BRTS PROJECTS

Ministry of Road Shipping Transport & Highways(MORST&H)


NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled : 05.11.09

Location / Source : Sisodra

Sampled By

Type of Material

: Soil (Borrow Area)

Date Tested

: 06.11.09

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

6075

: Sandip Vyas

Volume of Mould, v (cc) :

2250

10040

10358

10464

10836

10904

10794

(g)

3965

4283

4389

4761

4829

4719

(g/cc)

1.762

1.904

1.951

2.116

2.146

2.097

(g)

38.59

38.99

42.17

37.90

36.34

37.09

Wt. of Wet Soil + Container, w6

(g)

109.78

119.34

139.94

134.20

115.02

130.68

Wt. of Dry Soil + Container, w7

(g)

104.07

111.77

128.15

120.80

103.00

114.81

Wt. of Wet Soil + Mould, W 2


Wt. of Wet Soil, w3=(w2-w1)
Wet Density, Yb=(w3/v)

(g)

Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

5.71

7.57

11.79

13.40

12.02

15.87

Wt.of Dry Soil, w9=(w7-w5)

(g)

65.48

72.78

85.98

82.90

66.66

77.72

(%)

8.72

10.40

13.71

16.16

18.03

20.42

1.621

1.724

1.715

1.822

1.818

1.742

Water Content w= 100*w8/w9

Dry Density Yd=100x(Yb/100+w) (g/cc)

RESULTS
MDD =
OMC =

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

ATTERBERG'S LIMITS
As per IS 2720 (PART - 5)
Laboratory No.

Date Sampled : 28.10.2009

Location / Source : Jalaram Earth Moovers - Dabhel

Sampled By

Type of Material

: Soil (Borrow Area)

Date Tested

: Sandip Vyas
: 30.10.2009

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Liquid Limit
Determonation No.

Container No.

Plastic Limit
3

37.00

42.00

39.00

36.50

38.00

38.00

Wt. of Container and Wet Soil W 2

98.00

96.50

97.50

94.00

52.50

51.50

Wt. of Container and Dry Soil W 3

82.5

82.00

81.5

77.5

49.50

49.00

Wt. of Moisture W 4=W 2-W 3

15.50

14.50

16.00

16.50

3.00

2.50

45.50

40.00

42.50

41.00

11.50

11.00

34.07

36.25

37.65

40.24

26.09

22.73

37

31

24

18

Empty Weight Container W 1

Wt. of Dry Soil W 5=W 3-W 1


Moisture Content W=100*W 4/W 5
No. of Drops/Depth of Penetration

Name & Sign :


(Contractor's Representative)

Avg. 24.41

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled : 02.11.09

Location / Source : Geeta Carting - Adajan

Sampled By

Type of Material

: Soil (Borrow Area)

Date Tested

: 04.11.09

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

6075

: Sandip Vyas

Volume of Mould, v (cc) :

10431

10631

10889

10944

10890

(g)

4356

4556

4814

4869

4815

(g/cc)

1.936

2.025

2.140

2.164

2.140

10

(g)

37.00

34.00

36.00

36.00

37.00

Wt. of Wet Soil + Container, w6

(g)

131.00

133.50

134.50

134.50

131.00

Wt. of Dry Soil + Container, w7

(g)

123.00

123.50

123.00

122.00

118.50

Wt. of Wet Soil + Mould, W 2


Wt. of Wet Soil, w3=(w2-w1)
Wet Density, Yb=(w3/v)

(g)

Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

8.00

10.00

11.50

12.50

12.50

Wt.of Dry Soil, w9=(w7-w5)

(g)

86.00

89.50

87.00

86.00

81.50

(%)

9.30

11.17

13.22

14.53

15.34

1.771

1.821

1.890

1.889

1.855

Water Content w= 100*w8/w9

Dry Density Yd=100x(Yb/100+w) (g/cc)

2250
6

RESULTS
MDD =
OMC =

1.902
13.95

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled : 03.11.09

Location / Source : Shreenath Stone Quarry - Sonagadh

Sampled By

Type of Material

: G.S.B.

