Vadodara Mahanagar Seva Sadan


Water Supply Project Efforts for achieving Service Level Benchmarks :-

SNo
1

Indicator
Coverage of WS connections (Popln) Per capita availability of WS at consumer end Extent of metering of WS connections Extent of Non-Revenue Water (UFW) Continuity of Water Supply Efficiency of redressal of Customer Complaints Quality of Water Supplied Cost recovery of in Water Supply Services Efficiency in collection of Water Supply Charges Number of persons receiving less than 70 Lpcd

Benchmark
100%

Existing
90%

Proposed
98-100%

135 Lpcd

150 lpcd

150 Lpcd 100% in project area 15-20%

100%

Nil

15%

25-35%

24x7

2 hrs

24x7 in developing area 90%

80%

65 70%

100%

100%

100%

100%

75-80 %

100%

90%

90%

90%

10

Vadodara Mahanagar Seva Sadan

Water Supply Project

Efforts made to strengthen water supply system in last 5 years


(I) Source upgradation (under JnNURM Scheme)
(a) Sayaji Sarovar (Ajwa Dam)
Strengthening work completed so storage capacity increased from 1879 MCFT to 2231 MCFT (Design Capacity) i.e. 352 McFt., which cares for about 2 months extended water supply. Project completed with costing =

Rs.986 lacs.

(b) Supporting capacity to Sayaji Sarovar is taken care by Pratappura Dam, which damaged during Earthquake. Strengthening work is under progress for Pratappura dam, Feeder channel and miscellaneous work with cost =

Rs.1704 lacs. Rs.703 lacs. Rs.4103 lacs. Rs.775 lacs.

(c) Additional water filtration plant of 50 MLD at Nimeta is prepared to increase capacity from 95 MLD to 145 MLD at a cost =

(d) Feeder Network from source to city is completed by laying line of 1500mm diameter BWSC line about 30 km length with a cost = (e) Balancing Reservoir of 30 ML capacity project completed at a cost =

(f) New source of 75 MLD water from Narmada River Canal water at Khanpur Project is just to complete within short time with intake wall, water filtration plant and 8 km long transmission line at a cost =

Rs. 6473 lacs. Rs.1093 lacs.

(g) Pumping machinery up gradation at Radial Collector wells is under process at cost =

Total of (I) =
Reservoir (GSRs)

Rs.15837 lacs.

(II) Elevated Service Reservoirs (ESRs) & Ground Service


(a) Under Mastering Up gradation, four (Ajwa, Subhanpura, Manjalpur, Harinagar) ESRs with GSRs, and command area network completed at a cost= at a cost =

Rs. 813.66 lacs. Rs.1700 lacs.

(b) Under Swarnim Gujarat Project, two ESRs with GSR and command network completed

Under JnNURM scheme, 24 x 7 water supply project is under construction for newly developed area of city (Kapurai, North Harni, Sayajipura and Chhani) with ESRs-GSRs and command area network with water meters at a cost =

Rs.8975 lacs. Rs. 463.64 lacs.

(d) Old Grond Services Reservoirs are under upgradation (Tarsali, Wadiwadi, Karelibaug, Warasia, Jail, Lalbaug) at a cost =

Total of (II) =

Rs.11952.3 lacs.

Vadodara Mahanagar Seva Sadan

Water Supply Project

(III) Feeder Networks Upgradation


(a) Under JnNURM scheme old feeder at Tarsali is taken to replace and enhance capacity for a length of about 8 km which is under progress at a cost =

Rs. 788.81 lacs. Rs. 409.30 lacs. Rs. 287 lacs.

(b) City zones are interconnected and upgraded for capacity, with 750 mm dia. DI line of length of 2.8 km ( IPCL circle to Kalpataru Market) at a cost =

(e) Old feeder line replaces due to heavy leakage for a length of 3.8 km (Kalpataru Market to Akota ESR) at a cost =

Total of (III) =

Rs.1485.11 lacs.

(IV) Network Upgradation as per Master Plan suggestions in various area of the city .
(a) Various work regarding network upgradation as per Master Plan suggestions in various area of the city are completed at a cost = (b) Various works are on hand in various area of city at a cost =

Rs. 7230.54 lacs. Rs. 477.05 lacs .

Total of (IV) =

Rs.7707.59 lacs.

Works Completed and on Hand: (After Master Planning for Water supply) During 2005-06 to 2010-11 Rs. In Lacs (i) (ii) (iii) (iv) Source upgradation related ESR-GSR Related Feeder Networks Upgradation Network Upgradation 15837 11952.3 1485.11 7707.59 36982 lacs