DATA SHEET

Construction of Pump House for the LPDS (3mx3m)


District :Erode
Village : Thoddampalayam
Taluk :Sathyamangalam
Sl.No. Quantity

Description of item

1m

Rate
Ps
4

Unit
5

Amount
Rs. Ps
6

Earthwork excavating and depositing


on bank within initial lead of 10 M.& initial lift of 2M.
In hard stiff clay,stiff black cotton, hard red earth, shales,
murram, gravel, stoneyearth, and earth mixed with
small size boulders as per S.S.20.B.and S.I.62.
for foundation

2 1m

Rs

57.50

633.50
9.00
642.50

57.50 1m

supplying and filling the basement with filling sand


in layers of not more than 15cm thick as well ramped

3 1m

consolidated..etc
Filling charges

633.50 1m
3
9.00 1m
SUB DATA

CEMENT MORTAR 1:4 FOR 1Cu.m.

360.0 Kg. Cement


3

1m

1m

4400.00 1 M.T

Sand

633.50

29.70
2247.20

633.50 1m

Mixing charges

29.70 1m
Rate For 1 Cu.M. = Rs.

1584.00

2247.20

CEMENT MORTAR 1:5 FOR 1Cu.m.

288.0 Kg. Cement


1.0 Cu.M Sand
1.0 Cu.M

4
9.0 Cu.M
4.5 Cu.M
1.8 Nos.
17.7 Nos.
14.1 Nos.

4400.00 1 M.T
633.50 1 Cu.M
29.70 1 Cu.M

Rate For 1 Cu.M. = Rs.


MAIN DATA
Cost of cement concrete 1:5:10 using 40 m.m.
size H.B.Stones For 10 Cu.M.

1930.40

H.B.Stones 40 m.m. size


Cement mortar 1:5
Mason II class
Muzdoor class I
Muzdoor class II

594.50 1 Cu.M
1930.40 1 Cu.M
162.00 1 No.
112.00 1 No.
101.00 1 No.
Rate For 1 Cu.M. = Rs.

1773.54

1267.20
633.50
29.70
1930.40

5350.50
8686.80
291.60
1982.40
1424.10
17735.40
1301.64
1

Random rubblemasonry in C.M.1:5 for 10 Cu.M

10.0 Cu.m
1.0 Cu.M
3.4 Cu.M
7.1 Nos.
10.6 Nos.
14.1 Nos.
14.1 Nos.

Random rubble stone for masonry work


Bond stone
Cement mortar 1:5
Mason I class
Mason II class
Muzdoor class I
Muzdoor class II

296.00 1 Cu.M
394.50 1 Cu.M
1930.40 1 Cu.M
179.00 1 No.
162.00 1 No.
112.00 1 No.
101.00 1 No.

Rate For 1 Cu.M. = Rs.

1590.92

2960.00
394.50
6563.36
1270.90
1717.20
1579.20
1424.10
15909.26
1590.93

Brickwork in CM 1:5 using best country bricks of size 83/4x4 1/2x 2 3/4
for 2.83 m3

1300 nos Bricks


0.708 m
1 No
3 Nos
2 Nos
6Nos

2421.00 1000nos
1930.40
179.00
162.00
112.00
101.00

C M 1:5

Mason I class
Mason II class
Muzdoor class I
Muzdoor class II
Rate For 1 Cu.M. = Rs.

1m
1 No.
1 No.
1 No.
1 No.

2123.33

3147.30
1366.72
179.00
486.00
224.00
606.00
6009.02
600.9

Plastering with cement mortar 1:5


12m.m. thick for 1 sq.m.

0.14 Cu.m
1.1Nos
0.5No
1.10 Nos.

8
1 kg
2

1m

9 10 m2

11 m2
20Nos
2.20 Nos
1.1 Nos
3.20 Nos
20 Nos

Cement mortar 1:5


Mason I class
Muzdoor class I
Muzdoor class II

1930.40 1 Cu.M
179.00 1 No.
112.00 1 No.
101.00 1 No.

