20.00

20.00

100.00%

M15 A80

174

15

142.00

142.00

100.00%

GRADE OF
CONCRETE

CEMENT
CONTENT

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

21
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

D-01
D-02
D-03
D-04
D-05
D-06
D-07
D-08
D-10
D-09
D-11
D-12
D-13
D-14
D-15
D-16
D-17
D-18

9-Apr-09
11-Apr-09
14-Apr-09
15-Apr-09
16-Apr-09
17-Apr-09
18-Apr-09
18-Apr-09
20-Apr-09
20-Apr-09
21-Apr-09
21-Apr-09
22-Apr-09
23-Apr-09
23-Apr-09
24-Apr-09
24-Apr-09
25-Apr-09

34.07
33.18
25.33
29.48
25.33
25.04
28.30
29.33
30.22
32.74
34.07
34.07
30.52
28.44
29.78
33.93
28.89
33.56

D-19

27-Apr-09

27.56

20
21
22
23
24
25
26
27
28
29
30
31
32

D-20
D-21
D-22
D-23
D-24
D-25
D-26
D-27
D-28
D-29
D-30
D-31

27-Apr-09
28-Apr-09
28-Apr-09
29-Apr-09
29-Apr-09
30-Apr-09
30-Apr-09
2-May-09
4-May-09
4-May-09
5-May-09
5-May-09

26.89
32.44
26.52
34.81
31.4
31.56
32.89
25.33
28.89
25.78
30.52
28.89

D-32

6-May-09

34.52

27.6

29
Sample No. 1 to 32
30.52

27.00

Standard dev

Average
30.13

32.78

Standard deviation
3.13

30.67

Coefficient of variation
10.38
29.23

31.29

29.67

29.93

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

D-33
D-34
D-35
D-36
D-37
D-38
D-39
D-40
D-41
D-42
D-43
D-44
D-45
D-46

6-May-09
7-May-09
7-May-09
8-May-09
8-May-09
9-May-09
9-May-09
11-May-09
12-May-09
15-May-09
15-May-09
16-May-09
16-May-09
18-May-09

31.11
32.89
33.04
31.56
32.59
30.67
36.67
33.19
26.52
30.81
26.81
26.81
25.33
31.26

D-47

18-May-09

25.33

48
49
50
51
52
53
54
55
56
57

D-48
D-49
D-50
D-51
D-52
D-53
DSB-1
DSB-2
DSB-4

19-May-09
19-May-09
20-May-09
20-May-09
21-May-09
21-May-09
29-May-09
30-May-09
1-Jun-09

28.00
26.22
27.41
25.78
25.63
26.52
25.93
27.70
25.78

DSB-3

1-Jun-09

28.15

58

DSB-5

2-Jun-09

28.44

59
60
61
62
63
64

DSB-6
DSB-7
DSB-8
DSB-9
DSB-10

3-Jun-09
30-Jun-09
2-Jul-09
3-Jul-09
3-Jul-09

25.19
28.74
27.85
28.44
25.19

DSB-11

4-Jul-09

26.22

27.5

Sample No. 33 to 64
32.15

33.28

Average
28.49

27.74

Standard deviation
2.99

27.48

Coefficient of variation
10.50
26.26

26.48

27.63

26.93

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

65
66
67
68
69
70
71
72
73
74
75
76
77
78
79

DSB-12
DSB-13
DSB-14
DSB-15
DSB-16
DSB-17
DSB-18
DSB-19
DSB-20
DSB-21
DSB-27
DSB-28
DSB-29
DSB-30

6-Jul-09
6-Jul-09
7-Jul-09
11-Jul-09
13-Jul-09
14-Jul-09
15-Jul-09
15-Jul-09
16-Jul-09
17-Jul-09
21-Jul-09
21-Jul-09
21-Jul-09
22-Jul-09

30.37
26.07
28.89
29.92
29.78
30.82
28.89
30.22
29.18
29.33
29.63
25.63
27.41
30.37

DSB-31

22-Jul-09

30.07

80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

DSB-32
DSB-33
DSB-34
DSB-35
D-54
D-55
DSB-41
DSB-42
DSB-43
DSB-44
DSB-45
DSB-46
DSB-47
DSB-48
DSB -54
DSB -55

23-Jul-09
23-Jul-09
24-Jul-09
24-Jul-09
24-Jul-09
25-Jul-09
26-Jul-09
26-Jul-09
28-Jul-09
29-Jul-09
31-Jul-09
1-Aug-09
3-Aug-09
3-Aug-09
6-Aug-09
6-Aug-09

26.07
27.41
25.18
29.48
26.96
33.19
29.19
27.26
25.48
28.44
25.03
28.74
25.93
30.52
29.33
27.11

DSB -56

7-Aug-09

25.18

26.7

Sample No. 65 to 96
28.81

29.93

Average
28.35

28.44

Standard deviation
2.05

28.48

Coefficient of variation
7.22
27.26

28.78

27.04

28.04

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

97
98
99
100
101
102
103
104
105
106
107
108
109
110
111

DSB -57
DSB -58
DSB -59
DSB -60
DSB -61
DSB -62
D-56
DSB-63
DSB-65
DSB-66
DSB-67
DSB-68
DSB-69
DSB-70

7-Aug-09
8-Aug-09
8-Aug-09
10-Aug-09
10-Aug-09
10-Aug-09
10-Aug-09
13-Aug-09
14-Aug-09
14-Aug-09
14-Aug-09
17-Aug-09
17-Aug-09
17-Aug-09

25.18
25.33
25.77
25.04
25.77
26.52
25.18
25.63
27.85
28.74
25.63
26.67
25.48
25.04

DSB-71

18-Aug-09

28.30

112
113
114
115
116
117
118
119

DSB-72
DSB-73
DSB-74
DSB-75
DSB-76
DSB-77
DSB-78

18-Aug-09
19-Aug-09
19-Aug-09
19-Aug-09
20-Aug-09
21-Aug-09
22-Aug-09

27.11
25.04
25.18
25.93
27.85
25.78
26.52

DSB-81

25-Aug-09

25.33

120
121
122
123
124
125
126
127
128

DSB-82
DSB-94
DSB-244
DSB-245
DSB-246
DSB-247
DSB-254
DSB-256

26-Aug-09
31-Aug-09
27-Nov-09
27-Nov-09
28-Nov-09
28-Nov-09
2-Dec-09
5-Dec-09

26.37
27.7
25.33
25.93
28.59
28.44
25.18
23.56

DSB-257

5-Dec-09

23.26

26.1

Sample No. 97 to 128


25.33

25.78

Average
26.10

27.22

Standard deviation
1.37

26.48

Coefficient of variation
5.25
26.00

26.00

26.89

25.11

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

DSB-258
DSB-259
DSB-260
DSB-261
DSB-262
DSB-263
DSB-265
DSB-266
DSB-267
DSB-268
DSB-269
DSB-272
DSB-278
DSB-279
DSB-280
DSB-281
DSB-284
DSB-285
DSB-286
DSB-288
DSB-289
DSB-296
DSB-299
DSB-301
DSB-302
DSB-303
DSB-305
D-57
D-63
DSB-312
DSB-313

7-Dec-09
7-Dec-09
7-Dec-09
7-Dec-09
8-Dec-09
8-Dec-09
9-Dec-09
9-Dec-09
10-Dec-09
10-Dec-09
10-Dec-09
11-Dec-09
14-Dec-09
14-Dec-09
15-Dec-09
15-Dec-09
17-Dec-09
17-Dec-09
17-Dec-09
19-Dec-09
21-Dec-09
24-Dec-09
24-Dec-09
25-Dec-09
26-Dec-09
26-Dec-09
28-Dec-09
30-Dec-09
2-Jan-10
5-Jan-10
5-Jan-10

25.18
24.89
28.00
22.96
27.56
24.15
25.33
23.85
24.15
21.04
21.78
24.15
27.56
28.74
31.11
29.33
22.22
28.74
28.15
24.74
29.19
29.78
25.19
28.30
26.04
25.93
31.70
32.59
31.41
28.59
28.15

DSB-314

5-Jan-10

26.81

27.5

Sample No. 129 to160


25.26

25.22

Average
26.79

22.78

Standard deviation
2.99

29.19

Coefficient of variation
11.18
25.96

28.12

29.07

28.74

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

D-65
D-66
D-67
DSB-318
DSB-319
D-73
D-74
DSB-321
DSB-322
D-75
D-76
D-78
D-79
DSB-324
DSB-325
D-80
D-81
D-84
D-86
D-90
D-92
D-94
D-97
D-99
DSB-332
D-101
D-102
D-108
D-110
D-111
D-112

5-Jan-10
5-Jan-10
5-Jan-10
8-Jan-10
8-Jan-10
9-Jan-10
9-Jan-10
11-Jan-10
11-Jan-10
11-Jan-10
11-Jan-10
13-Jan-10
13-Jan-10
14-Jan-10
14-Jan-10
14-Jan-10
14-Jan-10
17-Jan-10
17-Jan-10
18-Jan-10
18-Jan-10
19-Jan-10
21-Jan-10
21-Jan-10
22-Jan-10
22-Jan-10
22-Jan-10
23-Jan-10
23-Jan-10
24-Jan-10
24-Jan-10

27.85
29.78
28.74
33.04
32.89
27.41
29.48
32.74
28.89
31.7
29.93
33.63
30.67
30.22
30.67
30.37
29.93
35.56
30.67
34.96
26.67
37.04
34.96
33.33
32.74
25.18
27.11
33.48
34.22
34.22
31.11

D-113

24-Jan-10

26.81

27.4

Sample No. 161 to 192


29.85

30.63

Average
31.13

31.04

Standard deviation
2.93

30.48

Coefficient of variation
9.42
32.78

33.00

29.63

31.59

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224

Date of
Casting

D-116
DSB-336
D-117
D-121
D-123
D-125
D-127
DSB-337
D-128
D-129
D-130
DSB-338
D-133
D-138
D-139
D-141
DSB-339
D-145
D-147
DSB-340
DSB-341
D-150
DSB-342
D-155
D-157
D-161
DSB-343
D-165
D-166
DSB-344
DSB-345

25-Jan-10
27-Jan-10
27-Jan-10
29-Jan-10
30-Jan-10
31-Jan-10
4-Feb-10
7-Feb-10
8-Feb-10
8-Feb-10
9-Feb-10
10-Feb-10
10-Feb-10
11-Feb-10
12-Feb-10
12-Feb-10
13-Feb-10
13-Feb-10
13-Feb-10
14-Feb-10
15-Feb-10
16-Feb-10
17-Feb-10
17-Feb-10
17-Feb-10
18-Feb-10
19-Feb-10
19-Feb-10
20-Feb-10
21-Feb-10
21-Feb-10

D-169

21-Feb-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

29.93
34.37
28.89
26.52
30.81
25.33
30.96
21.93
28.59
30.81
27.85
19.44
28.30
27.41
28.30
26.67
15.85
27.41
27.56
31.11
32.15
26.96
30.52
29.33
25.19
30.07
29.04
30.81
28.44
29.19
30.07
29.19

28.0

Sample No. 193 to 224


29.93

27.26

Average
28.09

26.67

Standard deviation
3.61

27.67

Coefficient of variation
12.85
25.48

29.74

28.78

29.22

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

D-171
D-172
D-173
D-174
D-175
D-176
D-177
D-178
D-179
D-180
D-181
D-182
D-183
D-184
D-185
D-186
D-187
D-189
D-192
D-194
D-196
D-197
D-198
D-202
D-203
D-206
D-207
D-208
DSB-350
D-209
D-210

22-Feb-10
22-Feb-10
22-Feb-10
23-Feb-10
23-Feb-10
23-Feb-10
24-Feb-10
24-Feb-10
25-Feb-10
25-Feb-10
25-Feb-10
25-Feb-10
25-Feb-10
26-Feb-10
26-Feb-10
26-Feb-10
26-Feb-10
27-Feb-10
28-Feb-10
2-Mar-10
3-Mar-10
3-Mar-10
3-Mar-10
4-Mar-10
5-Mar-10
5-Mar-10
5-Mar-10
5-Mar-10
6-Mar-10
6-Mar-10
6-Mar-10

29.78
30.81
32.74
26.52
27.26
31.26
28.89
28.89
30.37
30.81
28.15
31.11
31.85
30.07
28.30
29.33
31.70
32.30
32.89
30.96
30.22
29.04
30.37
30.96
31.96
34.07
29.48
29.48
28.00
30.07
32.59

D-211

6-Mar-10

31.11

26.4

Sample No. 225to 256


29.96

29.08

Average
30.35

30.11

Standard deviation
1.73

29.89

Coefficient of variation
5.69
31.96

30.51

30.60

30.40

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

D-212
D-213
D-215
DSB-351
D-217
D-218
D-220
D-221
D-222
D-224
D-226
D-227
D-229
DSB-352
D-230
D-231
D-233
D-234
D-235
D-236
D-237
D-239
D-241
D-245
D-247
D-250
D-251
D-252
D-253
D-255
D-256

6-Mar-10
6-Mar-10
7-Mar-10
8-Mar-10
8-Mar-10
8-Mar-10
9-Mar-10
9-Mar-10
10-Mar-10
10-Mar-10
11-Mar-10
11-Mar-10
11-Mar-10
12-Mar-10
12-Mar-10
12-Mar-10
12-Mar-10
13-Mar-10
13-Mar-10
13-Mar-10
13-Mar-10
14-Mar-10
14-Mar-10
15-Mar-10
15-Mar-10
16-Mar-10
16-Mar-10
16-Mar-10
17-Mar-10
17-Mar-10
18-Mar-10

30.22
30.22
27.41
30.22
27.11
29.63
26.67
26.37
30.52
30.67
26.96
31.26
25.93
26.22
25.63
26.52
25.63
28.89
31.56
30.67
31.70
29.19
28.89
29.63
25.19
29.48
29.93
30.37
33.78
28.89
25.19

D-257

18-Mar-10

26.67

26.9

Sample No. 257to 288


29.04

28.06

Average
28.66

29.07

Standard deviation
2.25

25.99

Coefficient of variation
7.86
29.69

28.92

29.75

28.15

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

D-259
D-260
D-264
D-267
D-269
D-270
D-271
D-272
D-274
D-277
DSB-355
D-280
D-282
D-283
D-284
D-285
D-286
D-289
D-290
D-294
D-296
D-299
D-300
D-301
D-302
D-303
D-304
D-305
D-306
D-307
D-308

18-Mar-10
18-Mar-10
19-Mar-10
20-Mar-10
20-Mar-10
20-Mar-10
21-Mar-10
21-Mar-10
23-Mar-10
23-Mar-10
24-Mar-10
24-Mar-10
25-Mar-10
25-Mar-10
25-Mar-10
25-Mar-10
26-Mar-10
26-Mar-10
26-Mar-10
27-Mar-10
27-Mar-10
28-Mar-10
29-Mar-10
29-Mar-10
29-Mar-10
29-Mar-10
30-Mar-10
30-Mar-10
30-Mar-10
31-Mar-10
31-Mar-10

26.22
25.19
28.00
26.22
27.11
26.07
29.78
30.07
29.63
32.89
28.30
27.20
27.56
30.37
30.81
27.70
27.56
26.96
27.85
26.07
26.96
30.51
26.52
27.70
27.70
25.93
28.89
30.07
25.63
29.48
30.37

D-309

31-Mar-10

25.78

26.6

Sample No. 289to 320


26.55

28.53

Average
28.03

29.12

Standard deviation
1.88

28.80

Coefficient of variation
6.71
27.08

27.88

27.64

27.70

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352

Date of
Casting

D-312
D-313
D-314
D-315
D-316
D-317
D-319
D-321
D-322
D-323
D-324
D-325
D-326
D-327
D-328
D-329
D-331
D-332
D-333
D-335
D-336
D-337
D-340
D-341
D-342
D-343
D-344
D-345
D-346
D-348
D-349

31-Mar-10
31-Mar-10
1-Apr-10
1-Apr-10
1-Apr-10
1-Apr-10
2-Apr-10
3-Apr-10
3-Apr-10
4-Apr-10
4-Apr-10
5-Apr-10
5-Apr-10
5-Apr-10
6-Apr-10
6-Apr-10
6-Apr-10
7-Apr-10
7-Apr-10
7-Apr-10
7-Apr-10
7-Apr-10
8-Apr-10
8-Apr-10
8-Apr-10
9-Apr-10
9-Apr-10
9-Apr-10
9-Apr-10
10-Apr-10
10-Apr-10

D-352

10-Apr-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

27.26
27.26
27.70
31.56
28.59
29.63
31.41
26.07
30.07
29.93
31.41
27.70
31.11
28.59
26.52
26.37
30.22
32.59
32.89
32.44
27.85
29.04
28.74
29.19
28.44
28.74
29.78
27.11
29.48
27.41
26.22
26.67

26.6

Sample No. 321to 352


28.47

29.15

Average
29.00

30.04

Standard deviation
1.97

28.56

Coefficient of variation
6.78
31.20

28.65

28.71

27.82

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384

Date of
Casting

D-354
D-355
D-356
D-359
D-360
D-361
D-364
D-366
D-367
D-368
D-369
D-372
D-373
D-375
D-377
D-379
D-380
D-382
D-383
D-385
D-386
D-388
D-389
D-390
D-391
D-392
D-394
D-395
D-396
D-397
D-399

10-Apr-10
11-Apr-10
11-Apr-10
12-Apr-10
12-Apr-10
13-Apr-10
13-Apr-10
13-Apr-10
14-Apr-10
14-Apr-10
14-Apr-10
15-Apr-10
15-Apr-10
16-Apr-10
17-Apr-10
18-Apr-10
18-Apr-10
19-Apr-10
20-Apr-10
20-Apr-10
20-Apr-10
21-Apr-10
21-Apr-10
21-Apr-10
21-Apr-10
21-Apr-10
22-Apr-10
22-Apr-10
22-Apr-10
23-Apr-10
23-Apr-10

D-400

23-Apr-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

29.33
26.22
28.30
31.11
31.11
31.41
31.26
29.33
29.04
25.78
28.57
27.70
29.04
26.22
28.59
25.78
28.30
31.70
26.66
28.44
31.26
27.70
28.74
28.26
28.44
29.04
28.74
28.45
25.93
27.26
25.63
25.78

26.5

Sample No. 353to 384


29.21

30.43

Average
28.41

28.03

Standard deviation
1.83

27.59

Coefficient of variation
6.43
29.27

28.88

28.12

26.15

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

D-402
D-404
D-406
D-407
D-409
D-411
D-414
D-415
D-416
D-418
D-421
D-440
D-444
D-445
D-447
D-448
D-450
D-451
D-452
D-454
D-455
D-457
D-460
D-461
D-462
D-463
D-464
D-466
D-470
D-475
D-476

24-Apr-10
24-Apr-10
24-Apr-10
24-Apr-10
25-Apr-10
25-Apr-10
25-Apr-10
26-Apr-10
26-Apr-10
26-Apr-10
26-Apr-10
2-May-10
3-May-10
3-May-10
3-May-10
4-May-10
4-May-10
4-May-10
4-May-10
5-May-10
5-May-10
5-May-10
6-May-10
6-May-10
6-May-10
6-May-10
7-May-10
8-May-10
8-May-10
9-May-10
9-May-10

26.57
28.44
27.85
26.81
28.89
30.67
27.70
28.89
30.67
26.37
28.74
28.59
26.07
26.37
26.52
26.04
26.81
28.59
28.59

