APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

1.

General. Transition of C2 responsibilities will be viewed as an implied task in XVIII Airborne Corps operations. This transition may be the assumption of C2 from another headquarters or the passing of the C2 function to another organization. The attached Corps checklist serves as a base-line checklist for such transition operation. This checklist invariably, will require changes/modifications depending on the particular situation, the approved conditions for transition, and the factors of METT-T. The transition operation/activities will be coordinated by a Transition Team formed by representatives from each staff section and headed by a G3 Current Operations Officer. Prior to any transition operation, the Transition checklist will be coordinated and approved by both headquarters involved in the transition.

2.

TABS: A. Transition Procedures B. Transition Sequence

C-5-1

TAB A TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII ABN CORPS FSOP C. 1. Transition Checklists General.

a. G3 Operations will maintain proponency for all Transition activities. b. All Corps staff sections will be prepared to provide a member to the Corps Transition Team. c. The "Conditions for Transition" formulated for each transition operations will form the basis for all transition activities. d. Conditions for Transition will be originated by the outgoing headquarters and jointly approved by the outgoing Cdr, incoming Cdr and higher headquarters for the outgoing unit. e. A standard Transition Checklist will be maintained by all Corps staff sections and will serve as the basis for coordination with counterpart staff sections during transition activities. 2. Responsibilities.

a. G3 Plans and G3 Operations will publish the formal Conditions for Transition. b. All staff sections will: (1) (2) briefings. 3. Briefing Formats. a. The initial briefing, given by the outgoing staff, will follow the format of the Corps Daily (1700) Update Briefing. The purpose of the briefing is to acquaint the incoming CDR/Staff with the mission, intent, concept of operations, task organization, Appoint a member to the Transition Team. Update applicable transition checklist. (3) Provide briefer for required transition

C-5-A-2

TAB A TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII ABN CORPS FSOP current situation, future missions, and status of all combat service and combat service support elements. The briefing will end with a thorough discussion of the Conditions for Transition and known issues. b. The final briefing, given by the incoming staff, should be in the format of a decision briefing. The briefing will address the status of each Condition for Transition, any outstanding issues, the recommendation to accept/not accept transition, and the recommended effective date/time for the transition.

C-5-A-3

TAB B (TRANSITION SEQUENCE) TO APPENDIX 5 (BATTLE FIELD TRANSITION PROCEDURE) TO ANNEX C (OPERATIONS) TO XVIII ABN CORPS FSOP The following sequence assumes that the XVIII Airborne Corps HQs is the Current JTF (or ARFOR) HQs and is handing off those duties to another Headquarters: o Conditions for Transition developed by G3 Opns/G3 Plans.

o Conditions for Transition coordinated with all Corps staff sections. o Transition Team briefs the Corps G3 or Chief of Staff on proposed Conditions for Transition. o Conditions for Transition forwarded Headquarters for input/concurrence. to incoming unit

o Concurrence/comments on Conditions for Transition received from incoming unit. o Final Conditions for Transition approved by Corps CG/CofS. to higher

o Final Conditions for Transition forwarded headquarters and incoming unit headquarters.

o Schedule for Transition activities forwarded to higher headquarters and incoming unit headquarters. o Corps Transition Team meets with incoming unit staff, using Transitions Checklists, to coordinate transition activities and identify issues. o Corps Transition Team gives initial Transition briefing to the Corps CG and incoming CG and key staff members (briefing format IAW para 3, page A-7-A-1). o Transition required. team coordination meeting(s) conducted, as

o Incoming staff to status of each briefing should transition should

briefs CG of incoming and outgoing units as Condition for Transition. Format for this be a Decision Brief to determine if/when take place.

o Joint decision by Corps Cdr/Incoming Cdr to execute the transition.

C-5-B-4

TAB B (TRANSITION SEQUENCE) TO APPENDIX 5 (BATTLE FIELD TRANSITION PROCEDURE) TO ANNEX C (OPERATIONS) TO XVIII ABN CORPS FSOP o Message sent by outgoing unit to higher headquarters (Info copy to subordinate and adjacent units) announcing that Conditions of Transition have been met and that transition will take place at a specific date/time. o Transition occurs

C-5-B-5

TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 1. The following checklists are enclosed: J1/G1/Medical/Chaplain J2/G2 J3/G3 Operations J3/G3 Air J3/G3 Air Defense (Counter Air) J3/G3 Electronic Warfare J3/G3 Aviation J3/G3 Psyop/Civil Affairs J3/G3 NBC Fire Support Element J4/G4 J5/G5 J6/G6 Engineer Staff Judge Advocate Provost Marshal Headquarters Commandant Liaison PAO

ENCL 1 ENCL 2 ENCL 3 ENCL 4 ENCL 4 ENCL 4 ENCL 4 ENCL 4 ENCL 5 ENCL 6 ENCL 7 ENCL 8 ENCL 9 ENCL 10 ENCL 11 ENCL 12 ENCL 13 ENCL 14

(Actual checklists are published separately by the Corps G3)

C-5-C-1

ENCL 1 (J1/G1 PERSONNEL TRANSITION CHECKLIST) TO TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX A (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

J-1/G-1 1. JTF Task Organization

Current Task Organization (Units, Strength, Critical Shortfalls). Future/Projected Task Organization 2. Review of Critical Actions Past 7 days Current/Ongoing Next 14 days 3. Medical Support Systems

Hospitals/Medical Units remaining in theater Method of handling soldiers returned to duty Theater EVAC Policy Evacuation Procedures (Routing, time delays, key players, tracking) 4. Graves Registration System

Theater Processing Policy Active GREG sites Remains evacuation (Routing, handling procedures, escorts, priorities, time delays, key players, tracking) 5. Personnel Strength Reporting System Current Unit Strengths Projected Strengths Reporting Procedures (Forms, suspenses, key players) COMMS and Automation assets available 6. Casualty Reporting/Notification System Component Service Procedures CONUS POCs for JTF Reporting JTF Reports required to higher. C-5-C-1-7

ENCL 1 (J1/G1 PERSONNEL TRANSITION CHECKLIST) TO TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX A (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP In theater notification requirements. 7. PERSONNEL REPLACEMENT SYSTEM. Component Service Requirements. Facilities available/number of replacements daily or weekly. In theater notification requirements. JTF HQ individual replacement procedures. 8. JTF HQ PERSONNEL SERVICE SUPPORT SYSTEMS. Admin Support. Finance Support. Personnel Records. 9. (ICRC). UN, other relief agencies. US Civilians working/ living in theater --Expertise available, potential liaison/employees. MWR opportunities in theater -- PX sites, Exchanges and IMPRESS, Phone Home sites, Rest and Relaxation sites/contracts. 10. SUPPORTING J-1 FAMILY STAFF SYSTEMS. JTF Command IG. service procedures for support; theater. Chaplain -- Component religious considerations in OUTSIDE SUPPORT AGENCIES OPERATING IN THEATER. International Committee of the Red Cross

Staff Judge Advocate -- Cases pending; Status of Forces Agreement with host nations; Off limits Areas/Establishments; Rules of Engagement. See TAB 8.