Rate For 1 Sq.M. = Rs.


Fabricating and supplying and erecting required no of
structural steel members like MS angle as purlins of size
65mmx65mm

63.42

Cost of MS angles

52.00 1 kg

63.43

Fabrication and erection labour charges


Add 2.50% for wastage

12.30 1m

Rate For 1 Kg = Rs.


Supplying and laying of asbestos cment fully corrugated
sheet 6mm thck of approved quality for roofing with
necessary U and J bolts and nuts,bitumen GI washers
etc..

65.60

138.00 1m

AC corrugated sheet

270.26
196.90
56.00
111.10
634.26

52.00
12.30
1.3
65.60

1518.00

5.00 1No

100.00

Fitters II nd class

146.00 1No

321.20

Carpenter I st claa

176.00 1No

193.60

Muzdoor class I

112.00

358.40

Adjustable GI J bolt of 6mm dia

Bitumen Washers 15mm dia


Rate for 1 Sq.m-Rs

1.00
251.12

1 No.
1 No.

20.00
2511.20

2
10 100 m
3

0.07 m
1.60 Nos
0.50 Nos
2.70 Nos
LS

White Washing 2 coats freshly burnt shell lime etc


Shell lime

850.00

Mason II class
Muzdoor class I
Muzdoor class II

162.00
112.00
101.00

Gum ganjee water,Brush,Scaffolding charges ...etc...


Rate for 1 Sq.m-Rs

11

10 m

1m3
1 No.
1 No.
1 No.

59.50
259.20
56.00
272.70
7.60
655.00

6.55

Painting 2coats on new iron works for door without


priming coats etc

2.22 litres Enamel paint


1.10 Nos Painter I st class

150.00 Litre
143.00 1 No
Rate for 1 Sq.m-Rs

49.03

Certified that the above rates are adopted as per the current P.W.D standard shedule of
rates for the year 2008-09
Counter signed

Assistant Executive Engineer,


Agricultural Engineering Department,
Gobichettipalayam

Junior Engineer,
Agricultural Engg Department,
Gobichettipalayam

333.00
157.30
490.30

DETAILED CUM ABSTRACT ESTIMATE


Construction of Pump House for the LPDS (3mx3m)
District :Erode
Village : Thoddampalayam
Taluk :Sathyamangalam
Length Breadth
Depth
Sl.
Description of work
Nos.
no.
M.
M.
M.
2

Rate

Amount

57.50

369.15

1.05
0.09
1.14 1773.54

2030.35

3.96
3.16
7.12 1590.92

11327.19

1.91
1.67
2.48
0.12
0.06
6.25
0.46
0.06
5.72 2123.33

12151.82

Quantity
M3
7

1 Earthwork excavating and


depositing on bank within
initial lead of 10 M.&
initial lift of 2M.In hard stiff clay
stiff black cotton, hard red earth,
shales,murram, gravel, stoneyearth,
and earth mixed with small size
boulders as per S.S.20.B.and S.I.62.
For foundation
1x1
1x1

Cost of cement concrete 1:5:10 using


2 40 m.m.HB stony julli
All round Main Wall
For step
3 Random rubblemasonry in C.M.1:5
BGL:- All round Main Wall
AGL:- Basement all round

1x1
1x1

1x1
1x1

11.72
1.20

11.72
1.20

11.72
11.72

0.60
0.50

0.60
0.50

0.45
0.45

0.90
0.15

0.15
0.15

0.75
0.60

6.33
0.09
6.42

4 Brick work in CM1:5


Back side Wall
Front Side wall
Side Walls
For Step1
For Step2

1x1
1x1
1x2
1x1
1x1

3.46
3.46
2.40
1.20
1.20

0.23
0.23
0.23
0.50
0.25

2.40+2.10/2

Deduction:- For Door


For Cement jolly work

1x1
1x1

1.00
0.60

0.23
0.23

2.00
0.45

5 supplying and filling the basement with filling sand


in layers of not more than 15cm thick as well ramped
consolidated..etc
For Basement 1x1
2.78

