Work ID No.

SPECIFICATION REPORT
Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN SC ST
COLONIES IN RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P
Estd. Cost Rs.

23.50 Lakhs

The work for Providing internal roads with CC pavement & CC Drains in SC ST Localities of
Rajeevnagar Bit-I H/O Gudihathnur G.P. & M of Adilabad (D) has been sanctioned vide Proc. No.
___________________________ of the District Collector, Adilabad for an amount of Rs. 23.50 Lakhs
under the Grant of M.G.N.R.E.G.S. for the year 2011-12.
The estimate is prepared as per the Guidelines of M.G.N.R.E.G.S. Works on basis of CSSR - 2011-12
with the following provisions are made in the estimate.

1. Improvement of Existing embankment.


2. Providing Granular Base Gravel with 66% of Gravel and 34% of Local available sand.
3. Construction of WBM Gr. II.
4. CC Payment as per the guidelines of MG NREGS i.e., M-20 Nominal mix
5. RCC slabs over side drains

The estimate cost comes to Rs. 23.50 Lakhs within the Administrative Sanctioned Amount.

An early technical approval is soliciated.

Asst. Engineer
T.W; Echoda

Dy. Executive Engineer


T.W; S.D. Echoda

68

137665296.xls.ms_office

GENERAL ABSTRACT
Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN
SC ST COLONIES IN RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P

Sl,
No

Description of Item

Quantity

Rate

Per

Amount

Construction of WBM sigle layer road as


per abstratct estimate

2313122.73

Each

2313122.73

35219.42

Each

35219.42

3 Other Provisions

4 Add L.S For round off

1657.85

GRAND TOTAL RUPEES

Asst. Engineer
T.W; Echoda

Dy. Executive Engineer


T.W; S.D. Echoda

2350000.00

Rural Development Department


MGNREGS-AP
Input Data Sheet for the work
Comprehensive Development-Providing Internal Roads with CC Drains in SC ST Colonies

Note:
1. The estimate should be prepared habitation wise.
2. The entire length of road shall be covered in one estimate.
4. The specification of MS name board has to be in detail in datasheet.
5. The detailed estimate, datasheet and lead statement prepared manually outside the computer should be
tied to the computer generated estimate.

A) General Information
DCC (Departmental Computer Center) Name :

UTNOOR

Name of Mandal

GUDIHATHNUR

Name of Gram Panchayat ;

GUDIHATNUR

Name of Habitation

RAJEEVNAGAR

:
1) Road connecting from
2) Total length ofthe proposed Road
3 )Total drain length proposed:
4) Population being served:

RAJEEVNAGAR
1075.00 M
1105.00 M

D) Quarries and Leads


S.N Name of
1 Sand for
filling
2 Sand for
Mortor
3 Aggregat
e 20mm
to 10mm
4 19-22mm
HBG
Metal

Name of the quarry


Tharnam

Lead in
33

Peddawagu

90

Boregaongutta

10

Boregaongutta

10

5 40-45mm Boregaongutta
HBG
Metal

10

6 60-63mm Boregaongutta
HBG
Metal

10

7 225 mm Boregaongutta
Rough
stone of
OTG
variety

10

To

8 225 mm Boregaongutta
Rough
stone of
HBG
variety
9 RCC
Nirmal
NP2/NP3
Pipes
10 Gravel
Kupti

10

60

24

11 Cement

Adilabad

12 Steel

Adilabad

E) Abstract estimate
Quantites and Rates shall be as per technically sanctioned estimate. Rates shall be worked out as per
standard data basing on rates available in RSSR and CSSR.
Road Work (RW)
Total tasks
Task Details
CCRW01.Engaging Unskilled Labour for earth work
excavation in ordinary soils at site with initial lead &
initial lift and breaking clods and sectioning for
16134 formation of embankment (RSSR)
CCRW02.Engaging unskilled labour for Filling
foundation with sand but excluding conveyance of
16135 sand (RSSR)
CCRW03.Cost and conveyance of sand for filling
including all charges but excluding labour charges for
16136 filling.(CSSR)

Sl.No Task No

Qty

Rate

Amount

Cum

403.13

253.75

51146.00

Cum

0.00

14.00

0.00

Cum

0.00

469.23

0.00

Cum

0.00

6333.70

0.00

16137

CCRW04.Providing plain cement concrete M15 using


20mm to 12mm Graded HBG crushed Metal with 250
Kgs of cement per 1cum of concrete, including C/c of
all materials, curing ,labour charges etc., complete as
per drawings & tech. specifications Clause 802, 803,
1202 & 1203 as per clause 800 & 1200 (1) of MORD
and guidelines For side drains

Cum

0.00

5021.00

0.00

CCRW05.RCC M- 20 Nominal mix using 20mm to


12mm Graded size crushed hard granite metal
including C/C of all materials, taxes ,operational,
incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for
16138 finished item of work for slab over drain

Kgs

0.00

47300.40

0.00

16139

CCRW06.Supplying, fitting and placing HYSD bar


reinforcement in slab over drain complete and
technical specifications including fabrication charges

cum

725.63

443.01

321455.73

CCRW07.Supply and collection of well graded


granular material (i.e. 66% of gravel having stone
aggregate of 9.5 mm to 4.75 mm size, and 34% of
sand of size less than 2.6mm) with CBR not <15%
and plasticity index <6% in soaked condition including
labour charges and stacking to Departmental gauge
for pre measurements as per MoRD standards for
16140 Sub Base. (CSSR)

CCRW08.Engaging Unskilled Labour for spreading


the collected well graded granular material and
sectioning
for
Sub
Base,
blindage
&
16141 Shoulders.(RSSR)
CCRW09.Compaction of collected well graded
granular soil to OMC using 8-10T Power Road Roller
to achieve CBR value not <15% and plasticity index
<6% with required waterings and keeping the rolled
surface wet for a period of 15 days as per MoRD
standards for Base(192 mm loose to 150 mm
compacted) and for Shoulders (125 loose to 100mm
16142 compacted) (CSSR)

Cum

725.63

12.15

8816.00

Cum

403.13

93.64

37749.00

Cum

201.56

959.17

193333.00

10

16143

CCRW10.Supply and collection of mixer of stone


aggregates having 50% of 60-63mm HBG metal ,
46% of 40-45mm HBG metal and 4% of 19-22mm
HBG metal including cost ,conveyance, loading,
unloading and stacking to departmental gauge for pre
measurements for WBM Grade-II surfaceas per
MORD standards( 100mm Loose thick)(CSSR)

Cum

201.56

326.09

65727.00

11

CCRW11.Spreading the collected mixer of stone


aggregates in uniform thicknesses and good gravel
for blindage, hand packing and rolling with 8-10T
Power Road Roller in stages to proper grade and
camber with required waterings and keeping the rolled
surface wet for a period of 15 days including
brooming.(100mm loose to 75mm compacted)
16144 (CSSR)

Cum

335.94

4815.70

1617774.00

Sq.m

33.59

340.00

11422.00

each

1.00

0.00

0.00

each

2.00

0.00

0.00

each

1.00

5700.00

5700.00

Cum

478.91

22.00

10536.075

Cum

296.30

50.00

14814.84375

Cum

246.71

40.00

9868.5

Cum

0.00

50.00

0.00

Rs.
Rs.

1.00
1.00

0.00
0.00

0.00
0.00

Rs.

1.00

0.00

0.00

23
24

CCRW12.Construction of un-reinforced, dowel jointed


at expansion and construction joint only, PCC
pavement thickness as per design over a prepared
sub base using M20 grade, coarse and fine
aggregates confirming to IS 383including all labour
16145 charges etc. complete(CSSR)
CCRW13.Providing Mastic Pads of size .6mX1.2 M of
16146 12.7mm thick as per CSSR
CCRW14.Supply and fixing of KM stones including
16147 painting and required lettering
CCRW15.Supply and fixing of HM stones including
16148 painting and required lettering
CCRW16.Supply and fixing of MS name board of size
2feet.6inch x4feet including painting and required
16149 lettering
16150 CCRW17.OP04.Seigniorage charges of gravel
CCRW18.OP02.Seignorage charges on quantity of
16151 metal
CCRW19.OP03.Seignorage charges on quantity of
16152 sand
CCRW20.OP05.Seignorage charges on quantity of
16153 stone
16154 CCRW21.OP01.VAT @ 4%
16155 CCRW22.OP06.Q.C. charges @ 0.50%
CCRW23.Provision for price escalation cement and
16156 steel
15669 Differential cost of Cement for April as per GO.94

25

15673

26
27

15667

28
29

Differential cost of Cement for January as per GO.94


15666
15672 Differential cost of Cement for July as per GO.94

12
13
14
15

16
17
18
19
20
21
22

Nos.

--

Nos.

--

Differential cost of Cement for December as per


15677 GO.94

Nos.

--

Differential cost of Cement for February as per GO.94

Nos.

--

Nos.

--

Nos.

--

Differential cost of Cement for August as per GO.94

30
31
32
33

15671 Differential cost of Cement for June as per GO.94


15668 Differential cost of Cement for March as per GO.94
15670 Differential cost of Cement for May as per GO.94
Differential cost of Cement for November as per
15676 GO.94

34

15675

35
36
37

Differential cost of Cement for September as per


15674 GO.94
15681 Differential cost of Steel for April as per GO.94
15685 Differential cost of Steel for August as per GO.94

38
39
40
41
42

15689
15684
15683
15680
15682

43
44

Differential cost of Steel for November as per GO.94


15688
15687 Differential cost of Steel for October as per GO.94

Kgs

--

Kgs

--

Differential cost of Steel for September as per GO.94

Kgs

--

45

15686

Nos.
Nos.
Nos.

----

Nos.

--

Nos.

--

Nos.

--

Kgs
Kgs

---

Differential cost of Steel for December as per GO.94

Kgs

--

Differential cost of Steel for July as per GO.94


Differential cost of Steel for June as per GO.94
Differential cost of Steel for March as per GO.94
Differential cost of Steel for May as per GO.94

Kgs
Kgs
Kgs
Kgs

-----

Differential cost of Cement for October as per GO.94

TOTAL

Asst. Engineer
T.W; Echoda

Dy. Executive Engineer


T.W; S.D. Echoda

2348342.15

DETAILED ESTIMATE FOR WBM ROAD


Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN SC ST COLONIES IN
RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P
Sl
No

Description of Item

No

Measurmetns

Qty

Rate

Per

Amount

10

2.50

0.15

403.13

126.88

Cum

0.00

2.50

0.15

0.00

14.00

Cum

469.23

Cum

51.00
50.00
102.00
117.00
115.00
35.00
70.00
80.00
75.00
80.00
20.00
180.00
100.00
1075.00

CCRW01.Engaging Unskilled Labour for earth


work excavation in ordinary soils at site with
1 initial lead & initial lift and breaking clods and
sectioning for formation of embankment
(RSSR) For Internal Road
Sri Gangareddy (h) to Sana (h)
Sri S.Keshav (h) to Rajanna (h)
Sri Balaji (h) to Phoolsingh (h)
Smt Urmila (h) to Babu (h)
Sri Faizu (h) to Arju (h)
Smt Drupathibai (h) to Muthnur road
Sri Rajanna (h) to Mohd. Ali (h)
Sri Vishwanath (h) to Jai indal (h)
Sri Jadi prahlad (h) to Kashinath (h)
Sri Babu (h) to Salim (h)
Sri Pasha Driver (h) to Bikshapathi (h)
Sri G.Srinivas(h) to Suresh (h)
Sri Shivlal (h) to Narhari (h)
CCRW02.Engaging unskilled labour for Filling
2 foundation with sand but excluding
conveyance of sand (RSSR)
From A to B

1
1
1
1
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
1
1

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

From A to B

1 x

0.00

51,146.00

CCRW03.Cost and conveyance of sand for


filling including all charges but excluding labour
charges for filling.(CSSR) For side Drain
1 X

1105.00

0.90

0.10

0.00

Sri Gangareddy (h) to Sana (h)

1 x

51.00

2.50

0.15

19.13

Sri S.Keshav (h) to Rajanna (h)

1 x

50.00

2.50

0.15

18.75

Sri Balaji (h) to Phoolsingh (h)

1 x

102.00

2.50

0.15

38.25

Rate as per RSSR ( NREGS )

0.00

CCRW07.Supply and collection of well graded


granular material (i.e. 66% of gravel having
stone aggregate of 9.5 mm to 4.75 mm size,
and 34% of sand of size less than 2.6mm)
3 with CBR not <15% and plasticity index <6% in
soaked condition including labour charges and
stacking to Departmental gauge for pre
measurements as per MoRD standards for
Sub Base. (CSSR)

Page 7

137665296.xls.ms_office

Sl
No
1

Description of Item

Measurmetns

No

Qty

Rate

Per

Amount

10

725.63

443.01

Cum

321,455.73

725.63

12.15

Cum

8,816.00

2
Smt Urmila (h) to Babu (h)

1 x

117.00

2.50

0.15

43.88

Sri Faizu (h) to Arju (h)

1 x

115.00

2.50

0.15

43.13

Smt Drupathibai (h) to Muthnur road

1 x

35.00

2.50

0.15

13.13

Sri Rajanna (h) to Mohd. Ali (h)

1 x

70.00

2.50

0.15

26.25

Sri Vishwanath (h) to Jai indal (h)

1 x

80.00

2.50

0.15

30.00

Sri Jadi prahlad (h) to Kashinath (h)

1 x

75.00

2.50

0.15

28.13

Sri Babu (h) to Salim (h)

1 x

80.00

2.50

0.15

30.00

Sri Pasha Driver (h) to Bikshapathi (h)

1 x

20.00

2.50

0.15

7.50

Sri G.Srinivas(h) to Suresh (h)

1 x

180.00

2.50

0.15

67.50

Sri Shivlal (h) to Narhari (h)

1 x

100.00

2.50

0.15

37.50

Sri Gangareddy (h) to Sana (h)

1 x

51.00

1.00

0.15

15.30

Sri S.Keshav (h) to Rajanna (h)

1 x

50.00

1.00

0.15

15.00

Sri Balaji (h) to Phoolsingh (h)

1 x

102.00

1.00

0.15

30.60

Smt Urmila (h) to Babu (h)

1 x

117.00

1.00

0.15

35.10

Sri Faizu (h) to Arju (h)

1 x

115.00

1.00

0.15

34.50

Smt Drupathibai (h) to Muthnur road

1 x

35.00

1.00

0.15

10.50

Sri Rajanna (h) to Mohd. Ali (h)

1 x

70.00

1.00

0.15

21.00

Sri Vishwanath (h) to Jai indal (h)

1 x

80.00

1.00

0.15

24.00

Sri Jadi prahlad (h) to Kashinath (h)

1 x

75.00

1.00

0.15

22.50

Sri Babu (h) to Salim (h)

1 x

80.00

1.00

0.15

24.00

Sri Pasha Driver (h) to Bikshapathi (h)

1 x

20.00

1.00

0.15

6.00

Sri G.Srinivas(h) to Suresh (h)

1 x

180.00

1.00

0.15

54.00

Sri Shivlal (h) to Narhari (h)

1 x

100.00

1.00

0.15

30.00

For Side berms

2150.00
CCRW08.Engaging Unskilled Labour for
spreading the collected well graded granular
4
material and sectioning for Sub Base, blindage
& Shoulders.(RSSR)

CCRW09.Compaction of collected well graded


granular soil to OMC using 8-10T Power Road
Roller to achieve CBR value not <15% and
plasticity index <6% with required waterings
5 and keeping the rolled surface wet for a period
of 15 days as per MoRD standards for
Base(192 mm loose to 150 mm compacted)
and for Shoulders (125 loose to 100mm
compacted) (CSSR)
Sri Gangareddy (h) to Sana (h)
Sri S.Keshav (h) to Rajanna (h)
Sri Balaji (h) to Phoolsingh (h)
Smt Urmila (h) to Babu (h)
Sri Faizu (h) to Arju (h)
Smt Drupathibai (h) to Muthnur road
Sri Rajanna (h) to Mohd. Ali (h)
Sri Vishwanath (h) to Jai indal (h)

1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1

51.00
50.00
102.00
117.00
115.00
35.00
70.00
80.00

Page 8

2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

19.13
18.75
38.25
43.88
43.13
13.13
26.25
30.00

137665296.xls.ms_office

Sl
No
1

Description of Item
2
Sri Jadi prahlad (h) to Kashinath (h)
Sri Babu (h) to Salim (h)
Sri Pasha Driver (h) to Bikshapathi (h)
Sri G.Srinivas(h) to Suresh (h)
Sri Shivlal (h) to Narhari (h)

Measurmetns

No
3
1
1
1
1
1

x
x
x
x
x

1
1
1
1
1

4
75.00
80.00
20.00
180.00
100.00

5
2.50
2.50
2.50
2.50
2.50

6
0.15
0.15
0.15
0.15
0.15

Qty

Rate

Per

Amount

7
28.13
30.00
7.50
67.50
37.50

10

403.13

93.64

Cum

37,749.00

9.56
9.38
19.13
21.94
21.56
6.56
13.13
15.00
14.06
15.00
3.75
33.75
18.75
201.56

959.17

Cum

193,333.00

326.09

Cum

65,727.00

CCRW10.Supply and collection of mixer of


stone aggregates having 50% of 60-63mm
HBG metal , 46% of 40-45mm HBG metal and
4% of 19-22mm HBG metal including cost
6
,conveyance, loading, unloading and stacking
to departmental gauge for pre measurements
for WBM Grade-II surfaceas per MORD
standards( 100mm Loose thick)(CSSR)
Sri Gangareddy (h) to Sana (h)
Sri S.Keshav (h) to Rajanna (h)
Sri Balaji (h) to Phoolsingh (h)
Smt Urmila (h) to Babu (h)
Sri Faizu (h) to Arju (h)
Smt Drupathibai (h) to Muthnur road
Sri Rajanna (h) to Mohd. Ali (h)
Sri Vishwanath (h) to Jai indal (h)
Sri Jadi prahlad (h) to Kashinath (h)
Sri Babu (h) to Salim (h)
Sri Pasha Driver (h) to Bikshapathi (h)
Sri G.Srinivas(h) to Suresh (h)
Sri Shivlal (h) to Narhari (h)

