Stage 2 CSG water monitoring and management plan

1.0 Stage 2 CSG water monitoring and management plan


1.1 Introduction
Coal seam gas has been produced in Queensland for more than 10 years and accounts for about 80% of all gas consumed in the State. QGC is expanding its existing CSG operations through development of the Queensland Curtis LNG Project (the QCLNG Project). The QCLNG Project is developing coal seam gas in the Surat Basin in southern Queensland to supply gas to export and domestic markets (refer Figure 1). QGC, a wholly-owned subsidiary of the BG Group, is drawing on its own extensive CSG expertise as well as the wider group's international liquefied natural gas (LNG) experience to develop the world's first unconventional LNG facility. The process of extracting coal seam gas from the Walloon Coal Measures (WCM) deep underground produces water which, when treated, can be beneficially used by local farmers, industry and communities. Central to the project's success is ensuring that the integrity of the Great Artesian Basin (GAB), of which the Surat Basin is a part, is maintained. To this end, QGC has made a firm commitment to geological and hydrogeological data gathering, analysis, modelling and monitoring and the establishment of environmentally sustainable water management strategies around CSG operations. This Stage 2 WMMP outlines QGC's approach and commitment to water monitoring and management for the QCLNG Project. It is based on existing and new scientific information and approach. The Stage 2 WMMP: Highlights those tasks completed and started since project approval (October 2010) Summarises key findings from data collected and interpreted to date Sets out a schedule of tasks, delivery mechanisms and target completion dates (i.e. a plan) for SEWPAC to assess compliance against relevant approval conditions.

1.1.1 Goals and objectives


QCLNG's success rests fundamentally on maintaining the long-term integrity of the GAB, ensuring minimal impact on the sustainability of local and regional ground and surface water resources and mitigating impacts on ecological systems considered to be MNES at springs associated with GAB strata. To achieve these objectives, QGC's strategy is: Developing robust water management tools Establishing an extensive monitoring network Calculation of early warning signals and response actions Quantifying and managing potential risks and developing response strategies Implementation of responsible CSG water management and beneficial use options.

150E

150E 150E

151E

151E 151E

150E

CAIRNS

CAIRNS CAIRNS

151E

Cassio
26S 26S 26S

Cassio Cassio

TOWNSVILLE TOWNSVILLE

CAIRNS

TOWNSVILLE MACKAY MACKAY

MACKAY

26S

Acrux Acrux PLA 399 PL 398 Cassio PLA 399 PL 398 Acrux PLA 399 PL 398 Polaris Acrux PLA 399 PL 398 Polaris Polaris

TOWNSVILLE

CLERMONT

CLERMONT GLADSTONE CLERMONT GLADSTONE


26S

26S 26S

! .

WANDOAN WANDOAN WANDOAN

MACKAY

GLADSTONE

! . ! .

ROMA CHINCHILLA ROMA CHINCHILLA CLERMONT BRISBANE ROMA BRISBANE CHINCHILLA


26S

GLADSTONE

BRISBANE

Cam Kathleen Kathleen

Cam

PL 277 Cam Alex Kathleen Downs PL 277 Polaris ATP 651 ATP 651 PL 277 PL 171 PL 171 PL 276 PL 276 ATP 651 Woleebee Woleebee PL 171 Ross Carla Creek PL 276 Ross Carla Mamdal Mamdal Creek Woleebee Lawton Lawton Paradise Downs Kathleen Cam Alex Ross Mamdal Carla Creek Lawton PL 277 ATP 651 PL 276 Woleebee Creek Ross PL 171 Mamdal Lawton

Paradise Paradise Alex Downs WANDOAN Alex Downs Paradise

! .

ROMA

CHINCHILLA

BRISBANE

PLA 393 PLA 393 Peebs 393 Peebs PLA Peebs

Carla

ATP 574 ATP 574 PLA 392 PLA 392 ATP 574 Marcus Pinelands PLA 393 Pinelands Marcus PLA 392 Peebs Marcus Pinelands ATP 632 ATP 632 Connor Connor PLA 392ATP 632 Pinelands Connor PLA 461 PLA 461 676 ATP 676 ATP PLA 461 Avon Downs Avon Downs ATP 676 PLADowns 472 Avon PLA 472

ATP 574 Marcus

! .

DULACCA DULACCA DULACCA

! . ! .

ATP 632 Connor

! .

MILES MILES MILES

! . ! .

! .