2.18

2.40
2.10
0.20
0.20

0.30

1.82
1.82

642.50

1168.14

Supplyng and fixing of MS Door of


size 1mx2m

1No 4500.00

Supplyng and fixing of RCC jolly of size0.60mx0.45m

8 Flooring concrete in CC1:5:10

1No

1x1

2.78

2.18

0.15

4500.00

300.00

300.00

0.91 1773.54

1612.25

9 Fabricating and supplying and erecting

required no of structural steel members


like MS angle as purlins of size ISA65656mm thick

Purlins

1x4

4.00

5.80

1x1

3.50

3.00

kg/m

92.80

65.60

6087.68

10.50

251.12

2636.76

7.20
5.04
13.5
8.30
7.27
10.8
0.54
0.54
9.00
62.19
2.00
0.27
59.92

63.42

3800.13

59.92

6.55

392.48

4.00

49.03

196.12

10 Supplying and laying of asbestos cment


fully corrugated sheet 6mm thck of
approved quality for roofing with
necessary U and J bolts and
nuts,bitumen GI washers etc..

11 Plastering in cm1:5-12mm thick


InnerSide:Back wall
Front Wall
Side Wall
OuterSide:Back wall
Front Wall
Side Wall
For Step1
For Step2
Floor

1x1
1x1
1x2
1x1
1x1
1x2
1x1
1x1
1x1

Deduction:- For Door


For Cement jolly work

1x1
1x1

12 White Washing 2 coats freshly burnt


shell lime etc

13

3.00
2.40
3.00
3.46
3.46
2.40
1.20
1.20
3.00
1.00
0.60

2.40
2.10
2.40+2.10/2

2.40
2.10
2.40+2.10/2

0.45
0.45
3.00
2.00
0.45

1x1

Painting 2coats on new iron works for


door without priming coats etc
For door 1x2

1.00

2.00

46572.06
or 47000

DETAILED CUM ABSTRACT ESTIMATE


Construction of Pump House for the LPDS (3mx3m)
District :Erode
Village : Thoddampalayam
Taluk :Sathyamangalam
Length Breadth
Depth
Sl.
Description of work
Nos.
no.
M.
M.
M.
2

Rate

Amount

57.50

406.34

1.16
0.09
1.25 1773.54

2221.89

4.36
3.49
7.85 1590.92

12486.97

1.91
1.67
3.11
0.12
0.06
6.87
0.46
0.06
6.34 2123.33

13470.40

Quantity
M3
7

1 Earthwork excovating and


depositing on bank within
initial lead of 10 M.&
initial lift of 2M.In hard stiff clay
stiff black cotton, hard red earth,
shales,murram, gravel, stoneyearth,
and earth mixed with small size
boulders as per S.S.20.B.and S.I.62.
For foundation
1x1
1x1

Cost of cement concrete 1:5:10 using


2 40 m.m.HB stony julli
All round Main Wall
For step
3 Random rubblemasonry in C.M.1:5
BGL:- All round Main Wall
AGL:- Basement all round

1x1
1x1

1x1
1x1

12.92
1.20

12.92
1.20

12.92
12.92

0.60
0.50

0.60
0.50

0.45
0.45

0.90
0.15

0.15
0.15

0.75
0.60

6.98
0.09
7.07

4 Brick work in CM1:5


Back side Wall
Front Side wall
Side Walls
For Step1
For Step2

1x1
1x1
1x2
1x1
1x1

3.46
3.46
3.00
1.20
1.20

0.23
0.23
0.23
0.50
0.25

2.40+2.10/2

Deduction:- For Door


For Cement jolly work

1x1
1x1

1.00
0.60

0.23
0.23

2.00
0.45

5 supplying and filling the basement with filling sand


in layers of not more than 15cm thick as well ramped
consolidated..etc
For Basement 1x1
2.78