D-477

10-May-10

30.07

25.48
25.63
28.30
26.67
31.41
30.67
30.37
27.55
26.22
25.18
30.07
28.44

26.5

Sample No. 385to 416


26.52

30.00

Average
27.98

27.48

Standard deviation
1.76

27.42

Coefficient of variation
6.29
29.04

28.59

26.25

28.52

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

417
418

D-478

10-May-10

28.00

D-479

10-May-10

29.63

419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448

D-480
D-481
D-482
D-483
D-484
D-487
D-489
D-491
D-492
D-493
D-497
D-498
D-499

10-May-10
10-May-10
10-May-10
11-May-10
11-May-10
12-May-10
13-May-10
13-May-10
14-May-10
14-May-10
15-May-10
15-May-10
15-May-10

29.78
30.96
30.07
26.67
26.67
26.96
29.04
30.81
31.11
29.33
30.67
29.78
26.96

D-502
D-504
D-505
D-506
D-507
D-508
D-509
D-510
D-514
D-516
D-518
D-520
D-522
D-523
D-525
D-526

16-May-10
17-May-10
17-May-10
17-May-10
17-May-10
17-May-10
18-May-10
18-May-10
18-May-10
19-May-10
20-May-10
21-May-10
21-May-10
21-May-10
22-May-10
22-May-10
22-May-10

27.7
29.04
31.11
31.85
30.67
30.07
25.93
29.63
30.37
26.37
30.22
29.33
30.07
28.3
27.85
27.71

D-527

fck+0.825x
established
standard deviation

28.44

26.3

Sample No. 417to 448


29.59

27.59

Average
29.10

30.07

Standard deviation
1.61

28.78

Coefficient of variation
5.54
30.67

29.00

29.00

28.08

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480

D-529
D-530
D-531
D-534
D-535
D-538
D-541
D-542
D-543
D-544
D-545
D-546
D-549
D-551
D-553
D-558
D-559
D-560
D-561
D-562
D-563
D-564
D-565
D-566
D-567
D-568
D-569
D-570
D-571
D-572
D-573
D-574

Date of
Casting
22-May-10
23-May-10
24-May-10
25-May-10
25-May-10
25-May-10
26-May-10
27-May-10
27-May-10
27-May-10
28-May-10
29-May-10
29-May-10
29-May-10
30-May-10
31-May-10
31-May-10
1-Jun-10
1-Jun-10
1-Jun-10
1-Jun-10
1-Jun-10
1-Jun-10
2-Jun-10
2-Jun-10
2-Jun-10
2-Jun-10
2-Jun-10
2-Jun-10
3-Jun-10
3-Jun-10
3-Jun-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

29.63
31.11
33.04
31.11
30.96
29.48
27.41
26.67
28
28.44
27.56
25.63
27.85
25.63
30.22
30.81
25.63
26.96
28.59
28.59
32.15
26.52
31.11
27.73
26.81
28.59
31.41
27.7
26.52
26.37
28.30
30.96

26.7

Sample No. 449 to 480


31.22

28.63

Average
28.67

27.41

Standard deviation
2.08

28.63

Coefficient of variation
7.26
27.44

29.38

28.63

28.04

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509

D-575
D-576
D-577
D-578
D-580
D-581
D-583
D-585
D-586
D-587
D-590
D-593
D-594
D-595
D-596
D-597
D-598
D-599
D-602
D-603
D-604
D-605
D-607
D-609
D-612
D-613
D-614
D-616

510
511
512

D-619
D-622

D-618

D-623

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

4-Jun-10
4-Jun-10
4-Jun-10
5-Jun-10
5-Jun-10
5-Jun-10
6-Jun-10
7-Jun-10
7-Jun-10
8-Jun-10
9-Jun-10
10-Jun-10
10-Jun-10
11-Jun-10
11-Jun-10
12-Jun-10
12-Jun-10
12-Jun-10
13-Jun-10
13-Jun-10
14-Jun-10
14-Jun-10
14-Jun-10
15-Jun-10
15-Jun-10
16-Jun-10
16-Jun-10
16-Jun-10
17-Jun-10

28.74
27.85
28.44
27.56
27.85
31.11
27.26
29.04
26.67
26.22
29.78
27.41
29.63
27.11
27.85
31.41
28.89
27.70
28.00
27.26
26.96
26.52
27.26
28.74
25.78
25.93
26.96
26.96
25.93

17-Jun-10
18-Jun-10
18-Jun-10

26.67
26.07
29.78

26.2

Sample No. 481 to 512


28.15

28.82

Average
27.79

27.52

Standard deviation
1.44

29.00

Coefficient of variation
5.19
27.96

27.37

26.41

27.11

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544

Date of
Casting

D-625
D-626
D-627
D-628
D-630
D-633
D-634
D-635
D-636
D-637
D-642
D-643
D-645
D-647
DSB-425
DSB-426
DSB-427
DSB-428
DSB-429
DSB-430
DSB-431
DSB-432
D-649
DSB-433
D-651
DSB-435
D-654
DSB-440
DSB-441
D-656
DSB-442

18-Jun-10
19-Jun-10
19-Jun-10
19-Jun-10
22-Jun-10
22-Jun-10
22-Jun-10
23-Jun-10
23-Jun-10
23-Jun-10
26-Jun-10
26-Jun-10
27-Jun-10
28-Jun-10
29-Jun-10
29-Jun-10
30-Jun-10
30-Jun-10
30-Jun-10
30-Jun-10
30-Jun-10
30-Jun-10

DSB-443

7-Jul-10

1-Jul-10
1-Jul-10
2-Jul-10
2-Jul-10
4-Jul-10
6-Jul-10
6-Jul-10
7-Jul-10
7-Jul-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

27.85
28.30
27.26
28.74
28.74
29.48
29.19
27.56
31.41
32.15
33.19
33.48
33.33
33.04
28.59
28.74
27.41
33.33
28.77
29.19
31.70
32.44
29.03
29.48
25.19
25.48
25.78
26.37
26.07
26.22
26.52
26.07

27.2

Sample No. 513 to 544


28.04

28.74

Average
29.07

32.56

Standard deviation
2.61

30.93

Coefficient of variation
8.99
29.68

30.66

25.71

26.22

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

Not less than


(Mpa)

(which ever is more)


Mpa

27-Jul-10
27-Jul-10
28-Jul-10
28-Jul-10
29-Jul-10
29-Jul-10

25.33
25.93
26.22
26.22
26.22
26.22
26.07
25.48
25.93
30.22
25.48
25.78
25.93
26.82
33.18
26.67
27.41
26.07
29.48
25.19
26.37
25.93
29.19
25.93
23.89
26.08
26.37
32.44
31.11
32.59
26.22

DSB-492

29-Jul-10

25.19

22-Jul-10
23-Jul-10
23-Jul-10
23-Jul-10
23-Jul-10
24-Jul-10
24-Jul-10
24-Jul-10
24-Jul-10

f ck+4

28 Days

8-Jul-10
9-Jul-10
13-Jul-10
13-Jul-10
13-Jul-10
13-Jul-10

21-Jul-10
21-Jul-10
21-Jul-10

Statistical Analysis

28 Days

DSB-445
DSB-446
DSB-455
DSB-456
DSB-457
DSB-459
D-665
D-666
DSB-465
DSB-466
DSB-467
DSB-468
DSB-473
D-676
D-677
DSB-475
D-678
D-679
DSB-480
DSB-481
DSB-484
D-681
D-682
D-683
DSB-485
D-685
D-687
D-689
D-690
DSB-490
DSB-491

15-Jul-10
15-Jul-10
16-Jul-10
16-Jul-10
16-Jul-10
17-Jul-10
20-Jul-10

fck+0.825x
established
standard deviation

27.0

Sample No. 545 to 576


25.93

26.00

Average
27.10

26.85

Standard deviation
2.37

28.15

Coefficient of variation
8.76
27.04

26.86

27.20

28.78

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608

Date of
Casting

D-693
D-694
D-697
D-699

30-Jul-10
30-Jul-10
3-Aug-10
4-Aug-10

D-700
D-701
D-702
DSB-498
DSB-501
D-704
D-706
D-707
DSB-506
D-709
D-710
D-711
DSB-510
D-715
D-716
D-717
D-718
DSB-520
D-720
D-722
D-723
D-724
D-725
D-726
D-728
D-731
D-732
D-733

4-Aug-10
5-Aug-10
5-Aug-10
5-Aug-10
6-Aug-10
10-Aug-10
11-Aug-10
11-Aug-10
11-Aug-10
12-Aug-10
12-Aug-10
14-Aug-10
14-Aug-10
17-Aug-10
18-Aug-10
19-Aug-10
20-Aug-10
20-Aug-10
23-Aug-10
24-Aug-10
24-Aug-10
24-Aug-10
25-Aug-10
25-Aug-10
27-Aug-10
30-Aug-10
30-Aug-10
30-Aug-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

30.67
33.04
26.07
25.93
27.26
26.52
26.33
29.19
31.11
32.16
28.3
27.85
29.41
30.07
27.26
27.85
26.52
29.19
26.82
30.96
27.85
26.67
28.44
29.33
29.33
29.19
27.7
28.44
27.41
29.04
30.37
28.89

26.5

Sample No. 577 to 608


28.93

27.33

Average
28.60

29.86

Standard deviation
1.78

28.65

Coefficient of variation
6.24
28.37

28.07

28.67

28.93

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640

D-734
DSB-538
DSB-539
D-737
D-738
D-742
D-743
D-744
D-746
D-749
D-750
D-751
DSB-560
DSB-561
DSB-563
D-755
D-756
D-757
D-758
D-759
D-760
D-761
D-764
D-768
D-769
DSB-574
DSB-575
D-774
D-775
DSB-576
DSB-577
DSB-579

Date of
Casting
30-Aug-10
30-Aug-10
30-Aug-10
31-Aug-10
31-Aug-10
2-Sep-10
2-Sep-10
2-Sep-10
3-Sep
4-Sep
4-Sep
4-Sep
6-Sep
6-Sep
7-Sep
7-Sep
7-Sep
8-Sep
8-Sep
13-Sep
13-Sep
13-Sep
15-Sep
27-Sep
27-Sep
5-Oct
6-Oct
6-Oct
6-Oct
7-Oct
7-Oct
7-Oct

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

29.63
29.93
28.3
26.07
26.37
28.3
28.74
30.07
26.07
29.78
30.22
28.3
28.00
28.74
31.26
25.19
27.11
27.41
26.22
29.33
28.74
26.67
25.63
26.22
25.48
29.04
26.07
25.63
25.19
25.78
25.33
30.37

26.5

Sample No. 609 to 640


28.48

28.37

Average
27.66

28.59

Standard deviation
1.84

28.30

Coefficient of variation
6.64
27.52

26.82

26.56

26.67

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672

D-777
D-778
D-779
DSB-582
DSB-583
D-782
D-783
D-784
D-785
D-786
DSB-585
DSB-589
DSB-590
DSB-592
D-792
D-793
D-794
D-795
D-796
D-801
D-802
DSB-597
DSB-598
D-803
D-804
D-806
D-807
DSB-600
DSB-601
DSB-604
D-808
D-809

Date of
Casting
8-Oct
8-Oct
8-Oct
9-Oct
9-Oct
9-Oct
9-Oct
9-Oct
9-Oct
9-Oct
10-Oct
11-Oct
12-Oct
12-Oct
13-Oct
13-Oct
13-Oct
14-Oct
14-Oct
15-Oct
15-Oct
16-Oct
16-Oct
16-Oct
16-Oct
16-Oct
16-Oct
18-Oct
18-Oct
19-Oct
19-Oct
19-Oct

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

26.07
26.67
26.22
30.37
27.26
25.48
25.48
25.63
25.48
25.78
25.93
26.67
24.15
29.19
26.22
25.33
26.52
26.22
25.48
28
16.89
25.93
26.52
27.11
25.63
26.67
26.37
26.82
26.07
26.52
26.37
27.26

26.7

Sample No. 641 to 672


27.33

25.96

Average
26.13

25.97

Standard deviation
2.04

26.22

Coefficient of variation
7.79
26.56

24.11

26.37

26.56

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704

D-810
D-811
DSB-606
DSB-607
DSB-608
DSB-609
D-814
D-815
D-816
DSB-611
DSB-612
D-817
D-818
DSB-615
DSB-617
D-820
D-821
DSB-619
D-823
D-824
D-825
DSB-626
D-826
D-827
D-828
DSB-627
D-829
D-830
DSB-634
D-831
D-832
DSB-636

Date of
Casting
19-Oct
19-Oct
20-Oct
20-Oct
21-Oct
21-Oct
21-Oct
21-Oct
21-Oct
23-Oct
23-Oct
23-Oct
23-Oct
25-Oct
26-Oct
26-Oct
27-Oct
28-Oct
28-Oct
28-Oct
29-Oct
1-Nov
1-Nov
1-Nov
1-Nov
2-Nov
2-Nov
8-Nov-10
8-Nov-10
9-Nov-10
9-Nov-10
13-Nov-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

27.41
27.26
25.48
25.04
26.37
25.33
25.33
25.48
25.92
25.33
25.19
26.96
25.48
25.48
25.04
27.85
29.48
27.70
26.37
26.22
26.81
25.19
28
25.93
26.52
30.22
25.48
27.41
26.52
27.85
26.52
31.41

26.3

Sample No. 673 to 704


26.30

25.63

Average
26.64

25.85

Standard deviation
1.54

25.96

Coefficient of variation
5.79
27.44

26.48

27.41

28.08

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736

DSB-637
DSB-638
D-834
DSB-639
D-838
D-839
D-840
D-841
D-842
DSB-649
D-843
D-845
DSB-652
DSB-653
DSB-654
DSB-655
D-847
D-848
DSB-662
DSB-668
DSB-670
DAM-852
DAM-855
DSB-672
DSB-673
DSB-675
DAM-856
DSB-676
DAM-858
DAM-859
DAM-860
DAM-861

Date of
Casting
14-Nov-10
14-Nov-10
15-Nov-10
15-Nov-10
21-Nov-10
22-Nov-10
22-Nov-10
23-Nov-10
23-Nov-10
25-Nov-10
26-Nov-10
29-Nov-10
29-Nov-10
30-Nov-10
30-Nov-10
30-Nov-10
1-Dec-10
1-Dec-10
8-Dec-10
14-Dec-10
16-Dec-10
17-Dec-10
18-Dec-10
19-Dec-10
19-Dec-10
20-Dec-10
21-Dec-10
22-Dec-10
22-Dec-10
22-Dec-10
22-Dec-10
22-Dec-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

28.15
26.52
26.22
28.29
31.11
26.37
26.37
25.78
26.22
28
26.37
29.04
25.63
26.07
26.52
25.19
24.74
23.85
34.96
27.85
31.70
30.07
29.04
28.44
29.33
27.41
20.74
26.07
26.52
25.63
25.04
25.04

27.1

Sample No. 705 to 736


27.30

27.41

Average
27.13

27.41

Standard deviation
2.58

25.85

Coefficient of variation
9.53
27.85

29.81

25.89

25.56

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768

DAM-862
DSB-679
DAM-866
DSB-683
DSB-684
DSB-685
DSB-688
DAM-868
DAM-869
DAM-870
DAM-872
DAM-873
DAM-874
DAM-876
DAM-878
DAM-879
DAM-883
DAM-884
DAM-885
DAM-889
DAM-890
DAM-891
DAM-894
DAM-895
DAM-896
DSB-702
DAM-898
DSB-705
DSB-706
DAM-902
DAM-903
DAM-904

Date of
Casting
22-Dec-10
23-Dec-10
23-Dec-10
25-Dec-10
26-Dec-10
26-Dec-10
27-Dec-10
27-Dec-10
27-Dec-10
27-Dec-10
28-Dec-10
28-Dec-10
28-Dec-10
28-Dec-10
29-Dec-10
29-Dec-10
2-Jan-11
3-Jan-11
3-Jan-11
6-Jan-11
6-Jan-11
6-Jan-11
8-Jan-11
8-Jan-11
8-Jan-11
9-Jan-11
10-Jan-11
10-Jan-11
10-Jan-11
11-Jan-11
11-Jan-11
11-Jan-11

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

26.37
26.96
25.78
28.44
30.07
28.30
26.37
29.19
28.15
28.44
25.78
29.19
25.63
30.22
26.07
25.63
25.63
26.96
26.81
28
28.44
25.93
25.18
28.44
27.41
27.7
25.63
31.11
29.78
25.19
26.81
27.41

26.3

Sample No. 737 to 768


26.89

28.48

Average
27.41

27.89

Standard deviation
1.62

26.89

Coefficient of variation
5.93
26.85

27.00

27.96

27.30

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800

DAM-906
DSB-707
DAM-909
DAM-910
DAM-911
DAM-912
DAM-913
DAM-914
DAM-915
DAM-916
DAM-917
DAM-918
DAM-919
DAM-922
DSB-717
DSB-718
DAM-923
DAM-924
DAM-925
DAM-926
DAM-928
DAM-929
DSB-724
DAM-932
DAM-933
DAM-934
DAM-935
DSB-725
DSB-728
DAM-939
DAM-940
DSB-729

Date of
Casting
12-Jan-11
12-Jan-11
13-Jan-11
13-Jan-11
13-Jan-11
14-Jan-11
14-Jan-11
14-Jan-11
15-Jan-11
15-Jan-11
15-Jan-11
17-Jan-11
17-Jan-11
17-Jan-11
18-Jan-11
18-Jan-11
19-Jan-11
19-Jan-11
19-Jan-11
19-Jan-11
20-Jan-11
20-Jan-11
21-Jan-11
22-Jan-11
22-Jan-11
22-Jan-11
22-Jan-11
22-Jan-11
23-Jan-11
24-Jan-11
24-Jan-11
24-Jan-11

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

26.96
26.67
26.07
25.33
27.85
25.33
28.44
27.56
30.37
29.78
27.11
26.52
25.93
25.33
28.89
28.74
27.11
25.93
29.93
26.67
28.15
27.7
25.63
29.04
26.81
27.3
28.15
25.63
26.67
32.44
25.63
26.96

26.4

Sample No. 769 to 800


26.26

27.30

Average
27.39

28.45

Standard deviation
1.68

27.22

Coefficient of variation
6.12
27.41

27.63

26.97

27.93

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

DSB-730
DAM-944
DSB-731
DSB-732
DAM-945
DAM-946
DAM-947
DAM-948
DAM-951
DAM-952
DAM-956
DAM-957
DAM-958
DSB-741
DAM-961
DAM-962
DAM-965
DAM-967
DAM-969
DAM-970
DAM-971
DAM-976
DAM-977
DAM-978
DAM-979
DAM-983
DAM-984
DAM-985
DAM-988
DAM-989
DAM-990

24-Jan-11
25-Jan-11
25-Jan-11
25-Jan-11
27-Jan-11
27-Jan-11
27-Jan-11
27-Jan-11
28-Jan-11
28-Jan-11
29-Jan-11
29-Jan-11
29-Jan-11
29-Jan-11
31-Jan-11
31-Jan-11
31-Jan-11
1-Feb-11
1-Feb-11
2-Feb-11
2-Feb-11
4-Feb-11
4-Feb-11
5-Feb-11
5-Feb-11
7-Feb-11
7-Feb-11
7-Feb-11
8-Feb-11
8-Feb-11
8-Feb-11