Date Tested

: 04.11.09

Proposed Use

: G.S.B.

Tested By

: Sandip Vyas/Sanjay Srivastav

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

6075

: S. Mukherjee/S.P.Gupta

Volume of Mould, v (cc) :

10752

11060

11529

11644

11484

(g)

4677

4985

5454

5569

5409

(g/cc)

2.079

2.216

2.424

2.475

2.404

(g)

36.00

37.00

41.00

40.00

36.00

Wt. of Wet Soil + Container, w6

(g)

150.50

154.50

147.50

169.00

144.00

Wt. of Dry Soil + Container, w7

(g)

143.00

145.00

136.50

154.00

130.00

Wt. of Wet Soil + Mould, W 2


Wt. of Wet Soil, w3=(w2-w1)
Wet Density, Yb=(w3/v)

(g)

Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

7.50

9.50

11.00

15.00

14.00

Wt.of Dry Soil, w9=(w7-w5)

(g)

107.00

108.00

95.50

114.00

94.00

(%)

7.01

8.80

11.52

13.16

14.89

1.943

2.036

2.174

2.187

2.092

Water Content w= 100*w8/w9

Dry Density Yd=100x(Yb/100+w) (g/cc)

2250
6

RESULTS
MDD =
OMC =

2.210
12.50

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled : 29.10.09

Location / Source : Plot no. 164/165, Site Camp

Sampled By

Type of Material

: Soil (Borrow Area)

Date Tested

: 31.10.09

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

6075

: Sandip Vyas/Sanjay Srivastav

Volume of Mould, v (cc) :

2250

10178

10314

10432

10676

10794

10858

(g)

4103

4239

4357

4601

4719

4783

(g/cc)

1.824

1.884

1.936

2.045

2.097

2.126

(g)

38.50

39.00

42.00

38.00

36.50

37.00

Wt. of Wet Soil + Container, w6

(g)

117.00

120.00

125.00

130.00

132.00

134.00

Wt. of Dry Soil + Container, w7

(g)

111.00

113.50

117.00

120.00

120.50

122.00

Wt. of Wet Soil + Mould, W 2


Wt. of Wet Soil, w3=(w2-w1)
Wet Density, Yb=(w3/v)

(g)

Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

6.00

6.50

8.00

10.00

11.50

12.00

Wt.of Dry Soil, w9=(w7-w5)

(g)

72.50

74.50

75.00

82.00

84.00

85.00

(%)

8.28

8.72

10.67

12.20

13.69

14.12

1.684

1.733

1.750

1.823

1.845

1.863

Water Content w= 100*w8/w9

Dry Density Yd=100x(Yb/100+w) (g/cc)

RESULTS
MDD =
OMC =

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

FREE SWELL INDEX


As per IS 2720 Part - 40 (1977)
Laboratory No.

Date Sampled : 28.10.09

Location / Source : Jalaram Earth Moovers - Dabhel

Sampled By

: Sandip Vyas

Type of Material

: Soil (Borrow Area)

Date Tested

: 30.10.09

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Sr. No.

Sample Level in
Water (Vw) ml

Sample Level in
Kerosene (Vk) ml

Free Swell Index (VwVk)

Free Swell Index


100X(Vw-Vk)/Vk %

14.00

12.00

2.00

16.67

Remarks

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

GRAIN SIZE ANALYSIS OF SOIL


As per IS 2720 Part - 4
Laboratory No.

Date Sampled : 28.10.09

Location / Source : Jalaram Earth Moovers - Dabhel

Sampled By

Type of Material

: Soil (Borrow Area)

Date Tested

: 30.10.09

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Wt. of Oven dry sample in gm. :

: Sandip Vyas

1000

Weight Retained in
gm.

