You are on page 1of 8

Job Number

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI

Date

28th Dec 2011

Retaining Wall Design : Ver W2.5.07 - 24 Aug 2011


Title : RETAINING WALL 2.00m To 3.00
C14

Input Data
Wall Dimensions

H1
H2
H3
Hw
Hr
B
D

(m)
(m)
(m)
(m)
(m)
(m)
(m)

4
0.8
0
1.35

C
F
xf
At
Ab
1.7 Cov wall
0.2 Cov base

Unfactored Live Loads

(m)
(m)
(m)
(m)
(m)
mm
mm

0.35
0.3
1.00
0.25
0.35
50
50

W
P
xp
L
xl
Lh
x

General Parameters

0
0
0
0
0
0
0.1

(kN/m)
(kN)
(m)
(kN/m)
(m)
(kN/m)
(m)

()
Soil frict
Fill slope ()
Wall frict ()
Conc kN/m3
kN/m3
Soil
fcu
(MPa)
fy
(MPa)

Design Parameters

33
25
15
24
19
25
460

SF Overt.
SF Slip
ULS DL Factor
ULS LL Factor
Pmax
(kPa)
Soil Poisson
DL Factor Ovt.

Seepage not allowed


Active pressure NOT applied on back of shear key for sliding
Theory
: Coulomb
Wall type : Cantilever

SEISMIC ANALYSIS SETTINGS:


Seismic Analysis ON/OFF:OFF

Hor Accel.

(g)

Vert Accel.

(g)

Include LL's

VALUES OF PRESSURE COEFFICIENTS:


Active Pressure coefficient Ka :0.403 (User Defined)
Passive Pressure coefficient Kp :5.854 (User Defined)
Base frictional constant :0.649 (User Defined)

FORCES ACTING ON THE WALL AT SLS:


All forces/moments are per m
Description
Destabilizing forces:
Total Active pressure Pa
Triangular W-table press Pw
Hydrostatic pressure on bot
of base: uniform portion
Hydrostatic pressure on bot
of base: triangular portion
Stabilizing forces:
Passive pressure on base Pp
Weight of the wall + base
Weight of soil on the base
Hydrostatic pressure on top
of rear portion of base
Hydrostatic pressure on top
of front portion of base

width
FORCES (kN ) and their LEVER ARMS (m )
F Horizontal
Lever arm F Vertical
Lever arm
left (+)
down (+)
59.169
5.337

-35.592

1.333
0.450

2.050
2.050
1.125

0.000

1.500

47.700
26.668
1.962

1.554
1.441
2.150

0.000

0.850

0.267

EQUILIBRIUM CALCULATIONS AT SLS


All forces/moments are per m

15.854
0.000
0.000

width

1.Moment Equilibrium
Point of rotation: bottom front corner of base.

2
2.0
1.4
1.6
150
0.1
0.9

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI

Sheet

Date

28th Dec 2011

For Overturning moment Mo calculate as follows:


Mo = Sum(hor. forces x l.a.) - Sum(vert. forces x l.a.)
For Stabilizing moment Mr calculate as follows:
Mr = -Sum(hor. forces x l.a.) + Sum(vert. forces x l.a.)
where l.a. = lever arm of each force.
Stabilizing moment Mr : 126.25 kNm
Destabilizing moment Mo : 48.79 kNm
Safety factor against overturning = Mr/Mo = 2.588
2.Force Equilibrium at SLS
Sum of Vertical forces Pv
Frictional resistance Pfric
Passive Pressure on shear key
Passive pressure on base
=> Total Horiz. resistance Fr

: 92.18
: 59.83
: 31.70
: 35.59
: 127.12

kN
kN
kN
kN
kN

Horizontal sliding force on wall Fhw :


Horizontal sliding force on shear key Fht :
=> Total Horizontal sliding force Fh :

64.51 kN
0.00 kN
64.51 kN

Safety factor against overall sliding = Fr/Fh = 1.971

*** SAFETY FACTOR IS LOWER THAN SPECIFIED MINIMUM OF

2.00 ***

FORCES ACTING ON THE WALL AT ULS:


All forces/moments are per m
Description
Destabilizing forces:
Total Active pressure Pa
Triangular W-table press Pw
Hydrostatic pressure on bot
of base: uniform portion
Hydrostatic pressure on bot
of base: triangular portion
Stabilizing forces:
Passive pressure on base Pp
Weight of the wall + base
Weight of soil on the base
Hydrostatic pressure on top
of rear portion of base
Hydrostatic pressure on top
of front portion of base

width
FORCES (kN ) and their LEVER ARMS (m )
F Horizontal
Lever arm F Vertical
Lever arm
left (+)
down (+)
82.836
7.472