1
1
1
1
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x
x

CCRW11.Spreading the collected mixer of


stone aggregates in uniform thicknesses and
good gravel for blindage, hand packing and
rolling with 8-10T Power Road Roller in stages
7 to proper grade and camber with required
waterings and keeping the rolled surface wet
for a period of 15 days including
brooming.(100mm loose to 75mm compacted)
(CSSR)
Sri Gangareddy (h) to Sana (h)
1 x
Sri S.Keshav (h) to Rajanna (h)
1 x
Sri Balaji (h) to Phoolsingh (h)
1 x

51.00
50.00
102.00
117.00
115.00
35.00
70.00
80.00
75.00
80.00
20.00
180.00
100.00
1075.00

2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50

51.00

2.50

0.075

50.00

2.50

0.075

9.38

102.00

2.50

0.075

19.13

1
1
1
1
1
1
1
1
1
1
1
1
1

0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075
0.075

9.56

Smt Urmila (h) to Babu (h)

1 x

117.00

2.50

0.075

21.94

Sri Faizu (h) to Arju (h)

1 x

115.00

2.50

0.075

21.56

Smt Drupathibai (h) to Muthnur road

1 x

35.00

2.50

0.075

6.56

Sri Rajanna (h) to Mohd. Ali (h)

1 x

70.00

2.50

0.075

13.13

Sri Vishwanath (h) to Jai indal (h)

1 x

80.00

2.50

0.075

15.00

Sri Jadi prahlad (h) to Kashinath (h)

1 x

75.00

2.50

0.075

14.06

Sri Babu (h) to Salim (h)

1 x

80.00

2.50

0.075

15.00

Sri Pasha Driver (h) to Bikshapathi (h)

1 x

20.00

2.50

0.075

3.75

Sri G.Srinivas(h) to Suresh (h)

1 x

180.00

2.50

0.075

33.75

Sri Shivlal (h) to Narhari (h)

1 x

100.00

2.50

0.075

1075.00

CCRW12.Construction of un-reinforced, dowel


jointed at expansion and construction joint
only, PCC pavement thickness as per design
8 over a prepared sub base using M20 grade,
coarse and fine aggregates confirming to IS
383including all labour charges etc.
complete(CSSR)
1 x
Sri Gangareddy (h) to Sana (h)

51.00

Page 9

18.75
201.56

2.50

0.125

15.94

137665296.xls.ms_office

Sl
No
1

Description of Item
2
Sri S.Keshav (h) to Rajanna (h)
Sri Balaji (h) to Phoolsingh (h)
Smt Urmila (h) to Babu (h)
Sri Faizu (h) to Arju (h)
Smt Drupathibai (h) to Muthnur road
Sri Rajanna (h) to Mohd. Ali (h)
Sri Vishwanath (h) to Jai indal (h)
Sri Jadi prahlad (h) to Kashinath (h)
Sri Babu (h) to Salim (h)
Sri Pasha Driver (h) to Bikshapathi (h)
Sri G.Srinivas(h) to Suresh (h)
Sri Shivlal (h) to Narhari (h)

Measurmetns

No
3
1
1
1
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x

1
1
1
1
1
1
1
1
1
1
1
1

Qty

Rate

Per

Amount

7
15.63
31.88
36.56
35.94
10.94
21.88
25.00
23.44
25.00
6.25
56.25
31.25
335.94

10

4815.70

Cum

1,617,774.00

0.125

33.59

340.00

Each

11,422.00

4
50.00
102.00
117.00
115.00
35.00
70.00
80.00
75.00
80.00
20.00
180.00
100.00
1075.00

5
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50

6
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125
0.125

2.50

CCRW13.Providing Mastic Pads of size


9 .6mX1.2 M of 12.7mm thick as per CSSR
( 2.50 X 0.125 = 0.3125 ) = 0.3125 X 1225/10
From A to B

10

CCRW14.Supply and fixing of KM stones


including painting and required lettering
From A to B

11

1 x 107.5

1 x

1.00

0.00

Each

1 x

2.00

0.00

Each

1 x

1.00

5700.00

Each

CCRW15.Supply and fixing of HM stones


including painting and required lettering
From A to B

CCRW16.Supply and fixing of MS name board


12 of size 2feet.6inch x4feet including painting
and required lettering
From A to B

Sub Total

5,700.00
2,313,122.73

FOR CC SIDE DRAINS


CCRW01.Engaging Unskilled Labour for earth
work excavation in ordinary soils at site with
13 initial lead & initial lift and breaking clods and
sectioning for formation of embankment
(RSSR)
Sri Gangareddy (h) to Sana (h)
1 X
Sri S.Keshav (h) to Rajanna (h)
1 X

51.00

50.00

Sri Balaji (h) to Phoolsingh (h)

1 X

0.00

Sri J.Bheemrao (h) to Pawar Bheemsingh (h)

1 X

115.00

Smt Urmila (h) to Babu (h)

1 X

117.00

Sri Faizu (h) to Arju (h)

1 X

115.00

Smt Drupathibai (h) to Muthnur road

1 X

90.00

Sri Rajanna (h) to Mohd. Ali (h)

1 X

0.00

Sri Vishwanath (h) to Jai indal (h)

1 X

30.00

Sri Kantharao (h) to Niyaz (h)

1 X

52.00

Sri Jadi prahlad (h) to Kashinath (h)

1 X

75.00

Sri Babu (h) to Salim (h)

1 X

80.00

Sri Pasha Driver (h) to Bikshapathi (h)

1 X

0.00

Sri G.Srinivas(h) to Suresh (h)

1 X

180.00

Page 10

137665296.xls.ms_office

Sl
No
1

Description of Item

Measurmetns

No
3

Qty

Rate

Per

Amount

10

0.90

0.60

0.00

126.88

Cum

14.00

Cum

Cum

1105.00

2
Sri Shivlal (h) to Narhari (h)

1 X

0.00

Sri Hanmanth (h) to Ankush (h)

1 X

100.00

Sri MGM School to Paithanya Uttam (h)

1 X

50.00

CCRW02.Engaging unskilled labour for Filling


14 foundation with sand but excluding
conveyance of sand (RSSR)
1 X

1105.00

0.90

0.10

0.00

Bottom of Drain

1 X

1105.00

0.75

0.10

0.00

Sides Walls of drain

1 X
1 X

2
2

1105.00 0.225
1105.00 0.175

0.600
0.600

0.00
0.00
0.00

6333.70

0.00

5021.00

0.00

47300.40

Rate as per RSSR ( NREGS )

CCRW04.Providing plain cement concrete


M15 using 20mm to 12mm Graded HBG
crushed Metal with 250 Kgs of cement per
1cum of concrete, including C/c of all
15 materials, curing ,labour charges etc.,
complete as per drawings & tech.
specifications Clause 802, 803, 1202 & 1203
as per clause 800 & 1200 (1) of MORD and
guidelines For side drains

CCRW05.RCC M- 20 Nominal mix using 20mm to


12mm Graded size crushed hard granite metal
including C/C of all materials, taxes ,operational,
16 incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges for
finished item of work for slab over drain

1 x

56

2.50

0.65

0.10

CCRW06.Supplying, fitting and placing HYSD


bar reinforcement in slab over drain complete
17
and technical specifications including
fabrication charges
1 x 1.683

MT

Sub-Total
18 CCRW17.OP04.Seigniorage charges of gravel

478.91

22.00

10,536.08

296.30

50.00

14,814.84

246.71

40.00

9,868.50

0.00

50.00

22 CCRW21.OP01.VAT @ 4%

1.00

0.00

23 CCRW22.OP06.Q.C. charges @ 0.50%

1.00

0.00

1.00

0.00

CCRW18.OP02.Seignorage charges on
quantity of metal
CCRW19.OP03.Seignorage charges on
20
quantity of sand
CCRW20.OP05.Seignorage charges on
21
quantity of stone
19

24

CCRW23.Provision for price escalation


cement and steel

Sub-Total
25
26
27
28
29

35,219.42

Differential cost of Cement for April as per


GO.94
Differential cost of Cement for August as per
GO.94
Differential cost of Cement for December as
per GO.94
Differential cost of Cement for February as per
GO.94
Differential cost of Cement for January as per
GO.94

Page 11

137665296.xls.ms_office

Sl
No
1
30
31
32
33
34
35
36

Description of Item
2
Differential cost of Cement for July as per
GO.94
Differential cost of Cement for June as per
GO.94
Differential cost of Cement for March as per
GO.94
Differential cost of Cement for May as per
GO.94
Differential cost of Cement for November as
per GO.94
Differential cost of Cement for October as per
GO.94
Differential cost of Cement for September as
per GO.94

No
3

Measurmetns
L

Qty

Rate

Per

Amount

10

37 Differential cost of Steel for April as per GO.94


Differential cost of Steel for August as per
GO.94
Differential cost of Steel for December as per
39
GO.94
38

40 Differential cost of Steel for July as per GO.94


41 Differential cost of Steel for June as per GO.94
42

Differential cost of Steel for March as per


GO.94

43 Differential cost of Steel for May as per GO.94


Differential cost of Steel for November as per
GO.94
Differential cost of Steel for October as per
45
GO.94
Differential cost of Steel for September as per
46
GO.94
44

GRAND TOTAL
Say Rs. (in Lakhs )

Asst. Engineer
T.W; ECHODA

2,348,342.15
23.50

Dy. Executive Engineer


T.W; S.D. ECHODA

Page 12

137665296.xls.ms_office

LEAD CHART
Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN SC ST COLONIES IN RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P
HB

Sl.
No.

Description

Source of Material

Lead in
Km

Convence
Charges

Blastering Charges

Machine crushing
charges @ 25%

Deduct from
Conveyance

GUDIHATHNUR

GUDIHATNUR

Initial Cost including


Seigionarage Charges

RAJEEVNAGAR

GP

10

11

Total Cost Unit per

Coarse Sand for mortor

Peddawagu

90

662.02

279.50

941.52

Cum

Coarse Sand for filling

Tharnam

33

264.73

204.50

469.23

Cum

Fine sand

Pendalwada

90

662.02

279.50

941.52

Cum

Morrum / 9.5 - 4.75mm

Kupti

24

193.66

52.50

246.16

Cum

Boregaongutta

10

77.63

419.30

70

104.83

-8.70

663.06

Cum

Boregaongutta

10

77.63

551.30

70

137.83

-8.70

828.06

Cum

Boregaongutta

10

77.63

681.30

70

170.33

-8.70

990.56

Cum

Boregaongutta

10

77.63

835.30

70

208.83

-8.70

1183.06

Cum

Boregaongutta

10

77.63

491.30

70

122.83

-8.70

753.06

Cum

Boregaongutta

10

77.63

351.30

70

498.93

Cum

Boregaongutta

10

77.63

491.30

70

122.83

761.76

Cum

Boregaongutta

10

77.63

821.30

70

205.33

-8.70

1165.56

Cum

6mm M/c HBG Metal


Nominal size (Granite,
Dolamite &Trap variety)
10mm M/c HBG Metal
6
Nominal size -do12-14mm M/c HBG Metal
7
Nominal size -do20mm M/c HBG Metal
8
Nominal size -do40mm M/c HBG Metal
9
Nominal size -do60-63mm metal IRC and
10
morth HBG metal
40-45mm metal IRC and
11
morth HBG metal
25-27mm metal IRC and
12
morth HBG metal
5

13

Remarks

12

137665296.xls.ms_office

Source of Material

Lead in
Km

Convence
Charges

Initial Cost including


Seigionarage Charges

Blastering Charges

Machine crushing
charges @ 25%

Deduct from
Conveyance

Boregaongutta

10

77.63

941.30

70

235.33

-8.70

1315.56

Cum

Boregaongutta

10

77.63

681.30

70

170.33

-8.70

990.56

Cum

Boregaongutta

10

77.63

551.30

70

137.83

-8.70

828.06

Cum

Boregaongutta

10

77.63

421.30

70

105.33

-8.70

665.56

Cum

Boregaongutta

10

77.63

251.30

70

62.83

-8.70

453.06

Cum

Kupti

24

194.67

227.30

70

56.83

-8.70

540.10

Cum

19 65mm IRC and morth OTG

Boregaongutta

10

77.63

113.30

70

260.93

Cum

20 40mm IRC and morth OTG

Boregaongutta

10

77.63

137.30

70

34.33

-8.70

310.56

Cum

Boregaongutta

10

77.63

37.60

70

185.23

Cum

22 HYSD Steel (FE415)

Adilabad

41000.00

41000.00

MT

23 Cement

Adilabad

5500.00

5500.00

MT

Nirmal

60

284.08

5250.60

5534.68

Rmt

Sl.
No.

13
14
15
16
17
18

21

24

Description

19-22mm metal IRC and


morth HBG metal
12.-14mm metal IRC and
morth HBG metal
9.50-11.20mm metal IRC
and morth HBG metal
5-7mm metal IRC and
morth HBG metal
2.36-5mm metal IRC and
morth HBG metal
2.36mm & below size (HBG
stone chips ) metal IRC and
morth HBG metal

Field picked metal


unbrocken of 25mm size

RCC Hume Pipes 900mm


dia

14

Total Cost Unit per

Remarks

137665296.xls.ms_office

1
2
3

Convence
Charges

Deduct from
Conveyance

Lead in
Km

Machine crushing
charges @ 25%

Source of Material

Blastering Charges

Description

Initial Cost including


Seigionarage Charges

Sl.
No.

Total Cost Unit per

Remarks

CERTIFICATES:Certified that the above leads are true and correct to the best of my knowledge
Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal
Certified that the 40mm, 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing

Asst. Engineer
TW Echoda

Dy .Executive Engineer
TW SD Echoda

15

Executive Engineer
TW Division Utnoor

137665296.xls.ms_office

16

DATA SHEET C.D Work


Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN SC ST
COLONIES IN RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P
Sl No
1

Ref to MORD
specifications
2

Description of Item

Unit

Qty

Rate

Amount

3
CCRW01.Engaging Unskilled Labour for earth
work excavation in ordinary soils at site with
initial lead & initial lift and breaking clods and
sectioning for formation of embankment
(RSSR)
Rate as per RSSR ( NREGS )

Cum

1.00

72.50

72.50
54.38

Add 75% for narrow excavation

126.88

CCRW02.Engaging unskilled labour for Filling


foundation with sand but excluding
conveyance of sand (RSSR)
Material
Cum

Add For Re Filling Charges

1.00

14.00

14.00

Rate per Cum

CCRW03.Cost and conveyance of sand for


filling including all charges but excluding
labour charges for filling.(CSSR)
As per lead chart

Cum

1.00

469.23

469.23
469.23

Rate per Cum

14.00

CCRW04.Providing plain cement concrete


M15 using 20mm to 12mm Graded HBG
crushed Metal with 250 Kgs of cement per
1cum of concrete, including C/c of all
materials, curing ,labour charges etc.,
complete as per drawings & tech.
specifications Clause 802, 803, 1202 & 1203
as per clause 800 & 1200 (1) of MORD and
guidelines For side drains

Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer
(MORD)
Unit = cum
(a) Material
Cement

0.275

5500.00

1512.50

Coarse sand

cum

0.480

941.52

451.93

20 mm aggregate

cum

0.607

1183.06

718.11

Page 16

137665296.xls.ms_office

17
Sl No

Ref to MORD
specifications

Description of Item

Unit

Qty

Rate

Amount

cum

0.313

990.56

310.04

Mate

day

0.00

0.00

0.00

Mason (1st Class)

day

0.100

445.31

44.53

Mazdoor (Unskilled)

day

1.390

335.94

466.95

hour

0.400

5500.00

2200.00

12 mm aggregate
(b) Labour

(c) Machinery
Concrete mixer 0.4/0.28 cum capacity

5704.07
(d) Formwork @ 10% on cost of material,
labour and machinery (a+b+c)

10%

5704.07

570.41
6274.48

e) Overheads & Contractors Profit on


(a+b+c+d)

6274.48

0.00
6274.48

Sub-Total :
f) Seigniorage charges (i) Sand

cum

0.48

40.00

19.20

(ii) Aggregate

cum

0.8

50.00

40.00
6333.68

g) Rate per cum

6333.70

CCRW05.RCC M- 20 Nominal mix using 20mm to


12mm Graded size crushed hard granite metal
including C/C of all materials, taxes ,operational,
incidental and labour charges such as machine
mixing, laying concrete, curing etc.,complete but
excluding cost of steel and its fabrication charges
for finished item of work for slab over drain

R.C.C grade M 20 Nominal mix (MORD)


(Nominal mix) using 20mm graded metal
(MORD)

Unit = cum
(a) Material
Cement

0.330

5500.00

1815.00

Coarse sand

cum

0.45

941.52

423.68

20 mm aggregate

cum

0.54

1183.06

638.85

12 mm aggregate

cum

0.36

990.56

356.60

Mate

day

0.00

0.00

0.00

Mason (1st Class)

day

0.10

445.31

44.53

Mazdoor (Unskilled)

day

1.39

335.94

466.95

(b) Labour

Page 17

137665296.xls.ms_office

18
Sl No

Ref to MORD
specifications

Description of Item

Unit

Qty

Rate

Amount

Concrete mixer 0.4/0.28 cum capacity

hour

0.40

345.00

138.00

Generator 33 KVA

hour

0.40

620.00

248.00

(c) Machinery

4131.62
d) Formwork @ 20% on cost of material,
labour and machinery (a+b+c)

20%

4131.62

826.32
4957.94

e) Overheads & Contractors Profit on


(a+b+c+d)

4957.94

0.00
4957.94

Sub-Total :
f) Seigniorage charges (i) Sand

cum

0.45

40.00

18.00

(ii) Aggregate

cum

0.9

50.00

45.00
5020.94

g) Rate per cum

5021.00

CCRW06.Supplying, fitting and placing HYSD


bar reinforcement in slab over drain complete
and technical specifications including
fabrication charges

Unit = t
(a) Material
HYSD bars including 5 per cent overlaps
and wastage
Binding wire
(b) Labour for cutting, bending,
shifting to site, tying, and placing in
position
Mate
Blacksmith / Rod binder
Mazdoor (Unskilled)
Sub-Total :
c) Overheads & Contractors Profit
Rate per tonn = a+b+c
Rate per tonne

