SNo
1
Indicator
Coverage of WS connections (Popln) Per capita availability of WS at consumer end Extent of metering of WS connections Extent of Non-Revenue Water (UFW) Continuity of Water Supply Efficiency of redressal of Customer Complaints Quality of Water Supplied Cost recovery of in Water Supply Services Efficiency in collection of Water Supply Charges Number of persons receiving less than 70 Lpcd
Benchmark
100%
Existing
90%
Proposed
98-100%
135 Lpcd
150 lpcd
100%
Nil
15%
25-35%
24x7
2 hrs
80%
65 70%
100%
100%
100%
100%
75-80 %
100%
90%
90%
90%
10
Rs.986 lacs.
(b) Supporting capacity to Sayaji Sarovar is taken care by Pratappura Dam, which damaged during Earthquake. Strengthening work is under progress for Pratappura dam, Feeder channel and miscellaneous work with cost =
(c) Additional water filtration plant of 50 MLD at Nimeta is prepared to increase capacity from 95 MLD to 145 MLD at a cost =
(d) Feeder Network from source to city is completed by laying line of 1500mm diameter BWSC line about 30 km length with a cost = (e) Balancing Reservoir of 30 ML capacity project completed at a cost =
(f) New source of 75 MLD water from Narmada River Canal water at Khanpur Project is just to complete within short time with intake wall, water filtration plant and 8 km long transmission line at a cost =
(g) Pumping machinery up gradation at Radial Collector wells is under process at cost =
Total of (I) =
Reservoir (GSRs)
Rs.15837 lacs.
(b) Under Swarnim Gujarat Project, two ESRs with GSR and command network completed
Under JnNURM scheme, 24 x 7 water supply project is under construction for newly developed area of city (Kapurai, North Harni, Sayajipura and Chhani) with ESRs-GSRs and command area network with water meters at a cost =
(d) Old Grond Services Reservoirs are under upgradation (Tarsali, Wadiwadi, Karelibaug, Warasia, Jail, Lalbaug) at a cost =
Total of (II) =
Rs.11952.3 lacs.
(b) City zones are interconnected and upgraded for capacity, with 750 mm dia. DI line of length of 2.8 km ( IPCL circle to Kalpataru Market) at a cost =
(e) Old feeder line replaces due to heavy leakage for a length of 3.8 km (Kalpataru Market to Akota ESR) at a cost =
Total of (III) =
Rs.1485.11 lacs.
(IV) Network Upgradation as per Master Plan suggestions in various area of the city .
(a) Various work regarding network upgradation as per Master Plan suggestions in various area of the city are completed at a cost = (b) Various works are on hand in various area of city at a cost =
Total of (IV) =
Rs.7707.59 lacs.
Works Completed and on Hand: (After Master Planning for Water supply) During 2005-06 to 2010-11 Rs. In Lacs (i) (ii) (iii) (iv) Source upgradation related ESR-GSR Related Feeder Networks Upgradation Network Upgradation 15837 11952.3 1485.11 7707.59 36982 lacs