DULACCA

PLA 472 ATP 459 676 PLA 459 PL 247 PL 247 ATP PLA 676 461 PLA McNulty Bellevue Bellevue McNulty ATP 676 PL 247 ATP 676 PLA 459 Avon Downs McNulty Bellevue PLA 458 PLA 458 PLA 472 PLA 458 PL 211

! .

MILES
PL 211

! .

CHINCHILLA CHINCHILLA CHINCHILLA

! . ! .

CONDAMINE CONDAMINE CONDAMINE

! .

! . ! .

27S

27S 27S

Berwyndale PL 211 Berwyndale PL 247 ATP 676 PLA 459 Bellevue Berwyndale McNulty PL 201 PL 201 PLA 458 Berwyndale PL 201 Berwyndale PL 229 PL 229 South PL South 211 Argyle Argyle Berwyndale PL 229 179 Berwyndale ATP South 632 PL 179 PL Argyle ATP 632 PL 179 PL 212 PL 212 ATP 632 ATP 620 PL 201 ATP PL620 212 Matilda-John Lauren Kenya Kenya Matilda-John Lauren ATP 620 Berwyndale PL 229 PL 263 South Argyle Lauren PL 180 Kenya PL 263Matilda-John PL 180 ATP 632 PL 212 ATP 620 Matilda-John PL 263 PL 263 Codie Lauren PL 180 PL 228 Kate PL 179 PL 180 PL 228 Codie Kate Kenya Codie

! .

JANDOWAE JANDOWAE JANDOWAE

! . ! .

! .

CHINCHILLA

! .
Owen Owen
27S

JANDOWAE

CONDAMINE

! .

PL 228 PL 257 Kate Jammat Kenya East Jammat Kenya PL 228 East Kate Owen Jammat Kenya East PL 278 PL 278

Owen ATP 443 676 PLA 443 ATP 676 PLA KOGAN PL 257 KOGAN PLATP 257 676 PLA 443

27S 27S

! .

KOGAN

! . ! .

27S

Codie

PL 278 ATP 676 PLA 443 KOGAN PL 257 Sean David Sean David Margaret Margaret Jordan Jordan Kenya East Jammat Sean David Margaret Jordan PL 273 PL 273 PL 442 PL 442 PL 273 PL 278 ATP 648 PL ATP 442 648 Poppy RubyJo 648 Celeste Celeste Poppy ATP RubyJo Isabella Isabella Michelle Michelle

27S

! .

Margaret

Jordan Michelle

! .
TARA

! . TARA ! .
TARA

Will Michelle

Sean David Celeste Poppy RubyJo Isabella PL 275 PL 275 PL 273 PL 275 PL 466 PL 466 PL 442 Will Clunie Jen Ridgewood Broadwater Barney 648 PL 466 Clunie Jen Ridgewood ATP Broadwater Barney RubyJo Barney Isabella Clunie Jen Broadwater

Celeste Poppy Will Ridgewood PLA 261 PLA 261

! .
TARA

PL 275 PLA 261 PL 279 PL 279 PL 474 PL 474 ATP 621 ATP 621 PL 279 Harry PL 474 Glendower AberdeenPL 466 Cougals Harry Myrtle Myrtle Aberdeen Glendower ATP 621 Cougals Will Ridgewood Barney Clunie Jen Broadwater Harry Myrtle Aberdeen Cougals Glendower ATP 648 ATP 648 PL 274 PL 274 ATP 648 PLA 261 PLA 262 PLA 262 PL 274 PL 279 PL Rae 474 TeviotPLA 262 Maire Teviot ATP 621 Maire Rae Myrtle Aberdeen Cougals Glendower Harry Teviot Maire Rae ATP 648 PL 274

PLA 262 Teviot Maire Rae

150E

150E 150E

151E

151E 151E

18

Kilometres
0 4.5 0 9 4.5

0 1:600,000 4.5 9 18 Scale (A3) Kilometers Kilometers

9 18

Map Projection: GDA 94 Map Projection: GDA 94

Map Projection: GDA 94 SCALE: DATA SOURCE: Towns, Railways, Roads - GA DATA SOURCE: Tenements - DME Tenements - DMERailways, Towns, GA SOURCE: 0 DATA 4.5 9 18 27 Roads - 36

Towns, Railways, Roads - GA


27

36

QCLNG Project Area Environmental Authority Applications Environmental Authority Applications Environmental Authority Applications
150E

151E

18 27

Environmental Authority Applications


27 36 27
SCALE: 1:600,000

KilometersSCALE:

Tenements - DME Kilometers

Map Projection: GDA 94

SCALE:

1:600,000

(A3)

Environmental Authority Areas EA Ruby EA Environmental Authority Areas Environmental Authority Areas Ruby EA Ruby Town Town Avon Downs and Wolleebee EA EA Woleebee Creek Avon Downs and McNulty EA McNulty Environmental Authority Areas Ruby EA Creek Town Avon Downs & McNulty EA EAWolleebee Creek EA Town Roads Major Major Roads Berwyndale South EA QGC Development Areas Avon South Downs and EA Berwyndale South EA QGC Development Areas Wolleebee Creek EA Major Roads Berwyndale EA McNulty QGC Development Areas Railway 36 Major Roads Railway EA South EA Central Berwyndale Bellevue EABellevue Central GasDevelopment Fields Gas Fields QGC Areas Railway Bellevue EA QCLNG Railway QCLNG Project AreaProject Area Jordan EA Northern GasFields Fields 36 Central Bellevue EA Jordan EA EA Northern Gas Fields Gas Central Gas Fields QCLNG Project Area Jordan Fields in QCLNG QCLNG Project Area QGC Fields QGC in QCLNG Project AreaProject Area Kenya EA Southern Fields Environmental Authority Areas Ruby EA Northern GasGas Fields Jordan EA Kenya EAEA Southern Gas Fields Gas 1:600,000 Northern Fields (A3) in QCLNG Project Area QGC Fields Kenya Town (A3) QGC Fields in QCLNG Project Area Avon and McNulty Note: Every effortDowns has been made to ensure this information is Wolleebee spatially accurate. Creek EA Southern Gas Fields Kenya EA EA Southern Gas Fields Note: Every effort has been made to ensure this information is spatially accurate. 1:600,000 Major (A3) Roads The location of this information should not be relied on as the exact field location. 18/09/2012 MAP M_11152_01 NO: M_11152_01 The location of this information should not be relied on as the exact field location. DATE: DATE:18/09/2012 MAP NO: Berwyndale South EA of Environment QGC "Based on or contains data provided by the State of Queensland (Department and Resource Management) 2012. In consideration of the State Development Areas "Based on or contains data provided by the State of Queensland of Environment and Resource Management) 2012. accurate. In consideration of the State Note: Every (Department effort has been made to ensure this information is spatially permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, Railway permitting use of this data you acknowledge and that State gives no warranty inrelied relation to the the exact data field (including accuracy, reliability, Theagree location ofthe thisno information should not be on as location. 18/09/2012 MAP NO: M_11152_01 DATE: completeness, currency or suitability) and Bellevue accepts liability (including without limitation, liability in negligence) for any loss, damage or costs EA Central Gas Fields completeness, currency ororsuitability) andprovided acceptsby no (including without limitation, Environment liability in negligence) for any loss, damage costs CREATED "Based on contains data theliability State Queensland (Department and Resource Management) 2012. In or consideration of the State REV NO: TM NO: F (including consequential damage) relating to any of use of the data. Data mustof not be used for direct marketing or be used in breach of the privacy laws." CREATED BY: BY: TM REV F (including consequential to any of the data.and Data must that not be used for gives direct no marketing or be used in breach the (including privacy laws." QCLNG Project Areadamage) permitting use ofrelating this data youuse acknowledge agree the State warranty in relation to the of data accuracy, reliability, Northern Gas Fields completeness, currency or suitability) and Jordan accepts EA no liability (including without limitation, liability in negligence) for any loss, damage or costs CREATED BY: TM REV NO: F damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws." QGC Fields in (including QCLNGconsequential Project Area

! .

! . ! .

! .

Kenya EA

Southern Gas Fields

Towns,version Railways, Roads - GA Figures compendium appendix DATA Refer toSOURCE: the A3 sized in the Tenements - DME

Note: Every effort has been made to ensure this information is spatially accurate. The location of this information should not be relied on as the exact field location. "Based on or contains data provided by the State of Queensland (Department of Environment and Resource Management) 2012. In consideration of the State permitting use of this data you acknowledge and agree that the State gives no warranty in relation to the data (including accuracy, reliability, completeness, currency or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including consequential damage) relating to any use of the data. Data must not be used for direct marketing or be used in breach of the privacy laws."