Page 18

1.050

41000.00 43050.00

kg

8.000

55.00

day
day
day

0.000
3.000
8.440

0.00
325.00
335.94

0.00%

440.00

0.00
975.00
2835.31
47300.31
47300.31
0.00
47300.31
47300.40

137665296.xls.ms_office

19
Sl No

Ref to MORD
specifications

Description of Item

Unit

Qty

Rate

Amount

9.5 mm to 4.75 mm @ 66% ( Gravel)

Cum

253.44

246.16

62386.79

2.36 mm below @ 34% (2.36 mm sand )

Cum

130.56

540.10

70514.80

CCRW07.Supply and collection of well graded


granular material (i.e. 66% of gravel having
stone aggregate of 9.5 mm to 4.75 mm size,
and 34% of sand of size less than 2.6mm)
with CBR not <15% and plasticity index <6%
in soaked condition including labour charges
and stacking to Departmental gauge for pre
measurements as per MoRD standards for
Sub Base. (CSSR)
Taking out put =300 Cum

Material
well graded granular sub - base material as per
table 400.2

Rate per 300 Cum

132901.59

Rate Per 1 Cum

443.01

CCRW08.Engaging Unskilled Labour for


spreading the collected well graded granular
material and sectioning for Sub Base,
blindage & Shoulders.(RSSR)
Labour
Cum

Mazdoor ( Un Skilled )( RSSR)

1.00

12.15

12.15

Rate per 1 Cum

12.15

CCRW09.Compaction of collected well graded


granular soil to OMC using 8-10T Power Road
Roller to achieve CBR value not <15% and
plasticity index <6% with required waterings and
keeping the rolled surface wet for a period of 15
days as per MoRD standards for Base(192 mm
loose to 150 mm compacted) and for Shoulders
(125 loose to 100mm compacted) (CSSR)

Taking out put =300 Cum

Machinery
Three Wheel 80 -100 KN static roller
Tractor with rotavator @ 25 Cum per Hour
Tractor with grader @ 25 Cum per Hour
Water Tanker 6kl capacity

10

hour
hour
hour
hour

844.40
30.00
345.00
0.00
345.00
0.00
345.00
8.00
Rate Per 300 Cum
Rate Per 1 Cum

25332.00
0.00
0.00
2760.00
28092.00
93.64

CCRW10.Supply and collection of mixer of


stone aggregates having 50% of 60-63mm
HBG metal , 46% of 40-45mm HBG metal and
4% of 19-22mm HBG metal including cost
,conveyance, loading, unloading and stacking
to departmental gauge for pre measurements
for WBM Grade-II surfaceas per MORD
standards( 100mm Loose thick)(CSSR)

Page 19

137665296.xls.ms_office

20
Sl No

Ref to MORD
specifications

Description of Item

Unit

Qty

Rate

Amount

Cum

264.60

498.93

132016.88

Cum

243.43

761.76

185434.02

Cum

21.17

1315.56

27850.30

By manual Means
Taking out put =360 Cum
Material
Cost of material

Cost of 60 - 63 mm HBG metal ( 50% 435.60


)
Cost of 40 - 45 mm HBG metal (46%435.60)
Cost of 19 - 22 mm HBG metal ( 4% 435.60 )

345301.20
959.17

Rate Per 360 Cum


Rate Per 1 Cum

11

12

CCRW11.Spreading the collected mixer of


stone aggregates in uniform thicknesses and
good gravel for blindage, hand packing and
rolling with 8-10T Power Road Roller in stages
to proper grade and camber with required
waterings and keeping the rolled surface wet
for a period of 15 days including
brooming.(100mm loose to 75mm compacted)
(CSSR)
By Manual Means
Taking out put =360 Cum
Labour
Mate
Mazdoor ( Skilled )
Mazdoor ( Un Skilled )
Machinery

day
day
day

10.08
2.00
250.00

325.00
325.00
268.75

3276.00
650.00
67187.50

Three Wheel 80 -100 KN static roller at


10cum per hour

hour

45.00

844.40

37998.00

Water tanker 6KL capacity

hour

345.00
24.00
Rate Per 360 Cum
Rate Per 1 Cum

8280.00
117391.50
326.09

CCRW12.Construction of un-reinforced,
dowel jointed at expansion and construction
joint only, PCC pavement thickness as per
design over a prepared sub base using M20
grade, coarse and fine aggregates confirming
to IS 383including all labour charges etc.
complete(CSSR)
Cement Concrete Pavement
Construction of un-reinforced, dowel jointed at expansion
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate
day
Mason (1st class)
day
Mason (2nd class)
day
Mazdoor (Unskilled)
day
Mazdoor (Skilled)
day

Page 20

5.00
5.00
150.00
6.00

445.31
406.25
268.75
325.00

2226.56
2031.25
40312.50
1950.00

137665296.xls.ms_office

21
Sl No

Ref to MORD
specifications

Description of Item

Unit

Qty

Rate

Amount

Surveyor
Mazdoor (Semi-Skilled)
Blacksmith for cutting of dowel bars including
removal of burrs, fabrications & fixing of dowel
bars.
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6
mixers) with weigh batcher and suitable
capacity calibrated water tank
Needle vibrator 40mm (petrol)
Screed vibrator
Plate vibrator
Concrete joint cutting machine for initial & final
cuts
Water tanker 6 kl capacity
Air Compressor (1 hour initial + 1 hour final)
c) Material
Crushed stone coarse aggregates, grading
will be as per Clause 1501.2.4.1 (Table
1500.1) of specifications @ 0.90 cum/cum of
concrete (25 mm & 12.5 mm blending)

day
day

2.00
6.00

500.00
268.75

1000.00
1612.50

day

1.00

406.25

406.25

hour

36.00

248.40

8942.40

hour
hour
hour

9.00
9.00
9.00

120.40
40.00
40.00

1083.60
360.00
360.00

hour

4.00

hour
hour

5.00
2.00

345.00
370.00

1725.00
740.00

cum

67.50

1241.75

83818.13

cum

33.75

941.52

31776.30

t
sqm

26.25
412.50

5500.00
25.00

144375.00
10312.50

0.118

941.52

110.72

0.005

37205.74

186.03

litre

19.00

55.00

1045.00

90.00

10.00

900.00

90.00

10.00

900.00

No.

483.00

1.00

483.00

litre

122.00

54.00

6588.00

litre

131.25

0.00

0.00

kl

18.00

70.00

1260.00

sqm

3.00

520.00

1560.00

3%

346064.74

346064.74
10381.94

Sand as per IS:383 and conforming to Clause


1500.2.4.2 @ 0.45 cum/cum of concrete
Cement @ 310 kg/cum of concrete
Polythene sheet 125 micron
Mild steel dowel bar 25 mm dia of grade S
240. 500 mm long 20 Nos. at culvert/bridge
slab and at construction joint including 5 per
cent wastage.
(4 x 20 x 0.500) + 5 per cent wastage = 42 m
@ 2.80 kg per m = 117.6 kg.
Bitumen primer @ 200 ml per joint for 23
joints
Bituminous sealant 800 ml per joint for 23
joints
Jute rope 12 mm dia including 5 per cent
wastage
Debonding strips 3.75 m (length) x 10 mm
(width) x 5 mm (thick) cut-out of rubber filler
board or similar material including 5 per cent
wastage
Polythene sheathing, covering 2/3rd dowel
bars (20x23) and tight fit including 5 per cent
wastage
Plasticizer 0.5 per cent by weight of cement
(M.180, P.336)
Curing compound (if used) @ 0.33 litre per
sqm
Water for curing
Joint filler board 20 mm thick as per IS:1838
(4 x 3.75 x 0.200 = 3 sqm)
(a+b+c)
d) Formwork @ 3% of (a+b+c)

Page 21

137665296.xls.ms_office

22
Sl No

Ref to MORD
specifications

Description of Item

Unit

Qty

Rate

Amount
356446.68

e) Overheads & Contractors Profit of


(a+b+c+d)
Sub-Total ::
f)Seigniorage charges (i) Sand
(ii) Metal

0.00

356446.68

cum
cum

33.75
67.50

40.00
50.00

1.00

340.00

340.00

1.00

5700.00

5700.00

g) Rate per cum = (a+b+c+d+e+f)/75


13

CCRW13.Providing Mastic Pads of size


.6mX1.2 M of 12.7mm thick as per CSSR

Sq.m

14

CCRW14.Supply and fixing of KM stones


including painting and required lettering

each

15

CCRW15.Supply and fixing of HM stones


including painting and required lettering

each

16

CCRW16.Supply and fixing of MS name


board of size 2feet.6inch x4feet including
painting and required lettering

each

17

CCRW17.OP04.Seigniorage charges of
gravel

Cum

18

CCRW18.OP02.Seignorage charges on
quantity of metal

Cum

19

CCRW19.OP03.Seignorage charges on
quantity of sand

Cum

20

CCRW20.OP05.Seignorage charges on
quantity of stone

Cum

21

CCRW21.OP01.VAT @ 4%

Rs.

22

CCRW22.OP06.Q.C. charges @ 0.50%

Rs.

23

CCRW23.Provision for price escalation


cement and steel

Rs.

24

Differential cost of Cement for April as per


GO.94

Nos.

25

Differential cost of Cement for August as per


GO.94

Nos.

26

Differential cost of Cement for December as


per GO.94

Nos.

27

Differential cost of Cement for February as


per GO.94

Nos.

28

Differential cost of Cement for January as per


GO.94

Nos.

29

Differential cost of Cement for July as per


GO.94

Nos.

30

Differential cost of Cement for June as per


GO.94

Nos.

31

Differential cost of Cement for March as per


GO.94

Nos.

Page 22

0.00
356446.68
1350.00
3375.00
361171.68
4815.62
4815.70

137665296.xls.ms_office

23
Sl No

Ref to MORD
specifications

Description of Item

Unit

32

Differential cost of Cement for May as per


GO.94

Nos.

33

Differential cost of Cement for November as


per GO.94

Nos.

34

Differential cost of Cement for October as per


GO.94

Nos.

35

Differential cost of Cement for September as


per GO.94

Nos.

36

Differential cost of Steel for April as per


GO.94

Kgs

37

Differential cost of Steel for August as per


GO.94

Kgs

38

Differential cost of Steel for December as per


GO.94

Kgs

39

Differential cost of Steel for July as per GO.94

Kgs

40

Differential cost of Steel for June as per


GO.94

Kgs

41

Differential cost of Steel for March as per


GO.94

Kgs

42

Differential cost of Steel for May as per GO.94

Kgs

43

Differential cost of Steel for November as per


GO.94

Kgs

44

Differential cost of Steel for October as per


GO.94

Kgs

45

Differential cost of Steel for September as per


GO.94

Kgs

Qty

Rate

Amount

Dy. Executive Engineer


T.W; S.D. ECHODA

Asst. Engineer
T.W; ECHODA

Page 23

137665296.xls.ms_office

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

0.00
8.36
18.11
26.47
34.82
43.18
51.54
59.90
68.26
76.62
84.98
93.34
101.70
110.06
118.42
126.78
135.14
143.50
151.86
160.22
168.58
176.94
185.30
193.66
202.02
210.38
218.74
227.10
235.46
243.82
250.79
257.76
264.73
271.70
278.67
285.64
292.61
299.58
306.55
313.52
320.49

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

CONVEYANCE CHARGES

0.00
7.95
19.12
27.48
35.83
44.19
52.55
60.91
69.27
77.63
85.99
94.35
102.71
111.07
119.43
127.79
136.15
144.51
152.87
161.23
169.59
177.95
186.31
194.67
203.03
211.39
219.75
228.11
236.47
244.83
251.80
258.77
265.74
272.71
279.68
286.65
293.62
300.59
307.56
314.53
321.50

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

0.00
12.52
27.12
39.65
52.17
64.69
77.21
89.73
102.25
114.77
127.29
139.81
152.33
164.85
177.37
189.89
202.41
214.93
227.45
239.97
252.49
265.01
277.53
290.05
302.57
315.09
327.61
340.13
352.65
365.17
375.61
386.05
396.49
406.93
417.37
427.81
438.25
448.69
459.13
469.57
480.01

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

0.00
11.04
29.73
42.02
54.31
66.60
78.89
91.18
103.47
115.76
128.05
140.34
152.63
164.92
177.21
189.50
201.79
214.08
226.37
238.66
250.95
263.24
275.53
287.82
300.11
312.40
324.69
336.98
349.27
361.56
371.80
382.04
392.28
402.52
412.76
423.00
433.24
443.48
453.72
463.96
474.20

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

0.00
4.69
12.63
17.86
23.08
28.30
33.52
38.74
43.96
49.18
54.40
59.62
64.84
70.06
75.28
80.50
85.72
90.94
96.16
101.38
106.60
111.82
117.04
122.26
127.48
132.70
137.92
143.14
148.36
153.58
157.93
162.28
166.63
170.98
175.33
179.68
184.03
188.38
192.73
197.08
201.43

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

0.00
4.69
10.17
14.87
19.56
24.26
28.96
33.66
38.36
43.06
47.76
52.46
57.16
61.86
66.56
71.26
75.96
80.66
85.36
90.06
94.76
99.46
104.16
108.86
113.56
118.26
122.96
127.66
132.36
137.06
140.97
144.88
148.79
152.70
156.61
160.52
164.43
168.34
172.25
176.16
180.07

PAGE NO : 24 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

327.46
334.43
341.40
348.37
355.34
362.31
369.28
376.25
383.22
390.19
397.16
404.13
411.10
418.07
425.04
432.01
438.98
445.95
452.92
459.89
466.86
473.83
480.80
487.77
494.74
501.71
508.68
515.65
522.62
529.59
536.56
543.53
550.50
557.47
564.44
571.41
578.38
585.35
592.32
599.29
606.26

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

CONVEYANCE CHARGES

328.47
335.44
342.41
349.38
356.35
363.32
370.29
377.26
384.23
391.20
398.17
405.14
412.11
419.08
426.05
433.02
439.99
446.96
453.93
460.90
467.87
474.84
481.81
488.78
495.75
502.72
509.69
516.66
523.63
530.60
537.57
544.54
551.51
558.48
565.45
572.42
579.39
586.36
593.33
600.30
607.27

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

490.45
500.89
511.33
521.77
532.21
542.65
553.09
563.53
573.97
584.41
594.85
605.29
615.73
626.17
636.61
647.05
657.49
667.93
678.37
688.81
699.25
709.69
720.13
730.57
741.01
751.45
761.89
772.33
782.77
793.21
803.65
814.09
824.53
834.97
845.41
855.85
866.29
876.73
887.17
897.61
908.05

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

484.44
494.68
504.92
515.16
525.40
535.64
545.88
556.12
566.36
576.60
586.84
597.08
607.32
617.56
627.80
638.04
648.28
658.52
668.76
679.00
689.24
699.48
709.72
719.96
730.20
740.44
750.68
760.92
771.16
781.40
791.64
801.88
812.12
822.36
832.60
842.84
853.08
863.32
873.56
883.80
894.04

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

205.78
210.13
214.48
218.83
223.18
227.53
231.88
236.23
240.58
244.93
249.28
253.63
257.98
262.33
266.68
271.03
275.38
279.73
284.08
288.43
292.78
297.13
301.48
305.83
310.18
314.53
318.88
323.23
327.58
331.93
336.28
340.63
344.98
349.33
353.68
358.03
362.38
366.73
371.08
375.43
379.78

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

183.98
187.89
191.80
195.71
199.62
203.53
207.44
211.35
215.26
219.17
223.08
226.99
230.90
234.81
238.72
242.63
246.54
250.45
254.36
258.27
262.18
266.09
270.00
273.91
277.82
281.73
285.64
289.55
293.46
297.37
301.28
305.19
309.10
313.01
316.92
320.83
324.74
328.65
332.56
336.47
340.38

PAGE NO : 25 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

613.23
620.20
627.17
634.14
641.11
648.08
655.05
662.02
668.99
675.96
682.93
689.90
696.87
703.84
710.81
717.78
724.75
731.72
738.69
745.66
752.63
759.60
766.57
773.54
780.51
787.48
794.45
801.42
808.39
815.36
822.33
829.30
836.27
843.24
850.21
857.18
864.15
871.12
878.09
885.06
892.03

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

CONVEYANCE CHARGES

614.24
621.21
628.18
635.15
642.12
649.09
656.06
663.03
670.00
676.97
683.94
690.91
697.88
704.85
711.82
718.79
725.76
732.73
739.70
746.67
753.64
760.61
767.58
774.55
781.52
788.49
795.46
802.43
809.40
816.37
823.34
830.31
837.28
844.25
851.22
858.19
865.16
872.13
879.10
886.07
893.04

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

918.49
928.93
939.37
949.81
960.25
970.69
981.13
991.57
1002.01
1012.45
1022.89
1033.33
1043.77
1054.21
1064.65
1075.09
1085.53
1095.97
1106.41
1116.85
1127.29
1137.73
1148.17
1158.61
1169.05
1179.49
1189.93
1200.37
1210.81
1221.25
1231.69
1242.13
1252.57
1263.01
1273.45
1283.89
1294.33
1304.77
1315.21
1325.65
1336.09

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

904.28
914.52
924.76
935.00
945.24
955.48
965.72
975.96
986.20
996.44
1006.68
1016.92
1027.16
1037.40
1047.64
1057.88
1068.12
1078.36
1088.60
1098.84
1109.08
1119.32
1129.56
1139.80
1150.04
1160.28
1170.52
1180.76
1191.00
1201.24
1211.48
1221.72
1231.96
1242.20
1252.44
1262.68
1272.92
1283.16
1293.40
1303.64
1313.88

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

384.13
388.48
392.83
397.18
401.53
405.88
410.23
414.58
418.93
423.28
427.63
431.98
436.33
440.68
445.03
449.38
453.73
458.08
462.43
466.78
471.13
475.48
479.83
484.18
488.53
492.88
497.23
501.58
505.93
510.28
514.63
518.98
523.33
527.68
532.03
536.38
540.73
545.08
549.43
553.78
558.13