26.96
28.59
29.04
27.41
30.37
28.59
28.15
26.67
26.67
29.78
31.85
29.63
29.63
30.81
31.7
29.48
26.52
29.33
25.48
26.22
26.52
29.19
28.15
27.56
27.11
26.81
28.74
25.04
26.37
25.48
26.07

DSB-757

8-Feb-11

25.78

26.5

Sample No. 801 to 832


28.00

28.45

Average
27.99

29.48

Standard deviation
1.85

30.41

Coefficient of variation
6.60
26.89

27.86

26.93

25.93

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864

Date of
Casting

DAM-993
DAM-994
DAM-995
DAM-996
DAM-998
DAM-999
DAM-1001
DAM-1002
DAM-1005
DAM-1006
DAM-1007
DAM-1011
DAM-1012
DAM-1013
DAM-1014
DAM-1015
DSB-767
DAM-1018
DAM-1019
DAM-1022
DAM-1023
DAM-1025
DAM-1026
DAM-1029
DSB-775
DAM-1031
DAM-1032
DAM-1033
DAM-1034
DAM-1035
DAM-1039

9-Feb-11
9-Feb-11
9-Feb-11
9-Feb-11
10-Feb-11
10-Feb-11
11-Feb-11
11-Feb-11
12-Feb-11
12-Feb-11
12-Feb-11
15-Feb-11
15-Feb-11
15-Feb-11
16-Feb-11
16-Feb-11
16-Feb-11
17-Feb-11
17-Feb-11
18-Feb-11
18-Feb-11
19-Feb-11
19-Feb-11
21-Feb-11
21-Feb-11
22-Feb-11
22-Feb-11
22-Feb-11
22-Feb-11
22-Feb-11
23-Feb-11

DAM-1040

23-Feb-11

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

27.41
25.48
32.89
32.59
26.96
26.07
26.67
28.30
32.74
26.96
27.26
29.19
29.19
27.85
25.93
27.7
26.22
27.11
26.81
26.81
27.26
25.04
27.26
27.26
13.78
23.41
28.3
29.33
27.41
23.11
21.63
28.59

27.8

Sample No. 833 to 864


29.59

27.00

Average
26.95

29.04

Standard deviation
3.42

27.67

Coefficient of variation
12.68
26.74

26.71

23.71

25.19

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896

DAM-1041
DAM-1043
DAM-1044
DAM-1048
DAM-1050
DAM-1051
DAM-1052
DAM-1055
DAM-1057
DAM-1058
DAM-1059
DAM-1060
DAM-1061
DAM-1065
DAM-1067
DSB-790
DSB-791
DSB-793
DAM-1071
DAM-1072
Dam1079
Dam1080
DSB 798
Dam1083
Dam1084
Dam1085
Dam1088
Dam1089
Dam1091
DSB 803
Dam1094
Dam1095

Date of
Casting
23-Feb-11
24-Feb-11
24-Feb-11
24-Feb-11
25-Feb-11
25-Feb-11
25-Feb-11
26-Feb-11
27-Feb-11
27-Feb-11
28-Feb-11
28-Feb-11
28-Feb-11
1-Mar-11
1-Mar-11
1-Mar-11
1-Mar-11
2-Mar-11
3-Mar-11
3-Mar-11
05-Mar-11
05-Mar-11
05-Mar-11
07-Mar-11
07-Mar-11
07-Mar-11
08-Mar-11
08-Mar-11
09-Mar-11
09-Mar-11
10-Mar-11
10-Mar-11

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

29.19
28.3
28.74
26.22
25.93
27.85
27.41
14.67
26.07
25.63
19.85
21.04
20.59
26.81
27.11
25.48
21.93
22.67
29.78
28.15

25.19
20.74
21.48
27.85
28.3
28.74
32.89
34.37
26.67
24
30.07
25.19

28.3

Sample No. 865 to 896


28.11

23.97

Average
25.90

23.15

Standard deviation
4.02

25.00

Coefficient of variation
15.52
25.63

23.82

31.08

26.48

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928

DSB 805
Dam1097
Dam1098
Dam1099
DSB 807
Dam1100
Dam1101
DSB 809
Dam1108
Dam1109
Dam1110
Dam1113
Dam1114
DSB 815
Dam1116
DSB 817
Dam1119
Dam1120
DSB 818
DSB 823
DSB 825
DSB 827
DSB 828
Dam1122
Dam1123
Dam1125
Dam1126
Dam1127
DSB 831
DSB 833
SN 6
Dam1129

Date of
Casting
10-Mar-11
11-Mar-11
11-Mar-11
11-Mar-11
11-Mar-11
12-Mar-11
12-Mar-11
12-Mar-11
13-Mar-11
13-Mar-11
14-Mar-11
15-Mar-11
15-Mar-11
15-Mar-11
16-Mar-11
16-Mar-11
17-Mar-11
17-Mar-11
17-Mar-11
22-Mar-11
23-Mar-11
23-Mar-11
23-Mar-11
24-Mar-11
24-Mar-11
25-Mar-11
25-Mar-11
25-Mar-11
25-Mar-11
25-Mar-11
25-Mar-11
26-Mar-11

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

23.85
26.52
31.11
28.59
32.59
25.78
31.7
26.07
25.48
25.19
26.51
35.52
32.59
25.19
28.74
26.07
26.37
28.3
22.22
22.67
22.67
23.11
22.81
27.11
27.7
27.33
28.3
28.15
21.48
24.59
23.56
28.15

27.8

Sample No. 897 to 928


27.52

29.04

Average
26.75

28.18

Standard deviation
3.35

28.15

Coefficient of variation
12.53
24.89

23.93

27.87

24.45

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 316 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
929
930
931
932
933
934
935
936
937
938

Dam1148
Dam1153
Dam1154
Dam1155
DSB 840
DSB 841
DSB 842
DSB 844
DSB 845

Date of
Casting
29-Mar-11
31-Mar-11
31-Mar-11
31-Mar-11
01-Apr-11
01-Apr-11
01-Apr-11
01-Apr-11
01-Apr-11

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

28.74
27.85
22.51
33.04
28
29.19
22.67
26.37
26.96

28.04

26.56

26.96

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

PHC-06
PHC-07
PHC-08
PHC-09
PHC-10
PHC-11
PHC-12
PHC-13
PHC-14
PHC-15
PHC-16
PHC-17
PHC-18
PHC-19
PHC-20
PHC-21
PHC-22
PHC-23
PHC-24
PHC-25
PHC-26
PHC-27
PHC-28
PHC-29
PHC-30
PHC-31
PHC-32
PHC-33
PHC-34
PHC-35
PHC-36

3-Apr-09
9-Apr-09
10-Apr-09
14-Apr-09
15-Apr-09
16-Apr-09
17-Apr-09
19-Apr-09
20-Apr-09
21-Apr-09
23-Apr-09
24-Apr-09
26-Apr-09
27-Apr-09
28-Apr-09
29-Apr-09
30-Apr-09
2-May-09
4-May-09
5-May-09
7-May-09
8-May-09
9-May-09
9-May-09
11-May-09
12-May-09
13-May-09
14-May-09
15-May-09
16-May-09
17-May-09

25.19
26.82
29.18
26.07
28.00
27.41
29.48
29.18
26.96
29.48
29.04
27.41
30.22
31.26
30.37
27.99
26.96
29.78
25.93
28.30
26.96
30.96
28.44
32.59
34.22
31.11
30.81
33.19
31.85
31.85
26.07

PHC-37

19-May-09

26.67

21

26.9

Statistical Analysis

29
Sample No. 1 to 32
26.82

28.52

Average
29.05

28.22

Standard deviation
2.32

29.96

Coefficient of variation
7.98
27.74

29.74

32.33

29.11

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

PHC-38
PHC-39
PHC-40
PHC-41
PHC-42
PHC-43
PHC-44
PHC-45
PHC-46
PHC-47
PHC-48
PHC-49
PHC-50
PHC-51
PHC-52
PHC-53
PHC-54
PHC-55
PHC-56
PHC-57
PHC-58
PHC-59
PHC-60
PHC-61
PHC-62
PHC-63
PHC-64
PHC-65
PHC-66
PHC-67
PHC-68

20-May-09
22-May-09
23-May-09
24-May-09
25-May-09
26-May-09
28-May-09
29-May-09
30-May-09
1-Jun-09
3-Jun-09
4-Jun-09
5-Jun-09
5-Jun-09
6-Jun-09
8-Jun-09
9-Jun-09
11-Jun-09
11-Jun-09
12-Jun-09
13-Jun-09
13-Jun-09
15-Jun-09
16-Jun-09
17-Jun-09
18-Jun-09
19-Jun-09
20-Jun-09
20-Jun-09
21-Jun-09
22-Jun-09

26.22
29.93
25.48
25.93
26.82
30.07
26.52
27.11
25.48
27.41
28.29
26.96
28.59
28.00
27.10
31.56
27.56
27.85
28.89
26.07
29.04
29.63
28.74
28.89
26.96
28.59
27.26
25.93
28.89
26.52
27.56

PHC-69

23-Jun-09

29.48

26.2

Statistical Analysis

Sample No. 33 to 64
26.89

27.63

Average
27.79

27.04

Standard deviation
1.48

28.81

Coefficient of variation
5.33
27.59

29.08

27.19

28.11

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

PHC-70
PHC-71
PHC-72
PHC-73
PHC-74
PHC-75
PHC-76
PHC-77
PHC-78
PHC-79
PHC-80
PHC-81
PHC-82
PHC-83
PHC-84
PHC-85
PHC-86
PHC-87
PHC-88
DSB-24
PHC-89
PHC-90
PHC-91
PHC-92
PHC-93
DSB-25
DSB-26
PHC-94
PHC-95
PHC-96
DSB-36

24-Jun-09
25-Jun-09
27-Jun-09
27-Jun-09
30-Jun-09
1-Jul-09
2-Jul-09
2-Jul-09
3-Jul-09
4-Jul-09
4-Jul-09
6-Jul-09
7-Jul-09
7-Jul-09
12-Jul-09
13-Jul-09
15-Jul-09
15-Jul-09
16-Jul-09
17-Jul-09
17-Jul-09
17-Jul-09
18-Jul-09
18-Jul-09
18-Jul-09
20-Jul-09
20-Jul-09
20-Jul-09
21-Jul-09
24-Jul-09
25-Jul-09

27.70
30.81
29.33
30.96
26.81
28.89
27.26
25.04
28.59
30.37
26.81
28.30
25.33
28.15
31.41
27.85
25.48
26.81
25.63
29.18
29.93
26.67
27.56
25.04
25.63
29.48
30.96
25.48
25.78
28.59
29.18

PHC-97

25-Jul-09

26.81

26.6

Statistical Analysis

Sample No. 65 to 96
29.70

27.00

Average
27.87

28.52

Standard deviation
1.93

28.19

Coefficient of variation
6.94
26.78

27.30

27.89

27.59

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128

DSB-40
PHC-98
PHC-99
PHC-100
PHC-101
PHC-102
PHC-103
PHC-104
PHC-105
PHC-106
PHC-107
PHC-108
PHC-109
PHC-110
PHC-111
PHC-112
PHC-113
PHC-114
PHC-115
PHC-116
PHC-117
DSB-64
PHC-118
PHC-119
PHC-120
PHC-121
PHC-122
PHC-123
PHC-124
DSB-79
DSB-80

26-Jul-09
27-Jul-09
30-Jul-09
31-Jul-09
31-Jul-09
1-Aug-09
2-Aug-09
2-Aug-09
5-Aug-09
5-Aug-09
5-Aug-09
6-Aug-09
6-Aug-09
7-Aug-09
7-Aug-09
8-Aug-09
9-Aug-09
9-Aug-09
10-Aug-09
10-Aug-09
12-Aug-09
13-Aug-09
14-Aug-09
17-Aug-09
19-Aug-09
19-Aug-09
19-Aug-09
24-Aug-09
24-Aug-09
25-Aug-09
25-Aug-09

25.19
26.51
26.52
27.85
26.96
26.81
30.22
26.67
25.33
27.11
27.41
28.30
29.63
28.89
25.48
26.81
29.19
26.81
25.33
28.59
25.19
31.09
30.81
27.26
29.04
25.19
27.26
28.74
26.96
26.08
25.04

DSB-85

26-Aug-09

25.04

26.4

Statistical Analysis

Sample No. 97 to 128


26.52

27.67

Average
27.29

27.04

Standard deviation
1.74

27.70

Coefficient of variation
6.37
27.48

28.59

27.56

25.78

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

DSB-87
PHC-125
DSB-90
PHC-126
DSB-93
PHC-127
PHC-128
PHC-129
DSB-96
DSB-99
PHC-130
PHC-131
PHC-132
PHC-133
DSB-101
PHC-134
PHC-135
DSB-107
PHC-136
PHC-137
PHC-138
PHC-139
PHC-140
PHC-141
PHC-142
PHC-143
PHC-144
PHC-145
DSB-139
DSB-143
DSB-148

27-Aug-09
27-Aug-09
28-Aug-09
28-Aug-09
29-Aug-09
29-Aug-09
31-Aug-09
2-Sep-09
4-Sep-09
5-Sep-09
5-Sep-09
6-Sep-09
6-Sep-09
7-Sep-09
8-Sep-09
12-Sep-09
12-Sep-09
15-Sep-09
19-Sep-09
20-Sep-09
21-Sep-09
21-Sep-09
21-Sep-09
3-Oct-09
3-Oct-09
3-Oct-09
5-Oct-09
5-Oct-09
8-Oct-09
10-Oct-09
13-Oct-09

27.11
25.93
25.19
25.04
25.48
26.52
28.30
26.67
25.33
27.76
27.40
28.89
25.48
25.33
25.19
29.04
25.04
26.08
25.93
26.81
26.37
25.17
26.66
30.22
32.44
26.22
25.48
26.07
29.78
29.19
30.37

PHC-147

13-Oct-09

31.85

26.7

Statistical Analysis

Sample No. 129 to160


25.82

26.74

Average
27.14

27.35

Standard deviation
2.07

26.26

Coefficient of variation
7.62
25.97

27.11

27.55

30.30

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192

DSB-152
DSB-153
PHC-148
DSB-164
PHC-149
PHC-150
PHC-152
PHC-153
PHC-154
PHC-155
PHC-156
DSB-178
DSB-179
PHC-157
DSB-184
DSB-186
PHC-158
DSB-190
PHC-159
PHC-160
PHC-161
DSB-193
PHC-163
DSB-200
DSB-203
PHC-164
DSB-212
DSB-213
DSB-214
PHC-165
PHC-166

14-Oct-09
14-Oct-09
14-Oct-09
21-Oct-09
21-Oct-09
22-Oct-09
22-Oct-09
26-Oct-09
27-Oct-09
28-Oct-09
28-Oct-09
29-Oct-09
29-Oct-09
29-Oct-09
30-Oct-09
31-Oct-09
31-Oct-09
4-Nov-09
4-Nov-09
5-Nov-09
5-Nov-09
6-Nov-09
8-Nov-09
9-Nov-09
9-Nov-09
12-Nov-09
13-Nov-09
13-Nov-09
13-Nov-09
13-Nov-09
13-Nov-09

25.63
26.96
32.15
34.07
30.37
29.93
28.44
32.30
25.19
31.56
31.85
28.74
27.85
25.63
25.63
25.63
30.52
27.70
30.52
29.63
26.96
34.96
29.33
30.22
25.48
31.56
30.07
28.74
28.59
31.70
30.22

PHC-167

15-Nov-09

27.70

27.1

Statistical Analysis

Sample No. 161 to 192


29.70

30.26

Average
29.24

29.34

Standard deviation
2.58

26.19

Coefficient of variation
8.83
29.59

30.37

28.96

29.55

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224

Lab.Ref.
No.

Date of
Casting

DSB-223
PHC-168
PHC-169
PHC-170
PHC-171
PHC-172
DSB-234
PHC-173
PHC-174
PHC-175
PHC-176
PHC-177
PHC-178
PHC-179
PHC-180
PHC-181
PHC-182
PHC-183

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

17-Nov-09
20-Nov-09
21-Nov-09
21-Nov-09
21-Nov-09
23-Nov-09
24-Nov-09
24-Nov-09
24-Nov-09
26-Nov-09
28-Nov-09
28-Nov-09
29-Nov-09
30-Nov-09
3-Dec-09
4-Dec-09
4-Dec-09
6-Dec-09
rotech foundation 1 7-Dec-09
rotech foundation 2 7-Dec-09
rotech foundation 3 7-Dec-09
PHC-184
8-Dec-09
rotech foundation 4 8-Dec-09
PHC-185
9-Dec-09
rotech foundation 5 9-Dec-09
PHC-186 10-Dec-09
DSB-270 11-Dec-09
PHC-187 11-Dec-09
DSB-274 12-Dec-09
PHC-188 12-Dec-09
PHC-189 12-Dec-09

27.85
34.07
34.96
33.48
27.56
30.67
30.07
26.67
25.48
26.37
31.11
25.93
28.74
30.52
26.96
29.48
28.00
31.85
26.37
23.26
24.30
28.44
25.78
28.30
22.07
26.37
22.67
29.93
23.56
29.19
29.78

rotech foundation 615-Dec-09

27.70

27.6

Statistical Analysis

Sample No. 193 to 224


32.59

28.74

Average
28.05

27.22

Standard deviation
3.19

28.93

Coefficient of variation
11.37
27.37

26.71

25.26

27.56

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

PHC-190 16-Dec-09
225
PHC-191 17-Dec-09
226
PHC-193 17-Dec-09
227
DSB-287 18-Dec-09
228
rotech
foundation 719-Dec-09
229
PHC-195 21-Dec-09
230
DSB-291 22-Dec-09
231
DSB-292 22-Dec-09
232
PHC-197 22-Dec-09
233
234 rotech foundation 822-Dec-09
DSB-293 23-Dec-09
235
PHC-198 23-Dec-09
236
DSB-297 24-Dec-09
237
PHC-199 24-Dec-09
238
PHC-201 25-Dec-09
239
PHC-202 25-Dec-09
240
PHC-203 26-Dec-09
241
PHC-204 27-Dec-09
242
PHC-205 27-Dec-09
243
DSB-307 29-Dec-09
244
DSB-309 30-Dec-09
245
PHC-207 30-Dec-09
246
PHC-208 30-Dec-09
247
PHC-209 31-Dec-09
248
PHC-210
4-Jan-10
249
PHC-211
4-Jan-10
250
PHC-212
5-Jan-10
251
DSB-315
6-Jan-10
252
PHC-213
6-Jan-10
253
DSB-316
7-Jan-10
254
PHC-214
7-Jan-10
255
PHC-215
8-Jan-10
256

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

30.52
28.74
29.93
25.33
22.22
30.22
25.93
25.78
29.63
23.56

25.78
26.67
25.33
31.26
32.59
32.00
31.56
33.33
31.11
26.52
28.30
28.89
28.44
30.52
26.52
27.70
24.44
28.15
27.11
23.11
26.22
28.15

27.4

Statistical Analysis

Sample No. 225to 256


28.63

26.04

Average
27.99

26.41

Standard deviation
2.85

30.30

Coefficient of variation
10.20
30.63

28.53

26.78

26.73

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288

DSB-320
PHC-216
PHC-217
PHC-218
DSB-323
PHC-219
PHC-220
D-82
DSB-326
D-83
PHC-222
DSB-327
D-87
PHC-223
DSB-328
DSB-329
DSB-330
PHC-224
DSB-331
D-100
DSB-333
D-104
PHC-225
PHC-226
DSB-334
PHC-227
PHC-228
PHC-229
PHC-230
PHC-231
PHC-232

