Date Tested
: 06.11.09
Proposed Use
: Sub Grade
Tested By
Mould No.
Trial No.
6075
: Sandip Vyas
2250
10040
10358
10464
10836
10904
10794
(g)
3965
4283
4389
4761
4829
4719
(g/cc)
1.762
1.904
1.951
2.116
2.146
2.097
(g)
38.59
38.99
42.17
37.90
36.34
37.09
(g)
109.78
119.34
139.94
134.20
115.02
130.68
(g)
104.07
111.77
128.15
120.80
103.00
114.81
(g)
Container No.
Wt of Container, w5
(g)
5.71
7.57
11.79
13.40
12.02
15.87
(g)
65.48
72.78
85.98
82.90
66.66
77.72
(%)
8.72
10.40
13.71
16.16
18.03
20.42
1.621
1.724
1.715
1.822
1.818
1.742
RESULTS
MDD =
OMC =
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
ATTERBERG'S LIMITS
As per IS 2720 (PART - 5)
Laboratory No.
Sampled By
Type of Material
Date Tested
: Sandip Vyas
: 30.10.2009
Proposed Use
: Sub Grade
Tested By
Liquid Limit
Determonation No.
Container No.
Plastic Limit
3
37.00
42.00
39.00
36.50
38.00
38.00
98.00
96.50
97.50
94.00
52.50
51.50
82.5
82.00
81.5
77.5
49.50
49.00
15.50
14.50
16.00
16.50
3.00
2.50
45.50
40.00
42.50
41.00
11.50
11.00
34.07
36.25
37.65
40.24
26.09
22.73
37
31
24
18
Avg. 24.41
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
Type of Material
Date Tested
: 04.11.09
Proposed Use
: Sub Grade
Tested By
Mould No.
Trial No.
6075
: Sandip Vyas
10431
10631
10889
10944
10890
(g)
4356
4556
4814
4869
4815
(g/cc)
1.936
2.025
2.140
2.164
2.140
10
(g)
37.00
34.00
36.00
36.00
37.00
(g)
131.00
133.50
134.50
134.50
131.00
(g)
123.00
123.50
123.00
122.00
118.50
(g)
Container No.
Wt of Container, w5
(g)
8.00
10.00
11.50
12.50
12.50
(g)
86.00
89.50
87.00
86.00
81.50
(%)
9.30
11.17
13.22
14.53
15.34
1.771
1.821
1.890
1.889
1.855
2250
6
RESULTS
MDD =
OMC =
1.902
13.95
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
Type of Material
: G.S.B.
Date Tested
: 04.11.09
Proposed Use
: G.S.B.
Tested By
Mould No.
Trial No.
6075
: S. Mukherjee/S.P.Gupta
10752
11060
11529
11644
11484
(g)
4677
4985
5454
5569
5409
(g/cc)
2.079
2.216
2.424
2.475
2.404
(g)
36.00
37.00
41.00
40.00
36.00
(g)
150.50
154.50
147.50
169.00
144.00
(g)
143.00
145.00
136.50
154.00
130.00
(g)
Container No.
Wt of Container, w5
(g)
7.50
9.50
11.00
15.00
14.00
(g)
107.00
108.00
95.50
114.00
94.00
(%)
7.01
8.80
11.52
13.16
14.89
1.943
2.036
2.174
2.187
2.092
2250
6
RESULTS
MDD =
OMC =
2.210
12.50
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
Type of Material
Date Tested
: 31.10.09
Proposed Use
: Sub Grade
Tested By
Mould No.
Trial No.
6075
2250
10178
10314
10432
10676
10794
10858
(g)
4103
4239
4357
4601
4719
4783
(g/cc)
1.824
1.884
1.936
2.045
2.097
2.126
(g)
38.50
39.00
42.00
38.00
36.50
37.00
(g)
117.00
120.00
125.00
130.00
132.00
134.00
(g)
111.00
113.50
117.00
120.00
120.50
122.00
(g)
Container No.