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

344.29
348.20
352.11
356.02
359.93
363.84
367.75
371.66
375.57
379.48
383.39
387.30
391.21
395.12
399.03
402.94
406.85
410.76
414.67
418.58
422.49
426.40
430.31
434.22
438.13
442.04
445.95
449.86
453.77
457.68
461.59
465.50
469.41
473.32
477.23
481.14
485.05
488.96
492.87
496.78
500.69

PAGE NO : 26 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

899.00
905.97
912.94
919.91
926.88
933.85
940.82
947.79
954.76
961.73
968.70
975.67
982.64
989.61
996.58
1003.55
1010.52
1017.49
1024.46
1031.43
1038.40
1045.37
1052.34
1059.31
1066.28
1073.25
1080.22
1087.19
1094.16
1101.13
1108.10
1115.07
1122.04
1129.01
1135.98
1142.95
1149.92
1156.89
1163.86
1170.83
1177.80

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

CONVEYANCE CHARGES

900.01
906.98
913.95
920.92
927.89
934.86
941.83
948.80
955.77
962.74
969.71
976.68
983.65
990.62
997.59
1004.56
1011.53
1018.50
1025.47
1032.44
1039.41
1046.38
1053.35
1060.32
1067.29
1074.26
1081.23
1088.20
1095.17
1102.14
1109.11
1116.08
1123.05
1130.02
1136.99
1143.96
1150.93
1157.90
1164.87
1171.84
1178.81

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

1346.53
1356.97
1367.41
1377.85
1388.29
1398.73
1409.17
1419.61
1430.05
1440.49
1450.93
1461.37
1471.81
1482.25
1492.69
1503.13
1513.57
1524.01
1534.45
1544.89
1555.33
1565.77
1576.21
1586.65
1597.09
1607.53
1617.97
1628.41
1638.85
1649.29
1659.73
1670.17
1680.61
1691.05
1701.49
1711.93
1722.37
1732.81
1743.25
1753.69
1764.13

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

1324.12
1334.36
1344.60
1354.84
1365.08
1375.32
1385.56
1395.80
1406.04
1416.28
1426.52
1436.76
1447.00
1457.24
1467.48
1477.72
1487.96
1498.20
1508.44
1518.68
1528.92
1539.16
1549.40
1559.64
1569.88
1580.12
1590.36
1600.60
1610.84
1621.08
1631.32
1641.56
1651.80
1662.04
1672.28
1682.52
1692.76
1703.00
1713.24
1723.48
1733.72

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

562.48
566.83
571.18
575.53
579.88
584.23
588.58
592.93
597.28
601.63
605.98
610.33
614.68
619.03
623.38
627.73
632.08
636.43
640.78
645.13
649.48
653.83
658.18
662.53
666.88
671.23
675.58
679.93
684.28
688.63
692.98
697.33
701.68
706.03
710.38
714.73
719.08
723.43
727.78
732.13
736.48

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

504.60
508.51
512.42
516.33
520.24
524.15
528.06
531.97
535.88
539.79
543.70
547.61
551.52
555.43
559.34
563.25
567.16
571.07
574.98
578.89
582.80
586.71
590.62
594.53
598.44
602.35
606.26
610.17
614.08
617.99
621.90
625.81
629.72
633.63
637.54
641.45
645.36
649.27
653.18
657.09
661.00

PAGE NO : 27 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

1184.77
1191.74
1198.71
1205.68
1212.65
1219.62
1226.59
1233.56
1240.53
1247.50
1254.47
1261.44
1268.41
1275.38
1282.35
1289.32
1296.29
1303.26
1310.23
1317.20
1324.17
1331.14
1338.11
1345.08
1352.05
1359.02
1365.99
1372.96
1379.93
1386.90
1393.87
1400.84
1407.81
1414.78
1421.75
1428.72
1435.69
1442.66
1449.63
1456.60
1463.57

165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

CONVEYANCE CHARGES

1185.78
1192.75
1199.72
1206.69
1213.66
1220.63
1227.60
1234.57
1241.54
1248.51
1255.48
1262.45
1269.42
1276.39
1283.36
1290.33
1297.30
1304.27
1311.24
1318.21
1325.18
1332.15
1339.12
1346.09
1353.06
1360.03
1367.00
1373.97
1380.94
1387.91
1394.88
1401.85
1408.82
1415.79
1422.76
1429.73
1436.70
1443.67
1450.64
1457.61
1464.58

165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

1774.57
1785.01
1795.45
1805.89
1816.33
1826.77
1837.21
1847.65
1858.09
1868.53
1878.97
1889.41
1899.85
1910.29
1920.73
1931.17
1941.61
1952.05
1962.49
1972.93
1983.37
1993.81
2004.25
2014.69
2025.13
2035.57
2046.01
2056.45
2066.89
2077.33
2087.77
2098.21
2108.65
2119.09
2129.53
2139.97
2150.41
2160.85
2171.29
2181.73
2192.17

165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

1743.96
1754.20
1764.44
1774.68
1784.92
1795.16
1805.40
1815.64
1825.88
1836.12
1846.36
1856.60
1866.84
1877.08
1887.32
1897.56
1907.80
1918.04
1928.28
1938.52
1948.76
1959.00
1969.24
1979.48
1989.72
1999.96
2010.20
2020.44
2030.68
2040.92
2051.16
2061.40
2071.64
2081.88
2092.12
2102.36
2112.60
2122.84
2133.08
2143.32
2153.56

165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

740.83
745.18
749.53
753.88
758.23
762.58
766.93
771.28
775.63
779.98
784.33
788.68
793.03
797.38
801.73
806.08
810.43
814.78
819.13
823.48
827.83
832.18
836.53
840.88
845.23
849.58
853.93
858.28
862.63
866.98
871.33
875.68
880.03
884.38
888.73
893.08
897.43
901.78
906.13
910.48
914.83

165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

664.91
668.82
672.73
676.64
680.55
684.46
688.37
692.28
696.19
700.10
704.01
707.92
711.83
715.74
719.65
723.56
727.47
731.38
735.29
739.20
743.11
747.02
750.93
754.84
758.75
762.66
766.57
770.48
774.39
778.30
782.21
786.12
790.03
793.94
797.85
801.76
805.67
809.58
813.49
817.40
821.31

PAGE NO : 28 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

1470.54
1477.51
1484.48
1491.45
1498.42
1505.39
1512.36
1519.33
1526.30
1533.27
1540.24
1547.21
1554.18
1561.15
1568.12
1575.09
1582.06
1589.03
1596.00
1602.97
1609.94
1616.91
1623.88
1630.85
1637.82
1644.79
1651.76
1658.73
1665.70
1672.67
1679.64
1686.61
1693.58
1700.55
1707.52
1714.49
1721.46
1728.43
1735.40
1742.37
1749.34

206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

CONVEYANCE CHARGES

1471.55
1478.52
1485.49
1492.46
1499.43
1506.40
1513.37
1520.34
1527.31
1534.28
1541.25
1548.22
1555.19
1562.16
1569.13
1576.10
1583.07
1590.04
1597.01
1603.98
1610.95
1617.92
1624.89
1631.86
1638.83
1645.80
1652.77
1659.74
1666.71
1673.68
1680.65
1687.62
1694.59
1701.56
1708.53
1715.50
1722.47
1729.44
1736.41
1743.38
1750.35

206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

2202.61
2213.05
2223.49
2233.93
2244.37
2254.81
2265.25
2275.69
2286.13
2296.57
2307.01
2317.45
2327.89
2338.33
2348.77
2359.21
2369.65
2380.09
2390.53
2400.97
2411.41
2421.85
2432.29
2442.73
2453.17
2463.61
2474.05
2484.49
2494.93
2505.37
2515.81
2526.25
2536.69
2547.13
2557.57
2568.01
2578.45
2588.89
2599.33
2609.77
2620.21

206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

2163.80
2174.04
2184.28
2194.52
2204.76
2215.00
2225.24
2235.48
2245.72
2255.96
2266.20
2276.44
2286.68
2296.92
2307.16
2317.40
2327.64
2337.88
2348.12
2358.36
2368.60
2378.84
2389.08
2399.32
2409.56
2419.80
2430.04
2440.28
2450.52
2460.76
2471.00
2481.24
2491.48
2501.72
2511.96
2522.20
2532.44
2542.68
2552.92
2563.16
2573.40

206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

919.18
923.53
927.88
932.23
936.58
940.93
945.28
949.63
953.98
958.33
962.68
967.03
971.38
975.73
980.08
984.43
988.78
993.13
997.48
1001.83
1006.18
1010.53
1014.88
1019.23
1023.58
1027.93
1032.28
1036.63
1040.98
1045.33
1049.68
1054.03
1058.38
1062.73
1067.08
1071.43
1075.78
1080.13
1084.48
1088.83
1093.18

206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246

825.22
829.13
833.04
836.95
840.86
844.77
848.68
852.59
856.50
860.41
864.32
868.23
872.14
876.05
879.96
883.87
887.78
891.69
895.60
899.51
903.42
907.33
911.24
915.15
919.06
922.97
926.88
930.79
934.70
938.61
942.52
946.43
950.34
954.25
958.16
962.07
965.98
969.89
973.80
977.71
981.62

PAGE NO : 29 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287

247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287

1756.31
1763.28
1770.25
1777.22
1784.19
1791.16
1798.13
1805.10
1812.07
1819.04
1826.01
1832.98
1839.95
1846.92
1853.89
1860.86
1867.83
1874.80
1881.77
1888.74
1895.71
1902.68
1909.65
1916.62
1923.59
1930.56
1937.53
1944.50
1951.47
1958.44
1965.41
1972.38
1979.35
1986.32
1993.29
2000.26
2007.23
2014.20
2021.17
2028.14
2035.11

247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287

CONVEYANCE CHARGES

1757.32
1764.29
1771.26
1778.23
1785.20
1792.17
1799.14
1806.11
1813.08
1820.05
1827.02
1833.99
1840.96
1847.93
1854.90
1861.87
1868.84
1875.81
1882.78
1889.75
1896.72
1903.69
1910.66
1917.63
1924.60
1931.57
1938.54
1945.51
1952.48
1959.45
1966.42
1973.39
1980.36
1987.33
1994.30
2001.27
2008.24
2015.21
2022.18
2029.15
2036.12

247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287

2630.65
2641.09
2651.53
2661.97
2672.41
2682.85
2693.29
2703.73
2714.17
2724.61
2735.05
2745.49
2755.93
2766.37
2776.81
2787.25
2797.69
2808.13
2818.57
2829.01
2839.45
2849.89
2860.33
2870.77
2881.21
2891.65
2902.09
2912.53
2922.97
2933.41
2943.85
2954.29
2964.73
2975.17
2985.61
2996.05
3006.49
3016.93
3027.37
3037.81
3048.25

247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287

2583.64
2593.88
2604.12
2614.36
2624.60
2634.84
2645.08
2655.32
2665.56
2675.80
2686.04
2696.28
2706.52
2716.76
2727.00
2737.24
2747.48
2757.72
2767.96
2778.20
2788.44
2798.68
2808.92
2819.16
2829.40
2839.64
2849.88
2860.12
2870.36
2880.60
2890.84
2901.08
2911.32
2921.56
2931.80
2942.04
2952.28
2962.52
2972.76
2983.00
2993.24

247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287

1097.53
1101.88
1106.23
1110.58
1114.93
1119.28
1123.63
1127.98
1132.33
1136.68
1141.03
1145.38
1149.73
1154.08
1158.43
1162.78
1167.13
1171.48
1175.83
1180.18
1184.53
1188.88
1193.23
1197.58
1201.93
1206.28
1210.63
1214.98
1219.33
1223.68
1228.03
1232.38
1236.73
1241.08
1245.43
1249.78
1254.13
1258.48
1262.83
1267.18
1271.53

247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287

985.53
989.44
993.35
997.26
1001.17
1005.08
1008.99
1012.90
1016.81
1020.72
1024.63
1028.54
1032.45
1036.36
1040.27
1044.18
1048.09
1052.00
1055.91
1059.82
1063.73
1067.64
1071.55
1075.46
1079.37
1083.28
1087.19
1091.10
1095.01
1098.92
1102.83
1106.74
1110.65
1114.56
1118.47
1122.38
1126.29
1130.20
1134.11
1138.02
1141.93

PAGE NO : 30 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328

288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328

2042.08
2049.05
2056.02
2062.99
2069.96
2076.93
2083.90
2090.87
2097.84
2104.81
2111.78
2118.75
2125.72
2132.69
2139.66
2146.63
2153.60
2160.57
2167.54
2174.51
2181.48
2188.45
2195.42
2202.39
2209.36
2216.33
2223.30
2230.27
2237.24
2244.21
2251.18
2258.15
2265.12
2272.09
2279.06
2286.03
2293.00
2299.97
2306.94
2313.91
2320.88

288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328

CONVEYANCE CHARGES

2043.09
2050.06
2057.03
2064.00
2070.97
2077.94
2084.91
2091.88
2098.85
2105.82
2112.79
2119.76
2126.73
2133.70
2140.67
2147.64
2154.61
2161.58
2168.55
2175.52
2182.49
2189.46
2196.43
2203.40
2210.37
2217.34
2224.31
2231.28
2238.25
2245.22
2252.19
2259.16
2266.13
2273.10
2280.07
2287.04
2294.01
2300.98
2307.95
2314.92
2321.89

288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328

3058.69
3069.13
3079.57
3090.01
3100.45
3110.89
3121.33
3131.77
3142.21
3152.65
3163.09
3173.53
3183.97
3194.41
3204.85
3215.29
3225.73
3236.17
3246.61
3257.05
3267.49
3277.93
3288.37
3298.81
3309.25
3319.69
3330.13
3340.57
3351.01
3361.45
3371.89
3382.33
3392.77
3403.21
3413.65
3424.09
3434.53
3444.97
3455.41
3465.85
3476.29

288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328

3003.48
3013.72
3023.96
3034.20
3044.44
3054.68
3064.92
3075.16
3085.40
3095.64
3105.88
3116.12
3126.36
3136.60
3146.84
3157.08
3167.32
3177.56
3187.80
3198.04
3208.28
3218.52
3228.76
3239.00
3249.24
3259.48
3269.72
3279.96
3290.20
3300.44
3310.68
3320.92
3331.16
3341.40
3351.64
3361.88
3372.12
3382.36
3392.60
3402.84
3413.08

288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328

1275.88
1280.23
1284.58
1288.93
1293.28
1297.63
1301.98
1306.33
1310.68
1315.03
1319.38
1323.73
1328.08
1332.43
1336.78
1341.13
1345.48
1349.83
1354.18
1358.53
1362.88
1367.23
1371.58
1375.93
1380.28
1384.63
1388.98
1393.33
1397.68
1402.03
1406.38
1410.73
1415.08
1419.43
1423.78
1428.13
1432.48
1436.83
1441.18
1445.53
1449.88

288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328

1145.84
1149.75
1153.66
1157.57
1161.48
1165.39
1169.30
1173.21
1177.12
1181.03
1184.94
1188.85
1192.76
1196.67
1200.58
1204.49
1208.40
1212.31
1216.22
1220.13
1224.04
1227.95
1231.86
1235.77
1239.68
1243.59
1247.50
1251.41
1255.32
1259.23
1263.14
1267.05
1270.96
1274.87
1278.78
1282.69
1286.60
1290.51
1294.42
1298.33
1302.24

PAGE NO : 31 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369

329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369

2327.85
2334.82
2341.79
2348.76
2355.73
2362.70
2369.67
2376.64
2383.61
2390.58
2397.55
2404.52
2411.49
2418.46
2425.43
2432.40
2439.37
2446.34
2453.31
2460.28
2467.25
2474.22
2481.19
2488.16
2495.13
2502.10
2509.07
2516.04
2523.01
2529.98
2536.95
2543.92
2550.89
2557.86
2564.83
2571.80
2578.77
2585.74
2592.71
2599.68
2606.65

329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369

CONVEYANCE CHARGES

2328.86
2335.83
2342.80
2349.77
2356.74
2363.71
2370.68
2377.65
2384.62
2391.59
2398.56
2405.53
2412.50
2419.47
2426.44
2433.41
2440.38
2447.35
2454.32
2461.29
2468.26
2475.23
2482.20
2489.17
2496.14
2503.11
2510.08
2517.05
2524.02
2530.99
2537.96
2544.93
2551.90
2558.87
2565.84
2572.81
2579.78
2586.75
2593.72
2600.69
2607.66

329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369

3486.73
3497.17
3507.61
3518.05
3528.49
3538.93
3549.37
3559.81
3570.25
3580.69
3591.13
3601.57
3612.01
3622.45
3632.89
3643.33
3653.77
3664.21
3674.65
3685.09
3695.53
3705.97
3716.41
3726.85
3737.29
3747.73
3758.17
3768.61
3779.05
3789.49
3799.93
3810.37
3820.81
3831.25
3841.69
3852.13
3862.57
3873.01
3883.45
3893.89
3904.33

329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369

3423.32
3433.56
3443.80
3454.04
3464.28
3474.52
3484.76
3495.00
3505.24
3515.48
3525.72
3535.96
3546.20
3556.44
3566.68
3576.92
3587.16
3597.40
3607.64
3617.88
3628.12
3638.36
3648.60
3658.84
3669.08
3679.32
3689.56
3699.80
3710.04
3720.28
3730.52
3740.76
3751.00
3761.24
3771.48
3781.72
3791.96
3802.20
3812.44
3822.68
3832.92

329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369

1454.23
1458.58
1462.93
1467.28
1471.63
1475.98
1480.33
1484.68
1489.03
1493.38
1497.73
1502.08
1506.43
1510.78
1515.13
1519.48
1523.83
1528.18
1532.53
1536.88
1541.23
1545.58
1549.93
1554.28
1558.63
1562.98
1567.33
1571.68
1576.03
1580.38
1584.73
1589.08
1593.43
1597.78
1602.13
1606.48
1610.83
1615.18
1619.53
1623.88
1628.23