Cumulative weight
Retained in gm.

% of Retained

% of Passing

4.75 mm

38.50

38.50

3.85

96.15

2.00 mm

14.00

52.50

5.25

94.75

IS Sieve size

Remarks

100 mm
75 mm
26.5 mm
19 mm

425 mic.

39.50

92.00

9.20

90.80

75 mic.

149.50

241.50

24.15

75.85

Gravel

3.85%

Sand

20.30%

Silt & Clay

75.85%

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

ATTERBERG'S LIMITS
As per IS 2720 (PART - 5)
Laboratory No.

Date Sampled : 28.10.2009

Location / Source : Jalaram Earth Moovers - Dabhel

Sampled By

Type of Material

: Soil (Borrow Area)

Date Tested

: Sandip Vyas
: 30.10.2009

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Liquid Limit
Determonation No.

Container No.

Plastic Limit
3

37.00

42.00

39.00

36.50

38.00

38.00

Wt. of Container and Wet Soil W 2

98.00

96.50

97.50

94.00

52.50

51.50

Wt. of Container and Dry Soil W 3

82.5

82.00

81.5

77.5

49.50

49.00

Wt. of Moisture W 4=W 2-W 3

15.50

14.50

16.00

16.50

3.00

2.50

45.50

40.00

42.50

41.00

11.50

11.00

34.07

36.25

37.65

40.24

26.09

22.73

37

31

24

18

Empty Weight Container W 1

Wt. of Dry Soil W 5=W 3-W 1


Moisture Content W=100*W 4/W 5
No. of Drops/Depth of Penetration

Name & Sign :


(Contractor's Representative)

Avg. 24.41

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled : 28.10.09

Location / Source : Jalaram Earth Moovers - Dabhel

Sampled By

Type of Material

: Soil (Borrow Area)

Date Tested

: 30.10.09

Proposed Use

: Sub Grade

Tested By

: Sandip Vyas/Sanjay Srivastav

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

6075

: Sandip Vyas

Volume of Mould, v (cc) :

10502

10750

10756

10720

(g)

4427

4675

4681

4645

(g/cc)

1.974

2.084

2.087

2.071

10

(g)

38.50

36.50

40.00

38.00

Wt. of Wet Soil + Container, w6

(g)

107.50

105.00

109.00

113.50

Wt. of Dry Soil + Container, w7

(g)

99.00

95.50

98.00

100.50

Wt. of Wet Soil + Mould, W 2


Wt. of Wet Soil, w3=(w2-w1)
Wet Density, Yb=(w3/v)

(g)

Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

8.50

9.50

11.00

13.00

Wt.of Dry Soil, w9=(w7-w5)

(g)

60.50

59.00

58.00

62.50

(%)

14.05

16.10

18.97

20.80

Dry Density Yd=100x(Yb/100+w) (g/cc)

1.731

1.795

1.754

1.714

Water Content w= 100*w8/w9

2243

RESULTS
MDD =
OMC =

1.812
17.1

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

SIEVE ANALYSIS OF GRANULAR SUB-BASE


As per IS 2386 Part - I
Laboratory No.

Date Sampled :

Location / Source :

Sampled By

Type of Material

Date Tested

Proposed Use

Tested By

Wt. of test sample :

IS Sieve size

27083

Weight Retained in
gm.

Cumulative weight
Retained in gm.

75 mm

53 mm

1440

26.5 mm

3500

% of Retained

% of Passing

Acceptance as per MORTH


Table 400-2 GSB- I / II
Grade - I

Grade-II
0

0.00

100.00

100

1440.00

5.32

94.68

80-100

100

4940.00

18.24

81.76

55-90

70-100

9.5 mm

5791

10731.00

39.62

60.38

35-65

50-80

4.75 mm

7504

18235.00

67.33

32.67

25-55

40-65

2.36 mm

3848

22083.00

81.54

18.46

20-40

30-50

425 mic.