2.78

2.40
2.10
0.20
0.20

0.30

2.32
2.32

642.50

1489.65

Supplyng and fixing of MS Door of


size 1mx2m

1No 4500.00

Supplyng and fixing of RCC jolly of size0.60mx0.45m

8 Flooring concrete in CC1:5:10

1No

1x1

2.78

2.78

0.15

4500.00

300.00

300.00

1.16 1773.54

2055.99

9 Fabricating and supplying and erecting

required no of structural steel members


like MS angle as purlins of size
65mmx65mm

Purlins

1x4

4.00

5.85

1x1

4.00

3.00

kg/m

93.60

65.60

6140.16

12.00

251.12

3013.44

7.20
6.30
13.5
8.30
7.27
13.5
0.54
0.54
9.00
66.15
2.00
0.27
63.88

63.42

4051.27

63.88

6.55

418.41

4.00

49.03

196.12

10 Supplying and laying of asbestos cment


fully corrugated sheet 6mm thck of
approved quality for roofing with
necessary U and J bolts and
nuts,bitumen GI washers etc..

11 Plastering in cm1:5-12mm thick


InnerSide:Back wall
Front Wall
Side Wall
OuterSide:Back wall
Front Wall
Side Wall
For Step1
For Step2
Floor

1x1
1x1
1x2
1x1
1x1
1x2
1x1
1x1
1x1

Deduction:- For Door


For Cement jolly work

1x1
1x1

12 White Washing 2 coats freshly burnt


shell lime etc

13

3.00
3.00
3.00
3.46
3.46
3.00
1.20
1.20
3.00
1.00
0.60

2.40
2.10
2.40+2.10/2

2.40
2.10
2.40+2.10/2

0.45
0.45
3.0
2.00
0.45

1x1

Painting 2coats on new iron works for


door without priming coats etc
For door 1x2

1.00

2.00

50750.65
or 51000.00

Sl
No.

Description of Work

1 x 1

79.20

0.50

0.90

1 x 1
1 x 1
1 x 1

79.20
1.20
1.20

0.50
1.20
1.00

0.10
0.30
0.10

1 x 1
1 x 1
1 x 1

79.20
1.20
1.20

0.50
1.00
1.20

0.20
0.20
0.15

1 x 1
1 x 1

79.20
6.92

0.50
0.45

0.60
0.45

1
1
1
1

79.00
1.00
0.60
1.20

0.23
0.23
0.23
0.23

3.05
2.00
0.45
0.10

1 Earth work excavation and depositing on


bank within initial lead and initial lift in
hard stiff clay, stiff black cotton, hard red
earth slabs etc as per Ss 20B & SI 62 for
foundation

2 Sand filling with filling sand including


watering etc. for
Foundation
Basement
Steps

3 CC 1:4:8 using 40mm HBGS metal for


Foundation
Basement for step
Basement

4 R.R. Masonry in CM 1:5 for


Footing
Basement

5 Brick work in CM 1:5 using II Class


Bricks of size 22cm x 11cm x 7.5cm for
super structures.
All round main Wall
Deduction for Door
Deductions for Jolly
Deduction for Lintel

x
x
x
x

1
1
1
1

Step-I
Step-II
Step-III
Step-IV

1
1
1
1

x
x
x
x

1
1
1
1

1.20
1.20
1.20
1.20

0.80
0.60
0.40
0.20

1
1
1
1
1
1
1

x
x
x
x
x
x
x

1
1
1
1
1
1
2

28.00
79.00
6.92
1.00
1.00
1.20
0.23

11.50

28.00
1.20
1.00

11.50
0.23
0.45

0.00
0.00
0.00
0.00

6 Centering charges lintel and roof slab


including strutting
Roof Slab
Roof Slab Side
Deduct Wall placement
Lintel Bottom
Lintel Front side
Lintel Back side
Lintel side