329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369

1306.15
1310.06
1313.97
1317.88
1321.79
1325.70
1329.61
1333.52
1337.43
1341.34
1345.25
1349.16
1353.07
1356.98
1360.89
1364.80
1368.71
1372.62
1376.53
1380.44
1384.35
1388.26
1392.17
1396.08
1399.99
1403.90
1407.81
1411.72
1415.63
1419.54
1423.45
1427.36
1431.27
1435.18
1439.09
1443.00
1446.91
1450.82
1454.73
1458.64
1462.55

PAGE NO : 32 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

2613.62
2620.59
2627.56
2634.53
2641.50
2648.47
2655.44
2662.41
2669.38
2676.35
2683.32
2690.29
2697.26
2704.23
2711.20
2718.17
2725.14
2732.11
2739.08
2746.05
2753.02
2759.99
2766.96
2773.93
2780.90
2787.87
2794.84
2801.81
2808.78
2815.75
2822.72
2829.69
2836.66
2843.63
2850.60
2857.57
2864.54
2871.51
2878.48
2885.45
2892.42

370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

CONVEYANCE CHARGES

2614.63
2621.60
2628.57
2635.54
2642.51
2649.48
2656.45
2663.42
2670.39
2677.36
2684.33
2691.30
2698.27
2705.24
2712.21
2719.18
2726.15
2733.12
2740.09
2747.06
2754.03
2761.00
2767.97
2774.94
2781.91
2788.88
2795.85
2802.82
2809.79
2816.76
2823.73
2830.70
2837.67
2844.64
2851.61
2858.58
2865.55
2872.52
2879.49
2886.46
2893.43

370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

3914.77
3925.21
3935.65
3946.09
3956.53
3966.97
3977.41
3987.85
3998.29
4008.73
4019.17
4029.61
4040.05
4050.49
4060.93
4071.37
4081.81
4092.25
4102.69
4113.13
4123.57
4134.01
4144.45
4154.89
4165.33
4175.77
4186.21
4196.65
4207.09
4217.53
4227.97
4238.41
4248.85
4259.29
4269.73
4280.17
4290.61
4301.05
4311.49
4321.93
4332.37

370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

3843.16
3853.40
3863.64
3873.88
3884.12
3894.36
3904.60
3914.84
3925.08
3935.32
3945.56
3955.80
3966.04
3976.28
3986.52
3996.76
4007.00
4017.24
4027.48
4037.72
4047.96
4058.20
4068.44
4078.68
4088.92
4099.16
4109.40
4119.64
4129.88
4140.12
4150.36
4160.60
4170.84
4181.08
4191.32
4201.56
4211.80
4222.04
4232.28
4242.52
4252.76

370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

1632.58
1636.93
1641.28
1645.63
1649.98
1654.33
1658.68
1663.03
1667.38
1671.73
1676.08
1680.43
1684.78
1689.13
1693.48
1697.83
1702.18
1706.53
1710.88
1715.23
1719.58
1723.93
1728.28
1732.63
1736.98
1741.33
1745.68
1750.03
1754.38
1758.73
1763.08
1767.43
1771.78
1776.13
1780.48
1784.83
1789.18
1793.53
1797.88
1802.23
1806.58

370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410

1466.46
1470.37
1474.28
1478.19
1482.10
1486.01
1489.92
1493.83
1497.74
1501.65
1505.56
1509.47
1513.38
1517.29
1521.20
1525.11
1529.02
1532.93
1536.84
1540.75
1544.66
1548.57
1552.48
1556.39
1560.30
1564.21
1568.12
1572.03
1575.94
1579.85
1583.76
1587.67
1591.58
1595.49
1599.40
1603.31
1607.22
1611.13
1615.04
1618.95
1622.86

PAGE NO : 33 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

2899.39
2906.36
2913.33
2920.30
2927.27
2934.24
2941.21
2948.18
2955.15
2962.12
2969.09
2976.06
2983.03
2990.00
2996.97
3003.94
3010.91
3017.88
3024.85
3031.82
3038.79
3045.76
3052.73
3059.70
3066.67
3073.64
3080.61
3087.58
3094.55
3101.52
3108.49
3115.46
3122.43
3129.40
3136.37
3143.34
3150.31
3157.28
3164.25
3171.22
3178.19

411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

CONVEYANCE CHARGES

2900.40
2907.37
2914.34
2921.31
2928.28
2935.25
2942.22
2949.19
2956.16
2963.13
2970.10
2977.07
2984.04
2991.01
2997.98
3004.95
3011.92
3018.89
3025.86
3032.83
3039.80
3046.77
3053.74
3060.71
3067.68
3074.65
3081.62
3088.59
3095.56
3102.53
3109.50
3116.47
3123.44
3130.41
3137.38
3144.35
3151.32
3158.29
3165.26
3172.23
3179.20

411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

4342.81
4353.25
4363.69
4374.13
4384.57
4395.01
4405.45
4415.89
4426.33
4436.77
4447.21
4457.65
4468.09
4478.53
4488.97
4499.41
4509.85
4520.29
4530.73
4541.17
4551.61
4562.05
4572.49
4582.93
4593.37
4603.81
4614.25
4624.69
4635.13
4645.57
4656.01
4666.45
4676.89
4687.33
4697.77
4708.21
4718.65
4729.09
4739.53
4749.97
4760.41

411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

4263.00
4273.24
4283.48
4293.72
4303.96
4314.20
4324.44
4334.68
4344.92
4355.16
4365.40
4375.64
4385.88
4396.12
4406.36
4416.60
4426.84
4437.08
4447.32
4457.56
4467.80
4478.04
4488.28
4498.52
4508.76
4519.00
4529.24
4539.48
4549.72
4559.96
4570.20
4580.44
4590.68
4600.92
4611.16
4621.40
4631.64
4641.88
4652.12
4662.36
4672.60

411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

1810.93
1815.28
1819.63
1823.98
1828.33
1832.68
1837.03
1841.38
1845.73
1850.08
1854.43
1858.78
1863.13
1867.48
1871.83
1876.18
1880.53
1884.88
1889.23
1893.58
1897.93
1902.28
1906.63
1910.98
1915.33
1919.68
1924.03
1928.38
1932.73
1937.08
1941.43
1945.78
1950.13
1954.48
1958.83
1963.18
1967.53
1971.88
1976.23
1980.58
1984.93

411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451

1626.77
1630.68
1634.59
1638.50
1642.41
1646.32
1650.23
1654.14
1658.05
1661.96
1665.87
1669.78
1673.69
1677.60
1681.51
1685.42
1689.33
1693.24
1697.15
1701.06
1704.97
1708.88
1712.79
1716.70
1720.61
1724.52
1728.43
1732.34
1736.25
1740.16
1744.07
1747.98
1751.89
1755.80
1759.71
1763.62
1767.53
1771.44
1775.35
1779.26
1783.17

PAGE NO : 34 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492

452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492

3185.16
3192.13
3199.10
3206.07
3213.04
3220.01
3226.98
3233.95
3240.92
3247.89
3254.86
3261.83
3268.80
3275.77
3282.74
3289.71
3296.68
3303.65
3310.62
3317.59
3324.56
3331.53
3338.50
3345.47
3352.44
3359.41
3366.38
3373.35
3380.32
3387.29
3394.26
3401.23
3408.20
3415.17
3422.14
3429.11
3436.08
3443.05
3450.02
3456.99
3463.96

452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492

CONVEYANCE CHARGES

3186.17
3193.14
3200.11
3207.08
3214.05
3221.02
3227.99
3234.96
3241.93
3248.90
3255.87
3262.84
3269.81
3276.78
3283.75
3290.72
3297.69
3304.66
3311.63
3318.60
3325.57
3332.54
3339.51
3346.48
3353.45
3360.42
3367.39
3374.36
3381.33
3388.30
3395.27
3402.24
3409.21
3416.18
3423.15
3430.12
3437.09
3444.06
3451.03
3458.00
3464.97

452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492

4770.85
4781.29
4791.73
4802.17
4812.61
4823.05
4833.49
4843.93
4854.37
4864.81
4875.25
4885.69
4896.13
4906.57
4917.01
4927.45
4937.89
4948.33
4958.77
4969.21
4979.65
4990.09
5000.53
5010.97
5021.41
5031.85
5042.29
5052.73
5063.17
5073.61
5084.05
5094.49
5104.93
5115.37
5125.81
5136.25
5146.69
5157.13
5167.57
5178.01
5188.45

452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492

4682.84
4693.08
4703.32
4713.56
4723.80
4734.04
4744.28
4754.52
4764.76
4775.00
4785.24
4795.48
4805.72
4815.96
4826.20
4836.44
4846.68
4856.92
4867.16
4877.40
4887.64
4897.88
4908.12
4918.36
4928.60
4938.84
4949.08
4959.32
4969.56
4979.80
4990.04
5000.28
5010.52
5020.76
5031.00
5041.24
5051.48
5061.72
5071.96
5082.20
5092.44

452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492

1989.28
1993.63
1997.98
2002.33
2006.68
2011.03
2015.38
2019.73
2024.08
2028.43
2032.78
2037.13
2041.48
2045.83
2050.18
2054.53
2058.88
2063.23
2067.58
2071.93
2076.28
2080.63
2084.98
2089.33
2093.68
2098.03
2102.38
2106.73
2111.08
2115.43
2119.78
2124.13
2128.48
2132.83
2137.18
2141.53
2145.88
2150.23
2154.58
2158.93
2163.28

452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492

1787.08
1790.99
1794.90
1798.81
1802.72
1806.63
1810.54
1814.45
1818.36
1822.27
1826.18
1830.09
1834.00
1837.91
1841.82
1845.73
1849.64
1853.55
1857.46
1861.37
1865.28
1869.19
1873.10
1877.01
1880.92
1884.83
1888.74
1892.65
1896.56
1900.47
1904.38
1908.29
1912.20
1916.11
1920.02
1923.93
1927.84
1931.75
1935.66
1939.57
1943.48

PAGE NO : 35 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533

493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533

3470.93
3477.90
3484.87
3491.84
3498.81
3505.78
3512.75
3519.72
3526.69
3533.66
3540.63
3547.60
3554.57
3561.54
3568.51
3575.48
3582.45
3589.42
3596.39
3603.36
3610.33
3617.30
3624.27
3631.24
3638.21
3645.18
3652.15
3659.12
3666.09
3673.06
3680.03
3687.00
3693.97
3700.94
3707.91
3714.88
3721.85
3728.82
3735.79
3742.76
3749.73

493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533

CONVEYANCE CHARGES

3471.94
3478.91
3485.88
3492.85
3499.82
3506.79
3513.76
3520.73
3527.70
3534.67
3541.64
3548.61
3555.58
3562.55
3569.52
3576.49
3583.46
3590.43
3597.40
3604.37
3611.34
3618.31
3625.28
3632.25
3639.22
3646.19
3653.16
3660.13
3667.10
3674.07
3681.04
3688.01
3694.98
3701.95
3708.92
3715.89
3722.86
3729.83
3736.80
3743.77
3750.74

493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533

5198.89
5209.33
5219.77
5230.21
5240.65
5251.09
5261.53
5271.97
5282.41
5292.85
5303.29
5313.73
5324.17
5334.61
5345.05
5355.49
5365.93
5376.37
5386.81
5397.25
5407.69
5418.13
5428.57
5439.01
5449.45
5459.89
5470.33
5480.77
5491.21
5501.65
5512.09
5522.53
5532.97
5543.41
5553.85
5564.29
5574.73
5585.17
5595.61
5606.05
5616.49

493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533

5102.68
5112.92
5123.16
5133.40
5143.64
5153.88
5164.12
5174.36
5184.60
5194.84
5205.08
5215.32
5225.56
5235.80
5246.04
5256.28
5266.52
5276.76
5287.00
5297.24
5307.48
5317.72
5327.96
5338.20
5348.44
5358.68
5368.92
5379.16
5389.40
5399.64
5409.88
5420.12
5430.36
5440.60
5450.84
5461.08
5471.32
5481.56
5491.80
5502.04
5512.28

493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533

2167.63
2171.98
2176.33
2180.68
2185.03
2189.38
2193.73
2198.08
2202.43
2206.78
2211.13
2215.48
2219.83
2224.18
2228.53
2232.88
2237.23
2241.58
2245.93
2250.28
2254.63
2258.98
2263.33
2267.68
2272.03
2276.38
2280.73
2285.08
2289.43
2293.78
2298.13
2302.48
2306.83
2311.18
2315.53
2319.88
2324.23
2328.58
2332.93
2337.28
2341.63

493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533

1947.39
1951.30
1955.21
1959.12
1963.03
1966.94
1970.85
1974.76
1978.67
1982.58
1986.49
1990.40
1994.31
1998.22
2002.13
2006.04
2009.95
2013.86
2017.77
2021.68
2025.59
2029.50
2033.41
2037.32
2041.23
2045.14
2049.05
2052.96
2056.87
2060.78
2064.69
2068.60
2072.51
2076.42
2080.33
2084.24
2088.15
2092.06
2095.97
2099.88
2103.79

PAGE NO : 36 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574

534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574

3756.70
3763.67
3770.64
3777.61
3784.58
3791.55
3798.52
3805.49
3812.46
3819.43
3826.40
3833.37
3840.34
3847.31
3854.28
3861.25
3868.22
3875.19
3882.16
3889.13
3896.10
3903.07
3910.04
3917.01
3923.98
3930.95
3937.92
3944.89
3951.86
3958.83
3965.80
3972.77
3979.74
3986.71
3993.68
4000.65
4007.62
4014.59
4021.56
4028.53
4035.50

534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574

CONVEYANCE CHARGES

3757.71
3764.68
3771.65
3778.62
3785.59
3792.56
3799.53
3806.50
3813.47
3820.44
3827.41
3834.38
3841.35
3848.32
3855.29
3862.26
3869.23
3876.20
3883.17
3890.14
3897.11
3904.08
3911.05
3918.02
3924.99
3931.96
3938.93
3945.90
3952.87
3959.84
3966.81
3973.78
3980.75
3987.72
3994.69
4001.66
4008.63
4015.60
4022.57
4029.54
4036.51

534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574

5626.93
5637.37
5647.81
5658.25
5668.69
5679.13
5689.57
5700.01
5710.45
5720.89
5731.33
5741.77
5752.21
5762.65
5773.09
5783.53
5793.97
5804.41
5814.85
5825.29
5835.73
5846.17
5856.61
5867.05
5877.49
5887.93
5898.37
5908.81
5919.25
5929.69
5940.13
5950.57
5961.01
5971.45
5981.89
5992.33
6002.77
6013.21
6023.65
6034.09
6044.53

534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574

5522.52
5532.76
5543.00
5553.24
5563.48
5573.72
5583.96
5594.20
5604.44
5614.68
5624.92
5635.16
5645.40
5655.64
5665.88
5676.12
5686.36
5696.60
5706.84
5717.08
5727.32
5737.56
5747.80
5758.04
5768.28
5778.52
5788.76
5799.00
5809.24
5819.48
5829.72
5839.96
5850.20
5860.44
5870.68
5880.92
5891.16
5901.40
5911.64
5921.88
5932.12

534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574

2345.98
2350.33
2354.68
2359.03
2363.38
2367.73
2372.08
2376.43
2380.78
2385.13
2389.48
2393.83
2398.18
2402.53
2406.88
2411.23
2415.58
2419.93
2424.28
2428.63
2432.98
2437.33
2441.68
2446.03
2450.38
2454.73
2459.08
2463.43
2467.78
2472.13
2476.48
2480.83
2485.18
2489.53
2493.88
2498.23
2502.58
2506.93
2511.28
2515.63
2519.98

534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574

2107.70
2111.61
2115.52
2119.43
2123.34
2127.25
2131.16
2135.07
2138.98
2142.89
2146.80
2150.71
2154.62
2158.53
2162.44
2166.35
2170.26
2174.17
2178.08
2181.99
2185.90
2189.81
2193.72
2197.63
2201.54
2205.45
2209.36
2213.27
2217.18
2221.09
2225.00
2228.91
2232.82
2236.73
2240.64
2244.55
2248.46
2252.37
2256.28
2260.19
2264.10

PAGE NO : 37 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

4042.47
4049.44
4056.41
4063.38
4070.35
4077.32
4084.29
4091.26
4098.23
4105.20
4112.17
4119.14
4126.11
4133.08
4140.05
4147.02
4153.99
4160.96
4167.93
4174.90
4181.87
4188.84
4195.81
4202.78
4209.75
4216.72
4223.69
4230.66
4237.63
4244.60
4251.57
4258.54
4265.51
4272.48
4279.45
4286.42
4293.39
4300.36
4307.33
4314.30
4321.27

575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

CONVEYANCE CHARGES

4043.48
4050.45
4057.42
4064.39
4071.36
4078.33
4085.30
4092.27
4099.24
4106.21
4113.18
4120.15
4127.12
4134.09
4141.06
4148.03
4155.00
4161.97
4168.94
4175.91
4182.88
4189.85
4196.82
4203.79
4210.76
4217.73
4224.70
4231.67
4238.64
4245.61
4252.58
4259.55
4266.52
4273.49
4280.46
4287.43
4294.40
4301.37
4308.34
4315.31
4322.28

575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

6054.97
6065.41
6075.85
6086.29
6096.73
6107.17
6117.61
6128.05
6138.49
6148.93
6159.37
6169.81
6180.25
6190.69
6201.13
6211.57
6222.01
6232.45
6242.89
6253.33
6263.77
6274.21
6284.65
6295.09
6305.53
6315.97
6326.41
6336.85
6347.29
6357.73
6368.17
6378.61
6389.05
6399.49
6409.93
6420.37
6430.81
6441.25
6451.69
6462.13
6472.57

575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

5942.36
5952.60
5962.84
5973.08
5983.32
5993.56
6003.80
6014.04
6024.28
6034.52
6044.76
6055.00
6065.24
6075.48
6085.72
6095.96
6106.20
6116.44
6126.68
6136.92
6147.16
6157.40
6167.64
6177.88
6188.12
6198.36
6208.60
6218.84
6229.08
6239.32
6249.56
6259.80
6270.04
6280.28
6290.52
6300.76
6311.00
6321.24
6331.48
6341.72
6351.96