9-Jan-10
10-Jan-10
10-Jan-10
12-Jan-10
13-Jan-10
13-Jan-10
13-Jan-10
14-Jan-10
15-Jan-10
15-Jan-10
16-Jan-10
17-Jan-10
17-Jan-10
18-Jan-10
19-Jan-10
20-Jan-10
20-Jan-10
20-Jan-10
21-Jan-10
21-Jan-10
22-Jan-10
22-Jan-10
22-Jan-10
22-Jan-10
23-Jan-10
23-Jan-10
24-Jan-10
24-Jan-10
24-Jan-10
25-Jan-10
25-Jan-10

29.04
27.26
31.41
33.33
20.44
31.11
31.56
22.37
22.07
29.04
27.41
20.30
25.93
32.00
28.89
27.70
34.52
31.85
23.70
30.37
35.70
30.67
30.81
33.19
33.18
32.74
33.48
33.48
28.44
32.89
29.04

PHC-233

30-Jan-10

35.56

28.5

Statistical Analysis

Sample No. 257to 288


28.30

25.51

Average
29.67

24.95

Standard deviation
4.23

29.81

Coefficient of variation
14.26
31.23

32.71

32.26

32.00

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320

PHC-234
PHC-235
PHC-236
PHC-237
PHC-238
PHC-239
PHC-240
PHC-241
PHC-242
PHC-243
P.C-1
PHC-244
PHC-245
PHC-246
PHC-247
PHC-248
PHC-249
PHC-250
PHC-251
PHC-252
D-148
PHC-253
D-152
PHC-254
PHC-255
D-160
D-164
PHC-256
PHC-257
PHC-258
DSB-346

30-Jan-10
30-Jan-10
31-Jan-10
31-Jan-10
2-Feb-10
3-Feb-10
4-Feb-10
4-Feb-10
5-Feb-10
5-Feb-10
6-Feb-10
6-Feb-10
6-Feb-10
9-Feb-10
10-Feb-10
10-Feb-10
11-Feb-10
11-Feb-10
13-Feb-10
14-Feb-10
15-Feb-10
15-Feb-10
16-Feb-10
16-Feb-10
17-Feb-10
18-Feb-10
18-Feb-10
18-Feb-10
19-Feb-10
21-Feb-10
22-Feb-10

34.07
34.22
32.00
26.07
33.48
31.56
36.74
36.00
31.56
27.56
17.19
27.11
30.22
30.96
32.15
31.11
31.85
30.37
32.59
30.22
31.26
26.67
25.78
25.04
29.04
29.04
33.19
34.81
30.37
31.11
28.78

P.C-2

22-Feb-10

26.81

28.1

Statistical Analysis

Sample No. 289to 320


31.97

33.87

Average
30.28

26.73

Standard deviation
3.80

31.26

Coefficient of variation
12.56
31.26

27.56

31.29

28.93

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352

PHC-259
PHC-260
PHC-261
PHC-262
PHC-263
PHC-264
PHC-265
PHC-266
PHC-267
P.C-3
PHC-268
PHC-269
PHC-270
PHC-271
PHC-272
PHC-273
PHC-274
PHC-275
P.C-5
PHC-276
PHC-277
PHC-278
PHC-279
P.C-6
D-244
PHC-280
D-249
PHC-281
D-254
P.C-7
PHC-282

22-Feb-10
22-Feb-10
23-Feb-10
24-Feb-10
26-Feb-10
27-Feb-10
3-Mar-10
4-Mar-10
4-Mar-10
5-Mar-10
5-Mar-10
6-Mar-10
6-Mar-10
7-Mar-10
7-Mar-10
9-Mar-10
9-Mar-10
9-Mar-10
10-Mar-10
10-Mar-10
11-Mar-10
11-Mar-10
13-Mar-10
14-Mar-10
15-Mar-10
15-Mar-10
16-Mar-10
16-Mar-10
17-Mar-10
17-Mar-10
17-Mar-10

27.56
28.00
28.59
33.93
32.00
30.52
30.81
35.11
32.89
33.93
30.52
33.48
32.30
34.07
30.52
30.67
31.41
31.26
27.41
26.52
29.78
33.33
30.22
28.15
25.48
32.74
24.00
27.26
26.52
27.11
32.74

D-258

18-Mar-10

25.48

27.5

Statistical Analysis

Sample No. 321to 352


30.02

32.27

Average
30.13

32.62

Standard deviation
2.97

31.79

Coefficient of variation
9.86
29.28

29.39

27.20

27.44

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384

PHC-283
PHC-284
D-265
PHC-285
PHC-286
PHC-287
D-273
PHC-288
PHC-289
DSB-353
DSB-354
D-275
PHC-290
D-281
PHC-291
PHC-292
PHC-293
PHC-294
D-287
P.C-8
P.C-9
PHC-295
PHC-296
P.C-10
PHC-297
PHC-298
PHC-299
PHC-300
PHC-301
PHC-302
PHC-303

18-Mar-10
18-Mar-10
19-Mar-10
19-Mar-10
19-Mar-10
19-Mar-10
21-Mar-10
21-Mar-10
22-Mar-10
23-Mar-10
23-Mar-10
23-Mar-10
23-Mar-10
24-Mar-10
24-Mar-10
24-Mar-10
25-Mar-10
25-Mar-10
26-Mar-10
26-Mar-10
26-Mar-10
26-Mar-10
26-Mar-10
28-Mar-10
28-Mar-10
30-Mar-10
31-Mar-10
31-Mar-10
1-Apr-10
1-Apr-10
2-Apr-10

25.33
28.59
28.30
27.85
26.52
25.48
29.04
31.56
30.67
28.44
29.69
25.78
29.93
25.93
30.81
32.74
26.81
28.59
27.41
30.07
30.22
32.89
27.56
30.07
29.63
33.48
33.04
33.93
29.78
26.67
27.26

P.C-11

3-Apr-10

28.74

27.0

Statistical Analysis

Sample No. 353to 384


27.32

28.65

Average
29.15

28.90

Standard deviation
2.41

29.24

Coefficient of variation
8.27
28.62

30.07

31.97

27.82

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416

PHC-304
PHC-305
DSB-359
P.C-12
D-330
DSB-361
P.C-13
PHC-306
PHC-307
PHC-308
PHC-309
PHC-310
PHC-311
PHC-312
P.C-15
PHC-313
PHC-314
HRT-6
P.C-17
P.C-18
HRT-7
PHC-315
PHC-316
P.C-19
PHC-317
PHC-318
PHC-319
P.C-20
HRT-8
PHC-320
P.C-21

3-Apr-10
4-Apr-10
5-Apr-10
5-Apr-10
6-Apr-10
7-Apr-10
8-Apr-10
8-Apr-10
8-Apr-10
8-Apr-10
10-Apr-10
11-Apr-10
12-Apr-10
12-Apr-10
13-Apr-10
14-Apr-10
14-Apr-10
15-Apr-10
15-Apr-10
15-Apr-10
16-Apr-10
16-Apr-10
16-Apr-10
17-Apr-10
17-Apr-10
18-Apr-10
18-Apr-10
19-Apr-10
21-Apr-10
21-Apr-10
22-Apr-10

26.67
29.04
29.93
29.93
30.67
28.74
30.96
28.00
26.52
31.85
30.22
32.89
29.78
30.52
31.85
29.48
28.44
30.52
29.78
29.33
26.22
29.19
28.3
30.37
30.07
30.96
28.59
27.41
31.85
26.07
27.71

DSB-363

23-Apr-10

28.15

26.4

Statistical Analysis

Sample No. 385 to 416


29.25

28.98

Average
29.38

30.25

Standard deviation
1.73

30.01

Coefficient of variation
5.89
28.86

28.83

29.78

27.97

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448

PHC-321
P.C-22
PHC-322
PHC-323
PHC-324
PHC-325
PHC-326
P.C-24
P.C-25
PHC-327
PHC-328
PHC-329
PHC-330
HRT-10
HRT-11
P.C-26
P.C-27
PHC-331
P.C-28
PHC-332
PHC-333
PHC-334
PHC-335
PHC-336
PHC-337
PHC-338
HRT-12
HRT-13
P.C-30
PHC-339
DSB-372

23-Apr-10
24-Apr-10
24-Apr-10
25-Apr-10
25-Apr-10
25-Apr-10
27-Apr-10
28-Apr-10
29-Apr-10
29-Apr-10
30-Apr-10
30-Apr-10
2-May-10
3-May-10
3-May-10
3-May-10
4-May-10
5-May-10
5-May-10
6-May-10
7-May-10
9-May-10
11-May-10
12-May-10
13-May-10
13-May-10
13-May-10
13-May-10
13-May-10
14-May-10
14-May-10

26.07
31.55
29.33
31.11
30.96
29.93

P.C-31

14-May-10

30.81

29.78
26.07
26.37
26.67
29.78
28.29
28.74
29.93
27.26
27.26
33.19
27.56
30.37
29.33
28.44
26.67
28.59
27.85
25.63
28.00
28.89
28.89
29.63
35.55
25.63

26.8

Statistical Analysis

Sample No. 417 to 448


29.80

28.62

Average
28.88

27.97

Standard deviation
2.22

29.28

Coefficient of variation
7.68
29.78

27.44

28.21

30.46

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480

PHC-340
HRT-14
HRT-15
P.C-32
PHC-341
PHC-342
PHC-343
PHC-344
PHC-345
HRT-16
HRT-17
HRT-18
HRT-19
PHC-346
PHC-347
PHC-348
PHC-349
PHC-350
DSB-381
PHC-351
P.C-34
PHC-352
P.C-35
DSB-387
P.C-36
DSB-388
PHC-353
P.C-37
HRT-20
HRT-21
HRT-22

15-May-10
15-May-10
15-May-10
15-May-10
16-May-10
17-May-10
18-May-10
19-May-10
19-May-10
19-May-10
22-May
22-May
22-May

HRT-23

31-May

22-May
23-May
23-May
23-May
23-May
25-May
25-May
26-May
27-May
27-May
28-May
28-May
29-May
29-May
29-May
30-May
30-May
31-May

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

30.67
27.71
25.63
29.18
26.82
33.04
33.48
31.26
31.11
28.15
28.74
29.48
29.18
28.44
27.85
25.78
29.48
27.56
29.93
31.85
25.78
28.44
26.52
29.92
27.7
26.52
27.26
27.11
25.93
28.44
30.67
27.81

26.7

Statistical Analysis

Sample No. 449 to 480


28.00

31.14

Average
28.67

29.33

Standard deviation
2.07

28.15

Coefficient of variation
7.24
28.92

27.67

26.90

28.05

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512

PHC-354
PHC-355
PHC-356
PHC-357
PHC-358
PHC-359
PHC-360
DSB-395
HRT-24
HRT-25
DSB-396
HRT-26
DSB-397
HRT-27
P.C-38
PHC-361
PHC-362
PHC-363
PHC-364
PHC-365
PHC-366
DSB-403
DSB-404
HRT-28
HRT-29
HRT-30
DSB-406
HRT-31
P.C-39
P.C-40
PHC-367

31-May
1-Jun
2-Jun
2-Jun
3-Jun-10
4-Jun-10
5-Jun-10
6-Jun-10
6-Jun-10
7-Jun-10
8-Jun-10
8-Jun-10
9-Jun-10
9-Jun-10

PHC-368

9-Jun-10
11-Jun-10
11-Jun-10
12-Jun-10
12-Jun-10
15-Jun-10
15-Jun-10
16-Jun-10
17-Jun-10
17-Jun-10
17-Jun-10
17-Jun-10
18-Jun-10
18-Jun-10
18-Jun-10
19-Jun-10
19-Jun-10
20-Jun-10

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

27.41
25.63
29.63
31.26
27.11
28.3
28.44
28.44
26.81
27.41
29.33
30.22
25.78
26.22
28.74
28.3
26.37
25.63
26.67
32
25.63
26.96
28.74
26.22
26.67
26.22
32.44
27.11
26.67
28.44
32.44
31.26

26.7

Statistical Analysis

Sample No. 481 to 512


28.21

27.82

Average
28.08

27.91

Standard deviation
2.06

27.08

Coefficient of variation
7.34
27.26

26.84

27.82

30.01

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544

PHC-369
PHC-370
PHC-371
P.C-41
P.C-42
P.C-43
HRT-32
DSB-421
DSB-422
D-646
PHC-372
DSB-424
P.C-46
PHC-373
D-648
PHC-374
D-650
HRT-33
PHC-375
D-652
D-653
HRT-34
PHC-376
D-657
PHC-377
D-658
PHC-378
PHC-379
DSB-447
DSB-448
P.C-48

20-Jun-10
21-Jun-10
21-Jun-10
22-Jun-10
23-Jun-10
23-Jun-10
24-Jun-10
26-Jun-10
26-Jun-10

PHC-380

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

31.26
28.59
29.93
29.93
29.93
30.81
28.89

27-Jun-10
27-Jun-10
28-Jun-10
28-Jun-10

31.26
32.74
26.96
29.19
31.7
33.93

28-Jun-10
29-Jun-10
29-Jun-10
1-Jul-10
1-Jul-10

31.11
29.33
29.19
26.82
27.85

1-Jul-10
3-Jul-10
4-Jul-10
5-Jul-10
5-Jul-10
7-Jul-10
7-Jul-10
8-Jul-10
8-Jul-10
8-Jul-10
9-Jul-10
9-Jul-10
9-Jul-10

32.59
25.48
25.93
25.19
30.67
25.18
29.78
27.56
26.22
30.22
27.41
26.37
26.96

9-Jul-10

33.19

27.0

Statistical Analysis

Sample No. 513 to 544


29.93

30.73

Average
29.13

30.90

Standard deviation
2.45

30.08

Coefficient of variation
8.41
27.31

27.39

27.93

27.80

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576

D-659
HRT-35
HRT-36
DSB-452
DSB-453
PHC-381
D-660
DSB-454
D-661
HRT-37
HRT-38
HRT-39
P.C-49
PHC-382
PHC-383
D-664
DSB-462
DSB-463
HRT-40
PHC-384
P.C-50
PHC-385
D-668
D-669
P.C-51
PHC-386
D-670
DSB-469
HRT-41
PHC-387
HRT-42

10-Jul-10
10-Jul-10
10-Jul-10
11-Jul-10
11-Jul-10

18-Jul-10
19-Jul-10

25.78
27.11
25.48
27.26
26.37
27.85
26.67
26.96
26.37
29.04
26.52
25.93
27.11
25.63
28.74
26.81
25.78
27.56
31.26
32.59
26.07
32.89
30.52
26.52
26.37
33.63
31.11
25.78
26.22
31.70
26.52

D-673

20-Jul-10

25.93

11-Jul-10
12-Jul-10
12-Jul-10
13-Jul-10
14-Jul-10
14-Jul-10
14-Jul-10
14-Jul-10
14-Jul-10
14-Jul-10
15-Jul-10
15-Jul-10
15-Jul-10
15-Jul-10
15-Jul-10
16-Jul-10
16-Jul-10
17-Jul-10
17-Jul-10
17-Jul-10
17-Jul-10
18-Jul-10
18-Jul-10
18-Jul-10

27.0

Statistical Analysis

Sample No. 545 to 576


26.64

27.21

Average
27.82

26.77

Standard deviation
2.42

26.94

Coefficient of variation
8.69
29.36

29.33

29.14

27.01

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608

D-674
D-675
DSB-472
PHC-388
DSB-476
PHC-389
DSB-479
PHC-390
PHC-391
HRT-43
HRT-44
PHC-392
D-684
DSB-486
PHC-393
PHC-394
P.C-52
PHC-395
DSB-489
HRT-45
PHC-396
PHC-397
DSB-495
PHC-398
PHC-399
PHC-400

20-Jul-10
20-Jul-10
20-Jul-10

PHC-401
DSB-496
HRT-46
P.C-53
P.C-54
DSB-499

20-Jul-10
21-Jul-10
21-Jul-10
22-Jul-10
22-Jul-10
22-Jul-10
23-Jul-10
23-Jul-10
23-Jul-10
24-Jul-10
24-Jul-10
24-Jul-10
24-Jul-10
26-Jul-10
27-Jul-10
28-Jul-10
29-Jul-10
29-Jul-10
29-Jul-10
1-Aug-10
2-Aug-10
3-Aug-10
4-Aug-10
5-Aug-10
5-Aug-10
5-Aug-10
5-Aug-10
5-Aug-10
6-Aug-10

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

25.04
26.67
25.19
25.78
28.30
27.56
28
32.59
32.89
31.26
25.19
29.04
26.07
26.96
25.78
26.52
26.07
32.00
32.89
29.63
30.22
29.19
27.56
33.48
33.48
34.96
35.56
27.56
25.48
25.78
25.63
28.15

27.6

Statistical Analysis

Sample No. 577 to 608


26.42

30.10

Average
28.77

28.57

Standard deviation
3.20

27.23

Coefficient of variation
11.12
30.00

31.48

30.47

28.15

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640

P.C-55
PHC-402
P.C-56
PHC-403
HRT-48
P.C-57
PHC-404
PHC-405
PHC-406
HRT-49
P.C-58
P.C-59
PHC-407
P.C-61
PHC-408
PHC-409
PHC-410
HRT-50
HRT-51
HRT-52
PHC-411
P.C-62
DSB-522
DSB-526
P.C-63
HRT-53
PHC-412
HRT-54
HRT-55
D-727
PHC-413
PHC-414

6-Aug-10
7-Aug-10
7-Aug-10
9-Aug-10
9-Aug-10
10-Aug-10
11-Aug-10
11-Aug-10
11-Aug-10
11-Aug-10
12-Aug-10
12-Aug-10
14-Aug-10
14-Aug-10
15-Aug-10
16-Aug-10
17-Aug-10
18-Aug-10
18-Aug-10
19-Aug-10
20-Aug-10
20-Aug-10
21-Aug-10
22-Aug-10
22-Aug-10
23-Aug-10
24-Aug-10
24-Aug-10
24-Aug-10
26-Aug-10
26-Aug-10
27-Aug-10

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

29.48
34.37
26.22
28.44
29.18
29.93
28
27.56
28.3
26.52
28.15
27.41
29.78
27.11
30.52
26.82
29.93
26.67
29.33
26.07
27.7
26.96
26.07
26.96
26.07
26.67
30.52
27.85
26.52
26.82
29.78
29.33

26.5

Statistical Analysis

Sample No. 609 to 640


29.60

28.25

Average
28.16

27.88

Standard deviation
1.82

28.47

Coefficient of variation
6.45
27.78

26.74

27.41

29.14

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672

PHC-415
HRT-56
HRT-57
P.C-64
PHC-416
PHC-417
PHC-418
DSB-540
P.C-66
PHC-419
DSB-542
DSB-543
PHC-420
HRT-58
HRTI-4
PHC-421
PHC-422
PC-68
D-753
PHC-423
DSB-562
HRT-60
HRT-61
PHC-424
HRT-62
HRT-63
PHC-425
HRT-64
HRT-65
PHC-426
PHC-427
PHC-428

27-Aug-10
28-Aug-10
28-Aug-10
28-Aug-10
29-Aug-10
29-Aug-10
30-Aug-10
30-Aug-10
30-Aug-10
31-Aug-10
31-Aug-10
31-Aug-10
2-Sep-10
2-Sep-10
3-Sep
3-Sep
5-Sep
5-Sep
5-Sep
6-Sep
7-Sep
8-Sep
12-Sep
15-Sep
20-Sep
21-Sep
22-Sep
26-Sep
26-Sep
26-Sep
29-Sep
29-Sep