C-5-C-1-8

ENCL 1 (J1/G1 PERSONNEL TRANSITION CHECKLIST) TO TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX A (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP Adjutant General/Theater Admin -- Theater Awards policy; Theater Pass/Leave policy; Theater Tour Policy; Promotion policy; Component Service procedures. Chaplain Checklist (Religious Support) 1. JTF Task Organization Current ministry teams in theater. Religious coverage plan. Faith group balance and critical shortfalls. Ministry augmentation (contract clergy, lay support). 2. Review of Critical Tasks

Religious support plans. Religious issues for operational planning/sustainment. Specific Service Component (SC) ministry tasks. Command tasking. 3. Chaplain Technical Channel SC POCs for manpower, tasking, logistics. SC POCs for enlisted assignments. SC and JTF policies governing religious support. Ecclesiastical supplies. Contributions (literature, Audio/Visual, money). 4. Medical Support Systems Chaplains assigned to medical facilities. Casualty ministry plans. Battle stress programs. 5. Memorial Ceremony, Service, Funeral Command involvement. Religious support. 6. Reports Reports required by others. Reports received/required by JTF from subordinates. C-5-C-1-9

ENCL 1 (J1/G1 PERSONNEL TRANSITION CHECKLIST) TO TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX A (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP Daily log. Official correspondence.

7.

Outside Agencies Missionary and parachurch groups in theater. International and American Red Cross. Orphanages. MWR opportunities.

8.

Supporting Staff Systems J-1 personnel, MWR. J-3 force flow, task organization, battle ministry

plans. Civil Affairs -- Country analysis, religious orientation, displaced civilians. Staff Judge Advocate -- SOFA, ROE, contributions. Medical -- casualty ministry, battle stress intervention.

C-5-C-1-10

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP J2/G2 INTELLIGENCE TURNOVER CHECKLIST 1. Current Situation. A. AIR SITUATION.

B.

NAVY SITUATION.

C.

POLITICAL AND ECONOMIC SITUATION.

D.

GROUND SITUATION. (1) MANEUVER.

(2)

ARTILLERY.

(3)

AIR DEFENSE.

(4)

INTELLIGENCE.

(5)

MOBILITY/COUNTERMOBILITY/SURVIVABILITY.

C-5-C-2-11

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (6) LOGISTICS.

(7) COMMAND/CONTROL/COMMUNICATIONS.

(8)

NBC.

(9)

DECEPTION.

E.

THREAT STRENGTH. (1) % STRENGTH OF UNITS.

(2)

EQUIPMENT.

(3)

WEAPONS.

F.

THREAT VULNERABILITIES.

C-5-C-2-12

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP G. THREAT CAPABILITIES.

H.

PREDICTIONS.

2.

FRIENDLY INTELLIGENCE SITUATION. A. COLLECTION PLAN.

(1)

IMINT.

(A)

REQUIRED COVERAGE.

(B)

FOCUS (EEI/PIR).

(2)

SIGINT.

(A)

REQUIRED COVERAGE.

(B) NODES).

FOCUS (EEI/PIR TRANSLATED INTO EMITTERS AND

(3)

HUMINT.

C-5-C-2-13

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (A) NAIs.

(B)

SURVEILLANCE.

(C)

CI/IPW.

(D)

DOCEX.

(4)

COLLECTION ASSET STATUS. (A) ASSETS.

(B) HRS.

ASSET SCHEDULE - PREVIOUS 24 HRS; NEXT 24

(5)

POCs.

(6)

DOWNLINKS/COMMO/INTEL.

C-5-C-2-14

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (7) TIMES). REPORTING TIMES (COLLECT TIME TO REPORT IN HAND

(8)

COS/DEA/STATE.

B.

LISTS OF STAY BEHIND ELEMENTS. (1) INTELLIGENCE ASSETS.

(2)

COMMS ARCHITECTURE/FREQUENCIES.

(3)

CIA.

(4)

DIA NMIST.

(5)

JCMEC/FMIB.

C.

SIGINT. (1) TECH DATA (ADDS/CHANGES/DELETES).

(2)

MSCF.

C-5-C-2-15

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP D. EPW.

(1)

NUMBERS/LOCATION/CAT A/SOFA.

(2)

HANDOVER TO JTF/ARFOR.

(3)

HOST NATION HANDOVER.

E.

HOST NATION INTEL/SECURITY.

(1)

SUPPORT/ASSETS/COMMO.

(2)

POCs/LNOs.

3.

KEY TERRAIN.

4.

MAP UPDATES AND CORRECTIONS.

5.

BLACK, WHITE, AND GRAY LISTS.

C-5-C-2-16

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

6.

INTELLIGENCE COLLECTION PLAN.

7.

COORDINATION FOR STAY BEHIND PERSONNEL.

8.

COVER/SECURITY/OPSEC STATUS AND PLAN.

9.

LIST OF STAY BEHIND PRODUCTS.

A.

INTEL MAP W/CURRENT SITUATION.

B.

ALL SOURCE INTEL SUPPORT.

C.

IMAGERY PRODUCTS.

C-5-C-2-17

ENCL 2 (J2/G2 INTELLIGENCE TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP D. DATA. CURRENT WEATHER FORECAST/ON-HAND WEATHER AND LIGHT

10 ENCLOSURES 1. LIST OF THREAT, STRENGTH/CAPABILITIES/COURSE OF ACTION/WEAKNESS AND VULNERABILITIES/EFFECTS OF FRIENDLY ACTION. 2. 3. 4. 5. 6. 7. 8. 9. THREAT SITUATION OVERLAY (S). TROOP LIST OF FRIENDLY COLLECTORS. FRIENDLY COLLECTOR LOCATION OVERLAY (S). INTELLIGENCE COMMUNICATIONS NET DIAGRAM (S). KEY TERRAIN OVERLAY (S). MAP UPDATES AND CORRECTIONS (MAY BE OVERLAY {S}). BLACK LIST. WHITE LIST.

10. GREY LIST. 11. INTELLIGENCE COLLECTION PLAN.

C-5-C-2-18

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

TRANSITION CHECKLIST (J3 OPERATIONS/C2) General Guidelines Battlefield transition conditions achieved (bottom line factors for transition conditions should "paint" battlefield disposition for a smooth transition). Minimize disruptions to tactical disposition of forces. Minimize friendly vulnerabilities. Outgoing force is responsible for tactical emergencies until incoming force assumes control. Key characteristics of handover process are:

Rapid as possible, but thorough, coordination and execution must be present. All battlefield synchronized/reviewed. operating systems must be

Deception/security is essential.

Enemy disposition/probable COAs next 24 hours is critical consideration. - Final check of enemy/friendly dispositions (air, ground, sea), C3, and planned activities for next 12 hours is an essential point just prior to handover. Planning, coordination, and execution of transition are not complete until all units are fully aware of transition (communicated and acknowledged via multiple means).

