Professional Documents
Culture Documents
Implementation of Environmental Management Action Plan to be executed under Civil Works Contract
11.01 a
A. Carting away the unserviceable materials from work site to the nearest disposal site (up to a lead of 5km) and disposing the same in disposal pits or borrow areas including depositing unserviceable materials in layers and manual compaction. Appendix:1
lead charges up 5 km
Cum
B. The 30 cm top layer of disposal pit shall be provided with good earth, suitable for development of vegetation/plantation. All work shall be carried out as per specifications and approval of the Engineer in Charge sqm
layer thicknes 300mm (top removal soils) 0.3
11.02
Turfing at ground level at disposal pits for unserviceable material as per specifications and approval of the Engineer in Charge.
Sq.m
Regular water sprinkling (at least 4 times) per day at all construction sites for suppression of visible dust levels. Note: This item is to be operated after the completion of earthwork to suppress the visible dust levels. Cost of watering during compaction of earthwork is deemed to be already covered under civil works.
11.03 km
11.04
nos
11.05
11.06
Providing informatory sign boards (informatory /caution messages) for road users for providing information about ecologically sensitive areas, wild life crossing points (if any), important tourist locations, etc as applicable. The specifications of sign boards shall conform to relevant IRC specifications. The locations for informatory sign boards are given in Appendix-4
Sq.m
Construction of 30cm thick clay lined (at bottom and sides) pits for safe disposal of scarified bitumen including carriage (up to a lead of 10km), depositing bitumen in layers of 15 cms with manual compaction and covering the pit with 20cm thick good earth as top layer at ground level all complete as per Typical Drawing as given in the Appenxix:5
11.07 nos
11.08
Turfing at ground level at disposal pits for scarified bitumen as per specifications and approval of the Engineer in Charge.
Sq.m
11.11
no
11.12
Utilisation of unserviceable material obtained from Road way excavation for widening and construction of Cross roads.
Cum
11.13
nos
11.14
nos
11.16
Providing Oil Interceptors at the fuel/oil storage camps or Construction camps as per Typical Drawing in Appendix:8
Nos.
11.17
11.18
11.19
Enhancement of Road Side Ponds including, gardening, Costruction of Parking lots, internal roads, as per Drawing No. U/T/18 Complete with all leads and lift and as directed by Engineer.
No.