Wt of Container, w5
(g)
6.00
6.50
8.00
10.00
11.50
12.00
(g)
72.50
74.50
75.00
82.00
84.00
85.00
(%)
8.28
8.72
10.67
12.20
13.69
14.12
1.684
1.733
1.750
1.823
1.845
1.863
RESULTS
MDD =
OMC =
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
: Sandip Vyas
Type of Material
Date Tested
: 30.10.09
Proposed Use
: Sub Grade
Tested By
Sr. No.
Sample Level in
Water (Vw) ml
Sample Level in
Kerosene (Vk) ml
14.00
12.00
2.00
16.67
Remarks
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
Type of Material
Date Tested
: 30.10.09
Proposed Use
: Sub Grade
Tested By
: Sandip Vyas
1000
Weight Retained in
gm.
Cumulative weight
Retained in gm.
% of Retained
% of Passing
4.75 mm
38.50
38.50
3.85
96.15
2.00 mm
14.00
52.50
5.25
94.75
IS Sieve size
Remarks
100 mm
75 mm
26.5 mm
19 mm
425 mic.
39.50
92.00
9.20
90.80
75 mic.
149.50
241.50
24.15
75.85
Gravel
3.85%
Sand
20.30%
75.85%
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
ATTERBERG'S LIMITS
As per IS 2720 (PART - 5)
Laboratory No.
Sampled By
Type of Material
Date Tested
: Sandip Vyas
: 30.10.2009
Proposed Use
: Sub Grade
Tested By
Liquid Limit
Determonation No.
Container No.
Plastic Limit
3
37.00
42.00
39.00
36.50
38.00
38.00
98.00
96.50
97.50
94.00
52.50
51.50
82.5
82.00
81.5
77.5
49.50
49.00
15.50
14.50
16.00
16.50
3.00
2.50
45.50
40.00
42.50
41.00
11.50
11.00
34.07
36.25
37.65
40.24
26.09
22.73
37
31
24
18
Avg. 24.41
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
Type of Material
Date Tested
: 30.10.09
Proposed Use
: Sub Grade
Tested By
Mould No.
Trial No.
6075
: Sandip Vyas
10502
10750
10756
10720
(g)
4427
4675
4681
4645
(g/cc)
1.974
2.084
2.087
2.071
10
(g)
38.50
36.50
40.00
38.00
(g)
107.50
105.00
109.00
113.50
(g)
99.00
95.50
98.00
100.50
(g)
Container No.
Wt of Container, w5
(g)
8.50
9.50
11.00
13.00
(g)
60.50
59.00
58.00
62.50
(%)
14.05
16.10
18.97
20.80
1.731
1.795
1.754
1.714
2243
RESULTS
MDD =
OMC =
1.812
17.1
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
NAME OF PROJECT : Devlopment of Bus Rapid Transit System Corridor in Surat, on Surat- Navsari Road
CLIENT NAME : Surat Muncipal Corporation
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Date Sampled :
Location / Source :
Sampled By
Type of Material
Date Tested
Proposed Use
Tested By
IS Sieve size
27083
Weight Retained in
gm.
Cumulative weight
Retained in gm.
75 mm
53 mm
1440
26.5 mm
3500
% of Retained
% of Passing
Grade-II
0
0.00
100.00
100
1440.00
5.32
94.68
80-100
100
4940.00
18.24
81.76
55-90
70-100
9.5 mm
5791
10731.00
39.62
60.38
35-65
50-80
4.75 mm
7504
18235.00
67.33
32.67
25-55
40-65
2.36 mm
3848
22083.00
81.54
18.46
20-40
30-50
425 mic.
4572
26655.00
98.42
1.58
10-25
15-25
75 mic.
428
27083.00
100.00
0.00
3-10
3-10
Pan
Remarks :
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
Type of Material
: Soil
Date Tested
: 21.09.2009
Proposed Use
Tested By
: Sandip Vyas
Mould No.