575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

2524.33
2528.68
2533.03
2537.38
2541.73
2546.08
2550.43
2554.78
2559.13
2563.48
2567.83
2572.18
2576.53
2580.88
2585.23
2589.58
2593.93
2598.28
2602.63
2606.98
2611.33
2615.68
2620.03
2624.38
2628.73
2633.08
2637.43
2641.78
2646.13
2650.48
2654.83
2659.18
2663.53
2667.88
2672.23
2676.58
2680.93
2685.28
2689.63
2693.98
2698.33

575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615

2268.01
2271.92
2275.83
2279.74
2283.65
2287.56
2291.47
2295.38
2299.29
2303.20
2307.11
2311.02
2314.93
2318.84
2322.75
2326.66
2330.57
2334.48
2338.39
2342.30
2346.21
2350.12
2354.03
2357.94
2361.85
2365.76
2369.67
2373.58
2377.49
2381.40
2385.31
2389.22
2393.13
2397.04
2400.95
2404.86
2408.77
2412.68
2416.59
2420.50
2424.41

PAGE NO : 38 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

4328.24
4335.21
4342.18
4349.15
4356.12
4363.09
4370.06
4377.03
4384.00
4390.97
4397.94
4404.91
4411.88
4418.85
4425.82
4432.79
4439.76
4446.73
4453.70
4460.67
4467.64
4474.61
4481.58
4488.55
4495.52
4502.49
4509.46
4516.43
4523.40
4530.37
4537.34
4544.31
4551.28
4558.25
4565.22
4572.19
4579.16
4586.13
4593.10
4600.07
4607.04

616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

CONVEYANCE CHARGES

4329.25
4336.22
4343.19
4350.16
4357.13
4364.10
4371.07
4378.04
4385.01
4391.98
4398.95
4405.92
4412.89
4419.86
4426.83
4433.80
4440.77
4447.74
4454.71
4461.68
4468.65
4475.62
4482.59
4489.56
4496.53
4503.50
4510.47
4517.44
4524.41
4531.38
4538.35
4545.32
4552.29
4559.26
4566.23
4573.20
4580.17
4587.14
4594.11
4601.08
4608.05

616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

6483.01
6493.45
6503.89
6514.33
6524.77
6535.21
6545.65
6556.09
6566.53
6576.97
6587.41
6597.85
6608.29
6618.73
6629.17
6639.61
6650.05
6660.49
6670.93
6681.37
6691.81
6702.25
6712.69
6723.13
6733.57
6744.01
6754.45
6764.89
6775.33
6785.77
6796.21
6806.65
6817.09
6827.53
6837.97
6848.41
6858.85
6869.29
6879.73
6890.17
6900.61

616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

6362.20
6372.44
6382.68
6392.92
6403.16
6413.40
6423.64
6433.88
6444.12
6454.36
6464.60
6474.84
6485.08
6495.32
6505.56
6515.80
6526.04
6536.28
6546.52
6556.76
6567.00
6577.24
6587.48
6597.72
6607.96
6618.20
6628.44
6638.68
6648.92
6659.16
6669.40
6679.64
6689.88
6700.12
6710.36
6720.60
6730.84
6741.08
6751.32
6761.56
6771.80

616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

2702.68
2707.03
2711.38
2715.73
2720.08
2724.43
2728.78
2733.13
2737.48
2741.83
2746.18
2750.53
2754.88
2759.23
2763.58
2767.93
2772.28
2776.63
2780.98
2785.33
2789.68
2794.03
2798.38
2802.73
2807.08
2811.43
2815.78
2820.13
2824.48
2828.83
2833.18
2837.53
2841.88
2846.23
2850.58
2854.93
2859.28
2863.63
2867.98
2872.33
2876.68

616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656

2428.32
2432.23
2436.14
2440.05
2443.96
2447.87
2451.78
2455.69
2459.60
2463.51
2467.42
2471.33
2475.24
2479.15
2483.06
2486.97
2490.88
2494.79
2498.70
2502.61
2506.52
2510.43
2514.34
2518.25
2522.16
2526.07
2529.98
2533.89
2537.80
2541.71
2545.62
2549.53
2553.44
2557.35
2561.26
2565.17
2569.08
2572.99
2576.90
2580.81
2584.72

PAGE NO : 39 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697

4614.01
4620.98
4627.95
4634.92
4641.89
4648.86
4655.83
4662.80
4669.77
4676.74
4683.71
4690.68
4697.65
4704.62
4711.59
4718.56
4725.53
4732.50
4739.47
4746.44
4753.41
4760.38
4767.35
4774.32
4781.29
4788.26
4795.23
4802.20
4809.17
4816.14
4823.11
4830.08
4837.05
4844.02
4850.99
4857.96
4864.93
4871.90
4878.87
4885.84
4892.81

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697

CONVEYANCE CHARGES

4615.02
4621.99
4628.96
4635.93
4642.90
4649.87
4656.84
4663.81
4670.78
4677.75
4684.72
4691.69
4698.66
4705.63
4712.60
4719.57
4726.54
4733.51
4740.48
4747.45
4754.42
4761.39
4768.36
4775.33
4782.30
4789.27
4796.24
4803.21
4810.18
4817.15
4824.12
4831.09
4838.06
4845.03
4852.00
4858.97
4865.94
4872.91
4879.88
4886.85
4893.82

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697

6911.05
6921.49
6931.93
6942.37
6952.81
6963.25
6973.69
6984.13
6994.57
7005.01
7015.45
7025.89
7036.33
7046.77
7057.21
7067.65
7078.09
7088.53
7098.97
7109.41
7119.85
7130.29
7140.73
7151.17
7161.61
7172.05
7182.49
7192.93
7203.37
7213.81
7224.25
7234.69
7245.13
7255.57
7266.01
7276.45
7286.89
7297.33
7307.77
7318.21
7328.65

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697

6782.04
6792.28
6802.52
6812.76
6823.00
6833.24
6843.48
6853.72
6863.96
6874.20
6884.44
6894.68
6904.92
6915.16
6925.40
6935.64
6945.88
6956.12
6966.36
6976.60
6986.84
6997.08
7007.32
7017.56
7027.80
7038.04
7048.28
7058.52
7068.76
7079.00
7089.24
7099.48
7109.72
7119.96
7130.20
7140.44
7150.68
7160.92
7171.16
7181.40
7191.64

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697

2881.03
2885.38
2889.73
2894.08
2898.43
2902.78
2907.13
2911.48
2915.83
2920.18
2924.53
2928.88
2933.23
2937.58
2941.93
2946.28
2950.63
2954.98
2959.33
2963.68
2968.03
2972.38
2976.73
2981.08
2985.43
2989.78
2994.13
2998.48
3002.83
3007.18
3011.53
3015.88
3020.23
3024.58
3028.93
3033.28
3037.63
3041.98
3046.33
3050.68
3055.03

657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697

2588.63
2592.54
2596.45
2600.36
2604.27
2608.18
2612.09
2616.00
2619.91
2623.82
2627.73
2631.64
2635.55
2639.46
2643.37
2647.28
2651.19
2655.10
2659.01
2662.92
2666.83
2670.74
2674.65
2678.56
2682.47
2686.38
2690.29
2694.20
2698.11
2702.02
2705.93
2709.84
2713.75
2717.66
2721.57
2725.48
2729.39
2733.30
2737.21
2741.12
2745.03

PAGE NO : 40 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738

698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738

4899.78
4906.75
4913.72
4920.69
4927.66
4934.63
4941.60
4948.57
4955.54
4962.51
4969.48
4976.45
4983.42
4990.39
4997.36
5004.33
5011.30
5018.27
5025.24
5032.21
5039.18
5046.15
5053.12
5060.09
5067.06
5074.03
5081.00
5087.97
5094.94
5101.91
5108.88
5115.85
5122.82
5129.79
5136.76
5143.73
5150.70
5157.67
5164.64
5171.61
5178.58

698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738

CONVEYANCE CHARGES

4900.79
4907.76
4914.73
4921.70
4928.67
4935.64
4942.61
4949.58
4956.55
4963.52
4970.49
4977.46
4984.43
4991.40
4998.37
5005.34
5012.31
5019.28
5026.25
5033.22
5040.19
5047.16
5054.13
5061.10
5068.07
5075.04
5082.01
5088.98
5095.95
5102.92
5109.89
5116.86
5123.83
5130.80
5137.77
5144.74
5151.71
5158.68
5165.65
5172.62
5179.59

698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738

7339.09
7349.53
7359.97
7370.41
7380.85
7391.29
7401.73
7412.17
7422.61
7433.05
7443.49
7453.93
7464.37
7474.81
7485.25
7495.69
7506.13
7516.57
7527.01
7537.45
7547.89
7558.33
7568.77
7579.21
7589.65
7600.09
7610.53
7620.97
7631.41
7641.85
7652.29
7662.73
7673.17
7683.61
7694.05
7704.49
7714.93
7725.37
7735.81
7746.25
7756.69

698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738

7201.88
7212.12
7222.36
7232.60
7242.84
7253.08
7263.32
7273.56
7283.80
7294.04
7304.28
7314.52
7324.76
7335.00
7345.24
7355.48
7365.72
7375.96
7386.20
7396.44
7406.68
7416.92
7427.16
7437.40
7447.64
7457.88
7468.12
7478.36
7488.60
7498.84
7509.08
7519.32
7529.56
7539.80
7550.04
7560.28
7570.52
7580.76
7591.00
7601.24
7611.48

698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738

3059.38
3063.73
3068.08
3072.43
3076.78
3081.13
3085.48
3089.83
3094.18
3098.53
3102.88
3107.23
3111.58
3115.93
3120.28
3124.63
3128.98
3133.33
3137.68
3142.03
3146.38
3150.73
3155.08
3159.43
3163.78
3168.13
3172.48
3176.83
3181.18
3185.53
3189.88
3194.23
3198.58
3202.93
3207.28
3211.63
3215.98
3220.33
3224.68
3229.03
3233.38

698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738

2748.94
2752.85
2756.76
2760.67
2764.58
2768.49
2772.40
2776.31
2780.22
2784.13
2788.04
2791.95
2795.86
2799.77
2803.68
2807.59
2811.50
2815.41
2819.32
2823.23
2827.14
2831.05
2834.96
2838.87
2842.78
2846.69
2850.60
2854.51
2858.42
2862.33
2866.24
2870.15
2874.06
2877.97
2881.88
2885.79
2889.70
2893.61
2897.52
2901.43
2905.34

PAGE NO : 41 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779

739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779

5185.55
5192.52
5199.49
5206.46
5213.43
5220.40
5227.37
5234.34
5241.31
5248.28
5255.25
5262.22
5269.19
5276.16
5283.13
5290.10
5297.07
5304.04
5311.01
5317.98
5324.95
5331.92
5338.89
5345.86
5352.83
5359.80
5366.77
5373.74
5380.71
5387.68
5394.65
5401.62
5408.59
5415.56
5422.53
5429.50
5436.47
5443.44
5450.41
5457.38
5464.35

739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779

CONVEYANCE CHARGES

5186.56
5193.53
5200.50
5207.47
5214.44
5221.41
5228.38
5235.35
5242.32
5249.29
5256.26
5263.23
5270.20
5277.17
5284.14
5291.11
5298.08
5305.05
5312.02
5318.99
5325.96
5332.93
5339.90
5346.87
5353.84
5360.81
5367.78
5374.75
5381.72
5388.69
5395.66
5402.63
5409.60
5416.57
5423.54
5430.51
5437.48
5444.45
5451.42
5458.39
5465.36

739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779

7767.13
7777.57
7788.01
7798.45
7808.89
7819.33
7829.77
7840.21
7850.65
7861.09
7871.53
7881.97
7892.41
7902.85
7913.29
7923.73
7934.17
7944.61
7955.05
7965.49
7975.93
7986.37
7996.81
8007.25
8017.69
8028.13
8038.57
8049.01
8059.45
8069.89
8080.33
8090.77
8101.21
8111.65
8122.09
8132.53
8142.97
8153.41
8163.85
8174.29
8184.73

739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779

7621.72
7631.96
7642.20
7652.44
7662.68
7672.92
7683.16
7693.40
7703.64
7713.88
7724.12
7734.36
7744.60
7754.84
7765.08
7775.32
7785.56
7795.80
7806.04
7816.28
7826.52
7836.76
7847.00
7857.24
7867.48
7877.72
7887.96
7898.20
7908.44
7918.68
7928.92
7939.16
7949.40
7959.64
7969.88
7980.12
7990.36
8000.60
8010.84
8021.08
8031.32

739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779

3237.73
3242.08
3246.43
3250.78
3255.13
3259.48
3263.83
3268.18
3272.53
3276.88
3281.23
3285.58
3289.93
3294.28
3298.63
3302.98
3307.33
3311.68
3316.03
3320.38
3324.73
3329.08
3333.43
3337.78
3342.13
3346.48
3350.83
3355.18
3359.53
3363.88
3368.23
3372.58
3376.93
3381.28
3385.63
3389.98
3394.33
3398.68
3403.03
3407.38
3411.73

739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779

2909.25
2913.16
2917.07
2920.98
2924.89
2928.80
2932.71
2936.62
2940.53
2944.44
2948.35
2952.26
2956.17
2960.08
2963.99
2967.90
2971.81
2975.72
2979.63
2983.54
2987.45
2991.36
2995.27
2999.18
3003.09
3007.00
3010.91
3014.82
3018.73
3022.64
3026.55
3030.46
3034.37
3038.28
3042.19
3046.10
3050.01
3053.92
3057.83
3061.74
3065.65

PAGE NO : 42 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820

780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820

5471.32
5478.29
5485.26
5492.23
5499.20
5506.17
5513.14
5520.11
5527.08
5534.05
5541.02
5547.99
5554.96
5561.93
5568.90
5575.87
5582.84
5589.81
5596.78
5603.75
5610.72
5617.69
5624.66
5631.63
5638.60
5645.57
5652.54
5659.51
5666.48
5673.45
5680.42
5687.39
5694.36
5701.33
5708.30
5715.27
5722.24
5729.21
5736.18
5743.15
5750.12

780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820

CONVEYANCE CHARGES

5472.33
5479.30
5486.27
5493.24
5500.21
5507.18
5514.15
5521.12
5528.09
5535.06
5542.03
5549.00
5555.97
5562.94
5569.91
5576.88
5583.85
5590.82
5597.79
5604.76
5611.73
5618.70
5625.67
5632.64
5639.61
5646.58
5653.55
5660.52
5667.49
5674.46
5681.43
5688.40
5695.37
5702.34
5709.31
5716.28
5723.25
5730.22
5737.19
5744.16
5751.13

780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820

8195.17
8205.61
8216.05
8226.49
8236.93
8247.37
8257.81
8268.25
8278.69
8289.13
8299.57
8310.01
8320.45
8330.89
8341.33
8351.77
8362.21
8372.65
8383.09
8393.53
8403.97
8414.41
8424.85
8435.29
8445.73
8456.17
8466.61
8477.05
8487.49
8497.93
8508.37
8518.81
8529.25
8539.69
8550.13
8560.57
8571.01
8581.45
8591.89
8602.33
8612.77

780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820

8041.56
8051.80
8062.04
8072.28
8082.52
8092.76
8103.00
8113.24
8123.48
8133.72
8143.96
8154.20
8164.44
8174.68
8184.92
8195.16
8205.40
8215.64
8225.88
8236.12
8246.36
8256.60
8266.84
8277.08
8287.32
8297.56
8307.80
8318.04
8328.28
8338.52
8348.76
8359.00
8369.24
8379.48
8389.72
8399.96
8410.20
8420.44
8430.68
8440.92
8451.16

780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820

3416.08
3420.43
3424.78
3429.13
3433.48
3437.83
3442.18
3446.53
3450.88
3455.23
3459.58
3463.93
3468.28
3472.63
3476.98
3481.33
3485.68
3490.03
3494.38
3498.73
3503.08
3507.43
3511.78
3516.13
3520.48
3524.83
3529.18
3533.53
3537.88
3542.23
3546.58
3550.93
3555.28
3559.63
3563.98
3568.33
3572.68
3577.03
3581.38
3585.73
3590.08

780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820

3069.56
3073.47
3077.38
3081.29
3085.20
3089.11
3093.02
3096.93
3100.84
3104.75
3108.66
3112.57
3116.48
3120.39
3124.30
3128.21
3132.12
3136.03
3139.94
3143.85
3147.76
3151.67
3155.58
3159.49
3163.40
3167.31
3171.22
3175.13
3179.04
3182.95
3186.86
3190.77
3194.68
3198.59
3202.50
3206.41
3210.32
3214.23
3218.14
3222.05
3225.96

PAGE NO : 43 of 68

CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

Sl.No

Rubble/Size
Earth/Sand/Gr
Stone/ Cut
avel/ Murrum
Stone/ Coarse
/Lime/Surki
aggregates

Bricks

PCC
Cement/Steel/
Slabs/Shabad RCC poles/A.C
Slabs/CC &
& G.I Sheets
Laterite
/Packed
Blocks/Wood
materials

Water

Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges


821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

5757.09
5764.06
5771.03
5778.00
5784.97
5791.94
5798.91
5805.88
5812.85
5819.82
5826.79
5833.76
5840.73
5847.70
5854.67
5861.64
5868.61
5875.58
5882.55
5889.52
5896.49
5903.46
5910.43
5917.40
5924.37
5931.34
5938.31
5945.28
5952.25
5959.22

821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

CONVEYANCE CHARGES

5758.10
5765.07
5772.04
5779.01
5785.98
5792.95
5799.92
5806.89
5813.86
5820.83
5827.80
5834.77
5841.74
5848.71
5855.68
5862.65
5869.62
5876.59
5883.56
5890.53
5897.50
5904.47
5911.44
5918.41
5925.38
5932.35
5939.32
5946.29
5953.26
5960.23

821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

8623.21
8633.65
8644.09
8654.53
8664.97
8675.41
8685.85
8696.29
8706.73
8717.17
8727.61
8738.05
8748.49
8758.93
8769.37
8779.81
8790.25
8800.69
8811.13
8821.57
8832.01
8842.45
8852.89
8863.33
8873.77
8884.21
8894.65
8905.09
8915.53
8925.97

