LEIGHTON

NOKIA Chennai Plant BATTERY SELECTION CALCULATION I. DATA Type of Battery Rated Voltage Duration for Which DC Load to be met Capacity of the Battery End cell voltage at 10hour rate of discharge No. of Cells No. of Feeders Considered Trip coil rating of VCB at 110 V DC Closing coil rating of VCB at 110V DC : : : : : : : : : Calculation Continuous Load for 8Hours. Indicating Lamps (One per Breaker 3W each) for each Lamp on Announciation window considering One window on transformer feeder (3W per window): Auxiliary relay considering one relay per panel energised continuously (3W per panel) Total Power Required Current at 110 V DC Co-ampere capacity required for 8 hours loading : : : : : 37 Nos. 228 W 2.072 A 16.58 AH 17 AH 111 W 2 Nos. 6W : 37 Nos. 111 W Lead Acid 110 V 8 Hrs. 200AH 1.85 V 60 Nos. 37 Nos. (Based on SLD) 550 W 550 W MAIN RECEIVING STATION

S.M. ENGINEERS & CONSULTANTS

-2-

LEIGHTON

Momentary Load for 1 Minute Tripping of Breakers (Simultaneous Tripping of all Breakers) Power Required Current at 110V DC Ampere hour capacity : Total Ampere Hour Capacity : : Design Margin 20% Temperature Correction 15% Battery Life 25% Total AH capacity required Standard Rating : : : : : : : : 37 x 550 W 20350 W 185A : 185 x 1 /60 x 33.33

102.76 AH 17 AH + 102.76 AH 119.76 AH 23.95 17.96 29.94 191.61 A H 200 AH

Hence 200 AH, 110 V Battery Selected

S.M. ENGINEERS & CONSULTANTS

-3-

LEIGHTON

II. DATA

UNIT SUBSTATION - 1

Type of Battery Rated Voltage Duration for Which DC Load to be met Capacity of the Battery End cell voltage at 10hour rate of discharge No. of Cells No. of Feeders Considered Trip coil rating of VCB at 110V DC Closing coil rating of VCB at 110V DC Calculation Continuous Load for 8Hours. Indicating Lamps (One per Breaker 3W each) for each Lamp on Announciation window considering

: : : : : : : : :

Lead Acid 110V 8Hrs. 60AH 1.85V 60Nos. 10Nos. 550W 550W

10Nos. 1No. 10Nos. 63W 0.573A 4.58AH 5AH

30W 3W 30W

One window on transformer feeder (3W per window): Auxiliary relay considering one relay per panel energised continuously (3W per panel) Total Power Required Current at 110V DC Co-ampere capacity required for 8 hours loading : : : : : Momentary Load for 1 Minute Tripping of Breakers (Simultaneous Tripping of all Breakers) Power Required Current at 110V DC Ampere hour capacity : : :

10 x 550W 5500W 50A : : 50 x 1 /60 x 33.3 27.775AH Say:28AH

S.M. ENGINEERS & CONSULTANTS

-4-

LEIGHTON

Total Ampere Hour Capacity

: :

5 AH + 28 AH 33 AH 6.6 AH 4.95 AH 8.25 AH 52.8 AH 60 AH

Design Margin 20% Temperature Correction 15% Battery Life 25% Total AH capacity required Standard Rating

: : : : :

Hence 60AH, 110V Battery Selected

S.M. ENGINEERS & CONSULTANTS

-5-

LEIGHTON

III. UNIT SUBSTATION - II DATA Type of Battery Rated Voltage Duration for Which DC Load to be met Capacity of the Battery End cell voltage at 10hour rate of discharge No. of Cells No. of Feeders Considered Trip coil rating of VCB at 110V DC Closing coil rating of VCB at 110V DC : : : : : : : : : Calculation Continuous Load for 8Hours. Indicating Lamps (One per Breaker 3W each) for each Lamp on Announciation window considering One window on transformer feeder (3W per window): Auxiliary relay considering one relay per panel energised continuously (3W per panel) Total Power Required Current at 110 V DC Co-ampere capacity required for 8 hours loading : : : : : Momentary Load for 1 Minute Tripping of Breakers (Simultaneous Tripping of all Breakers) Power Required Current at 110 V DC Ampere hour capacity : : : : 7 x 550W 3s850W 35A : 35 x 1 /60 x 33.33 Say:20AH 7Nos. 45W 0.409A 3.273AH 3.3AH 21W 1No. 3W : 7Nos. 21W Lead Acid 110V 8Hrs. 40AH 1.85V 60Nos. 7Nos. 550W 550W

19.45AH

S.M. ENGINEERS & CONSULTANTS

-6-

LEIGHTON

Total Ampere Hour Capacity

: :

3.3AH + 20AH 23.3AH 4.66AH 3.495 5.825 37.28AH 40AH

Design Margin 20% Temperature Correction 15% Battery Life 25% Total AH capacity required Standard Rating

: : : : :

Hence 40AH, 110V Battery Selected