DATE:

18/09/2012 TM

MAP NO: REV NO:

M_11152_01 F

CREATED BY:

Figure 1 The QCLNG gas field project area

Throughout this document, reference is made to results generated by QGCs GEN2 groundwater model. However, the Queensland Water Commission's (QWC) Underground Water Impact Review (UWIR) is due for formal release in October 2012 and will include an updated groundwater model which addresses cumulative impacts. Upon formal release of the UWIR and finalisation of associated legal arrangements regarding access to model results, QGC will update the predictions contained in this Stage 2 Water Monitoring and Management Plan.

1.2 QCLNG Snapshot


The QCLNG Gas Field Approval (EPBC 2008/4398) authorises the project area which includes the following petroleum tenures: Authority to Prospect (ATP): 574, 610, 621, 632 (portion of), 647, 648, 651, 676 and 768 (portion of) Petroleum Lease (PL): 179, 201, 228, 229, 171,180, 211, 247 Petroleum Lease Application (PLA): 212, 257, 259, 261, 262, 263, 273, 274, 275, 276, 277, 278, 279. The application, granting and conversion of petroleum lease applications is an ongoing process with the Queensland Department of Natural resources and Mines (DNRM). The list below represents all changes that have occurred with QGC tenures within the overall approved QCLNG Gas Field Approval (EPBC 2008/4398) to the 17 September 2012 ATPs converted to PLs and thereby no longer exist: ATP 610 (covered by PL 247), ATP 651 (covered by PLs 276 and 277) PLAs granted to PL: 212, 257, 263, 273, 274, 275, 276, 277, 278, 279, 398, 442, 466, 474 PLAs withdrawn: 259 (covered by grant of PL 273) PLAs applied for over ATP areas held by QGC (PLA): 392 and 393 (portion of ATP 574), 398 and 399 (portion of ATP 768), 443, 458, 459, 461 and 472 (portion of ATP 676) 442, 466 and 474 (portion of ATP 648) Petroleum Facility Licence Applications (PFL): PFL 19, PFL 22 Petroleum Facility Licence Grants (PFL): PFL 19, PFL 22. The QCLNG gas fields project area is shown at Figure 1. The approval conditions allow for the development of up to a maximum of 6,000 production wells and impacts related to gas field development over a 50-year period to 31 October 2060. It should be noted that approximately 2,000 wells will be in production at any one time, with new wells progressively brought on-line to replace maturing wells, which will be decommissioned. The gas fields component of the project covers 468,000 ha within the Walloon Fairway of the Surat Basin. Project activity is located on land between the towns of Taroom, Wandoan, Condamine, Tara, Chinchilla and Dalby.

Works will be carried out as a single stage of development and comprises: Up to 6,000 gas production wells with around 2,000 wells scheduled by mid-2014. The balance of wells will be phased in to replace declining wells over the life of the project Installation of wells and associated well pad surface equipment including wellhead separators, wellhead pumps, wellhead flares, telemetry devices and metering stations Installation of gas gathering systems (High Density Polyethylene (HDPE) and steel pipes) Completion of field compressor stations and central processing plants, including dehydration facilities, substations and power lines Development of access tracks, borrow pits, warehouses, construction and operations camps, offices and telecommunications Construction of water gathering lines, trunklines, ponds, treatment facilities and brine storage ponds Preparation of the necessary infrastructure for the beneficial use of treated CSG water Installation of above-ground 132 kv power lines to connect the new central processing plants to third party substations. Also, installation of underground and above-ground 33 kv power lines connecting central processing plant substations to field compressor stations and Water Treatment Plant substations Development of accommodation camps for construction and operations people, along with warehouses, lay down areas, communication towers and fibre optic cabling. QGC will develop the acreage outlined in Figure 1 with most blocks contributing to QCLNG production in 2014. Therefore, QGC has developed an holistic water monitoring and management plan for the entire project life to responsibly monitor and manage CSG water for the whole acreage. For all key activities a base plan has been selected and each base plan is described in the Stage 2 WMMP. If alternative strategies with better outcomes are proven over time, QGC will apply for revision of the plan. This Stage 2 WMMP covers the first stage of major gas field development and will be revised and updated no later than the commissioning of the LNG Plant, expected to be December 2013.

1.3 Addressing Regulatory Requirements


QCLNG gas field development was referred to the Federal Minister for the Environment under EPBC referral 2008/4398. The Minister approved the action on 22 October 2010, subject to certain conditions, including the submission of this Stage 2 WMMP by 23 April 2012. The implementation of the approved Stage 2 WMMP must not be later than 22 December 2012.

QGC will develop about 6,000 CSG wells. QGC works with landholders, traditional custodians of the land and environmental scientists before final decisions on site selection are made.