C-5-C-3-19

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

TRANSITION CHECKLIST (J3 OPNS/C2 CONTINUED) 1. Locations of: OUTGOING UNIT CG DCG/XO CofS G3 2. C3 Facilities/Status: OUTGOING/STATUS INCOMING/STATUS MAIN FWD ASSAULT AIRBORNE ISB / / / / / / / / / / INCOMING

3. Review Current Mission statement for outgoing unit and Higher Headquarters. 4. Review of Commanders Intent for Higher HQs and outgoing commander. 5. Review Follow-up missions currently assigned to outgoing unit. 6. Review Present Task Organization/Command Relationships.

7. Review Proposed Task Organization/Command Relationships (Effective after Transition). 8. Review Concept of Operation, by Phase, for Key Units.

C-5-C-3-20

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP a. Outg tical Information Requirements (CCIR). 12. Review of all required reports, to include submission times, formats etc. 13. Review of current disposition of all friendly units in the AO/JOA. 14. Handover of files, to include: a. b. c. d. All orders from outgoing & Higher Headquarters. Copies of significant activities for the operation. Copies of all outgoing SITREPS. Updated/posted Operational Maps.

J3, ANTI-AIR WARFARE CELL (ADE) TRANSITION CHECKLIST DATE/TIME GROUP: LOCATION OF BRIEFING: AIR DEFENSE ELEMENT 1. Enemy: a. Air Order of Battle (AOB). Techniques, tactics, and procedures of threat

b. aircraft. c. 2.

TBM threat/locations.

Friendly: a. b. Air order of battle. Joint ADA assets, task organization and locations.

C-5-C-3-21

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP c. d. e. 3. Host nation/allied ADA. ADA Liaison (higher adjacent & lower). Techniques, tactics and procedures for airbattle.

Early warning sources: a. b. c. AWACS availability/Rivet Joint/TRAP Broadcast. CRC/TACC/TAOC locations. HIMAD/AAW locations.

4.

Who is designated as: a. b. c. d. JFACC. ADE. AADC. AAW Cdr.

5. 6. 7. 8. 9.

C2 architecture for HIMAD systems. Existing air space control measures. Existing emission control (EMCON). Existing rules of engagement (ROE). Current ADW and WCS.

10. AD priorities. 11. Existing SOPs. XVIII ABN CORPS AIR DEFENSE ELEMENT I. SITUATION. a. Operations previous 12 hours.

C-5-C-3-22

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP b. Current/projected operations next 24 hours. c. II. Preplanned operations 24 - 48 hours.

COMMUNICATIONS. a. b. c. Type Equipment (AM, FM, VHF, etc). Frequencies/call signs/telephone numbers. Existing communications problems.

III.

AUGMENTATION REQUIREMENTS NONE "ELECTRONIC WARFARE CHECKLIST"

1. 2. 3. 4.

Restricted Frequency List: EWO Call Sign and Frequency, Methods of contacting him: Call Signs and Frequencies of any EAC assets: EW Priorities/Targets: System: Frequencies: Associated to which Level of Command

5.

Assets Available: Corps/Division Organic Assets: OPCON or Attached Assent: EAC Assets:

6.

Activities: Past: Present:

C-5-C-3-23

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP Expected Future:

7.

ECM Effectiveness: Technical Data, i.e., Freqs, Associated Units, Call Signs. TRANSITION CHECKLIST FOR AVIATION OPERATIONS

1.

SITUATION A. B. CURRENT AVIATION ACTIVITIES ENEMY THREAT TO ARMY AVIATION

2.

OPERATIONS A. B. C. D. E. CURRENT LOCATION OF AVN UNITS HAZARDS TO FLIGHT (WIRES, OBSTACLES) LOCATION OF HLX (SURVEYED/UNSURVEYED) ACTIVE AIRDROMES/AIRPORTS/AIR STRIPES STATUS OF NAVAIDS/FOC/FCC

3.

CSAR A. ONGOING CSAR MISSIONS - STATUS - FREQ/CALLSIGNS - LOCATIONS - ISOPREP DATA AVAILABLE SAR CAPABLE AVIATION ASSETS POC FOR SAR ISSUES (HOST NATION SUPPORT)

B. C. 4.

LOGISTICS A. B. ACTIVE FARPS IN THEATER HOST NATION SUPPORT AVAILABLE CMO HANDOFF CHECKLIST (JTF) C-5-C-3-24

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP UNITS DATE 1. POC's HN USEMB International Relief Agencies U.S. Business Leaders 2. 3. Treaties and Agreements in effect. Civilian Situation: a. b. Attitude of the local population. Ability of local population to care for itself. now next 48 hours. c. Medical condition of civilian population /POC /POC

d.

Capability of national government to function.

e. Ability care/handle DCs.

of

government/HN

military

forces

to

f. Current population of major cities, towns, and villages in AO. g. h. Current number of DCs: Flow of DCs/means of travel.

C-5-C-3-25

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP i. Location and status of DC collection points, assembly areas and DC camps. j. Civilian humanitarian use. k. l. m. n. o. resources available for military and

Availability of labor in AO. Relief agencies and type of support available. Status of public health and sanitation. Status of public services/facilities. CMO programs currently in place.

p. Recommendations on implementing follow-on civic action programs. q. Civil information programs currently in place. Recommended. r. Ability of host nation to protect populace form NBC contamination and support decontamination operations. s. Terrorist or guerrilla activity civilian population or the conduct of CMO. 4. affecting the

Item of political, cultural, or economic value in AO. (i.e. archives, monuments, banks, mines, museums/objects of art, etc.)

C-5-C-3-26

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 5. CA units/teams available.

6.

PSYOP Integration into CA activities.

JTF HANDOFF CHECKLIST J3/NBC DIRECTORATE 1. Personnel/Admin Issues. a. b. 2. JTF/MSC 74A strength/shortages. JTF/MSC 54B strength/shortages.

