INTRODUCTION
Masonry Arch Bridges in Portugal:
INTRODUCTION
Major Causes of Damage: - Deep change of loads for which bridges were built - Lack of adequate maintenance - Ageing processes (decay of the materials)
UNIVERSITY OF MINHO
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
INTRODUCTION
Generalized Damage: - Absence of mortar in the stone joints - Existence of vegetation and biological colonization - Presence of humidity and efflorescences - Accelerated decay of the materials Localized Damage: - Longitudinal cracking of the arches - Lack of plumbness of the spandrel walls - Movement of abutments
UNIVERSITY OF MINHO
(Preventive maintenance)
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
(ICOMOS):
-
Minimum repair to assure safety and durability Respect of the original conception Compatibility between existing and new materials
UNIVERSITY OF MINHO
Survey and Repair of 2 Portuguese Masonry Arch Bridges - Boutaca Bridge - Donim Bridge
3
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
BOUTACA BRIDGE (stone masonry) - Local: Batalha, center of Portugal - Purpose: roadway (belonging to the former road Lisbon-Porto)
INTRODUCTION BOUTACA BRIDGE
T1 C6 C5 C4
T6 T3 C3 C2 T5 C1 P1
A7
T4 A6 T2 P6 A5 A4 A3 P4 P3 A2 A1
P7
P5
P2
UNIVERSITY OF MINHO
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
Results of the Survey carried out: - Vegetation & lost of plaster (lack of maintenance)
INTRODUCTION BOUTACA BRIDGE
- Humidity & biological colonization (deficient drainage system) - Cracking in the buttress walls (Buttresses overloaded) - Existing anchorages much deteriorated
masonry)
(outward movement of
UNIVERSITY OF MINHO
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
C6
C5
C4
C3
C2
C1
A7
P7
Detail
Patress plate
UNIVERSITY OF MINHO
Tie rod
6
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
B) Other measures:
- Cleaning and removal of vegetation - Replacement of plaster - Need for periodical visual inspections
UNIVERSITY OF MINHO
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
DONIM BRIDGE (stone masonry) - Local: Guimares, North of Portugal - Purpose: roadway (major importance untill 2 centuries ago)
INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE
- Date of construction: 15th 16th century - Dimensions: 62m length, 4m width (larger span 12m)
Flat roadway
A1
A2
A3
A4
UNIVERSITY OF MINHO
Flood arch
Pier + Cutwaters
Semicircular Arches
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
Results of the Survey carried out: - Extensive longitudinal cracking in the left arch - Longitudinal cracking in the flood (right) arch - Cutwater of the right pier highly damaged - Infesting vegetation all over the bridge
UNIVERSITY OF MINHO
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
Major problems : - Outward movements of spandrel walls - Longitudinal cracking in the left and right arches - Pre-collapse of a cutwater (right pier)
10
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
rope-strechers
- Tie rod to bind the spandrel walls - Infill put back into its place
] profiles
SPANDREL WALL
tie rod
shape
UNIVERSITY OF MINHO
Tie-rod
Anchor rods
U profiles
Anchor rods
ARCH
11
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
- Full width anchors across the arch - Stitching anchors linking the arch to the spandrel walls
INTRODUCTION BOUTACA BRIDGE DONIM BRIDGE
UNIVERSITY OF MINHO
Stitching anchors
12
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
C) Other measures:
(same
- Replacement of the missing foundation stone block - Waterproofing of the pavement and reconstruction of the
drainage system
UNIVERSITY OF MINHO
13
arch 04
4 T H.
CONFERENCE
ON
ARCH
BRIDGES
BARCELONA,
2004
Final Remarks
Common features to both examples
UNIVERSITY OF MINHO
14