4572

26655.00

98.42

1.58

10-25

15-25

75 mic.

428

27083.00

100.00

0.00

3-10

3-10

Pan

Remarks :

Name & Sign :


(Contractor's Representative)

Name & Sign :


(Consultant's Representative)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled : 20.09.2009

Location / Source : Maa Krupa Earth Moovers - Lajpor (Sanjaybhai)

Sampled By

Type of Material

: Soil

Date Tested

: 21.09.2009

Proposed Use

Tested By

: Sandip Vyas

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.
Wt. of Wet Soil + Mould, W 2

(g)

Wt. of Wet Soil, w3=(w2-w1)


Wet Density, Yb=(w3/v)

3937

: Sandip Vyas

Volume of Mould, v (cc) :

996.95

5677

5809

5886

6001

5992

6021

(g)

1740

1872

1949

2064

2055

2084

(g/cc)

1.745

1.878

1.955

2.070

2.061

2.090

10

Container No.
Wt of Container, w5

(g)

40.00

37.00

38.00

42.00

38.00

35.00

Wt. of Wet Soil + Container, w6

(g)

74.06

79.20

86.80

85.20

86.42

83.00

Wt. of Dry Soil + Container, w7

(g)

71.50

75.02

81.02

79.50

79.00

74.51

Wt. of Water, w8=(w6-w7)

(g)

2.56

4.18

5.78

5.70

7.42

8.49

Wt.of Dry Soil, w9=(w7-w5)

(g)

31.50

38.02

43.02

37.50

41.00

39.51

(%)

8.13

10.99

13.44

15.20

18.10

21.49

(g/cc)

1.614

1.692

1.723

1.797

1.745

1.72

Water Content w= 100*w8/w9


Dry Density Yd=100x(Yb/100+w)

1.9
1.85
1.8
1.75
1.7
1.65

RESULTS

1.6
1.55
5.00

10.00

15.00

20.00

MDD =
OMC =

1.797
15.2

Remarks :

Contractor's Representative

Consultant's Representative

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled :

Location / Source : Trial Pit, Chainage 5.800 (Depth : 1000 mm)

Sampled By

Type of Material

: Soil

Date Tested

Proposed Use

Tested By

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

3937

Volume of Mould, v (cc) :

996.95

5656

5833

5943

6104

6150

6058

(g)

1719

1896

2006

2167

2213

2121

(g/cc)

1.724

1.902

2.012

2.174

2.220

2.127

10

(g)

41.00

40.00

37.00

36.00

26.00

10.00

Wt. of Wet Soil + Container, w6

(g)

64.00

70.00

72.00

123.50

79.00

48.00

Wt. of Dry Soil + Container, w7

(g)

60.00

64.00

66.00

105.00

67.00

43.00

Wt. of Wet Soil + Mould, W 2


Wt. of Wet Soil, w3=(w2-w1)
Wet Density, Yb=(w3/v)

(g)

Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

4.00

6.00

6.00

18.50

12.00

5.00

Wt.of Dry Soil, w9=(w7-w5)

(g)

19.00

24.00

29.00

69.00

41.00

33.00

Water Content w= 100*w8/w9

(%)

21.05

25.00

20.69

26.81

29.27

15.15

Dry Density Yd=100x(Yb/100+w) (g/cc)

1.424

1.521

1.667

1.714

1.717

1.847

35.00
30.00
25.00
20.00
15.00
10.00

RESULTS

5.00
0.00
1

MDD =
OMC =

1.812
9.61

Remarks :

Contractor's Representative

Consultant's Representative

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled :

Location / Source : Trial Pit, Chainage 6.750 (Depth : 1000 mm)

Sampled By

Type of Material

: Soil

Date Tested

Proposed Use

Tested By

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

3937

Volume of Mould, v (cc) :

996.95

5735

5797

5893

5960

6088

6075

(g)

1798

1860

1956

2023

2151

2138

(g/cc)