Intelligence Issues.

a. Does the enemy possess nuclear devices, biological agent weapons, chemical or riot control agents? b. Has the enemy used special weapons to date? special

c. Does the enemy possess the resolve to employ weapons?

d. What agents have been used? What delivery systems were used? What were prevailing azimuths of SSM attacks? 3. Operational Issues.

a. Has the NCA/JCS/CINC delegated nuclear/chemical/ RCA release authority to JTF? b. Has the NCA/JCS/CINC nuclear/chemical/RCA release? issued constraints to

C-5-C-3-27

ENCL 3 (J3/G3 OPERATIONS TRANSITION CHECKLIST)TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP c. Has the JTF/Corps delegated nuclear/chemical/RCA release authority to MSC/TF commanders? 4. Logistical Issues.

a. MSC/TF NBC defense end item status(number on hand and operational): (1) (2) (3) (4) (5) b. M93 NBCRS FOX M157 Smoke generator system M1059 Smoke generator system M17 SANATOR decon system M12 decon apparatus

MSC/TF NBC CDE/IPE status(GREEN/AMBER/RED/BLACK): (1) (2) (3) (4) BDU/CPOG stockage Protective mask availability NBC First Aid items (NAAK, NAPP, CIPRO, etc) NBC Detection equipment

C-5-C-3-28

ENCL 4 (FIRE SUPPORT OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP FIRE SUPPORT HANDOVER CHECKLIST 1. ENEMY SITUATION: A SHORT PARAGRAPH OF THE ENEMY SITUATION KEYING ON HIS INDIRECT FIRE SUPPORT, AIR DEFENSE AND EW ASSETS 3AND THEIR LOCATIONS. 2. FRIENDLY SITUATION: ADDRESS WHICH FRIENDLY UNITS ARE IN THE AREA, WILL THERE BE ANY STAY BEHIND TEAMS OR RECON TEAMS, AND THEIR LOCATIONS. 3. FIRE SUPPORT: A. B. PRIORITY OF FIRES. FIRE SUPPORT ASSETS: (1) (a) (b) (c) (d) (e) (f) (g) AVAILABLE. (i) AIR FORCE (JFACC). TYPE AND NUMBER OF AIRCRAFT AVAILABLE. (DON'T FORGET SOF AIRCRAFT) JFACC COMMAND AND CONTROL STRUCTURE. ATO CYCLE (CRITICAL TIMES). TARGET NOMINATION CHANNELS AND PROCEDURES. CURRENT AND FUTURE APPORTIONMENT AND ALLOCATION. ORDINANCE AVAILABLE (TYPE AND QUANTITY). RULES OF ENGAGEMENT FOR AF AIRCRAFT. (h) RECONNAISSANCE AND SURVEILLANCE ASSETS SPECIAL CONSIDERATIONS * GATOR (MINES DELIVERED/PLANNED). * PLANNED SEAD. * EW AIRCRAFT AVAILABLE. NAVAL ASSETS. NAVAL AIR. SHIP TYPES/NAMES. WPNS SYSTEMS/ORDNANCE. FIRE SUPPORT AREA/FIRE SUPPORT STATION (FSA/FSS). SPECIAL CONSIDERATIONS. TLAMS.

(2)

C-5-C-4-29

ENCL 4 (FIRE SUPPORT OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (3) FIRE SUPPORT COORDINATION MEASURES. EXCHANGE OVERLAYS/GRIDS. WHAT MEASURE ARE IN EFFECT AND FOR HOW LONG. WHAT MEASURES ARE NO LONGER IN EFFECT. PROPOSED FSCM'S. (4) (5) RULES OF ENGAGEMENT - COMPARE OURS WITH THEIRS. LOOK FOR CHANGES OR UPDATES. TARGETING. GENERAL REVIEW/EXCHANGE OF TARGET INFORMATION. TARGETS SERVICED (STATUS/TDA). REVIEW AND ISSUE UPDATED TARGET LIST. TARGETS OUTSTANDING (STATUS/TDA). TARGETS PROPOSED (ALREADY IN ATO CYCLE). HVT/HPT. CHECK TARGET NUMBERING. TARGET NOMINATION SUBMISSION TIMES. PROTECTED TARGET LIST. TARGET VALIDATION TIMES AND PROCEDURES. COMMUNICATIONS NETWORK. COMPARE SYSTEMS AND DEVELOP A MEANS TO WITH STAY BEHIND TEAMS OR ASSETS. (7) *NOTE* COORDINATING INSTRUCTIONS. REPORTING. THERE WILL NOT BE ANY ADDITIONAL PERSONNEL OR EQUIPMENT REQUIREMENTS FOR BATTLE HANDOVER

(6) COMMUNICATE

C-5-C-4-30

ENCL 5(J4/G4 LOGISTICS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP TRANSITION CHECKLIST J4 OPERATIONS 1. Current mission and any planned future missions in the AOR. 2. Current supporting unit task organization; how long and how much will the units need to be supported 3. Current logistic concept of support 4. Current priority of support and proposed priority of support for future operations. 5. Locations/Status of logistical units, ISB's, LSA's, etc., and how long they are to remain in place.

6. Status of supplies on hand (including some source of supply): CLASS CLASS CLASS CLASS CLASS CLASS CLASS CLASS CLASS CLASS OTHER 7. I _____________________________________________ II _____________________________________________ III _____________________________________________ IV _____________________________________________ V _____________________________________________ VI _____________________________________________ VII _____________________________________________ VIII_____________________________________________ IX _____________________________________________ X _____________________________________________ _____________________________________________

Status of fixed facilities (military and Host Nation): ISB'S_____________________________________________ LSAs _____________________________________________ CACHE'S_____________________________________________ PORTS _____________________________________________ AIRFIELDS _____________________________________________ C-5-C-5-31

ENCL 5(J4/G4 LOGISTICS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP BUILDINGS _____________________________________________ POL _____________________________________________ WATER _____________________________________________ BUILDINGS _____________________________________________ HOSPITALS _____________________________________________ KIA COLLECTION POINTS 8. Current reporting system and reports that are in place.

9. Transportation. a. Airfield capabilities/ADAG operations b. Sea lift requirements/port capabilities c. Intratheater/intertheater airflow/airdrop and requirements d. Assets available (Military and Host Nation) e. MCC Validation procedures f. Rail availability/capability 10. Supply and Service: a. Existing inter-service support agreements b. Pre-position war reserve material stocks Availability c. Petroleum resource availability and procedures d. Laundry and bath support available e. Mortuary Affairs f. Current CL I ration cycle and break down points 11. Maintenance: a. Facilities available b. Current support available and how long will it remain in place c. Host Nation support available (PWRMS)

capabilities

C-5-C-5-32

ENCL 5(J4/G4 LOGISTICS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 12. Current and expected Civil Military Operations (CMO/Humanitarian relief support requirements 13. Current NEO requirements and their expected duration 14. Host Nation Support Available: a. All Classes of supply b. Transportation - land, sea and air: c. Maintenance d. Services MA, Laundry, Bath, etc.: 15. Points of Contact: POC Phone# Activity Location

JTF SURGEON-MEDICAL TRANSITION CHECKLIST 1. Current JTF/components. 2. 3. mission (operational and medical) for

Planned future mission for JTF and components. Current task organization. a. b. Overall. Medical task organization. evacuation policy/anticipated or required

4. Current changes. 5.

Current concept of medical support for each component.

6. Current priority of medical support and proposed changes for future operations.

C-5-C-5-33

ENCL 5(J4/G4 LOGISTICS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 7. Current locations of medical units-MEDLOC2 Report/map review. a. b. c. d. e. f. g. h. Command and control units. Level I units. Level II units. Level III units. Level IV/V units. Fixed facilities/HNS facilities. Surgical units. Evacuation units. (1) Ground evacuation units. (2) Air evacuation units. i. j. k. l. m. n. 8. Aeromedical staging units. Combat stress units. Medical logistics units. Preventive medicine units. Veterinary units. Dental units.