0.10
0.23
0.23
0.03
0.10
0.10

7 Supplying and fabricating and placing in


position of steel rods for RCC slab
1 x 1
8 Supplying and fixing of RCC jolly of size 1 x 1
0.60M x 0.45M
9 RCC in 1:2:4 using 20mm HBGS jelly for
roof slab, sunshade and lintel
Roof Slab
Lintel
Sunshade

1 x 1
1 x 1
1 x 1

0.10
0.10
0.075+0.05
2.00

10 Supplying and fixing of M.S. Door of size 1 x 1


1.00Mx2.00M in M.S. angle 40mm x
40mm
x
6mm
M.S.
angle
40mmx40mmx6mm MS flat
11 Plastering in CM 1:5, 20mm thick
Pump Room inner side

1 x 4

1.50

3.05

Pump Room Outer side


Steps, Treads
Side of step-IV
Side of step III
Side of step VI
Side of Step-I
Sides of soffits of Door
Sides of soffits of Jolly
Deduct for Door
Deduct for Jolly
Floor Plastering

1
1
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x

4
4
2
2
2
2
1
1
2
2
1

1.96
1.20
0.80
0.60
0.40
0.20
6.00
2.10
1.00
0.60
1.50

4.05

Ceiling Inner side of pump Room


Ceiling outer side Projection
Ceiling outer side face
Sunshade Bottom side
Sunshade side face

1
1
1
1
1

x
x
x
x
x

1
1
1
1
1

28.00
8.64
9.44
1.00
1.90

1.50
0.20

Sunshade of Top side

1 x 1

1.00

0.45

1 x 1

9.60

1 x 1

2.36

0.20
0.15
0.15
0.15
0.15
0.23
0.23
2.00
0.45
1.50

12 Plastering in CM 1:3- 12mm thick for

0.10
0.45
0.075+0.05
2.00

13 Pointing with CM 1:3 in RR Masonry


Basement

0.45

14 Weathering course over RCC ro9of


including fixing one course of pressed tile
etc. complete

15 Colour washing two coats with approved


Cement paint for cement plastered
surfaces & Sunshades top and side surface
1 x 1

2.36

16 White washing two coats for ceiling


surfaces and sunshade bottom
1 x 1

ABSTRACT ESTIMATE
Village
:
Taluk
District
:
Field: No.

Hosur

Name of work : Construction of Pump Room


Sl
No.
1 5.60 m3
2 1.17 m3

Qty

Rate

50
322.3

Per

1 m3
1 m3

Amount

280
377.09

3 1.70 m3

1656.37

1 m3

2,815.82

4 3.89 m3

1379.69

1 m3

5,366.99

3.63 m3
5.348 m2
0.30 Qtl
1No.

1761.86
382
3292.6
500

1 m3
1 m2
1Qtl
1No.

6,395.55
2,042.92
987.78
500

9 0.613 m3

2677.86

1 m3

1,641.52

10 1No.

3850

1No

3,850.00

11 34.34 m2

96.87

1 m2

3,326.51

12 5.94 m2

61.28

1 m2

364

13 5.57 m2

272.27

1 m2

1,516.54

14 32.66 m2

7.75

1 m2

253.11

15 5.37 m2
16 4.32 m2

5.5
55.42

1 m2
1 m2

29.53
239.41

5
6
7
8

17

L.S.

13.23

30,000.00

Ass
ista
nt
Exe
.
En
gin
eer
Agr
icul
tur
al
En
gin
eeri
ng
Dep
t.
Hos
ur

Assistan
t
Enginee
r

Contents

35.640

3.960
0.432
0.120
4.512

7.920
0.240
0.216
8.376

23.760
1.401
25.161

55.419
0.460
0.062
0.028

Contents

5.60m3

0.62
0.43
0.12
3

0.17 m

1.24
0.24
0.22
3

1.70 m

2.49
1.4
3

3.89 m

3.82
0.46
0.06
0.03

8
8.25
8.5
8.75
9
9.25
9.5
9.75
10
10.25
10.5
10.75
11
11.25
11.5
11.75
12
12.25
12.5
12.75
13
13.25
13.5
13.75
14