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

33.04
29.33
32.69
32.15
31.85
30.37
29.63
30.81
28.15
30.22
27.11
26.52
33.33
27.26
29.33
32.44
32.00
28.00
29.33
32.89
27.11
27.11
27.41
33.48
26.52
32.59
26.07
32.59
28.44
29.19
26.81
28.89

27.0

Statistical Analysis

Sample No. 641 to 672


31.57

30.17

Average
29.77

28.77

Standard deviation
2.42

30.39

Coefficient of variation
8.12
29.41

29.04

29.23

27.58

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704

HRT-66
HRT-67
PHC-429
PHC-430
HRTI-8
PHC-431
PC-70
HRTI-9
PHC-432
PC-71
PHC-433
HRT-68
PHC-434
HRT-69
HRT-70
HRT-71
PHC-435
HRT-72
PHC-436
PHC-437
PHC-438
PHC-439
PHC-440
PHC-441
PHC-442
PHC-443
HRT-73
PC-72
HRT-74
PHC-444
PHC-445
DSB-596

30-Sep
30-Sep
30-Sep
1-Oct
3-Oct
3-Oct
3-Oct
4-Oct
5-Oct
5-Oct
6-Oct
7-Oct
7-Oct
8-Oct
8-Oct
8-Oct
8-Oct
9-Oct
9-Oct
9-Oct
10-Oct
10-Oct
11-Oct
12-Oct
13-Oct
13-Oct
14-Oct
14-Oct
15-Oct
15-Oct
15-Oct
15-Oct

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

26.81
25.33
26.81
25.78
26.81
27.41
30.07
25.63
26.67
28.89
27.11
26.22
25.78
27.41
27.85
26.22
31.11
26.67
28.59
28.74
26.07
25.93
28.45
21.78
26.07
25.33
26.22
29.04
17.33
29.04
25.48
24.74

27.0

Statistical Analysis

Sample No. 673 to 704


26.49

27.58

Average
26.61

27.01

Standard deviation
2.45

27.51

Coefficient of variation
9.20
27.85

25.61

25.51

24.84

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736

HRT-75
PHC-446
PHC-447
PHC-448
PHC-449
PC-73
PC-74
PHC-450
PHC-451
HRT-76
HRT-77
HRT-78
HRT-79
HRT-80
PHC-452
DSB-613
PC-75
HRTI-10
PHC-453
HRT-81
HRT-82
PC-76
PC-77
HRT-83
PHC-454
PHC-455
PHC-456
DSB-622
HRTI-11
HRTI-12
PHC-457
PHC-458

16-Oct
16-Oct
16-Oct
18-Oct
18-Oct
18-Oct
19-Oct
20-Oct
20-Oct
21-Oct
21-Oct
21-Oct
22-Oct
22-Oct
23-Oct
24-Oct
24-Oct
26-Oct
26-Oct
27-Oct
27-Oct
27-Oct
27-Oct
28-Oct
28-Oct
30-Oct
30-Oct
30-Oct
31-Oct
31-Oct
31-Oct
31-Oct

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

26.07
26.37
25.18
26.07
26.37
29.63
25.33
26.52
25.18
25.48
25.48
25.78
27.41
25.48
27.26
27.11
25.93
25.04
25.48
26.96
25.92
25.93
25.63
27.85
25.92
26.37
25.48
25.48
26.52
25.63
25.48
25.93

25.8

Statistical Analysis

Sample No. 705 to 736


26.62

26.42

Average
26.13

25.80

Standard deviation
0.94

26.37

Coefficient of variation
3.62
25.88

26.27

25.90

26.30

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768

DSB-625
HRT-84
HRT-85
PHC-459
PC-78
PC-79
PC-80
PC-81
PC-82
D-844
D-849
HRTI-14
HRTI-15
PHC-460
HRT-86
PHC-461
HRT-87
HRT-88
HRT-89
PHC-462
PHC-463
PHC-464
PHC-465
HRT-90
HRTI-17
HRTI-18
PHC-466
HRTI-20
HRTI-21
HRTI-22
PHC-467
PHC-468

31-Oct
2-Nov
2-Nov
2-Nov
10-Nov-10
18-Nov-10
18-Nov-10
25-Nov-10
3-Dec-10
26-Nov-10
3-Dec-10
6-Nov-10
6-Nov-10
6-Nov-10
7-Nov-10
7-Nov-10
8-Nov-10
8-Nov-10
8-Nov-10
8-Nov-10
8-Nov-10
11-Nov-10
11-Nov-10
12-Nov-10
14-Nov-10
14-Nov-10
14-Nov-10
15-Nov-10
16-Nov-10
16-Nov-10
16-Nov-10
16-Nov-10

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

25.63
28.59
27.11
26.96
25.04
27.26
27.41
25.93
18.37
26.22
33.33
27.41
26.07
27.56
26.22
28.15
26.37
26.81
26.81
25.79
26.52
25.63
26.52
26.07
28.15
27.41
25.93
29.18
25.48
27.85
26.22
26.67

26.8

Statistical Analysis

Sample No. 737 to 768


26.77

25.04

Average
26.71

26.49

Standard deviation
2.14

26.86

Coefficient of variation
8.00
26.32

26.72

27.33

26.37

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800

PHC-469
HRT-91
HRT-92
HRT-93
DSB-643
PHC-470
PHC-471
DSB-646
PHC-472
HRTI-23
HRTI-24
DSB-651
HRTI-25
PHC-473
PHC-474
HRT-94
HRTI-26
HRT-95
HRTI-27
HRTI-28
HRTI-29
HRTI-30
PHC-475
PHC-476
DSB-656
DSB-657
DSB-658
DSB-660
DSB-665
PHC-477
PHC-478
HRT-96

17-Nov-10
18-Nov-10
19-Nov-10
20-Nov-10
20-Nov-10
20-Nov-10
22-Nov-10
23-Nov-10
23-Nov-10
24-Nov-10
26-Nov-10
27-Nov-10
27-Nov-10
27-Nov-10
30-Nov-10
1-Dec-10
1-Dec-10
2-Dec-10
2-Dec-10
2-Dec-10
3-Dec-10
3-Dec-10
4-Dec-10
4-Dec-10
4-Dec-10
6-Dec-10
6-Dec-10
7-Dec-10
9-Dec-10
10-Dec-10
10-Dec-10
10-Dec-10

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

26.96
25.04
26.22
28
28.59
26.37
26.67
26.37
26.67
28.89
27.11
26.67
25.78
26.37
30.96
33.93
31.85
27.85
29.48
27.41
31.7
31.56
28.74
28.44
27.85
26.07
26.07
28.15
29.63
33.93
29.93
29.04

26.9

Statistical Analysis

Sample No. 769 to 800


26.86

27.26

Average
28.38

26.92

Standard deviation
2.32

29.46

Coefficient of variation
8.00
29.98

29.06

28.62

30.42

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832

HRT.I-31
PHC-479
DSB-666
PHC-480
DSB-667
PC-83
HRT.I-32
HRT.I-33
HRT-97
DSB-669
PHC-481
HRT-98
HRT-99
HRT-100
HRT.I-34
PHC-482
DSB-671
HRT.I-35
PHC-483
PHC-484
HRT-101
PHC-485
HRT-102
HRT-103
PHC-486
HRT.I-36
PHC-487
PHC-488
PC-84
HRT-104
HRT-105
HRT-106

11-Dec-10
12-Dec-10
12-Dec-10
13-Dec-10
13-Dec-10
15-Dec-10
15-Dec-10
15-Dec-10
15-Dec-10
15-Dec-10
16-Dec-10
16-Dec-10
16-Dec-10
17-Dec-10
18-Dec-10
18-Dec-10
18-Dec-10
19-Dec-10
19-Dec-10
20-Dec-10
21-Dec-10
22-Dec-10
22-Dec-10
22-Dec-10
23-Dec-10
24-Dec-10
24-Dec-10
25-Dec-10
26-Dec-10
26-Dec-10
26-Dec-10
27-Dec-10

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

28.44
31.56
31.70
28.74
26.37
29.19
25.33
25.04
33.48
29.78
30.96
32.30
31.26
30.67
27.26
31.56
27.70
27.56
31.85
33.19
30.52
34.37
27.41
26.81
34.52
30.96
28.59
26.96
30.07
29.18
27.85
32.00

27.1

Statistical Analysis

Sample No. 801 to 832


29.33

28.20

Average
29.79

31.41

Standard deviation
2.55

29.34

Coefficient of variation
8.18
30.87

30.77

30.05

30.54

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864

DSB-686
PHC-489
PHC-490
PC-85
PC-86
HRT-107
HRT-108
HRT-109
HRT-110
HRTI-37
HRTI-38
HRT-111
PHC-491
HRTI-39
PHC-492
PHC-493
PC-87
PHC-494
DSB-698
DSB-699
DSB-700
PHC-495
HRTI-40
PHC-496
HRT-112
HRT-113
HRT-114
PHC-497
HRTI-41
HRTI-42
DSB-710
DSB-712

27-Dec-10
28-Dec-10
28-Dec-10
31-Dec-10
2-Jan-11
2-Jan-11
2-Jan-11
3-Jan-11
3-Jan-11
4-Jan-11
4-Jan-11
4-Jan-11
4-Jan-11
5-Jan-11
5-Jan-11
6-Jan-11
7-Jan-11
7-Jan-11
8-Jan-11
8-Jan-11
8-Jan-11
8-Jan-11
9-Jan-11
9-Jan-11
10-Jan-11
11-Jan-11
11-Jan-11
11-Jan-11
12-Jan-11
12-Jan-11
13-Jan-11
13-Jan-11

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

34.81
29.33
31.70
28.59
28.89
31.11
26.81
27.70
25.48
27.26
25.78
25.48
29.33
25.63
26.67
27.41
27.56
26.37
26.07
27.26
30.37
25.19
26.37
26.07
29.19
29.93
25.19
27.70
25.19
25.63
28.15
28.89

26.8

Statistical Analysis

Sample No. 833 to 864


30.74

27.88

Average
27.72

26.49

Standard deviation
2.23

27.16

Coefficient of variation
8.56
27.14

27.85

27.14

27.01

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896

PHC-498
DSB-714
HRT-115
PHC-499
DSB-715
HRTI-43
PC-88
HRT-116
PHC-500
DSB-716
DSB-720
DSB-721
PHC-501
DSB-722
PHC-502
DSB-723
PHC-503
HRT-117
PC-89
PHC-504
PHC-505
DSB-737
HRTI-44
HRT-118
PHC-506
DSB-738
DSB-739
PC-90
PHC-507
DSB-742
PHC-508
PHC-509

13-Jan-11
14-Jan-11
14-Jan-11
14-Jan-11
17-Jan-11
17-Jan-11
17-Jan-11
17-Jan-11
17-Jan-11
18-Jan-11
19-Jan-11
19-Jan-11
19-Jan-11
20-Jan-11
20-Jan-11
21-Jan-11
21-Jan-11
22-Jan-11
24-Jan-11
24-Jan-11
25-Jan-11
28-Jan-11
28-Jan-11
28-Jan-11
28-Jan-11
29-Jan-11
29-Jan-11
29-Jan-11
29-Jan-11
30-Jan-11
30-Jan-11
30-Jan-11

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

26.22
28.00
31.11
25.78
29.33
26.93
32.30
33.04
26.07
29.48
25.19
25.04
28.89
32.44
26.81
25.78
26.07
26.07
25.19
33.04
30.67
26.67
27.56
32.00
33.04
26.37
29.33
30.07
25.93
29.33
27.11
25.93

27.2

Statistical Analysis

Sample No. 865 to 896


27.90

29.53

Average
28.34

27.85

Standard deviation
2.67

27.68

Coefficient of variation
8.04
27.95

29.39

29.01

27.14

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928

HRTI-45
PC-91
DSB-744
PHC-510
PHC-511
DSB-745
DSB-746
DSB-748
DSB-750
DSB-751
DSB-753
HRTI-46
PHC-512
HRT-119
HRT-120
HRT-121
DSB-759
PHC-513
PHC-514
DSB-762
HRTI-47
PHC-515
HRT-122
DSB-763
HRTI-48
PHC-516
HRT-123
HRTI-49
HRT-124
HRTI-50
DSB-766
PHC-517

31-Jan-11
31-Jan-11
1-Feb-11
1-Feb-11
1-Feb-11
2-Feb-11
2-Feb-11
2-Feb-11
3-Feb-11
4-Feb-11
4-Feb-11
4-Feb-11
4-Feb-11
8-Feb-11
9-Feb-11
9-Feb-11
9-Feb-11
9-Feb-11
9-Feb-11
10-Feb-11
10-Feb-11
10-Feb-11
11-Feb-11
11-Feb-11
11-Feb-11
11-Feb-11
12-Feb-11
12-Feb-11
13-Feb-11
13-Feb-11
15-Feb-11
16-Feb-11

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

27.26
27.26
25.48
25.63
26.22
26.81
27.11
26.37
27.11
34.96
26.67
28.59
28.89
28.15
27.11
25.93
31.56
32.59
25.48
26.37
26.07
26.67
25.63
26.81
25.78
31.56
25.48

27.5

Sample No. 897 to 928


26.44

28.10

Average
27.03

29.06

Standard deviation
3.04

29.04

Coefficient of variation
9.43
28.12

27.09

26.96

26.67
26.22
26.07
15.85
26.52

Statistical Analysis

24.94

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960

FBI-8
HRTI-51
FBI-9
HRTI-52
FBI-10
PHC-518
PHC-519
HRTI-53
DSB-779
PHC-520
PHC-521
DSB-781
HRTI-54
PHC-522
HRT-125
PC-92
PHC-523
HRT-126
PHC-524
PHC-525
PC-93
PHC-526
PHC-527
PHC-528
PHC-529
DSB-752
DSB 797
PHC 530
HRT 127
Fic 11
PHC 531
HRT 128

17-Feb-11
18-Feb-11
18-Feb-11
19-Feb-11
19-Feb-11
21-Feb-11
21-Feb-11
22-Feb-11
23-Feb-11
23-Feb-11
23-Feb-11
24-Feb-11
24-Feb-11
26-Feb-11
27-Feb-11
28-Feb-11
28-Feb-11
1-Mar-11
1-Mar-11
1-Mar-11
2-Mar-11
2-Mar-11
2-Mar-11
2-Mar-11
3-Mar-11
4-Mar-11
04-Mar-11
04-Mar-11
04-Mar-11
05-Mar-11
05-Mar-11
05-Mar-11

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

28
26.96
25.78
26.22
26.37
27.56
21.18
20
13.33
19.11
22.67
21.19
23.26
26.52
19.70
25.63
31.26
20.15
27.56
27.41
25.33
25.18
26.37
19.7
28.22
28.15
23.56
25.63
25.19
19.85
29.33
22.96

28.1

Statistical Analysis

Sample No. 929 to 960


26.82

21.26

Average
24.35

21.01

Standard deviation
3.82

24.42

Coefficient of variation
11.23
26.15

25.49

25.10

23.63

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992

Fic 12
HRT I 55
HRT I 56
DSB 800
DSB 801
PHC 532
Fic 13
PHC 533
PHC 534
PC 94
HRT I 57
HRT 129
PHC 535
HRT I 58
HRT 130
PHC 536
PHC 537
HRT I 59
Fic 14
PHC 538
HRT I 60
SN 5
Fic 15
PHC 539
PHC 540
HRT I 61
HRT I 62
HRT 131
PHC 541
HRT I 63
HRT 132
PHC 542

06-Mar-11
06-Mar-11
06-Mar-11
07-Mar-11
07-Mar-11
07-Mar-11
08-Mar-11
08-Mar-11
08-Mar-11
09-Mar-11
09-Mar-11
09-Mar-11
10-Mar-11
10-Mar-11
10-Mar-11
11-Mar-11
12-Mar-11
12-Mar-11
13-Mar-11
13-Mar-11
13-Mar-11
13-Mar-11
14-Mar-11
14-Mar-11
14-Mar-11
14-Mar-11
15-Mar-11
15-Mar-11
16-Mar-11
16-Mar-11
16-Mar-11
17-Mar-11

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

25.93
18.52
19.26
25.19
20.15
26.81
25.19
31.11
25.33
25.33
25.93
25.33
25.93
21.78
20.15
22.67
21.63
24.44
19.7
27.41
26.81
25.48
26.96
30.52
17.78
22.07
23.26
22.22
30.52
25.93
18.81
21.04

27.9

Statistical Analysis

Sample No. 961 to 992


22.64

25.65

Average
24.04

24.94

Standard deviation
3.56

22.77

Coefficient of variation
15.67
24.25

24.94

23.63

25.14

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 344Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sampl
e No.

Lab.Ref.
No.

Date of
Casting

993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016

PHC 543
DSB 820
DSB 821
DSB 824
HRT 133
DSB 830
DSB 832
HRT 134
Fic 16
HRT I 64
HRT 135
Fic 17
HRT I 65
PC 95
DSB 838
PC 96
SN 8
DSB 839
DSB 843
HRT I 66
HRT I 67
DSB 846

18-Mar-11
21-Mar-11
21-Mar-11
22-Mar-11
22-Mar-11
25-Mar-11
25-Mar-11
25-Mar-11
26-Mar-11
26-Mar-11
26-Mar-11
27-Mar-11
29-Mar-11
30-Mar-11
31-Mar-11
31-Mar-11
31-Mar-11
01-Apr-11
01-Apr-11
01-Apr-11
01-Apr-11
02-Apr-11

28 Days

Mean of 4 Non-overlapping
consecutive results not less than
fck+0.825x
established
f ck+4
standard
deviation
28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

f ck-4

24.44
30.07
28.89
28.74
33.48
21.93
29.48
24.44
23.56
17.78
22.67
27.56
28.3
25.33
28.3
27.85
27.7
31.85
32.15
23.26
26.52
27.11

27.93

25.11

24.20

28.22

28.10

26.82

Statistical Analysis

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A20

Cement Content : 330Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

6-Jan-10
7-Jan-10
7-Jan-10
8-Jan-10
22-Jan-10
22-Jan-10
12-Feb-10
13-Feb-10
2-Mar-10
5-Mar-10
12-Mar-10

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

21
D-69
D-70
D-71
D-72
D-105
D-106
D-143
D-146
D-195
D-205
D-232

fck+0.825x
established
standard deviation

26.22
25.93
27.26
32.15
36.00
31.26
27.41
28.15
33.48
30.96
25.93

27.8

29
Sample No. 1 to 32
27.89

30.71

Average
29.52

30.12

Standard deviation
3.43

#DIV/0!