1.804

1.866

1.962

2.029

2.158

2.145

(g)

38.00

38.00

42.00

35.00

38.00

37.00

Wt. of Wet Soil + Container, w6

(g)

87.00

90.00

81.00

79.00

80.00

98.00

Wt. of Dry Soil + Container, w7

(g)

83.00

85.00

76.00

73.00

76.00

90.00

Wt. of Wet Soil + Mould, W 2


Wt. of Wet Soil, w3=(w2-w1)
Wet Density, Yb=(w3/v)

(g)

Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

4.00

5.00

5.00

6.00

4.00

8.00

Wt.of Dry Soil, w9=(w7-w5)

(g)

45.00

47.00

34.00

38.00

38.00

53.00

Water Content w= 100*w8/w9

(%)

8.89

10.64

14.71

15.79

10.53

15.09

1.656

1.686

1.710

1.752

1.952

1.863

Dry Density Yd=100x(Yb/100+w) (g/cc)

2.000
1.950
1.900
1.850
1.800
RESULTS

1.750

Series1

1.700

MDD =
OMC =

1.650

1.812
9.61

1.600
Remarks :

1.550
1.500
8.89

Contractor's Representative

10.64

14.71

15.79

10.53

15.09

Consultant's Representative

Series1

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled :

Location / Source : Trial Pit, Chainage 8.700 (Depth : 1000 mm)

Sampled By

Type of Material

: Soil

Date Tested

Proposed Use

Tested By

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

3937

Volume of Mould, v (cc) :

5711

5890

6033

6084

6048

(g)

1774

1953

2096

2147

2111

(g/cc)

1.779

1.959

2.102

2.154

2.117

10

(g)

37.00

37.00

40.00

38.00

18.00

Wt. of Wet Soil + Container, w6

(g)

62.00

86.00

87.00

98.00

49.00

Wt. of Dry Soil + Container, w7

(g)

58.00

82.00

81.00

86.00

42.00

Wt. of Wet Soil + Mould, W 2

(g)

Wt. of Wet Soil, w3=(w2-w1)


Wet Density, Yb=(w3/v)
Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

4.00

4.00

6.00

12.00

7.00

Wt.of Dry Soil, w9=(w7-w5)

(g)

21.00

45.00

41.00

48.00

24.00

Water Content w= 100*w8/w9

(%)

19.05

8.89

14.63

25.00

29.17

Dry Density Yd=100x(Yb/100+w) (g/cc)

1.494

1.799

1.833

1.723

1.639

996.95

35
30
25
20
15
10

RESULTS

MDD =
OMC =

0
0.00

5.00

10.00

15.00

1.812
9.61

20.00

Remarks :

Contractor's Representative

Consultant's Representative

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled :

Location / Source : Trial Pit, Chainage 8.700 (Depth : 500 mm)

Sampled By

Type of Material

: Soil

Date Tested

Proposed Use

Tested By

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.

3937

Volume of Mould, v (cc) :

996.95

5705

5814

5853

5935

6027

6002

(g)

1768

1877

1916

1998

2090

2065

(g/cc)

1.773

1.883

1.922

2.004

2.096

2.071

10

(g)

40.00

36.00

34.00

37.00

36.00

36.00

Wt. of Wet Soil + Container, w6

(g)

85.00

78.00

78.00

87.00

62.00

109.00

Wt. of Dry Soil + Container, w7

(g)

83.00

72.00

72.00

80.00

56.00

92.00

Wt. of Wet Soil + Mould, W 2

(g)

Wt. of Wet Soil, w3=(w2-w1)


Wet Density, Yb=(w3/v)
Container No.
Wt of Container, w5

Wt. of Water, w8=(w6-w7)

(g)

2.00

6.00

6.00

7.00

6.00

17.00

Wt.of Dry Soil, w9=(w7-w5)

(g)

43.00

36.00

38.00

43.00

20.00

56.00

(%)

