Description Gross Calorific Value of Coal Plant Heat Rate Plant Efficiency Plant load factor Plant availability Unit Capacity Therefore, Coal consumption for 1 unit No. of Units Total Coal Consumption Ash content considered in worst coal Total ash generated Designed duration considered for the ash pond Bulk density of ash for disposal area calculation Ash fill height Bottom Ash & Coarse Ash generated
Unit Kcal/Kg Kcal/Kwh 2800 2500 34.45% % % MW TPH Nos. TPH % TPH Years T/m m % TPH TPA
3
100 100 600 535.714 1 535.714 44.00 235.714 3 0.60 20.00 20 47 412971 80 189 1651886 1238914 2064857 4955657 8259429 103243 134216 174480 17 1st 65 48180 62634 81424 8 26 2nd 80 27531 35791 46528 5 22 3rd 90 13766 17895 23264 2 20
16
% TPH TPA
17
T m
3
18
T m
3 2
19
BA & CA disposal area required Required ash dyke area considering 30% additional area requirement for Ash Bundh, Stilling pond etc. Total ash pond area required considering 30% green belt
m2 m2 Hectares
20
Year %
21
Disposal area required for Fly Ash Required ash dyke area considering 30% additional area requirement for Ash Bundh, Stilling pond etc. Total ash pond area required considering 30% green belt
m2 m2 Hectares
22
Hectares
23
Hectares Acre
33 80
Total coal consumption for all unit per year Total coal consumption for all unit per day Total coal consumption for all unit per hour Storage Hour Total storage required for all unit Number of storage bunker Required storage per bunker Bulk density of coal Required storage volume per bunker Operating time of CHP Required capacity of CHP Selected capacity of CHP Conveying speed of conveyor Required belt width Selected belt width
4.6928571 0.0128571 535.7143 14.00 7500.0000 16 468.7500 0.80 585.9375 13.50 952.3810 1600.00 3.10 1338.6989 1400.00
S.No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Description Gross Calorific Value of Coal Plant Heat Rate Plant Efficiency Plant load factor Plant availability Unit Capacity Therefore, Coal consumption for 1 unit No. of Units Total Coal Consumption Ash content considered in worst coal Total ash generated Designed duration considered for the ash pond Bulk density of ash for disposal area calculation Ash fill height Bottom Ash & Coarse Ash generated
Unit Kcal/Kg Kcal/Kwh 4000 2250 38.28% % % MW TPH Nos. TPH % TPH Years T/m m % TPH TPA
3
90 100 600 303.750 1 303.750 44.00 133.650 3 0.60 20.00 20 27 234155 80 107 936619 702464 1170774 2809858 4683096 58539 70246 77271 8 1st 25 58539 76100 98930 10 18 2nd 50 39026 50734 65954 7 14 3rd 75 19513 25367 32977 3 11
16
% TPH TPA
17
T m
3
18
T m
3 2
19
BA & CA disposal area required Required ash dyke area considering 30% additional area requirement for Ash Bundh, Silling pond etc. Total ash pond area required considering 30% green belt
m2 m2 Hectares
20
Year %
21
Disposal area required for Fly Ash Required ash dyke area considering 30% additional area requirement for Ash Bundh, Stilling pond etc. Total ash pond area required considering 30% green belt
m2 m2 Hectares
22
Hectares
23
Hectares Acre
28 68
Total coal consumption for all unit per year Total coal consumption for all unit per day Total coal consumption for all unit per hour Storage Hour Total storage required for all unit Number of storage bunker Required storage per bunker Bulk density of coal Required storage volume per bunker Operating time of CHP Required capacity of CHP Selected capacity of CHP Conveying speed of conveyor Required belt width Selected belt width
2.6608500 0.0072900 303.7500 14.00 4252.5000 16 265.7813 0.80 332.2266 13.50 540.0000 1600.00 3.10 1338.6989 1400.00