-32.033

1.333
0.450

22.196
0.000
0.000

2.050
2.050
1.125

0.000

1.500

42.930
24.001
1.766

1.554
1.441
2.150

0.000

0.850

0.267

EQUILIBRIUM CALCULATIONS AT ULS


All forces/moments are per m

width

1.Moment Equilibrium
Point of rotation: bottom front corner of base.
For Overturning moment Mo calculate as follows:
Mo = Sum(hor. forces x l.a.) - Sum(vert. forces x l.a.)
For Stabilizing moment Mr calculate as follows:
Mr = -Sum(hor. forces x l.a.) + Sum(vert. forces x l.a.)
where l.a. = lever arm of each force.
Stabilizing moment Mr : 113.63 kNm
Destabilizing moment Mo : 68.31 kNm
Safety factor against overturning = Mr/Mo = 1.663

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI

Sheet

Date

2.Force Equilibrium at ULS


Sum of Vertical forces Pv
Frictional resistance Pfric
Passive Pressure on shear key
Passive pressure on base
=> Total Horiz. resistance Fr

: 82.97
: 53.84
: 28.53
: 32.03
: 114.41

kN
kN
kN
kN
kN

Horizontal sliding force on wall Fhw :


Horizontal sliding force on shear key Fht :
=> Total Horizontal sliding force Fh :

90.31 kN
0.00 kN
90.31 kN

Safety factor against overall sliding = Fr/Fh = 1.267

SOIL PRESSURES UNDER BASE AT SLS


Maximum pressure : 72.08 kPa
Minimum pressure : 9.87 kPa
Maximum pressure occurs at left hand side of base

WALL MOMENTS (ULS) AND REINFORCEMENT TO BS8110 - 1997


Position from
base top (m )
0.00
0.07
0.15
0.22
0.29
0.37
0.44
0.51
0.58
0.66
0.73
0.80
0.88
0.95
1.02
1.10
1.17
1.24
1.31
1.39
1.46
1.53
1.61
1.68
1.75
1.83
1.90
1.97
2.04
2.12
2.19
2.26
2.34
2.41
2.48
2.56
2.63
2.70
2.77
2.85
2.92
2.99
3.07

Moment
(kNm )
79.97
75.28
71.17
67.03
62.92
58.88
54.97
51.24
47.69
44.33
41.14
38.12
35.25
32.54
29.97
27.54
25.25
23.08
21.05
19.13
17.34
15.66
14.10
12.64
11.29
10.03
8.88
7.81
6.84
5.95
5.14
4.40
3.74
3.15
2.63
2.17
1.76
1.41
1.11
0.85
0.64
0.47
0.33

Front Reinforcing Back Reinforcing Nominal (0.13%)


(mm/m )
(mm/m )
(mm/m )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

658.03
623.75
593.78
563.15
532.29
501.64
471.69
442.84
415.20
388.74
363.42
339.20
316.04
293.91
272.76
252.56
233.31
214.97
197.54
181.00
165.34
150.54
136.59
123.46
111.15
99.62
88.87
78.87
69.61
61.05
53.19
46.00
39.45
33.53
28.20
23.44
19.23
15.53
12.33
9.58
7.27
5.35
3.79

457.60
455.00
452.40
449.80
447.20
444.60
442.00
439.40
436.80
434.20
431.60
429.00
426.40
423.80
421.20
418.60
416.00
413.40
410.80
408.20
405.60
403.00
400.40
397.80
395.20
392.60
390.00
387.40
384.80
382.20
379.60
377.00
374.40
371.80
369.20
366.60
364.00
361.40
358.80
356.20
353.60
351.00
348.40

28th Dec 2011

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

3.14
3.21
3.29
3.36
3.43
3.50
3.58
3.65

Client
Calcs by

0.22
0.14
0.08
0.04
0.02
0.01
0.00
0.00

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.56
1.63
0.95
0.49
0.21
0.06
0.01
0.00

Sheet

Date

345.80
343.20
340.60
338.00
335.40
332.80
330.20
327.60

BASE MOMENTS (ULS) AND REINFORCEMENT TO BS8110 - 1997


Position from
left (m )
0.00
0.05
0.09
0.14
0.18
0.23
0.27
0.32
0.36
0.41
0.45
0.50
0.54
0.58
0.63
0.68
0.72
0.77
0.81
0.85
0.90
0.94
0.99
1.03
1.08
1.13
1.17
1.22
1.26
1.30
1.35
1.40
1.44
1.49
1.53
1.57
1.62
1.67
1.71
1.75
1.80
1.84
1.89
1.94
1.98
2.02
2.07
2.12
2.16
2.21
2.25