Coefficient of variation
11.63
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 210Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

12
1
2
3
4
5
6
7
8

D-77
D-85
D-88
D-89
D-91
D-93
D-95

12-Jan-10
17-Jan-10
17-Jan-10
18-Jan-10
18-Jan-10
19-Jan-10
20-Jan-10

25.33
24.15
29.33
22.96
20.59
21.33
24.15

D-96

20-Jan-10

23.56

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

D-98
D-103
D-107
D-109
D-114
D-115
D-118
D-119
D-149
D-151
D-153
D-154
D-156
D-158
D-159
D-162
D-163
D-167
D-168
D-170
D-188
D-190
D-191

21-Jan-10
22-Jan-10
23-Jan-10
23-Jan-10
24-Jan-10
25-Jan-10
27-Jan-10
28-Jan-10
15-Feb-10
16-Feb-10
16-Feb-10
17-Feb-10
17-Feb-10
18-Feb-10
18-Feb-10
18-Feb-10
18-Feb-10
21-Feb-10
21-Feb-10
21-Feb-10
27-Feb-10
27-Feb-10
28-Feb-10

21.78
27.41
21.19
22.67
20.44
17.48
21.19
22.07
23.70
18.07
17.30
19.56
20.00
18.37

D-193

2-Mar-10

25.48

17.48
18.96
17.63
16.74
19.11
19.41
20.44
18.81
21.93

17.5

18
Sample No. 1 to 32
25.44

22.41

Average
21.21

23.26

Standard deviation
3.08

20.30

Coefficient of variation
14.51
19.66

18.70

18.22

21.67

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 210Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

D-199
D-200
D-201
D-204
D-214
D-216
D-219
D-223
D-225
D-228

Date of
Casting
4-Mar-10
4-Mar-10
4-Mar-10
5-Mar-10
6-Mar-10
8-Mar-10
9-Mar-10
10-Mar-10
10-Mar-10
11-Mar-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

23.85
21.04
18.22
19.85
18.22
21.48
18.52
19.11
20.00
17.48

16.6

Sample No. 33 to 64
20.74

19.33

Average
19.78

18.74

Standard deviation
1.92

#DIV/0!

Coefficient of variation
9.72
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A40

Cement Content : 262Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

fck+0.825x
established
standard deviation

DSB-207
DSB-264
DSB-282
DSB-283
DSB-300
DSB-310
D-58
D-59
D-60
DSB-311
D-61
D-62
D-64
D-68
DSB-335
D-120
D-122
D-124
D-126
D-131
D-132
D-134
D-135
D-136
D-137
D-142
D-140
D-144
DSB-347
HRT-5
DSB-449

11-Nov-09
9-Dec-09
15-Dec-09
16-Dec-09
25-Dec-09
31-Dec-09
31-Dec-09
31-Dec-09
1-Jan-10
2-Jan-10
2-Jan-10
2-Jan-10
3-Jan-10
6-Jan-10
27-Jan-10
28-Jan-10
29-Jan-10
31-Jan-10
2-Feb-10
9-Feb-10
9-Feb-10
10-Feb-10
10-Feb-10
11-Feb-10
11-Feb-10
12-Feb-10
13-Feb-10
13-Feb-10
24-Feb-10
27-Mar-10
10-Jul-10

20.74
23.11
21.33
20.59
20.89
19.70
28.15
21.04
24.00
24.30
22.07
23.85
19.26
19.85
22.81
20.01
15.85
18.96
22.37
22.22
23.70
21.19
19.70
24.59
23.26
21.19
23.85
24.3
27.74
17.19
26.96

DSB-458

13-Jul-10

17.78

17.4

18
Sample No. 1 to 32
21.44

22.45

Average
21.95

23.56

Standard deviation
2.85

20.48

Coefficient of variation
12.99
19.85

22.30

23.15

22.42

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A40

Cement Content : 262Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

33
34

DSB-460

14-Jul-10

18.52

DSB-474

21-Jul-10

19.11

35
36

DSB-477

22-Jul-10

DSB-478

22-Jul-10

21.63
20.15

37
38

DSB-482

23-Jul-10

DSB-483

23-Jul-10

26.37
21.48

39

DSB-508

11-Aug-10

19.56

40

HRTI-1

16-Aug-10

18.22

41

DSB-516

18-Aug-10

21.18

42

P.C-65

28-Aug-10

26.81

43

PC-69

7-Sep-10

20.89

44

FI-1

30-Oct-10

17.33

45

F.I.-02

11-Nov-10

16.74

46

F.I.-03

15-Nov-10

15.70

47

F.I.-04

19-Nov-10

20.59

48

F.I.-05

25-Nov-10

16.74

49

DSB-697

6-Jan-11

25.93

50

DSB-756

5-Feb-11

21.33

Sample No. 33 to 64
19.85

21.41

Average
20.46

21.55

Standard deviation
3.26

17.44

Coefficient of variation
15.93
23.63

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

21
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

DSB-83
DSB-84
DSB-86
DSB-88
DSB-89
DSB-91
DSB-92
DSB-95
DSB-97
DSB-98
DSB-102
DSB-103
DSB-104
DSB-108
DSB-109
DSB-110
DSB-113
DSB-114
DSB-115
DSB-117
DSB-118
DSB-119
DSB-120
DSB-121

26-Aug-09
26-Aug-09
27-Aug-09
27-Aug-09
28-Aug-09
28-Aug-09
29-Aug-09
2-Sep-09
4-Sep-09
4-Sep-09
8-Sep-09
9-Sep-09
10-Sep-09
15-Sep-09
15-Sep-09
15-Sep-09
18-Sep-09
18-Sep-09
19-Sep-09
21-Sep-09
22-Sep-09
22-Sep-09
22-Sep-09
25-Sep-09

26.97
25.78
26.52
31.11
26.67
25.19
26.37
29.93
26.96
25.48
25.93
27.85
25.48
30.67
25.03
29.63
27.41
29.19
25.04
25.04
30.07
25.04
25.93
28

DSB-122 26-Sep-09

25.78

26
27
28
29
30
31
32

DSB-123
DSB-125
DSB-126
DSB-127
DSB-128
DSB-129

26-Sep-09
29-Sep-09
29-Sep-09
29-Sep-09
30-Sep-09
30-Sep-09

27.56
30.51
25.40
30.36
30.21
25.48

DSB-130 30-Sep-09

29.62

26.7

29
Sample No. 1 to 32
27.60

27.04

Average
27.38

26.56

Standard deviation
2.07

27.70

Coefficient of variation
7.55
26.67

27.26

27.31

28.92

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57

DSB-131
DSB-132
DSB-133
DSB-134
DSB-135
DSB-136
DSB-137
DSB-140
DSB-141
DSB-142
DSB-144
DSB-145
DSB-146
DSB-147
DSB-149
DSB-154
DSB-156
DSB-157
DSB-158
DSB-159
DSB-160
DSB-163
DSB-165
DSB-166

58
59
60
61
62
63
64

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

1-Oct-09
1-Oct-09
3-Oct-09
3-Oct-09
5-Oct-09
5-Oct-09
5-Oct-09
8-Oct-09
8-Oct-09
9-Oct-09
10-Oct-09
10-Oct-09
10-Oct-09
12-Oct-09
13-Oct-09
14-Oct-09
14-Oct-09
15-Oct-09
15-Oct-09
16-Oct-09
19-Oct-09
20-Oct-09
21-Oct-09
21-Oct-09

29.18
27.26
25.33
25.33
27.11
25.63
25.47
30.37
28.29
25.19
25.48
30.07
30.22
30.96
31.56
29.63
27.35
29.48
31.11
31.11
29.93
26.86
32.74
29.78

DSB-167 21-Oct-09

29.63

DSB-168
DSB-170
DSB-171
DSB-172
DSB-173
DSB-174

22-Oct-09
23-Oct-09
24-Oct-09
24-Oct-09
27-Oct-09
28-Oct-09

31.85
30.96
30.07
29.13
35.85
32.74

DSB-176 28-Oct-09

30.67

27.1

Sample No. 33 to 64
26.78

27.15

Average
29.26

27.26

Standard deviation
2.58

30.59

Coefficient of variation
8.83
29.76

29.83

30.63

32.10

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

DSB-177
DSB-180
DSB-181
DSB-182
DSB-183
DSB-185
DSB-187
DSB-188
DSB-189
DSB-191
DSB-192
DSB-195
DSB-196
DSB-197
DSB-198
DSB-199
DSB-201
DSB-202
DSB-204
DSB-205
DSB-206
DSB-208
DSB-209
DSB-210
DSB-211
DSB-215
DSB-216
DSB-217
DSB-218
DSB-219
DSB-220

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

29-Oct-09
29-Oct-09
30-Oct-09
30-Oct-09
30-Oct-09
31-Oct-09
2-Nov-09
2-Nov-09
2-Nov-09
5-Nov-09
5-Nov-09
6-Nov-09
7-Nov-09
7-Nov-09
9-Nov-09
9-Nov-09
9-Nov-09
9-Nov-09
10-Nov-09
10-Nov-09
10-Nov-09
11-Nov-09
11-Nov-09
11-Nov-09
12-Nov-09
14-Nov-09
14-Nov-09
14-Nov-09
16-Nov-09
16-Nov-09
16-Nov-09

33.78
28.59
27.70
27.70
27.56
31.26
37.48
33.62
33.04
34.22
33.93
33.47
31.41
28.30
28.15
29.78
26.96
31.26
25.33
25.33
27.41
28.29
25.78
27.26
28.87
33.48
28.15
26.96
30.96
26.82
25.19

DSB-222 17-Nov-09

30.96

27.6

Sample No. 65 to 96
29.44

32.48

Average
29.66

33.67

Standard deviation
3.18

29.41

Coefficient of variation
10.72
27.22

27.19

29.37

28.48

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

97
98
99

DSB-224 17-Nov-09
DSB-225 18-Nov-09

25.04
29.33

DSB-226 19-Nov-09

32.44

100

DSB-227 19-Nov-09

32.74

101

DSB-228 19-Nov-09

33.04

102

DSB-229 20-Nov-09

31.26

103

DSB-230 20-Nov-09

28.44

104

DSB-231 21-Nov-09

27.85

105

DSB-232 23-Nov-09

29.78

106

DSB-233 23-Nov-09

26.22

107

DSB-235 24-Nov-09

26.22

108

DSB-236 25-Nov-09

27.70

109

DSB-237 25-Nov-09

30.22

110

DSB-238 25-Nov-09

32.59

111

DSB-239 25-Nov-09

30.37

112

DSB-240 26-Nov-09

32.30

113

DSB-241 26-Nov-09

29.04

114

DSB-242 26-Nov-09

28.00

115

DSB-243 26-Nov-09

30.07

116

DSB-248 28-Nov-09

28.89

117

DSB-249 30-Nov-09

28.59

118

DSB-250 30-Nov-09

26.67

119

DSB-251

1-Dec-09

28.44

120

DSB-253

1-Dec-09

29.04

121

DSB-255

2-Dec-09

29.33

122

DSB-271 11-Dec-09

21.63

123

DSB-273 12-Dec-09

26.52

124

DSB-275 12-Dec-09

25.93

125

DSB-276 12-Dec-09

30.37

126

DSB-277 14-Dec-09

27.11

127

DSB-290 22-Dec-09

28.74

128

DSB-294 23-Dec-09

25.78

27.1

Sample No. 97 to 128


29.89

30.15

Average
28.74

27.48

Standard deviation
2.55

31.37

Coefficient of variation
8.87
29.00

28.19

25.85

28.00

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

129

DSB-295 23-Dec-09

30.22

130

DSB-298 24-Dec-09

28.59

131

DSB-304 28-Dec-09

28.89

132

DSB-306 29-Dec-09

26.07

133

DSB-308 29-Dec-09

30.81

134

DSB-317

7-Jan-10

29.93

135

DSB-348

2-Mar-10

29.19

136

DSB-349

3-Mar-10

30.37

137

DSB-356 26-Mar-10

27.85

138

DSB-357

1-Apr-10

25.78

139

DSB-358

3-Apr-10

33.48

140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

DSB-360
DSB-362
DSB-365
DSB-366
DSB-367
DSB-368
D-465
DSB-369
DSB-370
D-485
DSB-371
DSB-373
D-513
DSB-374
DSB-375
DSB-376
DSB-377
D-528
DSB-378
DSB-379

6-Apr-10
19-Apr-10
30-Apr-10
5-May-10
6-May-10
6-May-10
7-May-10
9-May-10
10-May-10
11-May-10
12-May-10
15-May-10
18-May-10
19-May-10
19-May-10
20-May-10
20-May-10

DSB-380

24-May

26.07
28.89
28.14
26.22
29.78
30.22
26.52
29.78
31.11
27.7
29.19
28.59
29.63
26.22
25.63
28
27.7
30.37
26.07
25.63
27.11

22-May
23-May
24-May

fck+0.825x
established
standard deviation

26.6

Sample No. 129 to160


28.44

30.08

Average
28.43

28.30

Standard deviation
1.95

28.26

Coefficient of variation
6.85
29.41

28.78

26.89

27.30

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

Sample Lab.Ref.
No.
No.

Date of
Casting

161
162
163
164

DSB-382
DSB-383
DSB-384

25-May
25-May
26-May

29.93
29.93
29.78

DSB-385

27-May

26.67

165
166
167
168

DSB-386
DSB-389
DSB-390

27-May
1-Jun
1-Jun

27.11
26.07
25.78

DSB-391

2-Jun

27.11

169
170
171
172

DSB-392
DSB-393
DSB-394

3-Jun-10
4-Jun-10
5-Jun-10

25.63
32.15
26.22
26.07

27.52

173
174
175
176

DSB-399 10-Jun-10
DSB-400 11-Jun-10
DSB-401 11-Jun-10

25.92
26.07
25.63
28.74

26.59

177
178
179
180

DSB-405 18-Jun-10
DSB-407 19-Jun-10
DSB-408 19-Jun-10

26.37
31.41
31.11
26.96

28.96

181
182
183
184

DSB-410 20-Jun-10
DSB-411 20-Jun-10
DSB-412 20-Jun-10

27.70
26.22
28.15
29.33

27.85

185
186
187
188

DSB-415 22-Jun-10
DSB-416 22-Jun-10
DSB-417 23-Jun-10

28.74
30.96
29.78
32.00

30.37

189
190
191
192

DSB-419 25-Jun-10
DSB-420 25-Jun-10
DSB-423 26-Jun-10

32.59
32.59
33.04
28.89

31.78

DSB-398 10-Jun-10

DSB-402 14-Jun-10

DSB-409 19-Jun-10

DSB-413 21-Jun-10

DSB-418 24-Jun-10

DSB-434

1-Jul-10

27.0

Sample No. 161 to192


29.08

26.52

Average
28.58

Standard deviation
2.43

Coefficient of variation
8.49

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

Sample Lab.Ref.
No.
No.

