ISGEC John Thompson

ER/ 0769 / C Index Rev 00 00/ 15.05.09

AFBC BOILER
OPERATION & MAINTENANCE MANUAL
Section Introduction 1. 2. 3. 4. 4 A. 5. 5 A. 6. 7. 8. 9. 10. 11. 11 A 12. 13. 14. 15. 15 A. Overview of IJT Boilers Project Technical Details Hydraulic test Pre-commissioning inspection Pre-commissioning of AFBC Boiler Inspection auxiliaries & operation of boiler plant
2 1 3 2 6 11 19 4 3 5 2 5 10 11 2 5 7 14 2

DESCRIPTION

PAGE

Boiler Control Philosophy Commissioning of boiler Refractory Dry out procedure Chemical boil out procedure Setting of safety valve Steam Blowing Routine Operation of Plant Start up Procedure for AFBC Boiler Shutdown for Inspection/ repair Emergencies Water Chemistry Maintenance of Boiler Maintenance of AFBC Boiler

1 x 67 TPH Single Drum AFBC Boiler M/s Divine Vidyut Ltd., Saraikela, Jharkhand

181

ISGEC John Thompson

ER/ 0769 / C Index Rev 00 00/ 15.05.09 2 3

16. 17.

Protection of idle Boilers Boiler DOs & Dont

1 x 67 TPH Single Drum AFBC Boiler M/s Divine Vidyut Ltd., Saraikela, Jharkhand