Moment
(kNm )
-0.00
-0.05
-0.20
-0.45
-0.80
-1.26
-1.81
-2.46
-3.22
-4.07
-5.03
-6.09
-7.24
-8.50
-9.86
-11.32
-12.87
-14.53
-16.29
-18.15
-20.12
-22.18
-24.34
-26.60
-28.97
-31.43
-34.00
-36.66
-39.43
-42.29
-45.26
-48.33
-51.50
-54.77
-58.14
-61.61
-65.18
-68.85
-72.62
-76.49
-80.47
-84.54
-88.71
-90.84
5.18
3.51
2.58
1.79
1.15
0.65
0.29

Top Reinforcing
(mm/m )

Bot Reinforcing
(mm/m )

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
21.39
14.85
9.50
5.35
2.38

0.00
0.42
1.67
3.75
6.67
10.42
15.00
20.42
26.67
33.75
41.67
50.42
60.00
70.42
81.67
93.75
106.67
120.42
135.00
150.42
166.67
183.75
201.67
220.42
240.01
260.42
281.67
303.76
326.67
350.42
375.01
400.43
426.68
453.76
481.68
510.43
540.01
570.43
601.68
633.76
666.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SHEAR CHECK AT WALL-BASE JUNCTION TO BS8110 - 1997


Shear force at bottom of wall V =

76.0 kN

Nominal (0.13%)
(mm/m )
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00
455.00

28th Dec 2011

Job Number

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI

Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

Date

Shear stress at bottom of wall v = 0.26 MPa OK


Allowable shear stress vc = 0.41 MPa (based on Wall tensile reinf.)

Sketch of Wall

Design code: BS8110 - 1997

0.10
0.25

0.35

0.30

0.80
1.35

4.00

15.00

25.00

1.70

33.00

0.35
0.20

1.00
9.9kPa

72.1kPa
Wall type: Cantilever
Theory: Coulomb

SFslip = 1.97
SFslip (ULS) = 1.27
SFovt = 2.59
SFovt (ULS) = 1.66

Ka=0.40 (User defined)


Kp=5.85 (User defined)
=0.65 (User def.)
V= 76.0kN
v= 0.26MPa
vc= 0.41MPa

28th Dec 2011

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI

Date

28th Dec 2011

Wall Bending Moments

Moment max = 79.97kNm @ -.350m

Wall Moments
3.50

3.00

Height (m)

2.50

2.00

1.50

1.00

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.00

.500

Bending moment (kNm)

Base Bending Moments

-10.0

Moment max = -90.84kNm @ 1.88m

.100
.200
.300
.400
.500
.600
.700
.800
.900
1.00
1.10
1.20
1.30
1.40
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20

Base Moments

Bending moment (kNm)

-20.0
-30.0
-40.0
-50.0
-60.0
-70.0
-80.0
-90.0
Position (m)

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

Sheet

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI

Date

28th Dec 2011

Wall Reinforcement

Reinf. max = 658.0mm/m @ 0.00m

Wall Reinforcement
3.60
3.40
3.20
3.00

Nominal

2.80
2.60
2.40
Height (m)

2.20
2.00
Back

1.80
1.60
1.40
1.20
1.00
.800 Front
.600

600

500

400

300

100

200

.400
.200

Reinforcement (mm/m)

Base Reinforcement

700

Base Reinforcement

Reinf. max = 666.7mm/m @ 1.76m

650
600
550
Nominal

400
350
300
250
200
Nominal
150

Position (m)

Top

2.20

2.10

2.00

1.90

1.80

1.70

1.60

1.50

1.40

1.30

1.20

1.10

1.00

.900

.800

.700

.600

.500

.400

.300

50.0

.200

100
.100

Reinforcement (mm/m)

500
450

Job Number
Job Title
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : mail@prokon.com

Client
Calcs by

GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
Checked by
SRI
SRI

Schematic Reinforcement

Y12@200 (Hor)
Y12@200 (Hor)
Y16@300 (NF)
Y12@200 (FF)
1-R10/m2 clips
1-R10/m2 clips
Y12@200 starters

FRONT

Y16@250 starters
Y12@200 (T1)
Y16@300 (B1)
Y12@200 (T2)
Y12@200 (B2)
Y12@200

SECTION

Y12@200 (EF)

Sheet

Date

28th Dec 2011