Current status of medical operating systems. control and communications

a. Command, status/connectivity. b. c. d. Hospitalization system.

Surgical status/backlog. Evacuation system.

C-5-C-5-34

ENCL 5(J4/G4 LOGISTICS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (1) Air and ground evacuation. (2) Intra-theater and inter-theater aeromedical evacuation. e. f. g. h. i. j. k. Patient regulating system (joint and component). Joint Blood Program/blood supply system. Class VIIIA supply system. Medical equipment maintenance services. Preventive medicine services. Veterinary services. Dental services.

9. Current reporting system status/reports modifications and problems.

10. Current and projected special support requirements and duration. a. Medical support to Civil Military Operations (CMO). support to Non-combatant Evacuation

b. Medical Operations (NEO). c. d. e.

Medical support for detainees and/or EPWs. Medical support for displaced civilians/refugees. Medical support for designated "special personnel".

11. Point of contact listings. POC Fax Location Phone Radio

C-5-C-5-35

ENCL 5(J4/G4 LOGISTICS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP a. ARFOR b. AFFOR

c. d. e. f.

NAVFOR MARFOR JSOTF CINC Unified Command Surgeon JMRO JBPO ASMRO Others

g. h. i. j.

C-5-C-5-36

ENCL6(J5/G5 TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (COMMAND AND CONTROL) TO XVIII AIRBORNE CORPS FIELD SOP 1. Situation. Discuss critical events and decision points yet to Location of forces.

a. occur. b.

c. Discussion considerations for increasing or modifying force array/task organization/command relationships. 2. 3. Mission. Review proposed mission.

Operations. Review conditions for transition to subsequent

a. phases. b. c. d.

Discuss/review branches and/or sequels yet to occur. Review follow-on branches/sequels. Review proposed intent.

C-5-C-6-37

ENCL 7(J6/G6 COMMUNICATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP J6/G6 CLASSIFICATION JSOTF-JTF C3 TRANSITION CHECKLIST POINTS OF CONTACT: JTF J6 JSOTF J6 AIR COMP CMD ARFOR G6 MARFOR G6 NAVFOR N6 1. TRANSITION NET(S) STATUS: a. SINGLE CHNL TACSAT SAT: UPLINK DNLINK AZ EL COMSEC BANDWIDTH b. VHF-FM FREQ: MANUAL: QUE: COMSEC: FREQ: COMSEC: FREQ: (LOW) FREQ: (MED) FREQ: (HIGH) COMSEC: (e.g. 100OW)

(5KKz OR 25 Khz)

c. d.

UHF-AM HIGH FREQ (HF)

2. 3.

CEOI STATUS: COMSEC STATUS VINSON KG 94/81 OTHER

C-5-C-7-38

ENCL 7(J6/G6 COMMUNICATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 4. RECOGNITION SIGNALS a. b. c. d. 5. SIGN/COUNTERSIGN RUNNING PASSWORD NUMBER COMBINATION VISUAL

FREQUENCIES/TACSAT ACCESS AVAILABLE a. b. c. d. e. f. JTF a. S/C TACSAT CHNLS AVAILABLE: UHF-AM: VHF-FM: HF: VHF-AM: "BRICK" VHF/UHF: ASSAULT CP C3 STATUS: SATCOM. NET: JTF COMMAND SAT: UPLINK: DNLINK: AZ EL COMSEC ACCESS PERIOD NET: JTF O/I OR DATA SAT: UPLINK: DNLINK: AZ EL COMSEC ACCESS PERIOD NET: JTF ASIDS/THMT SAT: UPLINK: DNLINK: AZ EL COMSEC ACCESS PERIOD C-5-C-7-39

6.

ENCL 7(J6/G6 COMMUNICATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP NET: ARFOR COMMAND SAT: UPLINK: DNLINK: AZ EL COMSEC ACCESS PERIOD NET: JSOTF CMD SAT: UPLINK: DNLINK: AZ EL COMSEC ACCESS PERIOD b. VHF-FM JOINT BATTLE AREA CMD FREQ: MANUAL: QUE: COMSEC: HIGH FREQ COMMAND (TACSAT BACKUP) FREQ: (LOW) FREQ: (MED) FREQ: (HIGH) UHF-AM COMMAND (OR AIR COMPONENT TACSAT) FREQ: COMSEC:

c.

d.

e. (1) (2)

INMARSAT TERMINALS LOCATION NUMBER

C-5-C-7-40

ENCL 7(J6/G6 COMMUNICATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (3) (4) (5) (6) (7) f. DATA RATE HUB 1 HUB 2 SHF/GMF MESH/HUB/SPOKE LINKS AVAILABLE: DATA RATE SPOKE 2 SPOKE 2 DATA RATE SPOKE 3 SPOKE 3 DATA RATE

DATA RATE SPOKE 1

SPOKE 4______ SPOKE 4_____

SPOKE 1

C-5-C-7-41

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP ENGINEER TRANSITION CHECKLIST 1. Command and Control a. Each Unit (1) (2) (3) (4) (5) (6) (7) (8) (a) Designation. Type unit. Capabilities. Equipment. Location. Special requirements. Commander. Administrative. Current SITREP from each subordinate unit. (To include all service components).

(b) Copies of all engineer overlays with codes and numbering systems. (c) Turnover of all target folders, mine field reports, reconnaissance reports, etc. (d) Communications/security data (Call signs, phone books, etc.). b. c. d. e. Command and support relationships. Priorities of work. Alternate headquarters. Time phasing of unit deployments.

C-5-C-8-42

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 2. Rear operations. a. b. c. d. 3. Base clusters. Area damage control plan. Engineer POC,s. Facilities.

Host Nation interface. a. Real estate. (1) (2) (3) (4) (5) b. Acquisition policy. Maintenance policy. Disposal policy. Current real estate holdings. Future requirements.

Support. (1) (2) (3) (4) Current engineer support agreements. Civilian construction organizations available. Construction materials available. Current support contracts.

c.

Engineer units (1) (a) (b) (c) Each Unit Designation. Type unit Capabilities

C-5-C-8-43

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (d) (e) (f) (g) (h) (1) Equipment Location Special requirements Commander Administrative. Current SITREP.

(2) Copies of all engineer overlays with codes and numbering systems. (3) Turnover of all target folders, mine field reports, reconnaissance reports, etc. (4) Communications/security data (Call signs, phone books, etc.). (2) (3) (4) (5) d. Command and support relationships. Priorities of work. Alternate headquarters. Time phasing of unit movements.

Working groups or boards. (1) (2) (3) (4) Chairman. Composition. Meeting location and frequency. Charter or purpose.

4.

Construction planning and management. a. Plans or studies.

C-5-C-8-44

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP b. c. d. Construction standards and policies. Theater priorities of work. Joint Civil Military Engineer Board. (1) (2) (3) (4) (5) e. Charter or purpose. Chairman. Organization. Procedures. Meeting location and frequency.