Date of
Casting

193
194
195
196

DSB-436
DSB-437
D-663

2-Jul-10
3-Jul-10

197
198
199
200

D-672
D-686
D-688
D-692

19-Jul-10
27-Jul-10
27-Jul-10
30-Jul-10

201
202
203
204

D-695
DSB-438
DSB-439

31-Jul-10
4-Jul-10
5-Jul-10

DSB-444

8-Jul-10

26.37
26.81
30.52

205
206
207
208

DSB-450
DSB-451
DSB-461

11-Jul-10
11-Jul-10
14-Jul-10

25.63
25.78
29.78

DSB-470

18-Jul-10

26.37

209
210
211
212

DSB-471
DSB-487
DSB-488

20-Jul-10
24-Jul-10
26-Jul-10

25.63
26.22
27.11

DSB-493

31-Jul-10

27.11

213
214
215
216

DSB-494

31-Jul-10

31.41

DSB-497
DSB-500
DSB-502

5-Aug-10
6-Aug-10
7-Aug-10

28
31.26
27.56

217
218
219
220

DSB-503 9-Aug-10
DSB-504 10-Aug-10
DSB-505 11-Aug-10
DSB-507 11-Aug-10

26.08
28.59
27.85
29.93

28.11

221
222
223
224

DSB-509
DSB-511
D-713
DSB-512

26.67
26.67
28.59
29.18

27.78

D-671

13-Jul-10
19-Jul-10

12-Aug-10
14-Aug-10
16-Aug-10
16-Aug-10

25.33
26.37
27.85

26.5

Sample No. 193 to 224


26.30

25.63
25.93
31.11
28.59

28.30

Average
27.75

27.56
30.52
28.56

Standard deviation
1.86

26.89

Coefficient of variation
6.69
26.52

29.56

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa
26.5

225
226
227
228

DSB-513
DSB-514
DSB-515
DSB-517

16-Aug-10
16-Aug-10
17-Aug-10
19-Aug-10

26.97
29.33
27.56
27.26

229
230
231
232

DSB-518
DSB-519
DSB-521
DSB-523

19-Aug-10
20-Aug-10
20-Aug-10
21-Aug-10

27.56
26.96
28.3
28

27.71

233
234
235
236

DSB-524
DSB-525
DSB-527
DSB-528

21-Aug-10
21-Aug-10
22-Aug-10
22-Aug-10

26.52
26.96
28.15
26.67

27.08

237
238
239
240

DSB-529
DSB-530
DSB-531
DSB-532

24-Aug-10
24-Aug-10
26-Aug-10
27-Aug-10

32.15
29.48
29.48
32.44

30.89

241
242
243
244

DSB-533
DSB-534
DSB-535
DSB-536

27-Aug-10
28-Aug-10
28-Aug-10
28-Aug-10

30.52
29.83
32.44
30.67

30.87

245
246
247
248

D-730
DSB-537
D-736
DSB-541

29-Aug-10
30-Aug-10
31-Aug-10
31-Aug-10

30.67
29.19
26.81
26.67

28.34

249
250
251
252

DSB-544 31-Aug-10
DSB-545 1-Sep-10
DSB-546 1-Sep-10
DSB-547 1-Sep-10

30.37
28.89
28.59
30.52

29.59

253
254
255
256

DSB-548
DSB-549
DSB-550
DSB-552

27.41
28
27.11
26.67

27.30

2-Sep-10
2-Sep-10
2-Sep-10
3-Sep

Sample No. 225 to 256


27.78

Average
28.69

Standard deviation
1.80

Coefficient of variation
6.27

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa
26.4

257
258
259
260

DSB-553
DSB-554
DSB-555
DSB-556

3-Sep
3-Sep
4-Sep
5-Sep

29.19
29.07
28.44
26.07

261
262
263
264

D-754
DSB-557
DSB-558
DSB-559

5-Sep
6-Sep
6-Sep
6-Sep

26.22
26.81
28.30
26.67

27.00

265
266
267
268

DSB-564
DSB-565
DSB-566
DSB-567

7-Sep
13-Sep
13-Sep
14-Sep

27.85
32.00
28.15
26.07

28.52

269
270
271
272

DSB-568
DSB-569
D-765
D-766

15-Sep
15-Sep
15-Sep
24-Sep

27.26
27.41
25.48
25.48

26.41

273
274
275
276

D-767
DSB-570
D-771
D-772

25-Sep
27-Sep
29-Sep
29-Sep

30.37
26.67
27.56
27.11

27.93

277
278
279
280

DSB-571
DSB-572
DSB-573
D-773

30-Sep
1-Oct
4-Oct
6-Oct

26.52
31.41
28.15
29.33

28.85

281
282
283
284

DSB-578
DSB-580
DSB-581
DSB-584

7-Oct
8-Oct
8-Oct
9-Oct

29.04
31.11
26.52
26.96

28.41

285
286
287
288

DSB-586
DSB-587
DSB-588
D-790

10-Oct
10-Oct
11-Oct
11-Oct

27.56
26.37
25.18
26.82

26.48

Sample No. 257 to 288


28.19

Average
27.72

Standard deviation
1.74

Coefficient of variation
6.28

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa
26.2

289
290
291
292

D-791
DSB-591
DSB-593
DSB-594

11-Oct
12-Oct
13-Oct
13-Oct

25.78
25.33
25.92
25.63

293
294
295
296

DSB-595
DSB-599
D-805
DSB-602

14-Oct
16-Oct
16-Oct
19-Oct

25.33
25.78
26.82
25.93

25.97

297
298
299
300

DSB-603
DSB-605
DSB-610
D-819

19-Oct
20-Oct
22-Oct
23-Oct

28.59
27.26
25.78
25.04

26.67

301
302
303
304

DSB-614
DSB-616
DSB-618
DSB-620

24-Oct
25-Oct
26-Oct
28-Oct

26.81
25.93
29.19
30.96

28.22

305
306
307
308

DSB-621
D-822
DSB-623
DSB-624

28-Oct
28-Oct
31-Oct
31-Oct

25.33
27.26
29.48
25.63

26.93

309
310
311
312

DSB-628
DSB-629
DSB-630
DSB-631

4-Nov-10
4-Nov-10
4-Nov-10
6-Nov-10

27.85
27.26
28.15
27.56

27.71

313
314
315
316

DSB-632 7-Nov-10
DSB-633 8-Nov-10
D-833
12-Nov-10
DSB-635 13-Nov-10

28.59
26.96
26.52
27.7

27.44

317
318
319
320

DSB-640
DSB-641
DSB-642
D-836

26.22
28.74
28.44
25.33

27.18

15-Nov-10
16-Nov-10
18-Nov-10
19-Nov-10

Sample No. 289 to 320


25.67

Average
26.97

Standard deviation
1.47

Coefficient of variation
5.47

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa
27.3

321
322
323
324

D-837
DSB-644
DSB-645
DSB-647

20-Nov-10
21-Nov-10
22-Nov-10
23-Nov-10

26.67
27.11
27.85
25.63

325
326
327
328

DSB-648 24-Nov-10
DSB-650 25-Nov-10
D-846
1-Dec-10
DSB-659 7-Dec-10

26.81
29.04
31.26
28.29

28.85

329
330
331
332

DSB-661
DSB-663
DAM-851
DSB-664

8-Dec-10
8-Dec-10
8-Dec-10
9-Dec-10

34.67
27.41
28.44
30.67

30.30

333
334
335
336

DSB-674
DSB-677
DSB-678
DSB-680

20-Dec-10
23-Dec-10
23-Dec-10
23-Dec-10

31.11
26.07
26.07
27.70

27.74

337
338
339
340

DSB-681
DSB-682
DAM-867
DSB-687

24-Dec-10
24-Dec-10
24-Dec-10
27-Dec-10

30.96
28.89
25.48
26.96

28.07

341
342
343
344

DSB-689 28-Dec-10
DSB-690 29-Dec-10
DSB-691 29-Dec-10
DSB-692 1-Jan-11

30.07
35.41
34.07
25.78

31.33

345
346
347
348

DSB-693 2-Jan-11
DAM-882 2-Jan-11
DSB-694 3-Jan-11
DSB-695 06-Jan-11

25.78
26.81
27.70
25.78

26.52

349
350
351
352

DSB-696
DSB-701
DSB-703
DSB-704

26.07
25.19
26.07
32.3

27.41

06-Jan-11
08-Jan-11
09-Jan-11
10-Jan-11

Sample No. 321 to 352


26.82

Average
28.38

Standard deviation
2.84

Coefficient of variation
9.99

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa
26.9

353
354
355
356

DSB-708
DSB-709
DSB-711
DSB-713

12-Jan-11
12-Jan-11
13-Jan-11
14-Jan-11

26.37
25.93
26.07
29.48

357
358
359
360

DSB-719
DAM-936
DSB-726
DSB-727

19-Jan-11
23-Jan-11
23-Jan-11
23-Jan-11

26.52
26.81
25.63
26.07

26.26

361
362
363
364

DSB-733
DSB-734
DSB-735
DSB-736

27-Jan-11
27-Jan-11
28-Jan-11
28-Jan-11

29.48
28.59
29.78
29.78

29.41

365
366
367
368

DSB-740 29-Jan-11
DSB-743 30-Jan-11
DAM-968 1-Feb-11

27.7
31.26
26.67

DSB-747

2-Feb-11

26.07

369
370
371
372

DSB-749
DSB-754
DSB-755

3-Feb-11
4-Feb-11
4-Feb-11

27.89

DAM-982

6-Feb-11

30.22
26.22
27.26
27.85

DSB-758
DSB-760
DSB-761

8-Feb-11
9-Feb-11
9-Feb-11

26.07
25.04
26.07
25.78

25.74

18.37
28.15
26.07
25.19

24.45

25.68
26.67
25.63
26.22

26.05

373
374
375
376

DSB-764 12-Feb-11

377
378
379
380

DSB-765 15-Feb-11
DAM-1024 18-Feb-11
DSB-768 18-Feb-11

381
382
383
384

DAM-1028 20-Feb-11
DSB-770 20-Feb-11
DSB-771 20-Feb-11

DSB-769 19-Feb-11

DSB-772 20-Feb-11

Sample No. 353 to 384


26.96

Average
26.83

Standard deviation
2.25

27.93

Coefficient of variation
8.40

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

385
386
387
388

DSB-773 21-Feb-11
DSB-774 21-Feb-11
DSB-776 22-Feb-11

389
390
391
392

DSB-778 22-Feb-11
DSB-780 23-Feb-11
DAM-1042 24-Feb-11

393
394
395
396

DSB-782 25-Feb-11
DSB-783 25-Feb-11
DSB-784 26-Feb-11

397
398
399
400

DSB-786 26-Feb-11
DSB-787 27-Feb-11
DSB-788 27-Feb-11

401
402
403
404

DSB-792
DSB-794
DSB 795

DSB-777 22-Feb-11

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

16.74
13.93
14.81
12.59

28.9

Sample No. 385 to 416


14.52

13.04
24.15
20.3
26.37

20.97

25.78
26.07
21.93
22.52

24.08

21.63
25.33
21.19
18.96

21.78

04-Mar-11
04-Mar-11

21.19
22.37
22.22
25.19

22.74

405
406
407
408

Dam1077 05-Mar-11
Dam1078 05-Mar-11
DSB 799 06-Mar-11
DSB 802 08-Mar-11

22.22
26.37
21.04
27.85

24.37

409
410
411
412

DSB 804
DSB 806
DSB 808

09-Mar-11
10-Mar-11
11-Mar-11
Dam1102 12-Mar-11

26.07
21.93
20.74
26.52

23.82

413
414
415
416

Dam1103 12-Mar-11
Dam1104 12-Mar-11
Dam1105 12-Mar-11
DSB 810 12-Mar-11

27.56
30.22
31.85
25.63

28.82

DAM-1054 25-Feb-11

DSB-785 26-Feb-11

DSB-789 28-Feb-11

DSB 796

2-Mar-11
3-Mar-11

Average
22.63

Standard deviation
4.72

Coefficient of variation
20.87

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

417
418
419
420

DSB 811 13-Mar-11


Dam1111 14-Mar-11
Dam1112 14-Mar-11
DSB 812 14-Mar-11

25.78
25.63
26.07
24.89

25.59

421
422
423
424

DSB 813
DSB 814
DSB 816

15-Mar-11
15-Mar-11
16-Mar-11
18-Mar-11

26.37
27.11
30.67
31.85

29.00

425
426
427
428

DSB 822 22-Mar-11


DSB 826 23-Mar-11
Dam1121 24-Mar-11
Dam1124 24-Mar-11

25.19
28.15
21.93
19.56

23.71

429
430
431
432

DSB 829
DSB 834
DSB 835

25-Mar-11
26-Mar-11
27-Mar-11
Dam1138 28-Mar-11

21.63
27.85
27.56
29.56

26.65

433
434
435
436

Dam1139 28-Mar-11
Dam1140 28-Mar-11
Dam1141 28-Mar-11
Dam1142 28-Mar-11

25.78
28
35.26
27.33

29.09

437
438
439
440

Dam1143 28-Mar-11
DSB 836 28-Mar-11
Dam1144 29-Mar-11
Dam1145 29-Mar-11

25.93
22
29.19
28

26.28

441
442
443
444

Dam1146 29-Mar-11
Dam1147 29-Mar-11
DSB 837 29-Mar-11
SN 7
29-Mar-11

26.67
30.67
30.07
26.67

28.52

445
446
447
448

Dam1149 30-Mar-11
Dam1150 30-Mar-11
Dam1151 30-Mar-11
Dam1152 30-Mar-11

26.07
24.74
23.56
25.15

24.88

DSB 819

Sample No. 417 to 448

Average
26.72

Standard deviation
3.18

Coefficient of variation
11.89

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M25 A40

Cement Content : 338 Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
449
450
451
452
453

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20 A40

Cement Content : 280Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

16
1
2
3
4
5
6

DSB-100
DSB-105
DSB-106
DSB-111
DSB-112

7-Sep-09
12-Sep-09
14-Sep-09
17-Sep-09
18-Sep-09

DSB-116

21-Sep-09

DSB-124

26-Sep-09

25.48

8
9
10
11
12
13
14
15
16
17
18
19
20
21

DSB-138
DSB-150
DSB-151
DSB-155
DSB-161
DSB-162
DSB-169
DSB-175
DSB-194
DSB-252
DAM-1049
DAM-1066
DAM-1070
DAM-1075

6-Oct-09
13-Oct-09
13-Oct-09
14-Oct-09
19-Oct-09
20-Oct-09
22-Oct-09
28-Oct-09
6-Nov-09
1-Dec-09
24-Feb-11
1-Mar-11
2-Mar-11
3-Mar-11

20.44
25.93
26.96
26.08
29.12
25.93
26.07
21.04
25.48
24.59

22.67
20.44
23.11
24.44
26.37
25.48

17.93
16.15
17.04
15.56

23.2

24
Sample No. 1 to 32
22.67

24.44

Average
23.16

27.02

Standard deviation
3.90

24.63

Coefficient of variation
16.83
18.93

15.56

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20A20

Cement Content : 285Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

fck+0.825x
established
standard deviation

DTA-10
DTA-11
DTA-12
DTA-13
DTA-14
DTA-15
DTA-16
DTA-17
DTA-18
DTA-25
DTA-19
DTA-20
DTA-22
DTA-23
DTA-24
DTA-26
DTA-27
DTA-28
DTA-29
DTA-32
DTA-33
DTA-34
DTA-35
DTA-36
DTA-37
DTA-38
DTA-39
DTA-40
DTA-41
DTA-42
DTA-43

26-Jun-09
29-Jun-09
30-Jun-09
02-Jul-09
03-Jul-09
04-Jul-09
07-Jul-09
12-Aug-09
13-Aug-09
15-Aug-09
17-Aug-09
18-Aug-09
20-Aug-09
21-Aug-09
22-Aug-09
26-Aug-09
28-Aug-09
29-Aug-09
31-Aug-09
09-Sep-09
11-Sep-09
14-Sep-09
16-Sep-09
17-Sep-09
19-Sep-09
22-Sep-09
23-Sep-09
25-Sep-09
26-Sep-09
29-Sep-09
01-Oct-09

20.44
22.37
27.85
20.15
21.63
20.89
22.67
20.15
20.30
22.52
20.81
21.33
21.19
20.00
25.14
20.74
21.63
20.59
21.63
22.07
26.81
27.85
21.63
22.67
21.04
20.00
20.59
23.70
21.33
20.15
20.15

PHB-26

30-Dec-09

25.78

21.9

24
Sample No. 1 to 32
22.70

21.34

Average
22.06

21.24

Standard deviation
2.26

21.77

Coefficient of variation
10.24
21.48

24.74

21.33

21.85

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20A20

Cement Content : 285Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

33
34
35

HRT-1
HRT-2

13-Feb-10
24-Feb-10

19.85
23.56

HRT-3

25-Feb-10

24.30

36

PHB-27

25-Feb-10

22.37

37
38

PHB-28

25-Feb-10

26.67

PHB-29

26-Feb-10

22.67

39
40

HRT-4

17-Mar-10

22.22

PC-14

9-Apr-10

26.67

41

PHB-30

20-Apr-10

22.37

42
43
44

HRT-9
P.C-29

28-Apr-10
6-May-10

20.15
24.00

BPI-1

26-May

23.41

45
46
47
48

BPI 5
P.C-44
P.C-45

11-Jun-10
23-Jun-10
23-Jun-10

BPI 6

9-Jul-10

22.70
26.81
23.56
21.93

49
50
51
52

BPI 7
BPI 8
BPI 9

16-Jul-10
25-Jul-10
28-Jul-10

24.30
23.70
21.04

BPI 10

3-Aug-10

20.00

53
54
55
56

BPI 11
HRT-47
BPI 12
BPI 13

5-Aug-10
5-Aug-10
10-Aug-10
11-Aug-10

20.89
25.93
27.56
26.22

25.15

57
58
59
60

P.C-60
BPI 14
PHB-31
PHB-32

14-Aug-10
17-Aug-10
28-Aug-10
29-Aug-10

20.44
23.41
30.96
25.19

25.00

61
62
63
64

HRT.I.-2
PHB-33
PHB-34
HRTI-5

29-Aug-10
30-Aug-10
3-Sep-10
4-Sep-10

24.3
24.3
22.96
22.22

23.45

Sample No. 33 to 64
22.52

24.56

Average
23.65

22.48

Standard deviation
2.48

23.75

Coefficient of variation
10.48
22.26

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20A20

Cement Content : 285Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

65
66
67
68

HRTI-6
PHB-38
D-762
PHB-35

5-Sep-10
10-Sep-10
13-Sep-10
21-Sep-10

22.07
20.44
26.67
24.15

23.33

69
70
71
72

HRTI-7
PHB-36
PHB-37
BPI-16

28-Sep-10
30-Sep-10
8-Oct-10
11-Oct-10

20.30
20.44
20.44
20.15

20.33

73
74
75
76

BPI-17
PHB-39
BPI-18
BPI-19

12-Oct-10
21-Oct-10
24-Oct-10
27-Oct-10

16.59
23.70
20.74
20.74

20.44

77
78
79
80

BPI-20
PHB-40
HRTI-13
BPI-21

29-Oct-10
29-Oct-10
4-Nov-10
9-Nov-10

20.44
21.19
21.78
20.59

21.00

81
82
83
84

HRTI-16
HRTI-19
BPI-22
BPI-23

9-Nov-10
15-Nov-10
16-Nov-10
19-Nov-10

20.59
21.78
20.44
24.74

21.89

85
86
87
88

BPI-24
BPI-25
BPI-26
BPI-27

24-Nov-10
27-Nov-10
30-Nov-10
4-Dec-10

21.33
20.30
23.70
20.44

21.44

89
90
91
92

BPI-28
BPI-29
BPI-30

14-Dec-10
15-Dec-10
23-Dec-10

20.59
22.07
20.59

93
94
95
96

Sample No. 65 to 96

Average
21.37

Standard deviation
1.91

Coefficient of variation
8.92

21.08

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20 A40

Cement Content : 262Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

6-Feb-10
22-Feb-10

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

21
P.C-1
P.C-2
P.C-33

fck+0.825x
established
standard deviation

BPI-2
BPI-3
BPI-4
DSB-414

18-May
30-May
31-May
1-Jun
21-Jun-10

17.19
26.81
20.74
28.89
21.04
32.00
22.37

PC-69

7-Sep

20.89

24.1

24
Sample No. 1 to 32
23.41

24.08

Average
23.74

#DIV/0!

Standard deviation
4.98

#DIV/0!

Coefficient of variation
20.96
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20 A40

Cement Content : 273Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

4-Jun-09
6-Jun-09
7-Jun-09
9-Jun-09
10-Jun-09
11-Jun-09
22-Jun-09
23-Jun-09
23-Jun-09
19-Aug-09
4-Sep-09
7-Sep-09

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

16
DTA-1
DTA-2
DTA-3
DTA-4
DTA-5
DTA-6
DTA-7
DTA-8
DTA-9
DTA-21
DTA-30
DTA-31

fck+0.825x
established
standard deviation

20.89
26.52
20.00
20.00
20.44
24.44
21.78
20.44
20.00
22.37
20.59
23.26

21.7

24
Sample No. 1 to 32
21.85

21.78

Average
21.73

21.56

Standard deviation
2.07

#DIV/0!

Coefficient of variation
9.55
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20 A20

Cement Content : 288Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

24-Apr-09
28-Apr-09
29-Apr-09
9-Jun-09
22-Jun-09
24-Jun-09
4-Jul-09
3-Aug-09
10-Aug-09
12-Aug-09
7-Oct-09
8-Oct-09
19-Oct-09

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

16
PHB-02
PHB-03
PHB-04
PHB-05
PHB-06
PHB-07
PHB-08
PHB-12
PHB-13
PHB-14
PHB-15
PHB-16
PHB-20

fck+0.825x
established
standard deviation

24.44
22.22
22.96
23.41
20.44
20.15
20.30
22.07
20.15
20.89
20.59
20.30
24.89

21.4

24
Sample No. 1 to 32
23.26

20.74

Average
21.75

20.48

Standard deviation
1.70

24.89

Coefficient of variation
7.82
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M20 A20

Cement Content : 311Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

19-Jul-09
20-Jul-09
30-Jul-09
10-Oct-09
10-Oct-09
15-Oct-09
2-Dec-09
2-Dec-09
5-Dec-09
29-Dec-09

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

16
PHB-09
PHB-10
PHB-11
PHB-17
PHB-18
PHB-19
PHB-22
PHB-23
PHB-24
PHB-25

fck+0.825x
established
standard deviation

22.22
22.22
20.74
24.30
23.70
28.74
27.11
25.93
29.63
25.78

22.4

24
Sample No. 1 to 32
22.37

26.37

Average
25.04

27.71

Standard deviation
2.93

#DIV/0!

Coefficient of variation
11.69
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M30 A20

Cement Content : 358Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

23-Jul-09
24-Jul-09
25-Aug-09
25-Aug-09

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

26
PHD-04
PHD-05
PHD-03
PHD-04

fck+0.825x
established
standard deviation

31.56
30.96
31.26
30.22

30.5

34
Sample No. 1 to 32
31.00

#DIV/0!

Average
31.00

#DIV/0!

Standard deviation
0.57

#DIV/0!

Coefficient of variation
1.85
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M30 A20

Cement Content : 379Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

28
29
30
31
32

DAM-950
DAM-954
DAM-955
DAM 1131
DAM 1132
DAM 1133
DAM 1134
DAM 1135
DAM 1136
DAM 1137

28-Jan-11
29-Jan-11
29-Jan-11
26-Mar-11
27-Mar-11
27-Mar-11
27-Mar-11
27-Mar-11
28-Mar-11
28-Mar-11

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

26
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

fck+0.825x
established
standard deviation

35.56
35.41
35.85
33.93
33.93
32.89
33.19
31.26
35.11
35.11

31.2

34
Sample No. 1 to 32
35.19

32.82

Average
34.22

35.11

Standard deviation
1.46

#DIV/0!

Coefficient of variation
4.27
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M30 A20

Cement Content : 366Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-4

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

27-Nov-09
24-Dec-09
24-Dec-09

Statistical Analysis
f ck+4

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

26
PHD-5
PHD-6
PHD-7

fck+0.825x
established
standard deviation

31.70
32.74
31.70

30.5

34
Sample No. 1 to 32
32.05

#DIV/0!

Average
32.05

#DIV/0!

Standard deviation
0.60

#DIV/0!

