Wherearewe?Wherearewegoing?
AbrahamEllis SandiaNationalLaboratories aellis@sandia.gov
GeneratorInterconnection Standards
Establishuniformtechnicalandprocedural requirementsforinterconnectionofgenerationon theelectricgrid Interconnectionstandardsaredrivenby
Safety(peopleandproperty) Gridreliability,performance Costconsiderations Fairness(justandreasonable,andnotunduly discriminatoryorpreferential)
WhatInterconnection StandardsandProceduresApply?
Bulk System Guidelines NERC, FERC IEEE, ANSI, IEC NESC
Distribution System Guidelines IEEE 1547, PUC/PRC IEEE, ANSI, IEC NEC
FederalJurisdictional InterconnectionStandards(FERCOrder)
Applytogenerators,participatinginwholesalemarket, regardlessofsizeandinterconnectionlocation
TSO/DSOfollowproforma proceduresviaOATT
Proceduresandrequirementsgenerallybasedonsize
LargeGeneratingFacilities(>20MW):LGIP/LGIA SmallGeneratingFacilities(SGF)(<20MW):SGIP/SGIA
SGIPhasstreamlinedprocessforsmallerDER
FastTrackProcessforcertaingeneratorsnolargerthan2MW 10kWInverterProcessforcertifiedinverterbasedgeneratorsnolarger than10kW(SGIPAttachment5)
StateJurisdictional InterconnectionStandards(PUC/PRCRule)
Applytogeneratorsuptoacertainsize,connectedto thegrid,butnot participatinginwholesalemarket
NetMetering,PURPAorsimilararrangementforsale of electricitytothehostutilityonly TypicallycoverREandotherDG,allcustomerclasses
Proceduresandstandardsvarybystate
GenerallyconformwithFERCSGIP,butsomehave significantdifferences
Technicalstandardsfocusedonthedistribution systemandDER
StateJurisdictional InterconnectionStandards
www.dsireusa.org / July 2009
WA: 20,000 MT: 50* OR: 25/2,000* SD: 10,000 WY: 25* NV: 20,000 CA: no limit NE: 25* CO: 10,000 KS: 25/200* MN: 10,000 WI: 15,000 MI: no limit IN: no limit IL: 10,000 MO: 100* PA: no limit VT: no limit NH: 100* NY: 2,000 MA: no limit CT: 20,000 NJ: 2,000* MD: 10,000 DC: 10,000
OH: 20,000 KY: 30* VA: 20,000 NC: no limit SC: 20/100* GA: 10/100*
UT: 25/2,000*
NM: 80,000
AR: 25/300*
HI: no limit
TX: 10,000
37 states +
DC & PR have adopted an interconnection policy
Notes: Numbers indicate system capacity limit in kW. Some state limits vary by customer type (e.g., residential/non-residential).No limit means that there is no stated maximum size for individual systems. Other limits may apply. Generally, state interconnection standards apply only to investor-owned utilities.
InterconnectionRequirements forSGF(FERCOrder2006)
FastTrackProcessforSGFthatpasscertainscreens
SGFcapacity<2MW SGFmeetscodes,standardsandcertification TotalSGFcapacity<15%ofpeakloadinthecircuit IfconnectingtoSpotNetwork,SGFmustbeinverterbased,not exceeding5%ofmaximumloador50kW TotalSGFfaultcurrent<10%oftotalfaultcurrent AdditionofSGFdoesnotcausedistributionequipmentandprotective devicestoexceed87.5%ofrating Transformerconnectioncompatiblewithutilitycircuit <20kWforsinglephase,<20%imbalanceamongphases
TypicalDERInterconnectionProcess
Example: CPUCRule21 Interconnection Process
TypicalDERInterconnectionProcess
Example: CPUCRule21Initial TechnicalReview Methodology
IEEE1547StandardFamily
(AppliestoDERnolargerthan10MVA)
No. 1547 1547.1 1547.2 1547.3 1547.4 1547.5 1547.6 1547.7 Title StandardforInterconnectingDistributedResourceswithElectric Power Systems StandardforConformanceTestsProceduresforEquipment InterconnectingDistributedResourceswithElectricPowerSystems ApplicationGuideforIEEE1547StandardforInterconnecting DistributedResourceswithElectricPowerSystems GuideForMonitoring,InformationExchange,andControlofDistributed ResourcesInterconnectedwithElectricPowerSystems DraftGuideforDesign,Operation,andIntegrationofDistributed ResourceIslandSystemswithElectricPowerSystems DraftTechnicalGuidelinesforInterconnectionofElectricPower Sources Greaterthan10MVAtothePowerTransmissionGrid DraftRecommendedPracticeForInterconnectingDistributedResources WithElectricPowerSystemsDistributionSecondaryNetworks DraftGuidetoConductingDistributionImpactStudiesforDistributed ResourceInterconnection Status 2003 2005 2008 2007 Pending Pending Pending Pending
InterconnectionStandards forDistributedEnergyResources
IEEE1547VoltageandFrequencyTolerance
VoltageRange (%Nominal) V<50% 50% V<88% 110%<V<120% V 120% Max.Clearing Time(sec)* 0.16 2.0 1.0 0.16 FrequencyRange (Hz) f>60.5 f<57.0* 59.8<f<57.0** Max.Clearing Time(sec) 0.16 0.16 Adjustable(0.16 and300)
Additionaldisconnectionrequirements
CeasetoenergizeforfaultsontheAreaEPScircuit Ceasetoenergizepriortocircuitreclosure Detectislandconditionandceasetoenergizewithin2seconds oftheformationofanisland(antiislanding)
InterconnectionStandards forDistributedEnergyResources