14.25
14.5
14.75
15
15.25

0.30479951

2.438

28

0.30479951

2.515

11.5

0.30479951

2.591

79

0.30479951

2.667

0.30479951

2.743

0.30479951

2.819

0.30479951

2.896

0.30479951

2.972

0.30479951

3.048

0.30479951

3.124

0.30479951

3.2

0.30479951

3.277

0.30479951

3.353

0.30479951

3.429

0.30479951

3.505

0.30479951

3.581

0.30479951

3.658

0.30479951

3.734

0.30479951

3.81

0.30479951

3.886

0.30479951

3.962

0.30479951

4.039

0.30479951

4.115

0.30479951

4.191

0.30479951

4.267

0.30479951

4.343

0.30479951

4.42

0.30479951

4.496

0.460

0.30479951

4.572

0.062

0.30479951

4.648

0.028

28.2

79.2

0.000
0.000
0.000
0.000
54.869

322.000
7.900
1.592
0.230
0.025
0.120
0.046
328.729

0.000
0.000

0.144 15.5
0.108 15.75
0.072 16
0.036 16.25
3.63 m3 16.5
16.75
17

5.57
0.944
1.592
0.23
0.03
0.12
0.046
2

5.348 m

17.25
17.5
17.75
18
18.25
18.5
18.75
19
19.25
19.5
19.75

20
20.25
1 No. 20.5

0.30 Qtl.

20.75
21

32.200
0.030
0.028

0.557
0.008
0.208

32.258

0.613 m3

0.000

1No.

18.300

21.25
21.5
21.75
22
22.25
22.5
22.75
23

23.25
23.5
23.75
14.4 24

0.30479951

4.724

0.30479951

4.801

0.30479951

4.877

0.30479951

4.953

0.30479951

5.029

0.30479951

5.105

0.30479951

5.182

0.30479951

5.258

0.30479951

5.334

0.30479951

5.41

0.30479951

5.486

0.30479951

5.563

0.30479951

5.639

0.30479951

5.715

0.30479951

5.791

0.30479951

5.867

0.30479951

5.944

0.30479951

6.02

0.30479951

6.096

0.30479951

6.172

0.30479951

6.248

0.30479951

6.325

0.30479951

6.401

0.30479951

6.477

0.30479951

6.553

0.30479951

6.629

0.30479951
0.30479951

6.706
6.782

0.30479951

6.858

0.30479951

6.934

0.30479951

7.01

0.30479951

7.087

0.30479951

7.163

0.30479951

7.239

0.30479951

7.315

1.592

31.752
0.960
0.240
0.180
0.120
0.060
1.380
0.483
4.000
0.540
2.250
51.185

42.000
1.728
0.944
0.450
0.119
0.450
45.691

4.320

5.570

51.185

18.81
0.96
0.24
0.18
0.12
0.06
1.38
0.48
4
0.54
2.25
3

34.34 m

2.25
1.728
0.944
0.45
0.118
0.45
2

5.94 m

4.32 m

5.57 m

32.66 m

24.25
24.5
24.75
25
25.25
25.5
25.75
26
26.25
26.5
26.75
27
27.25
27.5
27.75
28
28.25
28.5
28.75
29
29.25
29.5
29.75
30
30.25
30.5
30.75
31
31.25
31.5
31.75