Coefficient of variation
1.87
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 188Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

14-Mar-10
14-Mar-10
14-Mar-10
15-Mar-10
15-Mar-10
15-Mar-10
19-Mar-10
19-Mar-10
19-Mar-10
19-Mar-10
20-Mar-10
23-Mar-10
24-Mar-10
26-Mar-10
26-Mar-10
26-Mar-10
27-Mar-10
27-Mar-10
28-Mar-10
28-Mar-10

Statistical Analysis
f ck+3

90 Days

90 Days

Not less than


(Mpa)

(which ever is more)


Mpa

12
D-238
D-240
D-242
D-243
D-246
D-248
D-261
D-262
D-263
D-266
D-268
D-276
D-279
D-288
D-291
D-292
D-293
D-295
D-297
D-298

fck+0.825x
established
standard deviation

21.04
20.3
21.78
20.15
21.48
22.22
20.44
20.44
19.56
19.33
18.89
21.19
21.49
25.4
23.41
21.78
23.85
21.19
20.3
21.78

16.3

18
Sample No. 1 to 32
20.82

21.15

Average
21.30

19.74

Standard deviation
1.57

23.02

Coefficient of variation
7.38
21.78

#DIV/0!

#DIV/0!

#DIV/0!

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

Sample
No.

Lab.Ref.
No.

Date of
Casting

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

D-310
D-311
D-318
D-320
D-334
D-338
D-339
D-347
D-350
D-351
D-353
D-357
D-358
D-362
D-363
D-364
D-365
D-370
D-371
D-374
D-376
D-378
D-381
D-384
D-387
D-393
D-398
D-401
D-403
D-405
D-408

31-Mar-10
31-Mar-10
2-Apr-10
2-Apr-10
7-Apr-10
7-Apr-10
8-Apr-10
9-Apr-10
10-Apr-10
10-Apr-10
10-Apr-10
11-Apr-10
12-Apr-10
13-Apr-10
13-Apr-10
13-Apr-10
13-Apr-10
15-Apr-10
15-Apr-10
16-Apr-10
17-Apr-10
17-Apr-10
18-Apr-10
20-Apr-10
20-Apr-10
22-Apr-10
23-Apr-10
24-Apr-10
24-Apr-10
24-Apr-10
25-Apr-10

16.89
14.96
17.63
14.96
13.93
13.93
13.48
12.59
13.19
11.56
14.07
13.78
15.70
12.15
19.11
11.48
15.26
12.44
14.07
13.33
13.48
13.63
13.33
14.37
13.63
12.44
12.59
12.15
13.48
12.74
12.74

D-410

25-Apr-10

13.04

12
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160

fck+0.825x
established
standard deviation

16.4

18
Sample No. 1 to 32
16.11

13.48

Average
13.82

13.15

Standard deviation
1.68

14.61

Coefficient of variation
12.18
13.78

13.70

12.70

13.00

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample
No.
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160

Lab.Ref.
No.

Date of
Casting

D-412
D-413
D-417
D-419
D-420
D-441
D-442
D-443
D-446
D-449
D-453
D-456
D-458
D-459
D-467
D-468
D-469
D-471
D-472
D-473
D-474
D-486
D-488
D-490
D-494
D-495
D-496
D-500
D-501
D-503
D-511

25-Apr-10
25-Apr-10
26-Apr-10
26-Apr-10
26-Apr-10
2-May-10
2-May-10
2-May-10
3-May-10
4-May-10
4-May-10
5-May-10
5-May-10
6-May-10
8-May-10
8-May-10
8-May-10
8-May-10
9-May-10
9-May-10
9-May-10
11-May-10
12-May-10
13-May-10
14-May-10
14-May-10
14-May-10
16-May-10
16-May-10
16-May-10
18-May-10

D-515

19-May-10

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

13.48
13.78
11.41
13.78
13.48

13.33
12.29
11.71
12.74
13.33
12.74
13.63
11.41
13.04
11.56
13.04
14.07
13.33
13.04
13.63
14.07
13.63
12.74
11.41
13.78
15.26
12.30
12.89
13.63
13.18
15.11
14.52

15.8

Sample No. 33 to 64
13.11

12.70

Average
13.17

13.11

Standard deviation
0.98

12.26

Coefficient of variation
7.48
13.52

12.96

13.56

14.11

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample
No.

Lab.Ref.
No.

Date of
Casting

160
160
160
160

D-517
D-519
D-521

20-May-10

69
70
71
72

160
160
160
160

D-532
D-533
D-536

73
74
75
76

160
160
160
160

D-539
D-540
D-547

77
78
79
80

160
160
160
160

D-550
D-552
D-554

81
82
83
84

160
160
160
160

D-556
D-557
D-579

85
86
87
88

160
160
160
160

D-584
D-588
D-589

89
90
91
92

160
160
160
160

D-592
D-600
D-601

93
94
95
96

160
160
160
160

D-608
D-610
D-611

65
66
67
68

D-524

D-537

D-548

D-555

D-582

D-591

D-606

D-615

21-May
21-May
21-May

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

14.96
13.04
12.74

Sample No. 65 to 96
13.67

13.93

24-May
24-May
25-May
25-May

14.22
13.93
13.48

25-May
26-May
29-May
29-May

13.19

29-May
30-May
30-May
30-May

13.63
13.78
14.37
13.93

13.93

31-May
31-May
5-Jun-10
6-Jun-10

14.22
14.81
15.41
14.52

14.74

6-Jun-10
8-Jun-10
9-Jun-10
9-Jun-10

13.78
16.88
11.41
11.11

13.30

10-Jun-10
12-Jun-10
12-Jun-10
14-Jun-10

13.35
13.48
13.48
15.11

13.86

15-Jun-10
15-Jun-10
15-Jun-10
16-Jun-10

12.74
12.89
12.44
14.67

13.19

14.15

13.85

14.96
14.52
13.04
15.11

Average

13.97

Standard deviation
1.16

Coefficient of variation
8.37

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample
No.

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

Lab.Ref.
No.

Date of
Casting
17-Jun-10
18-Jun-10
18-Jun-10
18-Jun-10

12.74
12.89
12.44
12.89

12.74

21-Jun-10
22-Jun-10
22-Jun-10
23-Jun-10

13.33
13.78
13.33
16

14.11

23-Jun-10
23-Jun-10
25-Jun-10
26-Jun-10

16.74
13.78
14.07
14.07

14.67

6-Jul-10
16-Jul-10
23-Jul-10
29-Jul-10

13.48

14.07

97
98
99
100

160
160
160
160

D-617
D-620
D-621

101
102
103
104

160
160
160
160

D-629
D-631
D-632

105
106
107
108

160
160
160
160

D-639
D-640
D-641

109
110
111
112

160
160
160
160

D-655
D-667
D-680

113
114
115
116

160
160
160
160

D-696
D-698
D-703
D-705

3-Aug-10
4-Aug-10
10-Aug-10
11-Aug-10

117
118
119
120

160
160
160
160

D-708
D-712
D-714
D-719

12-Aug-10
16-Aug-10
17-Aug-10
23-Aug-10

14.07
14.07
17.04
12.89

14.52

121
122
123
124

160
160
160
160

D-721
D-729
D-735
D-739

24-Aug-10
27-Aug-10
30-Aug-10
31-Aug-10

13.63
12.15
15.26
15.59

14.16

125
126
127
128

160
160

D-740
D-741
D-745
D-747

31-Aug-10
2-Sep-10
3-Sep-10
3-Sep-10

12.59
14.07
15.56
16.3

14.63

D-624

D-638

D-644

D-691

11.85
11.41
14.96
15.56
14.07
14.81

Sample No. 96 to 128

Average
14.05

Standard deviation
1.42

12.93

Coefficient of variation
10.10
14.63

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

Sample
No.

Lab.Ref.
No.

Date of
Casting

129
130
131
132

D-748
D-752
D-763
D-770

3-Sep-10
4-Sep-10
15-Sep-10
27-Sep-10

12.74
13.07
20.89
10.67

14.34

133
134
135
136

D-776
D-780
D-782
D-787

6-Oct-10
8-Oct-10
9-Oct-10
10-Oct-10

14.81
15.7
14.96
13.63

14.78

137
138
139
140

D-788
D-789
D-797
D-798

10-Oct-10
10-Oct-10
14-Oct-10
14-Oct-10

13.33
14.37
14.82
14.37

14.22

141
142
143
144

D-799
D-800
D-812
D-813

14-Oct-10
14-Oct-10
19-Oct-10
19-Oct-10

10.52
17.34
12.89
12.59

13.34

145
146
147
148

DAM-853
DAM-854
DAM-857
DAM-863

17-Dec-10
17-Dec-10
21-Dec-10
22-Dec-10

18.22
18.52
15.11
17.63

17.37

149
150
151
152

DAM-864
DAM-865
DAM-871
DAM-875

22-Dec-10
23-Dec-10
27-Dec-10
28-Dec-10

18.22
15.11
16.74
14.81

16.22

153
154
155
156

DAM-877
DAM-880
DAM-881
DAM-886

28-Dec-10
30-Dec-10
30-Dec-10
3-Jan-11

15.26
14.96
14.67
15.26

15.04

157
158
159
160

DAM-887
DAM-888
DAM-892
DAM-893

4-Jan-11
5-Jan-11
7-Jan-11
7-Jan-11

14.81
14.67
15.85
14.67

15.00

Sample No. 129 to 160

Average
15.04

Standard deviation
2.19

Coefficient of variation
14.55

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

Sample
No.

Lab.Ref.
No.

Date of
Casting

161
162
163
164

DAM-897
DAM-899
DAM-900
DAM-901

8-Jan-11
10-Jan-11
10-Jan-11
10-Jan-11

14.81
14.22
15.41
16.3

15.19

165
166
167
168

DAM-905
DAM-907
DAM-908
DAM-920

11-Jan
13-Jan
13-Jan
17-Jan

20
14.37
16.74
14.81

16.48

169
170
171
172

DAM-921
DAM-927
DAM-930
DAM-931

17-Jan
20-Jan
21-Jan
21-Jan

16.3
17.04
14.81
14.52

15.67

173
174
175
176

DAM-937
DAM-938
DAM-941
DAM-942

23-Jan
23-Jan
24-Jan
24-Jan

13.93
14.52
17.19
18.37

16.00

177
178
179
180

DAM-943
DAM-949
DAM-953
DAM-959

25-Jan
27-Jan
28-Jan
29-Jan

19.71
16
15.26
17.93

17.23

181
182
183
184

DAM-960
DAM-963
DAM-964
DAM-966

29-Jan
31-Jan
31-Jan
31-Jan

17.63
15.26
15.85
16

16.19

185
186
187
188

DAM-972
DAM-973
DAM-974

2-Feb-11
2-Feb-11
3-Feb-11

15.85
15.41
18.22

DAM-975

3-Feb-11

18.37

189
190
191
192

DAM-980
DAM-981
DAM-986

5-Feb-11
5-Feb-11
7-Feb-11

17.93
17.48
13.93

DAM-987

7-Feb-11

15.7

Sample No. 161 to 192

Average
16.25

Standard deviation
1.65

Coefficient of variation
10.16

16.96

16.26

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

28 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

Sample
No.

Lab.Ref.
No.

Date of
Casting

193
194
195
196

DAM-991
DAM-992
DAM-997

9-Feb-11
9-Feb-11
9-Feb-11

18.07
16.59
18.96

DAM-1000

10-Feb-11

17.93

197
198
199
200

DAM-1003
DAM-1004
DAM-1008

11-Feb-11
11-Feb-11
12-Feb-11

14.07
14.22
14.37

DAM-1009

14-Feb-11

13.33

201
202
203
204

DAM-1010
DAM-1016
DAM-1017

14-Feb-11
17-Feb-11
17-Feb-11

12.59
15.11
17.48

DAM-1020

18-Feb-11

14.22

205
206
207
208

DAM-1021
DAM-1027
DAM-1030

18-Feb-11
19-Feb-11
21-Feb-11

13.93

DAM-1036

22-Feb-11

209
210
211
212

DAM-1037
DAM-1038
DAM-1045

22-Feb-11
23-Feb-11
24-Feb-11

DAM-1046

24-Feb-11

213
214
215
216

DAM-1047
DAM-1053
DAM-1056

24-Feb-11
25-Feb-11
26-Feb-11

DAM-1062

28-Feb-11

217
218
219

DAM-1063
DAM-1064

28-Feb-11
28-Feb-11

DAM-1068

1-Mar-11

11.85
11.11
14.52

220

DAM-1069

1-Mar-11

14.22

221

DAM-1073

3-Mar-11

12.59

222

DAM-1074

3-Mar-11

12.59

13.33
12.89
13.19

Sample No. 193 to 222


17.89

14.00

Average
14.12

14.85

Standard deviation
2.15

13.34

Coefficient of variation

12.59
14.52
14.22
13.93

13.82

13.93
18.07
13.78
10.96

14.19

15.21

12.93

11.93

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

Statistical Analysis
f ck+3

180 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

fck+0.825x
established
standard deviation

D-310
D-311
D-318
D-320
D-334
D-338
D-339
D-347
D-350
D-351
D-353
D-357
D-358
D-362
D-363
D-364
D-365
D-370
D-371
D-374
D-376
D-378
D-381
D-384
D-387
D-393
D-398
D-401
D-403
D-405
D-408

31-Mar-10
31-Mar-10
2-Apr-10
2-Apr-10
7-Apr-10
7-Apr-10
8-Apr-10
9-Apr-10
10-Apr-10
10-Apr-10
10-Apr-10
11-Apr-10
12-Apr-10
13-Apr-10
13-Apr-10
13-Apr-10
13-Apr-10
15-Apr-10
15-Apr-10
16-Apr-10
17-Apr-10
17-Apr-10
18-Apr-10
20-Apr-10
20-Apr-10
22-Apr-10
23-Apr-10
24-Apr-10
24-Apr-10
24-Apr-10
25-Apr-10

22.52
20.15
24.3
21.33
21.93
22.07
18.22
20.3
20.15
18.52
24.89
18.97
20
17.93
27.7
15.89
22.67
21.18
23.55
21.04
23.11
21.48
23.26
25.48
21.04
22.07
20.15
21.04
23.41
18.67
20.59

D-410

25-Apr-10

23.11

17.0

18
Sample No. 1 to 32
22.08

20.63

Standard devi

Average
21.46

20.63

Standard deviation
2.42

20.38

Coefficient of variation
11.29
22.11

23.33

21.08

21.45

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

180 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

D-412
D-413
D-417
D-419
D-420
D-429
D-430
D-437
D-438
D-441
D-442
D-443
D-446
D-449
D-453
D-456
D-458
D-459
D-467
D-468
D-469
D-471
D-472
D-473
D-474
D-486
D-488
D-490
D-494
D-495
D-496

25-Apr-10
25-Apr-10
26-Apr-10
26-Apr-10
26-Apr-10
28-Apr-10
28-Apr-10
29-Apr-10
30-Apr-10
2-May-10
2-May-10
2-May-10
3-May-10
4-May-10
4-May-10
5-May-10
5-May-10
6-May-10
8-May-10
8-May-10
8-May-10
8-May-10
9-May-10
9-May-10
9-May-10
11-May-10
12-May-10
13-May-10
14-May-10
14-May-10
14-May-10

23.55
22.07
18.96
20.74
24.59
24.44
22.67
20.74
20
19.26
19.71
18.96
29.48
19.26
18.37
20.74
16.74
18.82
17.93
22.22
21.93
19.7
21.19
21.93
22.81
24.59
20.15
19.41
21.92
21.33
15.78

D-500

16-May-10

22.67

17.2

Sample No. 33 to 64
21.33

23.11

Average
21.02

19.48

Standard deviation
2.66

21.96

Coefficient of variation
12.64
18.93

21.19

21.74

20.43

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

f ck+3

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

D-501
D-503
D-511

16-May-10
16-May-10
18-May-10

19.71
22.07
22.52

D-515

19-May-10

20.29

69
70
71
72

D-517
D-519
D-521

20-May-10

21.63
19.71
19.85

73
74
75
76

D-532
D-533
D-536

77
78
79
80

D-539
D-540
D-547

81
82
83
84

D-550
D-552
D-554

85
86
87
88

D-556
D-557

D-524

Statistical Analysis

180 Days

65
66
67
68

21-May
21-May
21-May

fck+0.825x
established
standard deviation

16.6

Sample No. 65 to 96
21.15

20.15

20.53

19.41

24-May
24-May
25-May
25-May

19.56
19.85
20.15

25-May
26-May
29-May
29-May

19.26
21.19
20

29-May
30-May
30-May
30-May

16
19.26
20.15
22.07
24.59

D-559
D-582

31-May
31-May
5-Jun-10
6-Jun-10

89
90
91
92

D-584
D-588
D-589
D-591

6-Jun-10
8-Jun-10
9-Jun-10
9-Jun-10

19.56
24
17.93
18.37

21.78

93
94
95
96

D-592
D-600
D-601
D-608

10-Jun-10
12-Jun-10
12-Jun-10
15-Jun-10

18.52
19.11
22.37
18.37

18.82

D-537

D-548

D-555

20.26

21.48

Standard deviation
1.99

21.15

Coefficient of variation

24.15

9.68
19.04

20.74

24.3
20.74

Average

23.33

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

180 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa
16.1

97
98
99
100

D-610
D-611
D-615
D-617

15-Jun-10
15-Jun-10
16-Jun-10
17-Jun-10

18.67
17.19
20.59
18.22

101
102
103
104

D-629
D-631
D-632
D-638

21-Jun-10
22-Jun-10
22-Jun-10
23-Jun-10

19.7
18.08
18.08
21.78

18.89

105
106
107
108

D-639
D-640
D-641
D-641

23-Jun-10
23-Jun-10
25-Jun-10
25-Jun-10

21.19
21.04
21.19
21.19

21.12

109
110
111
112

D-644
D-655
D-667

26-Jun-10
6-Jul-10
16-Jul-10
23-Jul-10

20.89

113
114
115
116

D-696

18.96

D-698
D-703
D-705

3-Aug-10
4-Aug-10
10-Aug-10
11-Aug-10

117
118
119
120

D-708
D-712
D-714
D-719

12-Aug-10
16-Aug-10
17-Aug-10
23-Aug-10

20
21.63
22.67
20.15

21.11

121
122
123
124

D-721
D-729
D-735
D-739

24-Aug-10
27-Aug-10
30-Aug-10
31-Aug-10

20.59
20.44
20.15
20.74

20.48

125
126
127
128

D-740
D-741
D-745
D-747

31-Aug-10
2-Sep-10
3-Sep-10
3-Sep-10

20
20.89
19.41
20.59

20.22

D-680

18.96
19.41
18.52
23.26
20.15
20

Sample No. 96 to 128


17.93

Average
20.14

Standard deviation
1.36

19.45

Coefficient of variation
6.74
20.59

SUMMARY OF CONCRETE TEST RESULTS


PROJECT : 330 MW Srinagar HEP
GRADE OF CONCRETE :- M15 A80

Cement Content : 174Kg/m3

Cube Compressive Strength (MPa)

Acceptance criteria as per


IS-456-2000

Sample Lab.Ref.
No.
No.

Date of
Casting

Mean of 4 Non-overlapping
consecutive results not less than
f ck-3

fck+0.825x
established
standard deviation

Statistical Analysis
f ck+3

180 Days

28 Days

Not less than


(Mpa)

(which ever is more)


Mpa

129
130
131
132

D-748
D-752
D-770
D-776

3-Sep-10
4-Sep-10
27-Sep-10
6-Oct-10

20.29
20.74
16.74
22.07

19.96

133
134
135
136

D-780
D-787
D-788
D-789

8-Oct-10
10-Oct-10
10-Oct-10
10-Oct-10

20
21.78
18.96
22.22

20.74

137
138

D-797
D-798

14-Oct-10
14-Oct-10

21.63
21.33

21.56