4.65

16.67

15.79

16.28

30.00

30.36

1.694

1.614

1.660

1.723

1.612

1.589

Water Content w= 100*w8/w9

Dry Density Yd=100x(Yb/100+w) (g/cc)

1.82
1.8
1.78
1.76
1.74
1.72

RESULTS

1.7

MDD =
OMC =

1.68
0.00

5.00

10.00

15.00

1.812
9.61

20.00

Remarks :

Contractor's Representative

Consultant's Representative

1. Gradiation:- 20 mm coarse aggregate ( Individual)


Source : Dharti Stone Quarry - Songadh
Sample Wt. :

15140 gms.

IS Sieve
Size(mm)

Weight
Retained in
(gm)

Cumulative Cumulative
Percentage Specification
Weight
Percentag
Passing (%)
Limit
Retained Retained (%)

25
20
10
4.75
2.36
pan

0
770
14140
230
0
0

0
770
14910
15140

0.00
5.09
98.48
100.00

100.00
94.91
1.52
0.00

25
20
10
4.75
2.36
pan

0
37
7585
625
0
0

0
37
7622
8247

0.00
0.45
92.42
100.00

100.00
99.55
7.58
0.00

25
20
10
4.75
2.36
pan

860
6163
4680
0
0
0

860
7023
11703
0

7.35
60.01
100.00
100.00

100.00
39.99
0.00
0.00

25
20
10
4.75
2.36
pan

860
6163
4680
0
0
0

860
7023
11703
0

7.35
60.01
100.00
100.00

100.00
39.99
0.00
0.00

25
20
10
4.75
2.36
pan

511
6163
4680
0
0
0

511
6674
11354
0

4.50
58.78
100.00
100.00

100.00
41.22
0.00
0.00

25
20
10
4.75
2.36
pan

860
6163
4680
0
0
0

860
7023
11703
0

7.35
60.01
100.00
100.00

100.00
39.99
0.00
0.00

25
20
10
4.75
2.36
pan

105
2955
2895
0
0
0

105
3060
5955
0

1.76
51.39
100.00
100.00

100.00
48.61
0.00
0.00

G.S.B. Gradation

Sample wt.

27137

75.00
53.00
26.50
9.50
4.75
2.36
0.425
0.075
pan

0
1438
3501
5791
7503
3848
4573
483

0
1438
4939
10730
18233
22081
26654
27137
0

0.00
5.30
18.20
39.54
67.19
81.37
98.22
100.00
100.00

100.00
94.70
81.80
60.46
32.81
18.63
1.78
0.00
0.00

0
2604
6207
11573
19601
23638
28782
30100
0

0.00
8.65
20.62
38.45
65.12
78.53
95.62
100.00
100.00

100.00
91.35
79.38
61.55
34.88
21.47
4.38
0.00
0.00

0
3656
5812
11249
19116
23150
27944
28450
0

0.00
12.85
20.43
39.54
67.19
81.37
98.22
100.00
100.00

100.00
87.15
79.57
60.46
32.81
18.63
1.78
0.00
0.00

G.S.B. Gradation

Sample wt.

30100

75.00
53.00
26.50
9.50
4.75
2.36
0.425
0.075
pan

0
2604
3603
5367
8028
4036
5144
1318

Sample wt.

28450

75.00
53.00
26.50
9.50
4.75
2.36
0.425
0.075
pan

0
3656
2157
5437
7866
4034
4794
506

LABORATORY TESTS
Gradiation of 20 mm size coarse aggregate
Source : Dharti Stone Quarry - Songadh
Sample Wt. :
15140
gms.

