RULES
GENERAL SAFETY
Nobody does any construction, repair or maintenance work without through the necessary safety training. New contract employees must be buddied with experience persons. Barricade all work with site signage. Need two persons two carry materials greater than 8 feet in length. GFCIs are required for all portable electrical equipment and extension cord.
Housekeeping policy
Keep area free of tripping hazards, pick up materials daily. Coordinate work activity with others in area. Maintain clear pathways. Do not block exits or emergency equipment. Clean up your work area prior to leaving. Do not store materials on top of cabinets, gang boxes. Etc
PPE
All PPE used shall meet or exceed applicable ANSI standards. PPE shall be selected based on the hazard present. Contractors must supply and maintain their own PPE. All contractors must be property trained by their companies on the PPE.
All work above 6 feet where exposed to a fall must be conducted with 100% tie off at the Intel site. Must be planned Type of Situations requiring fall protection. *Unprotected sides and edges. *Leading edges. *Hoist Areas *Excavation, pits, shafts. *Roofing *Wall and floor openings *Extending off catwalks, above ceiling, over tools.
All work must be properly barricaded and marked. Barricade must designate ownership, hazard and date. You will be responsible for providing all required signs or barricaded for the area you are working. Barricades must be once hazard is removed (en and day/shift). Any deviations must be approved by sponsor.
Carne Safety
Must comply with the crane manufacturers specification and limitations. Must be inspected by a competent person before each use. Current load test certified available. Boom path must be barricaded. All rigging gear must be inspected. Tag lines must be used on all loads. No lifting over populated areas.