Trial No.
Wt. of Wet Soil + Mould, W 2
(g)
3937
: Sandip Vyas
996.95
5677
5809
5886
6001
5992
6021
(g)
1740
1872
1949
2064
2055
2084
(g/cc)
1.745
1.878
1.955
2.070
2.061
2.090
10
Container No.
Wt of Container, w5
(g)
40.00
37.00
38.00
42.00
38.00
35.00
(g)
74.06
79.20
86.80
85.20
86.42
83.00
(g)
71.50
75.02
81.02
79.50
79.00
74.51
(g)
2.56
4.18
5.78
5.70
7.42
8.49
(g)
31.50
38.02
43.02
37.50
41.00
39.51
(%)
8.13
10.99
13.44
15.20
18.10
21.49
(g/cc)
1.614
1.692
1.723
1.797
1.745
1.72
1.9
1.85
1.8
1.75
1.7
1.65
RESULTS
1.6
1.55
5.00
10.00
15.00
20.00
MDD =
OMC =
1.797
15.2
Remarks :
Contractor's Representative
Consultant's Representative
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Date Sampled :
Sampled By
Type of Material
: Soil
Date Tested
Proposed Use
Tested By
Mould No.
Trial No.
3937
996.95
5656
5833
5943
6104
6150
6058
(g)
1719
1896
2006
2167
2213
2121
(g/cc)
1.724
1.902
2.012
2.174
2.220
2.127
10
(g)
41.00
40.00
37.00
36.00
26.00
10.00
(g)
64.00
70.00
72.00
123.50
79.00
48.00
(g)
60.00
64.00
66.00
105.00
67.00
43.00
(g)
Container No.
Wt of Container, w5
(g)
4.00
6.00
6.00
18.50
12.00
5.00
(g)
19.00
24.00
29.00
69.00
41.00
33.00
(%)
21.05
25.00
20.69
26.81
29.27
15.15
1.424
1.521
1.667
1.714
1.717
1.847
35.00
30.00
25.00
20.00
15.00
10.00
RESULTS
5.00
0.00
1
MDD =
OMC =
1.812
9.61
Remarks :
Contractor's Representative
Consultant's Representative
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Date Sampled :
Sampled By
Type of Material
: Soil
Date Tested
Proposed Use
Tested By
Mould No.
Trial No.
3937
996.95
5735
5797
5893
5960
6088
6075
(g)
1798
1860
1956
2023
2151
2138
(g/cc)
1.804
1.866
1.962
2.029
2.158
2.145
(g)
38.00
38.00
42.00
35.00
38.00
37.00
(g)
87.00
90.00
81.00
79.00
80.00
98.00
(g)
83.00
85.00
76.00
73.00
76.00
90.00
(g)
Container No.
Wt of Container, w5
(g)
4.00
5.00
5.00
6.00
4.00
8.00
(g)
45.00
47.00
34.00
38.00
38.00
53.00
(%)
8.89
10.64
14.71
15.79
10.53
15.09
1.656
1.686
1.710
1.752
1.952
1.863
2.000
1.950
1.900
1.850
1.800
RESULTS
1.750
Series1
1.700
MDD =
OMC =
1.650
1.812
9.61
1.600
Remarks :
1.550
1.500
8.89
Contractor's Representative
10.64
14.71
15.79
10.53
15.09
Consultant's Representative
Series1
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Date Sampled :
Sampled By
Type of Material
: Soil
Date Tested
Proposed Use
Tested By
Mould No.
Trial No.