821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

8461.40
8471.64
8481.88
8492.12
8502.36
8512.60
8522.84
8533.08
8543.32
8553.56
8563.80
8574.04
8584.28
8594.52
8604.76
8615.00
8625.24
8635.48
8645.72
8655.96
8666.20
8676.44
8686.68
8696.92
8707.16
8717.40
8727.64
8737.88
8748.12
8758.36

821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

3594.43
3598.78
3603.13
3607.48
3611.83
3616.18
3620.53
3624.88
3629.23
3633.58
3637.93
3642.28
3646.63
3650.98
3655.33
3659.68
3664.03
3668.38
3672.73
3677.08
3681.43
3685.78
3690.13
3694.48
3698.83
3703.18
3707.53
3711.88
3716.23
3720.58

821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850

3229.87
3233.78
3237.69
3241.60
3245.51
3249.42
3253.33
3257.24
3261.15
3265.06
3268.97
3272.88
3276.79
3280.70
3284.61
3288.52
3292.43
3296.34
3300.25
3304.16
3308.07
3311.98
3315.89
3319.80
3323.71
3327.62
3331.53
3335.44
3339.35
3343.26

PAGE NO : 44 of 68

137665296.xls.ms_office

B.( Lead) Conveyance charges for machinery per kilometer for


transporting materials by tippers and trucks
FOR THE YEAR 2011-12

CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki /


Description of Work
LEAD UP TO 1 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 1 KM to 2 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 2 KM to 3 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 3 KM to 4 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 4 KM to 5 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM

LEAD CHARGES

Unit

Hr
Hr
Hr

Quantity

0.15
0.15
0.15

Rate

351.30
233.90
111.20

52.70
35.09
16.68
104.47
0.00
20.89

351.30
233.90
111.20

73.77
49.12
23.35
146.24
0.00
29.25

351.30
233.90
111.20

98.36
65.49
31.14
194.99
0.00
39.00

351.30
233.90
111.20

119.44
79.53
37.81
236.78
0.00
47.36

351.30
233.90
111.20

140.52
93.56
44.48
278.56
0.00
55.71

0%

Hr
Hr
Hr

0.21
0.21
0.21
0%

Hr
Hr
Hr

0.28
0.28
0.28
0%

Hr
Hr
Hr

0.34
0.34
0.34
0%

Hr
Hr
Hr

0.40
0.40
0.40
0%

Amount

45 of 68

137665296.xls.ms_office
Description of Work
LEAD UP TO 5 KM to 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD BEYOND 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM

Unit

Hr
Hr
Hr

Quantity

0.06
0.06
0.06

Rate

Amount

351.30
233.90
111.20

21.08
14.03
6.67
41.78
0.00
8.36

351.30
233.90
111.20

17.57
11.70
5.56
34.83
0.00
6.97

0%

Hr
Hr
Hr

0.05
0.05
0.05
0%

CATEGORY : Coarse aggregate / Rubble stone / Size stone / Cut stone

LEAD UP TO 1 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 1 KM to 2 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 2 KM to 3 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM

LEAD CHARGES

Hr
Hr
Hr

0.15
0.15
0.15

351.30
200.10
111.20

52.70
30.02
16.68
99.40
0.00
19.88

351.30
200.10
111.20

73.77
42.02
23.35
139.14
0.00
27.83

351.30
233.90
111.20

98.36
65.49
31.14
194.99
0.00
39.00

0%

Hr
Hr
Hr

0.21
0.21
0.21
0%

Hr
Hr
Hr

0.28
0.28
0.28
0%

46 of 68

137665296.xls.ms_office
Description of Work

Unit

LEAD UP TO 3 KM to 4 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 4 KM to 5 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 5 KM to 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD BEYOND 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM

Hr
Hr
Hr

Quantity

0.34
0.34
0.34

Rate

351.30
233.90
111.20

119.44
79.53
37.81
236.78
0.00
47.36

351.30
233.90
111.20

140.52
93.56
44.48
278.56
0.00
55.71

351.30
233.90
111.20

21.08
14.03
6.67
41.78
0.00
8.36

351.30
233.90
111.20

17.57
11.70
5.56
34.83
0.00
6.97

285.80
233.90
106.30

42.87
35.09
15.95
93.91
0.00
31.30

0%

Hr
Hr
Hr

0.40
0.40
0.40
0%

Hr
Hr
Hr

0.06
0.06
0.06
0%

Hr
Hr
Hr

0.05
0.05
0.05

Amount

0%

BRICKS
LEAD UP TO 1 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3000 Nos =
Contractor's profit and overhead charges
RATE PER 1000 Nos.

LEAD CHARGES

Hr
Hr
Hr

0.15
0.15
0.15
0%

47 of 68

137665296.xls.ms_office
Description of Work
LEAD UP TO 1 KM to 2 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3000 Nos =
Contractor's profit and overhead charges
RATE PER 1000 Nos.
LEAD UP TO 2 KM to 3 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3000 Nos =
Contractor's profit and overhead charges
RATE PER 1000 Nos.
LEAD UP TO 3 KM to 4 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3000 Nos =
Contractor's profit and overhead charges
RATE PER 1000 Nos.
LEAD UP TO 4 KM to 5 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3000 Nos =
Contractor's profit and overhead charges
RATE PER 1000 Nos.
LEAD UP TO 5 KM to 30 KM / every KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3000 Nos =
Contractor's profit and overhead charges
RATE PER 1000 Nos.

LEAD CHARGES

Unit

Hr
Hr
Hr

Quantity

0.21
0.21
0.21

Rate

285.80
233.90
106.30

60.02
49.12
22.32
131.46
0.00
43.82

285.80
233.90
106.30

80.02
65.49
29.76
175.27
0.00
58.42

285.80
233.90
106.30

97.17
79.53
36.14
212.84
0.00
70.95

285.80
233.90
106.30

114.32
93.56
42.52
250.40
0.00
83.47

285.80
233.90
106.30

17.15
14.03
6.38
37.56
0.00
12.52

0%

Hr
Hr
Hr

0.28
0.28
0.28
0%

Hr
Hr
Hr

0.34
0.34
0.34
0%

Hr
Hr
Hr

0.40
0.40
0.40
0%

Hr
Hr
Hr

0.06
0.06
0.06
0%

Amount

48 of 68

137665296.xls.ms_office
Description of Work
LEAD BEYOND 30 KM / every KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3000 Nos =
Contractor's profit and overhead charges
RATE PER 1000 Nos.

Unit

Hr
Hr
Hr

Quantity

0.05
0.05
0.05

Rate

285.80
233.90
106.30

0%

Amount

14.29
11.70
5.32
31.31
0.00
10.44

PCC slabs/ Shahabad slabs/ BS slabs/ CC & Laterite blocks/ Wood


LEAD UP TO 1 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3.4 CUM =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 1 KM to 2 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 3.4 CUM =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 2 KM to 3 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 3.4 CUM =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 3 KM to 4 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 3.4 CUM =
Contractor's profit and overhead charges
RATE PER 1 CUM

LEAD CHARGES

Hr
Hr
Hr

0.15
0.15
0.15

285.80
233.90
106.30

42.87
35.09
15.95
93.91
0.00
27.62

285.80
233.90
106.30

60.02
49.12
22.32
131.46
0.00
38.66

351.30
233.90
111.20

98.36
65.49
31.14
194.99
0.00
57.35

351.30
233.90
111.20

119.44
79.53
37.81
236.78
0.00
69.64

0%

Hr
Hr
Hr

0.21
0.21
0.21
0%

Hr
Hr
Hr

0.28
0.28
0.28
0%

Hr
Hr
Hr

0.34
0.34
0.34
0%

49 of 68

137665296.xls.ms_office
Description of Work
LEAD UP TO 4 KM to 5 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 3.4 CUM =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD UP TO 5 KM to 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 3.4 CUM =
Contractor's profit and overhead charges
RATE PER 1 CUM
LEAD BEYOND 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 3.4 CUM =
Contractor's profit and overhead charges
RATE PER 1 CUM

Unit

Hr
Hr
Hr

Quantity

0.4
0.4
0.4

Rate

Amount

351.30
233.90
111.20

140.52
93.56
44.48
278.56
0.00
81.93

351.30
233.90
111.20

21.08
14.03
6.67
41.78
0.00
12.29

351.30
233.90
111.20

17.57
11.70
5.56
34.83
0.00
10.24

0%

Hr
Hr
Hr

0.06
0.06
0.06
0%

Hr
Hr
Hr

0.05
0.05
0.05
0%

CATEGORY : Cement/ Steel/ Pipes/ RCC poles/ AC & GI sheets/ Packed materials
LEAD UP TO 1 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 8 MT =
Contractor's profit and overhead charges
RATE PER 1 TONNE
LEAD UP TO 1 KM to 2 KM
A) HIRE CHARGES
Truck 10 T Charges (Sl. 58; Pg. No 326)
Fuel Charges (Sl. 58; Pg. No 326)
Crew charges (Sl. 58; Pg. No 326)
Cost for 8 MT =
Contractor's profit and overhead charges
RATE PER 1 TONNE

LEAD CHARGES

Hr
Hr
Hr

0.15
0.15
0.15

285.80
233.90
106.30

42.87
35.09
15.95
93.91
0.00
11.74

285.80
233.90
106.30

60.02
49.12
22.32
131.46
0.00
16.43

0%

Hr
Hr
Hr

0.21
0.21
0.21
0%

50 of 68

137665296.xls.ms_office
Description of Work
LEAD UP TO 2 KM to 3 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)
Cost for 8 MT =
Contractor's profit and overhead charges
RATE PER 1 TONNE

Unit

Hr
Hr
Hr

Quantity

0.28
0.28
0.28

Rate

Amount

351.30
233.90
111.20

98.36
65.49
31.14
194.99
0.00
24.37

351.30
233.90
111.20

119.44
79.53
37.81
236.78
0.00
29.60

351.30
233.90
111.20

140.52
93.56
44.48
278.56
0.00
34.82

351.30
233.90
111.20

21.08
14.03
6.67
41.78
0.00
5.22

351.30
233.90
111.20

17.57
11.70
5.56
34.83
0.00
4.35

0%

LEAD UP TO 3 KM to 4 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)

Hr
Hr
Hr

Cost for 8 MT =
Contractor's profit and overhead charges

0.34
0.34
0.34
0%

RATE PER 1 TONNE


LEAD UP TO 4 KM to 5 KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)

Hr
Hr
Hr

Cost for 8 MT =
Contractor's profit and overhead charges

0.4
0.4
0.4
0%

RATE PER 1 TONNE


LEAD UP TO 5 KM to 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)

Hr
Hr
Hr

Cost for 8 MT =
Contractor's profit and overhead charges

0.06
0.06
0.06
0%

RATE PER 1 TONNE


LEAD BEYOND 30 KM / every KM
A) HIRE CHARGES
Tipper charges (Sl. 54; Pg. No 326)
Fuel Charges (Sl. 54; Pg. No 326)
Crew charges (Sl. 54; Pg. No 326)

Hr
Hr
Hr

Cost for 8 MT =
Contractor's profit and overhead charges
RATE PER 1 TONNE

LEAD CHARGES

0.05
0.05
0.05
0%

51 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

WATER
LEAD UP TO 1 KM
A) HIRE CHARGES
Water Tanker charges (Sl. 64; Pg. No 326)
Fuel Charges (Sl. 64; Pg. No 326)
Crew charges (Sl. 64; Pg. No 326)
Cost for 8000 Litres =
Contractor's profit and overhead charges
RATE PER 1000 Lts.
LEAD UP TO 1 KM to 2 KM
A) HIRE CHARGES
Water Tanker charges (Sl. 64; Pg. No 326)
Fuel Charges (Sl. 64; Pg. No 326)
Crew charges (Sl. 64; Pg. No 326)
Cost for 8000 Litres =
Contractor's profit and overhead charges
RATE PER 1000 Lts.
LEAD UP TO 2 KM to 3 KM
A) HIRE CHARGES
Water Tanker charges (Sl. 64; Pg. No 326)
Fuel Charges (Sl. 64; Pg. No 326)
Crew charges (Sl. 64; Pg. No 326)
Cost for 8000 Litres =
Contractor's profit and overhead charges
RATE PER 1000 Lts.
LEAD UP TO 3 KM to 4 KM
A) HIRE CHARGES
Water Tanker charges (Sl. 64; Pg. No 326)
Fuel Charges (Sl. 64; Pg. No 326)
Crew charges (Sl. 64; Pg. No 326)
Cost for 8000 Litres =
Contractor's profit and overhead charges
RATE PER 1000 Lts.
LEAD UP TO 4 KM to 5 KM
A) HIRE CHARGES
Water Tanker charges (Sl. 64; Pg. No 326)
Fuel Charges (Sl. 64; Pg. No 326)
Crew charges (Sl. 64; Pg. No 326)
Cost for 8000 Litres =
Contractor's profit and overhead charges
RATE PER 1000 Lts.

LEAD CHARGES

Hr
Hr
Hr

0.15
0.15
0.15

285.80
233.90
106.30

42.87
35.09
15.95
93.91
0.00
11.74

285.80
233.90
106.30

60.02
49.12
22.32
131.46
0.00
16.43

285.80
233.90
106.30

80.02
65.49
29.76
175.27
0.00
21.91

285.80
233.90
106.30

97.17
79.53
36.14
212.84
0.00
26.61

285.80
233.90
106.30

114.32
93.56
42.52
250.40
0.00
31.30

0%

Hr
Hr
Hr

0.21
0.21
0.21
0%

Hr
Hr
Hr

0.28
0.28
0.28
0%

Hr
Hr
Hr

0.34
0.34
0.34
0%

Hr
Hr
Hr

0.40
0.40
0.40
0%

52 of 68

137665296.xls.ms_office
Description of Work
LEAD UP TO 5 KM to 30 KM / every KM
A) HIRE CHARGES
Water Tanker charges (Sl. 64; Pg. No 326)
Fuel Charges (Sl. 64; Pg. No 326)
Crew charges (Sl. 64; Pg. No 326)
Cost for 8000 Litres =
Contractor's profit and overhead charges
RATE PER 1000 Lts.
LEAD BEYOND 30 KM / every KM
A) HIRE CHARGES
Water Tanker charges (Sl. 64; Pg. No 326)
Fuel Charges (Sl. 64; Pg. No 326)
Crew charges (Sl. 64; Pg. No 326)
Cost for 8000 Litres =
Contractor's profit and overhead charges
RATE PER 1000 Lts.

LEAD CHARGES

Unit

Hr
Hr
Hr

Quantity

0.06
0.06
0.06

Rate

285.80
233.90
106.30

17.15
14.03
6.38
37.56
0.00
4.70

285.80
233.90
106.30

14.29
11.70
5.32
31.31
0.00
3.91

0%

Hr
Hr
Hr

0.05
0.05
0.05
0%

Amount

53 of 68

LABOUR CHARGES FOR THE YEAR 2011-12


25%
Agency
Sl.
Initial cost
Total
Description
Allowance @
No.
Rate per day
Rate per day
25%
1 Mason 1st Class
356.25
89.06
445.31
2 Mason 2nd Class
325.00
81.25
406.25
3 Brick layer 1st Class
0.00
0.00
0.00
4 Brick layer 2nd Class
0.00
0.00
0.00
5 Painter Class-I
0.00
0.00
0.00
6 Painter Class-II
0.00
0.00
0.00
7 Black smith / Bar bender
260.00
65.00
325.00
8

10

Light Mazdoor / Heavy Mazdoor


Labour charges for fabricating
steel works like Window Grills,
Compound Wall Grills, Iron
doors, windows including cost of
welding rods, power chargges,
excluding cost of fixing position Rs.12/-Kg.
Labour charges for fixing Iron
doors, Iron windows and
Window Grills in position - Rs.3/Kg

268.75

67.19

335.94

0.00

0.00

0.00

0.00

0.00

0.00

HIRE CHARGES OF MACHINERY FOR THE YEAR 2011-12


Sl.
No.

Description of machinery

Unit

Hire charges
in Rs.

Fuel charge Crew charges


Total in Rs.
in Rs.
in Rs.

Hour

44.80

61.90

141.70

248.40

Hour

77.00

123.80

141.70

342.50

Hour
Hour

6.00
1180.70

12.40
680.60

102.00
148.20

120.40
2009.50

3
4

Concrete Mixer 300 / 200


(Diesel)
Concrete Mixer 600 / 400
(Diesel)
Needle vibrator 40mm (Petrol)
Shovel 0.85 cum 110hp

Tipper 5cum / Tipper 10 tonnes

Hour

351.30

233.90

111.20

696.40

Truck 10 tonnes

Hour

285.80

233.90

106.30

626.00

1
2

NOTE :- Refer Page No.325 to 326 of SOR for buildings for the year 2011-12
SEIGNIORAGE CHARGES
NOTE :- The seigniorage charges as fixed by the Government in G.O.Ms.No.198 Industries and Commerce (M1) Department dated 13.08.2009, shall be follows :

Sl.
Name of the Minor Mineral
No.
1
2
3
4
5
6
a
b
7

Building stone
Rough stone / boulders
Road metal and ballast
Morrum / Gravel and ordinary
earth
Ordinary Sand
Polished stone slabs
Colour
Black
Bricks

cum
cum
cum

Rates of
Seigniorage
fee (In
Rupees)
50.00
50.00
50.00

cum

22.00

cum

40.00

sqm
sqm
1000 Nos

0.00
0.00
0.00

Unit

RATES OF THE MATERIALS AS PER SOR OF BUILDINGS FOR THE YEAR 2011-12
Sl. No.