IS Sieve
Size(mm)

Weight
Retained in
(gm)

Cumulative
Weight
Retained

Cumulative
Percentag
Retained (%)

Percentage
Passing (%)

Specification
Limit

40.00
20.00
10.00
4.750
2.360
pan

0
770
14140
230
0
0

0
770
14910
15140
15140
15140

0.00
5.09
98.48
100.00
100.00
100.00

100.00
94.91
1.52
0.00
0.00
0.00

100
80 - 100
0 - 20
0-5
0-0

Gradiation of 10 mm size coarse aggregate


Source : Dharti Stone Quarry - Songadh
Sample Wt. :
8247
gms.
IS Sieve
Size(mm)

Weight
Retained in
(gm)

Cumulative
Weight
Retained

Cumulative
Percentag
Retained (%)

Percentage
Passing (%)

Specification
Limit

16.00
12.50
10.00
4.750
2.360
pan

0
0
37
7585
625
0

0
0
37
7622
8247
8247

0.00
0.00
0.45
92.42
100.00
100.00

100.00
100.00
99.55
7.58
0.00
0.00

100
80 - 100
0 - 20
0-5
0-0

Water absorption (%)


Impact Value (%)
Flakiness Index (%)

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

MODIFIED PROCTOR'S COMPACTION TEST


As per IS 2720 (PART - 8)
Laboratory No.

Date Sampled : 20.09.2009

Location / Source : Site Camp

Sampled By

Type of Material

: Soil

Date Tested

: 21.09.2009

Proposed Use

Tested By

: Sandip Vyas

Mould No.

Wt. of Mould, W 1 (g) :

Trial No.
Wt. of Wet Soil + Mould, W 2

(g)

Wt. of Wet Soil, w3=(w2-w1)


Wet Density, Yb=(w3/v)

3937

: Sandip Vyas

Volume of Mould, v (cc) :

5734

5820

5917

5935

5935

(g)

1797

1883

1980

1998

1998

(g/cc)

1.802

1.889

1.986

2.004

2.004

Container No.
Wt of Container, w5

(g)

38.00

37.00

37.00

36.00

37.00

Wt. of Wet Soil + Container, w6

(g)

94.30

93.00

87.42

94.00

91.39

Wt. of Dry Soil + Container, w7

(g)

91.00

89.00

83.00

87.27

84.00

Wt. of Water, w8=(w6-w7)

(g)

3.30

4.00

4.42

6.73

7.39

Wt.of Dry Soil, w9=(w7-w5)

(g)

53.00

52.00

46.00

51.27

47.00

Water Content w= 100*w8/w9


Dry Density Yd=100x(Yb/100+w)

996.95

(%)

6.23

7.70

9.61

13.20

15.72

(g/cc)

1.696

1.754

1.812

1.771

1.722

1.82
1.8
1.78
1.76
1.74
1.72

RESULTS

1.7

MDD =
OMC =

1.68
0.00

5.00

10.00

15.00

1.812
9.61

20.00

Remarks :

Contractor's Representative

Consultant's Representative

BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. (JV) M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.

ATTERBERG'S LIMITS
As per IS 2720 (PART - 5)
Laboratory No.

Date Sampled : 20.09.2009

Location / Source : Site Camp

Sampled By

Type of Material

: Soil

Date Tested

: Sandip Vyas
: 21.09.2009

Proposed Use

Tested By

: Sandip Vyas

Liquid Limit
Determonation No.

Container No.

Plastic Limit
3

39.00

39.00

42.00

38.00

39.00

37.00

Wt. of Container and Wet Soil W 2

108.53

105.00

109.00

102.00

49.50

50.00

Wt. of Container and Dry Soil W 3

83.29

81.50

86.08

80.67

47.00

47.00

Wt. of Moisture W 4=W 2-W 3

25.24

23.50

22.92

21.33

2.50

3.00

44.29

42.50

44.08

42.67

8.00

10.00

56.99

55.29

52.00

49.99

31.25

30.00

19

23

29

34

Empty Weight Container W 1

Wt. of Dry Soil W 5=W 3-W 1


Moisture Content W=100*W 4/W 5
No. of Drops/Depth of Penetration

Contractor's Representative

Consultant's Representative