1. About Us.....................................................................................3 2. Advantages of solar system......................................................................3 3. Proposal Highlights...................................................................................4 4. Why you should use NEPC Solar..4 5. Basic representation of system................................................................5 6. System Bill of Material.............................................................................6 8. Commercial Offer..6 9. Payment Terms.........................................................................................6 10. Banking Details.......................................................................................7 11. Taxes & Duties........................................................................................8 12. General Terms &Conditions....................................................................8 13. Guarantee & Warranty...........................................................................8 14. Exclusions................................................................................................9 15. Validity of Offer......................................................................................9 16. Delivery Period........................................................................................9 17. Installed Projects.....................................................................................9
Page | 3
1. About Us
NEPC INDIA LTD, pioneer in Wind Energy in India since 1989 has revolution in manufacturing and supplying more than 4000 Wind turbines across India, Bangladesh and Kazakhstan NEPCINDIA LTD Has Diversified into Roof Top Solar Market across India. It has tied up with leading players for Photo voltaic components. The company will be able to offer standard format of grid and non-grid systems ranging from 1 KW to 1 MW. NEPC Solar will be able to offer all types of systems for Flat Roof, Ground Mount and other special applications as per customer requirements. The company will do suitable engineering and provide customers with most economic solutions. The prices of our solar systems will be competitive. NEPC INDIA will meet all International / MNRE / state nodal requirements to be eligible for subsidy. NEPC INDIA offers standard prices across India for the solar photo voltaic systems.
Page | 4
DESCRIPTION
10 KWp 14000 units/year Crystalline modules 80-100 sq ft per kWp 600 kg per annum per kWp 25 yrs Solar Inverter with MPPT Charge Controller To be mutually decided Capital subsidy of 30% from MNRE, Up front on Invoice Price Excluding Tax 80% on first year itself on invoice price Solar PV Module - 25 years Solar Inverters 1 Years Solar Batteries 3 Years
Page | 5
Tamil Nadu State Solar Energy Policy 2012 As per Tamil Nadu State Solar Energy Policy 2012 6% of the captive power is mandatory from Solar Energy for all Educational Institutions, SEZ, IT Parks, and other HT consumers.
Page | 6
11 KW to 21 KW to 41 KW to 61 KW to
SL.NO 1
2 3 4 5 6 7
Solar Inverter Solar Battery Aluminium Module mounting structure Array junction box UV Protected Solar PV cables Other BOS
MAKE Microsun Solar Tech Pvt Ltd / Waaree Energies Pvt Ltd / Shan Solar Pvt. Ltd Enertech UPS Pvt Ltd / Consul Consolidated Pvt Ltd HBL Power Systems Ltd / Exide Industries Ltd/ NEPC INDIA LTD NEPC INDIA LTD Siechem Technologies Pvt Ltd All certified and Branded Tier-1 Companies
8. Commercial Offer
S.NO 1. ITEM DESCRIPTION 10 KWp off-Grid Roof-Top/ ground Mounted Based Solar PV Power Plant Turnkey Solution. PRICES IN INR(Each) 19,71,429.00 QUANTITY In Nos 1 AMOUNT
Page | 7
19,71,429.00
98,571.00 20,70,000.00 6,00,000.00 14,70,000.00 In Words: Rupees Forteen Lakhs Seventy Thousands only.
9. Payment Terms
1. 2. 75% Advance along with the Purchase Order. 25% against Performa Invoice of major equipments like modules, structures and
11. Commercials:
Under Section 32 of Income Tax Act, profit making industrial, commercial and urban establishments can avail an accelerated depreciation of 80% on Solar Power Generating Systems and Solar PV Modules. Additionally, incentives in the form of capital subsidy are available from the Ministry of New and Renewable Energy, Government of India as per the scheme for Abatement of Diesel Generation in Industrial Installations. These incentives are Rs 81/Wp up to a maximum of 30% of equipment cost. The net payback period is 3 years. After the completion of the payback period, the generation of power is free and all the power generated from PV becomes power saved. The Customer shall give an undertaking to claim the subsidy on behalf of him/her from MNRE to NEPC SOLAR
Page | 8
Inverters: 1) Limited warranty for 12 months from the date of commissioning whichever earlier against any manufacturing defects Battery: 1) Limited warranty for 36 months from the date of commissioning whichever earlier against any manufacturing defects System Warranty DLP (Defect Liability Period): NEPC Solar warrants that our design and workmanship is free of defects for one (1) year. The system warranty covers the entire system except manufacturers defects in material and workmanship of the PV modules and inverters. 1) We warrant our own system workmanship, which means we are responsible and accountable for rectifying any system faults resulting from our workmanship. 2) We pass on the product warranties from module and inverter manufacturers back-to-back to the client. We will administer the warranty claims on the clients behalf. Manufacturing defects (in which case the manufacturer will replace it with a new/repaired product and return it to us); improper installation or maintenance by NEPC Solar or our contractors (in which case we shall bear the cost of the replacement); Negligence/damage by the client's staff or contractors (in which case we will invoice the client for the repair).
Page | 9
15. Exclusions
This offer is based on the design, supply & installation as in the offer. It does not include: 1. Local Permits and Liaison with local bodies / utility / Chief Electrical Inspector/state nodal agency etc. 2. 3. Insurance of the plant after commissioning of the power plant. All 240V Electrical Wiring from the inverter to main switch or any other wiring will be