50% < V > 88% 110% < V > 120%
V < 50%
V > 120%
InterconnectionStandards forDistributedEnergyResources
Otherapplicablecodesandstandards(not Requirement exhaustive)
VoltageRegulation Voltagecontrol Flicker Harmonics PowerFactor MaintainservicevoltagewithinANSIC84RangeA(+/5%) Notpermitted(IEEE1547) MaximumBorderlineofIrritationCurve(IEEE1453) <5%THD;<4%below11th;<2%for11th 15th,<1.5%for17th 21st;0.6%for23rd 33rd;<0.3%for33rd andup(IEEE519) Outputpowerfactor0.85lead/lagorhigher(equipment typicallydesignedforunitypowerfactor) Dedicatedprotection&synchronizationequipmentrequired, exceptsmallersystemswithutilityinteractiveinverters NFPANEC,IEEENESC
InterconnectionStandards forTransmissionConnectedSystems
SomekeydifferencescomparedtoDER
NeedtoconsidersomeoftheseforPVassystemsize&penetrationincrease Requirement VoltageTolerance FrequencyTolerance PowerFactorCapability VoltageControl Synchronization, Protection SCADA/EMSintegration PowerControl Other Ridethrough3phasefaultPOIforupto150ms Basedoninterconnectionrequirements +/ 0.95pf(orhigherdependingonstudyresults) Powerfactor,reactivepowerorvoltagecontrolatthe discretionoftransmissionoperator Dedicatedswitchingandprotectionequipment requiredfortransmissionconnectedsystems Requiredinallcases Emergingforhighpenetrationwind.Mayneedhandle withmarketinstrumentsinsomecases NERCFAC/TPL/MOD/PRC/VARstandards
FrequencyandVoltage ToleranceStandards(BulkSystem)
VoltageTolerance(LVRT)
Tolerateboltedfault(0volts)atPOIfor upto9cycles(150ms) FERCOrder661A:appliestowind generators>20MVA WECCLVRTcriterion:appliestoall generators>10MVA
WECCOffNominalFrequencyTolerance
FrequencyRange (Hz) 59.4 60.5 59.4 58.5or 60.6 61.5 58.4 57.9or 61.6 61.7 57.8 57.4 57.3 56.9 56.8 56.5 <56.4or >61.7
FrequencyTolerance
Forexample,WECCONFstandard, whichappliestoallgenerators
RulesstillevolvingintheUSand elsewhere
FrequencyandVoltage ToleranceStandards(BulkSystem)
Proposed NERCPRC024
Wouldapplytoallgenerators20MVA orlarger,andstationswithmultiple unitswithtotalcapacityof75MVAor more
EmergingPowerControl forHighPenetrationWind
Pkan Pbr
Pkan
Pbr
MediumVoltageStandard inGermany(10kVto110kV)
FaultTolerance
AppliestoPVasof2011 Invertersmustcomplywithboundaryline2 Mustprovidereactivesupportduringfault(voltagecontrol)
Source: E. Troester, New German Grid Codes for Connecting PV to the Medium Voltage Power Grid, 2nd International Conference on Concentrating Photovoltaic Power plant
MediumVoltageStandard inGermany(10kVto110kV)
StaticVoltageSupport
Providecapabilityof+/ 0.95pfatfulloutput(impactsequipmentrating) Dispatchcouldbeconstantpf,constantVar,Var supportbasedon poweroutput(seeexamplebelow)orVar supportbasedonvoltage AppliestoPVasof2010
Source: E. Troester, New German Grid Codes for Connecting PV to the Medium Voltage Power Grid, 2nd International Conference on Concentrating Photovoltaic Power plant
MediumVoltageStandard inGermany(10kVto110kV)
ActivePowerControl
Reducepoweroutputwhenfrequencyisabove50.2Hz AppliestoPVasof2010
Source: E. Troester, New German Grid Codes for Connecting PV to the Medium Voltage Power Grid, 2nd International Conference on Concentrating Photovoltaic Power plant
AFewObservations
WindandPVinterconnectionstandardsondifferenttracks,but converging NorthAmericanapproachtobulksystemstandardstendstobe technologyneutral
Itmakestechnicalsensetoapplydifferentrequirementstodifferent technologies(e.g.,Europeanapproach) Difficulttoreachconsensus,longprocess
WhereareWeGoing?
Reconciledistribution/transmissionstandards
Voltage/frequencytolerance Reactivepowercapability,volt/var control SCADAintegration Power/Frequencycontrol
Specialcases(e.g.,islands)orfuture veryhighpenetration?
Harmonizationisimportantforefficiencyandcost Severalactiveeffortsunderway
IEEE1547.4,1547.5,1547.6,P2030(SmartGrid) (http://grouper.ieee.org/groups/scc21/1547/1547_index.html) US:NERCIVGTF(http://www.nerc.com/filez/ivgtf.html) Europe:Mediumandlowvoltagegridcodes(GR,SP,FR,IT)
QuestionsandDiscussion
Codes&StandardsSpecifictoPV
Source IEEESCC21 StandardsCoordinating CommitteeonFuelCells,Photovoltaics, DispersedGeneration,andEnergy Storage UnderwritersLaboratoriesInc.(UL)PV StandardsTechnicalPanels NFPA ASTME44.09 TechnicalCommitteeon PhotovoltaicElectricPowerConversion IECTC82 Solarphotovoltaicenergy systems Documents IEEE1547series(DERupto10MVA) StandalonePVsystems,batteries(several) P2030(SmartGrid Newinitiative) UL1703(PVmodules) US1741(Inverters,chargecontrollers) NEC,Article690(solarPhotovoltaicSystems) SeveraladdressingPVmoduleandarray testing Severaladdressingmeasurement,safety, testprocedures