Other working groups or boards. (1) (2) (3) (4) (5) Charter or purpose. Chairman. Organization. Procedures. Meeting location and frequency.

5.

Engineer work. a. b. c. d. Airfields - maintenance and repair. Ports - maintenance and repair. Roads - MSR maintenance and repair. Bridging (standard/non-standard/float). (1) Assets available (not installed) and location.

(2) Installed bridging - location, length, load, classification.

C-5-C-8-45

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 6. Base development. a. Base development plans under study. (1) (2) (3) (4) theater. (6) (7) (8) (9) Standards of construction. Theater hospitalization policy. Theater climatic conditions. Time phasing of force deployment. Total force structure to be supported. Expected duration of force deployment. Types of equipment to be employed. Mission and operational objectives. (5) Number of days of supply to be stocked in

(10) LOC requirements. (11) Utility requirements. (12) Environmental requirements. (13) Real estate requirements. (14) Time phased construction requirements. b. 7. Inventories of available facilities.

Real property maintenance activities. a. Service facilities maintained. (1) (2) Electrical power. Potable water supply.

C-5-C-8-46

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (3) (4) b. Waste water collection. Telephone systems.

Fire protection. (1) (2) Host nation support. Fire fighting units.

c.

Refuse collection and disposal. (1) (2) (3) (a) (b) (4) (a) (b) (c) Policy. Current contracts. Land fill sites. In operation. Closed. Hazardous waste sites. Medical. Petroleum. NBC.

8.

Engineer logistics. a. Class IV (Wire, pickets). (1) (2) b. Locations, quantities, procedures and problems. Host nation support.

Class V. (1) Locations, quantities, procedures and problems.

C-5-C-8-47

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (2) c. Host nation support.

Class VII.

(1) Dealers names, locations, quantities, procedures and problems. (2) d. Host nation support.

Class IX (Construction Equipment).

(1) Dealers names, locations, quantities, procedures and problems. (2) e. Host nation support.

Maintenance support. (1) (2) Locations, quantities, procedures and problems. Host nation support.

f.

Contracting support. (1) (2) (3) Construction Facilities maintenance Services

g. Construction material suppliers (by name, location, telephone number). (1) (2) (3) (4) (5) Cement manufactures and suppliers Concrete readimix suppliers Steel manufactures and suppliers Lumber manufactures and suppliers Prefab metal building manufactures and suppliers

C-5-C-8-48

ENCL 8(ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (6) Concrete and steel culvert manufacturers and suppliers. (7) (8) suppliers. CMU block and brick manufactures and suppliers. Electrical wire and equipment manufactures and

(9) Plumbing material and equipment manufacturers and suppliers. (10) Well pipe, well drilling supplies and well pump manufacturers and suppliers. 9. Engineer reconnaissance missions. a. b. c. Performed with reports. In progress with interim results Planned

10. Topographic support. a. Type unit/location/commander. (1) (2) b. Type of support. Customers.

G2 requirements. (1) (2) Missions. Priorities.

c. d. e.

Survey Control Points and other survey data. Host nation support. Other sources.

C-5-C-8-49

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP ENGINEER TRANSITION CHECKLIST 1. Command and Control a. Each Unit (1) (2) (3) (4) (5) (6) (7) (8) (a) Designation. Type unit. Capabilities. Equipment. Location. Special requirements. Commander. Administrative. Current SITREP from each subordinate unit. (To include all service components).

(b) Copies of all engineer overlays with codes and numbering systems. (c) Turnover of all target folders, mine field reports, reconnaissance reports, etc. (d) Communications/security data (Call signs, phone books, etc.). b. c. d. e. Command and support relationships. Priorities of work. Alternate headquarters. Time phasing of unit deployments.

C-5-C-9-50

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 2. Rear operations. a. b. c. d. 3. Base clusters. Area damage control plan. Engineer POC,s. Facilities.

Host Nation interface. a. Real estate. (1) (2) (3) (4) (5) b. Acquisition policy. Maintenance policy. Disposal policy. Current real estate holdings. Future requirements.

Support. (1) (2) (3) (4) Current engineer support agreements. Civilian construction organizations available. Construction materials available. Current support contracts.

c.

Engineer units (1) (a) (b) (c) Each Unit Designation. Type unit Capabilities

C-5-C-9-51

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (d) (e) (f) (g) (h) (1) Equipment Location Special requirements Commander Administrative. Current SITREP.

(2) Copies of all engineer overlays with codes and numbering systems. (3) Turnover of all target folders, mine field reports, reconnaissance reports, etc. (4) Communications/security data (Call signs, phone books, etc.). (2) (3) (4) (5) d. Command and support relationships. Priorities of work. Alternate headquarters. Time phasing of unit movements.

Working groups or boards. (1) (2) (3) (4) Chairman. Composition. Meeting location and frequency. Charter or purpose.

4.

Construction planning and management. a. Plans or studies.

C-5-C-9-52

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP b. Construction standards and policies. c. d. Theater priorities of work. Joint Civil Military Engineer Board. (1) (2) (3) (4) (5) e. Charter or purpose. Chairman. Organization. Procedures. Meeting location and frequency.

Other working groups or boards. (1) (2) (3) (4) (5) Charter or purpose. Chairman. Organization. Procedures. Meeting location and frequency.

5.

Engineer work. a. b. c. d. Airfields - maintenance and repair. Ports - maintenance and repair. Roads - MSR maintenance and repair. Bridging (standard/non-standard/float). (1) Assets available (not installed) and location.

(2) Installed bridging - location, length, load, classification.

C-5-C-9-53

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 6. Base development. a. Base development plans under study. (1) (2) (3) (4) theater. (6) (7) (8) (9) Standards of construction. Theater hospitalization policy. Theater climatic conditions. Time phasing of force deployment. Total force structure to be supported. Expected duration of force deployment. Types of equipment to be employed. Mission and operational objectives. (5) Number of days of supply to be stocked in

(10) LOC requirements. (11) Utility requirements. (12) Environmental requirements. (13) Real estate requirements. (14) Time phased construction requirements. b. 7. Inventories of available facilities.

Real property maintenance activities. a. Service facilities maintained. (1) (2) Electrical power. Potable water supply.

C-5-C-9-54

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (3) Waste water collection. (4) b. Telephone systems.

Fire protection. (1) (2) Host nation support. Fire fighting units.

c.

Refuse collection and disposal. (1) (2) (3) (a) (b) (4) (a) (b) (c) Policy. Current contracts. Land fill sites. In operation. Closed. Hazardous waste sites. Medical. Petroleum. NBC.

8.

Engineer logistics. a. Class IV (Wire, pickets). (1) (2) b. Locations, quantities, procedures and problems. Host nation support.

Class V. (1) Locations, quantities, procedures and problems.

C-5-C-9-55

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (2) c. Host nation support.

Class VII.

(1) Dealers names, locations, quantities, procedures and problems. (2) d. Host nation support.