3937
5711
5890
6033
6084
6048
(g)
1774
1953
2096
2147
2111
(g/cc)
1.779
1.959
2.102
2.154
2.117
10
(g)
37.00
37.00
40.00
38.00
18.00
(g)
62.00
86.00
87.00
98.00
49.00
(g)
58.00
82.00
81.00
86.00
42.00
(g)
(g)
4.00
4.00
6.00
12.00
7.00
(g)
21.00
45.00
41.00
48.00
24.00
(%)
19.05
8.89
14.63
25.00
29.17
1.494
1.799
1.833
1.723
1.639
996.95
35
30
25
20
15
10
RESULTS
MDD =
OMC =
0
0.00
5.00
10.00
15.00
1.812
9.61
20.00
Remarks :
Contractor's Representative
Consultant's Representative
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Date Sampled :
Sampled By
Type of Material
: Soil
Date Tested
Proposed Use
Tested By
Mould No.
Trial No.
3937
996.95
5705
5814
5853
5935
6027
6002
(g)
1768
1877
1916
1998
2090
2065
(g/cc)
1.773
1.883
1.922
2.004
2.096
2.071
10
(g)
40.00
36.00
34.00
37.00
36.00
36.00
(g)
85.00
78.00
78.00
87.00
62.00
109.00
(g)
83.00
72.00
72.00
80.00
56.00
92.00
(g)
(g)
2.00
6.00
6.00
7.00
6.00
17.00
(g)
43.00
36.00
38.00
43.00
20.00
56.00
(%)
4.65
16.67
15.79
16.28
30.00
30.36
1.694
1.614
1.660
1.723
1.612
1.589
1.82
1.8
1.78
1.76
1.74
1.72
RESULTS
1.7
MDD =
OMC =
1.68
0.00
5.00
10.00
15.00
1.812
9.61
20.00
Remarks :
Contractor's Representative
Consultant's Representative
15140 gms.
IS Sieve
Size(mm)
Weight
Retained in
(gm)
Cumulative Cumulative
Percentage Specification
Weight
Percentag
Passing (%)
Limit
Retained Retained (%)
25
20
10
4.75
2.36
pan
0
770
14140
230
0
0
0
770
14910
15140
0.00
5.09
98.48
100.00
100.00
94.91
1.52
0.00
25
20
10
4.75
2.36
pan
0
37
7585
625
0
0
0
37
7622
8247
0.00
0.45
92.42
100.00
100.00
99.55
7.58
0.00
25
20
10
4.75
2.36
pan
860
6163
4680
0
0
0
860
7023
11703
0
7.35
60.01
100.00
100.00
100.00
39.99
0.00
0.00
25
20
10
4.75
2.36
pan
860
6163
4680
0
0
0
860
7023
11703
0
7.35
60.01
100.00
100.00
100.00
39.99
0.00
0.00
25
20
10
4.75
2.36
pan
511
6163
4680
0
0
0
511
6674
11354
0
4.50
58.78
100.00
100.00
100.00
41.22
0.00
0.00
25
20
10
4.75
2.36
pan
860
6163
4680
0
0
0
860
7023
11703
0
7.35
60.01
100.00
100.00
100.00
39.99
0.00
0.00
25
20
10
4.75
2.36
pan
105
2955
2895
0
0
0
105
3060
5955
0
1.76
51.39
100.00
100.00
100.00
48.61
0.00
0.00
G.S.B. Gradation
Sample wt.
27137
75.00
53.00
26.50
9.50
4.75
2.36
0.425
0.075
pan
0
1438
3501
5791
7503
3848
4573
483
0
1438
4939
10730
18233
22081
26654
27137
0
0.00
5.30
18.20
39.54
67.19
81.37
98.22
100.00
100.00
100.00
94.70
81.80
60.46
32.81
18.63
1.78
0.00
0.00
0
2604
6207
11573
19601
23638
28782
30100
0
0.00
8.65
20.62
38.45
65.12
78.53
95.62
100.00
100.00
100.00
91.35
79.38
61.55
34.88
21.47
4.38
0.00
0.00
0
3656
5812
11249
19116
23150
27944
28450
0
0.00
12.85
20.43
39.54
67.19
81.37
98.22
100.00
100.00
100.00
87.15
79.57
60.46
32.81
18.63
1.78
0.00
0.00
G.S.B. Gradation
Sample wt.