32
32.25
32.5

32.75
33

0.30479951

7.391

0.30479951

7.468

0.30479951

7.544

0.30479951

7.62

0.30479951

7.696

0.30479951

7.772

0.30479951

7.849

0.30479951

7.925

0.30479951

8.001

4.000

0.30479951

8.077

0.540

0.30479951

8.153

0.30479951

8.23

0.30479951

8.306

0.30479951

8.382

0.30479951

8.458

0.30479951

8.534

0.30479951

8.611

0.30479951

8.687

0.30479951

8.763

0.30479951

8.839

0.30479951

8.915

0.30479951

8.992

0.30479951

9.068

0.30479951

9.144

0.30479951

9.22

0.30479951

9.296

0.30479951

9.373

0.30479951

9.449

0.30479951

9.525

0.30479951

9.601

0.30479951

9.677

0.30479951

9.754

0.30479951

9.83

0.30479951

9.906

0.30479951

9.982

0.30479951 10.058

33.25
0.30479951 10.135
2

5.37 m

33.5

0.30479951 10.211

Hosur

Sl
No.

Description of Work

Nos.

1x1

6.92

0.9

0.9

1x1
1x1
1x1

6.92
1.2
1.2

0.9
1.2
1

0.1
0.3
0.1

1x1
1x1
1x1

6.92
1.2
1.2

0.9
1
1.2

0.2
0.2
0.15

1x1
1x1

6.92
6.92

0.6
0.45

0.6
0.45

1x1
1x1
1x1
1x1

6.92
1
0.6
1.2

0.23
0.23
0.23
0.23

2.4
2
0.45
0.1

1 Earth work excavation and depositing on


bank within initial lead and initial lift in
hard stiff clay, stiff black cotton, hard red
earth slabs etc as per Ss 20B & SI 62 for
foundation

2 Sand filling with filling sand including


watering etc. for
Foundation
Basement
Steps

3 CC 1:4:8 using 40mm HBGS metal for


Foundation
Basement for step
Basement

4 R.R. Masonry in CM 1:5 for


Footing
Basement

5 Brick work in CM 1:5 using II Class


Bricks of size 22cm x 11cm x 7.5cm for
super structures.
All round main Wall
Deduction for Door
Deductions for Jolly
Deduction for Lintel

Step-I
Step-II
Step-III
Step-IV

1x1
1x1
1x1
1x1

1.2
1.2
1.2
1.2

0.8
0.6
0.4
0.2

0.15
0.15
0.15
0.15

1x1
1x1
1x1
1x1
1x1
1x1
1x2

2.36
9.44
6.92
1
1
1.2
0.23

2.36
0.23
0.23
0.1
-

0.1
0.025
0.1

1x1

1x1

1x1
1x1
1x1

2.36
1.2
1

2.36
0.23
0.45

0.1
0.1
0.075+0.
05
2

1x1

6 Centering charges lintel and roof slab


including strutting
Roof Slab
Roof Slab Side
Deduct Wall placement
Lintel Bottom
Lintel Front side
Lintel Back side
Lintel side

7 Supplying and fabricating and placing in


position of steel rods for RCC slab

8 Supplying and fixing of RCC jolly of size


0.60M x 0.45M
9 RCC in 1:2:4 using 20mm HBGS jelly for
roof slab, sunshade and lintel
Roof Slab
Lintel
Sunshade

10 Supplying and fixing of M.S. Door of size


1.00Mx2.00M in M.S. angle 40mm x
40mm
x
6mm
M.S.
angle
40mmx40mmx6mm MS flat
11 Plastering in CM 1:5, 20mm thick

Pump Room inner side


Pump Room Outer side
Steps, Treads
Side of step-IV
Side of step III
Side of step VI
Side of Step-I
Sides of soffits of Door
Sides of soffits of Jolly
Deduct for Door
Deduct for Jolly
Floor Plastering

1x4
1x4
1x4
1x2
1x2
1x2
1x2
1x1
1x1
1x2
1x2
1x1

1.5
1.96
1.2
0.8
0.6
0.4
0.2
6
2.1
1
0.6
1.5

0.2
1.5

2.4
2.4
0.15
0.15
0.15
0.15
0.23
0.23
2
0.45
-

Ceiling Inner side of pump Room


Ceiling outer side Projection
Ceiling outer side face
Sunshade Bottom side
Sunshade side face