Description of Material

1
2

Coarse Sand for mortor


Coarse Sand for filling

Fine sand

Morrum / Gravel

5
6
7

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

RR Stone (Granite, Dolamite


&Trap variety)
Coursed rubble stone
(30x30x45cm)
Bond sotne (25x25x45 to 60
cm)
6mm M/c HBG Metal
Nominal size (Granite,
Dolamite &Trap variety)
10mm M/c HBG Metal
Nominal size -do12-14mm M/c HBG Metal
Nominal size -do20mm M/c HBG Metal
Nominal size -do40mm M/c HBG Metal
Nominal size -do2nd Class Bricks of size
23x11x7cm
Fly Ash Bricks of size 290 x
225 x 140mm
Fly Ash Bricks of size 290 x
112/100 x 140mm

Polished Bethamchela
coloured stone
Shahabad/Tandur/Rough
stone slabs minimum 40mm
thick
Cemet primer water base
Grade-I
Cemet primer water base
Grade-II
Red oxide primer Grade-I
Surya cem
Oil bound washable
distemper acrylic based
Snow cem or equalent
Plastic emulsion paint
standard make
Synthetic enamal paint
Grade-I all shades
Putty for wood work
Wood Primer
Binding wire
Water proofing compound
White cement
Cement Jalli 50mm thick
Alluminium sheet 24 guage
60-63mm metal IRC and
morth HBG metal
40-45mm metal IRC and
morth HBG metal

Index code / Page


No.
M-005 / 243
M-004 / 243
M-006 / 28/
243/233
M-007/56 /
243/234

Unit

Initial Cost

Remarks

Cum
Cum

279.50
204.50

Cum

279.50

Cum

52.50

M148 / 248

Cum

0.00

13/233

Cum

0.00

Cost include seigniorage charges


(Rs.13/-each)

76/235

Cum

0.00

Cost include seigniorage charges


and loading charges (Rs.27/-each)

M050 / 244

Cum

419.30

Cost include seigniorage charges,


blasting charges, machine
crushing charges

M051 / 245

Cum

551.30

-do-

M052 / 245

Cum

681.30

-do-

M053 / 245

Cum

835.30

-do-

M055/245

Cum

491.30

-do-

BMT A01/ 10

1000
Nos.

0.00

BMT A10 / 10

Each

0.00

-do-

BMT A13 / 10

Each

0.00

-do-

BMT B08 / 11

10 Sqm

0.00

-do-

BMT B.04 / 11

10 Sqm

0.00

-do-

BMT J.01 / 23

Lit.

0.00

--

BMT J.02 / 23

Lit.

0.00

BMT J.03 / 23
BMT J.27/ 24

Lit.
Kg

0.00
0.00

---

BMT J.21 / 26

Kg

0.00

--

BMT J.24/24

Kg

0.00

--

BMT J.22 / 24

Lit.

0.00

--

BMT J.30 / 24

Lit.

0.00

--

BMT J.07 / 24
BMT J.05/24
03 / 233
80/235
BMSW.68/74
BMS-W.17/70
BMS-W.18/70

Kg
Lit.
Kg
Kg
Kg
1Sqm
1Sqm

0.00
0.00
0.00
0.00
0.00
0.00
0.00

--

Cum

351.30

--

Cum

491.30

--

Cost include seigniorage charges


-do-doCost include seigniorage charges
and loading charges
--

Cost excluding loading &


unloading charges

------

35
36
37
38
39
40
41
42
43
44
45
46
47
48

25-27mm metal IRC and


morth HBG metal
19-22mm metal IRC and
morth HBG metal
12.-14mm metal IRC and
morth HBG metal
9.50-11.20mm metal IRC
and morth HBG metal
5-7mm metal IRC and morth
HBG metal
2.36-5mm metal IRC and
morth HBG metal
2.36mm & below size (HBG
stone chips ) metal IRC and
morth HBG metal
65mm IRC and morth OTG
40mm IRC and morth OTG
Field picked metal
unbrocken of 25mm size
HYSD Steel (FE415)
Cement
Bitumen 80/100
RCC Hume Pipes 900mm
dia

Cum

821.30

--

Cum

941.30

--

Cum

681.30

--

Cum

551.30

--

Cum

421.30

--

Cum

251.30

--

Cum

227.30

--

Cum
Cum

113.30
137.30

---

Cum

37.60

--

MT
MT
MT

41000.00
5500.00
0.00

----

RMT

5250.60

--

137665296.xls.ms_office

C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (idle


hire charges of trucks are not added)
THE YEAR 2011-12

Description of Work

Unit

Quantity

Rate

Amount

0%

Contractor's profit and overhead charges =

CATEGORY : Coarse aggregate / Rubble stone / Size stone / Cut stone by manual
means
Unit = cum
Taking output = 5.5 cum
a) Loading ( initial lead upto 30m)
Labour
Head Mazdoor

Day

0.02

268.75

5.38

Mazdoor

Day

0.5

268.75

134.38

Cost for 5.5 cum =

139.76

Contractor's profit and overhead charges

0.00

0%

RATE PER 1 CUM

25.41

b) Un-Loading (50% of the loading charges)


Labour
Head Mazdoor

Day

0.01

268.75

2.69

Mazdoor

Day

0.25

268.75

67.19

Cost for 5.5 cum =

69.88

Contractor's profit and overhead charges

0.00

0%

RATE PER 1 CUM

12.71

CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki by manual means


Unit = cum

Taking output = 5.5 cum


a) Loading ( initial lead upto 30m)
Labour
Head Mazdoor

Day

0.01

268.75

2.69

Mazdoor

Day

0.25

268.75

67.19

Cost for 5.5 cum =

69.88

Contractor's profit and overhead charges

0.00

0%

RATE PER 1 CUM

12.71

b) Un-Loading (50% of the loading charges)


Labour
Head Mazdoor

Day

0.005

268.75

1.34

Mazdoor

Day

0.125

268.75

33.59

Cost for 5.5 cum =


Contractor's profit and overhead charges
RATE PER 1 CUM

34.93
0%

0.00
6.35

LOAD & UNLOAD

57 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

CATEGORY : Bricks by manual means


Taking output = 2000 Nos
a) Loading ( initial lead upto 30m)

Unit = 1000 Nos.

Labour
Head Mazdoor

Day

0.01

268.75

2.69

Mazdoor

Day

0.25

268.75

67.19

Cost for 2000 Nos. =

69.88

Contractor's profit and overhead charges

0.00

0%

RATE PER 1000 NO'S

34.94

b) Un-Loading + Stacking (100% of the loading charges)


Labour
Head Mazdoor

Day

0.01

268.75

2.69

Mazdoor

Day

0.25

268.75

67.19

Cost for 2000 Nos. =

69.88

Contractor's profit and overhead charges

0.00

0%

RATE PER 1000 NO'S

34.94
CATEGORY : Cement by manual means

Taking output = 10 Tonnes


a) Loading ( initial lead upto 30m)

Unit = 1 Tonne

Labour
Head Mazdoor

Day

0.06

268.75

16.13

Mazdoor

Day

1.5

268.75

403.13

Cost for 10 Tonnes =

419.26

Contractor's profit and overhead charges

0.00

0%

RATE PER 1 TONNE

41.93

b) Un-Loading + Stacking (100% of the loading charges)


Labour
Head Mazdoor

Day

0.06

268.75

16.13

Mazdoor

Day

1.5

268.75

403.13

Cost for 10 Tonnes =


Contractor's profit and overhead charges
RATE PER 1 TONNE

419.26
0%

0.00
41.93

LOAD & UNLOAD

58 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

CATEGORY : Structural Steel, Steel Bars by manual means


Taking output = 10 Tonnes
a) Loading ( initial lead upto 30m)

Unit = 1 Tonne

Labour
Head Mazdoor

Day

0.07

268.75

18.81

Mazdoor

Day

1.8

268.75

483.75

Cost for 10 Tonnes =

502.56

Contractor's profit and overhead charges

0.00

0%

RATE PER 1 TONNE

50.26

b) Un-Loading + Stacking (100% of the loading charges)


Labour
Head Mazdoor

Day

0.07

268.75

18.81

Mazdoor

Day

1.8

268.75

483.75

Cost for 10 Tonnes =


Contractor's profit and overhead charges
RATE PER 1 TONNE

502.56
0%

0.00
50.26

LOAD & UNLOAD

59 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS


(including idle hire charges of trucks )

CATEGORY : Coarse aggregate / Rubble stone / Size stone / Cut stone by manual
means
Unit = cum
Taking output = 5.5 cum
a) Loading ( initial lead upto 30m)
a) Labour
Head Mazdoor

Day

0.02

268.75

5.38

Mazdoor

Day

0.5

268.75

134.38

Hr

0.5

626.00

313.00
452.76

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 5.5 cum =
Contractor's profit and overhead charges

0.00

0%

RATE PER 1 CUM

82.32

b) Un-Loading (50% of the loading charges)


a) Labour
Head Mazdoor

Day

0.01

268.75

2.69

Mazdoor

Day

0.25

268.75

67.19

Hr

0.25

626.00

156.50
226.38

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 5.5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM

0%

0.00
41.16

LOAD & UNLOAD

60 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki by manual means


Unit = cum

Taking output = 5.5 cum


a) Loading ( initial lead upto 30m)
a) Labour
Head Mazdoor

Day

0.01

268.75

2.69

Mazdoor

Day

0.25

268.75

67.19

Hr

0.5

626.00

313.00
382.88

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 5.5 cum =
Contractor's profit and overhead charges

0.00

0%

RATE PER 1 CUM

69.61

b) Un-Loading (50% of the loading charges)


a) Labour
Mate

Day

0.005

260.00

1.30

Mazdoor

Day

0.125

268.75

33.59

Hr

0.166

626.00

103.92
138.81

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 5.5 cum =
Contractor's profit and overhead charges
RATE PER 1 CUM

0%

0.00
25.24

LOAD & UNLOAD

61 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

CATEGORY : Bricks by manual means


Taking output = 2000 Nos
a) Loading ( initial lead upto 30m)

Unit = 1000 Nos.

a) Labour
Mate

Day

0.01

260.00

2.60

Mazdoor

Day

0.25

268.75

67.19

Hr

0.33

626.00

206.58
276.37

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 2000 Nos. =
Contractor's profit and overhead charges

0.00

0%

RATE PER 1000 NO'S

138.19

b) Un-Loading + Stacking (100% of the loading charges)


a) Labour
Mate

Day

0.01

260.00

2.60

Mazdoor

Day

0.25

268.75

67.19

Hr

0.33

626.00

206.58
276.37

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 2000 Nos. =
Contractor's profit and overhead charges
RATE PER 1000 NO'S

0%

0.00
138.19

LOAD & UNLOAD

62 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

CATEGORY : Cement by manual means


Unit = 1 Tonne

Taking output = 10 Tonnes


a) Loading ( initial lead upto 30m)
a) Labour
Mate

Day

0.06

260.00

15.60

Mazdoor

Day

1.5

268.75

403.13

Hr

626.00

626.00
1044.73

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 10 Tonnes =
Contractor's profit and overhead charges

0.00

0%

RATE PER 1 TONNE

104.47

b) Un-Loading + Stacking (100% of the loading charges)


a) Labour
Mate

Day

0.06

260.00

15.60

Mazdoor

Day

1.5

268.75

403.13

Hr

626.00

626.00
1044.73

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 10 Tonnes =
Contractor's profit and overhead charges
RATE PER 1 TONNE

0%

0.00
104.47

LOAD & UNLOAD

63 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

CATEGORY : Structural Steel, Steel Bars by manual means


Unit = 1 Tonne

Taking output = 10 Tonnes


a) Loading ( initial lead upto 30m)
a) Labour
Mate

Day

0.07

260.00

18.20

Mazdoor

Day

1.8

268.75

483.75

Hr

626.00

626.00
1127.95

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 10 Tonnes =
Contractor's profit and overhead charges

0.00

0%

RATE PER 1 TONNE

112.80

b) Un-Loading + Stacking (100% of the loading charges)


a) Labour
Mate

Day

0.07

260.00

18.20

Mazdoor

Day

1.8

268.75

483.75

Hr

626.00

626.00
1127.95

b) Machinery
Truck 10 T Charges (Sl. 58; Pg. No 326)
Cost for 10 Tonnes =
Contractor's profit and overhead charges
RATE PER 1 TONNE

0%

0.00
112.80

LOAD & UNLOAD

64 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

E. LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS


(including idle hire charges of trucks)
CATEGORY : Coarse aggregate / Rubble stone / Size stone / Cut stone by manual
means
Unit = cum
Taking output = 5.5 cum
a) Loading ( initial lead upto 30m)
Time required for
i) Positioning of tipper at loading point

Min

1.00

ii) Loading by front end loader 1 cum bucket capacity

Min

7.33

Min

Min

2.00

Min

10.33

@ 45 / 25 cum per hour


iii) Manoevouring, reversing, dumping and turning
for return
iv) Waiting time, unforeseen contingencies, etc.
Total
a) Machinery
Truck 5 Cum (Sl. 54; Pg. No 326)
Front end-loader 1 cum bucket capacity @ 45 cum
(Sl. 52; Pg. No 326)
Cost for 5.5 cum =

Hr
Hr

0.1722
0.1222

696.40
2009.50

119.92
245.56
365.48

b) Contractor's profit and overhead charges

0.00

0%

RATE PER 1 CUM

66.45

b) Un-Loading
Time required for
i) Positioning of tipper at loading point

Min

1.00

ii) Loading by front end loader 1 cum bucket capacity

Min

2.00

Min

Min

2.00

Min

5.00

@ 45 / 25 cum per hour


iii) Manoevouring, reversing, dumping and turning
for return
iv) Waiting time, unforeseen contingencies, etc.
Total
a) Machinery
Truck 5 Cum (Sl. 54; Pg. No 326)
Cost for 5.5 cum =
b) Contractor's profit and overhead charges
RATE PER 1 CUM

Hr

0.0833
0%

696.40

58.01
58.01
0.00
10.55

LOAD & UNLOAD

65 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki by manual means


Unit = cum

Taking output = 5.5 cum


a) Loading ( initial lead upto 30m)
Time required for
i) Positioning of tipper at loading point

Min

1.00

ii) Loading by front end loader 1 cum bucket capacity

Min

3.30

Min

Min

2.00

Min

6.30

@ 45 / 25 cum per hour


iii) Manoevouring, reversing, dumping and turning
for return
iv) Waiting time, unforeseen contingencies, etc.
Total
a) Machinery
Truck 5 Cum (Sl. 54; Pg. No 326)
Front end-loader 1 cum bucket capacity @ 45 cum
(Sl. 52; Pg. No 326)
Cost for 5.5 cum =

Hr
Hr

0.105
0.055

696.40
2009.50

73.12
110.52
183.64

b) Contractor's profit and overhead charges

0.00

0%

RATE PER 1 CUM

33.39

b) Un-Loading
Time required for
i) Positioning of tipper at loading point

Min

1.00

ii) Loading by front end loader 1 cum bucket capacity

Min

2.00

Min

Min

2.00

Min

5.00

@ 45 / 25 cum per hour


iii) Manoevouring, reversing, dumping and turning
for return
iv) Waiting time, unforeseen contingencies, etc.
Total
a) Machinery
Truck 5 Cum (Sl. 54; Pg. No 326)
Cost for 5.5 cum =
b) Contractor's profit and overhead charges
RATE PER 1 CUM

Hr

0.0833
0%

696.40

58.01
58.01
0.00
10.55

LOAD & UNLOAD

66 of 68

137665296.xls.ms_office
Description of Work

Unit

Quantity

Rate

Amount

F. LIFT CHARGES FOR MATERIALS BY HEAD LOAD

CATEGORY : Earth / Sand / Gravel / Murrum / Lime / Surki/ Coarse aggregate / Rubble
stone / Size stone / Cut stone
Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT
For additional lift of 1m beyond initial lift of 3 m
one meter lift is taken equivalent to 6 meters lead
average speed of conveyance by head load

60 m/minute

Round trip cycle time for 1.00 m considering 50 min/ hr working


1 x6x 60 / 50 / 60 )

0.12 min

No. of trips per day for lift 1.0 m above 3 m ( 8 x 60 / 0.12)

4000

Quantity of material by head load

0.015 cum

Quantity of material by head load per day ( 4000x 0.015 )

60 cum

Deploy 1 mazdoor for every additional lift of 1.0 m beyond initial lift.
Lift : Upto 3.00 m for materials under this Category

Mazdoor

Unit:

Day

60 cum

268.75

Total Rs: for 60 cum =


b) Contractor's profit and overhead charges

268.75
268.75
0.00

0%

RATE PER 1 CUM

4.48

CATEGORY : Cement bag / Reinforcement steel / Structural steel sections


Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT
For additional lift of 1m beyond initial lift of 3 m
one meter lift is taken equivalent to 6 meters lead
average speed of conveyance by head load

25 m/minute

Round trip cycle time for 1.00 m considering 50 min/ hr working


1 x6x 60 / 50 / 25 )

0.29 min

No. of trips per day foradditional lift 1.0 m above 3 m ( 8 x 60 / 0.29)

1655

Quantity of material by head load

50 kgs

Quantity of material by head load per day ( 1655x50x 0.015 )

83 tons

Deploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoor
Lift : Upto 3.00 m for materials under this Category

Mazdoor

Unit:

Day
Total Rs: for 83 Tonnes =
LOAD & UNLOAD

83 Tonnes

268.75

268.75
268.75
67 of 68

137665296.xls.ms_office
Description of Work

Unit

b) Contractor's profit and overhead charges

Quantity

Rate

Amount
0.00

0%

RATE PER 1 TONNE

3.24

CATEGORY : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab /
Wood
Lift : ADDITIONAL LIFT CHARGES FOR each 1 METER LIFT BEYOND 3 M INITIAL LIFT
For additional lift of 1m beyond initial lift of 3 m
one meter lift is taken equivalent to 6 meters lead
average speed of conveyance by head load

40 m/minute

Round trip cycle time for 1.00 m considering 50 min/ hr working


1 x6x 60 / 50 / 40 )

0.18 min

No. of trips per day for lift 1.0 m ( 8 x 60 / 0.18 )

2667

Quantity of material by head load

0.017 cum

Quantity of material by head load per day ( 1667x 0.018 )

45 cum

Deploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.or2/3 mazdoor
Lift : Upto 3.00 m for materials under this Category

Mazdoor

Unit:

Day

Total Rs: for 83 Tonnes =


b) Contractor's profit and overhead charges
RATE PER 1 CUM

0%

45 Cum

268.75

268.75
268.75
0.00
5.97

LOAD & UNLOAD

68 of 68