30100
75.00
53.00
26.50
9.50
4.75
2.36
0.425
0.075
pan
0
2604
3603
5367
8028
4036
5144
1318
Sample wt.
28450
75.00
53.00
26.50
9.50
4.75
2.36
0.425
0.075
pan
0
3656
2157
5437
7866
4034
4794
506
LABORATORY TESTS
Gradiation of 20 mm size coarse aggregate
Source : Dharti Stone Quarry - Songadh
Sample Wt. :
15140
gms.
IS Sieve
Size(mm)
Weight
Retained in
(gm)
Cumulative
Weight
Retained
Cumulative
Percentag
Retained (%)
Percentage
Passing (%)
Specification
Limit
40.00
20.00
10.00
4.750
2.360
pan
0
770
14140
230
0
0
0
770
14910
15140
15140
15140
0.00
5.09
98.48
100.00
100.00
100.00
100.00
94.91
1.52
0.00
0.00
0.00
100
80 - 100
0 - 20
0-5
0-0
Weight
Retained in
(gm)
Cumulative
Weight
Retained
Cumulative
Percentag
Retained (%)
Percentage
Passing (%)
Specification
Limit
16.00
12.50
10.00
4.750
2.360
pan
0
0
37
7585
625
0
0
0
37
7622
8247
8247
0.00
0.00
0.45
92.42
100.00
100.00
100.00
100.00
99.55
7.58
0.00
0.00
100
80 - 100
0 - 20
0-5
0-0
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. JV M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
Sampled By
Type of Material
: Soil
Date Tested
: 21.09.2009
Proposed Use
Tested By
: Sandip Vyas
Mould No.
Trial No.
Wt. of Wet Soil + Mould, W 2
(g)
3937
: Sandip Vyas
5734
5820
5917
5935
5935
(g)
1797
1883
1980
1998
1998
(g/cc)
1.802
1.889
1.986
2.004
2.004
Container No.
Wt of Container, w5
(g)
38.00
37.00
37.00
36.00
37.00
(g)
94.30
93.00
87.42
94.00
91.39
(g)
91.00
89.00
83.00
87.27
84.00
(g)
3.30
4.00
4.42
6.73
7.39
(g)
53.00
52.00
46.00
51.27
47.00
996.95
(%)
6.23
7.70
9.61
13.20
15.72
(g/cc)
1.696
1.754
1.812
1.771
1.722
1.82
1.8
1.78
1.76
1.74
1.72
RESULTS
1.7
MDD =
OMC =
1.68
0.00
5.00
10.00
15.00
1.812
9.61
20.00
Remarks :
Contractor's Representative
Consultant's Representative
BRTS PROJECTS
Ministry of Road Shipping Transport & Highways(MORST&H)
Project : Udhana Darwaja to Sachin (Surat Navasari Road)
CONTRACTOR : Cube Construction Engineering Ltd. (JV) M/S Relcon Infraprojects Pvt. Ltd.
CONSULTANT : Urban Mass Transit Company Ltd.
ATTERBERG'S LIMITS
As per IS 2720 (PART - 5)
Laboratory No.
Sampled By
Type of Material
: Soil
Date Tested
: Sandip Vyas
: 21.09.2009
Proposed Use
Tested By
: Sandip Vyas
Liquid Limit
Determonation No.
Container No.
Plastic Limit
3
39.00
39.00
42.00
38.00
39.00
37.00
108.53
105.00
109.00
102.00
49.50
50.00
83.29
81.50
86.08
80.67
47.00
47.00
25.24
23.50
22.92
21.33
2.50
3.00
44.29
42.50
44.08
42.67
8.00
10.00
56.99
55.29
52.00
49.99
31.25
30.00
19
23
29
34
Contractor's Representative
Consultant's Representative