1x1
1x1
1x1
1x1
1x1

1.5
8.64
9.44
1
1.9

1.5
0.2
0.45
-

Sunshade of Top side

1x1

0.45

0.1
0.075+0.
05
2
-

1x1

9.6

0.45

1x1

2.36

2.36

12 Plastering in CM 1:3- 12mm thick for

13 Pointing with CM 1:3 in RR Masonry


Basement

14 Weathering course over RCC ro9of


including fixing one course of pressed tile
etc. complete

15 Colour washing two coats with approved


Cement paint for cement plastered
surfaces & Sunshades top and side surface
1x1

16 White washing two coats for ceiling


surfaces and sunshade bottom
1x1

Per

Amount

ABSTRACT ESTIMATE
Village
:
Taluk
District
:
Field: No.

Poonapalli
:
Hosur
Krishnagiri
24, 29 & 30

Name of work : Construction of Pump Room


Sl
No.

Qty

Descript
ion

Rate

1 5.60 m3

2 1.17 m3

3 1.70 m3

4 3.89 m3

Earth
work
excavati
on and
depositi
ng
on
bank
within
initial
lead and
initial
lift
in
hard stiff
clay,
stiff
black
cotton,
hard red
earth
slabs etc
as per Ss
20B &
SI 62 for
foundati
on
Sand

50

1 m3

280

322.3

1 m3

377.09

1 m3

2,815.82

1 m3

5,366.99

filling
with
filling
sand
includin
g water
etc.
CC
1656.37
1:4:8
using
40mm
HBGS
Metal
R.R.
1379.69
Masonry
in CM
1:5

5 3.63 m3

Brick
1761.86
work in
CM 1:5
using II
Class
Bricks
of size
22cm x
11cm x
7.5cm
all round
main
walls

1 m3

6,395.55

6 5.348 m2

Centerin
g
charges
lintel
and roof
slab
includin
g
strutting

382

1 m2

2,042.92

7 0.30 Qtl

Supplyin
g
and
fabricati
ng and
placing
in
position
of steel
rods for
RCC
slab

3292.6

1Qtl

987.78

8 1No.

Supplyin
g
&
fixing &
RCC
jelly

500

1No.

500

9 0.613 m3

10 1No.

11 34.34 m2
12 5.94 m2
13 5.57 m2
14 32.66 m2
15 5.37 m2
16 4.32 m2

17

Ass
ista
nt
Exe
.
En
gin
eer

RCC
2677.86
1:2:4
using
20mm
jelly
Supplyin
3850
g
and
fixing of
M.S.
Door
Plasterin
96.87
g
in
CM 1:5
Ceiling
61.28
Plasterin
g 1:3
Weather 272.27
ing
Course
Colour
7.75
washing
White
5.5
washing
Pointing
55.42
in CM
1:3
Unfores
L.S.
een
Items
Total

1 m3

1,641.52

1No

3,850.00

1 m2

3,326.51

364

1 m2

1,516.54

1 m2

253.11

1 m2

29.53

1 m2

239.41

1m

13.23

#######

Assistan
t
Enginee
r

Agr
icul
tur
al
En
gin
eeri
ng
Dep
t.
Hos
ur

Agricult
ural
Enginee
ring
Dept.

Contents

5.60m3

0.62
0.43
0.12
0.17 m3

1.24
0.24
0.22
1.70 m3

2.49
1.4
3.89 m3

3.82
0.46
0.06
0.03

0.144
0.108
0.072
0.036
3.63 m3

5.57
0.944
1.592
0.23
0.03
0.12
0.046
5.348 m2

0.30 Qtl.
1 No.

0.557
0.008
0.208
3

0.613 m

1No.

14.4
18.81
0.96
0.24
0.18
0.12
0.06
1.38
0.48
4
0.54
2.25
34.34 m3

2.25
1.728
0.944
0.45
0.118
0.45
5.94 m2

4.32 m2

5.57 m2

32.66 m2

5.37 m2