Design of Guide Wall

Doc No.: AECOM/CC-20/Temp-01 Date: November 07, 2012

AECOM India Private Limited

9 floor, Infinity Tower C, DLF Cyber City, DLF Phase II, Gurgaon, Haryana, India, Pin 122 002

th

Design of Guide Wall

Prepared for

M/s J. Kumar - CRTG JV

Prepared by

AECOM India Private Limited 9th Floor, Infinity Tower C, DLF Cyber City, DLF Phase II 122002 Gurgaon, Haryana, India Telephone: +91 124 4830100 Fax: +91 124 4830108 www.aecom.com

November 07, 2012

AECOM India Pvt. Ltd 2012


The information contained in this document produced by AECOM India Pvt. Ltd is solely for the use of the Client identified on the cover sheet for the purpose for which it has been prepared and AECOM India Pvt. Ltd undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of AECOM India Pvt. Ltd.

Technical Verification / Revision Record

Project Name:

Design and Construction of Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Station Naraina Vihar & Ramps at Mayapuri and Delhi Cantt. for Underground Works on Mukundpur-Yamuna Vihar Corridor (Line-7)1 of Phase-III Delhi MRTS Design Document Number:
AECOM-CC20-Temp-01

Document Name:

Verification Prepared: Checked: Approved: Revision 0

Name Avinash KUMAR Rahul KUMAR Sumant GUPTA Date


November 07, 2012

Date

Signature

Approved
Sumant GUPTA

Description

1 2 3 4 5

Design and Construction of Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Station Naraina Vihar & Ramps at Mayapuri and Delhi Cantt. for Underground Works on Mukundpur-Yamuna Vihar Corridor (Line-7)1 of Phase-III Delhi MRTS

Contract No: CC-20 Design of Guide Wall

Table of Contents
1 2 2.1 2.2 2.3 3 3.1 INTRODUCTION DESIGN PHILOSOPHY Trench Excavation Concreting for D-Wall Dry Condition of Trench APPENDIX Calculation of Reinforcement 1 2 2 2 2 3 3

Page I of I

Design and Construction of Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Station Naraina Vihar & Ramps at Mayapuri and Delhi Cantt. for Underground Works on Mukundpur-Yamuna Vihar Corridor (Line-7)1 of Phase-III Delhi MRTS

Contract No: CC-20 Design of Guide WallDesign Manual

INTRODUCTION

This report pertains design of guide wall of Naraina station which facilitates for excavation of trench and maintains verticality of D-wall.

P ag e |1

Design and Construction of Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Station Naraina Vihar & Ramps at Mayapuri and Delhi Cantt. for Underground Works on Mukundpur-Yamuna Vihar Corridor (Line-7)1 of Phase-III Delhi MRTS

Contract No: CC-20 Design of Guide WallDesign Manual

2
2.1

DESIGN PHILOSOPHY
Trench Excavation

D wall grabber load, earth pressure and bentonite or polymer load is considered for design of horizontal reinforcement of vertical wall.D wall panel length is effective length for calculation of bending moment.

2.2

Concreting for D-Wall

Transit mixer, earth pressure and bentonite or polymer load is considered for design of horizontal reinforcement of vertical wall.

2.3

Dry Condition of Trench

At dry condition only earth pressure and surcharge load is considered for design of vertical wall vertical reinforcement.

P ag e |2

Design and Construction of Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Station Naraina Vihar & Ramps at Mayapuri and Delhi Cantt. for Underground Works on Mukundpur-Yamuna Vihar Corridor (Line-7)1 of Phase-III Delhi MRTS

Contract No: CC-20 Design of Guide WallDesign Manual

3
3.1

APPENDIX
Calculation of Reinforcement

P ag e |3

CC20 -Naraina Station Design of Guide Wall

Design of Guide Wall a) Design of Vertical Wall Size of Guide wall Length of D wall panel Vertical leg of guide wall Horizontal leg of guide wall Guide wall slab thickness Grade of Concrete Therefore, fck Grade of Reinforcement Therefore, fy Clear Cover Angle of internal friction Co-efficient of active earth pressure (ka Unit wt. of soil Unit wt. of water G.L. 150 Bentonite 150 1000

= = = = = = = = = = = =

5 1 0.6 0.15 M25 25

m m m m N/mm2

Fe 500 2 500 N/mm 25 mm 17 0.55


3 19 KN/m 3 10 KN/m

750

850 Pc Pb Pa

Bentonite pressure Total weight of Diaphragm wall grabber Area of grabber Hence surcharge total weight of Transit mixer area of mixer hence surcharge

Earth pressure = = = = = = = = = =

Unit weight of bentonite Height of bentonite fill (from bottom of Guide wall) Horizontal reinforcement calculation moment and shear Case-1: During Excavation

Machine pressure 100 5x 5 1000/(5x5) 40 45 7.5 x 2.5 450/(7.5x2.5) 24 12 0.8

T mxm KN/m2 T mxm KN/m2 KN/m3 m

CC20 -Naraina Station Design of Guide Wall

Lateral pressure due to surcharge at 1.2m away and 0.7m deep, qr where, Q = = = =
2 40 KN/mm 30 Degree 0.5 0.7 m

= =

Q[3Sin2 Cos3 -{(1-2 )Cos2 /(1+Cos )}]/(2 z2) (boussinesq eqn) kN/m2 6.33

z PA=qrxz

= = = = = = = = =

6.33 x 1.9 3.76 4.34 2.48 5 wL2/10 6.20 6.20

0.3 kN/m kN/m kN/m kN/m m kN-m KN

(say the surcharge is acting 0.8m from bottom of guide wall) PB=(1/2)xkaxyxh2 PC=(1/2)xyxh2 therefore net horizontal load (uls) (w) effective span (L) bending moment (M) Shear Force (V) Case-2: During Concreting

As per the method statement, during concreting the transit mixer will stand 1.2m away from the edge of excavation Surcharge due to transit mixer, Q Hence this case is less critical Hence this case is less critical comparing with the case-1 KN/m2 = 24.00 KN/m2 40.00 < (Surchage due to excavation)

Case-3: Check for no bentonite pressure (vertical reinforcement moment calculation) Assume 5 kpa construction surcharge in this case PA=kaxyxh 2 PB=(1/2)xkaxyxh therefore net horizontal load (w) Cantilever span(L) bending moment (M) Shear Force (V) Sliding Check ISMB 200 steel strut is providing to prevent sliding of guide wall against earth pressure. Minimum reinforcement 0.125% on each face = 188 mm2 T8 @200

= = = = = =

2.74 3.76 9.74 0.85 wL2/2 3.29 9.74

KN/m KN KN m kN-m KN