Class IX (Construction Equipment).

(1) Dealers names, locations, quantities, procedures and problems. (2) e. Host nation support.

Maintenance support. (1) (2) Locations, quantities, procedures and problems. Host nation support.

f.

Contracting support. (1) (2) (3) Construction Facilities maintenance Services

g. Construction material suppliers (by name, location, telephone number). (1) (2) (3) (4) (5) Cement manufactures and suppliers Concrete readimix suppliers Steel manufactures and suppliers Lumber manufactures and suppliers Prefab metal building manufactures and suppliers

C-5-C-9-56

ENCL 9 (ENGINEER OPERATIONS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (6) Concrete and steel culvert manufacturers and suppliers. (7) CMU block and brick manufactures and suppliers. (8) Electrical wire and equipment manufactures and suppliers. (9) Plumbing material and equipment manufacturers and suppliers. (10) Well pipe, well drilling supplies and well pump manufacturers and suppliers. 9. Engineer reconnaissance missions. a. b. c. Performed with reports. In progress with interim results Planned

10. Topographic support. a. Type unit/location/commander. (1) (2) b. Type of support. Customers.

G2 requirements. (1) Missions. (2) Priorities.

c. d. e.

Survey Control Points and other survey data. Host nation support. Other sources.

C-5-C-9-57

ENCL10(LEGAL TRANSITION CHECKLIST) TAB C(TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP Staff Judge Advocate Transition Checklist 1. 2. 3. Friendly situation. Enemy situation. Operations law. a. b. c. d. e. 4. Mission and commander's intent. Plans and orders. Weapons and ammunition. Targets. Rules of engagement.

Intelligence oversight. a. b. c. d. Intelligence requirements. Collection assets. Plans and orders. Targets.

5.

International law. a. Violations of the law of war. (1) (2) (3) b. Reports. Investigations. Disposition.

Status of EPWs. (1) Number.

C-5-C-10-58

ENCL10(LEGAL TRANSITION CHECKLIST) TAB C(TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

(2) (3) c.

Location. Compliance with GPW.

Status of civilian internees. (1) (2) (3) Number. Location. Compliance with GC.

d.

Enemy property. (1) (2) (3) (4) (5) (6) Destruction. Confiscation. Seizure. Requisition. Control. War trophies.

e.

Third country nationals. (1) (2) (3) Diplomatic agents. Nationals of a state not bound by the GC. Nationals of a co-belligerent.

(4) Nationals of a neutral state in belligerent territory and in occupied territory. f. 6. Local policies and precedents.

International agreements. a. International agreements in force.

C-5-C-10-59

ENCL10(LEGAL TRANSITION CHECKLIST) TAB C(TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

b. c. d. e. 7.

Authority to negotiate. Authority to conclude. Instructions. Local policies and precedents.

International organizations. a. b. c. d. UN. Regional organizations. ICRC. Others.

8. 9.

Political asylum and temporary refuge. Contingency contracting and fiscal law.

10. Claims. a. b. c. d. Single-service responsibility. Component responsibilities. SOFA claims provisions. Claims history. (1) (2) (3) e. Claims filed. Claims paid/denied. Potential claims.

Local policies and precedents.

11. Military justice.

C-5-C-10-60

ENCL10(LEGAL TRANSITION CHECKLIST) TAB C(TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

a. b. c.

Status of US forces. Right to exercise criminal jurisdiction. Violations of the UCMJ. (1) (2) (3) Reports. Investigations. Disposition.

d.

Local policies and precedents.

12. Foreign criminal jurisdiction. a. b. Key provisions of host nation law. Violations of host nation law. (1) (2) (3) (a) (b) Reports. Investigations. Disposition. Custody. Requests for custody.

13. Administrative law. a. b. c. d. Reports of survey. Line of duty investigations. AR 15-6 investigations. Administrative separations.

14. Environmental law.

C-5-C-10-61

ENCL10(LEGAL TRANSITION CHECKLIST) TAB C(TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP

A-7-L-4 15. Other legal issues. 16. Points of contact. a. b. c. d. e. f. g. h. i. JTF. ARFOR. NAVFOR. AFFOR. MARFOR. JSOTF. AMEMB. DOJ. HNG.

C-5-C-10-62

ENCL 11(PROVOST MARSHAL TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP PM OPERATIONAL TRANSITION CHECKLIST 1. Area Security Operations. a. Urban operations requirements. site security (support of HN infra-

b. Critical structure). c. d. 2.

FOB/ISB security requirements. JTF HQ security requirements.

EPW/CI/DC Operations. a. b. c. d. JTF Collection Facility. Return of EPW to host nation. Legal requirements/procedures for EPW/CI/DC turnover. Augmentation to ARFOR.

3.

Battlefield Circulation Control. a. b. c. MSR Identification. Refugee problems/displaced civilians. Critical convoy escorts.

4.

Law and Order Operations. a. Host Nation coordination/assistance. Rebuilding/

b. Requirements for combined operations. training of HN police forces. c. 5. Terrorist activities.

Civil Military Operations. National Building requirements.

C-5-C-11-63

ENCL 12(HQ COMMANDANT TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 1. Situation. a. b. c. d. e. 2. Location and boundaries of the Command Post Area. Enemy threat to the Command Post Area. Units collocated within the Command Post Area. Walk of the perimeter of the Command Post Area. Tour of the facilities within the Command Post Area.

Force Protection. a. b. c. d. e. f. g. Units organized into the Command Post Base. Units assigned to the Base Defense Cluster. Command relationships for base security. Base Defense Force for the Command Post. Quick Reaction Force and its alert notification. Higher headquarters to counter Level III Threats. Friendly units in area of operations.

h. Neutral forces in area of operations (host nation police, national guard, peace keepers). i. Indirect fire support available and preplanned targets (to include final defensive fires). j. k. Minefield Recording Cards. Base defense communications nets/systems.

l. Base Defense Overlay (individual positions, crew served weapons, preplanned fires, obstacles, minefields, check points, etc.). m. Traffic control and parking.

C-5-C-12-64

ENCL 12(HQ COMMANDANT TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP n. o. 3. Access Control into Command Post facilities. Rules of Engagement.

Material and Services. a. Supply. (1) (a) Class I. Mess location and arrangements.

(b) Equipment, personnel and augmentation required for current mess operations. (c) Cold storage vans. Wholesale Class I requisition procedures and

(d) issue point. (e)

Bulk ice issue procedures and location.

(f) Disposition of on-hand Class I stocks and due-in requisitions. (2) (a) issue point. Class II. Wholesale Class II requisition procedures and

(b) Disposition of on-hand Class II stocks and duein requisitions. (3) (a) (b) issue point. Class III (Bulk and Packaged Products). Fuel availability by type. Wholesale Class III requisition procedures and

(c) Disposition of on-hand Class III stocks and duein requisitions.

C-5-C-12-65

ENCL 12(HQ COMMANDANT TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (4) Class IV.

