CONCRETE BOX INLET TOEWALL DESIGN (# 5 REBAR)


Freeboard= 0.4 CFS input W= input B = 1.0 FEET QUAN 1 2 3 4 5 6 7 8 9 10 11 12 13 2 0 1 0 2 0 0 2 0 0 0 0 0 LENGTH 0.33 1.45 1.67 1.32 1.32 1.99 2.64 0.67 0.67 0.00 0.00 0.00 0.00 A 0.33 1.32 1.67 0.00 0.00 0.67 1.32 0.67 0.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.32 1.32 1.32 1.32 STEEL SCHEDULE - #5 BARS MARK B 0.13 TOTAL FT 0.66 0.00 1.67 0.00 2.64 0.00 0.00 1.34 0.00 0.00 0.00 0.00 0.00 6.31 LIN. FT. = VOLUME OF CONCRETE: TOEWALL: HEADWALL: BOX: BUTTRESS: TOTAL 0.0 CUBIC FEET 1.0 CUBIC FEET 0.7 CUBIC FEET 0.0 CUBIC FEET 1.7 CUBIC FEET PLUS 10% = 4 IN. DRAIN TUBING: 8 LIN. FT = 0.1 CU. YDS. 0.1 CU. YDS. 6.6 POUNDS

Required Q=
input F = input H = S= Toewall Depth =

CAPACITY =
BUTTRESS = WALL = = Toewall Width =

#NUM!
0 8 0.667 INCHES FEET FEET

CFS

TOTAL #5 (5/8 INCH DIAMETER) RE-BARS

PLUS 10 LIN. FT. 4 IN. PVC & 2 INTERNAL COUPLERS VOLUME OF RIPRAP: AROUND WEIR - 12" WIDE X 8" DEEP = DS CHANNEL-10 FEET, W WIDE, F HIGH, 1' DEEP, SS=2:1 = EARTHWORK: NORMAL EXCAVATION= TOEWALL TRENCH = NORMAL BACKFILL = NORMAL DIKE FILL = 1 CU. YDS. 2 LIN. FT. 1 CU. YDS. 0 CU. YDS. 0.0 CU. YDS. 0.1 CU. YDS.

(revised 4/08)

Client: County:

Designed: Checked:

Date: Date:

CONCRETE BOX INLET TOEWALL DESIGN (# 4 REBAR)


Freeboard= 0.4 CFS 0.0 0.0 1.0 0.0 QUAN 4 0 2 0 2 0 0 2 0 0 0 0 0 FEET LENGTH 0.33 1.26 1.67 1.13 1.13 1.80 2.26 0.67 0.67 0.00 0.00 0.00 0.00 A 0.33 1.13 1.67 0.00 0.00 0.67 1.13 0.67 0.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.13 1.13 1.13 1.13 STEEL SCHEDULE - #4 BARS MARK 1 2 3 4 5 6 7 8 9 10 11 12 13 B 0.13 TOTAL FT 1.32 0.00 3.34 0.00 2.26 0.00 0.00 1.34 0.00 0.00 0.00 0.00 0.00 8.26 LIN. FT. = VOLUME OF CONCRETE: TOEWALL: HEADWALL: BOX: BUTTRESS: TOTAL 0.0 CUBIC FEET 1.0 CUBIC FEET 0.7 CUBIC FEET 0.0 CUBIC FEET 1.7 CUBIC FEET PLUS 10% = 4 IN. DRAIN TUBING: 8 LIN. FT = 0.1 CU. YDS. 0.1 CU. YDS. 5.5 POUNDS W= B= 0.0 0.0

Required Q=
F= H= S= Toewall Depth =

CAPACITY =
BUTTRESS = WALL = = Toewall Width =

#NUM!
0 8 0.0

CFS INCHES

0.667 FEET FEET

TOTAL #4 (1/2 INCH DIAMETER) RE-BARS

PLUS 10 LIN. FT. 4 IN. PVC & 2 INTERNAL COUPLERS VOLUME OF RIPRAP: AROUND WEIR - 12 WIDE X 8 DEEP = DS CHANNEL-10 FEET, W WIDE, F HI, 1' DEEP, SS=2:1 = EARTHWORK: NORMAL EXCAVATION= TOEWALL TRENCH = NORMAL BACKFILL = NORMAL DIKE FILL = 1 CU. YDS. 2 LIN. FT. 1 CU. YDS. 0 CU. YDS. 0.0 CU. YDS. 0.1 CU. YDS.

Date Revision Notes 2/28/2008 Revised spreadsheet to allow user to input a value for reduction in capacity due to "freeboard", or the elevation of th emergency in relation to the top of headwall. Researched the validity of using a weir coefficient of 2.72. The straigh value of 3.1 from the EFH Ch. 3 is not valid for drop box structures. The Hydraulics Formulas drop box structure ca uses a varying coefficient based on h/w and b/w correction factors and is dependent on the size of structure. It rang between 2.6 and 2.9 for typical size structures. 4/9/2008 Corrected values for number of bar #1 calculated for #4 size rebar. Added 9" floor thickness for cell E17 value and equivalent for #4 rebar chart. Changed value in F18 to reduce for edge clearance. Freeboard cell unlocked and co #4 rebar table for reference on printouts.

e to "freeboard", or the elevation of the a weir coefficient of 2.72. The straight weir ulics Formulas drop box structure calculation ndent on the size of structure. It ranges

Rev. By B. Clarizia

oor thickness for cell E17 value and nce. Freeboard cell unlocked and copied to

B. Clarizia