Professional Documents
Culture Documents
Name Date of Birth Address : HENDRI AGUS SETIAWAN : Jakarta, August 8, 1978 : KP. RAWA BEBEK, Rt/Rw 005/008 Kota Baru Bekasi Barat , 17134 Phone e-mail Sex Nationality Religion Marital Status : 0812-85-350-378 : hdr878@yahoo.com : Male : Indonesian : Moslem : Married
2013
EDUCATION
Sistem informasi STMIK SWADHARMA S1 Manajemen Informatika -LP3I - Diploma Jakarta, graduated in 2000 MALAKA Technical High School majoring in Electrical Jakarta, graduated in 1996
KEY QUALIFICATION
I have worked as 5 (five) years in OIL & GAS projects and Mechanical & Piping Draftsman for 9 (nine) years in High Rise building projects. I have experiences in OIL & GAS project as a Piping Drafter. Responsibility for make a Piping Layout , Isometric drawing & material until preparing Material take off (MTO) for order and erection execution on the site. I also have experiences in Specialized both Mechanical & Piping system at High Rise Building Company projects as a Mechanical & Piping Draftsman, so that I am be able to make all installation is clear and prepare for detail and section drawing.
TRAINING
AutoCAD BMS (Buana Media Solutindo) - 1997 Mechanical-Electrical & Instrument - International Technical College 1997 PDMS PIPING AP-GREID , Oil & Gas Design Center Course 2009
COMPUTER LITERATE
Autocad R2008 / 2013 Autocad Plant 3D PDMS PIPING 11.6 Google SKETCH UP pro 8 Microsoft Office
2013
(June 2011 April 2012) Position : Mechanical & Piping Drafter The work performed during this period included the following : Piping Arrangement & Equipment Layout Pipe support detail Drawing. Isometric Drawing & Material List Spool Pipe drawing for Fabrication. Material Take Off ( MTO ) 3D drawing
(13 April 2009 ~ Mei 2011) Position : Mechanical & Electrical Drafter The work performed during this period included the following : Piping Arrangement & Equipment Layout Pipe support detail Drawing. Isometric Drawing & Material List Spool Pipe drawing for Fabrication. Material Take Off ( MTO ) 3D drawing
PT. Adhi Karya (Overseas Division) Doha City Center Expansion Phase III ( East ) - QATAR (20 April 2008 ~ January 2009) Position : Mechanical & Piping Drafter The work performed during this period included the following : Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
2013
RABANA CONTRACTOR Gas Pipeline Citarik ~ Tata Jabar (01 February 2006 ~ 30 September 2006) Position : Piping Drafter The work performed during this period included the following : Piping Arrangement & Equipment Layout Pipe support detail Drawing. Isometric Drawing & Material List Spool Pipe drawing for Fabrication. Material Take Off ( MTO ) 3D drawing
PT.RAKINTAM Cibubur Juction Shopping Center ( South Jakarta ) (1 Desember 2005 ~ 30 January 2006) Position : Mechanical & Piping Drafter The work performed during this period included the following : Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
Shimizu Total Scbk J.O The Pakubuwono Residences South Jakarta (1 Desember 2004 30 November 2005) Position : Mechanical & Piping Drafter The work performed during this period included the following : Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material
2013
PT. Inti Prima Takeka Kintamani Condominium South Jakarta (1 September 1996 30 August 1997) Position : Mechanical & Piping Drafter The work performed during this period included the following : Plumbing & Sanitary System. Chiller Piping Arrangement & Piping Riser. Fire Protection Piping Arrangement & Equipment Layout. Pump Room Piping Layout & Section Detail. Preparations for Isometric Drawing & Material