(a) Wholesale Class IV requisition procedures and issue point. (b) Disposition of on-hand Class IV stocks and due-in requisitions. (5) Class V. (a) Basic Load. (b) issue point. Wholesale Class V requisition procedures and

(c) Disposition of on-hand Class V stocks and due-in requisitions. (6) (a) issue point. (b) Class VI. Wholesale Class VI requisition procedures and Sundry Packs. Availability of AAFES support for personal

(c) demand items. (7) (a)

Class VII. Requisition procedures for major end items. Major end items to be transferred to incoming

(b) headquarters. (c) (8) (a) issue point.

Disposition of due-in Class VII requisitions. Class VIII. Wholesale Class VIII requisition procedures and

C-5-C-12-66

ENCL 12(HQ COMMANDANT TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (b) Disposition of on-hand Class VIII stocks and due-in requisitions.

(9)

Class IX. Requisition procedures for repair parts.

(a)

(b) Theater unique demand adjustments (filters, tires, batteries, etc.). (c) Disposition of on-hand Prescribed Load List (PLL) items and due-in requisitions. b. (MHE). (2) Availability of contract host nation support transportation assets. (3) Availability of transportation assets from support agencies/units. Location of Movement Control Centers/Teams. (4) (5) Main Supply Routes (overlays). Local transportation maps. Transportation. (1) Availability of material handling equipment

(6) Arrival airfield location, routes, and Arrival/Departure Airfield Control Group (A/DACG) procedures. (7) Seaport of Debarkation location, routes, and Terminal Service Company procedures. (8) Location, marking, and procedures for helicopter landing zones in the command post. c. Area. Trash Collection. (1) Collection procedures within the Command Post

C-5-C-12-67

ENCL 12(HQ COMMANDANT TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (2) Authorized disposal sites. Procedures, equipment,

d. Classified Waste Destruction. and responsibilities. e. Field Sanitation. (1) latrines. (2) agreements.

Location, servicing and status of field Contract port-a-let availability and service specific health concerns and

(3) Theater preventative measures. f. Water.

(1) water sources. (2) g. points. (2) services.

Suitability and required treatment of local

Location of approved water points.

Bath and Laundry Services. (1) Availability and location of field baths/shower Availability of and procedures for field laundry

(3) Contract bath and laundry availability and service agreements. h. Fire Fighting Support. (1) support. (3) Procedures to request fire fighting support. Location of military fire fighting elements. (2) Availability of host nation fire fighting

C-5-C-12-68

ENCL 12(HQ COMMANDANT TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP i. Office Equipment.

(1) Office equipment to be transferred to incoming headquarters. (2) Commercial leased equipment (copiers, automated data processing, etc.). (3) j. Inventory of office equipment found on site.

Power Generation. (1) Status of commercial power.

(2) Procedures to augment commercial power with tactical power. (3) (4) Structure power limitations. Tactical power lines emplaced in structures. Arrangements (structures, furniture,

k. Billeting. cots, linen, etc.). l.

Chaplain Activities. (1) Available organizations to provide chaplain

support. (2) Service schedules and locations. Availability and

m. Morale Welfare and Recreation. location off programs and equipment. n. Finance Support. finance support in theater.

Availability and location of

o. Contracting Support. Location of Field Contracting Office and commercial contract procedures. p. Maintenance. (1) operation. C-5-C-12-69 Maintenance peculiarities for the area of

ENCL 12(HQ COMMANDANT TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 ( BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP (2) support. (3) q. assets. (2) Availability of host nation engineer support. Equipment evacuation policies and procedures. Location of direct and support maintenance

Engineer Support. (1) Availability of engineer organizations and

r. Terrain Management. Procedures for terrain allocations and deconfliction within the Command Post Area. s. Medical, Evacuation and Hospitalization. (1) (2) (3) (4) facilities. Location of Command Post Aid Station. Location of Area Support Medical Company. Emergency Medical Evacuation request procedures. Location and capabilities of civilian treatment

t. Communications. Command Post Base communications nets, frequencies, call signs, and phone books.

C-5-C-12-70

ENCL 13(LIAISON OFFICER TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP LNO TRANSITION CHECKLIST 1. Point of Contact: a. b. c. d. e. Command/Deputy J3/G3/S3 Chief, Operations Chief, Plans LNO

2. General enemy situation in respective AO (disposition, activities). 3. Operations review/supplement (to J3/G3 staff): a. b. c. d. e. 4. Unit mission (current and follow-on) Commander's intent Task Organization Command relationships Unit situation (friendly and enemy)

Combat service support review/supplement (to J4/G4): a. b. Status, locations Capabilities

5.

Transition communications: a. b. Type channels (e.g., FM, HF, TACSAT) SOI/CEOI information

C-5-C-13-71

ENCL 13(LIAISON OFFICER TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP c. Recognition signals

6. Review status of conditions for assumption of ARFOR responsibilities.

C-5-C-13-72

ENCL 14(PUBLIC AFFAIRS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP 1. a. Situation.

Provide a brief summary of Public Affairs operations to date. Include personnel deployed, JIB operations, public opinion both national and international, media briefings, etc. b. (1) Media interest in operations. Current number of media in AOR.

(2) Specific media represented. Local/U.S. versus international. TV, newspaper, magazine, radio. (3) (4) DoD Media Pool activated? Likelihood____. Yes____No____

Percent of favorable versus unfavorable stories: (a) (b) Last 48 hours _____.

Operations to date _____. (c) Key topics:

(5) (6) (7)

Support available to media. Transportation (air/ground), special equipment.

VIP visits shceduled and what media coverage has been allowed:

What Public Affairs Guidance (PAG) is on file from USACOM, DA, or DoD? 2. Command Information. a. What is currently being done to keep the troops informed?

(1) Field Newspaper:____________________________________

C-5-C-14-73

ENCL 14(PUBLIC AFFAIRS TRANSITION CHECKLIST) TAB C (TRANSITION CHECKLIST) TO APPENDIX 5 (BATTLEFIELD TRANSITION PROCEDURES) TO ANNEX C (OPERATIONS) TO XVIII AIRBORNE CORPS FIELD SOP Size:_______________________Frequency:_____________________ ______

(2)

AFRTS:

Range:

Broadcast hours:

(3) Factsheets (local customs/laws, dangerous plants and wildlife, enemy goals/strengths/weapons. (1) Commercial newspapers, TV stations, and radio stations available to soldiers. 3. Names/Locations/Units. a.

Current location of JIBs, sub-Jibs, and MSC PAOs as well as names and phone numbers. b. 4. Location and POCs for contract printers, vehicle leasing, TMP, aviation assets, etc.

Ongoing Operations. a. b. c. List of all ongoing/planned media visits to units. Identify all interviews requested or planned. Describe current methods of transporting media products.

5. Significant Effects of Crossover. Based on knowledge of what PA assets are being introduced, and what assets are being withdrawn, discuss what operations/services will be constrained/enhanced by the crossover.

C-5-C-14-74